1 (A42789) July 12, 2012 E-FILE Attention: Ms. Sheri Young, Secretary to the Joint Review Panel Enbridge Northern Gateway Project National Energy Board 444 Seventh Avenue SW Calgary, AB T2P 0X8 Dear Ms. Young, Re: Northern Gateway Pipelines Application to the National Energy Board Enbridge Northern Gateway Project OH NEB File No: OF-Fac-Oil-N Follow-up to Information Requests Northern Gateway is now providing reports that have been prepared which respond to various information requests as follows: Ecological and Human Health Risk Assessment for Pipeline Spills (refer to Northern Gateway s response to Federal Government IR 118; Conceptual Fish Habitat Mitigation and Compensation Plan (refer to Northern Gateway s response to Federal Government IR 2.8a); Conceptual Marine Fish Habitat Compensation Plan (refer to Northern Gateway s response to Federal Government IR 2.8a) and JRP IR 8.18a) and b); and (refer to Northern Gateway s response to Federal Government IR 1.69 and 2.54). 3000, st Street SW, Calgary, AB, T2P 3L8 (T) (F)

2 (A42789) These documents are being filed electronically with the Board and will be served upon all OH Parties. If the Board should require additional information, please contact the undersigned at (403) Yours truly, Ken MacDonald Vice President, Law and Regulatory Northern Gateway Pipelines Limited Partnership cc: CEAA Attention: Sarah Devin 3000, st Street SW, Calgary, AB, T2P 3L8 (T) (F)

3 ENBRIDGE NORTHERN GATEWAY PROJECT Prepared by David Reid and Carol Thompson AMEC Environment & Infrastructure Calgary, Alberta July 2012 CE04112/406

4

5 Executive Summary Executive Summary The Enbridge Northern Gateway Project (the Project) will potentially affect 489 ha of wetlands made up mainly of swamps and fens located in the Southern Alberta Uplands and Interior Plateau. Power lines will potentially affect an additional 106 ha of wetlands, largely swamps in the Coast Mountains. Wetland functions that will be affected by the Project include hydrology, water quality, ecology and habitat. Following review of the Section 52 Application for the Project, Environment Canada (EC) requested that Northern Gateway provide a detailed assessment of wetland functions likely to be adversely affected and to provide more details on wetland compensation and monitoring plans. Following receipt of Environment Canada s written evidence submission in December 2011, this assessment was updated and replaces the earlier draft dated November The assessment of the potential effects of the pipelines and ancillary facilities was based on a pipeline right-of-way (RoW) width of 50 m and a power line RoW width of 40 m which make up the Project Development Area (PDA). The 1 km wide pipeline corridor described in the Application is intended only to aid in the planning of the pipelines and the completion of the environmental assessment. The centreline shown within the 1 km corridor is for illustrative purposes only. The final locations of the pipelines could occur anywhere within the 1 km corridor. Following approval of the Project, the exact location of the pipelines will be finalized within the 1 km wide corridor during detailed engineering. The final pipeline route will be selected based upon the route selection criteria described in the Application (Volume 3, Section 2). The phases associated with Project activities used in the assessment include the following: baseline existing conditions prior to development; construction - includes RoW and infrastructure clearing, pipe installation, cleanup and reclamation; operations - includes normal activities with stable surface conditions and reclaimed vegetation cover; and decommissioning - includes removal of above ground structures, recontouring and reclamation. Environmental protection measures are described in detail in the Construction Environmental Protection and Management Plan in the Application Volume 7A. These include measures to protect wildlife, fisheries, hydrology, water quality and vegetation along with emergency response approaches and capabilities. The residual effect of the Project on wetlands is assessed as adverse, low to moderate magnitude, local extent, long-term, reversible and not significant. A plan to monitor the effects of the Project on wetlands will be developed prior to commencement of construction. This plan will be prepared in consultation with federal and provincial regulatory agencies, landowners, participating First Nations and other stakeholders. The plan will include goals, site selection, monitoring parameters, standards, schedule and adaptive management. July 2012 Page i

6 Executive Summary A wetland compensation plan will be developed prior to construction in consultation with federal and provincial regulatory agencies, landowners, participating First Nations and other stakeholders. The plan will include goals, Project wetland interactions, compensation ratios, implementation, monitoring and maintenance. Page ii July 2012

7 Table of Contents Table of Contents 1 Introduction Spatial Boundaries Project Development Area Project Effects Assessment Area Regional Effects Assessment Area Temporal Boundaries Project Description Facilities Pipelines Ancillary Facilities Kitimat Terminal Centreline Surveys Construction Construction Spreads, Camps and Stockpile Sites Scheduling and Timing Right-of-Way Access Clearing Soil Salvage Grading and Trenching Lowering In and Backfilling Watercourse Crossings RoW Cleanup Pipeline Testing Reclamation Enhanced Reclamation Pipeline Operations RoW Inspection and Monitoring Containment Management Decommissioning Environmental Protection and Management Plan Methods Wetland Classification and Function Wetland Types Bog Wetland Fen Wetland Marsh Wetland Swamp Wetland Shallow-water (Aquatic) Wetland Wetland Function Hydrological Function Biogeochemical Function July 2012 Page iii

