March 10, Board of County Commissioners C/O Sean Hanagan Eagle County Community Development PO Box 850 Eagle, CO 81631

Size: px
Start display at page:

Download "March 10, 2015. Board of County Commissioners C/O Sean Hanagan Eagle County Community Development PO Box 850 Eagle, CO 81631"

Transcription

1 March 10, 2015 Board of County Commissioners C/O Sean Hanagan Eagle County Community Development PO Box 850 Eagle, CO Dear Board of County Commissioners: Thank you for your time and consideration in the review of the Hagedorn PUD for Edwards Mini-Storage. The BOCC requested some additional information about the need for storage facilities beyond the anecdotal information we presented and we have provided some additional information about current storage facility needs in the area. We have also reacted to some of the other questions we were asked. In addition to the information we have provided in this letter, we would like to give a brief overview of the information during the hearing on March 17, before public input begins. Fire District Review of the Driveway Design We have continued to work with the Eagle River Fire Protection District and the Eagle County Engineering Department to verify that the driveway design is acceptable and safe. The site plan was revised to allow for additional parking on the property and address fire district access. The drive aisle between the buildings was widened to allow adequate space for maneuvering and provide additional parking. On March 2, 2015, our engineer provided a stamped site plan that included an auto-turn analysis for the Fire District s ladder truck and indicating additional parking spaces (attached). Both the Engineering Department and the Eagle River Fire Protection District have indicated their acceptance of the design. Parking Modifications The total number of parking spaces has been increased from 6 to 12 spaces. Based on the experience of our operator, the number of parking spaces provided is more than adequate for the facility. The Traffic Impact Study indicates a range of 6 to 13 cars (worst case) arriving at the site in the peak hour. Status of the Edwards Area Community Plan Based on our understanding, Planning Staff will be putting together an overview of the current status of the Edwards Area Community Plan update. As potential land and business owners in Edwards, the Hagedorns are looking forward to participating in the process of updating the Edwards Area Community Plan and are excited to see its adoption. There have PO Box of 4 Eagle, Colorado

2 been significant changes in the development trends and character of the west Edwards Area since the 2003 plan was adopted with PUD approvals and commercial use, churches, and schools being developed in the area. Given that Highway 6 is a major arterial roadway with high volumes of traffic and transit overall, one would expect the character of the development fronting such a highway to be more intensely and commercially developed. Conditions Incorporated into Project To-Date A question was asked regarding which of the conditions of approval from the staff memorandum have already been addressed and incorporated into the PUD Guide prior to the BOCC hearing. The following list identifies the conditions and how each has been addressed: 1. The Applicant shall be responsible for construction and maintenance of an 8-ft wide recreation path across the frontage of their parcel. Timing for construction of this path shall be triggered by construction of a path on adjacent parcels to the east or west. The Applicant shall provide collateral in the form of a letter of credit in the amount of the estimated cost of construction to be held by Eagle County. Applicant Response: the location of the 8 ft. wide asphalt path is shown on the plan and referenced in the PUD Guide. 2. Prior to issuance of any building permit the applicant shall have a fully executed Access Permit issued by CDOT for the proposed access. Applicant Response: we have been working with CDOT and understand this requirement for a fully executed Access Permit. 3. To help delineate and maintain the identified wildlife corridor located on the southern and western portion of the PUD the applicant will plant native landscaping to prevent the human activities from negatively impacting wildlife. Applicant Response: we have included this requirement in the PUD Guide and therefore this condition could be eliminated. 4. The Applicant shall incorporate all Best Management Practices outlined in Perry Will s CPW letter. Applicant Response: we have listed the recommendations of Colorado Parks and Wildlife in the PUD Guide to make the project as wildlife-friendly as possible. This condition could be eliminated. 2 of 4

