1 PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH Petition No. 52 of 2013 Date of Order: In the matter of: Petition under Section 86 (1) (b) and 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 for purchase of electricity from solar energy generators in the State of Punjab. AND In the matter of: Punjab State Power Corporation Limited, The Mall, Patiala. AND In the matter of: Punjab Energy Development Agency (PEDA), Chandigarh Present: Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh, Member Order Punjab State Power Corporation Limited (PSPCL) has filed this petition seeking approval of the Commission to procure electricity including the tariff from solar energy generators to be established in the State of Punjab and also to the draft Power Purchase Agreement (PPA) to be executed with the solar energy generators. PSPCL has submitted that Government of Punjab (GoP) has recently issued New and Renewable Sources of Energy (NRSE) Policy, 2012, which is aimed at the development of renewable energy sources, in particular solar energy generation in the State of Punjab. PSPCL has further submitted that vide letter dated , Punjab Energy Development Agency (PEDA) informed that the Government of Punjab has approved installation of minimum 300 MW Solar PV power projects in the State in the first phase. 2. Pursuant to above, PEDA initiated competitive bidding process for inviting generators for the establishment of 300 MW Solar PV power projects in Punjab. On the basis of the bids received, PEDA allocated a total capacity of 250 MW Solar PV power projects to various developers. The allocations have been made in two categories namely (i) 1 to 4 MW (total capacity of such projects: 50 MW) and (ii) 5 to 30 MW (total capacity of such projects: 200 MW). The tariff discovered in the competitive bidding process varies from 7.20 per kwh to 8.70 per kwh for 1 to 4 MW capacity projects and 7.67 per kwh to 8.74 per kwh for 5 to 30 MW capacity 1

2 projects. The details of the tariffs discovered and allocations made are attached as per Annexure PSPCL has submitted that solar energy generation is expected to be one of the sources for future renewable energy generation which can be procured in large quantum. It has been further submitted that the solar energy generation has been promoted in various other States and also through the policies issued by the Government of India (GoI). On the same lines GoP has taken proactive steps to ensure development of solar energy generation capacity and at the same time discovered cost through the competitive bidding process. PSPCL has further submitted that it is the distribution licensee in the State of Punjab and is required to fulfil its minimum renewable purchase obligation (RPO) specified by the Commission in its Regulations namely Punjab State Electricity Regulatory Commission (Renewable Purchase Obligation and Its compliance) Regulations, 2011 (RPO Regulations, 2011). As per these Regulations, the solar RPO for FY and FY is 0.13% and 0.19% respectively. PSPCL has submitted that the present installed capacity for Solar PV power projects in Punjab is about MW and with the addition of aforementioned 250 MW capacity and another 65 MW solar capacity in the pipeline, PSPCL would be able to comply with the solar RPO. PSPCL has intimated that from the year onwards, the solar power of about 314 crore annually would be purchased from these 250 MW capacity Solar PV power projects at an average tariff of 8.37 per kwh. 4. PSPCL has submitted that the total procurement as envisaged is likely to exceed the RPO as specified presently and in the circumstances filed this petition seeking approval for procurement of 250 MW capacity of solar energy generation in the State of Punjab to be established by the generators as listed in Annexure-1. It has been submitted that in terms of section 86 (1)(b) and section 86(1)(e), the procurement of electricity including the rate is required to be approved by the Commission. PSPCL has also sought approval of the draft PPA to be signed with the solar power generators. 5. In the prayer, PSPCL has requested the Commission to approve the procurement of electricity by it from solar energy generators at the tariff discovered in the competitive bidding process conducted by PEDA as per details in Annexure-C to the petition and allow this power purchase cost as a pass through in the Annual Revenue Requirement (ARR) and further requested the Commission to approve the draft PPA, attached as Annexure-E to the petition, with or without modifications. 2

3 6. The petition was admitted by the Commission and PEDA was directed to file reply by with a copy to PSPCL as per Commission s Order dated PEDA in its response filed on , while referring to Commission s Order dated in Petition No. 37 of 2013 (Suo-Motu), has submitted that in line with the said Order, it invited competitive bids on the basis of discount to be offered by the bidders on the generic tariff determined by the Commission for Solar PV power projects. PEDA has further submitted that as per National Tariff Policy, the RPO for Solar power is targeted at 3% in the year Therefore to achieve the same, the per year rise on the base of RPO of 0.19% for FY specified by the Commission, will be 0.4% per year for which appropriate solar power capacity additions are required. PEDA has contended that, therefore, the addition of 250 MW through the present bidding process is in order and will help in achieving the RPO target in future. PEDA has further submitted that the tariff for the Solar PV power projects arrived at through the competitive bidding process is levellised tariff and will remain same for 25 years (term of the PPA) whereas the tariff for conventional coal based power projects will increase every year due to rise in fuel cost and therefore at some point of time in near future, this solar power will be cheaper than the conventional power from coal based thermal plants. PEDA has prayed that the prayer of PSPCL in the petition may be accepted by the Commission. 8. In the hearing on , PSPCL submitted that its prayer at Sr.No. (a) be taken up by the Commission on priority and prayer at Sr. No. (b) may be deferred for the time being pending resolution on deviations and variations and that PSPCL shall file an application for this purpose. PSPCL was directed to file the said application by with a copy to PEDA. PSPCL was further directed to file additional submissions on the deviations/variations occurring in the draft PPA by The next date of hearing was fixed to be held on PSPCL vide its Memo No. 6895/TR-5/539 dated sought extension for filing the submissions by PSPCL has filed the submissions on and submitted that in order to expedite the process of approval of procurement of electricity at the tariff discovered in the competitive bidding process conducted by PEDA and approval of the PPA, the present petition may be considered in two parts. Firstly for approval of procurement of electricity at the tariff discovered in the competitive bidding process conducted by PEDA with pass through of cost of this power through ARR of PSPCL 3

