1 Financial management of the project, tools and reporting Lead Partner Seminar 4th Call for Proposals Budapest, Hungary 11 December 2012 SEE Joint Technical Secretariat

2 Financial management of the project, tools and reporting Financial management of the project Reporting eligible project expenditure Reporting procedures: reporting system and tools

3 Financial management of the project Lead Partner Seminar 4th Call for Proposals Budapest, Hungary 11 December 2012 Beáta Marczis SEE Joint Technical Secretariat

4 Financial management of the project projects approved in the 3rd and 4th call for proposals = IPA integrated phase of the SEE Programme Lead partner principle One single subsidy contract is concluded per project, meaning that the Lead Partner signs the subsidy contract on behalf of the IPA-I Partners as well The lead partner shall be responsible for the financial aspects of IPA funds as well

5 Financial management of the project Financial management in the IPA integrated phase (3rd & 4th call): ERDF financial management procedures are followed! The Lead partner is responsible to collect and summarise the validated expenditure of each ERDF partner and IPA-I PPs responsible for submitting the Application for Reimbursement for the whole project to the JTS: ERDF PPs and IPA-I PPs receiving the ERDF contribution and IPA contribution transferring the relevant ERDF contribution and IPA contribution to its project partners

6 Project Partners collect documentation proving their expenditures, and get them validated according to the national control system ERDF PP1 LP Financial management of the project ERDF PP 2 IPA PP 1 IPA PP 2 Expenditures validated at national level by the Controllers Lead Partner (LP) verifies that the expenditures presented has been validated by the controllers LP prepares Progress report and Application for Reimbursement and submits to the JTS LP Deadline: 3 months from the end of the reporting period! Joint Technical Secretariat Verification of Progress reports and Application for reimbursement + Declarations of the Controllers Initiation of the reimbursement process by submitting the verified AfRs to the FTU Financial Transfer Unit ERDF and IPA payment Reimbursement of Community contribution to the LP Approval + reimbursement procedure cc. 3-4 months! LP transfers Community contribution to Project Partners

7 Financial management procedures 1. Validation of project expenditure Validation of expenditure means the output of the verification process performed by the controllers at national level for each ERDF Project partner and IPA-I project partner involved in the project. Only validated expenditure can be reported by the Project partners to the Lead partner. Only validated expenditure can be reported by the Lead Partner to the JTS!

8 Financial management procedures Main steps of the validation of expenditure 1. Each PP as well as the LP has to submit its expenditure relevant for a reporting period for validation to the designated Controller in its MS/PS, each PP responsible separately for having its expenditure validated! Designated Controllers: check the information at the Programme s website Standard and obligatory document to report expenditure to the Controller: Partner Report ERDF Partner Report and IPA Partner Report 2 reporting templates! SEE Control Checklist: minimum requirements for documentary evidence

9 Financial management procedures The Controller verifies the expenditure submitted by the PP/LP. After verification, the Controller issues the Declaration on validation of expenditure (standard and obligatory form) Each PP has to submit the declaration on validation of expenditure to the LP. The LP is responsible to verify that the expenditure of its PP is validated by the designated Controller for the SEE Programme. The Controller of the LP is responsible only for the validation of the LP s expenditure. Original declarations on validation of expenditure of the PPs have to be submitted by the LP to the JTS together with the Application for reimbursement.

10 Financial management procedures Timeframe for verification of expenditure Verification process 3 months from the end of each reporting period Preparation and submission of Partner Report by the Project Partner to the Controller Verification of expenditure by the Controller and issuing Declaration on validation on expenditure Preparation and submission of the Progress report and Application for Reimbursement for the whole project by the Lead partner to the JTS 60 days 30 days

11 Financial management procedures Use of Euro Declaration on validation of expenditure to be issued in EUR Application for reimbursement to be submitted in EUR Reimbursement of ERDF contribution and IPA contribution in EUR only one method is accepted to exchange currency to EUR the monthly accounting exchange rate of the Commission in force in the last month of the reporting period regulated in the Subsidy Contract, obligatory to use exchange rate risk borne by the PP

12 Financial management procedures 2. Submission of Application for Reimbursement (AfR) Lead Partner can request the reimbursement of ERDF contribution and IPA contribution by submitting an Application for Reimbursement to the JTS together with the Progress Report Application for Reimbursement shall contain only validated expenditure and shall be supported by the declarations on validation of expenditure Application for Reimbursement is automatically generated on the Front Office surface of the IMIS , when the progress report is fully completed

13 Financial management procedures LPs responsibilities & verifications before submission of the Application for reimbursement (AfR) the expenditure declared by the PPs has been incurred only for the Project purposes and corresponds to the activities of the approved AF; the expenditure declared by the PPs and included in the AfR had been validated by the designated controllers at national level; All declaration on validation of expenditure presented in the AfR are attached in original paper version officially signed by the designated controllers; The expenditure declared in the AfR has not been included in any other previous AfR; The information included in the AfR, the related Progress Report and its Annexes are true and correct.

14 Financial management procedures Further rules to the submission of the AfR In case the declarations on validation of expenditure are not received from each project partner for a given reporting period, the LP shall submit the application for reimbursement on the basis of the declarations on validation of expenditure available for the reporting deadline. The expenditure of the project partners not validated for the given reporting period within the deadline can be requested only for the following reporting deadline to the reporting period concerned. To be submitted within 15 days after the electronic submission: Application for reimbursement: 2 originals signed and stamped Declarations on validation: 1 original signed and stamped

15 Financial management procedures 3. Reimbursement of ERDF and IPA Funds to the LP LP submits the Progress Report and the Application for Reimbursement to the JTS for the deadlines given in the Subsidy Contract. JTS verifies and approves the Progress Report and Application for Reimbursement. After verification process by the JTS, reimbursement of ERDF and IPA contribution will be authorised by the Certifying Authority. Reimbursement of ERDF and IPA contribution to the EUR bank account of the LP indicated in the Subsidy contract. LP responsible to transfer the ERDF and IPA contribution of each project partner Bank statements on the project bank account have to be presented to the JTS with each Application for Reimbursement.