3 Market Trends for Mini-Storage in Eagle County Self-storage in the upper Eagle valley (Edwards, Avon, Eagle-Vail, Minturn, and Vail) is an underserved market with a constrained supply. The existing storage supply available to consumers in the area consists of five (5) smaller, older facilities concentrated around Avon and Eagle-Vail. No storage facilities exist in Edwards. In the self-storage industry, the standard measure of whether an area has a sufficient supply of storage is the existing number of square feet of self-storage per capita. An area is considered adequately served if it has approximately 7.5 square feet of existing self-storage per capita (the national average). An area with less than this amount of self-storage is considered to have a constrained supply for the population base. Residents may not be able to find an appropriately sized storage unit and prices will likely be high. The upper Eagle valley currently has approximately 4.4 square feet of self-storage per capita, well below what is considered to be a well-served area. Even with the proposed project, that number would be approximately 6.3 square feet per capita, still below the national average. And well below the average for Colorado of approximately 14.6 square feet per capita. These numbers are also conservative, since they are based off of 2010 census data indicating a lower population density. Given the constrained supply of self-storage in the upper Eagle valley, it is no surprise that prices in this area tend to be high. The standard measure of how expensive self-storage is, is the average amount of revenue a facility achieves per square foot of space per year. Based on this metric, storage in the upper Eagle valley is estimated to be about 90% more expensive than similar storage options in Eagle and Gypsum, and about 50% more expensive than storage in the Denver metro area. Our discussions with CubeSmart, a publicly traded national self-storage company, have confirmed that the upper Eagle valley is constrained in its self-storage supply. CubeSmart operates the storage facility located at 850 Nottingham Road in Avon for a Colorado-based owner. They confirmed that this facility has averaged an occupancy level of 92% over the last three-years, which is considered full occupancy. Anything near this level is thought of as completely full occupancy, since achieving a 100% occupancy level is realistically impossible. And as a reference for the price of storage in this area, CubeSmart also confirmed that this specific facility is commanding rental rates near what their properties in Brooklyn, NY are achieving. Residents of Eagle County are an active population with plenty of toys and gear. We believe that there is a demonstrated need for self-storage in Edwards, and that the project would be a benefit to residents of Eagle County. The attached exhibits provide an overview of the data we analyzed in arriving at these conclusions and their sources. The slides include the following: 3 of 4

4 Map showing distance of proposed Edwards facility to existing facilities in the upper Eagle valley; Map showing travel time to from Edwards to existing facilities in the upper Eagle valley; Graph of Self-Storage Supply in the upper Eagle valley in square feet per capita; Graph of Self-Storage Cost in the upper Eagle valley in dollars per square foot per year; and Existing Self-Storage Facilities - Size and Price per Square Foot. Where possible, data was sourced from publicly available sources and nationally recognized institutions. Statistics on the amount of self-storage space per capita was taken from The Self Storage Almanac, THK & Associates quarterly markets reports, market intelligence reports from CubeSmart, and 2010 US Census data. Pricing data was taken from existing facilities published rates, the Colorado Self Storage Association, and independent research. Occupancy estimates were provided by CubeSmart, as well as independent market research on existing facilities. These exhibits document the conclusions stated herein. We will provide an overview of this information at the March 17 hearing. Thank you for time and consideration of this matter. Sincerely, Dominic Mauriello, AICP Principal 4 of 4

5 Existing Self-Storage Facilities in the Upper Eagle Valley Distance from Edwards Mini Storage PUD Edwards Mini Storage PUD 4.8 miles Avon Mini Storage AAA Self Storage 4.8 miles Mountain Center Self Storage CubeSmart Avon 8.8 miles Vail Self Storage Source: Google Maps, Google Map Maker

6 Existing Self-Storage Facilities in the Upper Eagle Valley Drive time from Edwards Mini Storage PUD Edwards Mini Storage PUD 18 minutes Avon Mini Storage AAA Self Storage 11 minutes Mountain Center Self Storage CubeSmart Avon 16 minutes Vail Self Storage Source: Google Maps, Google Map Maker

7 Self-Storage Supply in the Upper Eagle Valley (Edwards, Avon, Eagle-Vail, Minturn & Vail) Square feet of self storage per capita Upper Eagle Valley CO Average National Average Upper Eagle Valley w/ Proposed Project Source: 2010 Census, THK & Associates, The Self-Storage Almanac, CubeSmart, Market Research

8 $30 Self-Storage Cost in the Upper Eagle Valley (Edwards, Avon, Eagle-Vail, Minturn & Vail) Average $ per sq. ft. per year $25 $20 $15 $10 $24.80 $16.20 $13.20 $17.00 $5 $0 Upper Eagle Valley Denver Metro Area Eagle / Gypsum Source: The Colorado Self Storage Association, CubeSmart, Edwards Self Storage PUD Pro Forma, Market Research Edwards PUD Anticipated

9 Existing Self-Storage Facilities in the Upper Eagle Valley Detailed list Name Address Town Size (sq. 4.) Avg. Rate ($/sf/yr) Mountain Center Self Storage 910 No4ngham Rd Avon 19,700 $27 CubeSmart Avon 850 No4ngham Rd Avon 28,500 $28 AAA Self Storage 371 Metcalf Rd Avon 30,000 $18 Avon Mini Storage 431 Metcald Rd Avon 16,000 $23 Vail Self Storage Highway 6 Eagle- Vail 19,500 $28 Source: CubeSmart, Published rates, MPG (calls to facilities), Independent market research