4 and thereafter the approval of PPA to be signed by PSPCL with the project developers. Accordingly, with regard to first part of the petition, PSPCL has prayed to approve the procurement of electricity from solar energy generators at the tariff discovered in the competitive bidding process conducted by PEDA as per the details already submitted and allow the power purchase cost to be incurred by PSPCL as pass through in the ARR of PSPCL. In the hearing on and as brought out in its Order of even date, the Commission considered the proposal of PSPCL and decided that Order in respect of the first part shall be issued separately. As regards second part, PEDA was directed in the Order dated to first take up the draft PPA with the bidders/project developers and obtain their consent/concurrence to the variations/deviations in the draft PPA from corresponding provisions in Request for Proposal (RfP) and Implementation Agreement (IA) and file the same within two/three days. 10. The Commission notes that PEDA initiated the competitive bidding process in a transparent manner and invited bids from solar PV power project developers for supply of electricity on the basis of discount offered by the bidders on the generic tariff determined by the Commission for Solar PV power projects in the said Order i.e per kwh. The Commission further notes that the rates discovered in the bidding process are in the range of 7.20 per kwh to 8.70 per kwh for 1 to 4 MW capacity projects and 7.67 per kwh to 8.74 per kwh for 5 to 30 MW capacity projects. The project wise tariff discovered is enclosed as Annexure-1 to this Order. The Commission further notes that, as brought out by PEDA, the Solar RPO is targeted as 3% by 2022 and would need to be enhanced by 0.4% per year from the current level. To meet this target, about 1330 MW solar capacity is required to be installed by 2022, considering 6% compound average growth rate of power in Punjab i.e. on an average about 145 MW annually. Presently in its RPO Regulations, 2011, the Commission has specified the RPO upto FY and accordingly, RPO beyond this period i.e. FY onwards is to be fixed by the Commission. The GoI is pressing hard to bring the solar RPO compliance in the States upto the targeted 3% as per the Tariff Policy. Recently, Joint Secretary, Government of India, Ministry of New and Renewable Energy vide letter dated has emphasized to suitably fix the RPO to match the same with the Tariff Policy. Secretary, Government of India, Ministry of New and Renewable Energy vide D.O. reference dated has also requested the Commission for ensuring the RPO compliance. The Commission notes that the approval granted by the GoP for installation of minimum 300 MW solar PV power projects is a step in the right 4

5 direction and would help the State to meet the solar RPO target from FY onwards. In this regard, the submission by PSPCL that they would be procuring more solar energy than RPO requirement beyond FY is not tenable. The Commission, under section 86 (1) (e) of the Electricity Act, 2003 is mandated to promote generation of electricity from renewable sources of energy. Furthermore, para 6.4 of the Tariff Policy provides for preferential tariff to be determined by the Commission for renewable energy projects while para of the National Electricity Policy requires adoption of suitable promotional measures for encouraging higher generation from renewable energy sources. 11. Keeping in view the above, the Commission approves the procurement of electricity by PSPCL from the solar energy generators at the tariff discovered in the competitive bidding process conducted by PEDA as per details in the attached Annexure-1. The cost of power purchase from the projects enlisted in Annexure-1 would be considered as pass through in the ARR of PSPCL. The tariff period for the said projects would be twenty five (25) years as per Regulation 6(c) of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 adopted by the Commission in its Order dated in Petition No. 35 of 2012 (Suo-Motu) with State specific modifications. Further, the tariffs approved above would be applicable upto provided that (i) the PPAs are signed on or before and the entire capacity covered in each PPA is commissioned on or before , in line with Regulation 8 of the said Regulations. Sd/- (Gurinder Jit Singh) Member Sd/- (Romila Dubey) Chairperson Chandigarh Dated:

