1 GUARDIAN SELF STORAGE EAST LLC 80 Washington Street Suite 100 Poughkeepsie, New York Received January 20, 2016 Town of Fishkill Planning Dept. January 20, 2016 Mary Hendricks, Chairperson Members of the Planning Board Town of Fishkill Planning Department 807 Route 52 Fishkill, New York HAND DELIVERED Re: 629 Route 52 Dear Chairperson Hendricks: We are in receipt of review Comments from the town engineer, John V. Andrews, Jr. dated January 18, During our last appearance before the planning board, we received verbal comments from Mr. Andrews and board members. Kindly accept this letter in response to those comments. John V. Andrews, Jr. Letter dated 1/18/16 1. The following notes shall be included on the site plan: A permit shall be obtained from the Town Clerk of the Town of Fishkill prior to tapping the Glenham Water District main. The service line shall be the responsibility of the owner from the valve to the point of service. CAMO Pollution Control, the Town Water and Sewer Operator, shall be notified at least 48 hours in advance of any disturbance to or excavation of the facilities of the Glenham Water District. The domestic water service shall be metered. The size, make and model of the installed meter shall be acceptable to the Town. Arrangements shall be made in advance with the Town of Fishkill Building Inspector concerning water metering. These notes have been added to Sheet S-5.

2 Mary Hendricks, Chairperson Members of the Planning Board January 20, 2016 Page 2 2. The Project Sponsor has submitted a certification from a Licensed Professional Engineer indicating that the subsurface sewage disposal system is functioning and not in a state of failure, i.e. no discharge of sewage to the ground surface and further, that the nature of construction of the existing facility is such that it can adequately accommodate future traffic. We take no exception to that certification. No comment necessary. 3. The project proposes modifications within the NYSDOT Highway Right-of-Way for Route 52. The project will require a NYSDOT Highway Work Permit for these improvements. The Town shall be copied on any and all correspondence to and from that Department. The Project Sponsor shall comply with this requirement. Applicant's engineer has made an additional submission for sight distance at the request of DOT which is also submitted herewith. 4. The Project Sponsor proposes landscaping within the NYSDOT Highway Right-of -Way. The Project Sponsor further proposes to create a curbed island along a portion of the right-of-way. The plan notes indicate the island to be grass. The referenced detail suggests that it will be concrete. The inconsistencies shall be addressed in future submittals. Sheet S-5 (Curb/Sidewalk Detail) has been modified to reflect that the island shall be grass rather than concrete. 5. The Project Sponsor has submitted a simple drainage analysis of the existing developed site. Proposed site disturbance is minimal. We take no exception to the report submitted. A more detailed analysis may be required for the future development. No comment necessary. Planning Board Member Comments 1. Consideration should be given to sealing and striping the parking lot. A Note has been added to the plan indicating that once construction/renovation work is complete, the parking lot will be sealed and striped. It is suggested that it would be wise to do this work at completion so that trucks and vehicles are not driven on the 'fresh look' until the very end of the work process.

3 Mary Hendricks, Chairperson Members of the Planning Board January 20, 2016 Page 3 Lastly, signature blocks have been added to the plan. Should you require anything else at this juncture, please let me know. Thank you. Very truly yours, Frank Redl Project Manager

4

5

6 climate controlled facility

7 ² ² ² ² climate controlled facility

8 facility controlled climate

9 climate controlled facility

10 climate controlled facility

11

Bylaw No. 8880. Private Sewer and Water Service Connection Bylaw, 2010

Bylaw No. 8880. Private Sewer and Water Service Connection Bylaw, 2010 Bylaw No. 8880 Private Sewer and Water Service Connection Bylaw, 2010 Codified to Bylaw No. 9202 June 23, 2014 BYLAW NO. 8880 The Private Sewer and Water Service Connection Bylaw, 2010 Whereas pursuant

