Defining Waste Recovery: Permanent Deposit of Waste on Land.

Size: px
Start display at page:

Download "Defining Waste Recovery: Permanent Deposit of Waste on Land."

Transcription

1 Environmental Permitting Regulations (England and Wales) 2010 Regulatory Guidance Series, No EPR 13 Defining Waste Recovery: Permanent Deposit of Waste on Land. Version 1.0

2 Record of changes Version Date Change March 2010 Issued to clarify our emerging position on what constitutes a recovery operation for this type of waste activity and to support implementation of the new standard rules for use of waste in construction as a result of the waste exemption review. Published by: Environment Agency Rio House Waterside Drive, Aztec West Almondsbury, Bristol BS32 4UD Tel: enquiries@environment-agency.gov.uk Environment Agency All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 2

3 A Quick Guide This regulatory guidance sets out our approach to determining whether an activity involving the permanent deposit of waste on land is waste recovery or waste disposal. Our position is based upon a legal test derived from the Waste Framework Directive and European case law. We believe that this test is best carried out by answering a series of questions which are set out in this guidance. All the questions must be addressed when deciding whether an activity is waste recovery. Examples of typical activities that could be waste recovery help explain how our position is implemented in practice. This guidance must be referred to by applicants seeking a recovery permit for the permanent deposit of waste on land. We require a justification that an activity is a waste recovery operation ( A Waste Recovery Plan ) to be submitted with their permit application to ensure they apply for the right permit. If it is decided that an activity is not recovery then a disposal permit will be required. A checklist is provided in Appendix 3 that sets out the key information we would expect to see included in a Waste Recovery Plan. Operators seeking to register an exemption involving the permanent deposit of waste should also satisfy themselves with reference to this guidance that their proposal meets the definition of waste recovery.

4 Contents 1. Purpose 2. Introduction 3. Recovery and Disposal of Waste 3.1 Planning permission 3.2 The Waste Framework Directive 3.3 The use of Quality Protocol complaint material 4. Establishing whether an Activity is Recovery or Disposal Appendix 1: Applying the Recovery Test in Practice. 1) Bunds 2) Landscaping and Golf Courses 3) Stabilising and Making Safe Land 4) Tracks and hardstandings 5) Construction fill for drainage channels and soakaways 6) Engineering fill for Roads / Buildings 7) Restoration of Former Mineral Workings 8) Creation of a Lake / Wet Nature Reserve in a former Mineral Working 9) Land levelling/contouring and improving land quality Appendix 2: Waste types that may be suitable in typical waste recovery to land uses. 1) Table 1: Waste types and typical uses in recovery schemes Appendix 3: Checklist to aid production of a Waste Recovery Plan.

5 1) Purpose This guidance is to assist applicants and our staff to decide whether a proposal to permanently deposit waste on land is a recovery or disposal activity. 2) Introduction We strongly support genuine waste recovery and encourage recovery of waste rather than its disposal, but it is important to clearly distinguish between recovery and disposal operations to ensure they are properly permitted and subject to the right legal and environmental controls. This guidance describes the differences between waste recovery and disposal, and sets out a number of questions that need to be addressed to help in deciding into which category a particular activity falls. To help in understanding how to address these questions, a number of examples of what we consider to be typical activities that can be classed as waste recovery are provided in Appendix 1. These examples provide an indication of the information we would expect to see in support of a particular recovery scheme. We refer to the justification supporting an application for a recovery permit as a Waste Recovery Plan. Appendix 3 provides a checklist for applicants which sets out the key issues we would expect to see addressed in a waste recovery plan. 3) Recovery and disposal of waste. Whether an activity constitutes disposal or recovery depends on a legal test derived from the Waste Framework Directive and European case law. This guidance sets out our understanding of the test. What is Waste Recovery? Waste recovery is about using waste to replace other non-waste materials to achieve a beneficial outcome in an environmentally sound manner. The clearest indicator of waste recovery is when it can be shown that the waste used is a suitable replacement for non-waste materials that would otherwise have to be used to achieve the end benefit. The European court has said that the essential characteristic of a waste recovery operation is that its principal objective is that the waste serve a useful purpose in replacing other materials which would have had to be used for that purpose, thereby conserving natural resources. 1 1 Abfall Service AG (ASA) C-6/00 Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 1

6 In other words, a material that would otherwise be disposed of is put to a beneficial use, which saves the use of non-waste materials. Most disposal and recovery operations will require an Environmental Permit, but the standards and measures that apply to each type of permit are different. An environmental permit for a disposal operation would normally contain more rigorous conditions than a recovery permit and would therefore be more costly. What is waste disposal? Waste disposal operations are about getting rid of waste in a safe and environmentally sound manner. The purpose of a disposal operation is to get rid of waste. If this is the primary reason for a proposed operation, it cannot be a recovery operation, even if there is some secondary benefit. A waste activity must be classified as either recovery or disposal: it cannot be both. Guidance on disposal operations can also be found in DEFRA guidance on the Waste Framework Directive. The Landfill Directive (Directive 1999/31/EC on the landfill of waste) applies to disposal of waste to land. This requires specific controls to be applied through the permits. We must ensure that these requirements are applied where waste is being disposed of to land. 3.1 Planning permission We cannot grant a permit for a specified waste management activity unless appropriate planning permission is in force, or the planning authority have given their approval to the scheme by another means. If a site has planning permission, this is likely to demonstrate that there is a need for the proposed development, but it does not in itself indicate that an activity is recovery. In some cases the planning permission may indicate that the proposed development is a disposal operation. Where the planning permission requires waste to be used this would be a factor tending to indicate that the proposed operation is more likely to be a disposal operation because it is difficult to then argue that use of natural resources was ever a possibility or envisaged. This decision must be based the legal test, which is set out in section 4 of this guidance. 3.2 The Waste Framework Directive The Waste Framework Directive (WFD; Directive 2006/12/EC on waste) lists a number of operations that are either disposal (Annex IIA), or recovery (Annex IIB). Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 2

