1 SPILL PREVENTION CONTROL AND COUNTERMEASURES TRAINING MANUAL Original Date of PYC SPCC Plan: June 7, 2004 Adopted Date of PYC SPCC Training Manual: June 10, 2004 CONTACT Abel Ferreira, PYC Fuel Chairman
2 TABLE OF CONTENTS Introduction page 3 PYC SPCC Plan Training I. Purpose page 3 II. Plan Authorization..page 3 III. Scope..pages 3-4 IV. Plan Components and Assignments...pages 4-5 V. Definitions...page 6 VI. Storage Tanks..page 7 VII. Emergency Spill Response Procedures pages 7-16 VIII. Reportable Spill Emergency Contact Reporting pages IX. Conclusions...page 18 PYC Boat Fueling Procedure page 19 PYC Reportable Spill Countermeasure.page 20 PYC Fuel Committee.....page 21 Internet Reference Web Sites.pages PYC Fuel Committee Acknowledgements....page 24 PYC Member/Personnel Acknowledgement Form...page 25 2
3 INTRODUCTION: Spill Prevention, Control, and Countermeasure (SPCC) plans for facilities are prepared and implemented as required by the U.S. Environmental Protection Agency (U.S. EPA) regulation contained in Title 40, Code of Federal Regulations, Part 112, (40 CFR 112). A non-transportation related facility is subject to SPCC regulations if: the capacity of any one aboveground storage tank (AST) exceeds 660 gallons; or the total aboveground storage capacity exceeds 1, 320 gallons; or the underground storage (UST) capacity exceeds 42,000 gallons; and if, due to its location, the facility could reasonably be expected to discharge oil into or upon the navigable waters or adjoining shorelines of the United States. PYC SPCC PLAN TRAINING: I. Purpose The intention of a Spill Prevention, Control and Countermeasures (SPCC) Plan is to establish the procedures and equipment required to prevent the discharge of oil and hazardous substances in quantities that violate applicable water quality standards, cause a sheen upon or discoloration of the surface of navigable waters or adjoining shorelines, or cause sludge or emulsion to be deposited beneath the surface of the water or upon adjoining shorelines. The Plan also establishes the activities required to mitigate such discharges (i.e., countermeasures) should they occur. II. Plan Authorization III. Scope A SPCC Plan has been prepared for The pursuant to 40 CFR 112 (Protection of the Environment, Oil Pollution Prevention). It will be available to the Department of Environmental Conservation (DEC) and the US Environmental Protection Agency (EPA) Regional Administrator, and his/her agents, upon request, for on-site review during normal working hours. A SPCC plan applies to all sites where oil is stored, processed, distributed, or consumed, and could be reasonably expected to discharge oil in harmful quantities, and when the storage capacity of the site exceeds 1,320 gallons. Currently, the aggregate storage capacity of the is approximately 3,000 gallons. Responsible full time employee at the PYC site shall become familiar with the contents of the Plan. 3
4 The PYC SPCC Coordinator shall be responsible for implementation of emergency spill response activities. In addition, two PYC Members shall be trained as assistant SPCC Coordinators to assume the SPCC Coordinator's responsibilities in the Coordinator's absence. PYC personnel/members with responsibilities for compliance with the requirements of the PYC SPCC Plan will participate in periodic training that teaches personnel/members to perform their duties in a way to prevent the discharge of harmful quantities of oil or hazardous substances. This training will include familiarization with this Plan, emergency response procedures, equipment, systems, and Material Safety Data Sheets (MSDS) for the products stored onsite. Training will be provided by the SPCC Coordinator/Assistant SPCC Coordinator s and/or Fuel Committee designated Training Facilitator(s). Training documentation records will be maintained by the Fuel Committee Chairman. IV. Plan Components and Assignments Management Approval The SPCC Plan will be reviewed and approved by PYC Board of Directors at a level of authority invested in them to commit necessary resources to implement the Plan. Professional Engineer Certification The SPCC Plan for a site must be reviewed and certified to be in accordance with good engineering practices by a Registered Professional Engineer. Plan Reviews and Amendments As set forth in 40 CFR 112, the SPCC Plan shall be reviewed and/or amended, if necessary, whenever there is a change in the design of the site, construction, operation, or maintenance which materially affects the site's potential for the discharge of regulated material. 4
5 Site Information The PYC is located in Hyde Park, New York on the eastern shore of the Hudson River. Located at N ', W ' 5
