1 nalysis of Design lternatives for Supplying Electric Power to Mission-Critical Loads in Data Centers: Reliability, Environmental, and Efficiency spects lejandro D. Domínguez-García, George Gross, and Philip T. Krein Department of Electrical and Computer Engineering, University of Illinois at Urbana-Champaign, Urbana, IL 61801, US {aledan, gross, EXECUTIVE SUMMRY In this report, we analyze the reliability, the CO 2 emission impacts, and the overall efficiency of three faulttolerant power supply topologies for mission-critical IT loads that eay Inc. has adopted in its data centers we refer to these topologies as Topology 1, Topology 2, and Topology 3. In Topology 1, fault tolerance is achieved through two utility feeders owned by the same distribution company, with a backup uninterruptible power supply (UPS) that rides through any temporary glitches in the utility feeders. In Topology 2, fault tolerance is achieved with the same feeder arrangement and a backup system with a diesel genset and a UPS. Topology 3 uses loom Energy fuel cells as the primary supply to the IT loads, with two utility feeders providing the backup. We perform a comprehensive, quantitative comparison of key performance metrics, including reliability the probability that the system is able to continuously serve power to the IT load and availability the fraction of the system lifetime during which it is able to serve power to the IT load. To this end, we construct Markov models for each topology. These models incorporate only the failure and repair behavior of the components that have the dominant impact on the key performance metrics. The construction of the Markov models requires the identification of every configuration that results from each possible sequence of component failures, and for each of these configurations, the determination whether or not the IT load is served. The Markov analysis also allows the evaluation of the expected annual CO 2 emissions, and overall system efficiency. Our analysis uses data furnished by eay Inc., loom Energy, and Rocky Mountain Power. The values provided represent the most up-to-date values at the time our work was conducted. Our findings indicate that Topology 3 outperforms the other two topologies in terms of the reliability and the availability metrics. The reliability of Topology 3 is a two-nine value represents a measurable improvement over that of Topology 2 at 0.98 a one-nine value. In other words, Topology 2 is on the order of ten times more likely to fail to serve the IT load than Topology 3. The least reliable topology is Topology 1, with a value of The availability of Topology 3 is , whereas that of Topology 2 is These values represent a significant improvement over the availability of Topology 1 at These results imply that, over a year, on average, Topology 3 may be unable to serve the IT load a fraction of time of less than 6 minutes out of 8760 hours. The corresponding values for Topology 2 and Topology 1 are 15 and 599 minutes out of 8760 hours, respectively. In terms of the CO 2 footprint of each topology, our studies indicate that Topology 3 produces the least emissions. Indeed, the adoption of Topology 3 reduces the expected annual CO 2 emissions by 49 % from those under either of the other two topologies. This result makes sense since the emissions rate for the loom Energy fuel cell is about half that associated with the utility feeder supply. There is no difference in terms of the expected CO 2 emissions per year between Topology 1 or Topology 2. This result follows from the fact that Topology 2 relies on the diesel genset to serve the IT load whenever both utility feeders fail, and the emissions for the genset is approximately equal to that of the power supplied via the utility feeders. In terms of the overall efficiency, Topology 3 s efficiency at 52.5 % compares favorably with the 42.6 % of Topology 1 or Topology 2. This improvement with Topology 3 represents an increase of nearly 23 % with respect to the lower efficiency of the other two topologies. s such, the fuel consumption of the loom cell in Topology 3 is nearly 19 % below that of Topology 1 or Topology 2. The advantages with the fuel cell supply are expected to continue for several years, even as the penetration of wind and solar resources into the grid continues to deepen. The use of on-site fuel cells offers a significant energy efficiency benefit over that of the utility power-based Topology 1 or Topology 2.

2 nalysis of Design lternatives for Supplying Electric Power to Mission-Critical Loads in Data Centers: Reliability, Environmental, and Efficiency spects 1 lejandro D. Domínguez-García, George Gross, and Philip T. Krein Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign Urbana, IL 61801, US {aledan, gross, krein}@illinois.edu bstract In this report, we analyze the reliability, carbon footprint, and overall efficiency of three different power supply topologies utilized by eay Inc. to serve mission-critical loads in data centers. In order to accomplish their functionality, the first and second topologies rely on two utility feeders as the main source for power, with conventional backup mechanisms an uninterruptible power supply (UPS) in the case of the first topology, and both a UPS and a bank of diesel generators in the case of the second topology. The third topology relies on loom Energy fuel cells as the main source of power for the mission-critical loads, with two utility feeders as backup. From a fault tolerance point of view, the first topology can accommodate, at most, one long-term failure in one of the two utility feeders. The second and the third topologies can accommodate up to two long-term failures. We perform a quantitative evaluation and comparison of the performance of the three topologies. To this end, we construct appropriate Markov models that allow us to compute all performance metrics of interest, including reliability, availability, and the expected number of hours per year that each topology is able to provide power to the mission-critical loads. In addition, we provide the expected values for the annual CO 2 emissions and the overall efficiency of each of the three topologies. The authors would like to thank Mike Lewis and James Monahan from eay Inc., and Jamie Day and Peter Gross from loom Energy for providing us with fruitful discussions and data, and helping us to clarify the numerous questions that we had while conducting the work reported in this document. ny opinions, findings, and conclusions or recommendations expressed here are those of the authors and do not necessarily reflect the views of the eay Inc. or loom Energy.

3 2 I. INTRODUCTION Reliable electric power supply is critically important in many applications, ranging from safety- and mission-critical systems for aerospace, aircraft, and automotive systems to information technology (IT) and communication systems. Typically, in any engineered system, the assurance of a high-level of reliability is achieved through the explicit incorporation of fault tolerant mechanisms into the system design. Fault tolerance is the ability of a system to adapt and compensate, in a systematic way, to random component faults, while providing complete or partial functionality [1]. The three basic features of a fault-tolerant system design are: (i) component redundancy; (ii) fault detection and isolation; and (iii) reconfiguration [2]. The reconfiguration feature ensures that, once a fault has been detected and isolated, a redundant component substitutes for a faulty one. In this report, we analyze the reliability of three fault-tolerant power supply topologies for mission-critical IT loads that eay Inc. has adopted in its data centers; we refer to these topologies as Topology 1, Topology 2, and Topology 3. In addition, we provide an assessment of the carbon footprint and the overall efficiency of each of these three power supply topologies. In Topology 1, fault tolerance is achieved through two utility feeders by the same utility company, with a backup uninterruptible power supply (UPS) that rides through temporary glitches in the utility feeders. In Topology 2, fault tolerance is achieved via two utility feeders owned by the same utility company, and a backup system comprising a UPS and a bank of diesel generators the Genset. Topology 3 relies on loom Energy fuel cells as the primary source of power to the IT loads, with two utility feeders owned by the same utility company as the backup. From a fault tolerance point of view, Topology 1 is one-fault tolerant, i.e., it can withstand, at most, one long-term failure. Topology 2 and Topology 3 are two-fault tolerant, i.e., each can withstand, at most, two long-term failures. We perform a comprehensive, quantitative comparison of the key performance metrics reliability, availability, and expected number of available hours per year for the three topologies. For this purpose, we construct appropriate Markov models for each topology; these models only incorporate the failure/repair behavior of the components that have the highest impact on the key performance metrics. Our analysis indicates the superiority of Topology 3 in terms of its reliability, i.e., the probability that the power supply system continuously delivers its functionality over an intended period of time [3]. Indeed, Topology 3 outperforms Topology 2 by one order of magnitude in terms of the reliability metric. useful by-product of the Markov model analysis is the computation of expected values of the annual emissions and efficiency metrics for each topology. For both these metrics, our analysis indicates that Topology 3 outperforms the other two topologies. However, it is important to note that the results yielded by the Markov models depend intensely on model parameters, i.e, the failure and repair rates of each component. The numerical values used in our analysis were provided by eay and loom Energy and represent their best estimates at the time our work was conducted [4]. Given the uncertainty associated with the values that these parameters may take, in future work we plan to explore the sensitivity of each performance metric to changes in the parameter values.