6 Annexure-1 Solar PV power projects with capacity 1 to 4 MW Sr. No. 1 WAA Solar Pvt. Ltd. Company Name Project Capacity (MW) Net Tariff Quoted ( /kwh) Project Project T R Energy & Agro Private Limited International Switchgears Pvt. Ltd Aditya Media Sales Ltd., Mumbai Shan Solar Pvt. Ltd Supreme Infrastructure India Ltd., Gurgaon Azure Urja Pvt. Ltd., New Delhi SAR Capital Pvt. Ltd Focal Energy Wind India Pvt. Ltd Atma Powers Private Limited, Muktsar Allianz Group LLC, Ludhiana Nexgen Solex Pvt. Ltd I K Energy Pvt. Ltd Asopus Infrastructure Limited Abundant Ventures LLC, USA Welspun Solar Punjab Pvt. Ltd., Mumbai Mokia Green Energy Pvt. Ltd Earth Solar Pvt. Ltd Total 50 Contd... 6

7 Solar PV power projects with capacity 5 to 30 MW Sr. No Company Name 1 Azure Urja Pvt. Ltd., New Delhi Project Capacity (MW) Net Tariff Quoted ( /kwh) Project Project Solairedirect Energy India Private Limited, Pune Welspun Solar Punjab Pvt. Ltd., Mumbai Project Project Punj Lloyd Infrastructure Limited Moserbaer Clean Energy Limited, New Delhi(Project-1) Asopus Infrastructure Limited (Project-1) Moserbaer Clean Energy Limited, New Delhi(Project Essel Infraprojects Ltd., Mumbai (Project-1) Asopus Infrastructure Limited (Project-2) Essel Infraprojects Ltd., Mumbai (Project-2) Lanco Solar Energy Private Limited, Gurgaon Total 200 7

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7. PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.2010 In the matter of : Determination of generic levellised generation

More information

S. No. Year Obligation expressed as percentage of energy consumption (%) 1 2011-12 6.00 2 2012-13 7.10 3 2013-14 8.20

S. No. Year Obligation expressed as percentage of energy consumption (%) 1 2011-12 6.00 2 2012-13 7.10 3 2013-14 8.20 Background paper for prescribing Renewable Purchase Obligation (RPO) for Captive consumption of CPP & open access consumers in the State for the period ending March, 2017 and related amendment in regulations:

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Shri. K.J.Mathew, Chairman Shri. C. Abdulla, Member Shri. M.P.Aiyappan, Member Petition No. CT/SOLAR JNNSM/KSERC/2010 August 4,

More information

BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION BAYS NO. 33-36, SECTOR 4, PANCHKULA-134112 - HARYANA

BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION BAYS NO. 33-36, SECTOR 4, PANCHKULA-134112 - HARYANA BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION BAYS NO. 33-36, SECTOR 4, PANCHKULA-134112 - HARYANA Quorum: Case No. HERC/PRO-51 of 2014 Date of hearing: 22.07.2014 Date of order : 22.07.2014 Shri

More information

DRAFT ORDER (SUO-MOTU)

DRAFT ORDER (SUO-MOTU) Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 22163964/65/69 Fax: 22163976 E-mail: mercindia@mercindia.org.in

More information

DELHI ELECTRICITY REGULATORY COMMISSION

DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION

More information

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001 KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001 Present: Shri M.R.Sreenivasa Murthy Chairman Shri Vishvanath Hiremath Shri K. Srinivasa

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,

More information

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY / RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012

More information

The Gazette of India. EXTRAORDINARY PART I - Section 1 PUBLISHED BY AUTHORITY Ministry of Power RESOLUTION

The Gazette of India. EXTRAORDINARY PART I - Section 1 PUBLISHED BY AUTHORITY Ministry of Power RESOLUTION The Gazette of India EXTRAORDINARY PART I - Section 1 PUBLISHED BY AUTHORITY Ministry of Power No. 23/11/2004-R&R (Vol.II) RESOLUTION New Delhi, Dated the 19 th January 2005 Guidelines for Determination

More information

Delhi Electricity Regulatory Commission Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi 17

Delhi Electricity Regulatory Commission Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi 17 Delhi Electricity Regulatory Commission Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi 17 No. F. 11(1160)/DERC/2014-15/ Petition No. 53/2014 In the matter of: Petition seeking approval for

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION

CENTRAL ELECTRICITY REGULATORY COMMISSION CENTRAL ELECTRICITY REGULATORY COMMISSION EXPLANATION FOR THE NOTIFICATION ON ESCALATION RATES DATED 04.04.2007 1. The Ministry of Power (MOP), vide its Notification dated, 19.01.2005, issued Guidelines

More information

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)

More information

Determination of cost of power generation for Dongamahua captive power plant of Jindal Steel & Power Ltd. from FY 2011-12 till FY 2015-16.

Determination of cost of power generation for Dongamahua captive power plant of Jindal Steel & Power Ltd. from FY 2011-12 till FY 2015-16. Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur - 492 001 (C.G.) Ph.0771-4048788, Fax: 4073553 www.cserc.gov.in, e-mail: cserc.sec.cg@nic.in Petition No. 47

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 30 of 2012 Date of Order: 12.11.2012 In the matter of : Petition under Section 86(1)(f) of the Electricity

More information

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes

More information

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT) DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,

More information

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1. OBJECTIVE : 1.1. This procedure shall provide guidance to the entities to implement

More information

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th & 5 th Floors, Singareni Bhavan, Red Hills, Hyderabad-500 004. O.P.No.