7 These Annexes are intended to identify disposal and recovery operations as they occur in practice. They are not precise descriptions of the operations, nor are they definitive lists of recovery or disposal activities. Other activities that do not appear on the lists can still be classed as recovery or disposal operations dependent upon the circumstances. It will be clear from the Annexes that similar sorts of operations can in some cases be disposal operations and in other cases recovery operations. Land treatment, for example may be a recovery operation where it results in benefit to agriculture or ecological improvement (R10) but a disposal operation (D2) where it results in biodegradation of liquid or sludgy discards in soils, etc. Simply looking to find a description of the proposed operation as one of the D and R codes, within those Annexes, will not always help decide the status of an activity. In all cases, the tests set out below must be applied. However, when a permit application is submitted, you must describe the proposed operation using one of the codes in the Annexes that best fits the operation you are proposing. 3.3 The use of Quality Protocol compliant material. If a waste derived material meets the requirements of a Quality Protocol, including the associated aggregate and/or engineering standards, then they are considered to be recovered and no longer waste, and can be used without the need for waste controls. It is up to the end-user of that material to check they have purchased a genuine product that complies with all the requirements of a Quality Protocol. If the material does not comply with the requirements, it will normally be waste and waste controls will apply. One of the key requirements of a quality protocol is that the end use of the quality protocol compliant material is a recovery operation. Like any non-waste material, if Quality Protocol compliant material is discarded it will be a waste. Therefore if such material is disposed of then this will be a waste disposal activity. For more information on the Quality Protocols project, including links to our regulatory position statements see below. 4) Establishing whether an activity is recovery or disposal. Whether an activity is recovery or disposal will often be, however there will be cases where it is not. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 3

8 In Appendix 1 are some examples of typical activities involving the permanent deposit of waste to land that we consider may qualify as recovery activity. These examples show the information needed and why it is necessary for making the decision. The following questions will help decide whether a proposed operation is a recovery operation, and should be read in conjunction with an example from Appendix 1 that best fits the proposed activity. Any justification for a recovery activity must include responses to all questions. 1) Is there a clear benefit from the activity? For an activity to be considered waste recovery there must be a clear benefit. Waste deposited with no resulting benefit is disposal. Waste can therefore only be recovered if it is put to a beneficial use. You must set out clearly what the benefit is, and show certainty of benefit when the proposal is completed. It is not therefore sufficient to show that the construction of a track for example, would give rise to benefit. We would need to see that there was a need for the track at that location and that it would be used when completed. We would require evidence to show that the quantity of waste proposed is proportionate to the benefit. If a proposal involves the deposit of a large quantity of waste material where the benefit derived from the scheme was small, it would tend to indicate the activity is disposal. It is possible that a scheme could use high quantities of materials and still be a genuine recovery. We would need to be satisfied that the level of benefit achieved warrants an operation on that scale. 2) Is the recovered waste material suitable for its intended use? In Appendix 2 we list examples of the types of waste that may be recovered on land. The table identifies which wastes are likely to be appropriate for a particular use. In sensitive environmental settings, a limited range of waste types will be appropriate. In the most sensitive settings, only strictly inert materials will be acceptable. Where wastes other than inert wastes are proposed in you must demonstrate that their deposit does not pose an unacceptable risk to the environment or human health. Refer to Chapter 3 of the guidance: Standards and Measures for the Deposit of Inert Waste on Land: for more information on assessing environmental risk. Where it is proposed to accept wastes from contaminated sites these sites should be clearly identified. If additional sites are identified once the work has Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 4

9 commenced you should notify the local area Agency Office prior to accepting wastes from these sites. The waste must be suitable for the intended purpose. You must provide information and evidence from an appropriately qualified person on the chemical and engineering properties of the waste material to show that it is suitable for the end use. The materials would not be suitable for recovery if, once deposited, they posed a risk to human health or the environment. If the material to be used is a direct replacement for a similar non-waste material, then the specification of the waste must be comparable with that of the non-waste material. However, it is still possible to present a case for recovery if the waste material is being used to replace materials which are not at all similar (for example, an earth noise bund being proposed as a replacement for a brick built screening wall). 3) Is the minimum amount of waste being used to achieve the intended benefit? You must show that the amount of waste proposed is no more than is needed for the scheme. You will need to include evidence that the structure is not bigger than it needs to be for the purpose it is to be used for. For example, a bund to screen from road noise will need to be a certain height and thickness to achieve the required noise attenuation. Its base will need to be wide enough to support the upper structure and the slope of the bund would be designed to prevent slippage. It may also be finished to be aesthetically pleasing for the setting that it is in or to prevent degradation and therefore be covered with soils suitable for growing plants on. You will need to provide plans and cross-sections showing original and planned final levels. They must be provided at a scale appropriate to the size of the project and must be sufficiently detailed so that they can clearly be understood and checked on site. The levels must be shown relative to Ordnance Datum. 4) Is the waste being used as a substitute for a non-waste material? Showing that the proposal would have a realistic likelihood of being undertaken using non-waste materials would be a strong indicator that the activity is a recovery operation. The clearer the case that waste is actually being used to replace non-waste materials, the stronger the argument for recovery. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 5

