1 Page 1 of 6 FLOOD INVESTIGATION INVENTORY SHEET Flood Investigation # Entry Date: 10/8/2007 2:39:57 PM Revised Date: 7/13/2015 3:11:20 PM Completed By: Hiren Patel, PBS&J SECTION I: LOCATION County - Pinellas State Road - SR 55 Road Description - 6 lane(s), Principal Arterial, Roadside Ditches Roadway Separation - Divided w/traversable Median Direction of Travel - Two-Way Functional System of Road - Rural Specific Classification of Road - Principal Arterial Roadway Drainage - Roadside Ditches Flooding Condition - Off-System Local Road Subject to Flooding - Business Name: Curlew Crossing Shopping Center Business/Private Property Address Subject to Flooding US Highway 19 N Clearwater, FL Location: Latitude: Longitude: Section/Township/Range - 18 / 28S / 16E Project is Active - No Associated Projects Project Date State Project Number Financial Project ID Work Program ID Project Description Attachment 8/15/ Resurfacing SPN roadwayplans.pdf SECTION II: PROBLEM DESCRIPTION Date of Original Complaint - 11/14/1997 Complainant Name - Dave Gingrich Problem Description - Property Flooding

2 Page 2 of 6 Details of the Problem - Complaint Filed 11/14/1997: Mr. Dave Gingrich of USAA Realty, on behalf of the Curlew Crossing Shopping Center, located on the southwest corner of the Curlew Road/US 19 intersection, had complaints of parking lot flooding. He believes water from US 19 ditches seeps into the ground in heavy rains and drains directly onto the significantly lower parking lots of Applebee's, Atlanta Bread Company and Kwanda Asian Bistro. In addition, there is no outfall for the ditches to the north and south of the shopping center access road and ditch overflow rushes down this road into the parking lot. The recent (2001) pavement additions on US 19 have added to the problem. Complaint Filed 1/15/2004: Mr. Gingrich believes water from the US 19 ditches seep into and thru the berm during heavy rains and drains directly onto the significantly lower parking lots of Applebees, Atlanta Bread Company, and Kwanda Asian Bristo. In addition, there is no outfall for the ditches to the north and south of the shopping center access road and ditch overflow rushes down this road into the parking lot. The recent (2001) pavement additions on US 19 have added to the problem. Frequency of Flooding - Several times per year Source for Frequency Data - Local Resident/Person Interviewed Historic High Water - No historic high water data was available. Flooding Event High Water - No event high water was recorded. History of Problem - First complaint was in 1997 per Mike Skrzypkowiak, a former FDOT maintenance employee who responded to the original complaint of overflow from the ditches running onto adjacent property by installing a berm along the backside of the US 19 west side swale. Persons Interviewed Site Visit Date - 11/14/2003 Site Inspection By - Shayne Paynter, PBS&J Interviewee(s) - Dave Gingrich, USAA Realty Site Visit Conditions - Not Applicable Observed High Water - No observed high water was observed on the date of the site visit. Site Visit Details - The area immediately west of US 19 is substantially lower than the roadway and drains to a low point to the southwest. From this point, runoff flows south in an existing ditch. From Curlew Road south approximately 700 feet (ft), a US 19 roadside swale collects runoff. There is no outfall for this ditch and water must either percolate out or rise high enough to spill into the shopping center access roads and into the area parking lots. A berm was constructed by FDOT maintenance circa 1998 to prevent water from overtopping the ditch top of bank to the west. Prior to the berm construction, water could overtop the berm along its length and diffuse over the property, as it historically has done. Because the berm was constructed higher than the roadway access roads, the only