8 Table of Contents Ecological Function Habitat Function Results Wetland Extent Wetland Function Mitigation Measures Project Design Measures General Practices Wildlife Protection Measures Fisheries Protection Measures Vegetation Protection Measures Assessment Identifications Timbered Land Rare Plants Wetlands Emergency Response Approaches and Capabilities Residual Effects Cumulative Effects Proposed Wetland Monitoring Plan Introduction Wetland Type Site Selection Methods Sample Plot Design Water Depth and Water Quality Vegetation Schedule Data Entry Data Analysis and Reporting Proposed Wetland Compensation Plan Goals Project Wetland Interactions Summary of Baseline Information of Affected Wetlands Compensation Wetland Areas Implementation Work Plan Monitoring and Maintenance Plan Literature Cited Page iv July 2012

9 Table of Contents List of Tables Table 5-1 Wetlands Affected in Each Physiographic Region Table 5-2 Wildlife Species at Risk and Species of Interest in Wetlands Table 5-3 Rare Plant Species in Wetlands in the PEAA in Alberta Table 5-4 Rare Plant Species in Wetlands in the PEAA in British Columbia Table 5-5 Potential Effects on Wetland Function Table 7-1 Residual Effects on Wetlands List of Figures Figure 1: Physiographic Regions Along the Pipeline Route... 4 Figure 2: Wetland Monitoring Plot July 2012 Page v

10

11 Section 1: Introduction 1 Introduction Following review of the Section 52 Application for the Project, EC requested that Northern Gateway provide a detailed assessment of wetland functions likely to be adversely affected by the Project and to provide more details on wetland compensation and monitoring plans. A meeting was held between EC and Northern Gateway on 9 August 2011 to clarify various items. This document provides a response to the Information Requests (IR) from EC included in Federal Government IR 1.69, 1.70 and 1.71, and Federal Government IR 2.54 and Following receipt of Environment Canada s written evidence submission in December 2011, this assessment was updated and replaces the earlier draft dated November The assessment is based on the following information sources: Northern Gateway Project Section 52 Application, Vol. 1 Overview and General Information Section, May 2010; Northern Gateway Project Section 52 Application, Vol. 3 Engineering Construction and Operations, May 2010; Northern Gateway Project Section 52 Application, Vol. 6A Environmental and Socio-economic Assessment (ESA) - Pipelines and Tank Terminal, May 2010; Northern Gateway Project Section 52 Application, Vol. 7A Construction Environmental Protection and Management Plan, May 2010; Northern Gateway Project Section 52 Application, Vol. 7B Risk Assessment and Management of Spills - Pipelines, May 2010; and Northern Gateway Project Section 52 Application, Terrestrial Technical Data Reports, October Spatial Boundaries Project Development Area The Project development area (PDA) is the disturbed area of the pipeline route, including the RoW, the Kitimat Terminal and associated infrastructure (e.g., power lines, permanent and temporary access roads, pump stations, staging areas, construction camps, stockpile sites and excess cut disposal areas for the tunnels). The PDA includes a permanent 25 m wide RoW and 25 m of temporary workspace. Power lines will require a 40 m wide RoW Project Effects Assessment Area The Project effects assessment area (PEAA) is a 1 km wide linear area that includes the terrestrial PDA and a defined area around the centreline of the terrestrial PDA (500 m). The potential effects on wetlands are evaluated within the boundaries of the PEAA. July 2012 Page 1

12 Section 1: Introduction Regional Effects Assessment Area The regional effects assessment area (REAA) is an area approximately 30 km wide that contains the PEAA. Within the REAA, cumulative environmental effects could occur depending on physical and biological conditions (e.g., air sheds, watersheds, and seasonal range of wildlife movements) and the type and location of other past, present or reasonably foreseeable projects or activities. 1.2 Temporal Boundaries The following phases of Project activities are used to assess Project effects: baseline includes the biophysical characteristics of the environment at the time of the assessment, and all existing disturbances of past and present projects; construction includes RoW and infrastructure site clearing and grading, RoW ditching, backfilling and reclamation; operations includes normal activities with stable surface conditions and reclaimed vegetation cover in temporary disturbance areas and modified vegetation cover within long-term disturbed areas; and decommissioning includes removal of all above ground structures, recontouring surfaces to stable conditions and reclaiming the site according to a reclamation plan Page 2 July 2012