More information

Right-of Way Use Permit Application

Right-of Way Use Permit Application Right-of Way Use Permit Application 400 SW 152 nd Street, Suite 300 Burien, WA 98166 Phone: (206) 439-3161 Inspection: Line 206-439-3162 Email address: rowpermits@burienwa.gov For City Use Only Reviewed

More information

Appendix F Subdivision Street Construction Applications and Forms

Appendix F Subdivision Street Construction Applications and Forms Appendix F Subdivision Street Construction Applications and Forms Subdivison Street Construction Process: Applicant submits the following: o Copy of the recorded record plan o Approved construction drawings

More information

Planning and Development Department PROPOSED MITIGATED NEGATIVE DECLARATION 1885 University Avenue, Berkeley, CA June 2006

Planning and Development Department PROPOSED MITIGATED NEGATIVE DECLARATION 1885 University Avenue, Berkeley, CA June 2006 Planning and Development Department PROPOSED MITIGATED NEGATIVE DECLARATION, Berkeley, CA June 2006 This mitigated negative declaration was prepared pursuant to the California Environmental Quality Act

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

DOCUMENTATION, AS-BUILT & TESTING CHECKLIST DEVELOPER REPRESENTATIVE S ACCEPTANCE AND CERTIFICATE OF COMPLETION STAGE 6

DOCUMENTATION, AS-BUILT & TESTING CHECKLIST DEVELOPER REPRESENTATIVE S ACCEPTANCE AND CERTIFICATE OF COMPLETION STAGE 6 DOCUMENTATION, AS-BUILT & TESTING CHECKLIST DEVELOPER REPRESENTATIVE S ACCEPTANCE AND CERTIFICATE OF COMPLETION STAGE 6 This checklist must be submitted prior to acceptance. (This list is not all inclusive,

More information

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. May 4, 2007

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. May 4, 2007 Case #ZON2007-01172 (Rezoning) At its meeting on May 3, 2007, the Planning Commission considered your request for a change in zoning from B-1, Buffer Business District, to B-1, Buffer Business District,

More information

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES 1.0 GENERAL 1.1 Article 12 of the Suffolk County Sanitary Code requires that toxic/hazardous material

More information

Village of Broadview Flood Control Assistance Program

Village of Broadview Flood Control Assistance Program Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS 10.1 APPLICATION REQUIREMENTS AND PROCEDURES 10.1.1 A permit shall be required for any construction or installation within the public right-of-way

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

V^^^^^-*^- Schedule No. DEPARTMENT OF GENERAL SERVICES RECORDS MANAGEMENT DIVISION RECORDS RETENTION AND DISPOSAL SCHEDULE.

V^^^^^-*^- Schedule No. DEPARTMENT OF GENERAL SERVICES RECORDS MANAGEMENT DIVISION RECORDS RETENTION AND DISPOSAL SCHEDULE. DEPARTMENT OF GENERAL SERVICES RECORDS MANAGEMENT DIVISION RECORDS RETENTION AND DISPOSAL SCHEDULE Agency Washington County Schedule No. Page 1 of 4 Division/Unit Finance/Water and Sewage Item No Description

More information

City of Boulder Municipal Stormwater Discharge Permit MCM4: Construction Inspections and Enforcement Stormwater Management Plan Review Procedure

City of Boulder Municipal Stormwater Discharge Permit MCM4: Construction Inspections and Enforcement Stormwater Management Plan Review Procedure City of Boulder Municipal Stormwater Discharge Permit MCM4: Construction Inspections and Enforcement Stormwater Management Plan Review Procedure Purpose This manual is intended to document procedures used

More information

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS I "i,, I, 1 " CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS CHAPTER 10 PERMIT PROCEDURES A N D BONDING REQUIREMENTS FOR CONTRACTORS, Section I -, INDEX :, - % I I,,J Topic b 101

More information

The Borough Council hereby ordains:

The Borough Council hereby ordains: AN ORDINANCE OF THE BOROUGH DEFINING AND ESTABLISHING RATES AND REGULATIONS FOR WATER AND SEWER SERVICE TO PROPERTIES AND ESTABLISHMENTS THEREIN; REQUIRING AND REGULATING CONNECTIONS TO THE WATER AND SEWER

More information

Village of Lynwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES. Response Due Date: Friday, April 18, 2014, 4:00 p.m.