10

COUNTY OF ELBERT. 18 September, 2014 For the Planning Commission meeting of 25 September, 2014 ELBERT COUNTY PLANNING COMMISSION

COUNTY OF ELBERT. 18 September, 2014 For the Planning Commission meeting of 25 September, 2014 ELBERT COUNTY PLANNING COMMISSION COMMUNITY & DEVELOPMENT SERVICES OFFICE P.O. BOX 7 215 COMANCHE STREET KIOWA, COLORADO 80117 303-621-3136 FAX: 303-621-3165 COUNTY OF ELBERT 18 September, 2014 For the Planning Commission meeting of 25

More information

Investor Presentation. Date September 2014

Investor Presentation. Date September 2014 Investor Presentation Date September 2014 The forward-looking statements contained in this presentation are subject to various risks and uncertainties. Although the Company believes the expectations reflected

More information

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise: 14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation

More information

For more information, visit: rethinkingstreets.com

For more information, visit: rethinkingstreets.com For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,

More information

Land Size: Land Splits: Adjacent Parcel: Modified: Land Size: Land Splits: Adjacent Parcel: Modified:

Land Size: Land Splits: Adjacent Parcel: Modified: Land Size: Land Splits: Adjacent Parcel: Modified: v 13, 2012 on NECPE LISTING ID: 28291779 WITHIN MILFORD'S OVAL DISTRICT - 118 NASHUA RD Milford, NH 03055 $995,000 Per Acre $995,000 Per Acre 1.05 Acres 10/16/2012 COMMERCIAL THIS SITE IS STRATEGICALLY

More information

Churches and Schools Development Standards

Churches and Schools Development Standards Uses Code Provisions Site Development Standards RS-4 Sec.24-44 RD Sec. 24-45 RM-23 Sec. 24-48 Residential Single Family Residential Two- Family (Duplex) Residential Mid- Rise Multifamily (High Density)

More information

Texas Case Studies in Access Management. Ed Hard, TTI

Texas Case Studies in Access Management. Ed Hard, TTI Texas Case Studies in Access Management Ed Hard, TTI 8 th National Conference on Access Management August 15, 2006 Presentation Overview TxDOT Arterial Widenings, College Station, TX Processes for Median

More information

Chapter 7 ZONING PLAN

Chapter 7 ZONING PLAN Chapter 7 ZONING PLAN Introduction This Chapter opens with a general description of a zoning plan. It is followed by a brief explanation of the relationship between this Growth Management Plan and the

More information

PLANNING DIVISION STAFF REPORT February 23, 2015. Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

PLANNING DIVISION STAFF REPORT February 23, 2015. Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810 PLANNING DIVISION STAFF REPORT PREPARED FOR THE PLAN COMMISSION Project Address: Application Type: Legistar File ID # 36810 Prepared By: Summary Conditional Use Timothy M. Parks, Planning Division Report

More information

12 February 8, 2012 Public Hearing APPLICANT:

12 February 8, 2012 Public Hearing APPLICANT: 12 February 8, 2012 Public Hearing APPLICANT: PROPERTY OWNER: VIRGINIA BEACH ASSOCIATES, LC REQUEST: Conditional Change of Zoning (I-1 to Conditional A-36) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

TH 23 Access Management Study Richmond to Paynesville

TH 23 Access Management Study Richmond to Paynesville TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...

More information

Prime Retail Space For Lease!

Prime Retail Space For Lease! Prime Retail Space For Lease! Enroute to Fast Growing Clovis Housing Developments Located on Heavily Trafficked Herndon Arterial Close to Highway 168 On/Off Ramps Adjacent to High Profile Centers NOW OPEN!