4 3 Utility Utility Utility Feeder a Feeder b Feeder a Feeder b Feeder a Feeder b Switch 1 Switch 1 Switch 1 us 1a us 1b us 1a us 1b us 1 Switch 2 UPS Genset Switch 2 Switch 3 UPS P f = 1200 kw Fuel cell Switch 2 IT load Supply 1: P s1 = 480 kw Supply 2: P s2 = 480 kw (a) Topology 1: power supplied through two parallel feeders. IT load Supply 1: P s1 = 480 kw Supply 2: P s2 = 480 kw (b) Topology 2: power supplied through two parallel feeders plus a cold-standby UPS/Genset. IT load Supply 1: P s1 = 480 kw Supply 2: P s2 = 480 kw (c) Topology 3: power supplied through onsite generation via Fuel cells plus two parallel feeders. Fig. 1. Data center mission-critical load power supply topologies. The remainder of this report is organized as follows. In Section II, we provide a qualitative description of the functionality of each of the three topologies. In Section III, we discuss the Markov models developed for evaluating the reliability, availability, and other performance metrics of interest of the three topologies a quantitative comparative analysis of the topologies is performed in terms of these performance metrics. In Section IV, we discuss the computation of the annual environmental impacts of each of the topologies. In Section V, we provide the quantitative comparison of the efficiency of each topology. Section VI summarizes the findings of our analyses. ppendix provides an overview on the modeling framework used in this work. ppendix lists the parameter values used in our analyses. II. DESCRIPTION OF POWER SUPPLY DESIGN LTERNTIVES This section provides an overview of three data center mission-critical load power supply topologies adopted by eay Inc. While many details of the actual physical elements in the topologies circuit breakers, switches, fuses, and transformers are omitted, the descriptions provided here capture the main functionality and salient features of each topology, and are adequate for use in our analysis.. Topology 1: Two Parallel Independent Utility Feeders The connectivity between sources and the mission-critical load for Topology 1 is shown in the simplified block diagram of Fig. 1(a). The power to the mission-critical load, referred to as IT load, can be supplied by two different sources, Supply 1 and Supply 2, both of which are enabled by a direct connection to us 1a and us 1b, respectively. The maximum power rating of the IT load is P l =960kW. Under normal operating conditions, half of the power, P s1 =480kW, is provided by Supply 1, while the other half, P s2 =480kW, is provided by Supply 2.

5 4 In the event that either Supply 1 or Supply 2 is unavailable due to some failure, the other supply will provide all 960 kw to the IT load. The power that flows into Supply 1 and Supply 2 via us 1a and us 1b, respectively, is provided in its entirety by two utility feeders, referred to as Feeder a and Feeder b, that belong to the same utility company. Under normal operating conditions, Feeder a supplies us 1a, which, in turn, serves power to Supply 1. Similarly, Feeder b serves power to Supply 2 via us 1b. If either Feeder a or Feeder b fails, then Switch 1 closes and both us 1a and us 1b are connected to the feeder that is still operational. The UPS helps ride through power glitches and feeder transfers, and if it fails, it is bypassed due to the action of Switch 2.. Topology 2: Two Parallel Dependent Utility Feeders plus a Cold-Standby Ups/Genset Figure 1(b) shows a simplified diagram for Topology 2, capturing the flow paths for the electric power sources to the IT load. The supply of power to the IT load is identical to that in Topology 1, with two different sources, Supply 1 and Supply 2. lso, as in Topology 1, both supplies are provided by a direct connection of Supply 1 and Supply 2 to us 1a and us 1b, respectively. Similar to Topology 1, under normal operating conditions, the total power to be delivered to the load, P l =960kW, is equally allocated to Supply 1 and Supply 2, with P s1 = P s2 =480kW. In the event that either of the supplies is unavailable, the total power is provided by the other available supply. Similarly to Topology 1, the power that flows into Supply 1 and Supply 2 via us 1a and us 1b, respectively, is provided entirely by two utility feeders, referred to as Feeder a and Feeder b, that belong to the same utility company. Under normal operating conditions, and similar to Topology 1, Feeder a and Feeder b supply power to us 1a and us 1b, respectively, which in turn supply power to Supply 1 and Supply 2, respectively. If either Feeder a or Feeder b fails, then Switch 1 closes and all power is supplied by the available feeder. In the event that a simultaneous failure of both feeders occurs, there is an uninterruptible power supply (UPS), and a diesel Genset for backup. The Genset is on cold standby, i.e., it is only brought online due the action of Switch 2 after both Feeder a and Feeder b become unavailable. lso, as in Topology 1, whenever the UPS fails, it is bypassed by the action of Switch 3. C. Topology 3: On-Site Generation via Fuel Cells plus two Independent Utility Feeders on Cold Standby Figure 1(c) shows a simplified diagram for Topology 3 that captures the connectivity between the power sources and the IT load. s shown in the lower part of the figure, the power to the IT load can be supplied by two different sources: (i) a Fuel cell, and (ii) a direct connection to us 1. The maximum power output of the Fuel cell is P f =1200kW, and it operates at that level under normal conditions. We refer to the Fuel cell supply as Supply 1, and to the direct connection to the us 1 supply as Supply 2. s shown in Fig 1(c), power injected into us 1 can be supplied by the Fuel cell and by two utility feeders, referred to as Feeder a and Feeder b, that belong to the same utility company. Under normal operating conditions, Feeder a is engaged and can inject or absorb power to or from us 1. Feeder b is engaged only if an outage in Feeder a occurs Switch 1 performs the transfer process. Note that the

6 5 Fuel cell can be bypassed through the action of Switch 2. Such a transfer occurs whenever the Fuel cell is not available due to either an internal failure or a failure in the gas supply. In such cases, the power to the IT load is provided by the utility supply via us 1 through the two utility feeders. The maximum power rating of the IT load is P l =960kW, and under normal operating conditions, half of this load, P s1 =480kW, is provided by Supply 1, and the other half, P s2 =480kW, is provided by Supply 2. In the event that either Supply 1 or Supply 2 is unavailable, the available power supply provides 960 kw. The Fuel cell can provide power to the IT load through Supply 1, and injects any excess power into us 1. Then, since the Fuel cell output is 1200 kw, and 480 kw is supplied through Supply 1, under normal operating conditions, the power provided to the IT load through Supply 2 (480 kw) is also provided by the Fuel cell, with the excess power ( = 240 kw) injected into the utility grid, or used to provide power to auxiliary loads not depicted in Fig. 1(c). In the unlikely event that both Feeder a and Feeder b are unavailable, the Fuel cell can supply all the power to the IT load by itself. III. RELIILITY/PERFORMNCE SSESSMENT In this section, we discuss the Markov models that we used to evaluate the reliability and performance metrics of the three topologies. The construction of these models relies on the description of the functionality of each of the three topologies provided in Section II; i.e., the models do not take into account the failure and repair behavior of the ancillary equipment such as, transformers, cables, circuit breakers, switches, fuses, and other protective devices. s such we use the same level of detail in the representation of the three topologies; thus, the analysis presented here is suitable for their comparison on a consistent basis. ppendix provides a brief summary of the Markov modeling framework used in this work; for a more detailed discussion on this topic, the reader is referred to [3], [5].. Topology 1: Two Parallel Independent Utility Feeders In the context of reliability analysis, Topology 1 is modeled as a a parallel system comprising the two utility feeders. However, these feeders are not independent as there are events, e.g., a wide-area blackout caused by a natural disaster, that may cause both feeders to fail at the same time. In order to build the reliability model for this topology, we first need to list all the configurations that arise from each possible sequence of failure events. For each configuration, we need to evaluate whether or not the system can maintain its functionality, which in this case means the continuation to provide power to the IT load. For this topology, there are four disjoint failure events that we need to consider when listing all possible failure sequences. These are: (i) Feeder a fails to supply power event, (ii) Feeder b fails to supply power event, (iii) both Feeder a and b fail to supply power at the same time event, and (iv) UPS fails to supply power event U. These events occur at rates,,, and U (see Table XII in ppendix for the numerical values used in the analysis). Once any one of these events occurs, we assume that a repair action may be triggered. The rates at which the

7 6 TLE I TOPOLOGY 1: FILURE EVENT DESCRIPTION. Event Description Failure rate Repair rate Event causing only Feeder a to fail to supply power µ Event causing only Feeder b to fail to supply power µ Event causing both Feeder a and b to fail to supply power µ U Event causing UPS to fail to supply power U µ U TLE II TOPOLOGY 1MRKOV RELIILITY MODEL: FILURE SEQUENCES, OUTCOMES, ND PROILITIES T t m = 8760 H. Configuration Failure sequence Power delivered to the load [kw] Probability at time t m = 8760 h 1 {;} (t m )= {} (t m )= {} (t m )= {U} (t m )= {} 0 5 (t m )= {! } 0 6 (t m )= {! } 0 7 (t m )= {! } 0 8 (t m )= {! } 0 9 (t m )= {U! } (t m )= {U! } (t m )= {U! } 0 12 (t m )= {U!! } 0 13 (t m )= {U!! } 0 14 (t m )= {U!! } 0 15 (t m )= {U!! } 0 16 (t m )= repair is completed after occurrence of events,,, and U are µ, µ, µ, and µ U, respectively (see Table XII in ppendix for the numerical values used in the analysis). key step in the analysis is to list all possible sequences of failure events, for which we use the following notation. We denote by {;} the event that no failures occurred. Sequences of failures involving single events,,, and U, are denoted by {}, {}, {}, and {U}. The sequence of failures that corresponds to event occurring first, followed by event, is denoted by {! }. Following this convention, the second column of Table II lists all possible failure sequences involving events,,, and U, while the third column lists the corresponding amount of power delivered to the IT load. y combining the information in Table I and Table II, we build a Markov model that allows us to evaluate the reliability of the topology (see, e.g., [3], [5]). The state-transition diagram for the resulting Markov reliability model is provided in Fig. 2, with the states corresponding to the configurations listed in Table II, and the transition rates in and out of each state indicated. y solving the Markov reliability model, we can compute the probability of occurrence of every sequence of failures at any given time instant. For example, the fourth column of Table II lists the probability of occurrence of each of the individual sequences of failures after t m =8760h have elapsed. In turn, these probabilities can be used to compute an estimate of the system reliability, which is defined as