Village of Lynwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES. Response Due Date: Friday, April 18, 2014, 4:00 p.m. Village of Lynwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES Response Due Date: Friday, April 18, 2014, 4:00 p.m. Send Sealed Qualifications to: Eugene Williams, Mayor Village of

More information

CHELAN COUNTY INFORMATION AND PROCEDURES FOR A BINDING SITE PLAN APPLICATION

CHELAN COUNTY INFORMATION AND PROCEDURES FOR A BINDING SITE PLAN APPLICATION CHELAN COUNTY INFORMATION AND PROCEDURES FOR A BINDING SITE PLAN APPLICATION This packet is designed to assist you in preparing your application for a binding site plan application. Applications may be

More information

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 APPLICATION FOR DEMOLITION PERMIT Permit Number: Date Received:

More information

SPECIAL EVENT PERMIT PROCESS GUIDE

SPECIAL EVENT PERMIT PROCESS GUIDE SPECIAL EVENT PERMIT PROCESS GUIDE The Community Development Department will accept applications for Special Event Permits. A complete description of the Special Event Permit process and regulations may

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

ARLINGTON COUNTY CODE. Chapter 18 PLUMBING AND GAS CODES

ARLINGTON COUNTY CODE. Chapter 18 PLUMBING AND GAS CODES Chapter 18 18-1. Title and Scope. 18-2. Definitions. 18-3. Availability of Codes. 18-4. Administration and Enforcement. 18-5. Registration of Contractors and Certification Requirements. 18-6. Permits and

More information

City of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014

City of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014 City of Springboro 320 West Central Avenue, Springboro, Ohio Wednesday, I. Call to Order and Roll Call Chairperson Hans Landefeld called the Springboro Planning Commission Meeting to order at the Springboro

More information

TOWN OF WELLS HOME BUSINESS APPLICATION PACKET

TOWN OF WELLS HOME BUSINESS APPLICATION PACKET TOWN OF WELLS HOME BUSINESS APPLICATION PACKET Attached you will find the information packet for a Home Business including Chapter 145, Section 51 that outlines the criteria you must fall into to be considered

More information

Chapter 19 Insurance and Bond Requirements

Chapter 19 Insurance and Bond Requirements Chapter 19 Insurance and Bond Requirements 1-1901 Insurance Requirements The Contract requires Contractors to carry insurance at least in accordance with the requirements stipulated. Before award the Contractor

More information

COMMERCIAL BUILDING. Guidelines for Permitting NEW CONSTRUCTION

COMMERCIAL BUILDING. Guidelines for Permitting NEW CONSTRUCTION COMMERCIAL BUILDING Guidelines for Permitting NEW CONSTRUCTION January 2007 SUBMIT TO THE COMMUNITY DEVELOPMENT DEPARTMENT 4 sets of plans including the following: Site Plan must show: - Drawn to scale

More information

Replacement of Manufactured Home

Replacement of Manufactured Home Town of Dover Building/Zoning /Code Enforcement Department 126 East Duncan Hill Road Dover Plains, NY 12522 (845) 832-0370 - fax Building Inspector/CEO George T. Hearn 845.832.6111 x102 - (GHearn@TownOfDoverNY.us)

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

DIRECTIONS FOR ALL SITE, SUBDIVISION, AND LAND DISTURBING ACTIVITY PLANS SUBMITTED TO THE CITY OF NEWPORT NEWS.

