PE21 7JE LEVEL 2 FLOOD RISK ASSESSMENT

Size: px
Start display at page:

Download "PE21 7JE LEVEL 2 FLOOD RISK ASSESSMENT"

Transcription

1 IE14/014/ymc Proposed Marstons Public House Swineshead Road Wyberton Fen Boston Lincolnshire PE21 7JE LEVEL 2 FLOOD RISK ASSESSMENT SUFFOLK: Registered Office: 7 Museum Street Ipswich Suffolk IP1 1HQ T F E ipswich@chick.co.uk (Registered No: ) ESSEX: 8 Atlantic Square Station Road Witham Essex CM8 2TL T E witham@chick.co.uk NORFOLK: 23 St Stephens Road Norwich NR1 3SP T F E norwich@chick.co.uk

2 FLOOD RISK ASSESSMENT [LEVEL 2 SCOPING STUDY] Proposed Restaurant / public house Swineshead Road Wyberton Fen Boston Lincolnshire PE21 7JE Client: Marston s Inns & Taverns PLC 1

3 Document Control Report prepared by: Y M Crowther HNC RMaPS On behalf of JPC Environmental Services A Division of JP Chick & Partners Limited 7 Museum Street Ipswich IP1 1HQ Signed: Dated: 23 / 09 / 2014 Report reviewed by: R M Crowther AIEMA On behalf of JPC Environmental Services A Division of JP Chick & Partners Limited Signed: Dated:..23 / 09 / ISSUE RECORD Issue Date Details Initial / 09 / 2014 Report issued in electronic format to: Barnes Construction - Andy Bates JWA Architects Stewart Prior Cerda Planning Michael Robson RMC 2

4 CONTENTS DOCUMENT CONTROL 1.0 EXECUTIVE SUMMARY 2.0 INTRODUCTION 2.01 Brief 2.02 Scope 2.03 Location 2.04 Site Description 2.05 Development Proposal 3.0 BACKGROUND TO FLOOD RISK AND REGULATORY CONTEXT 3.01 Current Guidance 3.02 Sequential Test 3.03 Exception Test 4.0 DESK STUDY 4.01 Sources of Information 4.02 Potential Sources of Flooding 4.03 Environment Agency 4.04 Boston Strategic Flood Risk Assessment (Aecom, 2010) 4.05 River Witham Catchment Flood Management Plan Boston Flood Alleviation Project 4.07 The Wash Shore Management Plan 4.08 Envirocheck Flood Screening Report 5.0 SURFACE WATER DRAINAGE 5.01 Current Drainage Strategy 5.02 Future Drainage Strategy 5.03 Pre & Post Development Runoff Rates 3

5 5.04 Borehole Permeability Testing 6.0 RESIDUAL RISK 6.01 General 6.02 Flood Warnings 6.03 Safe Access & Egress 6.04 Flood Evacuation 6.05 Compensatory Storage 7.0 SUMMARY / RECOMMENDATIONS 7.01 Potential Flood Risk 7.02 Recommendations APPENDICES A Site Location Plan B Topographical Survey C Architect s Layout Plan D Environment Agency Correspondence & Flood Modelling Outputs E Key extracts from the Boston SFRA F River Witham Catchment Flood Management Plan 2009 G Key extracts from the Wash Shore Management Plan H Envirocheck Flood Screening Report I Pre & Post Development Runoff Rates J Infiltration Test Results K Flood Resilient Construction Techniques Information Sheet 4

6 EXECUTIVE SUMMARY Site Name: Site Address: Client: Architect: Present Site Use: Proposed Site Use: Marston s Inns & Taverns PLC JWA Architects Agricultural / horticultural land Construction of new restaurant / public house with association car parking Objectives: To ascertain the potential extent of fluvial / tidal flood zones and explore whether these might impact on either the site or likely routes of access and egress. To make recommendations in respect of any or flood mitigation measures or drainage improvements that may be required to minimise the impact of the development. To make recommendations on additional investigations or hydraulic modelling, if considered necessary to better assess the level of risk. Sequential Test: According to the Environment Agency s indicative flood map, the site is located within Flood Zone 3 and therefore has an annual probability of 0.5% or greater, of flooding in any given year. This is classified as a High Probability of flooding. However it should be noted that this assessment does not take into account the protection afforded by existing flood defences. The Strategic Flood Risk Assessment (SFRA) undertaken in 2010 by Aecom Water for Boston Borough Council also places the site within flood zone 3. In terms of sensitivity, the development proposal is classified as More Vulnerable. Findings: Site levels range between 2.11m aod and 2.27m aod. The principal source of flood risk is tidal, via the nearby River Witham and the South Forty Foot Drain. The site benefits from a number of flood defences, offering protection against both fluvial and tidal flood events. While not considered to be formally defended the river channel offers a nominal level of protection rated at 1% (1 in 100 yrs). The tidal defences offer a varied standard of protection rated at 2% (The Haven) and 0.67% (1 in 150 yrs) around The Wash. The SFRA report confirms that the most significant risk of flooding is from a tidal event overtopping and/or a breach these earth embanked defences. The most significant historical flood event occurred in Whilst this impacted land to the East, the site itself remained unaffected. 5

7 According to the South Forty Foot Drain Model (September 2009) the key fluvial flood levels are 2.69m (1 in 100) and 2.73 (1 in 1,000). These figures include an allowance for climate change. According to the Northern Area Tidal Model (2006) the key Still Water tidal flood levels are 5.93m (1 in 200) based on a breach at Grand Sluice and 6.27 (1 in 1,000) based on a breach at Hobhole. These figures do not include an allowance for climate change. RMS modelling indicates that the site is NOT at risk from surface water (pluvial) flooding during the 1 in 75 or 1 in 100 yr events, but that the more extreme 1 in 1,000 yr event would result in the flooding of lower lying aspects (approx. 50% of the site). The Environment Agency RFfSW mapping identifies a small area of Low Risk to the west of the site. The Environment Agency have no record of any historical flooding on-site or in the immediate area. The proposed building will have a design life of 75 years, and therefore the climate change allowance factored into the fluvial modelling (100 years) makes the levels conservative. Searches indicate that there is no risk of groundwater flooding affecting the site. The Boston Flood Alleviation Project will ensure that the defences are maintained and kept up to a good standard. The Wash Shoreline Management Plan recommends a policy of Hold the Line for the length of shoreline around The Wash. This will ensure that the coastal frontage is continually protected. The site is supported by a good road infrastructure, and a comprehensive network of public transport. These provide excellent opportunities for safe access and egress. Risk Assessment: Hazard mapping provided by the Environment Agency suggests a minimum hazard rating of Danger to Most, increasing to a Danger for All when considering the more extreme events and impact of climate change. Based on recent local developments, a typical finished floor level of 3.30m aod may be required, to mitigate the residual risk of flooding. This offers a freeboard of 570mm above the 1 in 1,000 year fluvial flood level, however this is 1.03m above current ground levels. It is not considered feasible to fully protect against the predicted tidal flood levels. According to the SFRA, the site would not be at risk of flooding unless climate change is applied and or flood defences breached. In terms of surface water run-off, the proposals will increase the rate of run-off by l/s for a 1 in 100 year storm event. The volume of runoff associated with a 1 in 100 year storm of 6 hour duration will increase by 263m 3. The location of the site is on agricultural land accessed from a roundabout on the A52. In terms of safe access and egress during an extreme flood event, the site and 6