10 Demonstrating recovery is more difficult where a proportionate amount of waste would be put to a beneficial use where it is not possible to state that it will actually replace a non-waste material. This is likely to be relevant to proposals where the cost of importing the necessary non-waste materials would make the proposal unviable, and the works, although needed, would not take place for this reason. The same proposal might however become viable if a waste material could be used as a suitable alternative to the non-waste. Provided that the need for the proposal is clear, and that the use of waste achieves all that the non-waste would have done, and subject to the other tests, we might consider this to be recovery. The arguments for recovery are therefore reduced, (but not removed) where it can only be shown that the waste replaces non-waste materials that could have been used to do the work, rather than actually replacing non-waste that would have been used were the use of waste not possible. In deciding whether such a proposal is recovery we need to consider all of the other tests and in cases where it is not possible to show direct replacement, the test for benefit/need becomes particularly important. As the deposit of waste can generate income, we must be confident that there is a real need for the work to take place, and this is the reason the scheme is being progressed, not simply financial gain. 5) Will the proposal be completed to an appropriate standard? It is important that any justification for a recovery operation has been well thought through, and has been designed to give an effective and lasting benefit. The justification must show that scheme has been designed to achieve the stated benefit, and that it has, where appropriate, been built to last. Consideration must be given to how it will be constructed, finished off and where necessary, maintained. A particular consideration for large scale deposits is that they are designed and will be constructed in such a way that the operation does not cause soil erosion, pollution or increase flooding risk to the surrounding area. The Construction Code of Practice for the Sustainable Use of Soils on Construction Sites provides further advice on methods of managing schemes involving the importation or excavation of soils. Summary All of the questions set out above must be answered. Decisions about recovery require an overall view to be taken of these responses rather than focussing on a limited number of them. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 6

11 Appendix 1: Applying the Recovery Test in Practice. The following examples illustrate where we consider a particular activity could be a recovery operation. In all cases, the questions set out in this guidance must be applied to the proposed scheme. 1) Bunds In deciding whether use of waste in a bund is a recovery activity, the first step is to demonstrate that there is a need for, and a real benefit derived from its creation. Bunds can be created for a number of purposes (e.g. noise screening, containment, visual screening, flood defence). Evidence must be presented that shows the bund is needed. This would include setting out the benefits that would be derived when the work is completed, and justifying that there was a genuine need for the bund. If a planning permission requires a bund to achieve a given purpose e.g. to shield houses from motorway noise this would be an indicator that the scheme will have a beneficial use. If the need for the bund is such that it could be shown that the work would have been carried out to an appropriate standard using non-waste materials anyway, that is a very strong indicator of recovery. It is recognised however that for many large bunds this may be a difficult case to argue, and it does not always have to be relied upon to show waste recovery. If a very large bund is proposed, but the benefits derived from installing it are marginal, this would point more towards a disposal operation. The bund must be no larger than it needs to be, and a justification for the proposed dimensions of the bund must be provided. For a bund to attenuate noise for example, a case setting out why it was necessary to achieve a given noise level would be needed, and this would have to be supported by noise modelling which showed the bund had been designed to be no bigger than it needed to be to achieve that purpose. Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Drawings must be prepared to a suitable standard, and at a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. Any waste used in construction of the bund must be suitable for use. The justification must set out the types of waste that will be used in the scheme, and show that these will be fit for purpose. This must include risk assessment to show that proposed wastes to be deposited will not present any environmental risk or risk to health once the works have been completed, and evidence that they have suitable engineering properties. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 7

12 We would expect the waste to meet the minimum standards of an engineering fill material. The standards necessary will vary depending upon the nature of the bund. The specification for materials used in a noise bund for example might have less stringent engineering requirements than bund for flood defence purposes. The permit will limit use to those appropriate waste types included in the recovery justification unless any changes are agreed with us first. We would expect to see evidence that the scheme had been properly designed, and that the completed bund would be effective, stable and permanent. This would include details of the engineering design, (stability, drainage etc) and techniques to be employed when constructing the bund. We will need to consider the way in which the scheme has been completed. Bunds can result in large areas of exposed soil which can be unstable, and prone to erosion. It is essential that proposals include measures to mitigate this, for example a planting scheme. We would be unlikely to accept surrender of a permit if the proposed scheme does not show that it will be finished to an appropriate standard. 2) Landscaping and recreational facilities such as golf courses. Any justification that creating or modifying a golf course or carrying out landscaping works is a recovery activity must demonstrate that a genuine benefit will be derived. However, it must not be assumed that a proposal to create a golf course for example will give rise to benefit simply because a golf course is a recreational facility that might be used for that purpose. A golf course proposal should be presented as part of wider scheme that includes supporting infrastructure (for example a clubhouse parking facilities and vehicular access arrangements). An appropriate planning permission might indicate benefit and show that the golf course was part of a realistic overall proposal. We would need strong evidence to show that no more waste material would be used than was genuinely needed to achieve the intended purpose. The design proposal would need to consider this question for individual features of the proposal. In particular, information to support the creation of high mounds and other areas of landraising must be provided to show that the quantities of waste used are reasonable and that these features are actually needed. It will also be expected that the design will show that consideration has been given to using materials already on site for landscaping. We will need to be satisfied that all opportunities to do this have been identified to minimise the amount of waste material imported unnecessarily. It strongly indicates recovery if it can be demonstrated that the scheme or parts of the scheme would have been carried out anyway to an appropriate standard through the importation of non-waste materials. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 8