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th & 5 th Floors, Singareni Bhavan, Red Hills, Hyderabad-500 004. O.P.No. Between ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th & 5 th Floors, Singareni Bhavan, Red Hills, Hyderabad-500 004 O.P.No. 17 of 2009 Dated: 18.06.2011 Present Sri A. Raghotham Rao, Chairman Sri

More information

Case No. 100 of 2014. Smt. Chandra Iyengar, Chairperson Shri Vijay L. Sonavane, Member ORDER (SUO-MOTU)

Case No. 100 of 2014. Smt. Chandra Iyengar, Chairperson Shri Vijay L. Sonavane, Member ORDER (SUO-MOTU) Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 22163964/65/69 Fax: 22163976 E-mail: mercindia@merc.gov.in Website:

More information

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Notification No. TNERC/RPO/ 19/1 dated 07-12-2010

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Notification No. TNERC/RPO/ 19/1 dated 07-12-2010 TAMIL NADU ELECTRICITY REGULATORY COMMISSION Notification No. TNERC/RPO/ 19/1 dated 07-12-2010 In exercise of powers conferred by section 181 of the Electricity Act, 2003 (Central Act 36 of 2003) read

More information

SECURITIES AND EXCHANGE BOARD OF INDIA CORAM: T C NAIR, WHOLE TIME MEMBER

SECURITIES AND EXCHANGE BOARD OF INDIA CORAM: T C NAIR, WHOLE TIME MEMBER WTM/TCN/01 /CFD/ APRIL /08 SECURITIES AND EXCHANGE BOARD OF INDIA CORAM: T C NAIR, WHOLE TIME MEMBER IN THE MATTER OF PUBLIC OFFER FOR ACQUISITION OF 103,88,445 OF THE EQUITY SHARE CAPITAL OF JAGATJIT

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 7/MP/2013

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 7/MP/2013 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 7/MP/2013 Coram: Dr. Pramod Deo, Chairperson Shri V.S.Verma, Member Shri M.Deena Dayalan, Member In the matter of Date of Hearing: 14.3.2013

More information

Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION

Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Introduction Clean energy promotion in India Focus on

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR Suo-Motu In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects for FY 2013-14 and resultant Generic

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION

RAJASTHAN ELECTRICITY REGULATORY COMMISSION RAJASTHAN ELECTRICITY REGULATORY COMMISSION In the matter of amendments in: I. RERC (Renewable Energy Obligation) Regulations, 2007. II. RERC (Renewable Energy Certificate and Renewable Purchase Obligation

More information

Renewable Energy. and Renewal Energy Certificates in Indian Context

Renewable Energy. and Renewal Energy Certificates in Indian Context Renewable Energy and Renewal Energy Certificates in Indian Context With the increasing demand of energy and growing depletion of resources for energy generation, a global movement towards production of

More information

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Target Clients v Renewable Energy Generators in India v RPO mandated entities in India v Investors seeking

More information

CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009

CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 CERC (Terms and Conditions for Tariff determination from Renewable Statement of Objects and Reasons 1. Introduction 1.1 The Electricity Act, 2003 (hereinafter referred to as the Act ) under Section 79

More information

Analysis of state-wise RPO Regulation across India

Analysis of state-wise RPO Regulation across India The Renewable Purchase Obligations (RPO) has been the major driving force in India to promote the renewable energy sector. But the State Electricity Regulatory Commissions (SERCs) have defined their respective

More information

Tamil Nadu WiNd ENErgy ProfilE

Tamil Nadu WiNd ENErgy ProfilE Tamil Nadu WiNd ENErgy ProfilE Wind energy in Tamil Nadu has witnessed tremendous growth propelling the State to the number one position in India in terms of renewables. However the challenge that remains

More information

Draft Solar Power Tariff - Ground Mounted Grid Connected and Solar Rooftop with Net Metering Regulations - 2014

Draft Solar Power Tariff - Ground Mounted Grid Connected and Solar Rooftop with Net Metering Regulations - 2014 Draft Solar Power Tariff - Ground Mounted Grid Connected and Solar Rooftop with Net Metering Regulations - 2014 JERC invites suggestions / comments/inputs / objections on above draft Regulations of Joint

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION In exercise of powers conferred under sub-section (1) of Section 178 and Section 66 read

More information

Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No. 297 of 2013

Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No. 297 of 2013 Dated: 23 rd April, 2015 Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No. 297 of 2013 Present: Hon ble Mr. Rakesh Nath, Technical Member Hon ble Mr. Justice Surendra Kumar, Judicial

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Coram: 1. Shri Bhanu Bhushan, Member 2. Shri R. Krishnamoorthy, Member In the matter of Petition No.33/2003 Approval of tariff in respect of Assam Gas

More information

Sub: Modifications in the provisions of CPWD Works Manual 2007 regarding Two/Three envelope system, mobilization advance, specialized works, etc.

