Materials required to perform the cable circuit lowering will consist of the following:

Size: px
Start display at page:

Download "Materials required to perform the cable circuit lowering will consist of the following:"

Transcription

1 DESCRIPTION Relocation of Roslyn Road to eliminate the Grade Crossing with the Long Island Rail Road (LIRR) in Mineola, NY requires that the New York Power Authority s (NYPA) high presure fluid filed 345kV pipe cable circuit (Y-49) be lowered on both the north and south side of the present LIRR mainline crossing to permit construction of the new roadway under the LIRR. The cable circuit, consists of one 8 NPS (8-5/8 OD) corosion protected steel cable pipe, one 5 NPS (5-9/16 OD) corosion protected steel fluid return pipe andtwo 76.2 mm (3 OD) PVC conduits, containing Fiber Optic cable, encased in a concrete envelope of fluidized thermal backfil (FTB) that is approximately 1.22 m (4 ) wide and 0.61 m to 0.76 m (2 to 2-1/2 ) in depth. The 12 NPS steel Keyspan gas main will require special support and maintenance when exposed within the trench. Referring to the Contract Drawings for Plan/Profile and sections of the work on the north side of the LIRR, starting just south of East 2 nd Street, a 38.1 m (125 ) section of the pipe circuit must be exposed and the center portion of the section lowered approximately 0.5 m (1.6 ); on the south side of the LIRR, a 76.2 m (250 ) section of the pipe circuit must be exposed and the center portion of the section lowered approximately 1.23 m (4.0 ). MATERIALS Materials required to perform the cable circuit lowering will consist of the following: a. Approved material consisting of heat-shrinkable wrap-around repair sleeves and hand applied tape to repair any damage to the steel pipe s 1.52 mm (60 mil) thick polyethylene corosion protective coating. b. Temporary Wood Sheeting for trench conforming to Subsection A. c. Wood sheeting and support members to fabricate bend restrictors to prevent kinking steel pipes as they depart from the remaining FTB enclosure. d. Material for the support structures necessary over the excavation to support the pipes/conduits during excavation of the soil on either side of the enclosure down to the final required depth. e. Sand bags to support the pipes off the trench bottom and position the conduits prior to embedment in a new FTB enclosure. f. Backfill material to reconstitute trench conforming to the specifications for select granular fill, when excavated material cannot be reused. g. Interim wood sheeting to form the new FTB envelope conforming to Subsection A. h. Pressure rated full-circle pipe repair clamps for both the 8 & 5 NPS steel pipes for uses in the event either pipe is damaged, resulting in a fluid leak, during any phase of the circuit lowering operation. Page 1 of 9 9/18/08E 07/26/04

2 i. Fluidized Thermal Backfill (FTB) to reconstitute the concrete envelope around the repositioned pipes and conduits. i.1 FTB shall be composed of fine and coarse aggregate, cement and a fluidizing agent. i.2 Coarse and fine aggregate shall conform to ASTM Standard C 33 with the exception that the coarse aggregate shall be round pea gravel and limited in size to a maximum of 9.5 mm (3/8 in). i.3 Cement shall be Type I conforming to ASTM Standard C 150. i.4 Fluidizer shall be fly ash. The fly ash shall be Pozzolanic grade as used in fly ash concrete conforming to ASTM Standard C 618. i.5 Mix proportions kg/cubic meter (pounds/cubic yard) shall be Type A as specified below: Component Materials Coarse Aggregate mm (3/8 ) Fine Aggregate (Sand) Cement (Type I) ASTM C 150 Fluidizer: Fly Ash Water kg (1,350 lbs) 1,133.1 kg (1,910 lbs) 20.8 kg ( 35 lbs) kg (200 lbs) kg (371 lbs) i.6 Batching should be done by mass. If this is not possible, volume batching shall satisfy the specified mix proportion by mass. Batching and mixing may be made in a central plant and supplied by ready mix concrete trucks. Fly ash may be added and mixed either in a central batching plant or added to ready mix trucks on site and blended. Fly ash shall be added in dry powder form. Alternatively, on site batching and mixing may be permitted provided proper facilities are used. i.7 FTB supplied in slurry form shall have a consistency that will enable it to flow readily to fill the trench or tunnel, with no vibration spreading required. Flows of mm (7 ) for trench applications are required and shall be measured in accordance with the following procedures: i.7.1 Apparatus i Mold - The test specimen shall be formed in a mold made of mild steel. The mold shal be a cylinder 76.2 mm (3 ) inside diameter by mm (6 ) high, open at both ends. The minimum wal thicknes shal be 3.2 mm (1/8 ). i Tamping Rod - The tamping rod shall be a round, straight metal rod, 12.7 mm (1/2 ) in diameter and approximately mm (8 ) long, with a hemispherical tip. Page 2 of 9 9/18/08E 07/26/04