8 surrounding area are within the extent of expected flooding. However if warning is received early enough then it should be possible to reach areas of safety North of the site within a few minutes. Recommendations: Based on the information gathered as part of this Level 2 Scoping Study, JPC Environmental Services would make the following recommendations: - A finished floor level of not less than 3.03m aod is recommended, however further consultation is required with the local authority as nearby development have adopted floor level of 3.30m aod. The new restaurant / public house should be registered with Flood line Warnings Direct, the free flood warning service provided by the Environment Agency. A site specific Flood Response Plan should be formulated in consultation with the Emergency Planning Officer, and adopted. Staff should be trained in the evacuation procedures and need to be made aware of the warning / evacuation process. Due to the risk of on-site flooding, it would be prudent to consider the inclusion of some basic flood resilience measures such as: - Piled foundations - Where timber framed construction is adopted, knock-out panels should be included to provide improved opportunities for drying out the fabric of the building. - Non-absorbent insulation should be used within all floor and wall construction. - The electrical consumer unit should be locating at first floor level with wiring descending to the ground floor. - Electrical sockets / telecom and/or data ports should be a minimum of 1.0m above floor level. 7

9 2.0 INTRODUCTION 2.01 Brief JPC Environmental Services were appointed by Marston s Inns & Taverns Plc to undertake a Level 2 Flood Scoping Study in relation to the construction of a new Restaurant and Public House. Hereafter this will be referred to as the site The purpose of this desk based research was to: To identify potential sources and probable extent of flooding, and determine the likely risk of such events occurring. To determine the extent of the flood zones within the site by evaluating the topographical survey and the outputs from a 2-D model held by the Environment Agency. To make recommendations regarding the extent / type of flood resilient construction methods and a safe / sustainable floor level. To assess the potential impact of the development on surface water run-off and make recommendations on how this can be mitigated This Flood Risk Assessment, written in accordance with and meeting the requirements of, Planning Policy Statement 25 (PPS 25) Development and Flood Risk, has been requested by the local planning authority, (Boston Borough Council) and will be submitted to the Environment Agency for their comments / approval Authority to carry out this work was by written instruction from Barnes Construction Ltd This report shall be for the private and confidential use of Marston s Inns & Taverns, for whom it was undertaken. It should not be reproduced in whole or in part, or relied upon by a third party for any use without the express written authority of JPC Environmental Services Scope The main elements of the investigation were as follows: - To establish the potential extent of fluvial / tidal flood zones on site. To explore whether these might adversely impact either the site or likely routes of access and egress. 8

10 To explore any history of pluvial or surface water flooding not directly associated with a watercourse. To make recommendations in respect of any or flood mitigations measures or drainage improvements that may be required to minimise the impact of the development. To make recommendations on additional investigations or hydraulic modelling if considered necessary Location Address: Swineshead Road Wyberton Fen Boston PE21 7JE Grid References: Easting: m Northing: m Ordnance Survey Tile: TF A detailed map of the location is presented within Appendix A Site Description The site, which is situated West of Boston, currently comprises a parcel of agricultural field The site is located adjacent to a nearby roundabout and is bounded by the A52 Swineshead Road to the North, Old Hammond Beck to the South East and a Nursery to the West The site is located on the edge of a mixed commercial/residential area, to the West of Boston town centre and South of the A The land to the North has been recently developed to provide a number of commercial / retail units, further North of this area is the South Forty Foot Drain (Black Sluice Navigation) Land to the South beyond Old Hammond Beck is Agricultural. Whilst land immediately to the West is agricultural, further to the West there are a number of 9

11 established residential properties and commercial ribbon development either side of the A52. The land to the East adjacent to Old Hammond Beck Bank Road also comprises residential ribbon development A recent topographical survey of the site, provided by the client s Architect indicates that ground in the area of the proposed building footprint varies between 2.11m aod and 2.27m aod A copy of the survey is presented within Appendix B Development Proposal We understand that it our client s intention to develop the site as a restaurant / public house. The two storey building will be positioned to the West of the site, with customer parking to the South East. See extract below. Extract from architect s layout drawing While much of the land to the South East of the Marston s restaurant will be laid to hard surfaced car park, the land immediately around the building will be soft 10

12 landscaped, with a patio / beer garden to the North and a children s play area to the East The car park will provide parking for approximately 58 cars including 3 disabled spaces. There will also be a dedicated yard area for deliveries to the side The ground floor will be entirely laid out as a restaurant, bar and kitchen facilities, with the first floor flat providing a small office, staff facilities and living accommodation for the Site Manager The site access will be situated to the North East of the new restaurant, off an existing roundabout on the A52. This is located on the southern bank of New Hammond Beck, due South of Chain Bridge For more detailed information on the layout of the proposed development, a copy of which is presented within Appendix C. 11

13 3.0 BACKGROUND TO FLOOD RISK AND REGULATORY CONTEXT 3.01 Current Guidance In relation to flood risk, planning policy in England is currently guided by the new National Planning Policy Framework (NPPF) and the associated guidance relating to flood risk, published in March 2012, replacing Planning Policy Statement 25: Development and Flood Risk (PPS 25) The purpose of this planning framework is to ensure that flood risk issues are taken in to account at every stage of the planning process and that new residential and commercial developments are steered towards less vulnerable locations (zone 1) in preference to higher risk areas (zone 3) At a district or county level this takes the form of a Strategic Flood Risk Assessment, which seeks to inform local government development strategies. At this level potential development sites are classified in terms of their suitability for various types of future use. Where land in flood zone 1 is not available this is based on the identified level of risk, coupled with the sensitivity of the end use At all levels this policy relies on a series of predicted flood zones, which are defined by the Environment Agency. These zones are: - Zone 3b Functional flood plain annual probability of flooding >5%, or affected by flood events having a return period of up to 1 in 20 years Zone 3a area affected by floods with an annual probability of >1% fluvial flooding or >0.5% tidal. Return periods of up to 1 in 100 year fluvial or 1 in 200 year tidal flooding. Zone 2 Extreme flood plain with an annual probability of between 1% - 0.1% fluvial or 0.5% - 0.1% tidal. Return periods of up to 1 in 100 and 1 in 1000 for fluvial flooding or between a 1 in 200 and 1 in 1000 for tidal flooding. Zone 1 Outside the flood plain Land with <0.1% probability of tidal or fluvial flooding. Return periods greater than 1 in every 1,000 years In addition to exploring the potential risk and impact of flooding on the development, the site specific FRA s are required to assess the potential impact of the development on existing sites and the local hydrology. This is designed to ensure that new developments, which typically include extensive areas of impermeable surfacing, do not exacerbate flooding elsewhere. 12

14 3.02 Sequential Test The new NPPF advises local authorities, developers and consultants to follow a sequential, risk based approach to identifying land suitable for development At the strategic level local authorities zone areas for appropriate development, for example More Vulnerable uses such as residential development are preferred in flood zone 1, while Less Vulnerable development such as commercial premises may be appropriate in flood zone 2, where zone 1 sites are not available. Flood zone 3 is typically reserved for Water Compatible activities PPS 25 advises that When seeking planning permission for individual developments on sites allocated in development plans through the application of the Sequential Test, informed by a SFRA, developers need not apply the Sequential Test, but should apply the sequential approach to locating development within the site In the case of windfall sites, which have not been considered as part of the wider SFRA process, it may be necessary for developers and consultants to provide evidence that the Sequential Test has been undertaken. Such evidence must demonstrate that the type of development selected is appropriate to the level of potential flood risk pursuant to the site, and that alternative available sites have been considered The Environment Agency s flood map places the site within flood zone 3a. The proposed use of the site for restaurants would lead to a classification of Less Vulnerable, and would be suitable within the flood zone. However, the inclusion of residential accommodation increases the classification to More Vulnerable. It should be noted however that this is ancillary to the principal use as a food orientated restaurant / public house. Previous discussions with the Environment Agency have suggested that this may be suitable, however such case are decided at a local level, taking account of multiple factors. Extract from Technical Guidance to the NPPF March