DIRECTIONS FOR ALL SITE, SUBDIVISION, AND LAND DISTURBING ACTIVITY PLANS SUBMITTED TO THE CITY OF NEWPORT NEWS. DIRECTIONS FOR ALL SITE, SUBDIVISION, AND LAND DISTURBING ACTIVITY PLANS SUBMITTED TO THE CITY OF NEWPORT NEWS. BOTH EROSION AND SEDIMENT CONTROL GENERAL NOTES AND STATE MINIMUM STANDARDS MUST BE INCLUDED

More information

SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016

SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016 11 Clearwater Drive Little Rock, AR 72204 SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016 Section 1 Procedure Background information At the recommendation of

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

City of Doral 8300 NW 53 rd St. Doral, FL (305)

City of Doral 8300 NW 53 rd St. Doral, FL (305) City of Doral 8300 NW 53 rd St. Doral, FL 33166 (305) 593-6725 National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control Introduction: The City of Doral

More information

Foundation Repair Permit - Residential and Commercial

Foundation Repair Permit - Residential and Commercial CITY of SAN ANTONIO Development Services Department www.sanantonio.gov/dsd Date: 1901 S. Alamo Telephone Number (210) 207-1111 San Antonio, Texas 78204 Fax Number (210) 207-0102 Foundation Repair Permit

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS RESIDENTIAL BUILDING PERMIT REQUIREMENTS The Building Inspection Division has compiled this packet to help our customers obtain a Building Permit. Enclosed we have listed all departments and inspection

More information

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP; City of Santa Rosa ENCROACHMENT PERMIT APPLICATION Application#: Inspector: Liability Ins: WComp. Ins: FOR OFFICE USE ONLY NOTE: YOUR APPLICATION CANNOT BE PROCESSED WITHOUT COMPLETE INFORMATION IN AREAS

More information

DEVELOPER S GUIDE FOR SUBDIVISON & INFRASTRUCTURE DESIGN REVIEW PROCESS

DEVELOPER S GUIDE FOR SUBDIVISON & INFRASTRUCTURE DESIGN REVIEW PROCESS DEVELOPER S GUIDE FOR SUBDIVISON & INFRASTRUCTURE DESIGN REVIEW PROCESS This guide is provided to assist engineers, architects, developers and developer s representatives with the City and related elements

More information

CHAPTER 4 ROADS 400. DRIVEWAYS

CHAPTER 4 ROADS 400. DRIVEWAYS CHAPTER 4 ROADS 400. DRIVEWAYS Section 400.01 Definitions. For the purposes of Sections 400.01 through 400.15, the following terms shall have the meanings given to them unless the context clearly indicates

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

EI 08-002 ENGINEERING INSTRUCTION

EI 08-002 ENGINEERING INSTRUCTION To: New York State Department of Transportation ENGINEERING INSTRUCTION EI 08-002 Title: REVISED PLAN SHEET GUIDANCE Distribution: Approved: Manufacturers (18) Surveyors (33) Local Govt. (31) Consultants

More information

Receiving Water Body:

Receiving Water Body: 62-330 ENVIRONMENTAL RESOURCE PERMIT INDIVIDUAL - TECHNICAL STAFF REPORT 04-Nov-2015 APPLICATION #: IND-059-16968-1 Applicant: Eddie Dixon Holmes District School Board 701 E Pennsylvania Ave Bonifay, FL

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES WHEREAS, Wheaton Sanitary District had a cost reimbursement

More information

GRANT PROGRAM VILLAGE OF WESTCHESTER HOME FLOOD-PROOFING ASSISTANCE PROGRAM

GRANT PROGRAM VILLAGE OF WESTCHESTER HOME FLOOD-PROOFING ASSISTANCE PROGRAM GRANT PROGRAM VILLAGE OF WESTCHESTER HOME FLOOD-PROOFING ASSISTANCE PROGRAM INTRODUCTION The Village of Westchester is served by separate storm and sanitary sewers. During some intense rains, the capacity

More information

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

Name of Event: Sponsoring Organization: Name of Person Responsible for application: Address of Organization: Phone: Event Contact during event

