1 Page 1 of 6 San Antonio, TX Traffic System Site Survey Grounding, Bonding, Earth Resistivity and Surge Protection Focus Selected Traffic Intersections in and around the San Antonio TX area January 25, 2011 By Frank Basciano, Sales Engineer, Dehn, Inc..
2 Page 2 of 6 Executive Summary: At the direction of Lilly Banda, Traffic Management Engineer of the City of San Antonio Public Works Department, Traffic Management Division, Dehn Inc. completed a site survey of four intersections on Jan 25, Frank Basciano, Sales Engineer and Mark Brasier Account Executive for Dehn Inc accompanied three City of San Antonio Traffic Management employees having long tenure with the City. The intersections chosen varied in age and updates and most were known as trouble sites experiencing a higher than normally expected service record. Overall the grounding and bonding at all the sites were questionable at best. Earth resistivity is also an issue at one of the sites. Based on these findings, a recommendation is given that a systematic inspection of all traffic signals is done over a short time. The city currently does not have a modern earth resistivity test system. Dehn has this equipment available for sale and Lilly Banda has received a quote for such equipment. This equipment should be purchased and used as part of a preventative maintenance program. The three oldest intersections we surveyed revealed the most issues. Being upgraded over time and the wear and tear of weathering, these sites showed broken bonds, loose terminal connections (bonding issues) and some excessively high ground and earth resistance. The newest intersection on the outskirts of the city showed the most reliable grounding even being in the middle of a quarry with large rock formations. However, this site s surge protection products especially for the cameras were not well installed experiencing loose ground connections. Dehn Inc recommends that the City of San Antonio continue to work on improving its grounding, bonding and in some cases improve the earth resistivity at needed sites. In addition, the wiring methods and surge protection products currently being used are antiquated and inadequate for effective lightning protection. Wiring methods should be specified to the cabinet manufacturers to comply with modern Electro-Magnetic Compatibility (EMC) standards found in the IEC and IEEE collection of standards. Further, it is recommended that the City also incorporate the US Department of Transportation, Federal Highway Administration, Traffic Detector Handbook Third Ed (Publication No. FHWA-HRT ) especially appendixes N and O to create robust new designs and develop a preventative maintenance process. Please understand that the information in the Traffic Detector Handbook on lightning and its characteristics is antiquated and does not include information on the higher energy waveform of 10/350us mentioned in the IEC standards and IEEE standards. The current surge arresters that the City has installed are inadequate to function as a lightning protection device.
3 Page 3 of 6 San Antonio Traffic Systems Survey Jan 25, 2011 Location: Wurzbach & Bluemel Clamp-On Meter 32.5 ohms The electrical grounding was broken at the connection from the ground rod to disconnect. The technicians repaired this before we left. Earth Resistivity 38.5 ohms without power ground connected Earth Resistivity 0.19 ohms once power ground connected to the ground rod Recommendations: connecting ground wire to ground rod; use Bentonite or other approved chemical grounding method to improve earth resistivity, Dehn has a product called DEHNit (p/n ). Establish a PM for the ground rod two years.
4 Page 4 of 6 Location: Brookhollow & Heimer Clamp-On Reading: 90+ (unstable) ohms at pole; 430 ohms in cabinet Earth resisivitiy: 0.3 ohms at ground rod at pole; 137 ohms in ground rod in below ground box Approximately 5 feet between pole ground rod and ground rod in box Recommendations: bond pole & box ground rods; check below ground level clamp on pole ground rod for corrosion or looseness; use chemical like DEHNit to lower earth resistivity (two year PM), install Dehn surge arrester ( ) on incoming power block as there is no surge protection on the AC power mains (see photo just above right).