16 Financial management procedures 4. General principles in the IPA integrated phase The application for reimbursement for ERDF and for IPA can not be submitted by the LP separately by funds The application for reimbursement for ERDF and for IPA can not be approved by the JTS separately by funds The ERDF and IPA contributions might be transferred separately by the Financial Transfer Unit, in case: the requests of funds for ERDF and IPA are not authorized at the same time by the Certifying Authority, or the balance of the programme single bank account for the ERDF or IPA funding is not covering the amount to be reimbursed

17 Financial management procedures 5. Timeframe of reimbursement of ERDF funds Reporting period (6 months) Progress report + AfR (max. 3 months) Verification by JTS cc. 2 months) Payment CA+ FTU (cc. 1 month)

18 Financial management procedures 6. Financial progress and decommitment of the project Spending forecasts are set in the Subsidy Contract LP has the possibility to deviate: real spending can be lower or higher than originally planned for a given reporting period To be considered: in case of under-spending compared to the spending forecasts, the MA is entitled to decommit the project by reducing the original project budget and the corresponding ERDF / IPA contribution In case of decommittment at programme level, MC may decide on the decommitment of the projects on case by case basis The LP can request amendment of the spending forecasts only in relation to substantial changes in the project affecting the project budget

19 Financial management procedures 7. Last advices The liquidity of the programme therefore the fluency of payments to the projects depends on the spending and the reported expenditure of the projects! Submit Application for Reimbursement for each reporting period! First reporting period: obligation by the subsidy contract: Art. 12. f) opportunity to learn the reporting report at least preparation costs, expenditure related to the starting up of the project, e.g. kick off event, communication plan, staff costs, etc. Keep deadlines of reporting! Progress report and Application for Reimbursement submitted in time and complete = earlier payment of Community contribution to the project!

20 Thank you for your attention!

21 Reporting eligible project expenditure Lead Partner Seminar 4th Call for Proposals Budapest, Hungary 11 December 2012 Niko Finka SEE Joint Technical Secretariat

22 Reporting eligible project expenditure Sound financial management of the project is based on the eligibility of expenditure! Expenditure has to be eligible according to the eligibility rules of the SEE Programme Be aware of the eligibility rules! In case of question: PPs consult national controller and/or LP contacts JTS Eligibility of expenditure has to be proved! Documentary evidence submitted to the Controller On the spot: evidence of the expenditure is available

23 Reporting eligible project expenditure Documents Eligibility in time Special types of expenditure Expenditure per Budget lines Compliance with EU policies and other horizontal rules Ineligible expenditure Revenues

24 Reporting eligible project expenditure Documents EC Regulations + national legislation SEE Programme Manual: part of the Application package SEE Implementation Manual v4.0 Subsidy Contract SEE Control Guidelines + SEE Control Checklist: main requirements at programme level National eligibility rules: more detailed, can be stricter than programme s rules!

25 Reporting eligible project expenditure Eligibility in time Starting date of the eligibility of expenditure: approval date of the projects (for most of the projects 28th September 2012, however some of the projects will be approved later so the starting day may be different) exception: preparation costs Expenditure incurred by IPA-I partners will be eligible according to the same rules under condition that the Financing Agreement is signed by the IPA Partner State of the given partner before the date of approval of the project by the Monitoring Committee. Otherwise, starting date of eligibility of expenditure for IPA-I Partners will be the date of signature of the Financing Agreement by the IPA Partner State of the given partner.

26 Reporting eligible project expenditure Eligibility in time Financing agreement signatures: Montenegro- September 3, 2012 Republic of Serbia - September 7, 2012 Republic of Croatia October 31, 2012

27 Reporting eligible project expenditure Eligibility in time Eligibility of expenditure between the approval date and the starting date of the project: restricted only to certain necessary administrative procedures for the contracting, i.e. travel and accommodation costs related to conditions clearing and participation at the Lead Partner seminar End date of the eligibility of project expenditure: end date of the project Only exception: Costs incurred in the last reporting period and control costs related to the Final Progress Report have to be paid within 60 days from the project end date at the latest.

28 Reporting eligible project expenditure Preparation costs ERDF Partners: incurred between 1st January 2007 and day before approval day of the project (27th September 2012 or later depending on the project) IPA-I Partners: incurred between the date of signature of the FA by the IPA Partner State of the given partner and day before approval day of the project (27th September 2012 or later depending on the project)

29 Reporting eligible project expenditure Preparation costs up to the amount approved in the AF (WP0) only for the activities presented in the approved AF only for the PPs planned in the approved AF restricted to budget lines staff costs, travel costs, external expertise paid until the end date of the 1st reporting period: 31st March 2013 to be reported in the first Progress Report or at the latest in the 2nd progress report (Article 4.8 of the Subsidy contract)

30 Reporting eligible project expenditure Expenditure according to 10% flexibility rule 10% activities mentioned in the approved AF up to the amount planned in the ERDF PP s budget of the approved AF expenditure directly incurred and paid by the ERDF PP

31 Reporting eligible project expenditure Expenditure according to 10% flexibility rule Additionally for 10% Associated Strategic Partner expenditure only for the benefit of the 10% partners indicated in the AF expenditure related to eligible budget lines for 10% rule (travel and accommodation, external expertise and services) ERDF PP should respect the public procurement rules at national level Specific rules set by the Partnership Agreement

32 Reporting eligible project expenditure Expenditure according to 20% flexibility rule 1. Associated Strategic Partner: 20% ASP The expenditure of an 20% Associated Strategic Partner is included in the project budget of one ERDF sponsoring partner from the SEE Programme area expenditure is verified by the controller of the sponsoring ERDF partner Only travel and accommodation costs are eligible

33 Reporting eligible project expenditure Expenditure according to 20% flexibility rule 2. 20% ERDF Partners The partner from the EU territory but outside the programme area participates directly to the project with a separate budget. The same eligibility rules apply for the 20% ERDF partners as for the ERDF partners located in the Programme area.

34 Reporting eligible project expenditure Expenditure according to 20% flexibility rule The same budget lines are eligible for the 20% ERDF partners. The expenditure of the 20% ERDF partner is verified by its controller outside the SEE Programme area Preconditions: relevance of the 20%, MoU signed between the MS of the 20% PP and the SEE Programme

35 Reporting eligible project expenditure Staff costs Costs of the personnel for project management and/or tasks for project activities Staff directly employed by regular working contract or similar type of contract according to national rules civil servants if allowed by national legislation and contractual basis is in line with national eligibility rules! clear assignment to the project: main tasks within the project described in the contract/job description

36 Reporting eligible project expenditure Staff costs Proof on working time spent on the project: timesheets Calculation of staff costs: according to national guidance, if no other requirement: SEE Control Guidelines Fringe benefits, rewards over the monthly salaries are not eligible Overtime, 13th-14th month s extra salary included in the regular contract: proportionally allocated to the project and if allowed by national eligibility rules!

37 Reporting eligible project expenditure Overheads Flat rate basis up to 8% of staff costs (excluding preparation costs) Real costs basis up to 20% of staff costs: justified by invoices, supporting documents!»»»» Office rental fee, electricity, heating, water and other services related to the maintenance of the office (e.g. cleaning); Phone, fax, internet, postal costs, courier; Stationery, printing, copying; Indirect staff costs or services supporting directly the project implementation and proportionally allocated to the project: administrative staff, book-keeping/accounting, salary administration, IT support.