15 3.03 Exception Test In the event that lower risk sites are not available then the Exception Test must be satisfied. This test provides a method for managing flood risk while still allowing necessary development to take place. There are three elements to the Exception Test, all of which must be satisfied These are: a) Sustainability it must be proven that the development confers wider benefits to community at large that outweigh the potential flood risk b) Brownfield land the site should be developable, previously developed land or alternatively there are no reasonable alternative previously developed sites available c) Safe a site specific FRA must demonstrate that the development will be safe, without increasing flood risk elsewhere and where possible will reduce flood risk overall As the site is situated within flood zone 3, according to the Environment Agency s flood map, the NPPF indicates that the Exception Test may need to be satisfied. (see table below). Extract from NPPF Technical Guidance 14

16 While the restaurant aspect of the proposed development is acceptable within the flood zone, the living accommodation is considered to be higher risk In line with the sequential approach the more vulnerable accommodation has been located at first level above the restaurant. The residential aspects will therefore remain safe and dry during even the most extreme 0.1% probability (1 in 1,000 year + CC) flood event. 15

17 DESK STUDY 4.01 Sources of Information As part of the desk based research, JPC Environmental Services consulted the following sources of information: Environment Agency s indicative flood mapping Product 3 & 8 information supplied by the Environment Agency Boston Strategic Flood Risk Assessment (Aecom, 2010) River Witham Catchment Flood Management Plan Boston Flood Alleviation Project The Wash Shoreline Management Plan British Geological Survey online reference mapping Envirocheck Flood Screening Report 4.02 Potential Sources of Flooding In line with guidance contained in National Planning Policy Framework (NPPF) and the retained Practice Guide to Planning Policy Statement 25 (PPS 25), we have explored the various potential sources of flooding which could impact the site both before and after the proposed development. This assessment has identified and will go on to evaluate the following flood risk issues: Fluvial flooding Tidal flooding South Forty Foot Drain (Black Sluice Navigation) Old & New Hammond Becks Via the River Witham Via South Forty Foot Drain Boston Haven (& Witham Outfall Channel) Wash Banks Surface water flooding (pluvial flooding) Fluvial Flooding Fluvial flooding occurs when excessive rainfall takes place within a river s catchment resulting in high levels of run-off, which in turn causes water levels within the river to rise. This can occur over an extended period or, in the case of flash flooding, due to 16

18 intense rainfall over a relatively short duration. When the level of surface water runoff exceeds the river s capacity this generally leads to localised overtopping or in some cases one or more breaches may occur In this instance the nearest watercourses are Old Hammond Beck, New Hammond Beck and South Forty Foot Drain. Old Hammond Beck is the closest and forms the site s South East boundary, flowing from South West to North East. New Hammond Beck, which flows from West to East, is located on the opposite side of the A52, to the North of the site. The largest of the watercourses is the South Forty Foot Drain which runs broadly parallel to the New Hammond Beck While the close proximity of these watercourses suggests that fluvial flood events may have a significant impact on the site, the flow within the drains is artificially managed, via a series of pumping stations. These pumps are controlled by local Internal Drainage Board. Many of the drains in this part of the country are hundreds of years ago, having been constructed to drain the low lying fenland As a result of their managed status, water levels within these watercourses is not prone to significant fluctuation and therefore we do not consider these to be the primary or most significant source of flood risk. Tidal Flooding Tidal flooding occurs when an exceptionally high tide, almost always accompanied by a storm tide surge, overtops and/or breaches the tidal defences along the coastline or tidal estuary Direct tidal flooding tends to produce higher flood levels than fluvial events and there is an increased likelihood of hard or earth embanked sea defences being overtopped or breached, particularly when water levels rise quickly, allowing floodwaters to pour inland. In this instance Boston is located within the tidal stretches of The Haven and the River Witham and approximately 10-12km from the Wash. Due to the low lying nature of the site and the close proximity of the coast, there is a relatively high probability that the site may become flooded during an extreme event The potential extent of tidally influence flooding can also be exacerbated by the inability of the River Witham to discharge via its tidal outfall at Boston (Grand Sluice). The River Witham s discharge can be restricted for significant periods of time during a high tide. Such events can threaten both coastal and inland areas. 17

19 Although, this assessment is confirmed by the Environment Agency s indicative flood mapping it is worth noting that during the most severe flood event of recent times, in 1953, the site and Boston area was not affected. However, Boston was affected by the more recent storm surge event of December 2013, although again the site remained dry Tidal flooding is subsequently considered to be the most likely source of significant flood risk, to affect the site, and will be explored in more detail within subsequent sections of this report. Surface Water (Pluvial) Flooding Pluvial flooding is closely related to Fluvial flooding, in that it typically occurs when excessive rainfall occurs within a catchment, to such an extent that it is unable to be absorbed by the underlying soils. Water that is unable to soak in to the soil accumulates and migrates in line with the local topography, eventually making its way the nearest watercourse or more usually in built up areas the nearest storm sewer The site is situated in a relatively rural location, with large expanses of permeable greenfield land around it. While the underlying geology is typically fine grained alluvial silts / clays which are not especially permeable, the landscape is crisscrossed with drainage to direct surface water quickly into the network of Main Drains Because of the Borough s relatively flat topography, many of the local drainage systems are either pumped into the receiving watercourse, or discharge under gravity into a watercourse (Drain) which is itself pump-drained We therefore consider that surface water flooding does not represent as significant source of potential flood risk, as fluvial or tidal flooding Environment Agency This section of the report contains Environment Agency information Environment Agency and database rights The Environment Agency is responsible for the maintenance of all Main Rivers, for keeping records of significant fluvial and tidal flood events, and for establishing an indicative flood map, which displays the extent of anticipated flooding in four distinct 18

20 probability zones. These zones were previously described in section 3, paragraph To confirm the extent of both fluvial and tidal flood zones JPC Environmental Services have consulted with the Environment Agency and received both a detailed flood map and a series of modelled flood levels. See image below The above map extract shows that the site is located within tidal flood zone 3. The annual risk of flooding is therefore >0.5% (1 in 200 yrs) from the sea or 1% (1 in 100 yrs) from fluvial flooding. It should be noted however that the above map does not take into account the protection afforded by established flood defences in the area and as such is very much the worst case scenario The fluvial flood levels associated with the above model nodes are set out in the table below. These are measured in metres above Ordnance Datum Newlyn (modn) 19

21 The above table shows that the current maximum 1 in 100 year flood level is considered to be 2.73m aod. During the more extreme 1 in 1,000 year return period, the maximum flood level has been modelled at 2.76m aod. These figures include climate change, based on a default design life of 100 years This flood level would result in approximately 0.5m of flooding within the site In addition to fluvial levels, the Environment Agency has included Tidal flood levels derived from the North East Coastal Model. These levels, which incorporate a number of coastal and inland breach scenarios, are set out below: When comparing the undefended levels to the on-site ground levels, it is evident that during even the 0.5% probability event (1 in 200 year the design level), the site could potentially be inundated to a depth of 3.82m In addition to the model outputs, the Environment Agency has provided condition information regarding the various fluvial and tidal flood defences There are no formal fluvial flood defences protecting the site, but the natural channel is maintained by the Environment Agency providing a nominal protection against a flood event with a 1% change of occurring any year (1 in 100). The channel is inspected regularly and any potential defects rectified The Haven tidal defences protecting the site consist of earth embankments. They are in good condition and provide protection again a flood event with a 2% chance of occurring in any year (1 in 50). The defences are inspected regularly to identify potential defects early The Wash tidal defences protecting this site consist of earth embankments. They are in good condition and provide protection against a flood event with a 0.67% chance of occurring in any year (1 in 150). We inspect these defences regularly to ensure that any potential defects are identified early The Environment agency have issued to us modelled breach hazard mapping for the area which is in line with the Strategic Flood Risk Assessment which is discussed in more detail later in this report. 20