3 i i Test Plate - The test shall be carried out on a suitable metal plate to provide a uniform flowing surface. It should be of metal, of size 508 mm x 508 mm (20 x 20 ) and of a suitable thicknes to remain rigid. The test surface shal be plain and smooth. Rulers - Two mm (12 ) rulers, graduated in milimeters (inches) shall be provided. i.7.2 i.7.3 Sample i The sample of test mix shall be representative and obtained in accordance with ASTM Standard C 172. Procedures i Dampen the mold and place it in the center of the dampened level test plate. Fill to overflowing with the test mixture and compact with 5 strokes of the tamping rod uniformly distributed over the cross section of the surface. i Strike off the surface of the test mixture, remove any material that falls in the area around the mold base, and wipe the, test plate clean. i Lift the mold straight up slowly, allowing all of the material to flow out of the mold onto the base. i i i.7.4 Recording i i i Determine the average diameter of the resulting flow by measuring the diameter across two points at 90 degree intervals. Determine the maximum height of the flow material by standing the mold on the test plate adjacent to the flow material, resting the edge of one ruler across the diameter of the top of the mold. Allowing it to extend out over the flow material, measure the minimum "slump" of the material. Subtract the minimum slump from the height of the mold, to determine the maximum height of the flow. Record the flow in terms of average diameter in inches to the nearest 2.5 mm (0.1 ). This average diameter (Flow) shal be a minimum of 178 mm (7 ). Record the height of the flow, as measured in paragraph g.3.5, to the nearest 2.5 mm (0.1 ). Record any segregation of solids, bleeding at the edges or any other unusual conditions. j. Fiber Optic cable shall meet or exceed the following: Single mode, loose tube, 12-fiber optical cable, as manufactured by Corning Cable Systems part number 012RW4-T4100A20 or equivalent. Cable shall be all dielectric, non-armored, 2700N(600lbf) tensile strength, 0.35/0.25dB attenuation at 1310/1550nm, and PE jacket. Provide minimum reel of 1,524 meters (5000 feet) length with all associated splicing hardware. Page 3 of 9 9/18/08E 07/26/04