13 Section 2: Project Description 2 Project Description A brief Project description is presented in this section to focus on those components likely to have effects on wetlands. 2.1 Facilities The Project includes constructing, operating, and decommissioning two pipelines, associated facilities and the Kitimat Terminal Pipelines Northern Gateway is applying for approval to install the oil export and condensate pipelines within a 1 km wide corridor, which is approximately 1,172 km long (Figure 1). The pipelines will be located in a common, permanent 25 m wide RoW, extending from the initiating station near Bruderheim to the Kitimat Terminal. Following approval of the Project, the exact location of the two pipelines will be finalized within the 1 km wide corridor during detailed engineering (see section 2.2) The final pipeline route will be selected based upon the route selection criteria described in the Application (Volume 3, Section 2) Ancillary Facilities Ten electrically powered pump stations on the RoW will be required to operate the pipelines including the initiating stations at Bruderheim (for oil) and Kitimat (for condensate). Permanent roads and power lines will be required for the construction and operations of the pump stations. Information on the power line locations, lengths and widths is preliminary and will be confirmed during detailed design. Construction of the power lines will involve clearing of the easement, installation of standard wooden poles and stringing of the electric cables. A temporary road will be required along some parts of the power line easement during construction Kitimat Terminal The Kitimat Terminal is on the west side of Kitimat Arm and refers to the tank terminal (the area inside the security fence) and the marine terminal, as well as the undeveloped area outside the security fence that also includes the excess cut disposal area. The total area is 478 ha: 220 ha inside the security fence (the area of infrastructure development is discussed in detail in Application Volume 3, Section 9) and 258 ha outside the security fence. July 2012 Page 3

14 Section 2: Project Description Figure 1: Physiographic Regions Along the Pipeline Route Page 4 July 2012

15 Section 2: Project Description 2.2 Centreline Surveys Following approval of the Project, the exact location of the two pipelines will be finalized within the 1- km wide corridor during detailed design. The determination of the final route will incorporate: detailed engineering construction, and operational considerations further site-specific constraint mapping results of Aboriginal Traditional Knowledge studies further biophysical investigations (e.g., identification of site-specific habitat features such as wildlife trees, wetlands, rare plants), archaeological surveys; and input from participating Aboriginal groups and communities, landowners, the public, other interested parties and government agencies. The intent of these various surveys and undertakings will be to obtain finer-scale information to aid in the final routing for the two pipelines. The location of the probable centreline will be surveyed and marked. Centreline surveys will then be conducted by teams typically consisting of an engineer, a botanist, a wildlife ecologist and an archaeologist. A fisheries biologist will be included to assist in finalizing water crossing locations. Representatives of First Nations for the traditional territories that overlap that part of the pipeline will also be included in the team. Each biophysical specialist, the archaeologist and the First Nations representative will be responsible for identifying important design constraints, possible alternatives to avoid or minimize effects on sensitive features and requirements for specialized construction methods during pipeline installation. Where a feature cannot be avoided, mitigation measures will be identified including details on seasonal restrictions for certain activities, habitat compensation, reclamation methods, etc. If there are conflicts among engineering, biophysical, archaeological, fisheries or First Nations, the team will work to select the route best suited for pipeline safety while also avoiding or minimizing effects on as many sensitive features as possible. Detailed environmental alignment sheets will be developed. A separate set of alignment sheets will be developed for preparation of the pipeline RoW (i.e., clearing, grubbing) and another set for the trenching and construction of the pipeline. Within each set, the alignment sheets will identify the specific location (i.e., kilometre post start and finish) of environmental-sensitive or cultural-sensitive features characteristics and detail the mitigation measures to be employed during construction in order to minimize project effects. Details on access management during clearing and construction, and removal of access not needed for permanent operations will also be included. The construction alignment sheets will be completed and provided to the NEB for review and comment at least 60 days prior to the start of clearing. The construction alignment sheets will also be completed and provided to the NEB at least 60 days prior to the start of construction. July 2012 Page 5

