1 Secondary Containment for Distribution Oil Filled Equipment
2 Oncor recognized a need for a Standard for Secondary Containment due to: Clean Water Act Federal Regulation 40 CFR Oncor Standards states: When contamination of navigable water is possible from large oil filled equipment (greater than 1320 gallons per location) a containment system shall be installed. Contact Distribution Standards for details. Customer Requests Engineering environment Going Green Site evaluations are recommending Green innovations such as: Environmentally friendly paints, flooring, lighting, etc. Drought tolerant landscaping reducing water usage Turbidity Retention Reduce Liabilities
3 The objective: Design a Distribution Secondary Containment that would : Fit existing standard pad designs taking in account the largest transformer that would be placed on the pad and contain the total capacity of oil the equipment would hold.
4 The animation above illustrates the way in which our patented underflow systems achieve the most efficient capture of hydrocarbons and many other floating contaminants found flowing within storm sewers throughout the country and in our own neighborhoods. Traditionally, there have been three methods of separating oil from water: costly chemicals, applied heat, and residence or retention time (allowing enough area of space for the oil to naturally separate from the water over time). SCM-FLOW uses the retention time process by simply stacking the oil and water emulsion, facilitating natural separation. With SCM-FLOW, the oil becomes trapped behind the product, allowing the fresh water to pass through and move downstream. Our product is specifically designed for floatable contaminants, physically trapping 100% of the oil or floatable contaminants that come in contact with it. Once the oil has been separated or stacked behind the SCM-FLOW, acceptable industry practices can be utilized to remove the oil from the water, such as absorbent pads, cellules loose absorbents, skimming, or oil mops. SCM-FLOW is not designed for and will not effect water soluble contaminants. This design is easily included in new construction plans or retrofitted into an existing situation. Once the design criteria has been determined, we then prefabricate the management system to be installed. This plays a great deal in how our cost cutting measures work for you. SCM-FLOW has also been recognized and accepted as an Innovative Technology with the TCEQ.
5 Over 950 units have been installed throughout the Oncor Distribution and Transmission System. Secondary Containment should be considered around: Large bodies of water, rivers, creeks, etc. High auto or pedestrian areas Highly Sensitive areas Schools Daycares Hospitals Cemeteries Notable Oncor success stories are: Round Rock Decordova Sub
6 Containment for Distribution and Small Substation Transformers. Metal Vault Units Installed next to an existing transformer pad or pad poured in place. Designed to contain capacity of oil of the equipment by using galvanized railing on the concrete pad to direct oil and water into containment.
7 Metal Vault Unit Bolt Up Installation of Metal Vault Unit Site location prior to installation. Excavation next to existing pad site.
8 Metal Vault Unit Setting grade with sacrete. Containment placed in excavated area and will be anchored to the existing pad.
9 Metal Vault Unit Anchoring and Impacting containment to the existing pad with a rubber gasket seal between the two.
10 Metal Vault Unit Grounding of Containment
11 Metal Vault Unit Installing the SCM-FLOW unit within the Containment. Containment with installed galvanized metal grating, protective sealant between containment and pad and backfilling excavated area.
12 Metal Vault Unit Installation of galvanized metal railing around transformer pad diverting to the SCM-FLOW Containment.
13 Metal Vault Unit Complete installation of SCM-FLOW Metal Vault Unit.
14 Metal Vault Unit Complete installation of SCM-FLOW Metal Vault Unit.
15 Metal Vault Unit Pour additional pad to Containment Excavation for pad extension with smooth dowels in existing pad. Excavation for containment with sacrete sub grade.
16 Metal Vault Unit Set containment with Coal Tar Epoxy coating in excavated area.
17 Metal Vault Unit Set form and tie steel for pad extension to the containment.
18 Metal Vault Unit Pouring additional concrete to existing pad, extending pad to the Containment.
19 Metal Vault Unit Finish concrete. Forms will be removed from around poured area when concrete is set.
20 Metal Vault Unit Complete installation.
21 Containment for Distribution and Small Substation transformers. Moat Units Utilized on existing or new installations of transformers. Installed surrounding the entire transformer and pad. Lowers cost of concrete pad installation.