38 Reporting eligible project expenditure Travel and accommodation only travelling costs of the project staff costs directly related to the project travels within the eligible area cost-efficiency for means of transport and accommodation per diems according to national rules of the PP travelling costs of external experts shall be included in the service contracts and budgeted under the external expertise and services budget line;

39 Reporting eligible project expenditure External expertise and services the selection of the external experts shall comply: ERDF Partners: with the relevant National Public Procurement Law in force IPA-I Partners: with the provisions of Annex IV to the PRAG standard grant contract (PRAG templates should be used)

40 Reporting eligible project expenditure External expertise and services PPs of the same project cannot be contracted as an external expert or a sub-contractor additional contracts of external expertise nature signed with own staff of the PP institution: transparent selection /public procurement procedures same person already charged under staff costs can not be contracted under external expertise respect information and publicity requirements of the SEE Programme

41 Reporting eligible project expenditure Equipments equipment is foreseen in the approved AF used exclusively for the project implementation suppliers should be selected: ERDF Partners: with the relevant National Public Procurement Law in force IPA-I Partners: with the provisions of Annex IV to the PRAG standard grant contract (PRAG templates should be used)

42 Reporting eligible project expenditure Equipments full purchase price: in case the total economic life and depreciation period are shorter than or equal to the project duration in all other cases only depreciation costs or purchase price proportionally reduced calculation of the depreciation costs according to national rules!

43 Reporting eligible project expenditure Small scale investments only expenditure of the small scale investments explicitly described in the approved AF Costs of purchase of land are not eligible for financing from ERDF and IPA funds within the projects. changes have to be approved by the programme management bodies in each case

44 Reporting eligible project expenditure Small scale investments The contractors of investments should be selected: ERDF Partners: with the relevant National Public Procurement Law in force IPA-I Partners: with the provisions of Annex IV to the PRAG standard grant contract (PRAG templates should be used) small scale investments implemented in reality used only for the project purposes publicity requirements of the SEE Programme respected requirements on durability of operations (e.g. ownership) respected

45 Reporting eligible project expenditure Financial charges and guarantee costs charges for transnational financial transactions bank charges for opening and administering the account or accounts where the implementation of a project requires a separate account or accounts to be opened the cost of guarantees provided by a bank or other financial institution to the extent to which the guarantees are required by national or Community legislation legal consultancy fees, notary fees if they are directly linked to the project and are necessary for its implementation. Any other types of financial charges are ineligible

46 Reporting eligible project expenditure Compliance with EU policies and other rules The principle of cost efficiency and transparency Public Procurement State Aid Information and publicity requirements Environment protection Equal opportunities Expenditure by public authorities Double financing

47 Reporting eligible project expenditure Ineligible expenditure list of ineligible expenditure in the SEE Programme Manual and all those expenditure which do not fulfil the eligibility criteria according to the common eligibility rules of the SEE Programme and to national eligibility rules whichever is stricter not the same for ERDF and IPA

48 Reporting eligible project expenditure Revenues Only the cash in-flows directly paid by users for the goods and/or services provided by the project has to be considered as project generated revenues, such as charges borne directly by users for the use of infrastructure, sale or rent of land or buildings, or payments for services Net revenues has to be deducted by the Controllers from the eligible expenditure reported by the PP Calculation method has to be provided by the PP to report the net revenues Revenues not reported: corresponding ERDF and IPA amount will be reclaimed

49 Thank you for your attention!

50 Reporting procedures: reporting system and tools Lead Partner Seminar 4th Call for Proposals Budapest, Hungary 11 December 2012 Antonios Melas SEE Joint Technical Secretariat

51 Content Reporting system Obligation of a project Reporting periods + deadlines Required documents for submission Overview of IMIS reporting tool Sheets to fill in Financial Report part ( live presentation in IMIS) Activity report part (slides)

52 Reporting obligation of a project Contractual obligation Lead Partner reports to SEE JTS Progress Report overall project with focus on ERDF+IPA project part Project Partner expected to help LP preparing Progress Report Partner Report partner level

53 Reporting tools Progress Report Prepared and submitted online in SEE - IMIS Together with Application for Reimbursement Each LP accesses SEE Front Office with individual username and password User s FO Guidelines (version 4.0) shall be considered Partner Report MS Excel basis Reporting tool between PP and LP Tool for Declaration on validation of PP expenditures

54 Periods and deadlines 6-month periods (an exceptional 3-month period will be applied) Starting from final approval by MC (date of the endorsement of the outcomes of the conditions clearing exercise) 28 September 2012 Deadlines: 3 months following end of a period (online submission) + 15 days (for paper original version) Periods Deadlines 28 September 2012 March st July 2013 April 2013 June st October 2013 July 2013 December st April 2014 January 2014 June st October 2014 July 2014 September st January 2015

55 First and Final Progress Report First Progress Report Must include preparatory activities and costs (WP0) Final Progress Report To be submitted within 3 months after project end date Together with last Application for Reimbursement Reporting period for Final Progress Report Depends on the project end date / reporting period specified for each project separately

56 Submission of Progress Report Online - SEE Front Office Progress Report Application for reimbursement Original document X + 2 signed, original documents Declaration on validation of expenditure + 1 signed, original document (attachment - scans of original documents) Bank confirmation for transfers of LP to PPs of reimbursed amounts (attachment - scan of original document) X Project deliverables, outputs (English) X Project communication plan (with first Progress Report) X

57 Checking the Progress Reports The scope of checking reports actual implementation and expenditures coherent with planned activities and budget activities justify reported and claimed expenditures expenditures are in line with the nature of the project Progress Report (PR) and Application for Reimbursement (AfR) checked by JTS within 30 days Written notification ( ) in case some problem(s) detected If Corrective DoVs requested by JTS: 30 days deadline In all other cases: 10 days deadline Status of PR and AfR can be checked on the Front Office of the IMIS system

58 Reporting in IMIS Access and functions

59 Sheets to fill in Sheets to fill in: -Activity report -Financial report -Attachments

60 Activity report Main data Summary of project activities Activities per work packages Implementation of Grant contracts (in case of ENPI PPs in the project) Indicators

61 Main data Requested info: Overview of PPs activities and expenditures Possible estimated delay Administrative changes

62 Summary of the project activities

63 Summary of the project activities Summary of project activities (from start) Summary of the overall project implementation from the start of the project till the end of the latest reporting period Coherent and comprehensive, easy-to-read, self-explanatory, without referring to other parts of the report Summary written for external readers (possibility to be published on the SEE Programme website)

64 Summary of the project activities Operation of the partnership Contribution of the different project partners to the implementation of the project Possible partnership issues (non-active partner, change of partner etc.). Include the reasons behind the issue, likely consequences, as well as mitigation and preventative steps taken

65 Summary of the project activities Project implementation timeframe Is the implementation in line with the timeframe planned in the AF? (e.g. which parts of the project are, or may be in the future in delay) Effects of any time plan drift (how does it affects the overall implementation) Reasons and the proposed solutions to ensure future and effective timely implementation