Sub: Modifications in the provisions of CPWD Works Manual 2007 regarding Two/Three envelope system, mobilization advance, specialized works, etc. OFFICE MEMORANDUM No.DGW/MAN/160 ISSUED BY AUTHORITY OF DIRECTOR GENERAL OF WORKS NIRMAN BHAWAN, NEW DELHI DATED:31.07.08 Sub: Modifications in the provisions of CPWD Works Manual 2007 regarding Two/Three

More information

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY 1. OBJECTIVE 1.1. This procedure shall provide guidance to the entities to implement Renewable Energy Certificate

More information

SOUTH AFRICA s INDEPENDENT POWER PRODUCERS PROGRAMMES

SOUTH AFRICA s INDEPENDENT POWER PRODUCERS PROGRAMMES SOUTH AFRICA s INDEPENDENT POWER PRODUCERS PROGRAMMES November 2015 1 Energy in South Africa (1994-2011) November 2015 2 International support November 2015 3 Energy in South Africa (2011-2015) November

More information

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1 Objective (1) This procedure shall provide guidance to the entities to implement Renewable

More information

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com Draft ver2 Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com 1 TABLE OF CONTENTS S.No Contents Page No 1. PREAMBLE 3 2. OBJECTIVES 3 3. OPERATIVE

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Dated 24 th January 2014 NOTICE Notice is hereby given that Kerala State Electricity Regulatory Commission has published the Draft Kerala State Electricity

More information

Enhancing the corporate energy performance

Enhancing the corporate energy performance www.pwc.com/india Enhancing the corporate energy performance Energy efficiency and Renewable energy, GRID Emerging Energy Markets Some Concerns in the Indian energy scenario India faces formidable challenges

More information

02 July 2015. VIPL Response to balancedata gaps 1 / Queries Set Case 36 of 2015 Data Gaps/Deficiencies on the Petition submitted by VIPL

02 July 2015. VIPL Response to balancedata gaps 1 / Queries Set Case 36 of 2015 Data Gaps/Deficiencies on the Petition submitted by VIPL Exhibit A VIPL Response to balancedata gaps 1 / Queries Set Case 36 of 2015 Data Gaps/Deficiencies on the Petition submitted by VIPL VIPL- Transmission: Determination of Capital Cost and Approval of ARR

More information

Company Name Query Response. Systems Pvt. Ltd. the Bid in spite of neither being an ISO 9001:2008 nor a CMMI L3 certified company with a valid

Company Name Query Response. Systems Pvt. Ltd. the Bid in spite of neither being an ISO 9001:2008 nor a CMMI L3 certified company with a valid Following are the queries received from different companies with regard to the RFP for School Quality Assessment and Accreditation Management Solution : Company Name Query Response Orion India 1. Can Orion

More information

G.O.MS.No. 8 Dated 12.02.2015 Read the following:-

G.O.MS.No. 8 Dated 12.02.2015 Read the following:- GOVERNMENT OF ANDHRA PRADESH ABSTRACT ENERGY, INFRASTRUCTURE & INVESTMENT DEPARTMENT - Development of Solar Power in Andhra Pradesh Andhra Pradesh Solar Power Policy, 2015 Orders Issued. ------------------------------------------------------------------------------------------------------------

More information

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Grid Connected Solar Power in India Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Indian Power Sector (31 March 2012) Thermal Hydro Nuclear Renewable 1,31,353 MW

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No.59 of 2013 & Petition No.4 of 2014 Date of Order: 28.11.2014 Petition No.59 of 2013 In the matter of:

More information

( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT

( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT ( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT RENEWABLE ENERGY DEPARTMENT NOTIFICATION The 23 rd November, 2005 POLICY FOR PROMOTING GENERATION OF ELECTRICITY

More information

Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Regulatory Commission 1 Tamil Nadu Electricity Regulatory Commission No 19A, Rukmini Lakshmipathy Salai, Egmore, Chennai - 600 008. Phone:044-28411376, Website:http://www.tnerc.tn.nic.in/ Public Notice 1. The Tamil Nadu Generation

More information

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines

Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines Draft Regulations for Determination of Pipeline Tariff for Natural Gas Pipelines Petroleum & Natural Gas Regulatory Board, New Delhi November 29, 2007 Reader may please note that this document is the property

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 266/SM/2012

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 266/SM/2012 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 266/SM/2012 Coram: Dr. Pramod Deo, Chairperson Shri S. Jayaraman, Member Shri V.S. Verma, Member Shri M. Deena Dayalan, Member Date of Hearing:

More information

v/s. Western India Art Litho Works Pvt. Ltd.

v/s. Western India Art Litho Works Pvt. Ltd. 1 cp1096.2000 IN THE HIGH COURT OF JUDICATURE AT BOMBAY ORDINARY ORIGINAL CIVIL JURISDICTION COMPANY PETITION NO. 1096 of 2000 Solar Printing Inks v/s. Western India Art Litho Works Pvt. Ltd....Petitioner...Respondent

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

For providing Facility Management Services of IT Infrastructure at College of Engineering Pune

For providing Facility Management Services of IT Infrastructure at College of Engineering Pune College of Engineering Pune-411 005 INVITATION OF TENDER For providing Facility Management Services of IT Infrastructure at College of Engineering Pune Cost of document Rs. 500/- Page 1 of 12 COLLEGE OF

More information

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT ; SERVICE MATTER. Judgment delivered on: 10.03.2014. W.P.(C) 2656/2013 and CM No.