3 Page 3 of 6 outlet for the ditch runoff is at the access roads and into the shopping center property. In effect, the discharge characteristics have been altered from discharging all along the property in small amounts to discharging at two places in a larger amount. Because the drop is so steep and the berm relatively narrow, water can also percolate from the ditch into the parking lot. Although the permitted (SWFWMD Permit No ) plans show ditch blocks and baffles at both the Home Depot access road, approximately 350 ft north of Congress Avenue, and at the Applebee's/Atlanta Bread Company access road, approximately 800 ft south of Curlew Road, only the one at the Home Depot access was constructed. Per Mark Gillette of Greenhorne & O'Mara, no ditch work or ditch blocks were completed north of the Applebee's access road due to conflicts with a very shallow antiquated water main. Compensatory treatment was provided for this stretch of US 19 in other ditch locations. SECTION III: PROBLEM ANALYSIS Previous Analysis Previous Analysis By: Mike Skrzypkowiak, FDOT Maintenance on 11/14/1997. Previous Analysis: First complaint approximately 7 years ago (circa 1997) per Mike Skrzypkowiak, a former FDOT maintenance employee who responded to the original complaint of overflow from the ditches running onto adjacent property by installing a berm along the backside of the US 19 west side swale. Current Problem Analysis Current Problem Analysis: It appeared that either the side drain located immediately south of the Home Depot access was located in the wrong place or the access road was not constructed per plan. Outfall Description: Other Responsible Entity for Maintenance of Outfall: FDOT Attachment Attachments Attachment Description

4 Page 4 of _DrainageComplaintInventorySheet02.pdf _Sitephotos.pdf FloodInventory_Pr.pdf SPN originalcomplltr.pdf _SWFWMDAerial.pdf SPN drainagemap.pdf Attachment Type Site Photo SWFWMD Contour Map FDOT Drainage Map Drainage Complaint Inventory Sheet and site photos Flood Inventory Database Sheet for original complaint that has now been combined with this file. Original Complaint - Drainage Complaint Sheet Original Complaint - SWFWMD Aerial Contour Map Original Complaint - Drainage Maps SPN photos.pdf Site Photo Original Complaint - Photos DraftLetterToCurlewCrossings.pdf OfProposedConstruction.pdf sheet 20.pdf Sheet 5-7.pdf sheet 25.pdf sheet 26.pdf Media File Media File Original Complaint - Draft Letter mailed to Curlew Crossings Original Complaint - correspondence from GEC to D7 regarding proposed construction Original Complaint - Plan sheet showing proposed bleeder side drain pipe at southern drive entrance Original Complaint - Plan sheet showing proposed bleeder side drain pipe at northern drive entrance. The proposed 0.5-foot high earthern berm is also shown on this sheet. Original Complaint - Cross Section showing proposed bleeder pipe. Original Complaint - Cross Section showing bleeder pipe

5 Page 5 of 6 sheet 27.pdf Original Complaint - Cross Section showing bleeder pipe _Flood Inventory Rpt 1_04.pdf Original Complaint - Drainage complaint inventory sheet SECTION IV: CONCLUSIONS AND RECOMMENDATIONS Recommendation: An earthen berm near elevation 64.9' on the north side of the Applebees/Atlanta Bread Company access road should be constructed to prevent runoff from directly flowing into the Curlew Crossing parking lot. A 6" PVC pipe should be installed from just inside the berm south under the access road. In addition, a 6" PVC bleed-down pipe should be installed from the ditch block at the Home Depot access road south to the manhole at this location. It appears from a site visit on that the PVC pipes have been installed. See attached photos. From 1997 Complaint: It appears that at some point between 1976 and 1994 the side drain immediately south of the Home Depot access road was constructed. The 2001 FDOT plans provide no outfall short of overtopping access roads or percolation in the area west of US 19 from Curlew Road approximately 700 ft south. An earthen berm near elevation 64.9 on the north side of the Applebee's/Atlanta Bread Company access road should be constructed to prevent US 19 runoff from directly flowing into the Curlew Crossing parking lot. The estimated low edge of shoulder pavement in this location of US 19 is A 6-inch pvc pipe should be installed from just inside the berm south under the access road. This would provide a bleed-down orifice for the swale. In addition, a 6-inch pvc bleed-down pipe should be installed from the ditch block at the home Depot access road south to the manhole at this location. From this point, bleed down flow would enter a 30-inch pipe and head west to Curlew Creek. It should be noted that although this fix will help prevent water from US 19 from running onto adjacent properties, seepage from the steep hill adjacent to the Curlew Crossing Shopping Center will still continue to impact these property owners regardless of the existence of US 19. In addition, any high groundwater problems affecting the parking lot base material will not be alleviated by this fix. It should also be noted that runoff generated from the large parking lot and impervious area associated with Curlew Crossing far exceeds that generated from this portion of US 19. Recommendation Date: Project Ranking: ROADWAY FLOODING MATRIX Ranking of the roadway hazard level based on accident data, ADT, depth and location of water, and site specific factors. Ranking of the operational impacts (i.e. magnitude of vehicle speed reduction, ADT, frequency of flooding, availability of detour route, and cost 0