Name of Event: Sponsoring Organization: Name of Person Responsible for application: Address of Organization: Phone: Event Contact during event SPECIAL EVENT REQUEST FORM This special event request form is to facilitate communication, cooperation, and logistical coordination between the governing body of the Town of Clinton, our residents and

More information

EXHIBIT "A" PROJECT DOCUMENTATION AND SUBMITTAL GUIDELINES

EXHIBIT A PROJECT DOCUMENTATION AND SUBMITTAL GUIDELINES EXHIBIT "A" PROJECT DOCUMENTATION AND SUBMITTAL GUIDELINES A. SERVICE AVAILABILITY 1. Property Questionnaire. 2. Boundary survey of property. 3. Site plan. 4. Fee simple titleholder authorization letter

More information

FIRE SUPPRESSION INSTALLATION CITY OF HARRISONBURG, VIRGINIA

FIRE SUPPRESSION INSTALLATION CITY OF HARRISONBURG, VIRGINIA FIRE SUPPRESSION INSTALLATION CITY OF HARRISONBURG, VIRGINIA I. PURPOSE The purpose of this document is to provide planners and designers with information necessary in the design and construction of sprinkler

More information

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF

More information

AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB 31-15 SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS

AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB 31-15 SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB 31-15 SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS 1. General Description The contractor shall provide all labor, equipment,

More information

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville A Small City s Story of Implementing a Work Order and Asset Management System American Public Works Association 2013 Congress August 28, 2013 Introductions Public Works Department City of Colleyville,

More information

City of Greensboro North Carolina

City of Greensboro North Carolina City of Greensboro North Carolina Engineering and Inspections Department Construction Drawings Approval Process MAY 2016 Do You Need This Manual? May 2016 To: Engineers, Surveyors, Architects, Developers

More information

Insert Development Name. Insert Address. Insert Property Name, Address and Phone no. Insert Name, Address and Phone no.

Insert Development Name. Insert Address. Insert Property Name, Address and Phone no. Insert Name, Address and Phone no. Stormwater Management Facility Operation and Maintenance (O&M) Manual for: Located at: Prepared for: Prepared by: Reference: This manual is adapted from Town of Parker, Colorado, STORMWATER PERMANENT BEST

More information

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing US 281 AT PREMONT PUBLIC HEARING Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project

More information

5 NINTH LINE TRUCK RESTRICTION UPDATE TOWN OF MARKHAM

5 NINTH LINE TRUCK RESTRICTION UPDATE TOWN OF MARKHAM 5 NINTH LINE TRUCK RESTRICTION UPDATE TOWN OF MARKHAM The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated August 18, 2011, from

More information

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx. cityoflavernia@lavernia-tx.gov Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be

More information

I. Project Initiation Sheet (if any information changed since Concept Plan submittal)

I. Project Initiation Sheet (if any information changed since Concept Plan submittal) Development Services 201 W. Colfax Avenue, Dept. 203 Denver, CO 80202 P: 720-865-2982 www.denvergov.org/developmentservices Formal Site Development Plan Submittal Checklist General Submittal Requirements

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

Initial Subdivision Applications Shall Include the Following:

Initial Subdivision Applications Shall Include the Following: Initial Subdivision Applications Shall Include the Following: 1. Subdivision Application Form: completely filled out. (3 copies) 2. Plat: Depending on the type of subdivision, the Plat must adhere to the

More information

UNIVERSITY AND COLLEGE SIGN GENERAL INFORMATION AND APPLICATION

UNIVERSITY AND COLLEGE SIGN GENERAL INFORMATION AND APPLICATION UNIVERSITY AND COLLEGE SIGN GENERAL INFORMATION AND APPLICATION Dear Applicant: Enclosed is a copy of the Massachusetts Department of Transportation - Highway Division (MassDOT - Highway Division) University/College

More information

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION April 25, 2014 DUE DATE/LOCATION: Friday, May 9, 2014 Bid forms and references are due by 9:30 A.M. at:

More information

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY: ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.

