FRONT STREET & MUD ISLAND Interceptor Rehab

Size: px
Start display at page:

Download "FRONT STREET & MUD ISLAND Interceptor Rehab"

Transcription

1 ± 1!(!( 2!(!(!(!( 3!(!( 4!(!( 5!(!(!( 7!(!(!(!(!( 6!(!( 8!(!( 9!( Legend!( Manhole Rehab Mud IslandInterceptor (CIPP) Front St Interceptor (No Rehab) Gravity Main (No Rehab) Manhole (No Rehab) Sheet Boundary FRONT STREET & MUD ISLAND Interceptor Rehab

2 #*FS Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 1 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

3 FS ") FS ") FS ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 2 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

4 FS ") FS ") FS ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 3 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

5 FS ") FS ") FS ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 4 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

6 #*FS Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 5 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

7 FS #* FS #* FS ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 6 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

8 WO010176S 60'', 778' MI Depth: 28'!( MI010100S 60'', 228'!(!( MI010109S 24'', 90' WO Depth: 30' MI Depth: 25' MI010110S 24'', 385' MI010101S 60'', 527' MI Depth: 27'!( MI Depth: Unknown!( MI010111S 24'', 287' MI Depth: 26'!( Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 7 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

9 WO Depth: Unknown!( WO S 60'', 609' WO010175S 60'', 1001' WO Depth: Unknown!( WO010176S 60'', 778' Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 8 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

10 WO Depth: 25'!( WO S 60'', 609' WO Depth: Unknown!( WO010175S 60'', 1001' Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 9 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary

More information

--------------------------------------------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------------------- Request for Bid Front Street & Mud Island Interceptor Rehab Addendum # 1 to RFB No. 179821.71.0404 January 19, 2016 The following information encompasses Addendum # 1 for the above referenced RFB. Bidders

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: mhepa@mhepc.com RICHARD D. McGOEY, P.E. (NY &

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public

More information

SEWER LINE EXTENSION DESIGN CHECKLIST

SEWER LINE EXTENSION DESIGN CHECKLIST SEWER LINE EXTENSION DESIGN CHECKLIST SWLE# Utilities Staff Date DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling design plans for

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

Elev. A = 200.05, Elev. B = 325.25, horizontal distance = 1625 feet a. 7.7 b..077 c. 12.98 d. 1.28

Elev. A = 200.05, Elev. B = 325.25, horizontal distance = 1625 feet a. 7.7 b..077 c. 12.98 d. 1.28 1. If the percent grade is 7.25 % and the horizontal length of grade is 1625 feet, what is the change in elevation? a. 117.81 feet b. 1178.13 feet c. 11.78 feet d. 1.17 feet 2. In surveying, the distance

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

VDI Mixer/Amplifier/Multiplier Chains (MixAMCs)

VDI Mixer/Amplifier/Multiplier Chains (MixAMCs) VDI Mixer/Amplifier/Multiplier Chains (MixAMCs) VDI s MixAMCs provide high performance broadband downconversion and frequency extension of microwave spectrum analyzers into the THz range. Models are currently

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

Platte River Interceptor Slipline Rehabilitation

Platte River Interceptor Slipline Rehabilitation Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area

More information

Amendment 1 Preliminary Engineering Report for the City of Salida

Amendment 1 Preliminary Engineering Report for the City of Salida Amendment 1 Preliminary Engineering Report for the City of Salida Galleries Water Tank Rehabilitation Project February 11, 2010 Prepared by 1.0 Executive Summary The work of this Preliminary Engineering

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today

More information

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees Rates & Fees Residential Accounts Residential Accounts 2015 Calendar Year Initial Charges New Construction or Irrigation 3 Base Meter 2 Account Activation Fee System Development Charge 1 Size Meter Fee

More information

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019. Project Description

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019. Project Description PUBLIC NOTICE Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019 Project Description Project Name: Hunnewell Fish Hatchery Production Pond Renovation (Phases 2 and 3) Location: Hunnewell Fish