6 Page 6 of 6 to FDOT to handle problem, etc.) (Weight Factor = 7) Ranking of the nuisance factor to the public and FDOT. (Weight Factor = 3) 0 Ranking of the length of time before scheduled roadway improvements that will also provide remedy, are to be let to contract. Ranking of the costs to cure the problem, if any. Total Score 0 PRIVATE PROPERTY FLOODING MATRIX Ranking of the potential financial impacts versus the flooding frequency that impacts the private property. Ranking of the hazard level versus the flooding frequency that impacts the private property. Ranking of the nuisance factor to the private property as well as FDOT. Ranking of the costs to FDOT to cure the problem versus the financial impact to the private property if not cured. Ranking of the length of time before scheduled roadway improvements that will also provide remedy, are to be let to contract. Total Score 0

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section: . Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

Storm Drainage Systems 11.9-1

Storm Drainage Systems 11.9-1 Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of

More information

2011 HYDRAULICS MANUAL

2011 HYDRAULICS MANUAL STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

16 12 INDIVIDUAL SEWAGE DISPOSAL CODE OF HOPEWELL TOWNSHIP.

16 12 INDIVIDUAL SEWAGE DISPOSAL CODE OF HOPEWELL TOWNSHIP. 16 12 INDIVIDUAL SEWAGE DISPOSAL CODE OF HOPEWELL TOWNSHIP. a. Purpose. Due to the environmental characteristics of Hopewell Township, the board of health developed this ordinance in 1978 to address the

More information

Local Road Assessment and Improvement Drainage Manual

Local Road Assessment and Improvement Drainage Manual Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University

More information

SR 826/PALMETTO EXPRESSWAY PROJECT DEVELOPMENT & ENVIRONMENT STUDY FROM SR 93/I 75 TO GOLDEN GLADES INTERCHANGE Preliminary Drainage Report

SR 826/PALMETTO EXPRESSWAY PROJECT DEVELOPMENT & ENVIRONMENT STUDY FROM SR 93/I 75 TO GOLDEN GLADES INTERCHANGE Preliminary Drainage Report SR826 Project Development and Environment Study Preliminary Drainage Report SR 826/PALMETTO EXPRESSWAY PROJECT DEVELOPMENT & ENVIRONMENT STUDY FROM SR 93/I 75 TO GOLDEN GLADES INTERCHANGE Preliminary Drainage

More information

2014 Low Impact Development Project Performance Monitoring Report

2014 Low Impact Development Project Performance Monitoring Report OA and ADOT&PF 2 Low Impact Development Project Performance onitoring Report Prepared for: The unicipality of Anchorage Prepared by: And January 2 Table of Contents OA and ADOT&PF 2 Low Impact Development

More information

Summary of Potential Storm Drain Projects and Programs

Summary of Potential Storm Drain Projects and Programs Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.

More information

CHAPTER 4 STORM DRAINAGE SYSTEMS

CHAPTER 4 STORM DRAINAGE SYSTEMS CHAPTER 4 STORM DRAINAGE SYSTEMS 4.1 Overview... 4-1 4.1.1 Introduction... 4-1 4.1.2 Inlet Definition... 4-1 4.1.3 Criteria... 4-1 4.2 Pavement Drainage... 4-2 4.2.1 Introduction... 4-2 4.2.2 Storm Drain

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

WASHINGTON STATE DEPARTMENT OF TRANSPORTATION SUMMARY OF INVENTORY FINDINGS:

WASHINGTON STATE DEPARTMENT OF TRANSPORTATION SUMMARY OF INVENTORY FINDINGS: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION SUMMARY OF INVENTORY FINDINGS: Spokane River Dissolved Oxygen Total Maximum Daily Load October 15, 2013 Introduction Special Condition S6 of the Washington

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently

More information

Alternatives Design Report. Draft

Alternatives Design Report. Draft Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in

More information

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval

More information

Architectural Processing and Inspections for Home Mortgage Insurance

Architectural Processing and Inspections for Home Mortgage Insurance Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

SEWER LINE EXTENSION DESIGN CHECKLIST

SEWER LINE EXTENSION DESIGN CHECKLIST SEWER LINE EXTENSION DESIGN CHECKLIST SWLE# Utilities Staff Date DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling design plans for