5 Page 5 of 6 Location: McCullough & Dewey Clamp-On Meter: unstable, jumping between 8 50 ohms, no noise issue with the meter Disconnect across the street, no local ground rod connection, improper cabling used to run hot and neutral. (see photo just below) Did not take Earth Resistivity because of other problems Recommendations: Have power company put new power drop on pole near control cabinet, remove across the street disconnect, ground the neutral at the disconnect on the new power drop, use new cables for power, neutral and ground,
6 Page 6 of 6 Superway Panels Clamp-On Meter 0.19 ohms in each cabinet no noise issue with Dehn meter Earth Resistivity did not take as clamp on reading showed excellent ground resistance No photos taken as new system with surge arresters installed on power and BNC coax. Recommendations: all BNC camera arresters are loose in connection to ground and the ground connection of each arrester should be bonded together and a separate (short) wire solidly bonded to ground or use a more robust method to connect the ground plates to prevent connections coming loose from vibrations over time; install Dehn Industrial Ethernet arrester ( ) for any Ethernet cable leaving the cabinet. Conclusion: The City with approx. 3,000 intersections of various ages and types also finds itself with the continuous need to upgrade to modern electronic systems. These systems are often installed in cabinets and/or locations that do not or cannot provide quality electrical power, grounding or signal cable routing. This leaves these sites vulnerable to lightning & surge activity either damaging or resetting equipment. As lightning activity is high for the state of TX, precautions need to be taken to limit the damage from these storms. Grounding and bonding is important and must be addressed; however, high quality lightning and surge arresters must also be part of the overall installation. Another very important issue is that the wire routing for these cabinets should be designed in by engineering (not left to the cabinet manufacturer s discretion) to accommodate the current best practices to limit Electro-Magnetic Interference (EMI) especially against the Lightning Electro-Magnetic Pulse (LEMP). Using modest to low quality surge arresters often leads to equipment and arrester damage during storm activity. From information gathered from the technicians, there have been instances where the currently installed arresters failed catastrophically and did not protect the cabinet electronics. Surge arresters/protectors are not capable of mitigating the high energy lightning impulse. Combination lightning and surge arresters should be installed within cabinets on AC power mains and even on other cables entering or leaving the cabinet. Dehn has products that can meet these needs. If there are any questions related to this report or Dehn products, please contact me at or frank.basciano@dehn-usa.com. Respectfully submitted: Frank Basciano Sales Engineer; Dehn, Inc.
Chapter 9. Bonding and Grounding
Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and
More informationTROUBLESHOOTING PRELIMINARY
TROUBLESHOOTING PRELIMINARY To troubleshoot, one must first have a working knowledge of the individual parts and their relation to one another. Must have adequate hand tools Must have basic instrumentation:
More informationCurrent Probes. User Manual
Current Probes User Manual ETS-Lindgren L.P. reserves the right to make changes to any product described herein in order to improve function, design, or for any other reason. Nothing contained herein shall
More informationVideo Camera Installation Guide
Video Camera Installation Guide The intent of this guide is to provide the information needed to complete or modify a video camera installation to avoid lightning and induced power surge damage. This guide
More informationCONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
More informationEMC Engineering Guidelines For Automation Systems PS 4 PS 416 04/97 AWB 27-1287-GB
EMC Engineering Guidelines For Automation Systems PS 4 PS 416 1st edition 04/97 Moeller GmbH, Bonn Author: Werner Albrecht Editors: Klaus Krüger, Thomas Kracht Translator: Chris Baker, Terence Osborn Contents
More informationSANS 10142-1 : 2008 CODE OF PRACTICE THE WIRING OF PREMISES Part 1 : Low Voltage Installation
SANS 10142-1 : 2008 CODE OF PRACTICE THE WIRING OF PREMISES Part 1 : Low Voltage Installation 4 Compliance Proof of Compliance (Sub clause 4.1.1) The SABS safety mark The SABS approved performance mark
More informationGrounding of Electrical Systems NEW CODE: Grounding and Bonding
Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately
More informationMoxa EtherDevice Switch
Moxa EtherDevice Switch EDS-205 Hardware Installation Guide Third Edition, June 2008 2008 Moxa Inc., all rights reserved. Reproduction without permission is prohibited. P/N: 1802002050000 Overview The
More informationNEGRP TEST SUMMARY. Joseph A. Lanzoni, November 2005
NEGRP TEST SUMMARY Joseph A. Lanzoni, November 2005 The National Electrical Grounding Research Project (NEGRP) was a project managed and sponsored by the National Fire Protection Association (NFPA) Research
More informationDavid Brender Copper Development Association Inc. david.brender@copperalliance.us. Miramar, March 8, 2013
Grounding and Bonding in Communications Systems David Brender Copper Development Association Inc. david.brender@copperalliance.us Ennes Workshop Miramar, March 8, 2013 MMXIII This talk concentrates on:
More information1. Franklin Rod Performance 2. LEC/DAS Performance
THREE ESSENTIALS OF LIGHTNING PROTECTION: BONDING, GROUNDING AND SURGE PROTECTION by Richard Kithil, President and Orlando Alzamora, Vice-President National Lightning Safety Institute (NLSI) 1.0 Summary.