22 In relation to historical flood events, the Environment Agency have advised that they hold no records of any flooding in this area A copy of the information received from the Environment Agency is presented within Appendix D Boston Borough Council Strategic Flood Risk Assessment Aecom Water (October 2010) Boston Borough Council commissioned an update to the 2002 SFRA to account for the impact of climate change. This contains mapping, in accordance with PPS While PPS 25 has itself since been withdrawn, the climate change allowances ascribed to the East Coast during a series of 25 year tranches, have been adopted by its successor, the National Planning Policy Framework (NPPF). The Practice Guide associated with PPS 25 also remains valid guidance for the assessment of flood risk The SFRA states that due to the location of Boston being 10km West of the Wash Coastline, lying on the River Witham and Boston Haven (the river s tidal outfall channel) together with various drainage channels, Boston is at risk of both fluvial and tidal / coastal flooding. However, of these, tidal flooding from the overtopping and breaching of defences is the most significant source of flood risk Due to the land being reclaimed from the sea, there are numerous drainage channels throughout this area, see extract from SFRA study area below: The Site Figure 1 Significant watercourses in Boston 21

23 Relative Probability of Flooding. Within the SFRA, hydraulic modelling of the 1% (1 in 100 year) and 0.1% (1 in 1000 year) fluvial flood event and 0.5% (1in 200 year) and 0.1% (1 in 1000 year) tidal flood event was carried out to determine the relative probability of flooding at the proposed development site taking present flood defences into account. Flooding was assumed to occur when a flood embankment overtopped. Where the defence was an earth embankment it was assumed that breaching would follow. Figure 2 indicates that the site is classified as having a low relative probability of tidal flooding taking present flood defences into account. The Site FFigure 2. Relative Flood Risk Map taken from Boston Borough Council SFRA (2010). Residual Risk of Flooding Residual risks of flooding arise from either extreme events with exceptionally high return periods (200+ years) or events which, due to their unpredictable nature, are not readily amenable to quantitative analysis, for example premature structural failure, serious operational or equipment failures or freak accidents which cannot be foreseen. The principal residual flood risk in the Boston area would be a result of premature failure of the flood embankments well before the defences were overtopped The Catchment Flood Management Plan (CFMP) advises that tidal flooding from the Haven and overtopping of the tidal defences could inundate large parts of Boston. Within the Boston Borough Council SFRA, a 2-D model was developed for the 2115 climate change scenario to estimate the impact of a breach. 22

24 The resulting future Flood Hazard Mapping (Figure 3) shows the entirety of the proposed development site is classed as being at high risk of residual flooding with danger for most should a breach of the present flood defences occur. The report notes that this represents a worst case scenario and cannot be attributed to a particular magnitude event. The Site Figure 3 - Flood Hazard Map (for 200 year event plus climate change) taken from Boston Borough Council SFRA (2010) Key extracts from the SFRA are presented within Appendix E 4.05 River Witham Catchment Flood Management Plan (2009) The probability of river and tidal flood risk has been reduced significantly in the Boston area through the construction of defences; however the area is still at substantial risk from tidal flooding due to the overtopping of these defences. There is also a flood risk associated with the network of inland rivers and drains. Flood risk measures rely heavily on raised embankments, tidal doors to prevent tidal waters entering inland and the Black Sluice Pumping Station. Historical Flooding Records show that during the tidal surge in December 2013 Boston Haven area was flooded due to a rare tidal storm event flooding approximately 300 homes. Storm surges are created when strong winds push water up against a coastline. Low 23

25 atmospheric pressure associated with weather systems causes the sea level to rise even further. A storm surge in the North Sea can raise the average sea level by 2 3 metres over a large area. Serious coastal flooding often occurs when storm surges coincide with large spring tides. The most recent storm surge event, which occurred in December 2013, did not reach the site Key extracts from the CFMP are presented in Appendix F Boston Flood Alleviation Project Around the Wash, earth embankments give a standard of protection rated at 0.67% or 1 in 150 years. Currently the tidal storm defences in Boston provide a standard of protection for a tidal event of just 2% in any year (or 1 in 50 years). The Environment Agency is currently planning a flood alleviation scheme for Boston, consisting of a multifunctional barrier combined with the refurbishment of existing defences The Flood alleviation scheme has been developed as follows: Phase 1 - Black Sluice Lock completed March Connects River Witham (Lincoln) to Black Sluice Navigation (Boston to Donington Bridge) via 35km of new navigation. Phase 2 - Boston Barrier, improving navigation safety and reliability and reducing tidal flood risk. Phase 3 - Donington Bridge to Surfleet Seas End Link, connecting Black Sluice Navigation to RiverGlen. Feasibility work underway. Phase 4 - Surfleet to Crowland Link, enhancing connection from River Glen to River Welland. Phase 5 - Crowland to Peterborough Link, connecting River Welland to River Nene Phase 6 - Nene-Ouse Link, improving connection across the Middle Level Navigations (Peterborough to Ely, Cambridge and Bedford) The 90.2million multi-functional Boston Barrier will increase the level of protection to 0.33% or storms having a return period of 1 in 300 years (annual chance for the next 70 years). It will also provide safe inland navigation during the boating season (April to October) by retaining daytime low tide water levels upstream of the barrier. The barrier will not retain water levels during a tidal or fluvial flood event Work will be undertaken on the banks of the Haven downstream of the Barrier, to raise existing flood defences. Some of the existing downstream defences, like sea banks, are already better than those in Boston and there is no immediate need to 24

26 raise these defences. The strategy has also identified the need to raise the defences along the Haven in approximately 60 years time to reduce the risk of flooding from future sea level rises caused by climate change In 2011 there was extensive public consultation to decide the preferred location for the Boston Barrier. As a result, there was overwhelming support for the location just downstream of Black Sluice lock The Government Department for the Environment, Food and Rural Affairs (Defra) has reviewed Boston Barrier Strategy and given it permission to move to the next stage. This means the flood defence scheme, which will reduce tidal flood risk to 20,000 properties in Boston, remains on track to be completed by The Wash Shoreline Management Plan (SMP) The Wash SMP covers the area of coastline from Gibraltar Point to Old Hunstanton. This plan has taken into account the Humber Estuary coastal Authorities Group SMP2, the Old Hunstanton to Kelling Hard SMP2 and the Catchment Flood Management plans which assess the management of flood risks from rivers The Wash SMP covers from Gibraltar Point to North West King s Lynn the shoreline is characterised by a sea bank that divides salt marsh and mud flat from extensive low-lying agricultural land. Most of the agricultural land has been reclaimed from the sea over past centuries, and contains almost 50% of England s grade one and 10% grade two land. It supports a regionally and nationally valuable agriculture industry Following finalisation by the Environment Agency, local authorities and consultants, the Wash SMP was published in The coastline was separated into policy units, and each unit of managed coastline was evaluated and assigned one of four policy options, which were: - Hold the existing line Advance the line Managed realignment No active intervention The policy unit affecting the site is Policy Zone 1: River Steeping at Gibraltar Point to Wolferton Creek. Based on established settlements, habitation and land use around The Wash, the SMP is to continue to defend against tidal flooding. The risk is greater than for the other Policy Development Zones in this Plan and for other SMPs around 25