More information

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS This document provides a brief overview of zoning designations only. Inaccuracies may be present. Please consult the Sacramento County Zoning Code for

More information

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2013-00004 Hollymead Town Center Block VI Planning Commission Public Hearing: July 29, 2014 Staff: Claudette Grant Board of Supervisors

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: August 20, 2013 Planning Board Case No. 1564C

CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: August 20, 2013 Planning Board Case No. 1564C CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: August 20, 2013 Planning Board Case No. 1564C Rezoning from Community Service (CS) to Community Service Planned Development (CSPD) Hanley Center 5200

More information

Panther Lake Heated Storage

Panther Lake Heated Storage Capital Markets Self Storage Advisory Group Panther Lake Heated Storage 11024 SE 208TH STREET KENT, WASHINGTON 98031 :: OFFERING MEMORANDUM :: A SELF STORAGE DEVELOPMENT OPPORTUNITY :: Bob Hacker 253.596.0049

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 The Planning and Development Department hereby forwards

More information

Request for Proposals for Preserve of Montrose

Request for Proposals for Preserve of Montrose Request for Proposals for Preserve of Montrose RFP Issue Date: March 3, 2015 Proposals Due: April 21, 2015 Issued by the City of Montrose EDA PO BOX 25 MONTROSE MN 55363 763 575 7422 1 1. Intent of Offering

More information

Owners Network Meeting

Owners Network Meeting Owners Network Meeting 9:00 to Noon Facilitator Joe Garvey Introductions / Question of the Day Collier Valuation Update Jeff Shouse Google, Craiglist, Aggregator Mark Tidbits Mark Next Meeting Topics Sponsored

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

SEEKING COMPLETENESS WAIVERS AND PRELIMINARY & FINAL SITE PLAN APPROVAL

SEEKING COMPLETENESS WAIVERS AND PRELIMINARY & FINAL SITE PLAN APPROVAL APPLICATION & REPORTS FOR PB2009-05 INTERNATIONAL DEVELOPMENT CORPORATION SEEKING COMPLETENESS WAIVERS AND PRELIMINARY & FINAL SITE PLAN APPROVAL MEMORANDUM TO: FROM: RE: Borough of Tinton Falls

More information

Waterstone Business Park

Waterstone Business Park Orange County, North Carolina Waterstone Business Park Parcel Size Price Location Zoning Topography Combined total of 47 acres (Parcel #5-22 acres, #7-25 acres) $74,545 per acre (Parcel #5), $32,880 per

More information

Burnette Capital Self Storage CITY COUNCIL PACKAGE FOR OCTOBER 20, 2015

Burnette Capital Self Storage CITY COUNCIL PACKAGE FOR OCTOBER 20, 2015 Docket Item "D" R(C)-15-19 Burnette Capital Self Storage CITY COUNCIL PACKAGE FOR OCTOBER 20, 2015 Page 1 2 Application Summary 3 8 Revised Proffer Statement 9 10 Planning Commission Draft Minutes 11 13

More information

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space

AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space 831 Little Britain Road, New Windsor, Orange County, NY PROPERTY HIGHLIGHTS FOR ADDITIONAL INFORMATION,

More information

Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016

Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016 Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No. 16-000526-PLAN February 23, 2016 1101 Bull Street One West Park Avenue 1107 Bull Street

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

self storage units - aberdeen, nc

self storage units - aberdeen, nc self storage units - aberdeen, nc table of contents section I property brochure property flyer section II property maps aerial map standard site map traffic count map section III tax and market data tax

More information

COUNTY OF SANTA BARBARA PLANNING AND DEVELOPMENT MEMORANDUM

COUNTY OF SANTA BARBARA PLANNING AND DEVELOPMENT MEMORANDUM COUNTY OF SANTA BARBARA PLANNING AND DEVELOPMENT MEMORANDUM TO: Santa Barbara County Planning Commission FROM: Florence Trotter-Cadena, Senior Planner Development Review Division HEARING DATE: May 12,

More information

SELF-STORAGE DESK MARKET STUDY

SELF-STORAGE DESK MARKET STUDY SELF-STORAGE DESK MARKET STUDY Site Location: 9060 Dean Martin Drive Las Vegas, NV 89139 Client: Paige Yahraus Gross Desk Market Analysis performed by: Robert Copper, Self Storage 101 Prepared by Self

More information

FILE NO.: Z-8403. LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street

FILE NO.: Z-8403. LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street FILE NO.: Z-8403 NAME: Glason Short-form POD LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street DEVELOPER: Dennis Glason c/o the Law Office of Simmons S.

More information

Town of Snowmass Village. PO Box 5010. Or Delivered To: 1 P a g e

Town of Snowmass Village. PO Box 5010. Or Delivered To: 1 P a g e The Town of Snowmass Village invites qualified consultants to submit a proposal to develop a Request Community for Connectivity Proposals Plan for the Town. Proposals must be submitted by 4:00 pm Friday

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital

More information

City of Kamloops Notre Dame Corridor Access Plan

City of Kamloops Notre Dame Corridor Access Plan FINAL REPORT This report is prepared for the sole use of ICBC. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract.