13 Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Drawings must be prepared to a suitable standard, and at a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. The proposed waste types must be specified, all of which must be suitable for the intended use. Wastes proposed must meet the minimum standards of an engineering fill material. Where necessary, risk assessments must be provided to show that the waste types can be used without presenting a risk of harm to human health or to the environment. The permit will restrict the waste types to those specified unless any changes are agreed with us first. We would also need to be satisfied that the works will be carried out effectively, and will give lasting benefit. The design of features should therefore give consideration to stability, the way in which they will be constructed, and any necessary remediation (for example planting proposals). We would be unlikely to accept an application to surrender a permit until we were satisfied that appropriate remedial works are planned. Landscaping works will until finalised, result in large areas of exposed soil which could be unstable, and vulnerable to erosion. It is important that the scheme does not cause soil erosion, pollution or increase flooding risk to the surrounding area. 3) Making land safe The types of works that may be considered to be a recovery activity include using waste to stabilise or make safe quarry walls, or mine shafts. Demonstrating the need for the work to be carried out is essential. If you are seeking to make safe a dangerous feature, a report from a health and safety professional or regulator highlighting the need to make it safe is a good indicator of the need. A chartered engineer s report may also present suitable evidence that the work might be beneficial in that land will be stabilised. It would need also to show that there was a real need for this work to take place. We would need to be satisfied that the design of the scheme resulted in the minimum amount of material being used to achieve the intended purpose. If for example, a chartered engineer s report is submitted to justify the proposal, it should address the question of need and minimum quantity of material required. Their design brief should include a requirement to achieve the intended purpose using only the minimum amount of material. Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Drawings must be prepared to a suitable standard, and at a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 9

14 If it can be demonstrated that the scheme would have been progressed using nonwaste materials (for example, because of a specific requirement of the Health and Safety Executive), this would point strongly towards a recovery activity. The types of waste to be used must be specified, and all waste types proposed must be fit for their intended use. Where appropriate, risk assessments should be provided to show that the proposed waste types can be used without causing harm to human health or the environment. The permit will restrict the waste types to those specified unless any changes are agreed with us first. The engineering properties of the waste will be particularly important for stabilisation work which will be a structure with a specific engineering purpose. Materials will therefore need to meet appropriate engineering standards. We would need to be assured that the work was going to be undertaken to an appropriate standard to give an effective and lasting benefit, and the scheme design should reflect this by considering for example stability, drainage and construction techniques. Plans must also include means of adequately finishing off the works. We would wish to see that any areas of exposed soil would be protected from erosion. It is important that the works do not cause soil erosion, pollution or increase flooding risk to the surrounding area. 4) Tracks and hardstandings There must be a need to create the track / hardstanding, and this must be demonstrated in the justification. We would expect evidence that if a track /hardstanding were constructed, it would be used for the stated purpose and that the proposed level of use will be sufficient to warrant its construction. For example, in the case of creating a new forest track for timber felling / woodland management we would wish to see detail of your proposed woodland operations with a clear statement of why the tracks were needed at the proposed locations as part of the overall scheme. We would need to be satisfied that the design of the scheme resulted in the minimum amount of material being used to achieve the intended purpose. For example, an engineer s report may be submitted to justify the proposal, which should address the question of need and minimum quantity. Their design brief should include a requirement to achieve the intended purpose using only the minimum amount of material. Where creation of an embankment to support the track / hardstanding is proposed, the need for its inclusion must be justified. There is a need to show that there is a real need to achieve the stated track gradient or proposed level of the hardstanding, and that using less waste to more closely follow the natural contours of the land would not be a viable option. Any possibilities for reusing materials on Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 10

15 site as a means of reducing the amount of material imported ie cut and fill should also have been explored. Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Drawings must be prepared to a suitable standard, and to a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. We would need to see that the tracks would be constructed of a suitable material both in terms of the environmental risk it presents and its engineering properties. The types of waste to be used must be specified, and all waste types proposed must be fit for their intended use. Where appropriate risk assessment should be used to show that the proposed waste types can be used without causing harm to human health or the environment. Waste materials proposed must be shown to be of a relevant engineering specification for their intended use. This will include not only materials used in the track itself, but any fill material used in embankments. We would need to be assured that the work was going to be undertaken to an appropriate standard to give an effective and lasting benefit, and the scheme design should reflect this by considering for example, stability, drainage and construction techniques. The proposal should also include means of adequately finishing off the works, including selection of the right materials for the running surface and planting proposals for large areas of exposed soil. We would wish to see that any areas of exposed soil, were protected from erosion. It is important that the works do not cause soil erosion, pollution or increase flooding risk to the surrounding area. If it can be demonstrated that the track would be constructed to an appropriate standard anyway using non-waste materials, then this would strongly suggest that the proposal is waste recovery. 5) Construction fill for drainage channels and soakaways The proposal must show that there is a need for the drainage channels / soakaways to be constructed. It should be straightforward to show that the use of construction fill within a drainage ditch or soakaway has a clearly defined purpose, but the benefit must be shown by demonstrating that it is part of a defined surface water drainage system. The scheme design must demonstrate that only the minimum amount of waste material needed to achieve the purpose will be used. The drainage channels would constrain the quantity such that it should be easy to judge that the use of waste is proportionate. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 11