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION April 25, 2014 DUE DATE/LOCATION: Friday, May 9, 2014 Bid forms and references are due by 9:30 A.M. at:

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why

More information

BRUCE TOWNSHIP 32 MILE ROAD VILLAGE OF ROMEO 30 MILE ROAD CENTRAL SANITARY SEWER DISTRICT CAMPGROUND ROAD 28 MILE ROAD MOUND ROAD VAN DYKE AVENUE

BRUCE TOWNSHIP 32 MILE ROAD VILLAGE OF ROMEO 30 MILE ROAD CENTRAL SANITARY SEWER DISTRICT CAMPGROUND ROAD 28 MILE ROAD MOUND ROAD VAN DYKE AVENUE 26 MILE ROAD M-53 M-53 OWNER ENGINEER N TRUNKLINE SEWER AND SECTIONS 27, 34, 35, & 36 OF THE CENTRAL SANITARY SEWER DISTRICT T-4-S R-12-E,, SRF NO. 5623-01 BRUCE TOWNSHIP 32 MILE ROAD VILLAGE OF ROMEO

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

Waste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands

Waste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands Waste Management Infrastructure Rehabilitation in the U.S. Virgin Islands The United States Virgin Islands is a group of islands in the Caribbean that are an insular area of the United States. The islands

More information

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,

More information

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to

More information

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part

More information

GIS in Wastewater Collection System Master Planning

GIS in Wastewater Collection System Master Planning Page 1 of 6 GIS in Wastewater Collection System Master Planning Brad Roeth, EIT Stanley Consultants, Inc. This paper presents the use of GIS in a wastewater collection system master plan. The master plan

More information

Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis

Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis Wayne Miles, PE Michael Sloop, PE Presented at 2014 APWA Water Resources Conference September 16, 2014Wayne

More information

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900 Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals This section applies to design standards and procedures involved in the field location and plotting of all natural objects and surface improvements. This section also includes the requirements for submittal

More information

TENDER DOCUMENT FOR. AMC for repairing of lining in tanks/vessels/pipe/headers with FRP/PP in NRL Utility Plant Area. Tender No.

TENDER DOCUMENT FOR. AMC for repairing of lining in tanks/vessels/pipe/headers with FRP/PP in NRL Utility Plant Area. Tender No. NUMALIGARH REFINERY LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) NRL COMPLEX, NUMALIGARH, Dist : GOLAGHAT, ASSAM 785699 Tel.: 03776-265413 Fax : 03776-265514 TENDER DOCUMENT FOR AMC for repairing of lining

More information

Water CIPP What to Do When You re Between a Fence and a Hard Place

Water CIPP What to Do When You re Between a Fence and a Hard Place What to Do When You re Between a Fence and a Hard Place 1, Marty S. Paris, P.E. 2, and Anthony Parker 3 1 Kimley Horn and Associates, Inc. 12750 Merit Drive, Suite 1000, Dallas, TX 75251 Tel (972) 776-1785;

More information

Sanitary Sewer Overflow (SSO) Incident Report Form

Sanitary Sewer Overflow (SSO) Incident Report Form Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category

More information

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT PREPARED OCTOBER 9, 2001 PREPARED BY: CITY OF BLAINE, PUBLIC WORKS DEPARTMENT 1200 YEW AVENUE BLAINE, WA 98230 Introduction This completed

More information

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013 Wauwatosa Lateral Rehabilitation Pilot Project CSWEA Annual Meeting Madison, WI May 15, 2013 Overview Background Objectives Work Completed Testing Evaluation Conclusions 2 Milwaukee Metropolitan Sewerage

More information

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment

More information

DESIGN STANDARDS MANUAL

DESIGN STANDARDS MANUAL DEPARTMENT OF PUBLIC UTILITIES CITY OF VIRGINIA BEACH, VA DESIGN STANDARDS MANUAL Revised Table of Contents Table of Contents 1 Introduction... 1-1 1.1 Authority... 1-1 1.2 Revisions... 1-1 1.3 Organization