More informationWhat are the basic electrical safety issues and remedies in solar photovoltaic installations?
What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic
More informationTroubleshooting accelerometer installations
Troubleshooting accelerometer installations Accelerometer based monitoring systems can be tested to verify proper installation and operation. Testing ensures data integrity and can identify most problems.
More informationODOT ITB 063-14 Section 4: Flashers, Timers, & Software Systems Item 4-1
ODOT ITB 063-14 Item 4-1 DATA SHEET SSF-86-3 ODOT ITB 063-14 Item 4-1 Solid State Flasher: Description: The PDC model SSF-86 solid state flasher is a dual circuit flasher designed for the Traffic Control
More informationTerminal and Dimension
Ethernet Extender Model Number: SJ-L-DSL Complete Installation Guide Product Description Product Features SJ-L-DSL is network signal extension device, which consists of remote unit and local unit. It can
More informationGrounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.
Grounding Practice at Data and Communications Centers David Brender, P.E., CPQ National Program Manager Copper Development Association Inc. Overview of This Presentation Elements of building wiring and
More informationDET3 Contractor Series 3-Terminal Earth/Ground Resistance Testers
99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com DET3 Contractor Series 3-Terminal DET3 Contractor Series 2 and 3 point testing
More informationDRM75A 230V 20/100A DIN rail single phase two wire energy meter
DRM75A 230V 20/100A DIN rail single phase two wire energy meter 1.1 Safety instruction 1.2 Foreword 1.3 Performance criteria 1.4 Specifications 1.5 Basic errors 1.6 Description 1.7 Dimensions 1.8 Installation
More informationADSL Modem Installation Guide. Model # 36R515 Part # 030-300108 Rev. D Revision Date 12/2000. ADSL Modem Installation Guide
ADSL Modem Installation Guide Model # 36R515 Part # 030-300108 Rev. D Revision Date 12/2000 ADSL Modem Installation Guide Installation Instructions Westell ADSL Modem 1. Package Inspection and Contents...2
More information3.5 mm Audio Jack. Manual innoxplore ix B24 A2DP Stereo Bluetooth Audio Adapter Dongle 3.5mm Audio Jack [ix B24] Contents
3.5 mm Audio Jack Manual innoxplore ix B24 A2DP Stereo Bluetooth Audio Adapter Dongle 3.5mm Audio Jack [ix B24] Contents 1 Safety Information.. 2 1.1. Electronic Devices 2 1.2 Aircraft..2 1.3 Medical Instruments..2
More informationDET3 Contractor Series
DET3 Contractor Series 3-Terminal 2 and 3 point testing ART (Attached Rod Technique) testing capability User selectable test voltage (25/50 V) Choice of digital or analog display Warning indicators prevent
More informationPXL-250: Network Wiring
This document provides the network wiring requirements for a PXL-250 access control network. Network Requirements The PXL-250 uses a half-duplex, RS-485 communication bus. Per the RS-485 specification,
More information5-port / 8-port 10/100BaseTX Industrial Ethernet Switch User Manual
5-port / 8-port 10/100BaseTX Industrial Ethernet Switch User Manual Content Overview... 1 Introduction... 1 Features... 3 Packing List... 4 Safety Precaution... 4 Hardware Description... 5 Front Panel...