16 Where the work does not involve overall raising of land levels, scheme plans will be required showing the area(s) where waste is to be used and the quantity of waste required. It will not be necessary to provide original and final levels. For a soakaway, we would need to see that you had considered the flows that the soakaway would be receiving, and that the scheme had been designed around this. Although some margin might be appropriate, we would expect the soakaway to be only as big as it needed to be to deal with the expected flow. The waste used must be a suitable engineering material that would be expected to meet the specification requirements of a non-waste material that would normally be used. This could include specifications of size distribution (in particular fines content), strength, chemical composition etc. It should be possible to clearly demonstrate that the scheme would be carried out using non-waste materials since works of this type are often carried out using aggregates. This will be a strong indication that the proposed operation will be a recovery operation, but the other questions set out at section 4 still have to be addressed, for example you will still have to show benefit. The types of waste proposed must be specified, and all waste types proposed must be fit for their intended use. Where appropriate, risk assessments should be carried out to show that the proposed waste types can be used without causing harm to human health or the environment. The range of wastes that might be appropriate will be limited given the specific engineering properties required, and that the wastes may be acting as a drainage medium. You will be restricted to use of the waste types you specify in your recovery justification unless you agree any changes to this with us first. 6) Engineering preparation for Roads / Buildings The first step is to show the need for the scheme, and identify the benefits derived from carrying it out. Whilst it is easy to state that there will be a benefit from completed roads or building projects, we would need to see evidence that there was a need for a road / development at the proposed location, and that when constructed, it would be used, i.e. that there is a genuine purpose for the project. Evidence of planning permission or a planning requirement may help to demonstrate that benefit would be derived. We would need to be satisfied that the design of the scheme resulted in the minimum amount of material being used to achieve the intended purpose. If for example, an engineer s report is submitted to justify the proposal it should address the question of need and minimum waste use. Their design brief should include a requirement to achieve the intended purpose using only the minimum amount of material. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 12

17 Evidence should be presented to show that the overall scheme design has explored opportunities to re-use wastes on site to reduce the quantities of waste imported. Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Drawings must be prepared to a suitable standard, and to a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. Waste materials proposed must be of a relevant engineering specification for their intended use and evidence must be presented to support this. The types of waste must be specified, and all waste types proposed must be fit for their intended use. Where appropriate, you should present risk assessments to show that the proposed waste types can be used without causing harm to human health or the environment. We would need to be assured that the work was going to be undertaken to an appropriate standard to give an effective and lasting benefit. The scheme design should reflect this by considering for example, stability, drainage and construction techniques. Your plans should also include means of adequately finishing off the works, including selection of the right materials for the running surface and planting proposals for large areas of exposed soil. Your proposal must include that any areas of exposed soil will be protected from erosion. It is important that the works do not cause soil erosion, pollution or increase flooding risk to the surrounding area. 7) Restoration of Former Mineral Workings (excluding operations using extractive waste under the Mining Waste Directive). Restoration of former mineral workings can in some cases be a recovery activity. Generally, backfilling a quarry is likely to be a disposal operation. There should be a direct relation between the benefit will be derived from restoring a quarry and the work it is proposed to undertake. It is not generally accepted that backfilling a quarry to its original levels is in itself a benefit for the purposes of the waste recovery test. The benefit we look at is the end use of the restored mineral working, and the key test for recovery is what the minimum amount of waste is to achieve this benefit. A restoration scheme will therefore be to achieve a beneficial end use for the restored mineral working, for example bringing land into agricultural use. Given that the benefit of the restoration is normally the production of the final surface use, the amount of waste used should be judged against what is necessary to achieve that use of the land, the key question being could the benefit be achieved using less waste than proposed?. Additional fill above that needed to create the Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 13

18 desired end use would indicate a disposal activity. Any proposal must therefore have addressed the question of need and minimum waste use. Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Drawings must be prepared to a suitable standard, and to a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. The waste material must be suitable for its intended use. The range of wastes used in a mineral working restoration may be more restrictive than would be accepted at an inert waste landfill disposal activity. Not all wastes that may be suitable for disposal in a landfill, with pollution prevention provisions such as a geological barrier, may be suitable for infilling a particular mineral working. The recovery justification must address this through the selection of waste types, sources and the operator s proposed waste acceptance procedures. Where the groundwater level is above or will return to above the base of the original excavation, there may be constraints on the hydrogeological characteristic of the fill material to ensure that any necessary characteristics of the groundwater flow are not disrupted by the fill. This may mean in some cases that, to be suitable for use, the waste material must have particular properties such as high permeability. This restriction on material suitability may be overcome by the use of higher permeable pathways including the use of pipework. If it is possible to show that non-waste materials were being replaced, it would point towards the activity being recovery. The following evidence would support the consideration that a specific case may be a recovery activity: a technically and financially plausible, site specific source of non-waste material; and the quantities of non-waste material proposed and the timetable for infilling are realistic. A planning permission which requires the restoration of an area before further mineral extraction can take place might support the contention that a non-waste material would have had to have been used but it must be supported by evidence of the type suggested above to show that this is indeed a realistic prospect. Where the requirement of the planning permission is to use waste for that purpose this tends to indicate that non-waste materials were never envisaged for the proposal and therefore the operation is likely to be a disposal operation. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 14

19 8) Creation of a Lake / Wet Nature Reserve in a former Mineral Working. The creation of a recreational lake or a wet nature reserve in a former mineral working can be a recovery activity. The proposal would have to make clear that the infilling was part of a genuine scheme for recreational or ecological use, and that the creation of the feature would have a clear purpose and benefit. For instance it is easier to judge the purpose and benefit with a scheme that proposed the infilling of a lake in conjunction with the provisions of other items such as access arrangements, footpaths, landing stages, facilities for users etc. Planning permission would often provide this supporting evidence. The waste material must be suitable for use as a fill material. Due to the direct contact with water it is unlikely that the waste could be suitable unless it is free of any significant physical and chemical contamination. Part of the evidence to support this could be if the waste proposed comes from a consistent source with a low risk of contamination. The operator s proposed waste acceptance procedures would have to reflect the need for the waste to be suitable for this use. We would need to see that the scheme had been designed to achieve the stated aim using the minimum amount of waste materials needed. Recreational lakes must generally meet a number of criteria such as shallow shore slopes and overall depth whilst in a wetland area, the creation of the shoreline may require creating slopes to provide for a range of diverse habitats. Meeting these genuine criteria would define the quantities of waste required, and the need to create the proposed features must be clearly justified. Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Plans must be prepared to a suitable standard, and at a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. If it is possible to show that non-waste materials were being replaced, it would point towards the activity being recovery. The following evidence would support the consideration that a specific case may be a recovery activity: a technically and financially plausible, site specific source of non-waste material; and the quantities of non-waste material proposed and the timetable for infilling are realistic. Where the quantity of waste required is very large it becomes more difficult to accept that a non-waste material would have been used. For example, if the mineral working is significantly deeper than the optimum depth for the proposed use it becomes less likely that the infilling would be undertaken with a non-waste material. Such a deep lake would simply not be considered suitable for such a development if a non-waste material would be required to infill the lake. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 15