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS TDOT DESIGN DIVISION DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS August 1, 2012 CHAPTER 7 STORM DRAINAGE SYSTEMS SECTION 7.01 INTRODUCTION 7.01 INTRODUCTION...7-1 SECTION 7.02 DOCUMENTATION PROCEDURES

More information

Instructions and Helpful Hints. for Preparation of. Emergency Action Plans

Instructions and Helpful Hints. for Preparation of. Emergency Action Plans Instructions and Helpful Hints for Preparation of Emergency Action Plans using the fillable form electronic template for the NRCS sample EAP June 25, 2007 Introduction Emergency Action Plans (EAPs) are

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM

CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM INTRODUCTION The analysis of stormwater management system performance requires knowledge of the system components. This chapter presents a description of

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

FLORIDA ATLANTIC UNIVERSITY

FLORIDA ATLANTIC UNIVERSITY 9 Supporting Data The purpose of the Element is to ensure the provision of public facilities and services required to meet the future needs of the University, including: Stormwater management, to protect

More information

General Obligation Bond Projects FYE 2013-2018

General Obligation Bond Projects FYE 2013-2018 General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

Sustainable Road Drainage Asset Management Strategy and Financial Requirements

Sustainable Road Drainage Asset Management Strategy and Financial Requirements Sustainable Road Drainage Asset Management Strategy and Financial Requirements Liane Welch, P.E., Director, Tillamook County Public Works Patricia Bugas-Schramm, PBS Consulting Jeff Roorda, P.E., JRA TRB

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

Lane Shutdowns and Mobile Operations

Lane Shutdowns and Mobile Operations PERFORMANCE ACTIVITY 408 TREE REMOVAL WORK DESCRIPTION 1 WORK DESCRIPTION 2 Fallen Tree Standing Tree 408 TREE REMOVAL ACTIVITY DESCRIPTION Cut and remove tree as necessary. WORK DESCRIPTION 1 Fallen Tree

More information

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012 JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN Presentation to Insurance Companies 19 January 2012 Topics of Discussion Investigation Levels of Service Cause of Flooding Analysis Undertaken

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Chapter 7 Street, Inlets, and Storm Drains

Chapter 7 Street, Inlets, and Storm Drains Chapter 7 Street, Inlets, and Storm Drains Contents 1.0 Introduction... 1 1.1 Purpose and Background... 1 1.2 Urban Stormwater Collection and Conveyance Systems... 1 1.3 System Components... 2 1.4 Minor

More information

SECTION 108 - INLETS 108.1 INLET LOCATIONS

SECTION 108 - INLETS 108.1 INLET LOCATIONS Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing.

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing. Chapter 6 Storm Drains 6-1 Introduction A storm drain (storm sewer) is a network of pipes that conveys surface drainage from a surface inlet or through a manhole, to an outfall. Storm drains are defined

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage

More information

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010

More information

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING TEC has performed many GPS/GIS inventory projects and studies for the Ohio Department of Transportation (ODOT), Counties, and municipalities.

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

CHAPTER 4. STORM SEWER SYSTEM DESIGN

CHAPTER 4. STORM SEWER SYSTEM DESIGN CHAPTER 4. CONTENTS Section Page ST- 1.0 OVERVIEW... 1 1.1 Purpose of the Chapter... 1 1.2 Chapter Summary... 1 2.0 STREET DRAINAGE... 2 2.1 Street Function and Classification... 2 2.2 Minor Storm Design

More information

CLIFTY CREEK PLANT MADISON, INDIANA

CLIFTY CREEK PLANT MADISON, INDIANA 2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

Spot Safety Project Evaluation

Spot Safety Project Evaluation Spot Safety Project Evaluation Project Log # 200610094 Spot Safety Project # 04-01-219 Spot Safety Project Evaluation of the Traffic Signal and Left Turn Lane Installation at SR 1010 and SR 1526 in Johnston

More information

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding. Background & Issues To provide guidelines and requirements for Developers, the Community and the Shire s Planning and Sustainability officers for connection to the Shire s Stormwater Drainage Disposal

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short

More information

TH 23 Access Management Study Richmond to Paynesville

TH 23 Access Management Study Richmond to Paynesville TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

Chapter 13 - Storm Drainage Systems Publication 584 2010 Edition CHAPTER 13 STORM DRAINAGE SYSTEMS