66 Summary of the project activities Spending target Description of alignment with the spending target defined in the Subsidy Contract In case of any deviation explain why this has occurred along with an estimation of when the project will be able to catch up Include any foreseen further problems affecting the spending plans Other issues Comment on other issues etc. that are not addressed in any other section of the progress report can be described in this section

67 Activities per work packages Selection of the WP for which activities have been implemented and need to be reported

68 Activities per work packages Activities Outputs and results

69 Activities Relevant status Description of the activity Location of the activity Deviation and justification

70 Implementation of ENPI Grant contract ENPI PP1 can Ukraine

71 Implementation of ENPI Grant contract View data: Grant contract signed Total budget Date of signature End date of the grant contract

72 Activities and role of ENPI partners Activities All actions carried out by the specific ENPI PP in the given period should be briefly summarised in relation to the respective WPs, activities, outputs and results of the project. The description should provide evidence that the implemented activities are in line with the planned ones Role The specific role and contribution of the ENPI PP to the activities, outputs and results of the overall project should be highlighted, Clarification of the role of each partner, in case the respective Grant Contract involves more than one ENPI PP from the same country

73 Indicators

74 Help sources for reporting Documents: Downloads section Project management documents: SEE Project Implementation Package Annex 5 SEE Front Office Users' Guideline SEE Partner Report tool and guidelines Questions: Contact your JTS responsible PM/FM

South East Europe (SEE) Implementation Manual

South East Europe (SEE) Implementation Manual South East Europe (SEE) Implementation Manual Version 5.0 Date of approval (v1.2): 8 th May 2009 1 st amendment (v2.1): 7th July 2009 2 nd amendment (v3.1): 21 st January 2011 3 rd amendment (v3.2): 27

More information

Declaration and co financing Statement

Declaration and co financing Statement Declaration and co financing Statement 1. Declaration and co financing statement signed and stamped by each ERDF partner (including the Lead Applicant and 20% ERDF, if any) in original! 2. Declaration

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2E Network Management Table of contents Fact Sheet 2E 0. Introduction... 1 1. Roles and responsibilities of Lead and Project Partners... 2 2. The legal framework...

More information

Rules and Procedures in the new Programme 14-20

Rules and Procedures in the new Programme 14-20 Rules and Procedures in the new Programme 14-20 OBJECTIVES Overview of main rules and procedures to be followed Main novelties compared to the 2007-2013 period Risky points Information to be completed

More information

1st call for proposals: Administrative and submission procedures Infoday La Valeta, Malta, June 17th 2015

1st call for proposals: Administrative and submission procedures Infoday La Valeta, Malta, June 17th 2015 1st call for proposals: Administrative and submission procedures Infoday La Valeta, Malta, June 17th 2015 SIZE OF THE PARTNERSHIP As a minimum requirement, the partnership must involve: at least 4 financing

More information

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES Applicants Manual for the period 2014 2020 Version 1 PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2015 Disclaimer This document

More information

Partnership Agreement

Partnership Agreement IPA Operational Programme Slovenia Croatia 2007 2013 Partnership Agreement Based on Article 9 of the IPA Subsidy Contract No. , concluded between the Government Office for Local

More information

Cross-border Cooperation Programme Poland-Belarus-Ukraine 2007-2013. Guidelines on Preparation and Submission of Reports

Cross-border Cooperation Programme Poland-Belarus-Ukraine 2007-2013. Guidelines on Preparation and Submission of Reports Cross-border Cooperation Programme Poland-Belarus-Ukraine 2007-2013 Guidelines on Preparation and Submission of Reports INTRODUCTION... 4 Purpose and users of this guidelines... 4 Beneficiary s obligation

More information

Interreg V B Adriatic-Ionian ADRION First call for proposals main features. ADRION Info Day Bologna, 12 February 2016

Interreg V B Adriatic-Ionian ADRION First call for proposals main features. ADRION Info Day Bologna, 12 February 2016 Interreg V B Adriatic-Ionian ADRION First call for proposals main features ADRION Info Day Bologna, 12 February 2016 ADRION Programme 4 EU Member States: Croatia, Greece, Italy (part of the country), Slovenia;

More information

MANUAL FOR THE EURO-HEALTHY

MANUAL FOR THE EURO-HEALTHY MANUAL FOR THE EURO-HEALTHY INTERNAL AND PERIODIC PROJECT MONITORING AND REPORTING Coimbra, May, 2015 EURO-HEALTHY project has received funding from the European Union s Horizon 2020 research and innovation

More information

Subsidy Contract template. The MA reserves the right to modify the text of the Draft Subsidy Contract.

Subsidy Contract template. The MA reserves the right to modify the text of the Draft Subsidy Contract. Subsidy Contract template The MA reserves the right to modify the text of the Draft Subsidy Contract. Application ID: Project acronym: Project title: Subsidy Contract for the implementation of the Project

More information

O.1.2.5 General Reporting Obligations

O.1.2.5 General Reporting Obligations 3CE335P4 O.1.2.5 General Reporting Obligations Workpackage 1 Action 1.2 Author Version LP V1 Index 1. Introduction...3 1.2 Reporting and payment flows...3 2. Progress Report...4 3. Reporting procedure...5

More information

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 EUROPEAN COMMISSION European Social Fund Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 Version of June 2015 Please consult http://ec.europa.eu/esf/sco

More information

ENGLAND EUROPEAN REGIONAL DEVELOPMENT FUND OPERATIONAL PROGRAMME

ENGLAND EUROPEAN REGIONAL DEVELOPMENT FUND OPERATIONAL PROGRAMME ENGLAND EUROPEAN REGIONAL DEVELOPMENT FUND OPERATIONAL PROGRAMME 2014-20 GUIDANCE ON DOCUMENT RETENTION, INCLUDING ELECTRONIC DATA EXCHANGE, FOR 2014-20 ERDF PROJECTS February 2016 DOCUMENT RETENTION,

More information

REVENUE-GENERATING PROJECTS Guidelines for Project Partners

REVENUE-GENERATING PROJECTS Guidelines for Project Partners REVENUE-GENERATING PROJECTS Guidelines for Project Partners ESTONIA - LATVIA PROGRAMME 2007-2013 CCI No 2007 CB 163 PO 050 Cross-border Co-operation Programme under European Territorial Co-operation Objective

More information

Applicant s seminar 1 st Call

Applicant s seminar 1 st Call Applicant s seminar 1 st Call Munich Germany 09 July 2015 JS/ MA Thi s p r og r am m e is co- f i nanced by t he E ur op ean R eg i onal D ev el op m ent F und. Agenda 10:00 Official welcome by MA & JS

More information

PART 5 REPORTING ON THE PROJECT PROGRESS IMPLEMENTATION MANUAL FOR BENEFICIARIES

PART 5 REPORTING ON THE PROJECT PROGRESS IMPLEMENTATION MANUAL FOR BENEFICIARIES IMPLEMENTATION MANUAL FOR BENEFICIARIES PART 5 REPORTING ON THE PROJECT PROGRESS Cooperation Programme Interreg V-A Slovenia-Hungary for the programme period 2014-2020 Version 1_18 December 2015 0 PART