27 the country. It is beyond the scope of this Plan to determine a required standard of protection, but it can make decisions about the relative level of flood risk in the face of climate change. For this Policy Development Zone therefore, one of the critical decisions is whether to sustain the existing activity level (accepting gradual increase of risk), increase the activity level to sustain the existing level of risk, or aim to reduce flood risk. Sea level rise and potential future loss of foreshore width and height would increase pressure on the defences In the short-term, the policy option is to hold the existing sea bank alignments. In the medium and long-term, ideally the existing alignments should continue to be held. However there is a chance that climate change will cause a significant loss of salt marsh and mud flat in front of the sea banks. If this occurs, localised landward realignment should be considered as an alternative to holding the line. Extract from The Wash SMP Key extracts from the Wash SMP are presented in Appendix G British Geological Survey According to British Geological Survey online reference mapping the bedrock geology of the site lies within Ampthill Clay Formation Mudstone, Sedimentary Bedrock formed approximately million years ago in the Jurassic Period. Local environment previously dominated by shallow seas. The Superficial deposits are: Tidal Flat Deposits, 1- Clay and silt. Superficial deposits formed up to 3 million years ago in the Quaternary Period. Local environment previously dominated by shoreline Envirocheck Report Until recently, the Environment Agency did not hold information on surface water flooding. To address this shortfall, and obtain useful information on flood related insurance claims, JPC Environmental Services purchased an Envirocheck Flood Report. The insurance claims information is supplied by Crawford & Co. 26

28 The RMS dataset, which explores the potential of surface water flooding, uses a combination of land height, predicted rainfall and other variables to predict areas that are likely to be affected by surface water flooding during three key return periods, 1 in 75 years, 1 in 100 years and 1 in 1,000 years. This resulting information is displayed in map form of the attached report, which is presented in Appendix H The RMS Flood Risk mapping for the 1 in 75 year storm event shows that the proposed site is not at risk from surface water flooding. This nearest flooding is an area to the South. There are areas subject of surface water flooding adjacent to the South Forty Drain North of the site as well as North East in the residential areas of Boston. 1 in 75 year return period During a 1 in 100 year storm event, the extent of pluvial flooding around the site is likely to increase, although the site remains dry. The flooding area to the North of the South Forty Foot Drain has become more widespread, although immediately North (new supermarket) remains dry. 1 in in year year return period 27

29 During the more extreme 1 in 1,000 year storm event, the extent of pluvial flooding has again increased and is expected to impact the majority area, with the exception of a few isolated pockets of dry land to the North including the new supermarket. The site is now clearly shown within the flooded area, with approximately 50% of the site affected. 1 in 1,000 year return period The Flood Risk Location Map within the appendices of the report is an extract of the EA flood mapping and as a consequence shows that the site is situated within flood zone In addition to the flood modelling data, the report also includes details of flood related insurance claims within the locality, highlighting areas where water damage may have occurred. The report advises that the overall flood risk rating for the site is Low Finally, within section of the report covering British Geological Survey information, the report advises that there is no risk of groundwater flooding within the search area. The report also notes that the underlying geology suggests that the site is vulnerable to coastal flooding. 28

30 5.0 SURFACE WATER DRAINAGE 5.01 Current Drainage Strategy This site is undeveloped Greenfield land, and therefore has no formal drainage system other than the network of land drainage ditches Future Drainage Strategy To minimise the risk associated with new areas of impermeable surfacing, new developments are required to take into consideration the increased rate and volume of surface water run-off The new development would be expected to limit surface water discharges to Greenfield rates of run-off, via the use of sustainable drainage techniques, in line with a sustainable drainage hierarchy Below is a review of the key drainage techniques recognised as part of the sustainable drainage hierarchy, below: Rainwater harvesting by storing rainwater for later use potential discharges are reduced as is the use of treated tap water. Unfortunately rainwater harvesting remains a fairly expenses option and one best used on developments where non-potable water usage is high water. This approach has been dismissed. Infiltration techniques solutions such as permeable paving or soakaways rely on granular soils, where this ample opportunity for infiltration. The underlying soils in this site makes this unsuitable. Attenuation (above ground) temporary storage of rainwater in ponds or open water features for gradual release to a nearby watercourse. Such ponds present environmental / habitat benefits in addition to their water management characteristics. Attenuation (below ground) storage tanks or sealed water features with gradual release to a watercourse less beneficial to the wider environment but often required where space is at a premium Discharge rainwater direct to a watercourse Initial consultation with the Inland Drainage Board suggests that this approach would not be permitted. Discharge rainwater to a surface water drain Not available Discharge rainwater to the combined sewer Not permitted 29

31 The preferred methods for managing any site s surface water discharge retain the water within the site. This is either for re-use, or in the case of soakaways and permeable paving, makes use of natural infiltration to channel surface water into the underlying soils where it can slowly recharge groundwater resources at depth Unfortunately the cohesive nature of the underlying geology, comprising tidal flat deposits over Amphill Clay (Mudstone) make infiltration based techniques unsuitable We understand that the preferred solution will incorporate an attenuated discharge, although a detailed drainage scheme is to be subject to the findings of this report Pre & Post Development Runoff Rates The Pre-development run-off rates have been calculated as follows (based on a 15 minute storm): 1 in 1 year = 0.8 l/s 1 in 30 year = 2.3 l/s 1 in 100 year = 3.3 l/s based on no impermeable surfacing The Post development run-off rates have been calculated as follows (based on a 15 minute storm): 1 in 1 year = l/s 1 in 30 year = l/s 1 in 100 year = l/s based on 2885m2 of impermeable surfacing The detailed calculations for both pre and post development run-off rates are presented within Appendix I The additional areas of impermeable surfacing will increase the 1 in 100 year surface water discharge by l/s In terms of the volume of run-off arising from a 1 in 100 year storm, of 6 hour duration, the post-development catchment has the potential to produce an increased discharge of 263m 3. 30

32 5.04 Infiltration Testing In August 2014, Harrison Group were commissioned to carry out a ground investigation, comprising trial pitting and deep percussive boreholes As part of this combined geotechnical and geo-environmental investigation, two of the trial pits were selected for in-situ infiltration testing, in accordance with BRE Digest Each trial pit was extended to a depth of 2.10m, and filled with gravel to prevent collapse. Water levels were recorded at key intervals. Over a period of 26 hours, the water level in TP6 dropped 340mm, while the level in TP4 dropped by just 130mm in 25 hours. Both of these tests failed to meet the minimum Building Control requirement of 50% in 24 hours As neither test achieved 75% empty it was not possible to calculate an infiltration rate in accordance with BRE 365. Based on these results it is evident that the on-site soils within this location are of low permeability, and therefore not suitable for infiltration techniques such as soakaways A copy of the infiltration test results are presented in Appendix J. 31

33 6.0 RESIDUAL RISK 6.01 General While the site is located in close proximity to several IDB drains, including the South Forty Foot Drain, these watercourses form part of an artificially managed system. The main residual risks associated with these are: a failure of the pumping infrastructure; an inability for them to discharge in the tidally influenced river / estuary downstream, due to tide levels; and the route they provide for tidal flood waters to flow inland Of these, the most significant risk is associated with tidal flooding While this risk is mitigated by established defences, there remains an unquantifiable risk of tidal flooding via a defence failure or overtopping. This risk will also increase over time, as sea levels rise The breach scenarios modelled for the Environment Agency indicate that the site could see flooding between 0 and 0.25m during the design (1 in 200 yr) flood event. During the more extreme (1 in 100 yr) plus climate change flood event, the potential depth of flood waters on-site could reach m Flood Warnings In addition to the existing flood defences the residual risk outlined above is mitigated by an automated flood warning service provided by the Environment Agency. The site is situated within the flood warning area known as Tidal flooding in areas to the south of Boston, including Chain Bridge, Wyberton, Frampton and Skeldyke All registered properties receive advanced warning of adverse weather conditions and particularly high tides that might result in possible flooding The site is located within the Flood Alert area shown overleaf. 32