More informationGrounding and Shield Termination. Application Note 51204
Grounding and Shield Termination Application Note 51204 DEFINITIONS This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this
More informationNCHRP 08-36 TASK 114
NCHRP 08-36 TASK 114 Transportation Asset Management for Ancillary Assets Primary Authors: Keyur Shah, PMP John Patrick O Har, Ph.D. 2015 AASHTO Subcommittee on Maintenance Meeting July 21, 2015 Overview
More informationStructured Cabling, Earthing & Equipotential Bonding
White Paper Information and Communication Technology Structured Cabling, Earthing & Equipotential Bonding English Rev. 1.0.1 / 2012-06-01 1 Abstract All Dallmeier network products (PoE cameras, recorders,
More informationSTREETLIGHT SYSTEM GROUNDING AND BONDING
Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial
More informationProduct Documentation on the World Wide Web
Hotwire M/SDSL Standalone Termination Units Models 7974-A2, 7975-A2, and 7976-A2 Installation Instructions Document Number 7900-A2-GN11-00 August 2000 Product Documentation on the World Wide Web We provide
More informationEarth Ground Resistance
Principles, testing methods and applications Diagnose intermittent electrical problems Avoid unnecessary downtime Learn earth ground safety principles Earth Ground Resistance Why Ground, Why Test? Why
More information1.3. The network element must have the ability to be configured in a point to point, point to multi point, and daisy chain configuration.
DESCRIPTION This work shall consist of furnishing and installing 10/100 Ethernet over Twisted Pair (TWP) Copper Modems in accordance with the contract documents and as directed by the Engineer. MATERIALS
More informationFIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.
Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's
More information8 Port Gigabit 10M/100M/1000M Fast Ethernet Switch. User Manual
8 Port Gigabit 10M/100M/1000M Fast Ethernet Switch User Manual Part#: PL-1008G V0613 Package Contents: The following items should be found in your package: 8 Port Desk-top Giga Ethernet Switch Power Adapter
More informationSTATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva
STATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva INTRODUCTION: The United States Embassy in Suva, Fiji is seeking contractor proposals to upgrade
More informationM7250P. PoE Powered. Gigabit Ethernet Media Converter 1000BASE-TX TO 1000BASE-SX/LX. Installation Guide
M7250P PoE Powered Gigabit Ethernet Media Converter 1000BASE-TX TO 1000BASE-SX/LX Installation Guide September 2009 VERSITRON, Inc. 83 Albe Drive - Suite C Newark, DE 19702 www.versitron.com www.versitron.com
More informationClamp Filters that Suppress Emission Noise Provide Immunity Against Surge Noise
TDK EMC Technology Product Section Clamp Filters that Suppress Emission Noise Provide Immunity Against Surge Noise TDK Shonai Corporation Satoru Saito Reduce Emission Noise from Cables Even if an electronic
More informationIntersection Preassembled 19-inch Rack
Intersection Preassembled 19-inch Rack The intersection preassembled 19-inch rack comes fully assembled, wired and ready to be installed in a server rack. The rack provides communications, power conversion
More informationTelecommunication Line Protectors
TN CR 0025 Telecommunication Line s 1.1 The nature of telecom surges The telecom services considered in this report are transported on twisted pair. Each service has two wires, or lines, sometimes called
More informationDET3 and 4 Contractor Series Earth/Ground Resistance Testers
DET3 and 4 Contractor Series 2, 3 and 4 point testing ART (Attached Rod Technique) testing capability and stakeless testing technique Choice of digital or analog display Warning indicators prevent test
More informationSPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
More informationOutdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points
Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Features SELV Compliant No Detection Passive Injector Gigabit Compatible Full Protection
More informationLS1024B / LS2024B/ LS3024B. Solar Charge Controller USER MANUAL
EPSOLAR LS1024B / LS2024B/ LS3024B Solar Charge Controller USER MANUAL Thank you very much for selecting our product! This manual offers important information and suggestions with respect to installation,
More informationElectrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
More informationINSTRUCTION MANUAL MODEL PCD-88
INSTRUCTION MANUAL MODEL PCD-88 CLOSED CAPTION DECODER LINK ELECTRONICS, INC. 2137 Rust Avenue Cape Girardeau, Missouri 63703 Phone: 573-334-4433 Fax: 573-334-9255 e-mail: sales @ linkelectronics.com website:
More informationBLACK BOX. T1/E1 Link Extenders OCTOBER 2007 MT195A-T1 MT196A-E1
BLACK BOX NETWORK SERVICES OCTOBER 2007 MT195A-T1 MT196A-E1 T1/E1 Link Extenders Important This is a Class A device and is intended for use in a light industrial environment. It is not intended nor approved
More information270526-TC Grounding and Bonding for Telecommunications Systems
270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer
More informationADM1TE 5/30A DIN rail single phase two wire energy meter
ADMTE 5/30A DIN rail single phase two wire energy meter. Safety instruction.2 Foreword.3 Performance criteria.4 Specifications.5 Basic errors.6 Description.7 Dimensions.8 Installation.9 Operating.0 Troubleshooting.
More informationBB -508L/509L INSTALLATION MANUAL LATTICE BOOM CRANES. Greer Company Crane Systems. Greer Company
BB -508L/509L ANTI TWO-BLOCK ALARM SYSTEM LATTICE BOOM CRANES INSTALLATION MANUAL BB TM -508/509 Anti Two-Block System Lattice 1 of 14 PN W250015 01/21/01 BB -508L/509L ANTI TWO-BLOCK ALARM SYSTEM INSTALLATION
More informationMeasuring leakage currents in electromedical devices in accordance with IEC EN 62353
Measuring leakage currents in electromedical devices in accordance with IEC E 62353 White Paper Vincenzo Ventimiglia, engineer, SLT srl Gianpetro Pellizzer, self-employed engineer Introduction The measurement
More informationKZ0224UW INSTALLATION MANUAL SURGE PROTECTED CCTV POWER SUPPLY 24V AC, 5 AMP KZMI000549 11/12/01
KZ0224UW SURGE PROTECTED CCTV POWER SUPPLY 24V AC, 5 AMP INSTALLATION MANUAL KZMI000549 ISSUE DATE REVISIONS 1 November 2001 Initial release. 2001 BY ULTRAK ALL RIGHTS RESERVED ULTRAK CORPORATE OFFICE
More informationCharged cable event. 1 Goal of the ongoing investigation. 2 Energy sources for the CDE. Content
Charged cable event David Pommerenke, david_pommerenke@hp.com, 916 785 4550 Last update: Feb.23, 2001 Content Goal Energy sources, which may lead to CDE. Complexity of the different discharge modes. Possible
More informationLevelOne IFE-0500 4-Port PoE + 1-Port TP Industrial Fast Ethernet Switch User Manual
LevelOne IFE-0500 4-Port PoE + 1-Port TP Industrial Fast Ethernet Switch User Manual Ver. 1.0.0-0711 1 FCC Warning This Equipment has been tested and found to comply with the limits for a Class-A digital
More information33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application
33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application Features Compliant with the IEEE802.3at Standard -40 to +60 C Temperature Range Diagnostic LEDs Full Protection
More informationBODi rs BD004 Series Bandwidth-on-Demand Internet with Reliability and Survivability. Quick Start Guide NOTES
NOTES BODi rs BD004 Series Bandwidth-on-Demand Internet with Reliability and Survivability Quick Start Guide This is a Class A device and is not intended for use in a residential environment. Important