More information

GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING

GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING The aim of this guide is to give a summary of the main points of the administrative and financial processes governing

More information

IRSES Features. IRSES Objectives

IRSES Features. IRSES Objectives EUinDepth IRSES Objectives IRSES Features To strengthen research partnerships through staff exchanges and networking activities between researcher organisations from EU/AC and countries with which EU has

More information

From the light to the full application form focus on work plan

From the light to the full application form focus on work plan Lead Applicant Training, Prague, 20 October 2015 From the light to the full application form focus on work plan Monika Schönerklee-Grasser, Head of JS Evaluation and Monitoring Unit Full application form

More information

Eligibility Rules & Declaration of Expenses

Eligibility Rules & Declaration of Expenses Eligibility Rules & Declaration of Expenses Call 2 Table of contents 1 Basic eligibility rules... 2 2 Budget lines... 2 2.1 Personnel costs (incl. general costs / overheads)... 3 2.1.1 Conditions... 3

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014 the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway

More information

PREPARATORY ACTION IN THE FIELD OF SPORT. Administrative and Financial Management Handbook

PREPARATORY ACTION IN THE FIELD OF SPORT. Administrative and Financial Management Handbook PREPARATORY ACTION IN THE FIELD OF SPORT Administrative and Financial Management Handbook The rules outlined in this Administrative and Financial Handbook apply to the projects funded by the Preparatory

More information

Administration and Finances under H2020 in MSCA Helsinki 21/4/2015

Administration and Finances under H2020 in MSCA Helsinki 21/4/2015 Administration and Finances under H2020 in MSCA Helsinki 21/4/2015 Marcela Groholova Research Executive Agency Overview 1. EU contribution 2. Eligible costs 3. Cost categories 4. Parental and maternity

More information

LIFELONG LEARNING PROGRAMME TRANSFER OF INNOVATION, MULTILATERAL PROJECTS, LEONARDO DA VINCI LIFELONG LEARNING PROGRAMME 1 PROJECT NUMBER - [ ]

LIFELONG LEARNING PROGRAMME TRANSFER OF INNOVATION, MULTILATERAL PROJECTS, LEONARDO DA VINCI LIFELONG LEARNING PROGRAMME 1 PROJECT NUMBER - [ ] LIFELONG LEARNING PROGRAMME TRANSFER OF INNOVATION, MULTILATERAL PROJECTS, LEONARDO DA VINCI LIFELONG LEARNING PROGRAMME 1 PROJECT NUMBER - [ ] MODEL CONTRACT BETWEEN THE CONTRACTOR AND THE PARTNER 2 A

More information

Republic of Croatia. EuropeAid/131720/D/SER/HR QUESTIONS AND ANSWERS

Republic of Croatia. EuropeAid/131720/D/SER/HR QUESTIONS AND ANSWERS SCIENCE AND INNOVATION INVESTMENT FUND PHASE II QUESTIONS AND ANSWERS 1 REPORTING... 1 2 PROCUREMENT... 1 3 REALOCATION AND CONTRACT AMENDMENTS... 5 4 VISIBILITY... 5 5 FINANCING... 5 6 HUMAN RESOURCES...

More information

The Terms of Reference should be completed by the Beneficiary and be agreed with the Auditor

The Terms of Reference should be completed by the Beneficiary and be agreed with the Auditor ANNEX V-A FORM - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS TABLE OF CONTENTS TERMS OF REFERENCE FOR AN INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS CLAIMED UNDER A ERC GRANT AGREEMENT

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME GUIDANCE NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

Guide for reporting, documentation of activities and financial management of grants, 2016

Guide for reporting, documentation of activities and financial management of grants, 2016 Nordplus Adult Guide for reporting, documentation of activities and financial management of grants, 2016 All beneficiaries of the Nordplus Adult programme must submit a final report to the programme administration

More information

Horizon 2020 Guidelines for financial reporting for project-by-project participation of Swiss partners in EU research framework programmes

Horizon 2020 Guidelines for financial reporting for project-by-project participation of Swiss partners in EU research framework programmes Federal Department of Economic Affairs, Education and Research EAER State Secretariat for Education, Research and Innovation SERI Horizon 2020 Guidelines for financial reporting for project-by-project

More information

Seminar for approved projects 2 June 2016

Seminar for approved projects 2 June 2016 Seminar for approved projects 2 June 2016 Reporting & Monitoring Ji-Hyeon Kim-Vanguers Anke Möllers Monitoring Result-oriented Quality rather than quantity Role of the Joint Secretariat 1 project officer

More information

URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS

URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS Open 30 March 2015 16 June 2015 1 TABLE OF CONTENT INTRODUCTION... 3 SECTION 1 - ABOUT URBACT

More information

ENGLAND EUROPEAN SOCIAL FUND OPERATIONAL PROGRAMME

ENGLAND EUROPEAN SOCIAL FUND OPERATIONAL PROGRAMME ENGLAND EUROPEAN SOCIAL FUND OPERATIONAL PROGRAMME 2014-20 GUIDANCE ON DOCUMENT RETENTION, INCLUDING ELECTRONIC DATA EXCHANGE, FOR 2014-20 ESF PROJECTS April 2016 ESF Document Retention Guidance Version

More information

Management, budget & finance

Management, budget & finance European Union European Regional Development Fund Sharing solutions for better regional policies Management, budget & finance Interreg Europe secretariat Katja Ecke, Finance Officer Ilaria Piazza, Finance

More information

L 210/10 Official Journal of the European Union

L 210/10 Official Journal of the European Union L 210/10 Official Journal of the European Union 10.8.2007 COMMISSION REGULATION (EC) No 951/2007 of 9 August 2007 laying down implementing rules for cross-border cooperation programmes financed under Regulation

More information

CENTRAL EUROPE PROGRAMME Launch of the 3 rd Call for Proposals

CENTRAL EUROPE PROGRAMME Launch of the 3 rd Call for Proposals CENTRAL EUROPE PROGRAMME 2007-2013 National Info Day Venice, 31 March 2010 CENTRAL EUROPE PROGRAMME Launch of the 3 rd Call for Proposals Barbara Di Piazza JTS CENTRAL EUROPE PROGRAMME CENTRAL EUROPE PROGRAMME

More information

GUIDE FOR FILLING IN THE APPLICATION FORM. Central Baltic Programme 2014-2020. Version 2.0 (21.8.2015)

GUIDE FOR FILLING IN THE APPLICATION FORM. Central Baltic Programme 2014-2020. Version 2.0 (21.8.2015) GUIDE FOR FILLING IN THE APPLICATION FORM Central Baltic Programme 2014-2020 Version 2.0 (21.8.2015) Contents INTRODUCTION... 2 Small and regular projects... 2 The emonitoring System... 2 Support when