34 The Site Environment Agency Flood Warning areas While the amount of advanced warning is not guaranteed, the service aims to provide flood warnings up to 6 hours in advance of an impending flood, based on prevailing weather patterns and known tide levels Flood line Warnings Direct issues automated flood warnings via telephone, , fax and text message. The public house will therefore receive advance warning of potential flooding, allowing them to maintain a period of increased awareness or evacuate the site as necessary It should be noted that, according to the Environment Agency s website, the flood status for this area last changed in December See below. 33

35 The current status can be obtained via the link below: Safe Access & Egress As a result of the site s inland location, well behind the coastal defences, it is almost certain that any significant flood event will be preceded by news of flooding along the East Coast, well before floodwaters reach the site Unfortunately due to the low lying nature of Lincolnshire countryside, most of the surrounding road infrastructure is also situated within the predicted flood plain. However, by the time a flood warning is received it is unlikely that floodwaters will have encroached onto the highway, and therefore safe egress from the site should be possible The site benefits from almost immediate access to the A52, located to the North of the site, which itself provides quick access to the A17 and higher ground to the West. See map extract below. The Site Customers and staff should exit the site onto the roundabout, and take the first exit onto the A52. After 5.5miles they will reach a crossroads with the A17, at which they 34

36 should turn right and then continue in a north westerly direction out of the flood warning area Flood Evacuation JPC Environmental Services have produced this FRA as part of the planning application process as requested by Boston Borough Council We would also recommend that a Flood Response Plan is produced to assist in the safe and organised evacuation of the site, should a flood warning be received. It is likely that this will form part of a planning condition from the Local Planning Authority Compensatory Storage There is no requirement for compensatory storage on this site as the principal source of flooding is tidal, via The Haven & South Forty Foot Drain. Due to the vast potential volumes associated with tidal flooding, it is generally deemed inappropriate Mitigation Measures As this risk assessment has identified a residual risk of significant flooding, it is recommended that flood resilient construction techniques are incorporated within the construction of the new building. These measures will be designed to protect the occupants of the Manager s apartment, reduce the extent of water damage and facilitate any post-flood repairs / drying out In terms of finished floor levels it is usual for these to be based on the 1% inc cc fluvial design level, plus a freeboard of 300mm. This would result in a finished floor level of 3.03m aod. However we understand from reviewing recent developments in the area, that a floor level of 3.30m aod has been required. While 3.30m would afford an enhanced freeboard of 570mm, it is below the predicted tidal flood levels of 5.93m aod (0.5% inc cc) to 6.35m 0.1% inc CC) In relation to the office / living accommodation at first floor level, a floor to ceiling height 2.85m is shown. This places the first floor at a height of 6.15m aod. It is therefore recommended to incorporate flood resilient construction for the entire ground floor providing protection close to the 0.1% inc cc level. 35

37 The flood resilient construction techniques recommended for this development will include the following: - Piled foundations with a 225mm concrete beam and block suspended floor has been adopted to provide robust floor construction. The resulting sub-floor void will incorporate a 50mm concrete blinding laid to falls over 1200mm gauge polythene. This blinding will be laid at a gradient of 1 in 150 towards gullies and drainage channels which pass through the adjacent sleeper walls. This sub-floor drainage terminates in a modest sump, so that any flood water penetrating beneath the new building can be pumped out if necessary. Where timber fixings are considered to be at risk from exposure to flood water, stainless steel connectors and fixings will be specified. In terms of the timber frame, Acetylated wood products will be utilised for all ground floor studwork as an alternative to the traditional C16 timber studs. This will reduce the risk of fungal decay if moisture content of the frame remains above 20% for a significant period, following internal flooding. As masonry will be used to enclose the timber framed building it will not be possible to gain access to the internal wall construction from the building s exterior, in the event that drying out is required. However, the ground floor timber frame design will incorporate a series of separately flamed knock out panels. In the event of a significant flood, which results in internal flooding, these knock out panels can be removed to improve access for drying out or for total replacement of the knock out panel itself. The knock out panels will be sheathed with exterior grade plywood (EN636-3 to BSEN636) rather than OSB3 to prevent distortion due to water absorption. Between the external sheathing and the interior wall lining the inter-stud insulation will be a third party approved close cell insulation product rather than mineral wool. While paper faced gypsum plasterboard will be utilised for the internal wall lining, this will laid horizontally and considered a sacrificial finish. In the event of internal flooding internal disturbance and reconstruction will then be minimised. 36

38 Non-absorbent, closed cell insulation will be utilised within all floor and wall construction to a height of at least 6.15m aod. The electrical consumer unit will be located at first floor level with wiring descending to ground floor. Associated sockets will be located a minimum of 1.0m above the finished floor level to further reduce the risk of water damage. The proposed finished floor level will be set a minimum of 3.30m aod with external pavement and ground levels no greater than 3.15m aod where they abut the building. In drawing up the above measures we have consulted with the Communities and Local Government report: Improving the Flood Performance of New Buildings Flood Resilient Construction, which was published in May 2007; and the TRADA Information Sheet WIS2/3-64: Timber Frame Design for Flood-Prone Sites, published May Consideration should be given to the inclusion of a flood resilient floor covering, such as ceramic tile or stone to reduce the future cost of any flood damage Please note that the above is not an exhaustive list. A comprehensive list of flood resilient construction methods, which should be considered during the detailed design, is presented within Appendix K. 37

39 7.0 SUMMARY / RECOMMENDATIONS Summary of Potential Flood Risk The site is at risk from tidal flooding, which may arise as overtopping or a breach in the current coastal flood defences When comparing the modelled flood levels to the existing on-site ground levels, it is evident that the depth of external flooding could reach a maximum depth of m during an extreme tidal event, although hazard mapping indicates a more likely depth of between 1.0 and 2.0m for the 0.1% event (2115) The additional potential risk of surface water flooding, associated with the development s new areas of impermeable surfacing will be mitigated by an attenuated discharge In the event of a flood warning, the business will close to the public and the site will be evacuated. This will be facilitated by a Flood Response Plan. In the event that staff or customers become trapped by incoming flood waters, the Manager s apartment will provide a safe haven until flood waters recede Recommendations Based on the information gather as part of this desk based risk assessment, JPC Environmental Services would recommend the following: A finished floor level of not less than 3.03m aod is recommended, however further consultation is required with the local authority as nearby developments have adopted floor level of 3.30m aod. The new restaurant / public house should be registered with Floodline Warnings Direct, the free flood warning service provided by the Environment Agency. A site specific Flood Response Plan should be formulated in consultation with the Emergency Planning Officer, and adopted. Staff should be trained in the evacuation procedures and need to be made aware of the warning / evacuation process. Due to the risk of on-site flooding, it would be prudent to consider the inclusion of some basic flood resilience measures such as: - Piled foundations (reduced risk of scour) 38