16 Section 2: Project Description Additional detail will be provided in an updated Construction Environmental Protection and Management Plan (EPMP). The Construction EPMP will describe the approach and commitment by construction and project personnel so that the Project is carried out in a manner that protects the environment during construction. It will outline the general and specific methods that will be applied for the Project and will be used as a guidance document for construction and project personnel. The updated Construction EPMP will document the requirements to be followed to ensure that the Project is constructed under applicable regulations, internal policies and procedures and will meet project requirements. The Construction EPMP will be completed and provided to the NEB at least 60 days prior to the start of clearing. Clearing of the pipeline RoW and preparation for pipeline construction will not begin until the alignment sheets for the RoW preparation have been completed and provided to the NEB. Clearing will proceed in spreads during the approved timing windows determined by government agencies such as Canadian Wildlife Service (to minimize effects on migratory birds) and Fisheries and Oceans Canada. 2.3 Construction Construction Spreads, Camps and Stockpile Sites Construction of the pipelines and associated facilities will require the temporary use of land for construction camps and stockpile sites. Where possible, these facilities will be located on previously disturbed sites Scheduling and Timing Construction of the Project is scheduled for a 42 month period to achieve the planned in-service date, and to provide for a safe and efficient work progression while limiting adverse environmental and socioeconomic effects. An additional six months might be required to complete construction of the Kitimat Terminal. Clearing activities for the first construction season will begin the year before pipeline construction Right-of-Way Access Existing access to the RoW (e.g., forestry roads) will be used during construction wherever practical. Temporary access is assessed in a qualitative manner Clearing Clearing of work areas will be carried out to reduce the potential for erosion, limit the removal of vegetation outside the development area and optimize the reclamation effort. Merchantable timber will be salvaged as determined in the Timber Salvage Plan. In some areas, timber will be retained on the RoW to be rolled back onto disturbed areas to assist in the control of soil erosion, for watercourse reclamation or for control of access onto the RoW. Tree stumps and roots over the ditchline will be grubbed (removed) and, in other areas of the construction workspace, stumps will be grubbed or cut flush with the soil surface. Vegetation that is not merchantable will be burned or chipped and spread over the RoW. Page 6 July 2012

17 Section 2: Project Description Additional details are provided in the Construction Environmental Protection and Management Plan (EPMP) (Application Volume 7A) Soil Salvage Topsoil and other organic material will be conserved, as directed by provincial regulatory authorities or stockpiled if the material is required for reclamation efforts for Project infrastructure. These areas will be noted on the construction drawings and environmental alignment sheets. Efforts will be taken so that compaction and rutting are limited. Where soil salvage is required, soils will be recovered to limit the loss of organic matter and mixing of different soil horizons Grading and Trenching Grading on slopes will be limited to the extent practical. Trenches will be dug to depths and widths that can accept the pipe dimensions, pipeline separation requirements, tie-ins and watercourse crossings, while reducing the environmental effects of erosion, slope instability and potential for sediment effects on watercourses. For most of the RoW, trenches will be dug to a minimum of 8 m separation (centre to centre of each pipeline). The minimum distance from the outside of the pipelines to the edge of the maintained RoW will be 4 m. The minimum depth of cover to construction grade will be 0.9 m. The minimum depth of cover at watercourse crossings will be 1.2 m Lowering In and Backfilling Pipes will be brought to the RoW and will be bent and welded on-site before being joint-coated, inspected and lowered into the trench Watercourse Crossings The pipelines will cross 773 watercourses, of which 669 are fish-bearing. At some crossing locations, fisheries protection, as well as engineering constraints, has played a key role in selection of the crossing method. Where a backup crossing method is required (trenchless and some isolated crossings), the location of the crossing has been selected to accommodate both the primary and back-up crossing method. Watercourse crossing methods will include isolation, directional drilling, and aerial and open-trench methods. The method chosen will depend on a variety of environmental, engineering and societal issues (e.g., other uses of the watercourse, seasonal fisheries or wildlife limitations, terrain or geotechnical limitations) RoW Cleanup Cleanup of the RoW and other construction activities will be carried out as quickly as practical to prepare the areas for reclamation. July 2012 Page 7

18 Section 2: Project Description Pipeline Testing Before commissioning, the pipelines will be cleaned, pressure tested and inspected. Any damaged or defective portions of the pipelines will be repaired. The majority of the testing will be done with water (i.e., hydrostatic testing); however, some portions will be tested with air. Details on testing (e.g., water sources, discharge methods and locations, use of air) will be determined during detailed design Reclamation Reclamation refers to standard measures taken during construction to limit adverse environmental effects and return affected lands to a stable condition and equivalent land capability. During reclamation, areas will be regraded as required (e.g., areas having erosion gullies, vehicle ruts or trench settlement). The RoW will be recontoured as close to the pre-construction profile as feasible or to a stable angle of repose. RoW drainage patterns will also be returned to as close to pre-construction contours as practical and final erosion control structures will be installed. Topsoil will be prepared for revegetation and, ultimately, the RoW will be reclaimed as per landowner agreements and regulatory requirements Enhanced Reclamation Enhanced reclamation refers to activities that will be implemented to enhance the ecological integrity of affected lands. Site-specific reclamation issues will be identified and documented in specific plans. Examples of these techniques may include weed control, reseeding with native seed mixes, enhancement of wildlife habitat, wetland and watercourses, and sensitive soils reclamation. The plan will be developed in consultation with regulatory agencies and stakeholders. A post-construction monitoring and follow-up program will also be implemented. 2.4 Pipeline Operations The following provides a summary of some of the key activities that will be carried out during pipeline operations to protect the integrity of the pipelines and allow for successful reclamation of the areas affected by pipeline construction through to final abandonment RoW Inspection and Monitoring Once the pipelines have been commissioned, Northern Gateway will initiate regular RoW inspection programs. The pipelines will be monitored to identify anomalies that may occur and initiate appropriate remedial action as required. This monitoring program will include regularly scheduled aerial reconnaissance of the entire RoW to help detect any anomalies along the RoW, such as third party encroachments, construction activity near the pipelines, failure of erosion control and any natural events (e.g., rock or snow slides). This aerial reconnaissance will provide an overview of the state of the RoW and monitor the success of the revegetation program. Page 8 July 2012