More information

Science and Innovation Investment Fund (SIIF) Grant Scheme, 2nd Call. Reference: EuropeAid/131920/M/ACT/HR

Science and Innovation Investment Fund (SIIF) Grant Scheme, 2nd Call. Reference: EuropeAid/131920/M/ACT/HR IPA Component IIIc - Regional Competitiveness Operational Programnme 2007-2011 for Community Assistance under the IPA Regional Development Component in Croatia Science and Innovation Investment Fund (SIIF)

More information

PROJECT MANAGEMENT HANDBOOK CHAPTER V. Stage 4: PROJECT IMPLEMENTATION

PROJECT MANAGEMENT HANDBOOK CHAPTER V. Stage 4: PROJECT IMPLEMENTATION PROJECT MANAGEMENT HANDBOOK CHAPTER V Stage 4: PROJECT IMPLEMENTATION INTERACT is co-financed by the European Regional Development Fund (ERDF) Contents 1 Project implementation... 1 1.1 Partners responsibilities

More information

Education, Audiovisual and Culture Executive Agency Financial Information Kit

Education, Audiovisual and Culture Executive Agency Financial Information Kit Education, Audiovisual and Culture Executive Agency Financial Information Kit Introduction This financial information kit helps you avoid financial pitfalls in managing your project This Financial Information

More information

PREPARATION COST REPORT

PREPARATION COST REPORT PREPARATION COST REPORT European Territorial Cooperation Objective CENTRAL EUROPE Programme Don't remove the Excel protection. You risk that the form will be damaged and become NOT RECEIVABLE Title of

More information

APPLICATION INSTRUCTIONS

APPLICATION INSTRUCTIONS Version 1.1 APPLICATION INSTRUCTIONS Instructions for completing the Preparatory project call application form for the Northern Periphery and Arctic Programme 2014-2020 The application instructions are

More information

In2LifeSciences Implementation Guidelines Insight and Collaboration Incentives 4 th Call

In2LifeSciences Implementation Guidelines Insight and Collaboration Incentives 4 th Call In2LifeSciences Implementation Guidelines Insight and Collaboration Incentives 4 th Call IN2LifeSciences - Guidelines for insight and collaboration incentive projects 1. Project execution The insight or

More information

control and audit guidelines Version 2.1

control and audit guidelines Version 2.1 control and audit guidelines European Territorial Cooperation 2007 2013 TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1. TERMINOLOGY... 4 1.2. REGULATORY FRAMEWORK... 5 1.3. THE DIFFERENT CONTROL LEVELS...

More information

The Financial Management of your Culture sub-programme Project

The Financial Management of your Culture sub-programme Project The Financial Management of your Culture sub-programme Project Please note that this document is based on the e-tutorial provided by the Education, Audiovisual and Culture Executive Agency (EACEA) and

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE CALL FOR PROPOSALS JUST/2013/DAP/SAG/CAAM FOR CHILD ABDUCTION ALERT MECHANISMS SPECIFIC ACTION GRANTS

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE CALL FOR PROPOSALS JUST/2013/DAP/SAG/CAAM FOR CHILD ABDUCTION ALERT MECHANISMS SPECIFIC ACTION GRANTS EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE Directorate A: Civil justice Unit A.4: Programme management SPECIFIC PROGRAMME "DAPHNE III (2007 2013) CALL FOR PROPOSALS JUST/2013/DAP/SAG/CAAM FOR CHILD

More information

Staff costs Fact sheet on eligibility of staff costs 1

Staff costs Fact sheet on eligibility of staff costs 1 Version: June 2015 Staff costs Fact sheet on eligibility of staff costs 1 Definition Expenditure on costs of staff members employed by the partner organisation, who are formally engaged to work on the

More information

CEI Funding of Cooperation Activities Rules for Allocation of Resources. CEI Funding of Cooperation Activities Rules for Allocation of Resources

CEI Funding of Cooperation Activities Rules for Allocation of Resources. CEI Funding of Cooperation Activities Rules for Allocation of Resources CEI Funding of Cooperation Activities Rules for Allocation of Resources Last revision October 2008 1 A. General Criteria for the Allocation of Resources 1. Eligible applicants All public and private bodies

More information

Monitoring Systems Networking Meeting Harmonised Implementation Tools

Monitoring Systems Networking Meeting Harmonised Implementation Tools Monitoring Systems Networking Meeting Harmonised Implementation Tools 18-19 January 2012 Lille, France Harmonised implementation tools - PURPOSE The aim is to develop harmonised and simplified implementation

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2A Action Planning Networks Table of contents Fact Sheet 2A 1. Main objectives and expected results... 1 2. Network s development... 2 3. Partnership... 3 4. Activities

More information

SEPTEMBER 2011. INTERACT ENPI is a project funded by the European Union

SEPTEMBER 2011. INTERACT ENPI is a project funded by the European Union Guide on secondary procurement in ENPI CBC programmes SEPTEMBER 2011 INTERACT ENPI is a project funded by the European Union ACKNOWLEDGEMENTS This Guide has been developed by the INTERACT ENPI project

More information

Financial errors in FP7. How to improve the quality of financial statements? Paris, 21 February 2013 Vittorio MORELLI Svetozara PETKOVA Simona STAICU

Financial errors in FP7. How to improve the quality of financial statements? Paris, 21 February 2013 Vittorio MORELLI Svetozara PETKOVA Simona STAICU Financial errors in FP7. How to improve the quality of financial statements? Paris, 21 February 2013 Vittorio MORELLI Svetozara PETKOVA Simona STAICU Introduction This presentation is addressed to beneficiaries

More information

EUROPEAID PROJECT ADMINISTRATION MINI-GUIDE

EUROPEAID PROJECT ADMINISTRATION MINI-GUIDE EUROPEAID PROJECT ADMINISTRATION MINI-GUIDE JUNE 2014 EUROPEAID PROJECT ADMINISTRATION MINI-GUIDE This guide presents some of the key administrative points to remember when managing EuropeAid projects.