40 - Where timber framed construction is adopted, knock-out panels should be included to provide improved opportunities for drying out the fabric of the building. - Non-absorbent insulation should be used within all floor and wall construction. - The electrical consumer unit should be locating at first floor level with wiring descending to the ground floor. - Electrical sockets / telecom and/or data ports should be a minimum of 1.0m above floor level The opinions and recommendations expressed within this report are based on the results of desk based research and information provided by third party agencies. No additional hydraulic modelling has been undertaken as part of this assessment. 39

41 IG14/062 APPENDIX A Site Location Plan

42 JPC Environmental Services (A division of J P Chick & Partners Limited) 7 Museum Street Ipswich Suffolk IP1 1HQ Project: New Marston s Restaurant / Public House Swineshead Road BOSTON Lincs Date: Sept 2014 Drawing Number: JPC ES SK01 Scale: NTS Job Number: IG14/062 Drawing Title: Site Location Plan

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised Proposed Re-development, At 321 London Road, Wyberton Flood Risk Assessment - Revised Prepared By: C Mason C.Eng M.I.C.E May 2015 Contents Page No. 1. Introduction 2 2. Site Description 2 3. Flood Hazard

More information

Littleport Co-located Schools

Littleport Co-located Schools Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

Sutton Harbour Holdings PLC. March 2007

Sutton Harbour Holdings PLC. March 2007 Sutton Harbour Holdings PLC March 2007 Contents!! " # # $ % % &'(&'' ) ) ( * + ', *!$ -,!'! #. / $$ #% 00& ' 00&1 $ Executive Summary!! " WSP Development and Transportation has been engaged by Sutton

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 mail@jppuk.net jppuk.net Proposed Residential Development Land

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

Flood Risk Assessment and Drainage Statement

Flood Risk Assessment and Drainage Statement Trinity College, Cambridge Proposed Relocation of Felixstowe Rifle Range, Land north of Nicholas Road, Trimley St Mary, Felixstowe Quality Assurance Site name: Client name: Proposed Relocation of Felixstowe

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

Development at 2 St Albans Road, Kingston, London, KT25HQ

Development at 2 St Albans Road, Kingston, London, KT25HQ Development at SuDS Report. Prepared for: Report prepared by: Dave Alonso Divine Ideas (UK) ltd Date: August 2015 Project/Issue number: Appendices Attached: 1510/01/SuDS A, B & C Divine Ideas (UK) Ltd

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Groundwater Flooding: a UK Perspective

Groundwater Flooding: a UK Perspective Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding

More information

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

FLOOD INFORMATION SERVICE EXPLANATORY NOTES FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

More information

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148 Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Ref: RAB 148 Lindsey Phillips Turnbull Tweedale Ltd 61 Oaken Lanes Codsall South Staffordshire WV8 2AW R A B C O N S

More information

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015.

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015. Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015 Contents Flood Map Confirmation Flood Map Extract Model Output Data Data

More information

FLOOD RISKS IN LONDON

FLOOD RISKS IN LONDON Environment Committee FLOOD RISKS IN LONDON Summary of findings April 2014 About this summary 2 This is a summary of the findings of the Environment Committee s investigation into flood risk. In January

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan Preliminary Environmental Information Report: Appendix 16.C Flood Warning and Evacuation Plan THIS PAGE IS LEFT INTENTIONALLY BLANK Page 2 of 30 Contents SUMMARY 1. INTRODUCTION... 9 1.1 Background...

More information

FLOOD RISK ASSESSMENT

FLOOD RISK ASSESSMENT SEVERN ROAD RESOURCE RECOVERY CENTRE FLOOD RISK ASSESSMENT REF 402.0036.00374 September 2009 Severn Road Resource Recovery Centre Ref: 402-0036-00374 Viridor Waste Management i PPS25 Flood Risk Assessment

More information

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS 23 NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS Turn page Northamptonshire Flood Toolkit This guidance has been developed to support applicants and developers who are required or encouraged to produce and

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result

More information

Report Reference: gauges below. Recommendations are on page 2 and information about flood resistance and Sample resilience measures is on page 4.

Report Reference: gauges below. Recommendations are on page 2 and information about flood resistance and Sample resilience measures is on page 4. Flood Report This report is issued for the property described as: Flood Risk Assessment FURTHER ACTION Sample Street, Sample Town, UK Professional Opinion The Site falls within an area which has an elevated

More information

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site. Flood Risk Assessment Erection of Masjid/ Place of Worship, extended car parking following demolition of 11a Grafton Street & boundary treatment Land adjacent 11/ 11a Grafton Street, Preston, PR1 8JB 0723/

More information

Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014. David Keane Cork County Council

Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014. David Keane Cork County Council Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014 David Keane Cork County Council 1 Contents 1. The Power of Water 2. Defenses 3. Flooding & Flood Types 4. Flood Mitigation

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Flood Risk Assessment For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Contents 1. Introduction 2. The Site 3. Flood Risk 4. Existing drainage 5. Proposed Development

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment local development framework Strategic Flood Risk Assessment LOCAL DEVELOPMENT FRAMEWORK ROYAL BOROUGH OF KINGSTON UPON THAMES Level 1 and 2 April 2011 Contents Executive Summary 5 Part 1 - Aiding Planning

More information

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and 1. Purpose (1) It is the purpose of this Ordinance to protect human life, health, and property from flood conditions, to preserve the ability of floodplains to carry and discharge a base flood, and to

More information

Norfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May 2012. Bloc Hotels. Vantage Planning Ltd. www.vantageplanning.co.

Norfolk House Hotel Development Gatwick Airport. Flood Risk Statement. May 2012. Bloc Hotels. Vantage Planning Ltd. www.vantageplanning.co. Development Gatwick Airport May 2012 Bloc Hotels Vantage Planning Ltd www.vantageplanning.co.uk Vantage Planning Ltd Contents 1. Introduction... 2 2. The Proposed Development... 2 3. The Development Site...

More information

Cambridge House, Henry Street, Bath BA1 1UR

Cambridge House, Henry Street, Bath BA1 1UR Flood Risk Assessment Cambridge House, Henry Street, Bath BA1 1UR For Full Planning application to BANES Council June 2011 Introduction This report is prepared as requested by B&NES to accompany the planning

More information

Mr & Mrs Clarke Proposed Development at The River House, Balderstone Flood Risk Assessment

Mr & Mrs Clarke Proposed Development at The River House, Balderstone Flood Risk Assessment Proposed Development at The River House, Balderstone D2192-FRA-01 5 Nov 2015 PSA Design Ltd Consulting Engineers The Old Bank House 6 Berry Lane Longridge Preston PR3 3JA Tel. 01772 786066 Fax. 01772 786265

More information

Guideline: A risk assessment approach to development assessment in coastal hazard areas

Guideline: A risk assessment approach to development assessment in coastal hazard areas Guideline: A risk assessment approach to development assessment in coastal hazard areas Prepared by: Environment Planning, Department of Environment and Heritage Protection State of Queensland, 2013. The

More information

Planning Policy and Guidance on Flooding and Coastal Erosion

Planning Policy and Guidance on Flooding and Coastal Erosion Planning Policy and Guidance on Flooding and Coastal Erosion James Hooker (MRTPI) Senior Planning Manager Welsh Government RTPI Cymru - Water and Flooding Seminar Tuesday 20 th November 2012 Overview

More information

Planning Policy Statement 15 (PPS 15) Planning and Flood Risk

Planning Policy Statement 15 (PPS 15) Planning and Flood Risk Planning Policy Statement 15 (PPS 15) Planning and Flood Risk Planning Policy Statement 15 (PPS 15) Planning and Flood Risk Planning Policy Statements (PPSs) set out the policies of the Department of the

More information

Wye and Usk Catchment Flood Management Plan. Summary Report January 2010. managing flood risk

Wye and Usk Catchment Flood Management Plan. Summary Report January 2010. managing flood risk Wye and Usk Catchment Flood Management Plan Summary Report January 2010 managing flood risk We are Environment Agency Wales. It s our job to look after your environment and make it a better place for you,

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Water and Flooding Position Statement

Water and Flooding Position Statement Derby City Local Plan, Part 1: Core Strategy Water and Flooding Position Statement August 2015 1. Introduction 1.1 This position statement provides an update to the Derby HMA Joint Water Issues Paper which

More information

Strategic Flood Risk Assessment Update 2015

Strategic Flood Risk Assessment Update 2015 Strategic Flood Risk Assessment Update 2015 On behalf of Contents Glossary... iv Executive Summary... 1 1 Introduction... 4 1.1 Overview... 4 1.2 Future Development in Lewisham Borough... 5 2 SFRA Approach...