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT ; SERVICE MATTER. Judgment delivered on: 10.03.2014. W.P.(C) 2656/2013 and CM No. IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT ; SERVICE MATTER Judgment delivered on: 10.03.2014 W.P.(C) 2656/2013 and CM No.5029/2013 (stay) ABHISHEK YADAV... PETITIONER VERSUS ORIENTAL INSURANCE COMPANY

More information

BEFORE THE ADJUDICATING OFFICER SECURITIES AND EXCHANGE BOARD OF INDIA [ADJUDICATION ORDER NO. AO/SM-LS/ERO/10/2016]

BEFORE THE ADJUDICATING OFFICER SECURITIES AND EXCHANGE BOARD OF INDIA [ADJUDICATION ORDER NO. AO/SM-LS/ERO/10/2016] BEFORE THE ADJUDICATING OFFICER SECURITIES AND EXCHANGE BOARD OF INDIA [ADJUDICATION ORDER NO. AO/SM-LS/ERO/10/2016] UNDER SECTION 15-I OF SECURITIES AND EXCHANGE BOARD OF INDIA ACT, 1992 READ WITH RULE

More information

Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation

Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation Pilot Scheme of MNRE for Large Scale Grid Connected Roof Top Solar Power Generation Solar Energy Corporation of India (A Govt. of India Enterprise) NBCC Plaza, Tower-1, 4 th Floor, Pushp Vihar Sector-V,

More information

CENTRAL INFORMATION COMMISSION Club Building (Near Post Office) Old JNU Campus, New Delhi-110067 Tel: +91-11-26105682. File No.CIC/DS/A/2011/001995/RM

CENTRAL INFORMATION COMMISSION Club Building (Near Post Office) Old JNU Campus, New Delhi-110067 Tel: +91-11-26105682. File No.CIC/DS/A/2011/001995/RM CENTRAL INFORMATION COMMISSION Club Building (Near Post Office) Old JNU Campus, New Delhi-110067 Tel: +91-11-26105682 File No.CIC/DS/A/2011/001995/RM Appellant: Mr. Rakesh Kumar Gupta, New Delhi Public

More information

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and

More information

Report On Development of Conceptual Framework For Renewable Energy Certificate Mechanism for India

Report On Development of Conceptual Framework For Renewable Energy Certificate Mechanism for India Report On Development of Conceptual Framework For Renewable Energy Certificate Mechanism for India Submitted to Ministry of New and Renewable Energy (Government of India) Prepared by ABPS Infrastructure

More information

Minnesota Power PRE QUALIFICATION QUESTIONNAIRE. Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant

Minnesota Power PRE QUALIFICATION QUESTIONNAIRE. Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant Minnesota Power PRE QUALIFICATION QUESTIONNAIRE Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant December 1, 2014 CONTRACTOR s NAME: Project Description: Minnesota Power is developing,

More information

School of Open Learning University of Delhi

School of Open Learning University of Delhi ` School of Open Learning University of Delhi REQUEST FOR PROPOSAL FOR RENEWAL OF ORACLE ANNUAL TECHNICAL SUPPORT Dated:25/10/12 Cost: Rs.500/- Last Day of Submission:9/11/2012 Request for Proposal (RfP)

More information

2769-BAN: Power System Efficiency Improvement Project [Part-B(ii), Increased Renewable Energy Use] Memo no.- BPDB (sectt.

2769-BAN: Power System Efficiency Improvement Project [Part-B(ii), Increased Renewable Energy Use] Memo no.- BPDB (sectt. Invitation for Bids Date: 20 August 2014 Loan No. and Title: Contract Title.: Deadline for Submission of Bids: 2769-BAN: Power System Efficiency Improvement Project [Part-B(ii), Increased Renewable Energy

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. SM/354/2013 (Suo-Motu)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. SM/354/2013 (Suo-Motu) CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. SM/354/2013 (Suo-Motu) Coram: 1. Shri Gireesh B. Pradhan, Chairperson 2. Shri M. Deena Dayalan, Member 3. Shri A. K. Singhal, Member 4.