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505.

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505. FOR SALE FOR MORE INFORMATION PLEASE CONTACT: The Friedman Building 1701 18th Avenue South, Seattle 98144 PRICE: $4,800,000 FEATURES: LAND SF: 40,000 SF + Fantastic Large Townhome Site BUILDING SF: 33,332

More information

www.forwardmcduffie.com

www.forwardmcduffie.com E c o n o m i c D e v e l o p m e n t C h a m b e r o f C o m m e r c e To u r i s m is a community with a strong sense of history and a progressive business environment. With our prime location along

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

Adams County, CO. Plans to Explode Airport Management

Adams County, CO. Plans to Explode Airport Management Executive Recruitment for Airport Director (Click on the photo above for a message from Todd Leopold, County Manager) Front Range Airport (FTG) Adams County, CO The Community Adams County, CO Exciting

More information

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division

More information

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

County of San Diego, Planning & Development Services SECOND DWELLING UNIT County of San Diego, Planning & Development Services ZONING DIVISION The Zoning Ordinance, Section 6156.x, allows the addition of a second dwelling unit to those properties zoned to allow the Family Residential

More information

AVAILABLE - FORMER FIRST NIAGARA 100 MOHAWK STREET, COHOES, NEW YORK TRAFFIC COUNT

AVAILABLE - FORMER FIRST NIAGARA 100 MOHAWK STREET, COHOES, NEW YORK TRAFFIC COUNT property Cohoes Local Development Corporation 97 Mohawk Street Cohoes, NY 12047 518.233.2117 * Fax: 518.233.2168 Email: etremblay@ci.cohoes.ny.us www.cohoesldc.org. AVAILABLE - FORMER FIRST NIAGARA 100

More information

A-2, RURAL ESTATE-AGRICULTURE DISTRICT

A-2, RURAL ESTATE-AGRICULTURE DISTRICT CHAPTER 52 A-2, RURAL ESTATE-AGRICULTURE DISTRICT SECTION: 10-52-1: Purpose 10-52-2: Permitted Uses 10-52-3: Accessory Uses 10-52-4: Conditional Uses 10-52-5: Interim Uses 10-52-6: Lot Area, Density, and

More information

Public Survey for Phase I

Public Survey for Phase I Rockfish Valley Area Plan: Public Survey for Phase I For Nelson County Residents & Property Owners Name: OPTIONAL: Location of residence or property: o Address: o Voting District: North Central West South

More information

Tennessee Agricultural Production and Rural Infrastructure

Tennessee Agricultural Production and Rural Infrastructure Tennessee Trends in Agricultural Production and Infrastructure Highlights - In many states the percentage of the state population designated by the U.S. Census Bureau as living in rural areas has declined,

More information

Why Downtowns Matter ~ ~ Geoffrey Anderson

Why Downtowns Matter ~ ~ Geoffrey Anderson Why Downtowns Matter ~ ~ Geoffrey Anderson We re a little confused Richard Drudl Why Downtowns? Increasing demand for walkable live/work/play destinations Downtowns are again a key factor in economic

More information

BUSINESS USE PERMIT APPLICATION

BUSINESS USE PERMIT APPLICATION BUSINESS USE PERMIT APPLICATION Instructions and Information for Business Use Permits and Temporary Certificates of Occupancy are included at the end of this application. Planning and Development Services

More information

RESPONSE TO SUMMARY OF CONSULTATION OF FEBRUARY 27, 2012

RESPONSE TO SUMMARY OF CONSULTATION OF FEBRUARY 27, 2012 DISTRICT COURT, WATER DIVISION 5 STATE OF COLORADO, GARFIELD COUNTY COURTHOUSE 109 8TH STREET, SUITE 104 GLENWOOD SPRINGS, CO 81601 Concerning the Application for Water Rights of: COLORADO WATER CONSERVATION

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

River Management 2013 Colorado Flood

River Management 2013 Colorado Flood River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: September 24, 2012 Planning Board Case No. 1248Q

CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: September 24, 2012 Planning Board Case No. 1248Q CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: September 24, 2012 Planning Board Case No. 1248Q Morse Life Major Planned Development Amendment Location Aerial I. REQUEST Morse Campus outlined in

More information

OFFERING MEMORANDUM. Walgreens Drug Store 3315 South H Street Bakersfield, CA 93304