8 7 2 {} 6 {! } 7 {! } µ 1 µ 3 8 {! } {;} {U} {} 4 µ µ 9 {! } 10 {U! } 13 {U!! } 14 {U!! } 5 {} 11 {U! } 12 {U! } 15 {U!! } 16 {U!! } Fig. 2. Topology 1: Markov reliability model state-transition diagram. Green states indicate sequences of failures that result in no loss of power delivery to the load. Red states indicate sequences of failures that result in loss of power delivery to the load. Definition 1 ([3]): Reliability is the probability that the system continuously delivers its functionality, i.e., the system is able to continuously supply the power requested by the IT load, for an intended period of time, referred to as the mission time. Let U denote the set of states of the Markov model in Fig. 2, the elements of which correspond to sequences of failures after which the system is still able to deliver power to the IT load, i.e., U = {1, 2, 3, 4, 10, 11}, (all other states correspond to sequences that result in failure). Then, by using Definition 1, for a mission time t m, the reliability of Topology 1 is given by R(t m )= X i2u i (t m )= 1 (t m )+ 2 (t m )+ 3 (t m )+ 4 (t m )+ 10 (t m )+ 11 (t m ). (1) With a one year mission time, i.e., t m =8760h; the values in the fourth column of Table II yield R(t m )=0.90. (2)

9 8 In addition to reliability, another performance metric of interest is availability, which is the fraction of the system lifetime that the system is delivering its functionality, i.e., providing power to the IT load. vailability can be obtained from the steady-state distribution of a Markov model derived by adding slight modifications to the one depicted in Fig. 2. Specifically, it is necessary to add the transitions out of all the states associated with configurations in which the system is no longer able to provide power; these transitions are associated with repair actions (see, e.g., [3], [5]). For example, for State 6, which corresponds to the failure sequence {! }, the transition that needs to be added would restore the system to operation in State 2 at the repair rate µ. The state-transition diagram of the modified Markov model, referred to as the Markov availability model, is displayed in Fig 3, with the values of the long-term probabilities listed in Table III. Let Q denote the set of states of the Markov availability model in Fig. 3 corresponding to sequences of failures after which the system is still able to deliver power to the IT load. Then, the availability of Topology 1 is given by: = X i2q i = = (3) In addition, the expected number of hours within a year that the system delivers its functionality, which we denote by T, can be computed from as simply T =8760 = h. TLE III TOPOLOGY 1 MRKOV VILILITY MODEL: FILURE SEQUENCES ND LONG-TERM PROILITIES Configuration Failure sequence Long-term probability 1 {;} 1 = {} 2 = {} 3 = {U} 4 = {} 5 = {! } 6 = {! } 7 = {! } 8 = {! } 9 = {U! } 10 = {U! } 11 = {U! } 12 = {U!! } 13 = {U!! } 14 = {U!! } 15 = {U!! } 16 =

10 9 2 {} µ µ 6 {! } 7 {! } {;} µ µ 1 µ µ 3 {} 4 µ 8 {! } 9 {! } 10 {U} {U! } µ µ µ µ 13 {U!! } 14 {U!! } µ 5 {} 11 {U! } 12 {U! } µ µ 15 {U!! } 16 {U!! } Fig. 3. Topology 1: Markov availability model state-transition diagram. Green states indicate sequences of failures that result in no loss of power delivery to the load. Red states indicate sequences of failures that result in loss of power delivery to the load.. Topology 2: Two Parallel Dependent Utility Feeders plus a Cold-Standby Ups/Genset From a reliability point of view, Topology 2 can be modeled as a parallel system comprising two utility feeders, Feeder a and Feeder b, and a cold-standby backup comprising the UPS and the Genset. Upon failure of both Feeder a and Feeder b, the Genset is engaged by closing Switch 2; however, it is necessary that the UPS is available during this transfer process. In terms of their reliability, the two utility feeders are not independent since they belong to the same utility company; thus a blackout affecting this utility will affect both feeders. In this topology, there are five disjoint failure events that we need to consider. These are: (i) Feeder a fails to supply power event, (ii) Feeder b fails to supply power event, (iii) both Feeder a and Feeder b fail to supply power at the same time event, (iv) UPS fails to supply power event U, and (v) Genset fails to supply power event G. s displayed in Table IV, we use the same notation adopted for Topology 1 to denote the rates at which these failure events occur, and the corresponding repair rates (see Table XIII in ppendix for the numerical values used in the analysis).

11 10 TLE IV TOPOLOGY 2: FILURE EVENT DESCRIPTION. Event Description Failure rate Repair rate Event causing only Feeder a to fail to supply power µ Event causing only Feeder b to fail to supply power µ Event causing Feeder a and b to fail to supply power µ U Event causing UPS to fail to supply power U µ U G Event causing Genset to fail to supply power G µ G The next step in the analysis is to list all possible sequences of failure events and evaluate the outcome, i.e., whether or not the IT load is being supplied. The outcome of some failure sequences will depend on whether or not the Genset is successfully brought online. To this end, denote by S the event that describes success in bringing the Genset online, and denote by S the event that describes failure in bringing the Genset online. For example, consider the occurrence of event, i.e., both Feeder a and Feeder b fail at the same time and the Genset is successfully brought online; this sequence of events, denoted by { ^ S}, results in power being supplied to the IT load. On the other hand, if the Genset is not successfully brought online after event occurs (we denote this sequence of events by { ^ S}), then the system will fail to provide power. To illustrate further, {! ^ S! G} denotes the following sequence of events: Feeder a fails first; then, Feeder b fails and the Genset is successfully brought online; and finally the Genset fails. Following this convention, the second column of Table V lists all possible sequence of failures, while the third column lists the outcome of each sequence. To build the Markov reliability model, we need to define the probability 1 associated with event S, which we denote by c S. It follows that the probability associated with event S is 1 c S. y combining the information in Table IV and Table V, we can build the Markov reliability model state-transition diagram shown in Fig. 4. y using the failure and repair values in Table XIII in ppendix, and assuming that c S =0.99, we can compute the probabilities of each of the states for t m =8760h; these probabilities are listed in the fourth column of Table V. The next step is to use the results of the Markov reliability model to compute the reliability. s in the analysis of Topology 1, we can modify the transition diagram in Fig. 4 to generate a Markov availability model. The long-term occupational probabilities for this model are listed in the fifth column of Table V. The reliability, availability, and expected number of available hours per year estimates are listed in Table VI. C. Topology 3: On-Site Generation via Fuel Cells plus two Independent Utility Feeders in Cold Standby From a reliability point of view, Topology 3 can be be modeled as a parallel system comprising Feeder a and the Fuel cell, and a cold-standby backup system comprising Feeder b that is engaged when Feeder a fails. s in Topology 1 and Topology 2, the two utility feeders belong to the same utility company; however, unlike Topology 1 and Topology 2, only one of them is engaged at a time. 1 In the context of fault-tolerant systems, this probability is referred to as failure coverage (see, e.g., [6], [7]), and in general captures the ability of a fault-tolerant system to recover from a component failure and stay operational.

12 11 {;} µ U µ µ 1 {} {} c S 2 µ µ (1 c S ) 3 4 { ^ S} 5 c S µ µ c S µ c S 7 {! ^ S} 9 {! ^ S} 10 { ^ S} { ^ S! G} U {U} µ U µ U 6 8 (1 c S ) {! ^ S} (1 c S ) U c s (1 c S ) {! ^ S} (1 c s ) {! ^ S} U G µ µ 11 {! U} {! ^ S} 14 {! ^ S} 15 {! ^ S} 16 {! U} {U! } 19 {U! } 20 {U! } 22 {! U! } 23 {! U! } 24 {! U! } 25 {! U! } 26 {U!! } {U!! } 29 G G 21 G G {U!! } {U!! } {! ^ S! G}_ {! ^ S! G}_ {! ^ S! G}_ {! ^ S! G} Fig. 4. Topology 2: Markov reliability model state-transition diagram. Green states indicate sequences of failures that result in no loss of power delivery to the load. Red states indicate sequences of failures that result in loss of power delivery to the load.