More information

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP

More information

Washington County School District Request for Proposal School Bus Fleet Tracking System RFP #TD 1011

Washington County School District Request for Proposal School Bus Fleet Tracking System RFP #TD 1011 Request for Proposal I. GENERAL A. Intent of Request for Proposal (RFP) The purpose of this Request for Proposal is to solicit sealed, competitive proposals from vendors qualified and experienced to provide

More information

PRIVATE STORMWATER CONNECTION AND/OR MONITORING WELL. Applicant: Telephone Fax. Address: Zip Code E-mail Premises Involved: Specific Location

PRIVATE STORMWATER CONNECTION AND/OR MONITORING WELL. Applicant: Telephone Fax. Address: Zip Code E-mail Premises Involved: Specific Location STORMWATER ENGINEERING PUBLIC WORKS DEPARTMENT APPLICATION FORM FOR PRIVATE STORMWATER CONNECTION AND/OR MONITORING WELL Applicant: Telephone Fax Address: Zip Code E-mail Premises Involved: Specific Location

More information

Water and Sewer Service Line Policy

Water and Sewer Service Line Policy Water and Sewer Service Line Policy Effective beginning May 17, 2004 (Amended March 16, 2009) Water Service Line Policy General Statement The City of Arlington does not install or participate in water

More information

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING 7.00 Construction 7.01 Inspection and Testing of Improvements 7.02 Approval of Improvements 7.03 City Engineer s Acceptance of All Improvements

More information

Test Bore, Monitoring Well, & Underground Storage Tank Decommissioning Permit Application Packet

Test Bore, Monitoring Well, & Underground Storage Tank Decommissioning Permit Application Packet Test Bore, Monitoring Well, & Underground Storage Tank Decommissioning Permit Application Packet This packet contains the requirements and forms needed to apply for a permit allowing test bore, monitoring

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: November 5, 2015

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: November 5, 2015 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: November 5, 2015 DEVELOPMENT NAME Maritech Marine Subdivision, Phase 2 LOCATION 915 South Lawrence Street (West side of Lawrence Franklin Connector at the West

More information

Town of Beaumont. Lot Grading Guidelines

Town of Beaumont. Lot Grading Guidelines Town of Beaumont Lot Grading Guidelines LOT GRADING APPROVAL PROCESS Lot Grading Guidelines... 3 Introduction... 3 Purpose... 3 Definitions... 3 Lot Grading... 3 Lot Grading Plan... 3 Lot Grading Certificate...

More information

NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGES FROM CONCRETE BATCH PLANTS (RULE (3), F.A.C.)

NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGES FROM CONCRETE BATCH PLANTS (RULE (3), F.A.C.) NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGES FROM CONCRETE BATCH PLANTS (RULE 62-621.300(3), F.A.C.) PART I - INSTRUCTIONS This form is to be completed and submitted to the Department along with

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of temporary measures needed to control erosion and water pollution. These temporary measures

More information

Plan of Development Review Process

Plan of Development Review Process Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revisions effective: September 14, 2015) POF011 TABLE OF CONTENTS I. PRELIMINARY

More information

404-B. Hillside New Residential Guide PDS. New Single Family/Duplex/Townhouse. Additional Requirements for New Residential in Hillside Locations

404-B. Hillside New Residential Guide PDS. New Single Family/Duplex/Townhouse. Additional Requirements for New Residential in Hillside Locations Hillside New Residential Guide New Single Family/Duplex/Townhouse PDS Department Application # 404-B All new residential construction within Boise s designated Hillside Areas require a building permit

More information

Did You Know? Permits. Contractors. Inspections. Certificate of Occupancy

Did You Know? Permits. Contractors. Inspections. Certificate of Occupancy Did You Know? What can I build on my property? When do I need plans? What plans are required? Can I get specific questions answered? When must plans be sealed? How long does it take for plan review? Can

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT ATTACHED ARE THE REQUIREMENTS FOR OBTAINING A BUILDING PERMIT INCOMPLETE SUBMISSIONS WILL BE RETURNED IN THEIR ENTIRETY -- NO EXCEPTIONS!!

