1 Paper ID : Safety through Process Management Lessons Learned at Sour Gas Production Facilities Shafiullah Rana Chief Engineer (Electrical), Electrical Section, KDMIPE, ONGC, Dehradun India Sanyal_sarah@yahoo.co.in Abstract This paper discusses the lessons learned from Safety & Environment Audits conducted at Sour Gas Production Facilities A of offshore field in Mumbai, India. Production and processing systems have undergone significant changes since the inception of platform operations. Safety & Environment Audits have been a prudent tool and hence conducted during to identify and correct conditions that could threaten the Production Facilities, personnel and the environment. The production facilities were over 16 years old and typically employ older control and safety systems with limited capability compared to more current technology. Employing a more comprehensive audit/ inspection program was seen as an essential protection initiative that could significantly decrease the likelihood of damages of of MMT. The reservoir is producing under volumetric depletion drive with finite aquifer support. The XYZ Sour gas field comprises of two production platform complexes A and B and five well head platforms. Well fluid from well platforms flow to A & B process complexes where the sour gas and condensate are processed before its dispatch to the shore terminal. The gas produced is sour in nature with H 2 S in the range of PPM. The reservoir pressure and temperature were about 140 KSC & C respectively at that time. Surface pressure & temperature of the gas produced were KSC & C respectively. The sour gas produced is saturated with condensate & water. CO 2 in the gas is of the order of 5-6% that along with H 2 S makes the produced gas highly corrosive in nature. The field has been developed in phases. Accordingly, the field has witnessed addition of new wells, pipelines and wellhead platform. Process complex A which was originally designed to process 10 MMSCMD gas has been subsequently upgraded in two phases and further up-graded of processing facilities with installation and commissioning of Production Facilities and Environment. These audits took a comprehensive look at conformance with all applicable laws and regulations and accepted industry standards. Process, Safety, Electrical and Mechanical engineers conducted comprehensive evaluations of the process operation using a whole system approach to assess age and conditions of the equipment, pipelines, design of the facility, human organizational factors, mechanical and electrical maintenance and programs. The program has completed Audits at main process complex and unmanned production wellhead facilities with over 4560 action items identified and over Rs million spent on needed up gradation works. After Safety & Environment Audit, the Quarterly inspection results have shown significant improvement. Common items found result from age of the facility, changes in standards and regulations and revisions in the API/OISD Recommended Practices. These efforts have translated into reduced risk to the Production facilities, personnel and the environment. 1. Introduction The XYZ Sour gas field of Mumbai offshore, India was put on commercial gas production with initial gas rate of 2 MMSCMD. The North-South anticline structure of the field has an aerial extent of about 250 squires Kilometers. The hydrocarbon accumulation is confined with in Middle Eocene to Lower Oligocene. The producing reservoir is limestone and has been discovered into two distinct hydrocarbon producing zone. The first zone comprises of free gas while the second zone has bulk oil and gas. This has been further categorized into gas, oil and water layers based on the respective saturation values. The in place reserves of gas has been estimated in the range of Billion cubic meter and that of oil in the range Booster process complex at both the complexes. At the time of 1

2 Audit it was producing 16.3 MMSMD of sour gas, 2300 M 3 /Day of condensate and 240 M 3 /Day of produced water. The processing facilities at A Complex can be divided into three main groups i.e. gas system, condensate system and produced water system. Each process is described below: 1.1. Gas System The Process flow of the gas system is as under: Inlet Well Fluid Production Headers Well Stream Coolers High Pressure Separators (HP), Test Separator and Compressed gas from Intermediate Separator (IP) Suction Knock-out Drum Booster Compressors Discharge Knock-out Drum Gas Scrubber cum Glycol Contactor Glycol Recovery Vessel Gas Metering Trunk lines to Shore The controlled flow of well fluid at very high pressure and temperature collects in a production header and is routed to two gas-processing trains. The well fluid is cooled in shell & tube type well stream coolers where condensable water vapor & hydrocarbons condense and enters the high-pressure separator. In high pressure production separator, phase separation takes place. Gas, condensate and produced water separate out of well stream. The separated gas is dehydrated i.e. moisture or water vapor in gas is removed which is in the range of 3.5 to 4.0 Lbs/MMSCF as against maximum allowable limit to gas trunk-line transportation requirements i.e. 5 Lbs/MMSCF. The dehydration of gas is performed in glycol contactor where counter flowing tri-ethylene glycol (TEG) absorbs moisture from the up moving gas. The dehydrated gas after metering is dispatched to shore terminal via sub-sea trunk line. TEG rich with moisture is regenerated for re-circulation Condensate System The Process flow of the condensate system is as under: HP & Test Separators IP Separator Condensate Pumps Condensate Coalescers Condensate Meters Trunk lines to Shore The liquid from HP Separators and condensate from Test separator joins together and routed to the three phases IP (Intermediate Pressure) Separator. The liquids separated in Gas scrubber and Knock-out Drums (KOD s) also joins the inlet stream of IP Separator. The IP Separator pressure is maintained at 23 KSC for separation of gas, condensate and water. While the gas is routed to the (High Pressure) HP Compressor and separated water to the Produced water Flash drum, the condensate is pumped to Condensate Coalescers with the help of condensate pumps. During the total process the water content in the condensate is reduced to less than 15 PPM which is well with in the allowable parameters of 20 PPM. The condensate is then metered before dispatching to the gas trunk line Produced water System The Process flow of the produced water system is as under: IP Separator/Test Separator/Condensate Coalescers/KOD of HP & Booster Compressors/Fuel gas Scrubber Produced water Flash Vessel Produced Water conditioner Sump Caisson Before safe disposal to sea through sump caisson, produced water from IP Separator/Test Separator/Condensate Coalescers/KOD s of HP & Booster Compressors/Fuel gas Scrubber is treated in produced water conditioner. Hence there is practically no condensate accumulation in treated produced water. 2. Areas of Concerns in Operations A complex was originally designed to process 10 MMSCMD gas but has been subsequently upgraded. The up gradation in production and processing of sour gas, however, was not smooth. With 2