20 9) Land levelling / contouring and improving land quality. Hollows and dips in fields can affect the safe and effective operation of modern farm machinery or effect crop performance, and we would accept that use of waste to improve the contours of the land to address these issues can be a recovery activity. Unproductive land can be brought into agricultural, conservation or forestry use through the importation of waste to create a new soil profile, and we would accept that this can be a recovery activity. Any justification that an activity is recovery would need to clearly state the intended benefits of importing the waste, and demonstrate that there was a real need to carry out the work. We would also wish to see that the proposed benefits would be realised, and would need to see that the proposal included measures to ensure that the finished scheme would be brought into agricultural use. This might include consideration of how the existing topsoil will be managed (ie whether it will be excavated prior to the deposit and then re-used), or evidence that the imported material will perform as well or better than the buried topsoil. The quality of the waste materials imported is important, and in addition to providing assurances that they will pose no environmental or human health risk, we would need to be assured that the materials used would serve their purpose as a growing medium. It would be important too to show that where materials are used for infill (as opposed to the surface layers), they would have the appropriate engineering properties, and would be deposited using appropriate methods to ensure that the land remained usable, and was not prone to excessive settling. In the case of importing materials specifically to improve land quality, we would need to see evidence that the land would actually benefit from the importation of waste. This may take the form of an agronomists report which sets out the existing and the proposed agricultural value of the land. We need evidence that only the minimum amount of material is being used. For the growing medium, the proposed depth of materials should be no more than is necessary to be suitable for the proposed planting regime. This must be supported by evidence from an appropriately qualified person. The proposed level of fill should be no more that is needed to deliver the end use. Whilst completely levelling a hollow could be presented as a requirement, this would need to be supported by information showing that it was really necessary. For example, if the benefit was making the land safe for the operation of machinery, could this be achieved be developing a land profile which involved the use of less waste? Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 16

21 The created profile must suit the geographical and topographical environment in which it sits, for example, a created soil profile must be able to drain and not pond or shed water excessively. Detailed scheme drawings (plans/cross-sections) must be submitted showing original and final levels so that we can judge the volume of waste to be used. Drawings must be prepared to a suitable standard, and at a sufficiently detailed scale that it will be possible to verify compliance with levels as the scheme progresses. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 17

22 Appendix 2- Waste types that may be suitable in typical waste recovery to land uses. Table 1: Waste types and typical uses in recovery schemes Waste Types and uses Waste Code Description wastes from mineral excavation Typical uses(see key) Additional Notes(see key) Wastes from non metalliferous excavation A,B,E,F wastes from physical and chemical processing of non-metalliferous minerals waste gravel and crushed rocks other than those A,B,E,F containing dangerous substances waste sand and clays A,B,E,F waste from preparation and processing of meat, fish and other foods of animal origin mollusc or crustacean shells from which the flesh has C 1 been completely removed wastes from sugar processing soil from cleaning and washing beet B,E,F wastes from power stations and other combustion plants (except 19) bottom ash and slag from power stations(furnace Bottom Ash) A PFA from Power Stations A,B Gypsum (solid only) E Gypsum (sludge only) E Incinerator bottom ash and slag A wastes from the iron and steel industry waste from processing of slag A unprocessed slag A wastes from casting of ferrous pieces furnace slag A wastes from casting of non-ferrous pieces furnace slag A waste from manufacture of ceramic goods, bricks, tiles and construction products waste ceramics, bricks, tiles and construction products A,B,D (after thermal processing) wastes from manufacture of cement, lime and plaster and articles and products made from them waste concrete and concrete sludge A concrete, bricks, tiles and ceramics concrete A,B,D bricks A,B,D tiles and ceramics A,B,D mixtures of concrete, bricks, tiles and ceramics A,B,D bituminous mixtures, coal tar and tarred products Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 18

23 road base and road planings other than those containing D 4 coal tar soil (including excavated soil from contaminated sites) stones and dredging spoil soil and stones A,B,E,F dredging spoil (unless it contains dangerous substances) B track ballast, soil and stones other than those containing A,B,D 5 dangerous substances wastes from incineration or pyrolysis of waste bottom ash and slag(incinerator bottom ash) A wastes from waste water treatment plants not otherwise specified washed sewage grit (waste from desanding) only E,F stone filter media (if cleaned to remove sewage A, B, D contamination) only Wastes from the mechanical treatment of waste (for example sorting, crushing, compacting, pelletising) not otherwise specified Glass A minerals (for example sand, stones) A,B soil substitutes other than that containing dangerous E, F substances only treated bottom ash including IBA and slag other than A that containing dangerous substances only Wastes from soil and groundwater remediation solid wastes from soil remediation other than those B 3 containing dangerous substances Garden and park wastes(including cemetery waste) soil and stones A,B,E,F Key to Table Codes A. Structural fill for building, stabilising ramps, drainage, road construction. B. Construction of noise bunds, screening bunds, flood defence bunds, containment bunds, golf courses. Landscaping associated with construction work. Restoration of mineral workings. General fill material. C. Surface treatment of roads, tracks etc. Drainage. D. Road/track construction and repair, hard surfacing, car parks etc. E. Agricultural Improvement schemes. F. Ecological improvements, wetland schemes, lakes 1. Only shellfish shells from which the soft tissue or flesh has been removed. 2. Pulverised fuel ash (PFA) and Furnace bottom ash (FBA) must be tested to confirm that they are not hazardous and do not exceed the limits in Appendix F of the WRAP /Environment Agency Technical report on Manufacture of products from PFA and FBA (See link below ). The PFA/ FBA must also be suitable for the end use and comply with the standard BS EN 13242:2002 aggregates for unbound and hydraulically bound material for use in civil engineering work and road construction. Environment Agency Defining Waste Recovery: Permanent Deposit of Waste on Land 19