4 k. Materials for the temporary support and maintenance of the 12 NPS KeySpan gas main shall be in accordance with the Contract Documents. CONSTRUCTION DETAILS The relocation of Roslyn Road not only involves the lowering of NYPA s Y-49 cable circuit but also the proposed installation of a 18 inch RCP Sanitary Sewer and a KeySpan 12 NPS gas line adjacent to NYPA s circuit on the west side, and a 18 inch RCP Storm Sewer and 12 NPS Water line on the east side of the circuit. As a result, construction details for lowering the NYPA circuit will be governed by the construction schedule for these proposed utility additions and will require coordination with other Contractors, one of which will be KeySpan. Temporary support and maintenance of the existing 12 NPS steel gas main where exposed within the trench will be necessary. The main area of concern is the trench design required for exposing and lowering the NYPA circuit. Addresing only the NYPA circuit, a trench width of 2.44 m (8 ) is recommended to provide room on either side of the FTB envelope for removal of the envelope without subjecting the encased pipes and conduits to the risk of external damage. 1. Trenching Excavation shall conform to Subsection with the following additions: a. The present pipe system is located under the edge of the northbound lane of Roslyn Road at a depth of approximately 0.91 to 1.22 m (3 to 4 ) and, is encased in a 1.22 m wide x 0.61 m to 0.76 m deep (4 wide x 2 deep) envelope of fluidized thermal backfil (FTB). The original FTB backfill had a 28 day minimum compressive strength of 345 kpa (50 psi) and a maximum of 1034 kpa (150 psi). The Contractor shall be responsible for exposing the envelope and removal of all FTB from around the PVC conduits, the fluid return pipe and cable pipe without damage to either the PVC conduits or the corrosion protective coating on the steel pipes or the steel pipes. During exposure of the cable system, the pipes may be pressurized at 1379 kpa (200 psi) fluid pressure but will not be energized. The fluid within the pipes is an alkylbenzene containing no additives injurious to personnel or the environment, should a leak occur. Material Safety Data Sheets will be provided by NYPA. The method of pipe/conduit exposure is optional but must assure personnel safety and proper support of the trench and pipe/conduit system at all times. Sheeting must be provided for trench depths exceeding 1.52 m (5 ) using approved sheeting methods. The Contractor shal submit details of the exposure method, including location and type of sheeting proposed for review by NYPA and shall obtain approval from NYPA through the Engineer prior to construction. b. Starting north of the LIRR crossing, the Contractor is required to expose the FTB encased cable circuit for 38.1 m (125 ) and, starting south of the LIRR crosing, he must expose 76.2 m (250 ). There is a yellow warning tape on top of the concrete envelope. However, at some locations, the two conduits may have been installed on top of the FTB envelope and not encased in the envelope. On reaching the top of concrete envelope, the soil on both sides of the envelope at the support locations must be removed down to the envelope bottom and the FTB removed from Page 4 of 9 9/18/08E 07/26/04

5 around the pipes/conduits in the same area to permit installation of the pipe/conduit support system (Paragraph 2a & 2b below). c. On exposing the entire length of the concrete envelope, the Contractor is required to place survey marks at both ends of the concrete envelope. The Contractor will then make three measurements regarding the marks. One measurement to be made is the exact horizontal distance between the two marks. The second measurement is the length between the two marks as measured with a tape positioned directly on top of the concrete envelope. The third measurement shall be the elevations, with the vertical datum clearly defined, at both mark locations and the highest and lowest points on the exposed envelope. These measurements will be used to analyze the change in pipe stresses levels, when the pipes are lowered into their new final position in the trench. d. The Contractor shall provide surface run-off diversion to prevent surface water from entering the excavation. 2. Pipe Support System a. Prior to excavation below and removal of the entire FTB envelope from around the pipes and conduits, a pipe/conduit support system consisting of transverse stringers of wood or steel beams spanning the trench at right angles to the pipe system axis must be installed. The pipe/conduit support members must be positioned at intervals of approximately 7 m (23 ) and be capable of raising or lowering the individual pipes or conduits independently. The Contractor shall also provide additional support at each pipe or conduit joint location, if any. The cable pipe weighs approximately kgs/m (69 lbs/ft) and the fluid return pipe weighs kgs/m (23 lbs/ft). The fiber optic conduits are light but prone to sagging and may require additional support. b. Chain falls or coffin hoists attached to the overhead support system and to the pipes / conduits with wide nylon slings are recommended for lowering the pipes/conduits into position after the new trench bottom has been prepared. The chain falls or coffin hoists must have sufficient capacity to support the weight of the pipes. c. At the support locations, the Contractor is to carefuly remove approximately 0.5 m (20 ) of the FTB from around the pipes and conduits to permit installation of the nylon slings. The slings must be wide enough and configured to prevent damage to the pipe s protective coating. 3. Gas Main Support System a. Prior to excavation below the gas main, a support system integral with the pipe support system consisting of a longitudinal beam supported from the transverse pipe supports specified in paragraph 2.a. above must be installed. b. Support from the longitudinal beam to the gas main shall be in accordance with the Contract Documents. 4. FTB Removal a. With the pipes and conduits properly supported, the remainder of the FTB is to be carefully removed. Records indicate that the FTB backfill had compression strength of from 345 kpa (50 Page 5 of 9 9/18/08E 07/26/04