3 increase in production and gas processing, a number of operational problems and limitations surfaced. Some of them were as follows: 2.1. Process Observed reduced efficiency of Well stream coolers. Well stream coolers had problem of air locking. Cooling water flow across coolers has been reduced considerably. Observed abnormal high pressure differentials across heat exchangers resulting in drastic reduction in heat transfer efficiency in Plate heat exchangers. Heat exchangers are used for cooling of gas cooling water outlet of well stream cooler. The gas processing temperature exceeded the normal operating temperature (43 0 C). There was difficulty to contain the temperature within the operating parameters. The moisture content of export gas indicated a rising trend exceeding the pipeline transportation maximum allowable limit of moisture temperature. Observed increase in carry over of tri-ethylene glycols (TEG) from glycol contactor beyond the normal value. Observed increase in Glycol vapor loss in glycol regeneration system beyond the normal value. Observed High liquid load on Glycol contactors, packing failures in glycol re-boiler, frequent choking of charcoal filters, and over-pressurization of the system in glycol regeneration system Mechanical Observed frequent failures of pipe & pipe fittings of condensate and gas cooling system. Observed high vibration in Decks of Turbo generators for Power generation. Observed high vibrations and increased frequency of replacement of plunger packing of condensate pumps. Observed increased frequency of replacement of plunger packing of glycol pumps. Observed high vibrations in HP gas Compressors Electrical and Instrumentation Observed complete Power shutdown in case of tripping of one out of three Power turbine generators due to fault in load sequence logic control mechanism of Power Turbine generators. Observed high failure of closure of unmanned platform s wells in stipulated time, resulting in deployment and transportation of manpower to unmanned platforms through offshore vessel in odd hours for opening of the wells Safety & Environment Observed reduced Efficiency of the Tilted Plate Interceptors (TPI) and Dissolved Gas Floatation units of Produced water conditioner; threatening the Marine Environment. Observed minor leakage from flanged hub gasket of header valves of two unmanned platforms; depositing excess salt sticks due to oozing water with little leaking gas, which is rare phenomenon. Though the salinity of Produced water was well with in limit (7.5 mg/litre) compared to the sea water salinity of about 34mg/Litre. Observed Pressurized Pig receiver due to leakage in the isolation valve making the operations very risky during pig receiving. Observed continuous leakage of Lube Oil from the plunger driven condensate pumps and also from Power Turbine Generators making unsafe conditions in the deck areas and Turbine room. Observed leakage in the open deck drain, LLP (Low low pressure) gas flare line and Sewage piping making unsafe conditions. Out of seven number Life boats only four Life Boats were fully operational. The other three boats can be used for evacuation but cannot hoisted back to their positions electrically. 3

4 Both the Breathing Air Compressors were non-functional due to various electrical, mechanical and Quality control problems. As a result refilling of Breathing Air Apparatus was done at nearby process complex B, which was not a safe working condition. The working principle of Both Sewage Treatment Plants was based on Electrolysis and quality of Hypochlorite generation. Due to aging the environmental parameters like BOD, COD etc. were beyond the upper limit. Quality and frequency of Calibrations of F&G Detectors were not met as in many cases the self life spare sensors acceded the time limitations. The doors/enclosures of many rooms like Power Turbine generators, Control room, and Battery banks were not properly closing, making Halon System ineffective. In the light of above observations in the operations, the Safety & Environment Audits Program began with an initial Audit at Process complex A in the year Over 4560 action items were identified demonstrating a clear need for comprehensive auditing. The quantity and significance of the identified audit items prompted Asset Management to re-evaluate the facility inspection and environmental aspect prevention program. There was concern as there were gaps in the monthly safety & environment inspection programs, because the inspection specifics were prescribed by regulation as contained in organizations own safety & environment policy and programme based on API/OISD. It was observed and deliberated that the inspection program could not alone ensure safe operation of these facilities. The production facilities were over 16 years old and typically employ older control and safety systems with limited capability compared to more current technology. Production and processing systems have undergone significant changes since the inception of this platform operation. Employing a more comprehensive audit/inspection program was seen as an essential safety and environmental protection initiative that could significantly decrease the likelihood of operational and environmental damage. The deployed audit programme used Process, Safety, Electrical and Mechanical engineers to conduct comprehensive evaluations of the operation. These experts would assess age and conditions of the equipment, pipelines, design of the facility, human organizational factors, mechanical and electrical maintenance and programs using a whole system approach. The audits took a comprehensive look at conformance with all applicable laws and regulations and accepted industry standards such as with the API Recommended Practice RP-750 & SEMP-RP-75 on Management of Process Hazards, OSHA regulation 29 CFR on Process Safety Management of highly hazardous chemicals and EPA-40CFR-435/OISD on Environment management control. These regulations contain specific requirements for operations, plans and equipment on oil & gas production operations and environment control. 3. Audit Approach Each Audit is an in depth verification that an oil and gas facility complies with all applicable API/OSHA/EPA/OISD laws and regulations, follows industry standards, and continually re-evaluates and incorporates best achievable technology to safeguard the public and the environment. Each audit has five main areas or groups: Management Technical design Equipment Functionality-Integrity & Mechanical Electrical & Instrumentation Human Resource and Safety Management The groups identify action items with priorities and recommendations that are based on the information and requirement provided in a matrix (Annexure-I) as well as a written report in various Management manuals that highlights significant problems or design issues. 4. Results Process, Safety, Electrical and Mechanical engineers conducted Audit and comprehensive evaluations of the process operation using a whole system approach to assess age and conditions of the equipment, pipelines, design of the facility, human organizational factors, mechanical and 4