6 V. Definitions AST: Aboveground Storage Tank Boom: a temporary floating barrier used to contain an oil spill DEC: Department of Environmental Conservation Discharge: includes but is not limited to, any spilling, leaking, pumping, pouring, emitting, emptying, or dumping EPA: Environmental Protection Agency Harmful Quantities: a discharge that violates applicable water quality standards or causes a sheen upon, or discoloration of, the surface of the water or the adjoining shorelines MSDS: Material Safety Data Sheet Navigable waters: means all waters of the United States that are connected with a navigable stream, lake, or sea Oil: means oil of any kind or in any form, including but not limited to gasoline, diesel, lubrication oil, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil Sorbents: materials that soak up liquids SPCC: Spill Prevention Control and Countermeasures Spill: defined by US EPA as the discharge of oil into, or upon, the navigable waters of the United States or adjoining shorelines, in harmful quantities Spill Control Kit: Safety equipment used in order to protect and provide containment of contaminants in the event of a spill UST: Underground Storage Tank 6
7 VI. Storage Tanks PYC SPCC Training Manual There are four (4) aboveground storage tanks (ASTs) at the PYC containing gasoline, diesel, kerosene, or #2 fuel oil. Underground Storage Tanks There are no underground storage tanks (USTs) at the PYC. Waste Oil There is one (1) waste oil facility servicing the PYC. This is an inside facility that meets all of the required secondary containment and absorption protection needed to meet the EPA requirements in 40 CFR VII. Emergency Spill Response Procedures A. General Keep the material separated from water to minimize migration and the resulting potential increase in human and environmental exposure. Every effort should be made to contain at the source rather than resort to separation of the material from expanded portions of the environment or downstream water. B. Discovery of Release from Container/Tank/or Operating Equipment The person discovering a release of material from a container, tank, or operating equipment should initiate certain actions immediately: Assure that no danger to human life exists. If there is an immediate threat to human life. (i.e. a fire in progress or fumes overcoming personnel), the fire alarm should be sounded to evacuate the building. Request the assistance of the fire department's hazardous materials response team if an uncontrollable spill has occurred and/or if the spill has migrated beyond the site boundaries. 7
8 Extinguish any sources of ignition. Vehicles should be turned off. Avoid sparks and movement creating static electricity. Attempt to stop the release at its source. Simple procedures (turning valves, plugging leaks, etc.) may be attempted by the discoverer if there are no health or safety hazards and there is a reasonable certainty of the origin of the leak. Identify the material released. Consult MSDS documents which provide the information for proper identification of the characteristics of the released material. Initiate spill notification and reporting procedure. Report the incident immediately to the PYC SPCC Coordinator/or Assistant Coordinator(s) who will notify the DEC and EPA. C. Containment of Release from Container/Tank/ or Operating Equipment If material is released outside a containment area, it is critical that the material be contained as quickly as possible. Attempt to stop the release at the source. If the source of the release has not been found; if special protective equipment is necessary to approach the release area; or if assistance is required to stop the release, a fire department response should be initiated by contacting the Fire Department using the on site alarm system. The Local Fire Department will then notify the appropriate emergency department or agencies. PYC SPCC personnel and/or members should be available to guide the fire department's efforts. 8
9 Contain the material released into the environment. Following proper safety procedures, the spill should be contained by absorbent materials and dikes using shovels and brooms; if the spill occurs on the fuel dock, deployment of the containment boom(s) may be necessary. Consult applicable MSDS documents for material compatibility, and environmental precautions. Recover or cleanup the material spilled. As much material as possible should be recovered and reused where appropriate. Material which cannot be reused must be discarded as hazardous waste. Liquids absorbed by solid materials shall be shoveled into open top drum, or if the size of the spill warrants, into a roll-off container. After a cleanup, the drum lids shall be secured and the drums shall be appropriately labeled identifying the contents, the date of the spill/cleanup, and the site name and location. Combining non-compatible materials can cause potentially dangerous chemical and/or physical reactions or may severely limit disposal options. Compatibility information can be found on the MSDS documents. Cleanup of the spill area. Surfaces that are contaminated by the release shall be cleaned using an appropriate substance or water. Cleanup water must be minimized, contained and properly disposed. Occasionally, porous materials (such as wood, soil, or oil-dry) may be contaminated; such materials will require special handling for disposal. Decontaminate tools and equipment used in cleanup before replacing in Spill Containment Kit. 9