13 12 TLE V TOPOLOGY 2: FILURE SEQUENCES, SSOCITED OUTCOME, MRKOV RELIILITY MODEL PROILITIES T t m = 8760 H, ND MRKOV VILILITY MODEL LONG-TERM PROILITIES. Configuration Failure sequence Power delivered Markov reliability model Markov availability model to the load [kw] probabilities at t m = 8760 h long-term probabilities 1 {;} {} {} { ^ S} { ^ S} {U} {! ^ S} {! ^ S} {! ^ S} {! ^ S} {! U} {! ^ S} {! ^ S} {! ^ S} {! ^ S} {! U} { ^ S! G} {U! } {U! } {U! } {! ^ S! G}_ {! ^ S! G}_ {! ^ S! G}_ {! ^ S! G} 22 {! U! } {! U! } {! U! } {! U! } {U!! } {U!! } {U!! } {U!! } TLE VI TOPOLOGY 2: PERFORMNCE METRICS. Reliability vailability Expected number of available hours per year h

14 13 TLE VII TOPOLOGY 3: FILURE EVENT DESCRIPTION. Event Description Failure rate Repair rate Event causing only Feeder a to fail to supply power µ Event causing only Feeder b to fail to supply power µ Event causing Feeder a and b to fail to supply power µ F Event causing Fuel cell to fail to supply power F µ F F Event causing Feeder a and b, and Fuel cell to fail to supply power F µ F TLE VIII TOPOLOGY 3: FILURE SEQUENCES, SSOCITED OUTCOME, MRKOV RELIILITY MODEL PROILITIES T t m = 8760 H, ND MRKOV VILILITY MODEL LONG-TERM PROILITIES. Configuration Failure sequence Power delivered Markov reliability model Markov availability model to the load [kw] probabilities at t m = 8760 h long-term probabilities 1 {;} {} {} {F } {} {F } {! } {! F } {! F } {! } {! F } {! F } {F! } {F! } {! F } {!! F } {! F! } {!! F } {! F! } {F!! } {! } {! } {!! F } {!! F } {F!! } The disjoint events to consider in the analysis are: (i) failure of Feeder a event, (ii) failure of Feeder b event, (iii) Feeder a and Feeder b becoming simultaneously unavailable event, (iv) failure of the Fuel cell event F, and (v) Feeder a, Feeder b, and Fuel cell becoming simultaneously unavailable event F. s displayed in Table VII, we use a similar notation to the one in earlier analyses to denote rates at which these failure events occur and corresponding repair rates (see Table XIV in ppendix for the numerical values used in the analysis).

15 14 {} 2 µ µ F F 7 {! } 8 F 16 {!! F } 17 µ {! F } {! F! } 21 {! } F 9 {! F } F 23 {!! F } µ {;} µ µ 1 3 µ µ F F {} µ µ F F 10 {! } 11 {! F } F 18 {!! F } 19 {! F! } µ 22 F 12 {! F } {! } F 4 {F } µ F 24 {!! F } F µ 5 {} 6 {F } F 13 {F! } 14 {F! } {F!! } 25 {F!! } {! F } Fig. 5. Topology 3: Markov reliability model state-transition diagram. Green states indicate sequences of failures that result in no loss of power delivery to the load. Red states indicate sequences of failures that result in loss of power delivery to the load. To build the Markov reliability model, we list all possible sequences of failure events and evaluate the outcome; see the second column of Table VIII for the list, and the third column for the outcome. Then, by combining the information in Table VII and Table VIII, we can build the Markov reliability model state-transition diagram shown in Fig. 5. y using the failure and repair values in Table XIV in ppendix, we can evaluate the model and compute the probability of occurrence of each of the individual sequences of failures after t m =8760h have elapsed (see the fourth column of Table VIII for the values that these probabilities take). We can modify the transition diagram in Fig. 5 to generate a Markov availability model and compute the long-term probabilities for this model (see the fifth column of Table VIII). The same three performance metrics are computed and summarized in Table IX.

16 15 TLE IX TOPOLOGY 3: PERFORMNCE METRICS. Reliability vailability Expected number of available hours per year h TLE X TOPOLOGY COMPRISON. Topopolgy 1 Topology 2 Topology 3 Reliability vailability D. Comparative nalysis We summarize the metrics evaluated for the three topologies in Table X. We find that Topology 3 outperforms both Topology 1 and Topology 2 in each metric. The reliability of Topology 3 is 0.998, i.e., two nines. The reliability of Topology 2 is 0.98, i.e., one nine. The least reliable topology is Topology 1, with a reliability of 0.90, i.e., one nine. From a redundancy point of view, Topology 1 is essentially a dual-redundant system with Feeder a and Feeder b sharing the power supply to the IT load, and each one able to provide full power to the IT load in case of failure of the other feeder. Topology 2 is a dual-redundant system with Feeder a and Feeder b in a similar arrangement as in Topology 1. Topology 2 has the additional feature of a cold-standby Genset backup, engaged whenever both Feeder a and Feeder b fail. Topology 3 differs significantly from Topology 1 or Topology 2. Specifically, while in theory Feeder a and the Fuel cell constitutes a dual-redundant system as in the Topology 1 and 2, under normal operating conditions, the Fuel cell is capable of providing all the power to the IT load. s such, Feeder a is essentially acting as a hot standby system for the Fuel cell. lso Feeder b acts as a cold standby system for Feeder a. From a fault tolerance point of view, Topology 1 is one fault tolerant, i.e., it can withstand, at most, one long-term failure. Topology 2 and Topology 3 are two fault tolerant, i.e., each can withstand, at most, two long-term failures. The level of fault tolerance partly explains why Topology 1 is the less reliable topology. However, while in Topology 2 the Genset provides one more level of fault tolerance, the likelihood of the Genset providing power to the IT load when both Feeder a and Feeder b fail is a function of both the Genset failure rate and the probability that the Genset is successfully brought online in case of need. Indeed, these two factors constitute the reason that explains the superiority of Topology 3 over Topology 2. While the failure rate for the feeders is the same in either topology, the failure rate for the Genset is three orders of magnitude higher than the failure rate of the Fuel cell. Moreover, unlike the probability of successfully bringing the Genset online, the probability of successfully engaging Feeder b in Topology 3 is taken to be one. This discussion provides a succinct summary for the gains in performance attainable with Topology 3 vis-a-vis Topology 1 and Topology 2.

17 16 IV. CRON FOOTPRINT SSESSMENT To assess the CO 2 footprint of the three topologies, we need (i) the long-term probabilities of each possible configurations resulting from a particular sequence of failures, and (ii) the power provided under each possible configuration. The long-term probabilities for each topology are given in the previous section. These probabilities are listed in Table III for Topology 1, Table V for Topology 2, and Table VIII for Topology 3. The emissions assessment requires the data for the emissions rates associated with each power source: Feeder a, Feeder b, Genset, and Fuel cell. We denote these emissions rates by e a, e b, e g, and e f, respectively, and list their values in Table XV in ppendix. The numbers used for Feeder a and Feeder b are for the year 2012 and were provided by Rocky Mountain Power, the utility that serves the eay Inc. data centers in Utah, for the year We interpret the probability of each possible operational configuration as the fraction of time that a configuration associated with a particular failure sequence occurs during a specified period of time t e, say a year. For instance, in Topology 3, the long-term probability associated with failure sequence {}, i.e., Feeder a fails first, is 2 = as shown in Table VIII. Then, since in that configuration, the Fuel cell is operating at its maximum power output 2 P f =1200kW, the yearly contribution of the emissions associated with that particular configuration is E 2 (t e )= 2 t e P f e f = h 1200 kw lbs/kwh = lbs. (4) In (4), we consider only the emissions of the Fuel cell as this is the sole source of power for the IT load. However, there are other configurations in which more than one source provides power to the IT load. In Topology 1, when no failures occurred, i.e., the system is operating in Configuration 1 (see Table II), half of the power is supplied to the IT load by Feeder a, and the other half is provided by Feeder b. The yearly CO 2 emissions associated with that particular configuration of Topology 1 are E 1 (t e )= 1 t e (P s1 e a + P s2 e b ) = h (480 kw lbs/kwh +480 kw lbs/kwh) = lbs. (5) Then, once all the E i (t e ) s are evaluated, for each topology, we can compute the expected CO 2 emissions per year using: E(t e )= X i E i (t e ), (6) with t e =8760h. 2 Recall from that description in Section II- that P l =960kW only are delivered to the IT load, while any excess power that the Fuel cell produces, i.e., = 240 kw, is injected into the utility grid through either Feeder a or Feeder b or used to provide power to data center auxiliary loads.