5 electrical and instrumentation maintenance and programs. The program has completed Audits at main process complex and unmanned production wellhead facilities with over 4560 action items identified. Over Rs million spent on needed up gradation works to comply for liquidations of these action items. All but only few long term action items from this audit have been resolved. The following table shows the Priority levels that action items may be assigned. The distribution of action items by Priority level and identification of action items respectively are shown in the table-i & II: Table-I S.No. Priority Action Items Percentage of total Action Items % % % Grand Total 4560 Table-II S.No. Group Action Items Percentage of total Action Items 1. Management 91 2% 2. Technical design 228 5% 3. Equipment Functionality-Integrity & % Mechanical 4. Electrical & Instrumentation % 5. Human Resource and Safety Management % Grand Total 4560 The table shows that: The majority of items are identified by the Equipment Functionality-Integrity & Mechanical group, followed by Human Resource and Safety Management group. These items include the review of required plans and drawings to verify they are up to date, as well as condition or maintenance problems found. These items tend to show up as a Priority 1 or 2 action item. The number of Equipment Functionality-Integrity & Mechanical group items also appears large because of the potential risks involved with these conditions, design, or rating problems. The Electrical & Instrumentation group action items include maintenance and any electrical system design problems identified as well. Where as the overall facility design, piping, and processing equipment design problems are located in the separate Technical design group s action items. These items tend to show up as a Priority 1 or 2 action item. Technical design group action items may be the most critical for correcting to prevent accidents or catastrophes because they deal with the facility design and required safety features. These items tend to show up as a Priority 1 or 2 action item. Management group where common problems found in operations manuals are among the least. Management group action items also tend to be Priority 3 items because of their low likelihood to initiate a catastrophe and the prerequisite chain of events that must occur. 5. Lessons Learned The lessons learned from audits are many. The result can be a better audit performance with fewer action items and ultimately less risk. This can also be used to augment internal audits and inspections to avert potential accidents and Environment damage. A number of the Equipment Functionality and Integrity action items occurred for improvement. In some cases, this seemed to occur because of limited facility and maintenance engineering support. A planned schedule for all tank and pressure vessel internal inspections and ultrasonic thickness measurement should be available. Further, piping and pipeline maintenance assessment and scheduling of maintenance and repair can also avert environment damage. 5

6 Many of the electrical & Instrumentation action items are the result of years of service in the harsh marine environment. Many junction boxes, conduit, and enclosures were found damaged or corroded to where they could not function as designed. Cable tray systems heavily corroded or in disrepair; produced a significant number of action items. Bonding and grounding of equipment and tanks also proved to be a very common action items. Piping and Instrumentation Drawing errors also accounted for significant numbers of lower Priority action items. Commonly identified Technical issues included balk at applicability of Process Safety Management (PSM) regulations. Process Hazards Analyses (PHA s) or Hazards Operability Studies (HAZOP s) are tools within PSM that are effective in identifying and managing risks at sour gas processing facilities. Process complex A had previous PHA or HAZOP studies on file; however, it had not implemented corrections, or proceeded with new projects without evaluating the available information. Sour gas processing system design may require review in intermediate stages of development due to corrosive nature of gas flow in operating equipment. 6. Conclusion In today s environment, the Safety and Environmental practices impact the entire industry. The Audit Program is an example of such activity to supplement existing inspection programs. The programs is proving to ensure in cooperation with users that each facility is designed, constructed, maintained, monitored and operated in full compliance with applicable industry codes, regulations and accepted practices and ensure that organization has adequate safety and environmental programs in place. Adopting these guidelines Process complex A sorted out all those operational, maintenance and safety & environment related issues. Process complex A got with full fledged accreditations of integrated quality, health, safety and environment management (ISO 9001, ISO & OHSAS 18001) and international safety rating level 5 (ISRS-5) certification for their efforts in the end part of the year References 1. Operations & Maintenance Manuals of Process complex A 2. Analysis, Design, Installation and Testing of Basic Surface Safety Systems for Offshore Production Platforms. American Petroleum Institute Recommended Practice API RP-14C 3. Recommended Practices for Development of a Safety and Environmental Management Program, American Petroleum Institute Recommended Practice API RP Process Safety Management of Highly Hazardous Chemicals, Title 29, Code of Federal Regulations (CFR) Part Guidelines on Safety Management System in Petroleum Industry, OISD-GDN Environment Management in E&P Sector, OISD-RP-201 6