19 Section 2: Project Description As part of an ongoing monitoring program, the RoW will be frequently assessed to evaluate the success of revegetation. Any structural or aesthetic defects will be identified and corrected (e.g., recontouring of slumped or mounded areas to prevent water impoundment, removal of weeds, reseeding of areas along the RoW). In addition, vegetation control will be ongoing so that areas of the pipeline RoW that must remain visible from the air at all times are kept clear of large vegetation Containment Management An assessment of the potential for spills for the pipelines and related measures is in Application Volume 7B. The information contained there will be used to help develop emergency response plans and to identify personnel and equipment needs (e.g., response trailers) to be able to best respond, if required. 2.5 Decommissioning Above ground infrastructure will be removed. Underground pipelines and structures will be abandoned in place according to regulations and standards at the time of decommissioning. Unless government or local authorities decide to retain them, it is assumed that all Kitimat Terminal infrastructure will be removed to the top of the substrate and reclaimed according to the regulations and standards at the time of decommissioning. 2.6 Environmental Protection and Management Plan The Construction EPMP (Application Volume 7A) describes the environmental management aspects that will be applied to the Project during construction of the pipelines and associated facilities. The Construction EPMP gives a provisional description of the general and specific methods that will be applied for the Project and Northern Gateway s commitment to conduct the Project in a manner that protects the environment. Once detailed engineering and route selection have been completed, a final Construction EPMP will be produced as a guidance document for construction purposes and Project personnel. July 2012 Page 9

20

21 Section 3: Methods 3 Methods Existing data sources for wetlands in the PEAA within Alberta included: Alberta Vegetation Inventory (AVI) (ASRD 2009a, Internet site); and aerial photographs of the PEAA (ASRD 2009b, Internet site). Existing data sources for wetlands in the PEAA within British Columbia included: aerial photographs (Integrated Land Management Bureau, Crown Registry and Geographic Base [CRGB] 2009a, Internet site); Vegetation Resource Inventory (VRI) data; scale 1:20,000 (BC MoF 2009b, Internet site); Terrain Resource Information Management (TRIM) mapping (CRGB 2009b, Internet site); biogeoclimatic subzone/variant mapping Version 7.0 (BC MoF 2009c, Internet site); and 2006 SPOT imagery (5 m resolution) (Lunctus Geomatics Corp. 2006). Wetlands were delineated from the above information and confirmed by field surveys. Details of the methods are presented in Application Volume 6A, Section Assessment Methods for Vegetation Diversity and Technical Data Report Vegetation, Section 2.6 Wetlands. A footprint analysis was conducted to identify the total area of wetlands that would be crossed by the 50 m wide RoW (both permanent and temporary) including ancillary facilities. Power line easements were assessed on a 40 m wide RoW and other facilities outside of the RoW were assessed on the size of their footprint. July 2012 Page 11

22

23 Section 4: Wetland Classification and Function 4 Wetland Classification and Function 4.1 Wetland Types Wetlands are areas where the vegetation and soil development are largely dependent on the saturation of the soils with water for extended periods of time, resulting in generally low soil oxygen levels. Within wetlands, the vegetation community will be dominated by hydrophytes and the soil will feature hydric characteristics (National Wetlands Working Group 1988 and 1997, Beckingham and Archibald 1996, Beckingham, Corns and Archibald 1996, MacKenzie and Moran 2004). There are five wetland classes identified in the Project area. A description of the essential characteristics of the wetland classes are provided in the following sections Bog Wetland Wetlands classified as bogs are shrubby or treed, nutrient-poor peatlands with distinctive communities of ericaceous shrubs and hummock-forming Sphagnum species adapted to highly acid and oxygen-poor soil conditions. Bogs develop in basins where peat accumulation has raised the wetland surface above groundwater flow or where groundwater is very low in dissolved nutrients Fen Wetland Fens are peatlands where groundwater inflow maintains relatively high mineral content within the rooting zone. Non-ericaceous shrubs, sedges, grasses, reeds, and brown mosses are common. Fens develop in basins, lake margins, river floodplains, and seepage slopes. The water table is usually at or just below the peat surface for most of the growing season Marsh Wetland A marsh is a shallowly flooded mineral wetland. Typically, a marsh is dominated by emergent grass-like vegetation. A fluctuating water table is typical in marshes with the highest water table during the early growing season. Exposure of the substrate in late season or dry years is common. Nutrient availability is high due to near-neutral ph, water movement, and aeration of the substrate Swamp Wetland A swamp is a forested, treed, or tall-shrub, mineral wetland. A swamp wetland is dominated by trees and broadleaf shrubs on sites with a flowing or fluctuating, semi-permanent, near-surface water table. Tallshrub swamps are dense thickets, whereas forested swamps have large trees occurring on elevated microsites and lower cover of tall deciduous shrubs. Both types of swamps have abundant available nutrients from groundwater and often have surface standing water. Swamps may be underlain with peat, but it is well decomposed, woody, and dark. July 2012 Page 13