18 17 TLE XI EXPECTED YERLY CO 2 EMISSIONS Topology 1 Topology 2 Topology 3 Expected CO 2 emissions per year [lbs] For each of the three topologies, Table XI lists the values of E(t e ). s one can see from the results in this table, Topology 3 outperforms the other topologies with an expected CO 2 emissions per year about half the expected CO 2 emissions per year of either of the other topologies. This result makes sense by observing that the emissions rate for the Fuel cell is half the emissions rate associated with the utility feeders of both Topology 1 and Topology 2. There is no difference in terms of the expected CO 2 emissions per year of Topology 1 or Topology 2. This result is clear from the fact that Topology 2 relies on the Genset to provide power whenever both Feeder a and Feeder b fail, and the emissions rate for the Genset is similar to that of the power generated and delivered via the utility feeders, with the Genset rarely functioning more than a few hours per year. V. OVERLL ENERGY EFFICIENCY SSESSMENT Electricity in Utah comes primarily from coal-fired generation plants, although, recently, there has been substantial growth in the implementation of natural gas and wind resources. Thermal energy efficiency for coal plants is typically about 33 %, but the actual generation mix in Utah has significant other resource penetration. We compute an equivalent fuel efficiency based on CO 2 production. Rocky Mountain Power, which serves the sites of the eay Inc. data centers, reported CO 2 emissions rate to be approximately 1.52 lbs/kwh [4]. The Energy Information dministration reports that in Utah, coalbased electricity production emits about 204 lbs of CO 2 per million TU [8]. Now, one million TU is the energy equivalent of about 293 kwh and so the coal-based generation at 100 % efficiency produces lbs/kwh. The reported amount of 1.52 lbs/kwh implies that the average coal-equivalent efficiency is 0.696/1.52 = 45.8 %. However, the actual efficiency is below this value, in part because natural gas combustion involves lower CO 2 emissions than coal combustion. In our analysis, we use the 45.8 % coal-equivalent efficiency value as it offers the same basis for efficiency comparison that the CO 2 emission do. ny electrical energy from a generation source is delivered via the transmission and distribution networks, and possibly a user-side conversion device before it reaches the customer load where it is consumed. oth coal and natural gas have distribution costs and associated energy requirements. The comparison in this report is not intended as a wells to wheels computation. Rather, the efficiency and energy consumption are compared based on the point of entry of the electricity into the data center site. For the topologies depicted in Fig. 1, and some additional information on the components of the designs, we know that the electricity flow in Topology 1 and in Topology 2 passes from the point of entry into the data center site through two sets of transformers and the UPS before it is used to meet

19 18 the data center IT load. Distribution transformers in a [0.5, 1.5] MW rating range have efficiencies that approach 99 % [9], and we use this value in our analysis. The UPS efficiency is given to be 95 %. The efficiency from site entry to data center IT load is, therefore, = 0.931, or 93.1 %. The coal equivalent efficiency is obtained by multiplication by the value, to yield or the 42.6 % overall energy efficiency from fuel to the data center IT load based on the energy contents of coal. On the other hand, for Topology 3, under normal operating conditions, power is supplied by the loom Energy fuel cell, whose output is 1200 kw. We need to determine the fuel cell nominal full-load efficiency, which we do using reverse engineering. The conversion from the natural gas thermal source to ac electricity is reported to be 53 % [4], which includes the efficiency of the associated inverter. The ac power feeds into the data center IT load after passing through a transformer. Overall efficiency from the natural gas supply at site entry to electricity to the data center IT load through the fuel cells, inverter, and the single transformer is computed to be = 0.525, or 52.5 %. The 52.5 % overall efficiency in Topology 3 compares favorably with the overall 42.6 % efficiency of Topology 1 and Topology 2, and represents an increase of nearly 23 % with respect to the lower efficiency. s such, the fuel consumption of the fuel cell in Topology 3 is nearly 19 % below that of Topology 1 and Topology 2. The advantages with the fuel cell supply is expected to continue for several years, even as the implementation of wind and solar resources into the grid continues to expand. The use of on-site fuel cells offers a significant energy efficiency benefit compared to the utility power-based Topology 1 or Topology 2 supply. VI. CONCLUDING REMRKS In this report, we analyzed the reliability, carbon footprint, and overall efficiency of the three different power supply topologies adopted by eay Inc. to serve mission-critical loads in data centers. The first two topologies rely on utility feeders as the main source of power, while the third one relies on loom Energy fuel cells as the main power supply, with two utility feeders as backup. For each topology we constructed Markov models to describe their uncertain behavior due to component failures and repairs. These Markov models allowed us to compute performance metrics of interest, including reliability, availability, expected number of available hours per year, and expected CO 2 emissions per year. In turn, these key metrics allowed us to quantitatively compare the performance of the topologies from three perspectives. For each performance metric considered in the analysis, Topology 3, which relies on fuel cells as the main source of power, outperformed the other two. However, since the results depend on the model parameter values, future work needs to carefully explore the sensitivity of performance metrics with respect to parameter values.

20 19 PPENDIX MRKOV MODELS FOR RELIILITY ND PERFORMNCE EVLUTION Let X = {X(t), t 0} denote a Markov chain describing the stochastic behavior of a system subject to component failures and repairs. ssume that X takes values in a finite set S = {1, 2,..., n}, where 1 indexes the nominal, non-faulty system configuration, and 2,..., n index system configurations that arise due to sequences of component failures. Let i (t), t 0, be the probability that the system is in configuration i, and define the corresponding probability vector as (t) =[ 0 (t), 1 (t),..., n (t)]. The evolution of (t) is defined by the Chapman-Kolmogorov equations (t) = (t), (7) with 1 (0) = 1, j (0) = 0, j=2,..., n, and where is the generator of X (see, e.g., [11], [12]). To determine, the first step is to list all possible configurations associated with different component failure sequences. Transitions between states are governed by a combination of failure and repair rates. 1 2 {;} {} (a) Reliability model. µ 1 2 {;} {} (b) vailability model. Fig. 6. Single-component system Markov reliability and availability models. Example 1: Consider a system comprising a single component, which we denote by Component a, and denote by an event that causes Component a to fail. This system can only adopt two possible configurations, one in which Component a is operating, and one in which Component a has failed; thus S = {1, 2}. Figure 6(a) shows the state-transition diagram of the Markov reliability model associated with this system, where {;} denotes the sequence of component failures (in this case the empty set) that lead to configuration 1, and {} denotes the sequence of component failures, in this case only involving Component a, that lead to configuration 2. From Fig. 6(a), the generator for this Markov reliability model is given by " # = 0 0, (8) where is the failure rate for Component a. y solving (7) for 1 (0) = 1, and 2 (0) = 1, we obtain 1 (t) =e t, 2 (t) =1 e t, (9) and, for any mission time t m, the reliability of the system can be computed as R(t m )= 1 (t m )=e t m. (10)

Increased power protection with parallel UPS configurations

Increased power protection with parallel UPS configurations Increased power protection with parallel UPS configurations Making the selection between Centralized Bypass and Distributed Bypass systems Janne Paananen Application Engineer, Large Systems Group Eaton

More information

Designed for uptime. Defining data center availability via a tier classification system

Designed for uptime. Defining data center availability via a tier classification system Defining data center availability via a tier classification system MIETEK GLIKOWSKI All systems can fail this is a simple fact that every industry must deal with. The paramount concern for the data center

More information

Storage Battery System Using Lithium ion Batteries

Storage Battery System Using Lithium ion Batteries Offices and schools Utilities / Renewable energy Storage Battery System Using Lithium ion Batteries Worldwide Expansion of Storage Battery System s Commercial Buildings Residential The Smart Energy System

More information

How To Evaluate Cogeneration

How To Evaluate Cogeneration Power topic #7018 Technical information from Cummins Power Generation Inc. Evaluating cogeneration for your facility: A look at the potential energy-efficiency, economic and environmental benefits > White

More information

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Beacon Power Corporation KEMA Project: BPCC.0003.001 May 18, 2007 Final Report with Updated Data Emissions Comparison for

More information

Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, 2013. p i.

Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, 2013. p i. New York, NY, USA: Basic Books, 2013. p i. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=2 New York, NY, USA: Basic Books, 2013. p ii. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=3 New

More information

Data Center Combined Heat and Power Benefits and Implementation. Justin Grau, Google Inc. Sam Brewer, GEM Energy

Data Center Combined Heat and Power Benefits and Implementation. Justin Grau, Google Inc. Sam Brewer, GEM Energy Data Center Combined Heat and Power Benefits and Implementation Justin Grau, Google Inc. Sam Brewer, GEM Energy Data Center Challenges Electric Load Densification Thermal Dissipation Requires constant

More information

PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING

PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING LI CHUNYING DOCTOR OF PHILOSOPHY CITY UNIVERSITY OF HONG KONG FEBRUARY 2012 CITY UNIVERSITY OF HONG KONG 香 港 城 市 大 學 Performance Evaluation of Water-flow

More information

Generic Reliability Evaluation Method for Industrial Grids with Variable Frequency Drives

Generic Reliability Evaluation Method for Industrial Grids with Variable Frequency Drives Energy and Power Engineering, 2013, 5, 83-88 doi:10.4236/epe.2013.54b016 Published Online July 2013 (http://www.scirp.org/journal/epe) Generic Reliability Evaluation Method for Industrial Grids with Variable

More information

Half the cost Half the carbon

Half the cost Half the carbon Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within

More information

PV And Storage: Solutions with Potential

PV And Storage: Solutions with Potential EN PV And Storage: Solutions with Potential Energy on demand with the Sunny Central Storage Large-scale storages... support the growth of renewable energies complete diesel and solar diesel hybrid systems