7 MATRIX FOR AUDIT Annexure-I S. Group Responsibilities No. 1. Management 1. Review the various manuals, plans, policies, procedures and practices, emergency response plans, training programs and safe work practices for compliance with laws, regulations and industry standards. 2. Evaluate the use and application of this information by personnel at the facility. 3. Address Process HSE Management issues from a documentation or Management stand point much like the internal audits required by the various ISO Standards. 2. Technical design 1. Conduct a review of the Design of the facilities for compliance with API/EPA/OISD regulations for oil and gas production facilities as well as other requirements and standards. 2. Verify Process Hazards Analysis (PHA) being conducted by Process complex to identify appropriate safeguards and operations. 3. Review Existing PHA s for quality, adequacy of supporting process, safety information, appropriate analysis technique, all hazards addressed, proper documentation and meeting all requirements. 4. Check the sizing of pressure safety relief valves and the relief system as well as the coordination of a review of the various Detection systems and Fire protection systems. 5. Verify other design requirements involves verification of adequate 3. Equipment Functionality- Integrity & Mechanical 4. Electrical & Instrumentation 5. Human Resource and Safety Management containment volumes as identified in the Environment protection plan. 1. Examine the physical condition of the facility including operational and maintenance practices and the proper functioning of safety and environment protection system, prevention and response systems and equipment. 2. Review preventive maintenance procedures and schedule and compliance, equipment specification information for maintenance and design selection of equipment. 3. Verify the important tank, pressure vessel and safety relief valve inspections code or recommended industry practices and complete tables of information that summarize this information. 4. Verify that Cathodic and other corrosion protection system inspections, piping assessment and pipeline integrity inspections including smart pigging or hydrostatic tests are occurring on schedule. 1. Examine the physical condition of the Electrical & Instrumentation systems including operational and maintenance practices as well as proper design and installation to meet applicable code requirements. 2. Verify the accuracy of Process and Instrumentation Diagrams (P&ID s), Emergency and EM Response, Equipment diagram, Process Flow Diagrams and observe required periodic testing of this critical equipment. 3. Verify line diagrams and hazardous location area classification diagrams. Also specific requirements for backup, auxiliary, or emergency power as well as electrical & instrumentation controls, communications and other related equipment. 1. Conduct Safety Assessment of Management Systems (SAMS) that is based on interviews of company personnel and contractors at all levels of the organization. 2. Provide a separate and confidential report intended for impartial third party feedback and observations regarding apparent root causes and related management conditions as mentioned in the Lessons Learned. 7

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil

More information

Natural Gas Dehydrator Optimization

Natural Gas Dehydrator Optimization Natural Gas Dehydrator Optimization IAPG & US EPA Technology Transfer Workshop November 5, 2008 Buenos Aires, Argentina Natural Gas Dehydration: Agenda Methane Losses Methane Recovery Is Recovery Profitable?

More information

Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants

Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants Ram K. Saini, P.E. Principal Engineer, Chuck Emma, P.E. Principal Engineer, Burns and Roe Enterprises,

More information

How To Clean Up A Reactor Water Cleanup

How To Clean Up A Reactor Water Cleanup General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component

More information

Practical Implementation of Safety Management Systems at Unregulated Upstream Oil & Gas Facilities

Practical Implementation of Safety Management Systems at Unregulated Upstream Oil & Gas Facilities Practical Implementation of Safety Management Systems at Unregulated Upstream Oil & Gas Facilities Kristin D. Norton, PE CFSE Risk Management Professionals, Inc. 300 Goddard, Suite 200 Irvine, California

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

On-Site Risk Management Audit Checklist for Program Level 3 Process

On-Site Risk Management Audit Checklist for Program Level 3 Process On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:

More information

Training for Operations and Maintenance

Training for Operations and Maintenance Oil and Gas Training and Competency Development Training for Operations and Maintenance Developing technical skills and building practical experience for E&P teams and professionals Training that meets

More information

Recently Completed Projects - Storage Projects

Recently Completed Projects - Storage Projects Nicor Gas Thermal Oxidizer at Reboiler #6 N/A Illinois, USA Installation of a 3.0MM BTU/HR thermal oxidizer to replace the existing less efficient flare stack at Reboiler #6. Worked through the procurement

More information

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS BAY AREA AIR QUALITY MANAGEMENT DISTRICT RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS (ADOPTED: January 17, 1979) (AMENDED: November 1, 1989; October 6, 1993; June 15, 1994;

More information

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM 1. IS 15663(Part 1):2006 This code covers requirements and recommendations for the design, materials, construction and testing of pipelines made of steel