Michigan Wetlands. Department of Environmental Quality

Michigan Wetlands. Department of Environmental Quality Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about

More information

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT Section 24.0 Summary of s VE51988 KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT SUMMARY OF COMMITMENTS TABLE OF CONTENTS TABLE OF CONTENTS... 24-I 24.0 SUMMARY

More information

Recognizing Wetlands. For additional information contact your local U.S. Army Corps of Engineers office. Pitcher plant.

Recognizing Wetlands. For additional information contact your local U.S. Army Corps of Engineers office. Pitcher plant. US Army Corps of Engineers For additional information contact your local U.S. Army Corps of Engineers office. 1998 Edition Recognizing Wetlands Pitcher plant The information presented here will help you

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 Mitigation Goals and Objectives o Describe functions lost at impact site o Describe functions to be gained at mitigation site o Describe overall watershed

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Chapter 3 Communities, Biomes, and Ecosystems

Chapter 3 Communities, Biomes, and Ecosystems Communities, Biomes, and Ecosystems Section 1: Community Ecology Section 2: Terrestrial Biomes Section 3: Aquatic Ecosystems Click on a lesson name to select. 3.1 Community Ecology Communities A biological

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

Re: Teck Frontier Oil Sands Mine Project: Responses to Supplemental Information Requests (SIRs)

Re: Teck Frontier Oil Sands Mine Project: Responses to Supplemental Information Requests (SIRs) Teck Resources Limited January 16, 2014 Métis Local 125 (Fort Chipewyan Métis) Attention: Fred Fraser (President) Re: Teck Frontier Oil Sands Mine Project: Responses to Supplemental Information Requests

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.1 INTRODUCTION Mitigation measures, monitoring and other follow-up actions identified in Chapter 7 (Environmental Effects Assessment and Mitigation)

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta

Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta Fish and Wildlife Division Sustainable Resource Development Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta

More information

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002 Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

Waterway Technote Drains

Waterway Technote Drains Waterway Technote Drains Contents Benefits of good drain practice 1 Are your drains healthy? 2 The Sustainable Dairying Water Accord 3 Planning drain maintenance 3 Fencing and clearing 3 Bank shaping (battering)

More information

WONDERFUL, WATERFUL WETLANDS

WONDERFUL, WATERFUL WETLANDS WONDERFUL, WATERFUL WETLANDS OBJECTIVES The student will do the following: 1. List characteristics of wetlands. SUBJECTS: Science, Language Arts TIME: 60 minutes 2. Describe the functions of a wetland.

More information

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate

More information

Avison Management Services Ltd. COMPANY PROFILE

Avison Management Services Ltd. COMPANY PROFILE Avison Management Services Ltd. COMPANY PROFILE Providing resource management through environmental leadership. Mission Statement: We are committed to providing high quality, timely, and cost effective

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein

More information

Communities, Biomes, and Ecosystems

Communities, Biomes, and Ecosystems Communities, Biomes, and Ecosystems Before You Read Before you read the chapter, respond to these statements. 1. Write an A if you agree with the statement. 2. Write a D if you disagree with the statement.

More information

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS 5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS The methods that are used to conduct the environmental impact assessment (EIA) of the Project are described in this section. The EIA uses a methodological framework

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado WCAO-GJ-FONSI -14-01 United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado FINDING OF NO SIGNIFICANT IMPACT SPURLIN MESA LATERAL OF THE CRAWFORD

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Appendix C. Re-vegetation and Rehabilitation Sub-Plan

Appendix C. Re-vegetation and Rehabilitation Sub-Plan Appendix C Re-vegetation and Rehabilitation Sub-Plan DRENNAN SOLAR ENERGY FACILITY REVEGETATION & REHABILITATION PLAN PRODUCED FOR ERM ON BEHALF OF SOLAIREDIRECT BY Simon.Todd@3foxes.co.za JUNE 2013 BACKGROUND

More information

Vernal Pools: Introduction. Massachusetts state regulations that provide vernal pool protection

Vernal Pools: Introduction. Massachusetts state regulations that provide vernal pool protection Vernal Pools: Regulatory Protection in Massachusetts Introduction The importance of vernal pool habitat has been recognized in Massachusetts for over 2 decades. Salamander surveys conducted in the early