More information

Energy Systems Integration

Energy Systems Integration Energy Systems Integration Dr. Martha Symko-Davies Director of Partnerships, ESI March 2015 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy,

More information

Nuclear Power Plant Electrical Power Supply System Requirements

Nuclear Power Plant Electrical Power Supply System Requirements 1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, zeljko.jurkovic@nek.si Abstract Various regulations and standards require from electrical power system of the

More information

Alternative data center power

Alternative data center power Alternative data center power A quantitative TCO comparison of 400V AC and 600V AC power systems Abstract Power efficiency has become a critical focus for IT and facilities managers as they struggle to

More information

Eni Green Data Center - Specification

Eni Green Data Center - Specification Eni Green Data Center - Specification Green IT Adopting the principles of sustainable development is one of the key missions in the field of information technology today. 2% of the world s CO2 emissions

More information

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply. www.siemens.com/siestorage

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply. www.siemens.com/siestorage Totally Integrated Power SIESTORAGE The modular energy storage system for a reliable power supply www.siemens.com/siestorage Totally Integrated Power (TIP) We bring power to the point. Our products, systems,

More information

High availability From Wikipedia, the free encyclopedia

High availability From Wikipedia, the free encyclopedia High availability From Wikipedia, the free encyclopedia High availability is a system design approach and associated service implementation that ensures a prearranged level of operational performance will

More information

Increased Use of Renewable Energy Sources in Wireless Communication Networks. Alexis Kwasinski, PhD The University of Texas at Austin

Increased Use of Renewable Energy Sources in Wireless Communication Networks. Alexis Kwasinski, PhD The University of Texas at Austin Increased Use of Renewable Energy Sources in Wireless Communication Networks Alexis Kwasinski, PhD The University of Texas at Austin Alexis Kwasinski, 2014 Overview Motivation Technological Challenges

More information

Guidelines for ATS selection: How to choose the right transfer solution for your power application.

Guidelines for ATS selection: How to choose the right transfer solution for your power application. Power topic #7012 Technical information from Cummins Power Generation Inc. Guidelines for ATS selection: How to choose the right transfer solution for your power application. > White Paper By Gary Olson,

More information

Qualitative Analysis of Power Distribution Configurations for Data Centers

Qualitative Analysis of Power Distribution Configurations for Data Centers Qualitative Analysis of Power Distribution Configurations for Data Centers White Paper #4 2007 The Green Grid. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted,

More information

Isolated-Parallel UPS Configuration

Isolated-Parallel UPS Configuration Isolated-Parallel UPS Configuration 1 Inhalt 1 Introduction... 4 2 IP systems configuration... 6 3 Projects... 17 4 Conclusions... 17 2 Abstract The isolated-parallel UPS configuration has become well

More information

The Quest for Energy Efficiency. A White Paper from the experts in Business-Critical Continuity

The Quest for Energy Efficiency. A White Paper from the experts in Business-Critical Continuity The Quest for Energy Efficiency A White Paper from the experts in Business-Critical Continuity Abstract One of the most widely discussed issues throughout the world today is the rapidly increasing price

More information

BRASH Air-Steam Hybrid Technology for Combined Heat and Power (CHP)

BRASH Air-Steam Hybrid Technology for Combined Heat and Power (CHP) H C E R BRASH Air-Steam Hybrid Technology for Combined Heat and Power (CHP) A Solution for Home Heating and Electrical Generation BACKGROUND: Only one third of the energy consumed for electrical power

More information

Present and Future Cost of New Utility- Scale Electricity Generation

Present and Future Cost of New Utility- Scale Electricity Generation Present and Future Cost of New Utility- Scale Electricity Generation Version 1.0 July 10 Matt Croucher and Tim James L. William Seidman Research Institute W. P. Carey School of Business Arizona State University

More information

Definition of effective metrics for evaluating the efficiency of hybrid power systems at telecom cell sites

Definition of effective metrics for evaluating the efficiency of hybrid power systems at telecom cell sites Power topic #NAPT-5516-EN Technical information from Cummins Power Generation Definition of effective metrics for evaluating the efficiency of hybrid power systems at telecom cell sites A system-level

More information

CEMEP UPS. The high environmental performance solution for power supply to high-availability data centers

CEMEP UPS. The high environmental performance solution for power supply to high-availability data centers CEMEP UPS The high environmental performance solution for power supply to high-availability data centers Exchanges of information and communication needs are growing at an exponential rate. That growth

More information

Fuel cell microchp: Greener and cheaper energy for all

Fuel cell microchp: Greener and cheaper energy for all Fuel cell microchp: Greener and cheaper energy for all Paddy Thompson General Manager Business Development Ceramic Fuel Cells Ltd. May 2013 1 What does our generation mix look like today? 2 Will the lights

More information

Mixing Sodium and Lead Battery Technologies in Telecom Applications

Mixing Sodium and Lead Battery Technologies in Telecom Applications Mixing Sodium and Lead Battery Technologies in Telecom Applications Paul Smith Shanon Kolasienski Technical Marketing Manager Application Engineer GE Critical Power GE Energy Storage Plano, TX 75074 Schenectady,

More information

UPS Applications and VRLA Battery Sizing

UPS Applications and VRLA Battery Sizing TECHNICAL BULLETIN 41-7334 UPS Applications and VRLA Battery Sizing 41-7334/0213/CD www.cdtechno.com The uninterruptable power system (UPS) is used to protect critical equipment and processes from the

More information

Is an energy-wasting data center draining your bottom line?

Is an energy-wasting data center draining your bottom line? Abstract Is an energy-wasting data center draining your bottom line? New technology options and power distribution strategies can dramatically reduce the cost and carbon footprint of your data center.

More information

Meeting the FCC Backup Power Mandate From Site Audit to Total Site Solutions. DC Power, Outside Plant & Services for Business-Critical Continuity

Meeting the FCC Backup Power Mandate From Site Audit to Total Site Solutions. DC Power, Outside Plant & Services for Business-Critical Continuity Meeting the FCC Backup Power Mandate From Site Audit to Total Site Solutions DC Power, Outside Plant & Services for Business-Critical Continuity Integrated Backup Power Solutions to increase your network

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

Overview of Green Energy Strategies and Techniques for Modern Data Centers

Overview of Green Energy Strategies and Techniques for Modern Data Centers Overview of Green Energy Strategies and Techniques for Modern Data Centers Introduction Data centers ensure the operation of critical business IT equipment including servers, networking and storage devices.

More information

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011 Introduction As more companies and government organizations prepare greenhouse gas (GHG) inventories that reflect the emissions directly and indirectly associated with their operations, they increasingly

More information

Kinetic energy recovery on railway systems with feedback to the grid

Kinetic energy recovery on railway systems with feedback to the grid Kinetic energy recovery on railway systems with feedback to the grid Authors: J.M. ORTEGA, METRO DE BILBAO;S:A: H. IBAIONDO, A. ROMO. INGETEAM TRACTION,S.A. 1. Introduction The increasing concern with

More information

CIRCULAR 3,647, MARCH 4 2013

CIRCULAR 3,647, MARCH 4 2013 CIRCULAR 3,647, MARCH 4 2013 Establishes the minimum requirements for use of the advanced approach based on internal models for the calculation of the operational risk component (RWA OAMA ) of the Risk-Weighted

More information

2014 Residential Electricity Price Trends

2014 Residential Electricity Price Trends FINAL REPORT 2014 Residential Electricity Price Trends To COAG Energy Council 5 December 2014 Reference: EPR0040 2014 Residential Price Trends Inquiries Australian Energy Market Commission PO Box A2449

More information

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: Carsten.Agert@next-energy.de

More information

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus. DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure

More information

Xantrex Solar Monitor Widget. User Guide

Xantrex Solar Monitor Widget. User Guide Xantrex Solar Monitor Widget User Guide Xantrex Solar Monitor Widget User Guide About Xantrex Xantrex Technology Inc. is a world-leading supplier of advanced power electronics and controls with products

More information

Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup

Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup Press Release Contact: Gary Mason Tognum America Inc. Phone: +1 248 560 8480 E-mail: gary.mason@tognum.com Agency contact: Robert E. Sheldon, APR Creative Communications Consultants, Inc. Phone: +1 210

More information

Solar, storage and mining: New opportunities for solar power development. By Thomas Hillig (THEnergy) and James Watson (SolarPower Europe)

Solar, storage and mining: New opportunities for solar power development. By Thomas Hillig (THEnergy) and James Watson (SolarPower Europe) Solar, storage and mining: New opportunities for solar power development By Thomas Hillig (THEnergy) and James Watson (SolarPower Europe) SolarPower Europe / Solar, storage and mining: New opportunities

More information

Low Carbon Data Centres without compromise

Low Carbon Data Centres without compromise Low Carbon Data Centres without compromise Thursday 16 th September 2010 Pip Squire, Engineering & Project Director delivered by: Ark Continuity - Continuously Delivering high integrity data centres Introduction