More information

Operations and Maintenance Procedures for Natural Gas Systems

Operations and Maintenance Procedures for Natural Gas Systems Operations and Maintenance Procedures for Natural Gas Systems Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Office

More information

Automobile Air Conditioning Primer

Automobile Air Conditioning Primer Automobile Air Conditioning Primer An air conditioner is basically a refrigerator without the insulated box. It uses the evaporation of a refrigerant, like Freon, to provide cooling. The mechanics of the

More information

How To Make A High Co 2 Gas Blend

How To Make A High Co 2 Gas Blend ECONOMICAL OPTION FOR CO 2 / METHANE SEPARATION IN PRODUCED GAS CONTAINING A HIGH CO 2 FRACTION F. Patrick Ross, P.E. TPR Consulting 9907 Sagecourt Drive Houston, Texas 77089 (713) 870-9208 pat.ross@att.net

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 23 Rev: 01 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT I / 7 Natural Gas Transport. General principle The most efficient and effective method of natural gas distribution from the place of production to the

More information

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy UVCE Storage tank Hydrocarbons Steam coil Corrosion Steam Instrumentation

More information

Arkansas Natural Gas Severance Marketing Costs

Arkansas Natural Gas Severance Marketing Costs Arkansas Natural Gas Severance Marketing Costs The following lists present various costs by category as "Allowable" or "Disallowed" as marketing costs. While listing many items, this list may not be all

More information

Factory owners must ensure the boiler is:

Factory owners must ensure the boiler is: Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised

More information

Liquefied Natural Gas (LNG)

Liquefied Natural Gas (LNG) Graduate Diploma in Petroleum Studies Major in Liquefied Natural Gas (LNG) INDUCTION Launching ceremony Week 39, 2012 Administration / Plant visit / Fundamentals of LNG and LNG main risks awareness Module

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice FIR-001 Rev. 06/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model Piping System Model as a Life Cycle Document White Paper Introduction When designing piping systems, a variety of documents are created providing the details necessary to design, purchase, build, and test

More information

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL Siniša Stojan, Ph.D. student Damir Dražić, Ph.D. student Brodotrogir, HR - 21220 Trogir, Croatia sinisa.stojan@brodotrogir.hr,

More information

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS

More information

IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction

IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1 Copyright 2010, Brazilian Petroleum, Gas and Biofuels Institute - IBP This Technical Paper was prepared

More information

Hydraulic control unit series 0086-372-01

Hydraulic control unit series 0086-372-01 Technical Product Information No. 1290 EN Hydraulic control unit series 0086-372-01 Contents Page About this Technical Product Information (TPI) 2 The ORTLINGHAUS numbering system 2 About the product 3

More information

Version: 1.0 Last Edited: 2005-10-27. Guideline

Version: 1.0 Last Edited: 2005-10-27. Guideline Process hazard and risk Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se -1- Summary This report will try

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES Main Courses Duration: 26 weeks 1. NVQ Level 2 Performing Process Operation in Replicating Environment 2. NVQ Level 2 Performing

More information

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities Master Class Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities What you will learn: Skills and competencies in E&I oil and gas engineering Knowledge of the latest technologies

More information

Benefits of Using Automation Software for Gas Production Optimization Louis Ray and Kenneth Juran, SPE, Case Services, Inc.

Benefits of Using Automation Software for Gas Production Optimization Louis Ray and Kenneth Juran, SPE, Case Services, Inc. SPE 59713 Benefits of Using Automation Software for Gas Production Optimization Louis Ray and Kenneth Juran, SPE, Case Services, Inc. Copyright 2000, Society of Petroleum Engineers Inc. This paper was

More information

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Identify, interpret, and

More information

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000 Gas Standards and Safety Guidance Note January 2015 (GN106) Version 1.0 GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000 A guide to assist in the design of biogas

More information

Gas Detection for Refining. HA University

Gas Detection for Refining. HA University Gas Detection for Refining HA University Refinery Process and Detection Needs Refining i Crude Oil Final Products Coke Asphalt Waxes, Lubricating Oils and Greases Kerosene, Jet Fuel, Diesel Fuel, Home

More information

OIL & GAS PRODUCTION AUDITING

OIL & GAS PRODUCTION AUDITING OIL & GAS PRODUCTION AUDITING Wayne C. Dussel Offshore Measurement Supervisor El Paso Production GOM Basic Measurement Audit Steps I. Select location (s) to be reviewed. II. Review contracts, commingling

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 10 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia PIPING FLEXIBILITY ANALYSIS TABLE

More information

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008 HSE information sheet Fire and explosion hazards in offshore gas turbines Offshore Information Sheet No. 10/2008 Contents Introduction.. 2 Background of gas turbine incidents in the UK offshore sector...2

More information

CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS

CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS Natural gases either from natural production or storage reservoirs contain water, which condense and form solid gas hydrates to block pipeline flow

More information

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities Device Charts For Oil and Gas Handling and Production Facilities Purpose/Scope: The purpose of this document is to provide standardized guidance for use by the regulated community and air permit reviewers,