More information

Dated 14 July, 2015. Director (A&F) NHIDCL

Dated 14 July, 2015. Director (A&F) NHIDCL National Highways & Infrastructure Development Corporation Ltd. (A Public Sector Undertaking in the Ministry of Road Transport and Highways, Govt. of India) 3 rd Floor, PTI Building, 4 - Parliament Street,

More information

Some Observations on Variance and Risk

Some Observations on Variance and Risk Some Observations on Variance and Risk 1 Introduction By K.K.Dharni Pradip Kumar 1.1 In most actuarial contexts some or all of the cash flows in a contract are uncertain and depend on the death or survival

More information

Delhi Solar Energy Policy, 2015

Delhi Solar Energy Policy, 2015 DRAFT VERSION FOR PUBLIC COMMENT Delhi Solar Energy Policy, 2015 GOVERNMENT OF NCT OF DELHI DELHI SECTRETARIAT, I.P. ESTATE, NEW DELHI- 110002 10 September 2015 NOTIFICATION The Government of NCT of Delhi

More information

In Focus. India s Renewable Energy Certificate Market

In Focus. India s Renewable Energy Certificate Market 2011 1 India s Renewable Energy Certificate Market In Focus India s Renewable Energy Certificate Market Carbon Credit Capital LLC 561 Broadway New York, NY 10012 Tel: 212-925-5697 (Main Office) www.carboncreditcapital.com

More information

Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL

Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL Press Release on Tariff Orders FY 2014-15 for PSPCL & PSTCL The revised tariff rates for supply of electricity in the State of Punjab during the year 2014-15 have been determined and the Tariff Orders

More information

TELECOM DISPUTES SETTLEMENT & APPELLATE TRIBUNAL NEW DELHI. Petition No. 669 of 2012. Loop Telecom Ltd. (Haryana) : Petitioner

TELECOM DISPUTES SETTLEMENT & APPELLATE TRIBUNAL NEW DELHI. Petition No. 669 of 2012. Loop Telecom Ltd. (Haryana) : Petitioner TELECOM DISPUTES SETTLEMENT & APPELLATE TRIBUNAL NEW DELHI Dated 19 th October, 2012 Petition No. 669 of 2012 Loop Telecom Ltd. (Haryana) : Petitioner Vs. Bharat Sanchar Nigam Limited : Respondent BEFORE:

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No. L-1/(3)/2009-CERC Dated the 7 th August 2009 In exercise of powers conferred by section 178 of the Electricity Act, 2003 and all other

More information

Firstgreen Solar Credentials

Firstgreen Solar Credentials Firstgreen Solar Credentials 2015 First Green Consulting Private Limited Gurgaon: U 28A/3 FF DLF Phase III, Gurgaon 122002, India Tel: 0124-6450225 Email: sanjay@firstgreen.co WEB: www.firstgreen.co Contents

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

F. No. 66/185/2016 -WE Ministry of New & Renewable Energy

F. No. 66/185/2016 -WE Ministry of New & Renewable Energy F. No. 66/185/2016 -WE Ministry of New & Renewable Energy India has set an ambitious target of reaching 175 GW of installed capacity from renewable energy sources including 100 GW from solar and 60 GW

More information

Request for Proposal (RFP) for. Corporate Agency Arrangement for General Insurance Business

Request for Proposal (RFP) for. Corporate Agency Arrangement for General Insurance Business Request for Proposal (RFP) for Corporate Agency Arrangement for General Insurance Business Reference Number: RFP P&D(39)/184 /2016 Date of RFP: April 30, 2016 Last Date & Time for Seeking Clarifications

More information

104, Silverton Town, 1 st Floor, Golf Course Extension Road, Sec 50, Gurgaon 122001. File No. CIC/SH/A/2014/002741

104, Silverton Town, 1 st Floor, Golf Course Extension Road, Sec 50, Gurgaon 122001. File No. CIC/SH/A/2014/002741 Central Information Commission, New Delhi File No. File No. CIC/SH/A/2014/002740 Right to Information Act 2005 Under Section (19) Date of first hearing 5th January 2016 Date of first order 5th January

More information

Success in Scaling-up Solar Energy in Rajasthan, India

Success in Scaling-up Solar Energy in Rajasthan, India Success in Scaling-up Solar Energy in Rajasthan, India Shreemat Pandey Principal Secretary to Chief Minister Rajasthan, India 1. Introduction Solar power is attractive because it is abundant and offers

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923 CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923 Ref.No.: 2/7(8)/2008-RIMS/Policy/CERC Dated: 29 th

More information

TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR

TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR A) Renewable Energy Development in India 2009 B) Biofuels in India (For details, see overleaf) Two New Reports on Renewable Energy and

More information

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY Initial Issue: March 2008 1 st Revision: January 2010 2 nd Revision:

More information

Notification pertaining to Request for Proposal for setting up of Private Cloud at NPCI. RFP Reference No: NPCI/RFP/2015-16/IT/0008 dated 03.07.