More information

Underground Commercial Electric Service

Underground Commercial Electric Service Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer

More information

December 29, Mr. Colin Williamson, Operations Manager Pippin Wholesale Company PO Box 730 Harrison, AR RE: complaint investigation

December 29, Mr. Colin Williamson, Operations Manager Pippin Wholesale Company PO Box 730 Harrison, AR RE: complaint investigation December 29, 2010 Mr. Colin Williamson, Operations Manager Pippin Wholesale Company PO Box 730 Harrison, AR 72602-0730 RE: complaint investigation Dear Mr. Williamson: On November 5 and December 14, 2010,

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT MAP PARCEL TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT This form is an application for approval, not a building permit. Fill out application carefully. Applications lacking required data

More information

Electronic Signature and Fee Payment Confirmation

Electronic Signature and Fee Payment Confirmation Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By

More information

REQUEST FOR PROPOSAL #10-14 FOR THE MANAGEMENT, OPERATION, AND MAINTENANCE OF MONTGOMERY COUNTY PUBLIC TRANSPORTATION SYSTEM

REQUEST FOR PROPOSAL #10-14 FOR THE MANAGEMENT, OPERATION, AND MAINTENANCE OF MONTGOMERY COUNTY PUBLIC TRANSPORTATION SYSTEM REQUEST FOR PROPOSAL #10-14 FOR THE MANAGEMENT, OPERATION, AND MAINTENANCE OF MONTGOMERY COUNTY PUBLIC TRANSPORTATION SYSTEM The County of Montgomery, located in New York State, invites proposals to provide

More information

Village of Rantoul Backwater Valve Program

Village of Rantoul Backwater Valve Program Village of Rantoul Backwater Valve Program The Village of Rantoul s Backwater Valve Program is a program designed to prevent sewer backups in single and two-family homes in the Village of Rantoul due to

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements

More information

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE III SEPARATE SANITARY SEWER CODE

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE III SEPARATE SANITARY SEWER CODE CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE III SEPARATE SANITARY SEWER CODE Adopted July, 1991 Revised March, 1995 NORTHEAST OHIO REGIONAL SEWER DISTRICT CODE OF REGULATIONS

More information

SECTION EIGHT BONDING REQUIREMENTS

SECTION EIGHT BONDING REQUIREMENTS SECTION EIGHT BONDING REQUIREMENTS 8-00 BONDING REQUIREMENTS 8-01 No building permit for any construction in the subdivision shall be issued nor any lot within the subdivision conveyed until a bond has

More information

PERFORMANCE AGREEMENT AND SURETY PROCESS FOR SUBDIVISIONS AND SITE PLANS

PERFORMANCE AGREEMENT AND SURETY PROCESS FOR SUBDIVISIONS AND SITE PLANS H a n o v e r C o u n t y PERFORMANCE AGREEMENT AND SURETY PROCESS FOR SUBDIVISIONS AND SITE PLANS County of Hanover Department of Planning 7516 County Complex Road P.O. Box 470 Hanover, VA 23069 Phone:

More information

Standard terms and conditions

Standard terms and conditions Standard terms and conditions INTRODUCTION For the provision of a water service (Water Supply, Wastewater and Drainage) Under Section 73(2)(a) of the Water Services Act 2012, landowners may be entitled

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

APPENDIX B. Agency Correspondence

APPENDIX B. Agency Correspondence APPENDIX B Agency Correspondence Connecticut State Historic Preservation Office INTEGRATED HISTORIC PRESERVATION PLANNING June 29, 2012 Ms. Amanda Mayhew Northeast Utilities Service Company 107 Selden

More information

General Utility Work Obligations

General Utility Work Obligations General Utility Work Obligations This Section addresses the Utility Company (or Utility Owner) requirements. It does not apply to existing stormwater facilities, irrigation ditches, Intelligent Transportation

More information