OFFERING MEMORANDUM. Walgreens Drug Store 3315 South H Street Bakersfield, CA 93304 Photos on cover not of actual site OFFERING MEMORANDUM Walgreens Drug Store 3315 South H Street 93304 For More Information: Vince Roche Lic. 01155079 661.633.3817 vincent.roche@paccra.com 5060 California

More information

Municipality of the District of West Hants

Municipality of the District of West Hants Municipality of the District of West Hants STAFF REPORT TO: FROM: West Hants Planning Advisory Committee Jeanne Bourque, Planner DATE: July 21, 2011 SUBJECT: Richard Pineo - Application to Amend the West

More information

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Summary Description Proposed Project: Electrified Commuter Rail 30.2 Miles, 13 Stations Total

More information

3 September 9, 2015 Public Hearing

3 September 9, 2015 Public Hearing 3 September 9, 2015 Public Hearing APPLICANT: PI TELECOM INFRASTRUCTURE T, LLC PROPERTY OWNER: JSW HOLDINGS, LLC STAFF PLANNER: Carolyn A.K. Smith REQUEST: Conditional Use Permit (communications tower-monopole)

More information

a) Budget. The City of Fort Collins requests $100,000 to design and plan the Rocky Mountain

a) Budget. The City of Fort Collins requests $100,000 to design and plan the Rocky Mountain Applicant: City of Fort Collins, Colorado, Fort Collins, CO. Project: Planning and Development of Rocky Mountain Regional Arts Incubator Details of the Project City of Fort Collins Cultural Services a)

More information

SANITARY SEWER REBATE AGREEMENT FOR THE WYE AREA CENTRAL SANITARY SEWER COLLECTION MAINS, PUMPING STATIONS, FORCE MAINS, AND RELATED APPURTENANCES

SANITARY SEWER REBATE AGREEMENT FOR THE WYE AREA CENTRAL SANITARY SEWER COLLECTION MAINS, PUMPING STATIONS, FORCE MAINS, AND RELATED APPURTENANCES Return to: Revision to Draft Colleen Dowdall March 8, 2007 Worden Thane PC 111 N. Higgins, Ste 600 Missoula, MT 59802 SANITARY SEWER REBATE AGREEMENT FOR THE WYE AREA CENTRAL SANITARY SEWER COLLECTION

More information

I-70 Mountain Corridor PEIS Travel Demand Technical Report August 2010 Reissued March 2011

I-70 Mountain Corridor PEIS Travel Demand Technical Report August 2010 Reissued March 2011 I-70 Mountain Corridor PEIS Travel Demand Technical Report August 2010 Reissued March 2011 This page intentionally left blank. Travel Demand Technical Report Table of Contents Section 1. Introduction...1

More information

REZONING 16-000009 & PRELIMINARY PLAT 16-000005

REZONING 16-000009 & PRELIMINARY PLAT 16-000005 REZONING 16-000009 & PRELIMINARY PLAT 16-000005 REZONING REQUEST AND REVISED PRELIMINARY PLAT FOR THE BLUFFS AT WINDCASTLE - 4165 FAREDALE LANE Application: Engineer: Developer: Property Owner: Current

More information

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste 3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square

More information

NNN BI-LO Supermarket 3380-3322 Mall Road, Anderson, SC 29621

NNN BI-LO Supermarket 3380-3322 Mall Road, Anderson, SC 29621 NNN BI-LO Supermarket 3380-3322 Mall Road, Anderson, SC 29621 Price: $2,042,170 l NOI: $168,479 l CAP Rate: 8.25% Phone: 212.972.7457 Fax: 212.686.0078 exp@exp1031.com www.exp1031.com Low triple net rent

More information

Fast Track A Successful Redevelopment: The Palm Beach Outlets Story

Fast Track A Successful Redevelopment: The Palm Beach Outlets Story Fast Track A Successful Redevelopment: The Palm Beach Outlets Story SPEAKERS Rick Greene, AICP City of West Palm Beach Brian Seymour, Esq. Gunster Ken Tuma, PE UDKS Josh Long, AICP Gunster Grand Opening

More information

How To Improve Service In Arundel

How To Improve Service In Arundel Draft of Economic Development Strategy - Town of Arundel Chapter 3.3 - Infrastructure, Transportation and Zoning 1. Infrastructure The lack of infrastructure in Arundel could present significant problems

More information

Replacement of Manufactured Home

Replacement of Manufactured Home Town of Dover Building/Zoning /Code Enforcement Department 126 East Duncan Hill Road Dover Plains, NY 12522 (845) 832-0370 - fax Building Inspector/CEO George T. Hearn 845.832.6111 x102 - (GHearn@TownOfDoverNY.us)