6 psi) minimum to 1034 kpa (150 psi) maximum. However, should the concrete have higher compression strength, Elco International Inc. has a Darda hydraulic splitter for concrete, which has been used successfully for removing concrete from around corrosion protected steel high voltage cable pipes with minimal damage to the pipe coating or pipe. b. The Contractor will be responsible for the repair of any damage to the steel pipes, including removal and disposal of any fluid leaked from the pipes. Temporary repair clamps must be available on site in the event a leak occurs. c. On removal of the FTB, the center portion of the trench must be excavated down to final grade and the trench bottom shall be probed and inspected by the Engineer. Any soft or loose areas shall be excavated or compacted to 95% of Standard Proctor Maximum Density. 5. Pipe Protective Coating Inspection a. On completing all trench work but prior to lowering the pipes into their final position, the Contractormust test the pipe s corosion protective coating using a roler spring type holiday tester capable of producing a voltage of 10,000 12,000 volts. The Contractor must repair all defects noted. The proposed materials for repairs and the application method must be included in the Contractor s submital, for review and approval by NYPA. The Contractor must retest al repaired areas. 6. Pipe Lowering to Final Position a. On completing the pipe coating inspection, the Contractor is to position sand bags directly below each steel pipe at the pipe s desired elevation and spaced at intervals of approximately 3.0 m (10 ) to prevent pipe sagging. The sand bag supports must be high enough to position the pipe centers approximately 0.3 m (12 ) of the final trench bottom and centered under the 8 & 5 NPS pipes, which are spaced apart on 0.3 m (12 ) pipe centers. b. In addition, the Contractor is to fabricate bend restrictors from wood sheeting and support members to be placed at each end of the section to prevent kinking the pipes as they depart from the remaining FTB enclosure. The bend restrictors must have a radius not less than m (50 ). Contractor must advise NYPA of the design proposed for review and approval by NYPA. c. Prior to lowering the cable pipe, the Contractor is to arrange to have the cable splices located in the manholes on either side of the construction site X-Rayed to determine the exact positioning of the splice within the joint casing. After lowering the cable pipe, the splices are again to be X- Rayed to determine whether the splices have moved within the joint casing. Details of the proposed method and procedures used to X-Ray the splices must be included in the Contractor s submittal, for review and approval by NYPA. The splice manholes are located at approximately m (417 ) south of the LIRR tracks and m (1,270 ) north of the E. 2 nd Street/Roslyn intersection on Roslyn Road. d. Starting at the center of the section, the Contractor shall lower the two pipes uniformly to prevent kinking the pipes, one at a time, down onto the sand bags. Page 6 of 9 9/18/08E 07/26/04