More information

Fiscal Measurement Natural Gas

Fiscal Measurement Natural Gas White Paper FSG-WP-0012 February 2014 Fiscal Measurement Natural Gas Fiscal Measurement How much? Fiscal Measurement must not be confused with Custody Transfer; in fact, fiscal measurement is a more general

More information

Backup Fuel Oil System Decommissioning & Restoration Plan

Backup Fuel Oil System Decommissioning & Restoration Plan Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 19 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

Civil Engineering Sector Labour-Management Health and Safety Committee

Civil Engineering Sector Labour-Management Health and Safety Committee PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION

More information

SAMPLE CHAPTERS UNESCO EOLSS NATURAL GAS PROCESSING. H. K. Abdel-Aal National Research Center (NRC), Cairo, Egypt

SAMPLE CHAPTERS UNESCO EOLSS NATURAL GAS PROCESSING. H. K. Abdel-Aal National Research Center (NRC), Cairo, Egypt NATURAL GAS PROCESSING H. K. Abdel-Aal National Research Center (NRC), Cairo, Egypt Keywords: sour natural gas, gas sweetening, gas dehydration, amines, glycols, hydrates, hydrogen sulfide, NGL, cryogenic

More information

Medical Air Systems: Scroll

Medical Air Systems: Scroll GENERAL The Chemetron skid mount scroll medical air system is designed to provide medical breathing air for hospital and medical institutions. This system meets NFPA 99 requirements for Level 1 breathing

More information

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components TITLE Pipelines and Terminals Manual/Volume 3 - SECTION 02: SUBJECT 20: PURPOSE AND SCOPE During the normal lifetime of a pipeline it becomes necessary to add or remove piping, modify existing piping or

More information

Risk Assessment Data Directory. Report No. 434 1 March 2010. Process release frequencies

Risk Assessment Data Directory. Report No. 434 1 March 2010. Process release frequencies Risk Assessment Data Directory Report No. 434 1 March 2010 Process release frequencies I n t e r n a t i o n a l A s s o c i a t i o n o f O i l & G a s P r o d u c e r s P ublications Global experience

More information

The Dalian Developer A new approach to oil spill response

The Dalian Developer A new approach to oil spill response The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012 Contents Introduction

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001. June 16, 2011

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001. June 16, 2011 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001 June 16, 2011 NRC INFORMATION NOTICE 2011-12: REACTOR TRIPS RESULTING FROM WATER INTRUSION INTO

More information

Rx Whitepaper. Using an Asset Management Framework to Drive Process Safety Management and Mechanical Integrity

Rx Whitepaper. Using an Asset Management Framework to Drive Process Safety Management and Mechanical Integrity Rx Whitepaper Executive Overview Process Safety Management (PSM), driven by the OSHA 1910.119 standard, aims to prevent the unwanted release of hazardous chemicals, especially into locations which could

More information

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Ethanol Vehicle and Infrastructure Codes and Standards Citations Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and

More information

North Dakota State Fire and Tornado Fund Providing affordable property insurance coverage for the state and its political subdivisions since 1919.

North Dakota State Fire and Tornado Fund Providing affordable property insurance coverage for the state and its political subdivisions since 1919. North Dakota State Fire and Tornado Fund Providing affordable property insurance coverage for the state and its political subdivisions since 1919. Contents Check the condition of the hydronic system fluid.

More information

How To Make A Mine Guard Fosil Process

How To Make A Mine Guard Fosil Process UOP Amine Guard TM FS Technology for Acid Gas Removal 2009 UOP LLC. All rights reserved. UOP 5241B-01 Agenda Overview of the Amine Guard FS process UCARSOL TM Solvent characteristics Amine Guard FS flow

More information

Ammonia Detection System Codes and Design Specifications

Ammonia Detection System Codes and Design Specifications Ammonia Detection System Codes and Design Specifications December 28, 2015 Revision 5 920 N Trade Winds Pkwy Columbia, MO 65201 Ammonia detection system codes and design specifications Following is a discussion

More information

COLORADO APCD IR Camera Survey Program Guidance/Protocol (rev. 11/8/11)

COLORADO APCD IR Camera Survey Program Guidance/Protocol (rev. 11/8/11) COLORADO APCD IR Camera Survey Program Guidance/Protocol (rev. 11/8/11) Disclaimer: This document is designed to assist regulatory agency staff in conducting IR camera surveys at upstream and midstream

More information

CONTROL OF LEGIONELLA AUDIT PROFORMA

CONTROL OF LEGIONELLA AUDIT PROFORMA CONTROL OF LEGIONELLA AUDIT PROFORMA This document is an audit sheet designed to assist persons in control of cooling systems which incorporate cooling towers or evaporative condensers, to assess their

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

Engineering Software Enables Designing for the Deep

Engineering Software Enables Designing for the Deep An Industry White Paper By Kevin Gomez, Editor PACE Magazine, Cirrus Media, Australia The content of this paper originally appeared in PACE Magazine, February 26, 2013. www.pacetoday.com.au Overview What

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 38 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia CAUSTIC AND CHEMICAL TABLE OF CONTENT

More information

ThermoSorb Desiccant Dryers

ThermoSorb Desiccant Dryers ThermoSorb Desiccant Dryers Sierra Why dry compressed air? Contamination reduces efficiency The air we breathe contains contamination in the form of water vapour and airborne particles. During the compression

More information

2A.1 Features of Chiller Control Components... 104. 2A.3 Chilled-Water Supply Temperature Control... 107. 2A.4 Cooling-Water Supply Control...