More information

MODULE 5 - PAYROLL AND TIME MANAGEMENT

MODULE 5 - PAYROLL AND TIME MANAGEMENT FINANCIAL TOOLKIT FOR RECIPIENTS OF EU FUNDS FOR EXTERNAL ACTIONS - PAYROLL AND TIME Real life story The company AIDCONSULT managed a technical assistance (service) contract for an EU-funded project. The

More information

Frequently asked questions. FP7 Financial Guide

Frequently asked questions. FP7 Financial Guide Frequently asked questions FP7 Financial Guide Budgetary matters Eligible costs of a project What are the criteria for determining whether the costs of a project are eligible? First of all, costs must

More information

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS THE GENERAL SECRETARIAT FOR RESEARCH AND TECHNOLOGY AS PROGRAMME OPERATOR OF THE GREEK-EEA RESEARCH PROGRAMME IMPLEMENTED UNDER THE GREEK FINANCIAL MECHANISM 2009-2014 PREANNOUNCES RESEARCH WITHIN PRIORITY

More information

South East Europe (SEE) Programme Manual

South East Europe (SEE) Programme Manual South East Europe (SEE) Programme Manual 4 th Call for project proposals Version 4.1 May 2011 European Territorial Co-operation 2007 2013 CONTENTS Glossary 4 List of acronyms 7 1 Purpose and content of

More information

User s guide to complete the Execution Report

User s guide to complete the Execution Report User s guide to complete the Execution Report Investing in our commun future JTS April 2012 1 JTS April 2012 2 Table of Contents A - The implementation report form: general principles & SETUP... 4 A.01

More information

NON PAPER DIRECT COSTING OR LARGE INFRASTRUCTURES IN HORIZON 2020

NON PAPER DIRECT COSTING OR LARGE INFRASTRUCTURES IN HORIZON 2020 NON PAPER DIRECT COSTING OR LARGE INFRASTRUCTURES IN HORIZON 2020 1. THE ISSUE EU research grants are based on the reimbursement of direct and indirect costs incurred by the beneficiaries for their projects.

More information

Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines

Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines PURPOSE OF THE GUIDELINES These guidelines have been prepared to help proposers and beneficiaries under call 2014 of the

More information

JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME OPERATIONAL MANAGEMENT UNIT PUBLIC NOTICE

JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME OPERATIONAL MANAGEMENT UNIT PUBLIC NOTICE JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME OPERATIONAL MANAGEMENT UNIT PUBLIC NOTICE for the constitution of a ranking list for the awarding of coordinated and

More information

Aid to make good the damage caused by natural disasters (Article 107(2)(b) TFEU) Checklist for Member States

Aid to make good the damage caused by natural disasters (Article 107(2)(b) TFEU) Checklist for Member States EUROPEAN COMMISSION Competition DG Aid to make good the damage caused by natural disasters (Article 107(2)(b) TFEU) Checklist for Member States Document version: October 2013 Article 107(2)(b) of the Treaty

More information

Guide for Applicants COSME calls for proposals 2015

Guide for Applicants COSME calls for proposals 2015 Guide for Applicants COSME calls for proposals 2015 CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 Consortium coordinator... 4

More information

Erasmus+ General Information. Application Form Call: 2015. KA2 Cooperation and Innovation for Good Practices

Erasmus+ General Information. Application Form Call: 2015. KA2 Cooperation and Innovation for Good Practices General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

PROJECT PROGRESS REPORT for project financed by the ESPON Programme 2013

PROJECT PROGRESS REPORT for project financed by the ESPON Programme 2013 Colour code White cells Orange cells Green cells Blue cells must be filled in. PROJECT PROGRESS REPORT for project financed by the ESPON Programme 2013 FILLING IN INSTRUCTIONS This is the progress report

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi)

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) Version 1.0 9 June 2015 HISTORY OF CHANGES Version Publication date Changes 1.0 09.06.2015 Initial version 1 EUROPEAN COMMISSION

More information

Reporting transnational access and service activity costs. Version May 2011

Reporting transnational access and service activity costs. Version May 2011 Reporting transnational access and service activity costs Version May 2011 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are not

More information

FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS

FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS TABLE OF CONTENTS TERMS OF REFERENCE FOR AN INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS CLAIMED

More information

Project Completion Report (PCR) User Guide

Project Completion Report (PCR) User Guide Project Completion Report (PCR) User Guide FM0027-GDL-00041-EV17 8 February 2010 Page 2 of 10 1. Introduction The Project Completion Report (PCR) is a structured reporting format provided by the Financial

More information

GUIDELINES on filling in and submitting the application form. 1 st call for proposals 02 November 18 December 2015

GUIDELINES on filling in and submitting the application form. 1 st call for proposals 02 November 18 December 2015 GUIDELINES on filling in and submitting the application form 1 st call for proposals 02 November 18 December 2015 INTERREG SOUTH BALTIC PROGRAMME 2014-2020 GUIDELINES on filling in and submitting the application

More information

EUROPEAN RETURN FUND 2008-2013 1 GUIDE FOR APPLICANTS

EUROPEAN RETURN FUND 2008-2013 1 GUIDE FOR APPLICANTS EUROPEAN COMMISSION DIRECTORATE-GENERAL HOME AFFAIRS Directorate C: Schengen EUROPEAN RETURN FUND 2008-2013 1 COMMUNITY ACTIONS GUIDE FOR APPLICANTS 1 The European Return Fund 2008-2013 was established

More information

Frequently Asked Questions to the Marie Curie Actions Financial Guidelines

Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Updated 26/06/2012 Table of contents Q1: FOR CATEGORIES A-C (1-2 AS OF WP2011), WHICH AMOUNT HAS TO BE DECLARED IN THE FORM C

More information

Rights, Equality and Citizenship Programme Operating Grants 2017 to Framework Partners active in the area: rights of persons with disabilities

Rights, Equality and Citizenship Programme Operating Grants 2017 to Framework Partners active in the area: rights of persons with disabilities EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Social Affairs Disability and Inclusion Rights, Equality and Citizenship Programme Operating Grants 2017 to Framework Partners active in

More information

EN Form hash code D789C338B1 Page 1 of 33

EN Form hash code D789C338B1 Page 1 of 33 A. GENERAL INFORMATION Before completing this application form, please read the relevant sections in the 2010 Call for Proposals published by the European Commission and by your National Agency and the

More information

GUIDE FOR APPLICANTS SUPPORT FOR EUROPEAN COOPERATION PROJECTS

GUIDE FOR APPLICANTS SUPPORT FOR EUROPEAN COOPERATION PROJECTS Education, Audiovisual and Culture Executive Agency Culture Unit GUIDE FOR APPLICANTS SUPPORT FOR EUROPEAN COOPERATION PROJECTS CREATIVE EUROPE (2014-2020) CULTURE SUB-PROGRAMME VERSION: July 2014 Disclaimer:

More information

INTERREG IVA 2 Mers Seas Zeeën. Cross-border Cooperation Programme 2007-2013. Programme Manual. Guidance on Eligibility and Project Management

INTERREG IVA 2 Mers Seas Zeeën. Cross-border Cooperation Programme 2007-2013. Programme Manual. Guidance on Eligibility and Project Management INTERREG IVA 2 Mers Seas Zeeën Cross-border Cooperation Programme 2007-2013 Programme Manual Guidance on Eligibility and Project Management Version 06/02/2013 Operational programme of the European Territorial