More information

CHALLENGES IN LINING A 100 YR OLD BRICK SEWER

CHALLENGES IN LINING A 100 YR OLD BRICK SEWER North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 CHALLENGES IN LINING A 100 YR OLD BRICK SEWER Brad Jenson 1, Keith Hanks 2,

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Ship Repair, Maintenance & Modernization Cost Model. March 2014

Ship Repair, Maintenance & Modernization Cost Model. March 2014 Ship Repair, Maintenance & Modernization Cost Model March 2014 1 The Cost Model is a Microsoft EXCEL workbook that contains various tabbed worksheets. There are worksheets to enter basic project information

More information

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data

More information

SECTION 802 GRAVITY SEWER PIPE

SECTION 802 GRAVITY SEWER PIPE SECTION 802 GRAVITY SEWER PIPE 802-1 DESCRIPTION: This Work shall consist of furnishing all labor, materials, equipment, and incidentals required to remove and dispose of existing gravity sewer pipe if

More information

San Antonio, TX July 28, 2011

San Antonio, TX July 28, 2011 Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

Free Pre-Algebra Lesson 55! page 1

Free Pre-Algebra Lesson 55! page 1 Free Pre-Algebra Lesson 55! page 1 Lesson 55 Perimeter Problems with Related Variables Take your skill at word problems to a new level in this section. All the problems are the same type, so that you can

More information

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to

More information

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001 Gregory M. Hall, PE, QSD/QSP Project Engineer Oscar Larson & Associates REGISTRATION: EDUCATION: Civil Engineer #73260, California B.S. in Environmental Engineering, minor in Chemistry, Oregon State University,

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

THAT FIT SOLUTIONS. profile COVER STORY INLAND WATERS POLLUTION CONTROL, INC., DETROIT, MICH.

THAT FIT SOLUTIONS. profile COVER STORY INLAND WATERS POLLUTION CONTROL, INC., DETROIT, MICH. COVER STORY SOLUTIONS THAT FIT profile W When aging sewer lines in Detroit and the surrounding area begin INLAND WATERS POLLUTION CONTROL, INC., DETROIT, MICH. SERVICE AREA: CIPP lining (water, sewer and

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Math. Finding Perimeter and Area. Answers. Name: Solve the problems.

Math. Finding Perimeter and Area. Answers. Name: Solve the problems. 1) The woods behind Adam's house were 2 miles wide and 5 miles long. What is the perimeter of the woods? 2) Janet was cutting out some fabric for a friend. She cut a piece that was 7 centimeters wide and

More information

Daniel Kenny, Jonathan Shapiro, Tyler Rumler, Austin Tokarski

Daniel Kenny, Jonathan Shapiro, Tyler Rumler, Austin Tokarski Daniel Kenny, Jonathan Shapiro, Tyler Rumler, Austin Tokarski Why Are We Here? The 80/20 population rule 80% of the world's population is below the poverty line The richest 20% of the world's population

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required

More information

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 I. PROJECT IDENTIFICATION Applicant: Authorized Representative: Village of Eau Claire

More information

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project DOCUMENTS For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project February 11, 2013 OWNER Sandy Suburban Improvement District 8855 South 700 West Sandy, UT 84070

More information

Bulletin. Gerard D. Perry, Director of Accounts. DATE: August 2014. Sewer Rate Relief Fund FY2015

Bulletin. Gerard D. Perry, Director of Accounts. DATE: August 2014. Sewer Rate Relief Fund FY2015 Massachusetts Department of Revenue Division of Local Services Amy A. Pitter, Commissioner Robert G. Nunes, Deputy Commissioner & Director of Municipal Affairs Bulletin TO: Mayors, City Managers, Selectmen,

More information

Basis of Cost Estimates

Basis of Cost Estimates Wastewater Master Plan DWSD Project No. CS-1314 Technical Memorandum Original Date: May 8, 2003 Revision Date: September 2003 Author: Tucker, Young, Jackson, Tull Inc. Table of Contents 1 Purpose...1 2