22 Moat Unit Discharge SCM-FLOW Unit SCM-FLOW Unit
23 Moat Unit Initial installation of Containment along with rebar.
24 Moat Unit Front view of window with rebar and piers. Containment is ready for concrete pad to be poured within the galvanized metal containment.
25 Moat Unit Pouring the concrete pad within the containment. Tapping the hook anchors.
26 Moat Unit Floating and finishing the concrete pad. Finished troweling the concrete pad.
27 Moat Unit SCM-FLOW Containment complete. Pad window is ready for grout and the transformer to be set.
28 Moat Unit SCM-FLOW Containment complete. Ready for final grade.
29 as a Solution for Distribution Secondary Containment Needs Meets Federal Regulations for Secondary Containments in 40 CFR 112. Customer requests O & M savings incurred by containing oil spills, reducing clean up cost by thousands of dollars.
30 Tax Relief for Pollution Control Property through the TCEQ. Oncor has experienced 100% of the cost being deferred in tax benefits. TEXAS COMMISSION ON ENVIRONMENTAL QUALITY APPLICATION FOR USE DETERMINATION FOR POLLUTION CONTROL PROPERTY TCEQ Potential rate base recovery.
31 Texas Eco Services, Inc Saunders Fort Worth, Texas (817) Office (817) Fax Mark Stucks (214) Mobile Mark@txeco.com John Mark Wilson (214) Mobile John@txeco.com Randy Freelen (214) Mobile Randy@txeco.com
CHAPTER 15 MUNICIPAL SEPARATE STORM SEWER SYSTEM PROGRAM REQUIREMENTS
CHAPTER 15 MUNICIPAL SEPARATE STORM SEWER SYSTEM PROGRAM REQUIREMENTS 15.1 INTRODUCTION In accordance with Section 402 (p) of the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES)
More informationThe minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
More informationCellar Tech Containment Well Cellar Systems www.cellartech.com
Sealed Well Cellars are protected by US patent 7637692, 7987904, 8127837, and 8256505. Additional US patents pending. Basic Containment Well Cellar Sealed Well Cellars are protected by US patent 7637692,
More informationSTANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationChapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
More informationStormwater BMPs: Secondary Containment and Spill Control. September 2012
Stormwater BMPs: Secondary Containment and Spill Control September 2012 Secondary Containment Secondary Containment Helps to minimize the potential for pollution by: Keeping spills in a confined area Preventing
More informationDRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer
Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater
More informationPervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationCONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationBest Management Practices
for The City of Paso Robles is required to implement a Phase II Municipal Water Program in order to reduce or eliminate the pollutants that enter our waterways from both storm water and non-storm water
More informationATTACHMENT 12 CONTAINERS
ATTACHMENT 12 CONTAINERS Attachment 12 - Page 1 Table of Contents Table of Contents List of Tables List of Acronyms 12.1 Applicability 12.2 Description of 12.3 Reserved 12.4 Reserved 12.5 Description of
More informationVEHICLE SERVICE FACILITIES. Best Management Practices
VEHICLE SERVICE FACILITIES Best Management Practices Chapter 1 of the Best Management Practices Manual for the City s Storm Water Management Program Public Works Department 809 Center Street, Santa Cruz,
More informationMinnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5
Best Management Practices (BMP) for Concrete Washout The NPDES permit requires that concrete washout be managed on all construction projects. This document is Mn/DOT s interpretation of MPCA s guidance
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More informationBUSINESS INSPECTION PROGRAM
RESOURCES FOR ENVIRONMENTAL HELP BUSINESS INSPECTION PROGRAM How can I help keep our waters clean and healthy? Educate your staff about common surface water pollution sources (spills, leaky containers
More informationUtilities Privatization Success Story. Mid-west drought management Enhance water conservation Enhance environmental sustainability
Utilities Privatization Success Story Reclaimed Water Reuse Fort Sill, OK Objective Mid-west drought management Enhance water conservation Enhance environmental sustainability December 2015 Background
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationSECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
More informationWelcome: What is U Drain? Drain Materials. Flow
Welcome: Thank you for looking into the U Drain floor drain system. This paper will explore the functional features of the U Drain and why it is superior to other grated systems in the marketplace. We
More informationSecondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com
Secondary Containment: Regulations & BMPs Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Federal Secondary Containment Safeguarding method in addition to the primary
More informationFats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities
Fats, Oil and Grease Best Management Practices Manual Information, Pollution Prevention, and Compliance Information For Food Service Facilities Pinellas County Utilities Water Quality Management Division
More informationSUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y
Foundation A foundation is the bottom part of a building. It s the element that anchors the building to the ground and transmits the building s gravity load directly to the earth. Water damage weakens
More informationWhat Causes Foundation Leaking?