10 Notification and reports to outside agencies. The SPCC Coordinator shall determine if a reportable spill has occurred and shall make all necessary notifications. Arrange for proper disposal of any waste materials. Waste material from the cleanup must be characterized and labeled. The waste must be transported and disposed of in compliance with all applicable laws and regulations. Review the SPCC Plan. Appropriate personnel shall review spill response efforts, notification procedures, and cleanup equipment usage to evaluate their adequacy during a spill episode. Where deficiencies are found, the plan shall be revised and amended. D. Spill Discovery on Navigable Waters-PYC SPCC Spill Containment Boom Pictorial Note: The pictures in this pictorial represent a containment boom deployed south with an outgoing tide. If this were to be demonstrated with an incoming tide the boom would be deployed north. Were a reportable spill to occur at the PYC fuel dock, spill responders would use protective equipment from the Spill Containment Kit (i.e.tyvek suits, neoprene gloves and protective eyewear before deploying the boom). The primary tools used to respond to oil spills are mechanical containment recovery, and clean-up equipment, such as oil containment booms. INTRODUCTION TWO MAJOR STEPS involved in controlling oil spills are containment and recovery. 10
11 Stop the release at the source. Containment booms are used to control the spread of oil to reduce the possibility of polluting shorelines and other resources, as well as to concentrate oil in thicker surface layers, making recovery easier. In addition, booms may be used to divert and channel oil slicks along desired paths, making them easier to remove from the surface of the water. 11
12 Boom is secured to aft/port cleat of vessel. It is necessary for stationary booms to be monitored or tended due to changes produced by shifting tides. Boom is fully deployed from vessel and secured to Service Dock. 12
13 CONTAINMENT WHEN AN OIL SPILL occurs on water, it is critical to contain the spill as quickly as possible in order to minimize danger and potential damage to persons, property, and natural resources. Containment equipment is used to restrict the spread of oil and to allow for its recovery, removal, or dispersal. The most common type of equipment used to control the spread of oil is floating barriers, called, booms. Angled deflection of boom. Oil containment boom is angled across the current to divert or deflect oil away from sensitive areas and toward lower current areas for recovery. RECOVERY OF OIL ONCE AN OIL SPILL has been contained, efforts to remove the oil spill from the water begin. Two types of equipment booms and sorbents are commonly used to recover oil from the surface. 13
14 Floating absorbent pads and bulk absorbent are used. Sorbents are materials that soak up liquids. They are used to recover oil through the mechanisms of absorption. Absorbents allow oil to penetrate into pore spaces in the material they are made of. To be useful in combating oil spills, sorbents need to be both oleophilic and hydrophobic (water-repellant). Although they may be used as the sole cleanup method in small spills, sorbents are most often used to remove final traces of oil. 14
15 Spill containment boom is being removed from the water. 15
16 Disposal compliance. Once the sorbent containment boom has been used to recover oil from the water it is transported and disposed of in compliance with all applicable laws and regulations. The PYC will use 55 gallon drums/containers that are characterized and labeled for transportation and disposal purposes. 16