More informationELCOMPONENT LTD. User Manual
ELCOMPONENT LTD R-DCU - Remote Data a Collection Unit User Manual al CONTENTS Page 1. GENERAL... 1 2. SPECIFICATION... 4 3. INSTALLATION AND INSTRUCTIONS... 6 4. INSTRUMENT SET-UP AND RESET... 11 All rights
More informationFundamentals of Power
Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At
More informationSECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES
SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES 611-1 Description. This Section sets forth Contract acceptance procedures for installations of traffic control signals and devices
More informationLoad Cell Troubleshooting
VPG TRANSDUCERS Load Cells and Weigh Modules Technical Note VPGT-08 Scope Load cells are designed to sense force or weight under a wide range of adverse conditions; they are not only the most essential
More informationW O R L D C L A S S H I F I
W O R L D C L A S S H I F I O W N E R S M A N U A L Accessories: NAPSC, i-supply, Headline, Stageline IMPORTANT In order to comply with current European safety regulations it is essential that the Naim
More informationwith Component Rating A Simple Perspective
Cat-6A UTP and Shielded with Component Rating A Simple Perspective Asef Baddar RCDD, DCD Sr. Technical Manager Leviton Middle East Category Specifications Agenda Terminology International & North America
More informationInstalling PoE for Outdoor Deployments. White Paper
Installing PoE for Outdoor Deployments White Paper September 2011 Introduction This white paper addresses the challenges of installing powered devices in an outdoor environment, and explores different
More informationInstallation and safety instructions for AC/DC built-in devices
The device type and date of manufacture (week/year) can be found on the device rating plate. In the event of any queries about the device, please quote all the details given on the rating plate. For further
More informationAppendix A - Cost Estimate Spreadsheet
CCTV Camera, PTZ Per Each $18,500 $1,250 12 $33,500 Closed circuit television (CCTV) camera with pan, tilt, zoom (PTZ) functionality in a dome enclosure. CCTV Camera, Fixed Per Each $14,000 $1,250 12 $29,000
More informationInstalling the Broadband Global Area Network (BGAN) Fixed Mount Kit
Installing the Broadband Global Area Network (BGAN) Fixed Mount Kit Product description BGAN fixed mount kit Although the BGAN satellite modem terminal is designed for portable use, the BGAN Fixed Mount
More informationTechnical Update TAA.TU.11093 Rev. 1
http://www.gambro.com/en/usa_tech/ 800-525-2623 303-222-6500 Technical Update TAA.TU.11093 Rev. 1 Effective: 05 APR 2013 CO# 13084 Product: Subject: From: Phoenix Dialysis System Required Electrical Safety
More informationDUAL%CHANNEL BROADBAND%LINEAR%AMPLIFIER Model&A800D
ELECTRONICS AB DUAL%CHANNEL BROADBAND%LINEAR%AMPLIFIER Model&A800D & HIGH&VOLTAGE& FIXED&GAIN& BROADBAND & 800Vpp&60mA& 100x& DC&to&ca&200&kHz & LOW&OUTPUT&IMPEDANCE& HIGH&SLEW&RATE &
More informationWalking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
More informationTable of Contents. The Basics of Electricity 2. Using a Digital Multimeter 4. Testing Voltage 8. Testing Current 10. Testing Resistance 12
Table of Contents The Basics of Electricity 2 Using a Digital Multimeter 4 IDEAL Digital Multimeters An Introduction The Basics of Digital Multimeters is designed to give you a fundamental knowledge of
More informationTime Propane Pressure Drop Test Sign-Off Sheet
Time Propane Pressure Drop Test Sign-Off Sheet Printed Technician Name Address Social Security Number Telephone Number City State Zip Code Time Pressure Drop Test Conducted at the Range Did the Candidate:
More informationUSER MANUAL. MODEL 460 Series G.703 Coax to Twisted Pair Adapter (Balun)