More information

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP Granville Road Estate, London Borough of Barnet Flood Risk Assessment and Drainage Strategy August 2014 New Granville LLP Document History JOB NUMBER: 237 DOCUMENT REF: Granville Road FRA REVISIONS: Final

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

Structural Damage Due to Floods

Structural Damage Due to Floods Structural Damage Due to Floods By Craig D. Rogers, P.E. The Federal Emergency Management Agency (FEMA) reports that each year approximately 90 percent of all disaster-related property damage results from

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils.

11.2 The proposals to deal with the leachate within the closed Lodmoor North Landfill site are assessed in Chapter 10 Geology and Soils. Chapter Eleven Water Quality, Drainage and Hydrogeology Introduction 11.1 This Chapter considers the impact of the Relief Road on the hydrology of the area and considers both surface and groundwater. Runoff

More information

Flood Evacuation Strategy Hawkins Lane, Burton on Trent

Flood Evacuation Strategy Hawkins Lane, Burton on Trent Flood Evacuation Strategy Hawkins Lane, Burton on Trent Tesco Stores Ltd 10-Apr-14 Issue and Revision Record Rev Date Changes Originator Checker Approver - 10.09.10 N/A BS GB NK A 10.04.14 Amended to suit

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA 10.1 Summary Information 10.1.1 Location SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA The limits of Management Unit 5, a 2.9km stretch of shoreline fronting the town of Hornsea on the Holderness coast, are

More information

Insurance Questions: Clothes washers and dryers, food freezers and the food in them are covered if there is contents coverage.

Insurance Questions: Clothes washers and dryers, food freezers and the food in them are covered if there is contents coverage. Introduction: Floods occur when runoff from rain or snowmelt exceeds the capacity of rivers, stream channels or lakes and overflows onto adjacent land. Floods can also be caused by storm surges and waves

More information

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

More information

London Borough of Bexley. Bexley Strategic Flood Risk Assessment Level-1. Bexley SFRA Level-1 Report. August 2010

London Borough of Bexley. Bexley Strategic Flood Risk Assessment Level-1. Bexley SFRA Level-1 Report. August 2010 London Borough of Bexley Bexley Strategic Flood Risk Assessment Level-1 Bexley SFRA Level-1 Report Copyright and Non-Disclosure Notice The contents and layout of this report are subject to copyright owned

More information

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.

More information

London Borough of Newham. Local Flood Risk Management Strategy

London Borough of Newham. Local Flood Risk Management Strategy London Borough of Newham Local Flood Risk Management Strategy Version 5, September 2015 Local Flood Risk Management Strategy for the London Borough of Newham Document Management: Version Control Title:

More information

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and ARTICLE 16. FLOOD DAMAGE PREVENTION Section 16-1: Findings of Fact The flood hazard areas of the Town of Lillington are subject to periodic inundation which results in loss of life and property, health

More information

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1 City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration

More information

Climate Change Toolkit 07 Designing for Flood Risk

Climate Change Toolkit 07 Designing for Flood Risk Climate Change Toolkit 07 Designing for Flood Risk About this Document This is the seventh of eight components of Climate Change Tools, a package of guidance developed by the RIBA to encourage architects

More information

Useful information to help you protect your home or business from the risks of flooding

Useful information to help you protect your home or business from the risks of flooding communities Flood Resilience Guide Useful information to help you protect your home or business from the risks of flooding Contents Introduction...................................................................

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services Issue: 2 Adopted by Council: 20/02/07 Directorate of Environment and Regeneration Planning Services LOCAL PLANNIING GUIIDANCE NOTE NO..19:: SUSTAIINABLE DRAIINAGE SYSTEMS Background The provision of adequate

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

Homes and Environment Scrutiny Committee. (Environment & Transport)

Homes and Environment Scrutiny Committee. (Environment & Transport) REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

NOVEMBER 2009 [ISSUE 5]

NOVEMBER 2009 [ISSUE 5] 375 401 BRIGHTON ROAD CROYDON FLOOD RISK ASSESSMENT CLIENT: TRITHING LTD [ISSUE 5] Head Office: Unit 2 York House Edison Park Dorcan Way Swindon Wiltshire SN3 3RB Tel. 01793 619965 Fax. 01793 619967 Email:

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

ART Vulnerability and Risk Assessment Report September 2012 Appendix C. ART GIS Exposure Analysis

ART Vulnerability and Risk Assessment Report September 2012 Appendix C. ART GIS Exposure Analysis Adapting to Rising Tides GIS Exposure Analysis The aim of this appendix is to familiarize the reader with the data and methodology that was used to conduct an analysis of shoreline and community asset

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Integrated Local Flood Management and Drainage Strategy OVERVIEW Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure

More information

Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property. October 08

Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property. October 08 Flood Risk Assessment Breakspear House, Hemel Hempstead. Kier Property October 08 Prepared by:... Approved by:... Simon Marcos Keith Searle Principal Engineer Associate Director Flood Risk Assessment Rev

More information

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing 11.4 Voluntary Purchase As mentioned in Section 10 in certain high hazard areas of the floodplain, it may be impractical or uneconomic to mitigate flood hazard to existing properties at risk, or flood

More information

FLOOD DAMAGE PREVENTION ORDINANCE

FLOOD DAMAGE PREVENTION ORDINANCE FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated

More information

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Planning for sea level rise Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Table of contents Introduction 1 New flood levels for

More information

St Bees. Flood Investigation Report 37

St Bees. Flood Investigation Report 37 St Bees Flood Investigation Report 37 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane 6 Feb 2013 Draft Colin Parkes

More information

WET10 - THE CITY WATER DEBATE 2015. When Will London Flood? Introduction. Dr Paul Leinster, CBE

WET10 - THE CITY WATER DEBATE 2015. When Will London Flood? Introduction. Dr Paul Leinster, CBE WET10 - THE CITY WATER DEBATE 2015 When Will London Flood? Introduction Roger Hewitt, Past Master of the Water Conservators, opened the event by thanking the Worshipful Companies of the Glaziers and the

More information

PORT FOSDYKE COMMERCIAL BUILDINGS COMPLEX PE20 2DB. TO LET ON LEASE 1192.31m² (12,833 sq.ft.)

PORT FOSDYKE COMMERCIAL BUILDINGS COMPLEX PE20 2DB. TO LET ON LEASE 1192.31m² (12,833 sq.ft.) BY DIRECTION OF D. P. PACKAGING PORT FOSDYKE COMMERCIAL BUILDINGS COMPLEX PE20 2DB TO LET ON LEASE 1192.31m² (12,833 sq.ft.) COMMERCIAL WAREHOUSE & PREMISES FOSDYKE, BOSTON, LINCOLNSHIRE With Immediate

More information