More information

FREQUENTLY ASKED QUESTIONS Version November 2011

FREQUENTLY ASKED QUESTIONS Version November 2011 FREQUENTLY ASKED QUESTIONS Version November 2011 Composition of a Comenius Regio Partnership Which types of institutions are eligible to participate in Comenius Regio? Comenius Regio partnerships are bilateral

More information

Official Journal of the European Union

Official Journal of the European Union L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an

More information

SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS

SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS ALESSANDRO PRISTER PROGRAMME MANAGER ER, SJU ER CALL COORDINATOR List of topics covered Call

More information

HK Electric Smart Power Fund. Application Guideline

HK Electric Smart Power Fund. Application Guideline HK Electric Smart Power Fund Application Guideline Corporate Development Division 4/F Hongkong Electric Centre, 44 Kennedy Road, Hong Kong Hotline : 2887 3455 Fax : 2810 0506 Email : smartpowerfund@hkelectric.com

More information

COMMISSION DECISION. of XXX

COMMISSION DECISION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2014) XXX draft COMMISSION DECISION of XXX authorising the use of reimbursement on the basis of unit costs for actions requiring the conduct of clinical studies under

More information

HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical Devices 2012/S 157-261208

HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical Devices 2012/S 157-261208 1/5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:261208-2012:text:en:html HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical

More information

EUROPEAN COMMISSION EUROSTAT. Directorate C: National Accounts, Prices and Key Indicators. Call for proposals 21040/2014/003

EUROPEAN COMMISSION EUROSTAT. Directorate C: National Accounts, Prices and Key Indicators. Call for proposals 21040/2014/003 EUROPEAN COMMISSION EUROSTAT Directorate C: National Accounts, Prices and Key Indicators Call for proposals 21040/2014/003 PREPARATORY WORK FOR THE MODERNISATION OF PUBLIC SECTOR ACCOUNTING SYSTEMS ON

More information

GUIDE FOR APPLICANTS. Internal Security Fund

GUIDE FOR APPLICANTS. Internal Security Fund GUIDE FOR APPLICANTS Internal Security Fund "Police" and "Borders and Visa" and Justice programme (part delegated to DG HOME) "Preventing and reducing drug demand and supply" 2015 DISCLAIMER These guidelines

More information

Programme Manual. for coordination of macro-regional cooperation (specific-objective 4.2) for the period 2014 to 2020

Programme Manual. for coordination of macro-regional cooperation (specific-objective 4.2) for the period 2014 to 2020 Programme Manual for coordination of macro-regional cooperation (specific-objective 4.2) for the period 2014 to 2020 version 1.0, approved by the Monitoring Committee on 26 February 2015 edited by the

More information

Application Form Call: 2015. KA1 - Learning Mobility of Individuals. VET learner and staff mobility

Application Form Call: 2015. KA1 - Learning Mobility of Individuals. VET learner and staff mobility General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit and about the

More information

Annex I Work-Order Agreement Task. -. Signatures Project Manager Date Action leader Date Team member Date

Annex I Work-Order Agreement Task. -. Signatures Project Manager Date Action leader Date Team member Date Deliverable E1 Quality Manual Annex I Annex I Work-Order Agreement Work-Order Agreement Project Name: LIFE-DYNAMAP Project Number: LIFE13 ENV/IT/001254 Action (Code and Title): Category/Responsibility:

More information

Questions & Answers. on e-cohesion Policy in European Territorial Cooperation Programmes. (Updated version, May 2013)

Questions & Answers. on e-cohesion Policy in European Territorial Cooperation Programmes. (Updated version, May 2013) Questions & Answers on e-cohesion Policy in European Territorial Cooperation Programmes (Updated version, May 2013) This fact sheet was drafted jointly by INTERACT and European Commission (DG Regional

More information

ENGLAND EUROPEAN REGIONAL DEVELOPMENT FUND OPERATIONAL PROGRAMME GUIDANCE ON REVENUE GENERATING PROJECTS

ENGLAND EUROPEAN REGIONAL DEVELOPMENT FUND OPERATIONAL PROGRAMME GUIDANCE ON REVENUE GENERATING PROJECTS ENGLAND EUROPEAN REGIONAL DEVELOPMENT FUND OPERATIONAL PROGRAMME 2014-20 GUIDANCE ON REVENUE GENERATING PROJECTS September 2015 Guidance on Revenue Generating Projects Contents Background Purpose of the

More information

GUIDE FOR APPLICANTS SUPPORT FOR LITERARY TRANSLATION PROJECTS

GUIDE FOR APPLICANTS SUPPORT FOR LITERARY TRANSLATION PROJECTS Education, Audiovisual and Culture Executive Agency Culture Unit GUIDE FOR APPLICANTS SUPPORT FOR LITERARY TRANSLATION PROJECTS CREATIVE EUROPE (2014-2020) CULTURE SUB-PROGRAMME VERSION: December 2013

More information

SOCIAL SAFETY NETS IN WEST AFRICA

SOCIAL SAFETY NETS IN WEST AFRICA Annex A SOCIAL SAFETY NETS IN WEST AFRICA PROJECT BRIEF TEMPLATE (PB) Funding by ECOWAS and the Spanish Cooperation Deadline for receipt of applications: March 20, 2015 Applicant s name: Dossier N (For

More information

ENI Regulation and CBC Implementing rules for the period

ENI Regulation and CBC Implementing rules for the period ENI Regulation and CBC Implementing rules for the period 2014-2020 6 February 2012 Kirkenäs Bodil Persson (DG DEVCO) 1 Where are we today with the ENPI CBC Programmes? After long delays the programmes

More information

Indirect costs declared on a flat rate basis Flat rate costs calculated by application of standard scales of unit costs Lump sums

Indirect costs declared on a flat rate basis Flat rate costs calculated by application of standard scales of unit costs Lump sums Final version of 28/01/2010 COCOF 09/0025/04-EN EUROPEAN COMMISSION Employment, Social Affairs and Equal Opportunities DG ESF, Monitoring of Corresponding National Policies I, Coordination Audit, controls

More information

Guide for Applicants. Call for Proposal:

Guide for Applicants. Call for Proposal: Guide for Applicants Call for Proposal: COSME Work Programme 2014 TABLE OF CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 II.2.1.

More information

PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6

PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6 PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6 March 2005 Evolution of the consortium 1. If a sum has been allocated within the budget for new

More information

Seminario "Opciones de Costes Simplificados e Instrumentos Financieros"

Seminario Opciones de Costes Simplificados e Instrumentos Financieros Shutterstock - olly Seminario "Opciones de Costes Simplificados e Instrumentos Financieros" Taller: Costes indirectos declarados a tanto alzado, costes unitarios y cantidades globales Workshop 1 2007 2013:

More information

Calculation of Staff costs

Calculation of Staff costs Fact sheet no. 01/2011 Calculation of Staff costs 0. Foreword Within CENTRAL EUROPE, the costs definitively paid by partner institutions for the personnel involved in project activities are eligible with

More information

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES

More information