17 VIII. Reportable Spill Emergency Contact Reporting In the event of a reportable spill, the PYC employee/member discovering the release will contact the Local Fire Department by dialing 911 as soon as possible after the incident has occurred. Contact preference is listed in prioritized order on the Internal Reporting list. If spill discharge to surface water is imminent, emergency contacts/agencies should be notified as described below. 1. Internal Reporting In the event of a spill, the following internal contacts shall be made: TITLE NAME TELEPHONE a) SPCC Coordinator Abel Ferreira Alt# Asst Coordinator Ernie Klopping Asst Coordinator Paul DeLano Asst Coordinator Matt Wattoff Asst Coordinator John Kwak b) Fuel Chairman Abel Ferreira Alt# c) PYC House Chairman Nick Seeger d) PYC Commodore Frank Desiano e) PYC Vice Commodore Mark Jaggi f) PYC Rear Commodore Allen White g) Staatsburg Fire Department
18 IX. Conclusions 2. Reporting to Outside Agencies After the SPCC Coordinator has been notified, he/she will conduct reporting to outside agencies, such as NYS DEC; NYS Division of Coastal Resources; National Response Center; US EPA; Local Fire Department and/or Local Police Department, if necessary. It is difficult to demonstrate the value of spill prevention programs. The difficulty lies in the inability to count spills that have not occurred as a result of diligence on the part of an organization. What is clear, however, is that spill prevention programs do work and that reduced frequency is not a reason for complacency. The PYC Fuel Committee has the utmost confidence that its members will abide by the PYC SPCC Plan and work diligently to prevent spills at the facility. 18
19 PYC BOAT FUELING PROCEDURE Ensuring your safety, the safety of all members/guests and the safety of the Club 1) Adequately secure vessel to fuel dock. 2) Ask guests to step off boat. 3) Eliminate all ignition/static electricity sources and no smoking. 4) Close up boat hatches/ports/blower off, if applicable. 5) Deploy fuel line and spill containment holder to vessel. 6) Attach spill containment holder to vessel/open top. 7) Return to fuel tank/turn on pump. 8) Keep nozzle in contact w/fill neck. Prevent static electricity spark. 9) Return to vessel/dispense fuel/stop when close to full. 10) Remove spill containment holder/pour captured fuel, if any, in vessel tank. 11) Tighten vessel fuel cap. 12) Return fuel line to nozzle housing/return spill containment holder to container housing. 13) Run vessel blowers, if applicable/check for vapors. NOTE: Pumping fuel into small portable tanks is permitted once the fuel line is brought to the gravel area in front of the fuel dock. No portable tanks are to be filled on the fuel dock. 19
20 PYC REPORTABLE SPILL COUNTERMEASURE The ideal: Prevention is a sound investment! Safety First Account for All Personnel Remember the SWIMS Procedure Stop the leak Warn others Isolate the area Minimize your exposure Standby to assist spill responders In an effort to simplify familiarization of the Plan to its members the PYC Fuel Committee has created this bulleted procedure to follow in the event of a reportable spill. The Spill Discoverer Should Make sure that everyone is safe Call local fire department if immediate threat to human life Extinguish any sources of ignition Identify type of material spilled Initiate internal reporting call the SPCC Coordinator first The Spill Discoverer/Responder s Should Stop the release at source Contain the material released to the environment Recover/clean-up material spilled Clean-up surfaces contaminated by spill Decontaminate tools/equipment Properly dispose of waste material Report Spill Kit replenishment needs to Fuel Chairman The SPCC Coordinator/Assistant Coordinators Will Notify the remainder of the internal chains of command Notify 2 primary outside agencies: NYS DEC, NYS Dept of State Division of Coastal Resources or National Response Center Complete the necessary notification document(s) Review the PYC SPCC Plan with the Fuel Committee to evaluate spill countermeasure deficiencies, if any; revise/amend plan if necessary 20
21 PYC 2011 FUEL COMMITTEE Fuel Chairman: Abel Ferreira SPCC Coordinator: Abel Ferreira Assistant SPCC Coordinator: Mathew P. Wattoff Assistant SPCC Coordinator: Ernie Klopping Assistant SPCC Coordinator: Paul DeLano Assistant SPCC Coordinator: John Kwak Registered Professional Engineer: John Kwak 21
22 INTERNET WEB SITE REFERENCES Slides.pdf
23 INTERNET WEB SITE REFERENCES epspccmodelplan_retail.doc+sample+spcc+plans&hl=en mpleplan.doc+sample+marina+spcc+plan&hl=en 23
24 PYC FUEL COMMITTEE ACKNOWLEDGMENTS The PYC Fuel Committee gratefully acknowledges the assistance received from Frank Desiano in providing the PYC SPCC Plan Draft to the committee. The PYC Fuel Committee gratefully acknowledges the assistance received from Bill Spencer in providing the digital pictures for the Boom Pictorial. 24