More information

Nearly-zero, Net zero and Plus Energy Buildings How definitions & regulations affect the solutions

Nearly-zero, Net zero and Plus Energy Buildings How definitions & regulations affect the solutions Nearly-zero, Net zero and Plus Energy Buildings How definitions & regulations affect the solutions The topic of Zero Energy Buildings (ZEBs) has received increasing attention in recent years, up to inclusion

More information

OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS

OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS Data center power systems are constructed with a premium on reliability at a significant cost. The return on this investment is realized if it

More information

Selecting a UPS Topology for your Data Center. by Dr. Daniel Becker, Ph.D., Methode Active Energy Solutions

Selecting a UPS Topology for your Data Center. by Dr. Daniel Becker, Ph.D., Methode Active Energy Solutions Selecting a UPS Topology for your Data Center by Dr. Daniel Becker, Ph.D., Methode Active Energy Solutions Uninterruptible Power Supplies (UPS) are both reaching into new markets and expanding in new ways

More information

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission

More information

INTERFACES FOR RENEWABLE ENERGY SOURCES WITH ELECTRIC POWER SYSTEMS

INTERFACES FOR RENEWABLE ENERGY SOURCES WITH ELECTRIC POWER SYSTEMS INTERFACES FOR RENEWABLE ENERGY SOURCES WITH ELECTRIC POWER SYSTEMS Paulo Ferreira, Manuel Trindade, Júlio S. Martins and João L. Afonso University of Minho, Braga, Portugal paulo.alves.ferreira@sapo.pt,

More information

415V DISTRIBUTION FOR GREEN DATA CENTERS

415V DISTRIBUTION FOR GREEN DATA CENTERS White Paper: HMRP-WP001-A5 June 5, 2012 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2012 Mirus International

More information

Understanding California s Electricity Prices Updated April 2011

Understanding California s Electricity Prices Updated April 2011 White Paper Understanding California s Electricity Prices Updated April 2011 Executive Summary Most industry experts conclude that average electricity prices throughout the U.S. will increase significantly

More information

Data Center Combined Heat and Power (CHP): Benefits and Implementation

Data Center Combined Heat and Power (CHP): Benefits and Implementation Data Center Combined Heat and Power (CHP): Benefits and Implementation by Sam Brewer Justin Grau Page 1 of 14 I. Common Causes of Failure Major trends in the United States have reached an intersection

More information

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation September 2010 Prepared for: By Sierra Energy Group The Research & Analysis Division of Energy Central Table of Contents Executive

More information

Contents. Foreword. Acknowledgments

Contents. Foreword. Acknowledgments Foreword Preface Acknowledgments xv xvii xviii CHAPTER 1 Introduction 1 1.1 What Is Mission Critical? 1 1.2 Purpose of the Book 2 1.3 Network Continuity Versus Disaster Recovery 2 1.4 The Case for Mission-Critical

More information

OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE

OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE Please provide all relevant documents responsive to the information requests listed within each area below. In addition to the specific documents requested,

More information

NO-BREAK KS 7e. Concentrated Energy. 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM

NO-BREAK KS 7e. Concentrated Energy. 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM NO-BREAK KS 7e Concentrated Energy e 2750 kva (50Hz) 3000 kva (60Hz) DIESEL ROTARY UNINTERRUPTIBLE POWER SUPPLY SYSTEM Data Centre owners, operators and designers are required to meet ever increasing and

More information

Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering

Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering Brochure More information from http://www.researchandmarkets.com/reports/2171489/ Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering Description: A forward

More information

Inverter / Charger Installation General Operations and AC and DC Connections

Inverter / Charger Installation General Operations and AC and DC Connections Inverter / Charger Installation General Operations and AC and DC Connections The Inverter is just one piece. Sometimes, a tendency is to mount the inverter and batteries, and make it work It is better

More information

Columbia University Master Planning & Optimization

Columbia University Master Planning & Optimization Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District

More information

How To Understand The Infrastructure Of A Data Center

How To Understand The Infrastructure Of A Data Center 6 Data center defined The infrastructure behind a digital world MIETEK GLINKOWSKI Today s mobile society means that people are consuming and creating data at unprecedented levels the Internet, search engines,

More information

415V DISTRIBUTION FOR GREEN DATA CENTERS

415V DISTRIBUTION FOR GREEN DATA CENTERS White Paper: HMRP-WP001-A1 October 1, 2010 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2005 Mirus International

More information

A Discussion of PEM Fuel Cell Systems and Distributed Generation

A Discussion of PEM Fuel Cell Systems and Distributed Generation A Discussion of PEM Fuel Cell Systems and Distributed Generation Jeffrey D. Glandt, M. Eng. Principal Engineer, Solutions Engineering May 2011 The information contained in this document is derived from

More information

Growing your greenhouse business faster with gas engines.

Growing your greenhouse business faster with gas engines. Growing your greenhouse business faster with gas engines. Our combined heat and power engines can increase the efficiency and profitability of your greenhouses. Because it s not just your plants that need

More information

Sodium Sulfur Battery. ENERGY STORAGE SYSTEM for Reducing CO2 Emissions

Sodium Sulfur Battery. ENERGY STORAGE SYSTEM for Reducing CO2 Emissions Sodium Sulfur Battery ENERGY STORAGE SYSTEM for Reducing CO2 Emissions Sodium Sulfur Battery For the Future of Our Planet NGK s NAS system is now generating momentum for saving energy and renewable energy

More information

Get Renewable! Tampa, FL 33620. University of South Florida Board of Directors 4202 E. Fowler Ave. Tampa, FL 33620. Directors,

Get Renewable! Tampa, FL 33620. University of South Florida Board of Directors 4202 E. Fowler Ave. Tampa, FL 33620. Directors, 1 Get Renewable! Tampa, FL 33620 University of South Florida Board of Directors 4202 E. Fowler Ave. Tampa, FL 33620 Directors, I write to you on behalf of Get Renewable!, a green energy consulting firm

More information

Value Paper Author: Edgar C. Ramirez. Diverse redundancy used in SIS technology to achieve higher safety integrity

Value Paper Author: Edgar C. Ramirez. Diverse redundancy used in SIS technology to achieve higher safety integrity Value Paper Author: Edgar C. Ramirez Diverse redundancy used in SIS technology to achieve higher safety integrity Diverse redundancy used in SIS technology to achieve higher safety integrity Abstract SIS

More information

RENEWABLE ENERGY INFEED R Herman, M Malengret and CT Gaunt University of Cape Town, South Africa

RENEWABLE ENERGY INFEED R Herman, M Malengret and CT Gaunt University of Cape Town, South Africa RENEWABLE ENERGY INFEED R Herman, M Malengret and CT Gaunt University of Cape Town, South Africa Technology and tariffs for renewable energy in-feed at LV and MV Ron Herman : Performance of LV feeders

More information

Reliability Modeling of Direct Current Power Feeding Systems for Green Data Center

Reliability Modeling of Direct Current Power Feeding Systems for Green Data Center J Electr Eng Technol Vol. 8, No.??:?-?? http://dx.doi.org/10.5370/jeet.2013.? ISSN(Print) 1975-0102 ISSN(Online) 2093-7423 Reliability Modeling of Direct Current Power Feeding Systems for Green Data Center

More information

MICROGRIDS FOR DATA CENTERS

MICROGRIDS FOR DATA CENTERS MICROGRIDS FOR DATA CENTERS Table of Contents Summary of Pareto Energy s Microgrid Business Model Understanding the Risks of On-Site Power for Critical Infrastructure The Pareto Energy GridLink Solution

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

Business Continuity Plan Summary (Revised November 26, 2012)

Business Continuity Plan Summary (Revised November 26, 2012) Business Continuity Plan Summary (Revised November 26, 2012) This document summarizes the business continuity plan (BCP ) of CIS Capital Markets LLC, dba Clarkson Capital Markets (the Firm ). The purpose

More information

IMPACTS OF EPA S CARBON PROPOSAL ON COLORADO

IMPACTS OF EPA S CARBON PROPOSAL ON COLORADO IMPACTS OF EPA S CARBON PROPOSAL ON COLORADO BACKGROUND In 2013, coal provided 64% of Colorado s electricity, with natural gas providing 20%, renewables 14%, and other sources providing the remaining 2%.