7 e. The Contractor shall install temporary sheeting, for the new FTB encasement envelope, on either side of the trench, positioned 0.3 m (12 ) from the pipe centers and extending 0.76 m (30 ) above the trench bottom. f. Prior to lowering the PVC conduits, the Contractor shall inspect the manholes on either side of the construction site to make sure there is slack fiber optic cable available in the event the conduits elongate during the lowering operation. The Contractor shall lower the two conduits and position them approximately 0.15 m (6 ) below the top edge of the sheeting and 0.1 m (4 ) inside the sheeting edge. The Contractor shal place ties around the steel pipes, every 7 m (23 ), extending up to the PVC conduits to prevent the conduits from floating up when the FTB envelope is installed. The conduits must also be held from above until the FTB contacts the bottom of the conduits, at which time these upper ties can be removed or left in place. 7. Fluidized Thermal Backfill (FTB) a. Installation a.1 The FTB shall be supplied and transported in such a way as to minimize segregation and to facilitate installation. The FTB shall be installed by pouring it into the trench without causing excessive segregation or by pumping it through pipes into other inaccessible locations. b. Bleed Water b.1 The excess water that bleeds off from the FTB shall be drained away to a sump and removed. In poor draining soils, underdrains and vacuum dewatering may be used. Trapped air or bleed water shall be removed, to the Inspector's satisfaction, which may be caused by one or more elevation "crowns" in the profile. c. Forming c.1 If the cable trenches are shored, the shoring shall be lifted while the poured FTB is still in a fluid state. d. Backfilling d.1 Natural or granular backfills shall not be placed over fresh FTB until 24 hours after its placing, or at the discretion of the Inspector. e. Winter Construction e.1 If the FTB is to be placed in winter with temperatures at or below freezing, precautions shall be taken to protect thin lifts of backfill from freezing. e.2 Protection of bulk pours of backfills may be omitted at the discretion of the Inspector. Any ice within the cable trench shall be removed prior to placing the FTB. Page 7 of 9 9/18/08E 07/26/04

8 f. Compressive Strength f.1 Unless otherwise specified by the Engineer, FTB at 28 days shall have a minimum compressive strength of 345 kpa (50 psi) and a maximum of 1034 kpa (150 psi). The compressive strength test shall conform to the ASTM test procedures C 39 for cylindrical concrete specimens, except that specimen molds shall be made of cardboard to facilitate stripping after seven days for further curing and testing. g. Number of Test Cylinders g.1 The number of test cylinders to be made shall be as follows: Until Final Determination of Mix Proportions For each backfill Placement: 10 to 150 cu meters or cu yds Minimum No. of Cylinders Test Breaks (Days) Extra Each 50 cu meters or cu yds Each 150 cu meters or cu yds 8. Trench Restoration a. When the FTB has hardened, the Contractor shall remove the interim sheeting and the trench sheeting, if used, and back fill the trench. b. Due to the location of the construction activities, all material removed from the trench may have to be trucked from the site. The FTB material cannot be used as backfill. c. Excavation and backfill materials to be in accordance with the requirements of Subsection 206. All soil compaction must meet the requirements of Subsection The Contractor shall be responsible for maintaining the new FTB without damage during backfill and compaction. If the FTB is damaged due to the Contractor s operations, the FTB shal be repaired at no expense to the State and NYPA. 9. Drawing Review and Outage Notification a. Shop drawings pertaining to the lowering of NYPA s Y-49 and the temporary support of the KeySpan gas main must be submitted to NYPA / KeySpan for review and comment. NYPA / KeySpan will require one-week minimum turn around time. Page 8 of 9 9/18/08E 07/26/04