More information

Restoring Ecosystems. Ecosystem Restoration Services

Restoring Ecosystems. Ecosystem Restoration Services Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective

More information

To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (Board) and Interested Persons

To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (Board) and Interested Persons File OF-Fac-NOMA 01 01 17 July 2015 To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (Board) and Interested Persons Operations and Maintenance Activities on Pipelines under

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Forest Management Guidelines for the Protection of Four-toed and Spotted Salamander Populations Carol Hall & Bruce Carlson May 2004

Forest Management Guidelines for the Protection of Four-toed and Spotted Salamander Populations Carol Hall & Bruce Carlson May 2004 Forest Management Guidelines for the Protection of Four-toed and Spotted Salamander Populations Carol Hall & Bruce Carlson May 2004 Salamander Natural History Four-toed Salamanders: The Four-toed Salamander,

More information

Mine Plan of Operations Reclamation Bond Checklist

Mine Plan of Operations Reclamation Bond Checklist Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

/;L/rl 7!dolO DatE! J

/;L/rl 7!dolO DatE! J U.S. DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION Mid-Pacific Region Lahontan Basin Area Office, Carson City, Nevada Finding of No Significant Impact FONSI NO: LO-10-05 Recommende. Jane Schmidt Natural

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide

More information

Environmentally Significant Areas of Alberta. Volume 3. Prepared by: Sweetgrass Consultants Ltd. Calgary, AB. for:

Environmentally Significant Areas of Alberta. Volume 3. Prepared by: Sweetgrass Consultants Ltd. Calgary, AB. for: Environmentally Significant Areas of Alberta Volume 3 Prepared by: Calgary, AB for: Resource Data Division Alberta Environmental Protection Edmonton, Alberta March 1997 EXECUTIVE SUMMARY Large portions

More information

Forest Operations Compliance Audit Performance Indicators

Forest Operations Compliance Audit Performance Indicators Forest Operations Compliance Audit Performance Indicators Natural Resources September, 2013 Reference 867-01 TABLE OF CONTENTS Page INTRODUCTION... 5 1. OBJECTIVE: Effective Communication of Forest Operation

More information

LNG CANADA EXPORT TERMINAL PROJECT (PROJECT)

LNG CANADA EXPORT TERMINAL PROJECT (PROJECT) LNG CANADA EXPORT TERMINAL PROJECT (PROJECT) SCHEDULE B TABLE OF CONDITIONS FOR AN ENVIRONMENTAL ASSESSMENT CERTIFICATE DEFINITIONS Aboriginal Groups Application Certified Dredge Area Certified Project

More information

Aquatic Biomes, Continued

Aquatic Biomes, Continued Aquatic Biomes, Continued Introduction Extent of Marine biomes Issues & challenges Factors influencing distribution Dynamics in time & space Depth Tour of marine biomes Issues (by biome) Freshwater biomes

More information

Appendix B: Cost Estimates

Appendix B: Cost Estimates Appendix B: Estimates This appendix presents the estimated costs of the monitoring and supplemental research components presented in Section 3 of this document. A 20% quality assurance and quality control

More information

Hearing Order OH- 4-2- 11 File No. OF- Fac- Oil- N304-2010- 01 01

Hearing Order OH- 4-2- 11 File No. OF- Fac- Oil- N304-2010- 01 01 1 To: Enbridge Northern Gateway Pipelines Re: Northern Gateway Project Application From: Cheryl Brown Hearing Order OH- 4-2- 11 File No. OF- Fac- Oil- N304-2010- 01 01 Information No.2 2.1 tool by Det

More information

SECTION 5. Sediment Control Measures

SECTION 5. Sediment Control Measures SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm

More information

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 RANGELAND HEALTH STANDARDS - ASSESSMENT SAGEHEN ALLOTMENT #0208 STANDARD 1 - UPLAND WATERSHED This standard is being met on the allotment.

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Information Request 38

Information Request 38 Information Request 38 Information Request 38 38-1 Responses to Information Request 38 Response to Information Request 38b Response to Information Request 38c 38-2 38-9 38-10 Federal Review Panel Information

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

March 17, 2015. Dear Mr. Sullins:

March 17, 2015. Dear Mr. Sullins: Tony Sullins Endangered Species Chief, Midwest Regional Office Public Comment Process Attn: FWS-R5-ES-2011-0024 Division of Policy and Directives Management U.S. Fish and Wildlife Service 4401 N. Fairfax

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Muddy River Restoration Project Project Description

Muddy River Restoration Project Project Description Muddy River Restoration Project Project Description Since the fall of 1996, the Muddy River has flooded three times, causing damage to residents, businesses institutions and the public transit system in

More information

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12 CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT...