USER MANUAL MODEL 460 Series G.703 Coax to Twisted Pair Adapter (Balun) An ISO-9001 Certified Company Part #07M460-E Doc. #019021UE Revised 02/23/00 SALES OFFICE (301) 975-1000 TECHNICAL SUPPORT (301)
More informationCoaxial Cable Entry Panels, Coax and Grounding Connectors. Technical Note
Coaxial Cable Entry Panels, Coax and Grounding Connectors Technical Note Coaxial Cable Entry Panels, Coax and Grounding Connectors Surge Protection Solutions for PTC 2 Coaxial Cable Entry Panels, Coax
More informationElectrical Infrastructure in Remote Areas. A Review of Potential Threats to Safety and Sustainability
Electrical Infrastructure in Remote Areas A Review of Potential Justin Buskmiller 1, Larry Bentley 2 and Jon Fripp 3, Subject Key Word: Energy Key Words: Electrical infrastructure, power supply, power
More informationEDI Distributor Control Interface Wiring and Setup Instructions
Universal I/O EDI Distributor Control Interface Wiring and Setup Instructions EDI UNIVERSAL I/O INTERFACE MODULE The only interface needed for EDI-V5 controls Network compatible with all older EDI controls
More informationElectrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
More informationSecurity Cameras, CATV, GPS & Satellite Protection. White Paper
Security Cameras, CATV, GPS & Satellite Protection White Paper Security Cameras, CATV, GPS & Satellite Protection Surge Protection Solutions for PTC 1 Security Cameras, CATV, GPS & Satellite Protection
More informationHM-W536 Install Guide
HM-W536 Install Guide 9/13/2013 IMPORTANT SAFETY INSTRUCTIONS Warning - When using electrical devices, basic safety precautions should be followed to reduce the risk of fire, electrical shock or injury.
More informationInstallation Guide (Typical) For Micro-Comm Radio Telemetry And Control Systems
Installation Guide (Typical) For Micro-Comm Radio Telemetry And Control Systems Project: Location: Micro-Comm Project Manager: NOTE: This Installation Guide is intended to be a Typical Installation reference
More information8-Port PoE Network Switch
8-Port PoE Network Switch User s Guide WARNINGS AND CAUTIONS Read and understand all instructions. Follow all warnings and instructions marked on the product. Do not use this product near water - e.g.,
More informationCUSTOMER REQUIREMENTS AT POWER SUBSTATIONS
CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS Customer Handout Date Aug 2, 2010 Version 1.0 File Name Customer Requirements At Power Substations Document Id Outside Plant Engineering 1 Table Of Contents 1.0
More informationInterfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13
Interfacing electrification and system reliability Roger White Professional Head of Electrification and Plant Rail Abstract Integration is the term given to ensuring that the different elements of an electrified
More informationTDR900. Hand-held Time Domain Reflectometer/Cable Length Meter TDR900. Hand-held Time Domain Reflectometer/Cable Length Meter
Hand-held Time Domain Reflectometer/Cable Full autoranging for measuring the length of power, telephony, CATV and LAN cables, provides distance to an open or short. Extra large, high resolution backlit
More informationGround Resistance Clamp-On Tester
User s Manual Ground Resistance Clamp-On Tester MODEL 382357 Warranty EXTECH INSTRUMENTS CORPORATION (a FLIR company) warrants the basic instrument to be free of defects in parts and workmanship for one
More informationNo Phone Line System. Quick Start Guide NPL II. 1.0 Installation
Used in conjunction with EntraGuard Gold Telephone Entry Systems, the provides No Phone Line communication and door or gate control through existing building telephone lines without the need purchase phone
More informationDirections for use : Dosing chutes type DSX.