9 b. Notification to NYPA for a required circuit outage must not be less than 30 days in advance of commencement of the work on this item. The duration of an outage shall be limited to three weeks. 10. Fiber optic cable a. The services of a fiber optics testing and installation Contractor shall be prearranged to do testing and in the event that a new fiber optic cables need to be pulled and spliced. The Fiber optical installation Contractor shall provide certification in writing by the company producing the optical fiber cables that the Contractor is technically qualified in design, installation, servicing and testing of the required products for this project, is capable to act as a field advisor and is approved by NYPA. Prior to lowering the fiber optic cables to the final depth, the fiber optic Contractor shall test all fibers in each cable using an Optical Time Domain Reflectometer (OTDR) and Precision Loss Test Set. The Y49 fiber optic cables shall be pulled by hand from Manhole 21 and Fiber Handhole #8, once it has been verified that there is sufficient slack in the cables in these locations. b. Once the fiber optical cables and conduits have been lowered to the final depth, the fiber optics Contractor will be required to re-test all fibers end-to-end using an OTDR and precision loss test set between East Garden City and the South Transition stations. NYPA will review the (post) to (pre) test results for any increase in db losses or stress in the fibers, and will make a determination for approval to proceed. NYPA will be provided a hard copy of all OTDR and Precision Loss Test results, and will require 2-3 business days for review. c. In the event the fiber optic tests prove that the fibers were damageddue to the Contractor s operations, the damaged section must be replaced at no expense to the State and NYPA. The new fiber optic cables shall be pulled by hand from Manhole 21 and Fiber Handhole #8, spliced and tested to the satisfaction of NYPA. METHOD OF MEASUREMENT This work shall be measured as a lump sum. BASIS OF PAYMENT The lump sum price bid shall include the cost of furnishing all labor, materials and equipment to complete the work except that trench and culvert excavation and, temporary and interim sheeting shall be paid under their respective items. Monthly progress payments will be made in accordance with percent work completed as determined by the Engineer. Page 9 of 9 9/18/08E 07/26/04

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October 2013 5 Pages LABORATORY TESTING SECTION. Method of Test for

Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October 2013 5 Pages LABORATORY TESTING SECTION. Method of Test for Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation 5 Pages LABORATORY TESTING SECTION Method of Test for TIME OF SETTING OF CONCRETE MIXTURES BY PENETRATION RESISTANCE 1.

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Guide Specification Precast Concrete Products

Guide Specification Precast Concrete Products Guide Specification Precast Concrete Products This specificaton should be used only by qualified professionals who are competent to evaluate the significance and limiations of the specification and who

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

SECTION 16402 UNDERGROUND ELECTRIC SERVICE

SECTION 16402 UNDERGROUND ELECTRIC SERVICE SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA October 21, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04

More information

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Blvd. Sacramento, California 95819-4612

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS

GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. This specification covers the materials for and manufacture of precast reinforced concrete units produced in

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35 Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013

More information

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Construction Specifications for Keyhole Pavement Coring and Reinstatement F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

COMMERCIAL CONDUIT RULES AND REGULATION

COMMERCIAL CONDUIT RULES AND REGULATION Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

SECTION 02845 GUARDRAILS

SECTION 02845 GUARDRAILS SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes

Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes Optical Cable Pre-Construction Survey Author John Peters Issued December 2012 Abstract Pre-construction site survey is one of the most important steps in the engineering and placement of a new optical

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 603 SANITARY SEWER FORCE MAINS SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

Specification 6020. Underground Services - Subdivisions. Issue 12

Specification 6020. Underground Services - Subdivisions. Issue 12 Building Industry Consulting Services (BICS) Specification 6020 Underground Services - Subdivisions Issue 12 Page 1 of 59 Distribution Conduit Are Provided By Others In Accordance With CRTC Tariff 21461,

More information

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5 PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor

More information

SC-07 STORM DRAIN INLET PROTECTION

SC-07 STORM DRAIN INLET PROTECTION Greenville County Technical Specification for: SC-07 STORM DRAIN INLET PROTECTION 1.0 Storm Drain Inlet Protection 1.1 Description Provide Storm Drain Inlet Protection at all existing and newly installed

More information

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System An application for the construction or alteration of an individual subsurface sewage disposal system shall

More information

725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE

725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf

More information

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland

More information

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

550 PIPE CULVERTS, SEWERS AND DRAINS

550 PIPE CULVERTS, SEWERS AND DRAINS 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid

More information

SECTION 18370 SIGNAL WIRE AND CABLE

SECTION 18370 SIGNAL WIRE AND CABLE SECTION 18370 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for all cable and wire required for signal and signal power system wiring to wayside shelters, junction boxes, and factory

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information