Notification pertaining to Request for Proposal for setting up of Private Cloud at NPCI. RFP Reference No: NPCI/RFP/2015-16/IT/0008 dated 03.07. Notification pertaining to Request for Proposal for setting up of Private Cloud at NPCI RFP Reference No: NPCI/RFP/2015-16/IT/0008 dated 03.07.2015 1. About NPCI National Payments Corporation of India

More information

Carlsbad Springs Solar Project

Carlsbad Springs Solar Project Date: July 16, 2015 Qualified Applicant: Invenergy LLC 120 Front Street East, Suite 201 Toronto, ON M5A 4L9 Registered Proponent: Carlsbad Springs Solar Energy Partnership Email: carlsbadspringssolarinfo@invenergyllc.com

More information

JOINT PRESS RELEASE. ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed in Uganda

JOINT PRESS RELEASE. ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed in Uganda ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed in Uganda Kampala, December 10, 2014 18:00 The Electricity Regulatory Authority (ERA) in cooperation with GET

More information

Wind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key Fver

Wind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key Fver Wind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key positive Fver for the sector, though concerns on RPO compliance continue Summary February 2015 ICRA RESEARCH SERVICES

More information

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters

More information

Renewable Energy Certificate Mechanism in India

Renewable Energy Certificate Mechanism in India 16th NATIONAL POWER SYSTEMS CONFERENCE, 15th-17th DECEMBER, 2010 92 Renewable Energy Certificate Mechanism in India S.K.Soonee, CEO*, Minaxi Garg, DGM #, and Satya Prakash, Engineer # Abstract India has

More information

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE PRESENTATION BY : MR KESHAV PRASAD MEMBER, DELEGATION OF THE CONFEDERATION OF INDIAN INDUSTRY (CII) & CHIEF OPERATING OFFICER, IL&FS ENERGY

More information

File No. 5/22/2013-14/RT Ministry of New and Renewable Energy Grid Connected Rooftop Solar Power Division *****

File No. 5/22/2013-14/RT Ministry of New and Renewable Energy Grid Connected Rooftop Solar Power Division ***** File No. 5/22/2013-14/RT Ministry of New and Renewable Energy Grid Connected Rooftop Solar Power Division ***** Block 14, CGO Complex Lodhi Road, New Delhi-110003 Dated: 18.09.2015 Subject: Operational

More information

Solar Resource Measurement Importance. Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015

Solar Resource Measurement Importance. Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015 Solar Resource Measurement Importance Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015 1 Overview of SCE Large service territory 14 million residents 4.9

More information

F.No 4/8/2015-DoD-II A Government of India Ministry of Finance Department of Disinvestment Block No. 11, CGO Complex Lodhi Road, New Delhi-110003

F.No 4/8/2015-DoD-II A Government of India Ministry of Finance Department of Disinvestment Block No. 11, CGO Complex Lodhi Road, New Delhi-110003 F.No 4/8/2015-DoD-II A Government of India Ministry of Finance Department of Disinvestment Block No. 11, CGO Complex Lodhi Road, New Delhi-110003 To, Dated the 3 rd July, 2015 The Domestic Legal Firms

More information

Renewable Energy Certificate Mechanism

Renewable Energy Certificate Mechanism Opportunities in Financing Renewable Energy Projects focusing on FiT and RECs Balawant Joshi Director, balawant@gmail.com, balawant.joshi@abpsinfra.com In this presentation.. Investment Potential for Renewable

More information

National Electricity Policy 03-Feb-2005

National Electricity Policy 03-Feb-2005 National Electricity Policy 03-Feb-2005 Under the provisions of section 3(1) of the Electricity Act, 2003, the Central Government is required to prepare the National Electricity Policy for development

More information

Eversource Energy. October 26, 2015. For the Period: Calendar Year 2015 Compliance

Eversource Energy. October 26, 2015. For the Period: Calendar Year 2015 Compliance Request For Proposals To Provide NEPOOL-GIS Certificates in Compliance With the Massachusetts Renewable Energy and Alternative Energy Portfolio Standards For the Period: Calendar Year 2015 Compliance October

More information

Chapter 3 Short Term Policies issued to Exporters

Chapter 3 Short Term Policies issued to Exporters Chapter 3 Short Term Policies issued to Exporters 3.1 Short term policies Policies issued to the exporters covering goods exported on short term credit basis i.e. credit not exceeding 180 days are short

More information

Presentation Title ( Arial, Font size 28 )

Presentation Title ( Arial, Font size 28 ) Presentation Title ( Arial, Font size 28 ) Acquisition of 1,140 MW Welspun Renewable Portfolio Date, Venue, etc..( Arial, Font size 18 ) June, 2016 Message Box ( Arial, Font size 18 Bold) Disclaimer Certain

More information

Request For Proposal (RFP) for Empanelment of IT Consultants for Bank

Request For Proposal (RFP) for Empanelment of IT Consultants for Bank RFP Reference No : OBC/HO/DIT/RFP-CONS/03 / 2010-11 Request For Proposal (RFP) for Empanelment of IT Consultants for Bank Oriental Bank of Commerce Department of Information Technology Head Office New

More information

Solar City Master Plan - Executive Summary

Solar City Master Plan - Executive Summary Solar City Master Plan - Executive Summary Meeting the growing energy demand is one of the biggest challenges that the world is facing today. Rising population and depleting fossil fuel resources are compelling

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Draft Maharashtra Electricity Regulatory Commission (Net Metering for Rooftop Solar Systems) Regulations, 2015 Electricity Act, 2003 No. MERC / Legal

More information