More information

Impact of Remote Control Failure on Power System Restoration Time

Impact of Remote Control Failure on Power System Restoration Time Impact of Remote Control Failure on Power System Restoration Time Fredrik Edström School of Electrical Engineering Royal Institute of Technology Stockholm, Sweden Email: fredrik.edstrom@ee.kth.se Lennart

More information

Advanced Electricity Storage Technologies Program. Smart Energy Storage (Trading as Ecoult) Final Public Report

Advanced Electricity Storage Technologies Program. Smart Energy Storage (Trading as Ecoult) Final Public Report Advanced Electricity Storage Technologies Program Smart Energy Storage (Trading as Ecoult) Final Public Report Introduction Ecoult, working with CSIRO as its principal subcontractor, was provided $1,825,440

More information

Understand Hybrid Generator Battery Systems

Understand Hybrid Generator Battery Systems Understand Hybrid Generator Battery Systems For off-grid applications powered by diesel generators, move to cyclic operation to save costs Telecommunications operators in Africa, India and other developing

More information

2013 Residential Electricity Price Trends

2013 Residential Electricity Price Trends FINAL REPORT 2013 Residential Electricity Price Trends 13 December 2013 Reference: EPR0036 Final Report Inquiries Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E: aemc@aemc.gov.au

More information

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2012 Monitoring Report

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2012 Monitoring Report CO 2 from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2012 Monitoring Report August 11, 2014 1 This report was prepared on behalf of the states participating in the second

More information

Environmental Defense Fund NAFA Fleet Management Association

Environmental Defense Fund NAFA Fleet Management Association August 2009 Introduction About Our Organizations Highway Emissions Carbon Dioxide Methane and Nitrous Oxide Refrigerants (HFCs) Non-highway Emissions Sample Calculations Private light-duty fleet Private

More information

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Issued: August 2009 SIZED UP TO 100 KVA TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Applicability... 1 1.2 Definitions...

More information

Designing Fault-Tolerant Power Infrastructure

Designing Fault-Tolerant Power Infrastructure Designing Fault-Tolerant Power Infrastructure System Analysis and New Standards Enable Maximization of Operating Dependability for Data Centers & Other Mission Critical Facilities J.F. Christin (Author)

More information

Analysis of Load Frequency Control Performance Assessment Criteria

Analysis of Load Frequency Control Performance Assessment Criteria 520 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 16, NO. 3, AUGUST 2001 Analysis of Load Frequency Control Performance Assessment Criteria George Gross, Fellow, IEEE and Jeong Woo Lee Abstract This paper presents

More information

Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM

Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM Power Management Strategies for High-Density IT Facilities and Systems A White Paper from the Experts in Business-Critical Continuity TM Executive Summary Increases in data center density and diversity

More information

Venema Advies Nigeria Limited West Africa Data Center Limited. Datacenter Sustainability

Venema Advies Nigeria Limited West Africa Data Center Limited. Datacenter Sustainability Venema Advies Nigeria Limited West Africa Data Center Limited Datacenter Sustainability Lord of War What if I have AIDS? Don't you worry? You worry too much! Why do you worry about something that can kill

More information

Draft consolidated baseline and monitoring methodology ACM00XX

Draft consolidated baseline and monitoring methodology ACM00XX Draft consolidated baseline and monitoring methodology ACM00XX Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

FREE iphone APP Get our FREE OPEX SAVER CALCULATOR iphone App scan code to go direct to App Store.

FREE iphone APP Get our FREE OPEX SAVER CALCULATOR iphone App scan code to go direct to App Store. Text and design: Creuna/Mikla. Photo: Shutterstock, Getty Images. Document no: MMP10.0002.BR3 WWW.ELTEK.COM FREE iphone APP Get our FREE OPEX SAVER CALCULATOR iphone App scan code to go direct to App Store.

More information

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2010 Monitoring Report

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2010 Monitoring Report CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2010 Monitoring Report August 6, 2012 1 This report was prepared on behalf of the states participating

More information

On June 28, 2011, the Municipal Services Committee recommended that the City Council adopt the recommendations stated in the subject agenda report.

On June 28, 2011, the Municipal Services Committee recommended that the City Council adopt the recommendations stated in the subject agenda report. Agenda Report July 11, 2 0 11 TO: Honorable Mayor and City Council THROUGH: Municipal Services Committee (June 28, 2011) FROM: SUBJECT: Water and Power Department AUTHORIZE THE CITY MANAGER TO ENTER INTO

More information

IT White Paper. N + 1 Become Too Many + 1?

IT White Paper. N + 1 Become Too Many + 1? IT White Paper Balancing Scalability and Reliability in the Critical Power system: When Does N + 1 Become Too Many + 1? Summary Uninterruptible Power Supply (UPS) protection can be delivered through a

More information

Financial Analysis of Solar Photovoltaic Power plant in India

Financial Analysis of Solar Photovoltaic Power plant in India Financial Analysis of Solar Photovoltaic Power plant in India M. Ganga Prasanna, S. Mahammed Sameer, G. Hemavathi Department of Management Studies MadanapalleInstitute of Technology& Science Post Box No:

More information

A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW

A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW WE BRING GREEN SOLUTIONS TO YOU A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW Provided by A COOLER PLANET A Cooler Planet 1 The Complete Solar Guide WHY GO SOLAR? TOP FIVE FACTORS TO CONSIDER FOR ADDING

More information

A Design of DC/DC Converter of Photovoltaic Generation System for Streetcars

A Design of DC/DC Converter of Photovoltaic Generation System for Streetcars Journal of International Council on Electrical Engineering Vol. 3, No. 2, pp.164~168, 2013 http://dx.doi.org/10.5370/jicee.2013.3.2.164 A Design of DC/DC Converter of Photovoltaic Generation System for

More information

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems System Grounding and Ground-Fault Protection Methods for -Supplied Power Systems Bill Brown, P.E., Square D Critical Power Competency Center 1. INTRODUCTION The use of solid grounding for -supplied power

More information

FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE. SLIDE 1: Financial and Risk Analysis with RETScreen Software

FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE. SLIDE 1: Financial and Risk Analysis with RETScreen Software Training Module SPEAKER S NOTES FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE CLEAN ENERGY PROJECT ANALYSIS COURSE This document provides a transcription of the oral presentation (Voice & Slides)

More information

COMPARISON OF ELECTRICITY GENERATION COSTS

COMPARISON OF ELECTRICITY GENERATION COSTS Tarjanne Risto, Kivistö Aija COMPARISON OF ELECTRICITY GENERATION COSTS LAPPEENRANNAN TEKNILLINEN YLIOPISTO LAPPEENRANTA UNIVERSITY OF TECHNOLOGY TEKNILLINEN TIEDEKUNTA ENERGIA- JA YMPÄRISTÖTEKNIIKAN OSASTO

More information

Rapid Prototyping Reveals

Rapid Prototyping Reveals Rapid Prototyping Reveals The Key to Unlocking Electricity Investment, t Innovation, and Improvements September 15, 2010 Galvin Initiative Background Started by former Motorola Chairman Robert Galvin in

More information

Constant Voltage Charger Selection for VRLA Batteries

Constant Voltage Charger Selection for VRLA Batteries TECHNICAL BULLETIN 41-2129 Constant Voltage Charger Selection for VRLA Batteries Please Note: The information in this technical bulletin was developed for C&D Dynasty 12 Volt VRLA products. While much

More information

Recover Heat from Boiler Blowdown Water

Recover Heat from Boiler Blowdown Water Prepared for California Energy Commission (CEC) Prepared By: Southern California Gas Company (A Sempra Energy Utility) E3M Inc. May 2012 i Disclaimer The CEC and its contractor, Southern California Gas

More information

TAMPA ELECTRIC COMPANY UNDOCKETED: SOLAR ENERGY IN FLORIDA STAFF S REQUEST FOR COMMENTS INTRODUCTION PAGE 1 OF 1 FILED: JUNE 23, 2015.

TAMPA ELECTRIC COMPANY UNDOCKETED: SOLAR ENERGY IN FLORIDA STAFF S REQUEST FOR COMMENTS INTRODUCTION PAGE 1 OF 1 FILED: JUNE 23, 2015. INTRODUCTION PAGE 1 OF 1 Introduction Solar power is an important part of Florida s energy future and can provide a number of benefits to Florida and its citizens by generating power without emissions

More information

Telefónica South America Feasibility Studies

Telefónica South America Feasibility Studies 1 Telefónica South America Feasibility Studies The GSMA conducted a six country study for Telefónica in South America. The countries covered by this study were Argentina, Chile, Colombia, Mexico, Nicaragua,

More information

Value of storage in providing balancing services for electricity generation systems with high wind penetration

Value of storage in providing balancing services for electricity generation systems with high wind penetration Journal of Power Sources 162 (2006) 949 953 Short communication Value of storage in providing balancing services for electricity generation systems with high wind penetration Mary Black, Goran Strbac 1

More information

Solution Analysis White Paper CHOOSING THE RIGHT UPS FOR SMALL AND MIDSIZE DATA CENTERS: A COST AND RELIABILITY COMPARISON

Solution Analysis White Paper CHOOSING THE RIGHT UPS FOR SMALL AND MIDSIZE DATA CENTERS: A COST AND RELIABILITY COMPARISON Solution Analysis White Paper CHOOSING THE RIGHT UPS FOR SMALL AND MIDSIZE DATA CENTERS: A COST AND RELIABILITY COMPARISON Introduction A dependable uninterruptible power supply (UPS) system is essential

More information