A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall
More informationFOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN 37618 423-538-7144
FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN 37618 423-538-7144 This document may be printed and used for reference by
More informationPOLLUTION PREVENTION FACT SHEET: AUTOMOBILE MAINTENANCE
POLLUTION PREVENTION FACT SHEET: AUTOMOBILE MAINTENANCE Description This pollution prevention measure involves creating a program of targeted outreach and training for businesses involved in automobile
More informationPREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT
PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT PREVENTING GROUNDWATER POLLUTION IS EVERYONE S JOB! Even if our drinking water comes from rivers, lakes, or reservoirs, we need to be mindful of
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationAPPLICATION FOR DRY CLEANERS PROGRAM (THIS APPLICATION IS FOR A CLAIMS MADE POLICY)
APPLICATION FOR DRY CLEANERS PROGRAM (THIS APPLICATION IS FOR A CLAIMS MADE POLICY) INSTRUCTIONS 1. If space is not sufficient to fully answer the questions, please attach additional pages. 2. This form
More informationSpill Prevention, Control and Countermeasure (SPCC) Training
Spill Prevention, Control and Countermeasure (SPCC) Training Fort Jackson 2015 Origins of SPCC Regulatory History 1972 Clean Water Act Oil Pollution Act of 1990 Spill Prevention Control and Countermeasures
More informationPrevent Blockages in the Sanitary Sewer System
FATS, OILS & GREASE - BMPs The following Best Management Practices (BMPs) tables are listed below: Prevent blockages in the Sanitary Sewer System Properly Maintain Grease Traps and Interceptors to Prevent
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationInternational Greenhouse Company
Greenhouse Foundation Design As with any building, a good solid foundation is crucial for the long term durability and functionality of your greenhouse. A weak foundation will cause your greenhouse to
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationManaging Floor Drains and Flammable Traps
Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationSubstantially incomplete submissions will be declined
CONTRACTORS POLLUTION LIABILITY FOR FIRE/WATER RESTORATION CONTRACTORS APPLICATION REQUIREMENTS 1. Contractors Pollution Liability Application - complete all questions in full. 2. Special attention should
More informationInspection, Maintenance, and Repair of PaCT Canadian Pacific Rogers Pass Tunnels British Columbia, Canada
Inspection, Maintenance, and Repair of PaCT Canadian Pacific Rogers Pass Tunnels British Columbia, Canada by David N. Bilow, P.E., S.E., Director, Engineered Structures Portland Cement Association 5420
More informationLesson 5: Water Conductivity and Total Dissolved Solids Water Quality Sampling
Lesson 5: Water Conductivity and Total Dissolved Solids Water Quality Sampling Time Frame: Two 45-50 minute class periods Grade Level: 8 th 12 th Grade Overview: There are a wide variety of inorganic substances
More informationBEST MANAGEMENT PRACTICES FOR LEAK AND SPILL CONTROL
BEST MANAGEMENT PRACTICES FOR LEAK AND SPILL CONTROL Summary Keeping a facility clean helps improve productivity and employee morale. In addition, it presents a positive image to customers, stakeholders
More informationSECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
More informationGrease Trap Maintenance, Procedures and Cleaning Logs
SAWS Grease Reduction Program Grease Trap Maintenance, Procedures and Cleaning Logs Don t Feed the Grease Monster Best Management Practices for Commercial Food and Restaurant Facilities Train kitchen staff
More informationIntegrated Pest Management for Rat, Mice, and other Rodents at Thurston County s Waste and Recovery Center
Integrated Pest Management for Rat, Mice, and other Rodents at Thurston County s Waste and Recovery Center When you think of garbage you automatically think of rats and rodents because they are very opportunistic
More informationFabricated Drainage Products
Fabricated Drainage Products Complete Drainage System Inline Drains are used At the beginning of a drain line Add a new water inlet to an existing drain line using a riser pipe and tee HARCO Surface Drainage
More informationResidential Building Permits Information
City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,
More informationUltraTech International, Inc. Canadian Secondary Containment Requirements
UltraTech International, Inc. 11542 Davis Creek Court Jacksonville, Florida 32256 Canadian Secondary Containment Requirements The Canadian Council of Ministers of the Environment (CCME) is the major intergovernmental
More informationSusceptibility of Your Drinking Water Source to Contamination