2A.1 Features of Chiller Control Components... 104. 2A.3 Chilled-Water Supply Temperature Control... 107. 2A.4 Cooling-Water Supply Control... Appendix 2A: Chiller Control Principles... 104 2A.1 Features of Chiller Control Components... 104 2A.2 Start-up and Shutdown... 105 2A.2.1 Start-up...105 2A.2.2 Shutdown...106 2A.3 Chilled-Water Supply

More information

How To Clean Water From An Ammonia Refrigeration System

How To Clean Water From An Ammonia Refrigeration System Water Contamination and Water Removal in Industrial Ammonia Refrigeration Systems By Ray Ficker, PE Effects of Water Contamination Water contamination in an industrial ammonia refrigeration system can

More information

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) RULE 1173. FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (a) (b) Purpose This rule is intended to control volatile organic compounds

More information

C. starting positive displacement pumps with the discharge valve closed.

C. starting positive displacement pumps with the discharge valve closed. KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the

More information

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG IP THE INSTITUTE OF PETROLEUM Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG MODEL CODE OF SAFE PRACTICE PART 9 ISBN 0 471 91612 9 First'printed 1987 Reprinted October

More information

Dry-out Design Considerations and Practices for Cryogenic Gas Plants

Dry-out Design Considerations and Practices for Cryogenic Gas Plants Dry-out Design Considerations and Practices for Cryogenic Gas Plants Presented at the 93 rd Annual Convention of the Gas Processors Association April 14, 2014 Dallas, Texas Joe T. Lynch, P.E., David A.

More information

RS-24 (R426A): Q & A

RS-24 (R426A): Q & A RS-24 (R426A): Q & A 1 Q: What is RS-24? A: RS-24 is a non ozone depleting Drop-in replacement for R12 in all applications including mobile air conditioning. 2 Q: Yes, but what does RS-24 contain? A: RS-24

More information

Module No. # 02. Impact of oil and gas industry on marine environment

Module No. # 02. Impact of oil and gas industry on marine environment Health, Safety and Environmental Management in Petroleum and offshore Engineering Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. # 02 Lecture

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS A. Purpose and Scope A.1 The purpose and scope of these requirements is to establish safety and environmental requirements for contractors to be able to

More information

Goliat Produced Water Management

Goliat Produced Water Management Goliat Produced Water Management Hans Tore Nordbø, Process Engineer, Eni Norge AS Tekna Produced Water Management, 21.01.10-22.01.10, Clarion Hotel Stavanger www.eninorge.no PL229 Goliat location, ownership

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 32 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

No. Name Description Main input Data Main Output Data. cooling duty, process in/out temperature, inlet air temperature

No. Name Description Main input Data Main Output Data. cooling duty, process in/out temperature, inlet air temperature 1 AIRCOOLER Air cooler preliminary sizing cooling duty, process in/out temperature, inlet air temperature No of fans, Air cooler Dimension, bare area, no of rows, Fan Diameter, fan power 2 BLOW DOWN FACILITATOR

More information

ASME B31.3 Process Piping. Scope of B31.3 Course

ASME B31.3 Process Piping. Scope of B31.3 Course ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. Introduction -1 Scope of B31.3 Course This course covers piping as typically used in process

More information

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development. Section 11.1 APPLICATION FOR APPROVAL OF THE DEVELOPMENT PLAN FOR NIGLINTGAK FIELD PROJECT DESCRIPTION INTRODUCTION 11.1.1 HSE MANAGEMENT SYSTEM Shell s Health, Safety and Environment (HSE) management

More information

APPENDIX G. Guidance from USEPA Region X For ASPPs from Industrial Users APPENDIX 3. Detailed Information to be Considered in Development of IU ASPPs:

APPENDIX G. Guidance from USEPA Region X For ASPPs from Industrial Users APPENDIX 3. Detailed Information to be Considered in Development of IU ASPPs: APPENDIX G Guidance from USEPA Region X For ASPPs from Industrial Users APPENDIX 3 Detailed Information to be Considered in Development of IU ASPPs: o Identification of Potential Spill and Slug Discharge

More information

SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY

SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY 87th Annual Convention Grapevine, Texas, USA March 2-5, 2008 SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY Peter Schinkelshoek MSc Eng Twister BV Principal Process Engineer Peter.Schinkelshoek@TwisterBV.com

More information

Portable leak detection instrument improves heat rate at electric power plant. By Terrence O'Hanlon, CMRP Reliabilityweb.com

Portable leak detection instrument improves heat rate at electric power plant. By Terrence O'Hanlon, CMRP Reliabilityweb.com Portable leak detection instrument improves heat rate at electric power plant. By Terrence O'Hanlon, CMRP Reliabilityweb.com By using a ruggedized portable ultrasonic leak detector, Mr. Brian Thorp, PdM

More information

Select the Right Relief Valve - Part 1 Saeid Rahimi

Select the Right Relief Valve - Part 1 Saeid Rahimi Select the Right Relief Valve - Part 1 Saeid Rahimi 8-Apr-01 Introduction Selecting a proper type of relief valve is an essential part of an overpressure protection system design. The selection process