Paragraph 9 Exemption The reclamation or improvement of land

Paragraph 9 Exemption The reclamation or improvement of land The reclamation or improvement of land 1 INTRODUCTION This document provides guidance, definitions, operational policy and strategy with regard registering a paragraph 9 exemption under Schedule 1 of the

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Living & Working Managing Natural Resources and Waste

Living & Working Managing Natural Resources and Waste Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

NATIONAL ENVIRONMENTAL EMVIRONMENTAL MANAGEMENT ACT AMENDMENT BILL: WASTE. Parliament 28 th January 2014. Dr Dhiraj Rama

NATIONAL ENVIRONMENTAL EMVIRONMENTAL MANAGEMENT ACT AMENDMENT BILL: WASTE. Parliament 28 th January 2014. Dr Dhiraj Rama NATIONAL ENVIRONMENTAL EMVIRONMENTAL MANAGEMENT ACT AMENDMENT BILL: WASTE Parliament 28 th January 2014 Dr Dhiraj Rama NATIONAL ENVIRONMENTAL MANGEMENT ACT AMENDMENT BILL: MINING CONTENTS 1. Introduction

More information

Guidance notes on part C2 General varying a bespoke permit

Guidance notes on part C2 General varying a bespoke permit Guidance notes on part C2 General varying a bespoke permit Please read these guidance notes carefully before you fill in the forms. This guidance will help you complete part C2 of the application form

More information

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

the French experience

the French experience VLLW disposal and management of large volume of slightly contaminated materials the French experience Nicolas Solente Very Low Level Waste disposal in France The CIRES facility in Morvilliers VLLW waste

More information

6 CONSIDERATION OF ALTERNATIVES

6 CONSIDERATION OF ALTERNATIVES 6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Land contamination Information requirements for planning applications Version 0.05

Land contamination Information requirements for planning applications Version 0.05 Land contamination Information requirements for planning applications Version 0.05 May 2015 Table of contents Introduction Outlines the intent of this guidance and defines key terms Required information

More information

Use of Substitute Fuels in Large Combustion Plants (LCPs)

Use of Substitute Fuels in Large Combustion Plants (LCPs) Use of Substitute Fuels in Large Combustion Plants (LCPs) By Pat Swords Content of the Presentation What are substitute fuels What is the experience to date with these fuels What are the regulatory implications

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Guidance notes on part B2 General New bespoke permit

Guidance notes on part B2 General New bespoke permit Guidance notes on part B2 General New bespoke permit Please read these guidance notes carefully before you fill in the forms. This guidance will help you complete part B2 of the application form pack.

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

4 R Guide Reduce Reuse Recycle Recover

4 R Guide Reduce Reuse Recycle Recover 4 R Guide Reduce Recover 4 R Guide Skanska s Environmental Policy include a long term objective on Zero Waste Generation. This can be achieved by reducing upfront demand, reusing materials wherever possible

More information

Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded.

Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded. Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded. Key Messages Shelters and settlements should be sited above the highest

More information

Inert Waste and How to Manage It

Inert Waste and How to Manage It BEIJING CHARLOTTE CHICAGO GENEVA HONG KONG LONDON LOS ANGELES NEW YORK NEWARK MOSCOW PARIS SAN FRANCISCO SHANGHAI WASHINGTON, D.C. INERT WASTE MANAGEMENT : A VARIABLE GEOMETRY CONCEPT Joëlle Herschtel

More information

This document provides a summary of some of the decisions taken by SEPA on the definition of waste.

This document provides a summary of some of the decisions taken by SEPA on the definition of waste. Page no: Page 1 of 9 1. Background This document sets out a framework of factors to be considered in establishing whether a particular substance or object is likely to fall within the scope of the definition

More information

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks. Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

New environmental liabilities for EU companies

New environmental liabilities for EU companies New environmental liabilities for EU companies The ELD applies to all businesses that operate within the EU, even if the parent company is located outside of the EU. The ELD applies to all businesses,

More information

Rehabilitation and Remediation of POPs

Rehabilitation and Remediation of POPs and of POPs Module 3 and Overview of the course This module will cover various remediation and rehabilitation strategies. Contents Strategies (and part of ) Summary technologies Summary Learning outcomes

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

meeting the needs of families and the environment

meeting the needs of families and the environment Funeral practices, spreading ashes and caring for the environment meeting the needs of families and the environment We are the Environment Agency. It s our job to look after your environment and make it

More information

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent. 11 ENVIRONMENTAL REHABILITATION PLAN The overall land use vision for the MR133 area is to ensure that the operations are safe, stable and non-polluting over the long-term in order to be integrated into

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Slide 1. Enviros Consulting Ltd

Slide 1. Enviros Consulting Ltd Slide 1 Regulation of Waste Management Activities Past, Present and Future! Steve Bell Technical Manager Waste Management Thursday, 26 July 2007 Presentation Aims An insight of where we have come from