Pag. 1-10 Directions for use : Dosing chutes type DSX. Introduction The linear vibrations of STILETTO consist of a drive part and a movable part which are connected to leave springs. The purpose of the
More informationCaracterísticas. Starligh SA 9 de julio 1595 Córdoba Argentina - 0351-4809210 / 4119600
Balun Activo - BALUN_ACT Características Single Channel Active Video Transmitter Full-motion color video signal up to 3900ft(1200m) via UTP cat5e/6 NTSC, PAL & SECAM video format compatible Real-time transmission
More informationHP ProCurve High-Speed Transceivers Installation Guide
HP ProCurve High-Speed Transceivers Installation Guide Introduction The HP ProCurve High-Speed Transceivers can be installed into a number of HP ProCurve networking devices to provide 100 Mbps and 1000
More informationFeatures. Picture. Specifications
Type: for level measurement Order No.: see Table 1 / Page 4 Features Picture Two wire system Piezoresistive measuring element Output signal 4-20 ma Conformity error ±0.5 % FS or Standard DIN measuring
More informationAN96-07. Surging Ideas TVS Diode Application Note PROTECTION PRODUCTS. TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x
TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x On January 1, 1996, exports into Europe began facing some tough transient immunity standards. The International Electrotechnical Commission (IEC), a worldwide
More informationAbout the HotWire 7900 10-Slot Standalone Shelf
TM HotWire Model 7900 10-Slot Standalone Shelf Installation Instructions Document Number 7900-A2-GN10-10 About the HotWire 7900 10-Slot Standalone Shelf The HotWire 7900 10-Slot Standalone Shelf is designed
More informationTV Trouble Shooting Manual
INFORMATION SOURCE 5 TV Trouble Shooting Manual VOLUME 1 BY MASAAKI MUKAI AND RYOZO KOBAYASHI ASIAN AND PACIFIC SKILL DEVELOPMENT PROGRAMME INTERNATIONAL LABOUR OFFICE ISLAMABAD, PAKISSTAN, 1988 Appendix
More informationIR Intelligent Speed Dome Installation Manual. Version 1.0
IR Intelligent Speed Dome Installation Manual Version 1.0 Table of Contents 1 IR INTELLIGENT SPEED DOME INSTALLATION... 1 1.1 Installation Preparation...1 1.2 Initial Setup...1 1.3 Dial Switch Setup (For
More informationThe impact of the New EMC Directive 2004/108/EC
The impact of the New EMC Directive 2004/108/EC Presentation by Damon High Presentation Overview Brief overview of Electromagnetic Interference and Electromagnetic Compatibility EMC Directive and UK Legislation
More informationOperating instructions
ebm-papst Mulfingen GmbH & Co. KG Bachmühle D-74673 Mulfingen Phone +49 (0) 7938 81-0 Fax +49 (0) 7938 81-110 info1@de.ebmpapst.com www.ebmpapst.com CONTENTS 1. SAFETY REGULATIONS AND S 1.1 Levels of hazard
More informationMISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
More informationTMS TANK MANAGEMENT SYSTEM
TMS TANK MANAGEMENT SYSTEM Page 1 of 9 Operating Instructions GENERAL The Tank Management System is a bespoke design to control, monitor and accommodate efficient storage and dispensing of TMS. FUNCTIONS
More informationCurrent valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
More informationEPM3. Phase Sequence and Motor Rotation Tester. Users Manual
EPM3 Phase Sequence and Motor Rotation Tester Users Manual 1 L1 L2 L3 2 3 A B C CAT 600V 3-PHASE TESTER 5 TEST M1 M2 BATT M3 EPM3 MOTOR ROTATION TESTER EPM3 MOTOR ROTATION DETERMINED WHILE FACING MOTOR
More informationWiser Panel Meter, Model Number WISERCTPM200 Installer s Guide
Instruction Bulletin EAV85226 08/2014 Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide Retain for future use. Product Description Kit Contents The Wiser Panel Meter is for use in energy management
More informationSECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT
SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT 16.1-1 16.4 Intelligent Transportation Systems Introduction The ITS Engineering Unit is responsible for the design of all ITS
More informationBUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
More information