More information

POLICY BULLETIN Tecumseh Compressor Company Compressor Group

POLICY BULLETIN Tecumseh Compressor Company Compressor Group to Bulk Milk Coolers and Other System Page 1 of 5 Overall reliability can be enhanced if there exists a complete understanding of the features, system design, installation requirements, processing, charging

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 24 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia S TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

WHITE PAPERS. Process Safety Management

WHITE PAPERS. Process Safety Management WHITE PAPERS Process Safety Management The building blocks of a successful Process Safety Management (PSM) program are detailed piping and instrumentation diagrams (P&IDs) and standard operating procedures

More information

HYDROTHERMAL OXIDATION HAZARDOUS WASTE PILOT PLANT TEST BED. BY Henry Welland William Reed Dave Valentich Tom Charlton

HYDROTHERMAL OXIDATION HAZARDOUS WASTE PILOT PLANT TEST BED. BY Henry Welland William Reed Dave Valentich Tom Charlton I-- HYDROTHERMAL OXIDATION HAZARDOUS WASTE PILOT PLANT TEST BED BY Henry Welland William Reed Dave Valentich Tom Charlton IDAHO NATIONAL ENGINEERING LABORATORY 2525 FREMONT AVE IDAHO FALLS, IDAHO 83415-3765

More information

Test Code: 8297 / Version 1

Test Code: 8297 / Version 1 Blueprint HVAC Maintenance Technology PA Test Code: 8297 / Version 1 Copyright 2014. All Rights Reserved. General Assessment Information HVAC Maintenance Technology PA Blueprint Contents General Assessment

More information

CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION

CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION Grease, So What's the Problem? Does your facility produce grease? All commercial cooking facilities generate Fats, Oil, and Grease

More information

Dew Point Tester. Instruction Manual. CVS Regular Chiller Model A-2. CVS Regular Chiller Model A-2

Dew Point Tester. Instruction Manual. CVS Regular Chiller Model A-2. CVS Regular Chiller Model A-2 Instruction Manual Dew Point Tester The CVS Dew Point Tester is a chilled mirror apparatus, which operates by attaining the conditions necessary by the definition of dew point. When a gas is cooled out

More information

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE (Adopted January 6, 1978)(Amended August 3, 1979)(Amended July 11, 1980) (Amended August 3, 1990)(Amended December 7, 1990) (Amended November 17, 2000) RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN

More information

A Guide to Trouble-Free Cooling Towers

A Guide to Trouble-Free Cooling Towers A Guide to Trouble-Free Cooling Towers A basic understanding of cooling tower operation and maintenance will help keep a cooling water system running in top condition, year after year By David M. Suptic

More information

HYDROCARBON REMOVAL FROM AMINES DEMONSTRATED EXPERIENCE ABSTRACT

HYDROCARBON REMOVAL FROM AMINES DEMONSTRATED EXPERIENCE ABSTRACT HYDROCARBON REMOVAL FROM AMINES DEMONSTRATED EXPERIENCE Technical Article Presented at Gas Processors Association Annual Convention San Antonio, Texas, USA, March 16, 2005 By Gary L. Lawson, PE (Presenter)

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

Underground Storage Tanks

Underground Storage Tanks Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation

More information

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer HIPPS Application in the Gulf of Mexico Christopher Lindsey-Curran BP Senior Subsea Engineer Agenda Introduction and background HIPPS overview Codes and standards System design Regulatory issues Conclusions

More information

TECHNICAL ADVISORY BULLETIN

TECHNICAL ADVISORY BULLETIN RISK CONTROL AND CLAIM ADVOCACY PRACTICE TECHNICAL ADVISORY BULLETIN November 2014 www.willis.com FIRE PUMP TESTING Fire pumps are a critical part of a fire protection system, especially when they are

More information

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change Process Safety Management of Highly Hazardous & Explosive Chemicals Management of Change What if Our PHA s Reveal the Need to Change Something In our System to Minimize the Potential for Release We Must

More information

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat - Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e

More information

COMPRESSOR REPLACEMENT PROCEDURE

COMPRESSOR REPLACEMENT PROCEDURE COMPRESSOR REPLACEMENT PROCEDURE Bard Manufacturing Company Bryan, Ohio 43506 Since 1914...Moving ahead just as planned Manual No.: 2100-003E Supersedes 2100-003D File: Volume I, Tab 1 Date: 06-25-02 Copyright

More information

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications GE Oil & Gas Air cooled heat exchangers Robust and reliable for all loads and applications What it is Air cooled heat exchangers are commonly used in industrial applications where a reliable source of

More information

Performance Based Gas Detection System Design for Hydrocarbon Storage Tank Systems

Performance Based Gas Detection System Design for Hydrocarbon Storage Tank Systems Performance Based Gas Detection System Design for Hydrocarbon Storage Tank Systems Srinivasan N. Ganesan, M.S., P.E. MENA Region Manager, Kenexis DMCC, Dubai, UAE Edward M. Marszal, PE, ISA 84 Expert ABSTRACT

More information