More information

The implementation of the European Union Environmental Liability Directive

The implementation of the European Union Environmental Liability Directive RSPB Briefing January 2006 The implementation of the European Union Environmental Liability Directive Briefing on the main issues arising in relation water I. Introduction The European Union s Environmental

More information

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies

More information

Aggregates for Path Construction

Aggregates for Path Construction Aggregates for Path Construction Technical Information Note No. 7 October 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling

More information

After a flood. Practical advice on recovering from a flood

After a flood. Practical advice on recovering from a flood After a flood Practical advice on recovering from a flood 11558_Flood leaflets_after_v6.indd 1 19/11/07 15:15:15 We are the Environment Agency. It s our job to make people aware of flooding from rivers

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Information Request 14

Information Request 14 Information Request 14 Information Request 14 14-1 Responses to Information Request 14 Response to Information Request 14a Response to Information Request 14b Response to Information Request 14c Response

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents AMENDMENTS TO THE REGIONAL PLANS RELATING TO LAND REPAIR ON EARTHQUAKE DAMAGED RESIDENTIAL LAND UNDER s27 OF THE CANTERBURY EARTHQUAKE RECOVERY ACT 2011 1. This memorandum outlines the specific changes

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Environmental Permitting Guidance

Environmental Permitting Guidance www.defra.gov.uk Environmental Permitting Guidance Core guidance For the Environmental Permitting (England and Wales) Regulations 2010 Last revised: March 2013 Crown copyright 2013 You may re-use this

More information

Waste can you handle it?

Waste can you handle it? www.defra.gov.uk Hazardous waste regulations List of wastes regulations 2005 Waste can you handle it? www.defra.gov.uk Source: www.rethinkrubbishpartners.com Department for Environment, Food and Rural

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service

asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

Beyond Regulation. Head of Environment and Business Partnerships

Beyond Regulation. Head of Environment and Business Partnerships Beyond Regulation Martin Brocklehurst Head of Environment and Business Partnerships March 2011 What I m going g to cover: Current Regulations End of Waste - Quality Protocols Aggregates Tar based road

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

oil care Looking after your heating oil in the south east

oil care Looking after your heating oil in the south east oil care Looking after your heating oil in the south east We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Coal ash utilisation over the world and in Europe

Coal ash utilisation over the world and in Europe Workshop on Environmental and Health Aspects of Coal Ash Utilization International workshop 23 rd 24 th November 2005 Tel-Aviv, Israel Coal ash utilisation over the world and in Europe Hans-Joachim Feuerborn

More information

Watershed Works Manual

Watershed Works Manual National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:

More information

Baseline data: RCI Economic Development Committee

Baseline data: RCI Economic Development Committee 2011 County Business Patterns & Non-Employer Statistics, (NAICS), US Census Bureau The US Census provides establishments by employment size (self-employed/non-employer and 9 class sizes) using the NAICS

More information

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction PPG21 February 2004 Environmental Alliance working together Pollution Prevention Guidelines pollution incident response planning: PPG 21 These guidance notes have been drawn up to assist those developing

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Fact sheet 6: for farmers

Fact sheet 6: for farmers Fact sheet 6: for farmers Fuel Oil Storage June 2013 Are you planning to substantially alter your fuel oil store, or add a new one? If so, this fact sheet will help you meet the requirements of The Water

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

Undercover storage requirements for waste/recycling depots

Undercover storage requirements for waste/recycling depots Waste Information Sheet Undercover storage requirements for waste/recycling depots Update September 2010 EPA 845/10: This information sheet has been prepared for waste management and resource recovery

More information

Environmental Remediation Examples and Remediation Strategic Planning

Environmental Remediation Examples and Remediation Strategic Planning Environmental Remediation Examples and Remediation Strategic Planning Yasuo Onishi (yasuo.onishi@pnnl.gov) October 16, 2011 Pacific Northwest National Laboratory, and Washington State University, Civil

More information

Fact sheet 6: for farmers

Fact sheet 6: for farmers Fact sheet 6: for farmers Fuel Oil Storage February 2011 Are you planning to substantially alter your fuel oil store, or add a new one? If so, this fact sheet will help you meet the requirements of The

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical

More information

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Hazardous Materials and Waste Management Division (303) 692-3300 First Edition

More information

SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE

SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE Let us help! Free professional site visit with friendly support and advice. helpingyou@klargester.com to make the right decision or call

More information

Sandbags. and how to use them properly for flood protection

Sandbags. and how to use them properly for flood protection Sandbags and how to use them properly for flood protection We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom

Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom Environmental roles include Buffer zones Riparian zone protection Slope stabilisation Flooding reduction Carbon

More information

Pollution Incident Response Plan

Pollution Incident Response Plan Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

What to do before, during and after a flood. Practical advice on what to do to protect yourself and your property

What to do before, during and after a flood. Practical advice on what to do to protect yourself and your property What to do before, during and after a flood Practical advice on what to do to protect yourself and your property We are the Environment Agency. It s our job to make people aware of flooding from rivers

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

Department of Public Works. Recycling policy for buildings and civil infrastructure

Department of Public Works. Recycling policy for buildings and civil infrastructure Department of Public Works Recycling policy for buildings and civil infrastructure A whole-of-government recycling policy for buildings and civil infrastructure Policy statement The Queensland Government

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL

E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL HIGH SPEED TWO INFORMATION PAPER E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL This paper outlines the approach to sustainable placement of surplus excavated material for Phase One of the HS2

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

Engineering Policy 146. Severe Weather Management Plans

Engineering Policy 146. Severe Weather Management Plans Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...

More information

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures. BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming

More information

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Uniclass L6129 EPIC F122 CI/SfB Yp3 Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Introduction... 2 Product... 2 Sustainability... 2 Physical Properties of Lightweight Aggregate...

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information