Susceptibility of Your Drinking Water Source to Contamination The aquifer that supplies drinking water to ICASI Culinary School has a moderate susceptibility because of the following reasons: < Available
More informationGuide Specification Precast Concrete Products
Guide Specification Precast Concrete Products This specificaton should be used only by qualified professionals who are competent to evaluate the significance and limiations of the specification and who
More informationINSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
More informationFarm Fuel Tank Safety Guide
Farm Fuel Tank Safety Guide This brochure is provided by North Dakota Department of Emergency Services, your Local Emergency Planning Committee, and the State Emergency Response Commission along with assistance
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationSeattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
More informationStormwater Ponds. c ıty of a bı le ne st or m wat e r utı lıty dıv ısı on
CLEAN WATER FACT SHEET Stormwater Ponds c ıty of a bı le ne st or m wat e r utı lıty dıv ısı on Rapid growth in the City of Abil ene and consequent development, as well as construction of culverts, drains,
More informationExtraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the
More informationSeptember 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
More informationContact Person Sarah Morris-Benavides Revision 1.1 Document Plan 10200.037 Effective Date 07/01/2014 Review Date 03/15/2017.
Ames Laboratory Federal SPCC regulations (40 CFR Part 112) were created under the authority of the Clean Water Act. The stated purpose is " to prevent oil discharges from reaching navigable waters of the
More informationStorm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationImproper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
More informationALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE
Mapeguard WP System ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Products used: Mapeguard WP 200, Mapeguard ST, Mapeguard IC, Mapeguard EC, Mapeguard WP
More informationTRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit
SPILL PREVENTION, CONTROL, AND COUNTERMEASURE TRAINING SPCC/SWPP Training UGA STORM WATER Automotive Center POLLUTION Campus Transit PREVENTION PLAN PLAN Goals of SPCC/SWPP Training Introduce facility
More informationALL PRO HOME INSPECTION SERVICES Ken Davis
SERVICES Ken Davis RHI #258 BC/12 Registered Home Inspector and Certified Wood Burning Appliance Inspector www.allprohomeinspection.ca WET BASEMENTS Uncontrolled water has the ability to cause significant
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationATTACHMENT 1-9 CHWSF CONTAINER MANAGEMENT
1.0 INTRODUCTION ATTACHMENT 1-9 CHWSF CONTAINER MANAGEMENT 1.1 This Attachment provides information about the management of containers in U.S. Army Dugway Proving Ground s (DPG s) Container Storage Building
More informationSpill Control Prevention Plan (SCPP)
Spill Control Prevention Plan (SCPP) FACILITY INFORMATION PLEASE PRINT Facility Name: Mailing Address: Physical address if different: Owner Name: Owner Address: Primary Contact Name: Work Phone Number:
More informationDivision 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
More informationNatural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground
Natural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground December 2011 Table of Contents Definition of Terms... 2 Requirements for Secondary
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationA GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS
A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS What is a groundwater protection plan? A groundwater protection plan identifies the activities being conducted that can pollute groundwater and
More informationPreventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
More informationHistory of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
More informationSOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES
SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES Municipalities are responsible for any contaminant spill or release that occurs on property they own or operate. Particular areas of concern include any facilities
More informationCWC BF Non-Manufactured 2014
CWC BF Non-Manufactured 2014 INV# MATERIAL NAME PRICE DESCRIPTION 569016 Fiber Mesh 1lb 6.75 PRECAST 573100 2x2x6 Ecology Blocks 45.00 600 pounds per foot / check supply first 573150 2x2x3 Ecology Blocks
More informationKurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program
Kurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program LDEQ Water Regulations Spill Prevention and Control (SPC) Authorized
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationSuperform Products Ltd.
TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000
More informationDomestic heating Fuel storage tanks
Domestic heating Fuel storage tanks Oil leaks Prevention and action www.west-norfolk.gov.uk Environmental Health and Housing Borough Council of King s Lynn & West Norfolk, King s Court, Chapel Street,
More informationWWW.STOPTHECLOG.COM WHY A FATS, OILS AND GREASE PROGRAM. Employee Food Service Establishment Information Sheet INTRODUCTION
Employee Food Service Establishment Information Sheet WHY A FATS, OILS AND GREASE PROGRAM Fats, oils and grease (FOG) cause serious problems in the sewer system. FOG sticks to the walls of the pipes when
More informationBasement Moisture Problems
Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design
More informationEmbedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
More informationSection A SPCC Plan Implementation Checklist This section of the report addresses compliance with certain requirements of Federal Regulations 40 CFR 112. I. STATUS OF SPCC PLAN (40 CFR 112.3) YES NO A.
More informationCleaning Oil Spills. Table 1: Some examples of oil spills
Cleaning Oil Spills 1. Introduction Recently, I have become very aware of human misuse of our earth s environment. I think humans have not been very responsible and nice to our planet. We are polluting
More informationDura Life CONTAINMENT Systems
The Leading Provider of Secondary Containment for the Oil, Gas, Petrochemical & Agricultural Industries. SECONDARY SYSTEMS WEATHER RESISTANT, DURABLE The Leading Provider of Secondary Containment for the
More informationBILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"
BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP" Sl. 1 DISMANTLING WORK 1.1 Stripping off worn out plaster (outside and inside) and raking out joints
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationTYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an
More informationSPCC for Food Services
Welcome to the University s Annual Oil Spill Prevention, Control and Countermeasures (SPCC ) Compliance Awareness Training for Food Service Employees. Completing this training will fulfill your annual
More informationSECTION 03300 CAST-IN-PLACE CONCRETE
SECTION 03300 PART 1 GENERAL 1.01 DESCRIPTION This section describes materials and methods for formwork, reinforcement, mixing, placement, curing and repairs of concrete, and the use of cementations materials
More informationIs the General Industrial Permit for Stormwater Discharges Applicable to Your Facility and Property?
Is the General Industrial Permit for Stormwater Discharges Applicable to Your Facility and Property? Mark Grey, Ph.D., Technical Director, Construction Industry Coalition on Water Quality Marvin Sachse,
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationGood Housekeeping BMP
E.1. Good Housekeeping BMP Sweep or vacuum shops floor frequently. Use mopping as an alternative to hosing down work areas. Spot clean any spilled oil or fluids using absorbents or rags. Use dry cleanup
More informationWaterstops play a critical role in the integrity of concrete
J P SPECIALTIES, INC. www.facebook.com/waterstop Section 03150 MasterFormat 03 15 13 Metallic Waterstop for Extreme Chemical & Heat Resistance Waterstops play a critical role in the integrity of concrete
More informationPollution From Surface Cleaning. Flat work Sidewalks Plazas Building exteriors Parking areas Drive-throughs
Pollution From Surface Cleaning Flat work Sidewalks Plazas Building exteriors Parking areas Drive-throughs Pollution From Surface Cleaning It harms the environment... In most parts of the San Francisco
More informationUnderground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
More informationsymptoms of a faulty foundation
symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation
More informationHigh Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
More informationSpecial Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More information