More information

Construction Management

Construction Management Construction Management Engineering / Manufacturing / Project Management / Field Services Planning, coordination and control of dry bulk plant construction projects from concept to completion. Team consists

More information

Onsite Wastewater Concepts, Materials, Regulations & The Application Process Part I

Onsite Wastewater Concepts, Materials, Regulations & The Application Process Part I Onsite Wastewater Concepts, Materials, Regulations & The Application Process Part I B Onsite Sewage System Materials Instructors: Bart Harriss, RS, Environmental Manager Florida Department of Health Division

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information

Appendix S Pump Station Evaluation

Appendix S Pump Station Evaluation Appendix S Pump Station Evaluation Technical Memorandum Date: October 12, 2001 To: Re: Orange County Utilities Task 6.4 Raw Wastewater Pump Stations 1.0 Summary In accordance with Task 6.4 of the Orange

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

SANITARY SEWER SYSTEM ASSESSMENT

SANITARY SEWER SYSTEM ASSESSMENT SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.

More information

VersaRack Installation Instructions. masterack. Tools Required:

VersaRack Installation Instructions. masterack. Tools Required: masterack Versaack Installation Instructions ll of us at asterack wish to thank you for your purchase of the Versaack. We are proud of this product and hope that you fi nd it a functional as well as a

More information

VOLTAGE/CURRENT CALIBRATOR ISO-TECH ILC-421

VOLTAGE/CURRENT CALIBRATOR ISO-TECH ILC-421 VOLTAGE/CURRENT CALIBRATOR ISO-TECH ILC-421 TABLE OF CONTENTS 1. FEATURES... 1 2. SPECIFICATIONS... 1 2-1 General Specifications...1 2-2 Electrical Specifications... 2 3. FRONT PANEL DESCRIPTION... 4 3-1

More information

Apr 17, 2000 LAB MANUAL 1811.0

Apr 17, 2000 LAB MANUAL 1811.0 Apr 17, 2000 LAB MANUAL 1811.0 1811 BULK SPECIFIC GRAVITY (GMB) AND DENSITY OF COMPACTED BITUMINOUS SPECIMENS USING PARAFFIN OR PARAFILM ASTM Designation D 1188 (MN/DOT Modified) 1811.1 SCOPE This test

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

TRAFFIC ACCIDENT STUDY GUIDE 2010

TRAFFIC ACCIDENT STUDY GUIDE 2010 TRAFFIC ACCIDENT STUDY GUIDE 2010 SECTION SEVEN This study guide is designed to provide the law enforcement Explorer with basic principles. The guide is not all inclusive, and does not delineate specific

More information

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX In reference to the Request for Proposals for Geographic

More information

Let Us Give Utilities the Respect that they Deserve.

Let Us Give Utilities the Respect that they Deserve. Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous

More information

MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING

MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING EDWARD ALAN AMBLER, PE BILL THOMAS, PHD, PE COLLINS ORTON AGENDA Introduction Asbestos

More information

Master Anamorphic T1.9/35 mm

Master Anamorphic T1.9/35 mm T1.9/35 mm backgrounds and a smooth, cinematic look, the 35 Close Focus (2) 0.75 m / 2 6 Magnification Ratio (3) H: 1:32.3, V: 1:16.1 Weight (kg) 2.6 Weight (lbs) 5.7 Entrance Pupil (7) (mm) -179 Entrance

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

Project Scoping Document. Sherman Terrace Condominium Association Proposed Water Main Replacement Project

Project Scoping Document. Sherman Terrace Condominium Association Proposed Water Main Replacement Project PROJECT SCOPING Project Manager: Project Information: Dennis Cawley, PE Sherman Terrace Condo Assoc. WM Rehab DOCUMENT Draft: 01/27/09 Department: Section: Revised: Madison Water Utility Engineering Approved:

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information