More information

For Lease $19,500/Per Month

For Lease $19,500/Per Month Industrial Warehouse For Lease -10,000 SQFT 473 President Street, Brooklyn, NY Prepared by: For Lease $19,500/Per Month Coldwell Banker Reliable Commercial Division Office: (718)921-3100 Coldwell Banker

More information

Section 6 Traffic Analysis

Section 6 Traffic Analysis Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis

More information

5 March 12, 2014 Public Hearing

5 March 12, 2014 Public Hearing 5 March 12, 2014 Public Hearing APPLICANT: MOORE FARM, L.L.L.P. PROPERTY OWNER: MOORE FARM L.L.L.P. STAFF PLANNER: Kevin Kemp REQUEST: Change of Zoning (B-1A Limited Community Business to Conditional B-2

More information

MUSKEGON DEVELOPMENT SUMMARY

MUSKEGON DEVELOPMENT SUMMARY MUSKEGON DEVELOPMENT SUMMARY MEDC Redevelopmnet Ready Communities Peter Allen & Associates Paige Shesterkin Peter McGrath Frank Koziara James Carpenter Executive Summary As young professionals across the

More information

Addendum D. Nomination of Moody Wash ACEC

Addendum D. Nomination of Moody Wash ACEC Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a

More information

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD

NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD Date: June 29, 2016 To: From: Interested Person Susan Ellis, Land Use Services 503-823-5361 / susan.ellis@portlandoregon.gov NOTICE OF A TYPE Ix DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD The Bureau of

More information

Earth Retaining Structures

Earth Retaining Structures Earth Retaining Structures and Asset Management Earth Retaining Structures and Asset Management A Critical Component Tool in Maintaining Public Safety Earth Retaining Structures (ERS) are often an overlooked

More information

Multi-Tenant Retail Investment. NEC Signal Butte Rd & Southern Ave Mesa, AZ

Multi-Tenant Retail Investment. NEC Signal Butte Rd & Southern Ave Mesa, AZ Multi-Tenant Retail Investment NEC Signal Butte Rd & Southern Ave Mesa, AZ INVESTMENT ADVISORS Danny Gardiner Investment Associate (602) 385-1328 dannygardiner@pcaemail.com Chad Tiedeman Senior Investment

More information

30 Years of Smart Growth

30 Years of Smart Growth 30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,

More information

Planning Level Cost Estimation Tool. User s Manual

Planning Level Cost Estimation Tool. User s Manual Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO

More information

Park County, Wyoming. County Profile. Population Distribution. 2007 Distribution by Age by Sex. Household Income 2006

Park County, Wyoming. County Profile. Population Distribution. 2007 Distribution by Age by Sex. Household Income 2006 2007 Population: 27,073 Land Area: 6,942 sq. mi. Persons per sq. mi.: 3.89 County Seat: Cody (pop. 9,187) Source: Wyoming Economic Analysis Division, July 2007 Population Distribution Age 2007 estimate

More information

COLORADO MOUNTAIN COLLEGE. Our Mission: Leading Through Learning

COLORADO MOUNTAIN COLLEGE. Our Mission: Leading Through Learning COLORADO MOUNTAIN COLLEGE Our Mission: Leading Through Learning Colorado Mountain Junior College District and Service Area Our Vision: To provide access to success for individuals and their communities.

More information

THE RUSKIN COMMUNITY PLAN

THE RUSKIN COMMUNITY PLAN THE RUSKIN COMMUNITY PLAN Introduction Ruskin is a historic community situated on the shores of Tampa Bay, the Little Manatee River and the Ruskin Inlet, approximately 16 miles southeast of Tampa. The

More information

NEEDS ASSESSMENT PREVENTION. December 2014. Central Mountains RETAC. Prepared by: Caring Anne Consulting, LLC. Anne Robinson-Montera, RN, BSN

NEEDS ASSESSMENT PREVENTION. December 2014. Central Mountains RETAC. Prepared by: Caring Anne Consulting, LLC. Anne Robinson-Montera, RN, BSN Central Mountains RETAC PO Box 555 Frisco, CO 8443 Web: www.cmretac.org Prepared by: Caring Anne Consulting, LLC Anne Robinson-Montera, RN, BSN PO Box 5973 Eagle, CO 81631 Email: ar@caringanne.com December

More information

Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location:

Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location: Application No: 2009/2315 Application Type: FULL Case Officer: Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location: Kingston House Portsmouth Road Thames Ditton Surrey Proposal: Variation of Condition

More information

HAWTHORN SUITES 11400 College Blvd Overland Park, KS 66210

HAWTHORN SUITES 11400 College Blvd Overland Park, KS 66210 HAWTHORN SUITES 11400 College Blvd Overland Park, KS 66210 A Hotel to Apartment Repositioning Opportunity in the Heart of Johnson County, KS DISCLOSURES, NOTICES AND CONFIDENTIALITY CBRE, Inc. operates

More information

AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space

AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space AVAILABLE FOR LEASE ±6,500 Sq. Ft. Fully Furnished Office Space and ±6,300 Sq. Ft. Industrial Space 831 Little Britain Road, New Windsor, Orange County, NY FOR ADDITIONAL INFORMATION, CONTACT Exclusive

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information

1161.01 CONFORMITY WITH PLANS; DRAINAGE.

1161.01 CONFORMITY WITH PLANS; DRAINAGE. CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05

More information

Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation

Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation Chris Sturm Colorado Water Conservation Board Stream Restoration Coordinator 303 866 3441 chris.sturm@state.co.us

More information

D3 April 8, 2015 Public Hearing

D3 April 8, 2015 Public Hearing D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke

More information

TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision...

TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision... MCKENZIE COUNTY COMPREHENSIVE PLAN TABLE OF CONTENTS INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal....2 Vision...3 ECONOMIC DEVELOPMENT...4

More information

SUMMARY OF GROWTH & DEVELOPMENT TRENDS For THE CENTRAL AREA OF CHICAGO. The Parking Industry Labor Management Committee (PILMC)

SUMMARY OF GROWTH & DEVELOPMENT TRENDS For THE CENTRAL AREA OF CHICAGO. The Parking Industry Labor Management Committee (PILMC) SUMMARY OF GROWTH & DEVELOPMENT TRENDS For THE CENTRAL AREA OF CHICAGO Prepared for The Parking Industry Labor Management Committee (PILMC) August 7, 2003 Prepared by Metro Transportation Group, Inc. 70

More information

NWC Culebra & FM 1560 @ ALAMO RANCH PARKWAY HIGH-GROWTH FAR NW SAN ANTONIO, TX

NWC Culebra & FM 1560 @ ALAMO RANCH PARKWAY HIGH-GROWTH FAR NW SAN ANTONIO, TX Stillwater Ranch Scarborough Silver Oaks 1,700 lots Jefferson M.S. Ward SITE Carmel Canyon Apts 124 units Culebra Creek Soccer Park Meadows of Bridgewood 2,700 lots 1604 Greater Northwest ALAMO RANCH 3,500

More information

APPENDIX E TASK 5 TECHNICAL MEMORANDUM: TRAVEL DEMAND FORECASTING PROCESS

APPENDIX E TASK 5 TECHNICAL MEMORANDUM: TRAVEL DEMAND FORECASTING PROCESS APPENDIX E TASK 5 TECHNICAL MEMORANDUM: TRAVEL DEMAND FORECASTING PROCESS INTRODUCTION The purpose of this Technical Memorandum is to describe the methodologies and assumptions used in estimating travel

More information

Phase II of Homestake Water Project

Phase II of Homestake Water Project EAGLE VALLEY LIBRARY DISTRICT Phase II of Homestake Water Project Application for approval by the Eagle County Board of County Commissioners submitted by the City of Colorado Springs and the City of Aurora

More information

CHAPTER 4 EXISTING TRANSPORTATION MANAGEMENT

CHAPTER 4 EXISTING TRANSPORTATION MANAGEMENT CHAPTER 4 EXISTING TRANSPORTATION MANAGEMENT TRANSPORTATION MANAGEMENT SYSTEMS Prior to 1991, the Missouri Department of Transportation (MoDOT) had begun development of several independent management systems.

More information

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER

More information

Appendix G.3 Crain & Associates, Peer Review

Appendix G.3 Crain & Associates, Peer Review Appendix G.3 Crain & Associates, Peer Review Transportation Planning / Traffic Engineering VIA HAND DELIVERED Wendy Lockwood Sirius Environmental 1478 N. Altadena Drive Pasadena, California 91107 Subject:

More information

TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT

TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT TO: Mayor and Councilmembers FROM/PHONE: Mark Kutney, AICP, Development Services Director/(954) 797-1101 Prepared by Annie Feng, Planner II SUBJECT: Resolution

More information