More information

Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body

Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body Code of Practice for Pipelines and Telecommunication Lines Crossing a Water Body Made under the Water Act and the Water (Ministerial) Regulation Consolidated to include amendments in force as of June 24,

More information

Determination of NEPA Adequacy (DNA)

Determination of NEPA Adequacy (DNA) DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT OFFICE GRANTS PASS RESOURCE AREA 2164 NE SPALDING AVENUE GRANTS PASS, OR 97526 Determination of NEPA Adequacy (DNA) Office: Grants

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Appendix U. Environmental Compliance Monitoring Plan

Appendix U. Environmental Compliance Monitoring Plan RUBY PIPELINE PROJECT PLAN OF DEVELOPMENT Appendix U. Environmental Compliance Monitoring Plan U-1 June 2010 Environmental Compliance Monitoring Plan Ruby Pipeline Project May 2010 Table of Contents

More information

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION)

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) CD NO. 1 OF 19 CDS Initial Statement Exhibit A: Description

More information

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available

More information

PROCEDURE. See: Great Lakes Coastal Wetlands (http:// www.miseagrant.umich.edu/wetlands/index.html)

PROCEDURE. See: Great Lakes Coastal Wetlands (http:// www.miseagrant.umich.edu/wetlands/index.html) Activity: Students review a selection of career profiles and play a lively classroom game to find out more about marine and aquatic science professionals. Grade Level: 4-8 Subjects: Science, social studies

More information

Environmental Review Process

Environmental Review Process The Saskatchewan Natural Gas Advantage Workshop Environmental Review Process Bernie Ryma Environment & Sustainability TransGas February 24, 2010 Presentation Outline The presentation today will provide

More information

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136.

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. 33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. Source: 73 FR 19670, Apr. 10, 2008, unless otherwise noted.

More information

Oregon. Climate Change Adaptation Framework

Oregon. Climate Change Adaptation Framework Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

DRAFT Addendum to IVM Best Management Practices

DRAFT Addendum to IVM Best Management Practices Integrated Vegetation Management on Pipeline Rights-of-Way Addendum to Best Management Practices: Integrated Vegetation Management Ryan Brockbank, Western Environmental Consultants, Inc. The intent of

More information

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 J. Bonham 2 and K. Stephenson Abstract Recently the US Army Corps of Engineers (the Corps) has increased

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Information Request 29

Information Request 29 Information Request 29 Information Request 29 29-1 Response to Information Request 29 Response to Information Requests 29a Response to Information Requests 29b Response to Information Requests 29c Response

More information

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT August 2006 Prepared by: NB Department of Environment Environment 1. INTRODUCTION This General Review Statement

More information

a. For all activities that would result in the discharge of fill material into any vernal pool;

a. For all activities that would result in the discharge of fill material into any vernal pool; Final Sacramento District Nationwide Permit Regional Conditions for Nevada and the Lake Tahoe Basin in California (Effective March 19, 2012 until March 18, 2017) 1.* When pre-construction notification

More information

Guidelines for Professional Services in. the Forest Sector Forest Roads

Guidelines for Professional Services in. the Forest Sector Forest Roads Guidelines for Professional Services in the Forest Sector Forest Roads Photo June 2010 June 2012 TABLE OF CONTENTS 1 DEFINITIONS 1 2 INTRODUCTION 2 2.1 Purpose and Scope of Guidelines 2 2.2 Framework 3

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Environmental Construction Operations Plan (ECO Plan) Framework

Environmental Construction Operations Plan (ECO Plan) Framework ALBERTA INFRASTRUCTURE AND TRANSPORTATION Environmental Construction Operations Plan (ECO Plan) Framework COPYRIGHT, MAY 2005 THE CROWN IN RIGHT OF THE PROVINCE OF ALBERTA, AS REPRESENTED BY THE MINISTER

More information

Preparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens

Preparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens Preparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens While working with private landowners and wetland managers over the past several years, I ve noticed a common theme

More information

A Functional Classification System for Marine Protected Areas in the United States

A Functional Classification System for Marine Protected Areas in the United States A Functional Classification System for Marine Protected Areas in the United States The U.S. Classification System: An Objective Approach for Understanding the Purpose and Effects of MPAs as an Ecosystem

More information

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural

More information

STATEMENT OF JOSEPH G. PIZARCHIK, DIRECTOR OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE

STATEMENT OF JOSEPH G. PIZARCHIK, DIRECTOR OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE STATEMENT OF JOSEPH G. PIZARCHIK, DIRECTOR OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE COMMITTEE ON ENVIRONMENT AND PUBLIC WORKS U.S. SENATE ON THE IMPLICATIONS

More information

Woodland caribou (Rangifer tarandus caribou) in the Far North of Ontario: Background information in support of land use planning

Woodland caribou (Rangifer tarandus caribou) in the Far North of Ontario: Background information in support of land use planning Woodland caribou (Rangifer tarandus caribou) in the Far North of Ontario: Background information in support of land use planning The Far North Caribou Project (FNCP) was initiated in 2008 to support land

More information