Chapter 13 - Storm Drainage Systems Publication 584 2010 Edition CHAPTER 13 STORM DRAINAGE SYSTEMS CHAPTER 13 STORM DRAINAGE SYSTEMS 13.0 OVERVIEW A. Introduction. This chapter provides guidance on storm drain design and analysis. The quality of a final inplace system depends upon careful attention

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Crawlspaces. Bowling Green, KY Stormwater Best Management Practices July 2010 4-32. No Symbol. Symbol. Immediate and Long Term Problems

Crawlspaces. Bowling Green, KY Stormwater Best Management Practices July 2010 4-32. No Symbol. Symbol. Immediate and Long Term Problems Residential Pollution Prevention RHP-12 Tips for Wet Basements and Crawlspaces No Symbol Symbol Immediate and Long Term Problems Standing water or seepage inside residential crawl spaces and basements

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Sample Watershed Survey - First Draft

Sample Watershed Survey - First Draft Chapter 3 MONITORING FORMS Registration Form Watershed Survey and Map Assessment Form Return form to: Georgia Adopt-A-Stream 4220 International Parkway Suite 101 Atlanta, GA 30354 GEORGIA ADOPT-A-STREAM

More information

STREETS/INLETS/STORM SEWERS

STREETS/INLETS/STORM SEWERS DRAINAGE CRITERIA MANUAL (V. 1) CONTENTS Section Page ST- 1.0 INTRODUCTION... 1 1.1 Purpose... 1 1.2 Urban Stormwater Collection and Conveyance Systems... 1 1.3 Components of Urban Stormwater Collection

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM

P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM P-23 - DEVELOPMENT OF DELAWARE DEPARTMENT OF TRANSPORTATION STORMWATER BEST MANAGEMENT PRACTICE INSPECTION PROGRAM A. INTRODUCTION Peter Mattejat, PE KCI Technologies, Inc.; Laurel, Maryland Bruce Thompson

More information

Bexar County Public Works Department Flood Control Program

Bexar County Public Works Department Flood Control Program Bexar County Public Works Department Flood Control Program SC 4 Knoll Creek Drainage Improvements February 18, 2015 Meeting Agenda Introductions Bexar County Precinct 4 Chief of Staff Office of the County

More information

Prime Retail Space For Lease!

Prime Retail Space For Lease! Prime Retail Space For Lease! Enroute to Fast Growing Clovis Housing Developments Located on Heavily Trafficked Herndon Arterial Close to Highway 168 On/Off Ramps Adjacent to High Profile Centers NOW OPEN!

More information

AGENDA ASTORIA CITY COUNCIL WORK SESSION / REGULAR SESSION

AGENDA ASTORIA CITY COUNCIL WORK SESSION / REGULAR SESSION AGENDA ASTORIA CITY COUNCIL WORK SESSION / REGULAR SESSION October 19, 2015 6:00 p.m. 2 nd Floor Council Chambers 1095 Duane Street Astoria OR 97103 6:00 P.M. WORK SESSION 1. CALL TO ORDER 2. ROLL CALL

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

CHAPTER 13 STORM DRAINS

CHAPTER 13 STORM DRAINS CHAPTER 13 STORM DRAINS TABLE OF CONTENTS 13.1 OVERVIEW...3 13.1.1 Introduction...3 13.1.2 Symbols And Definitions...4 13.1.3 Concept Definitions...5 13.2 GENERAL DESIGN CRITERIA...7 13.2.1 Introduction...7

More information

11 p.m. to. Tuesday, June. will remain open. 14. closed

11 p.m. to. Tuesday, June. will remain open. 14. closed June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access

More information

CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS

CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS Note: All questions and comments should be directed to the Hydraulics Unit Supervisor, Environmental Services Section. Revised November 2015 Road Storm Drainage Systems

More information

Watershed Delineation

Watershed Delineation ooooo Appendix D: Watershed Delineation Department of Environmental Protection Stream Survey Manual 113 Appendix D: Watershed Delineation Imagine a watershed as an enormous bowl. As water falls onto the

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title: READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions

More information

River Management 2013 Colorado Flood

River Management 2013 Colorado Flood River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE Author: Audrey G. Beaulac, P.E., CPSWQ Company: (Hoyle, Tanner), Manchester, New Hampshire INTRODUCTION In early July 2013, 2 inches of rain fell

More information