25 Pop Quiz Open Book TEST YOUR PYC SPCC KNOWLEDGE 1) What does SPCC stand for? 2) In the event of a reportable spill, who does the spill discoverer internally call first? 3) What does the acronym MSDS stand for? 4) Name the 4 key components of an SPCC Plan: 5) A is a temporary floating barrier used to contain an oil spill. 6) Fill in the blanks for what a reportable spill discoverer must do: Assure that no to exists. any sources of. Attempt to the at its. the material. Report the incident internally to the PYC or first. What s your PYC SPCC Test Your Knowledge Score? 25
26 PYC MEMBER/PERSONNEL ACKNOWLEDGEMNT FORM I hereby acknowledge receipt of the PYC SPCC Training Manual Version I adopted on June 10, I have read the manual and evidence my agreement to abide by the PYC SPCC Plan as outlined in the PYC SPCC Training Manual. Print Name Signature Date **NOTE: Please sign and date the acknowledgment form at the end of your PYC SPCC training session and hand in to the PYC Fuel Committee Training Facilitator. 26
27 Season Review Acknowledgement Form PYC MEMBER/PERSONNEL ACKNOWLEDGEMNT FORM I hereby acknowledge receipt of the PYC SPCC Training Manual Version I adopted on June 10, I understand that each boating season I am required to review the manual as a requirement in order for me to have authorization to use the PYC fuel pumps. I have reviewed the manual and evidence my agreement to abide by the PYC SPCC Plan as outlined in the PYC SPCC Training Manual. Season: Print Name Signature Date Please sign and date the acknowledgment form and mail to PYC at PO Box 667, Hyde Park NY or put in Fuel Chairman drop box located in Club office. 27
History of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
More informationSpill Prevention, Control and Countermeasure (SPCC) Rule
Spill Prevention, Control and Countermeasure (SPCC) Rule Code of Federal Regulations Title 40 CFR Part 112 Training Guide for Oil and Fuel handlers on Farms 1 Purpose of SPCC Rule To prevent oil discharges
More informationACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas
ACTIVITY NAME Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas CY 2014 BOTTOM LINE UP FRONT To prevent oil discharges
More informationEnvironmental Health & Safety
Environmental Health & Safety Title: Oil Spill Notification, Reporting, and Response Effective Date: 04/01/2008 Document #: PBS-007-001.JPB Revision Date: Rev. 0 I. Purpose of the Policy: To ensure Oil
More informationSpill Prevention, Control and Countermeasure (SPCC) Training
Spill Prevention, Control and Countermeasure (SPCC) Training Fort Jackson 2015 Origins of SPCC Regulatory History 1972 Clean Water Act Oil Pollution Act of 1990 Spill Prevention Control and Countermeasures
More informationTRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit
SPILL PREVENTION, CONTROL, AND COUNTERMEASURE TRAINING SPCC/SWPP Training UGA STORM WATER Automotive Center POLLUTION Campus Transit PREVENTION PLAN PLAN Goals of SPCC/SWPP Training Introduce facility
More informationAppendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans
Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans Background What is a Spill Prevention, Control and Countermeasure (SPCC) Plan? An SPCC plan is a written document that describes
More informationSPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN
SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN XXXX FARM (CITY OR COUNTY), MICHIGAN CONTACT (NAME), OWNER CERTIFICATION: I hereby certify that I have examined the facility, and being familiar with the
More informationFUELING AND FUEL STORAGE
FUELING AND FUEL STORAGE BENCHMARK Implement spill prevention measures whenever fuel is handled or stored. Report, minimize, contain and clean up spills that do occur. FUELING BMPS Spills of diesel, oil,
More informationAPPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O
APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND
More informationAppendix E: Spills. Spill Prevention, Control, and Countermeasure Plans... 144. Your Role in Spill Response: What to Do if You Have a Spill...
Appendix E: Spills Spill Prevention, Control, and Countermeasure Plans... 144 Your Role in Spill Response: What to Do if You Have a Spill... 147 Oregon Clean Marina Guidebook Page 142 Oregon Clean Marina
More informationALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
More informationDOES YOUR COMPANY NEED AN SPCC PLAN? Larry Seabolt Remtech Engineers Remediation Specialists
DOES YOUR COMPANY NEED AN SPCC PLAN? Larry Seabolt What is a Spill Prevention, Control and Countermeasures Plan? Is your company required to have a SPCC plan? What constitutes a SPCC plan? The answer to
More informationAppendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY
More informationSPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA
SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed
More information<Your> Yacht Club. Oil Spill Response Plan
Oil Spill Response Plan EMERGENCY RESPONSE ACTION Reaction * Identify the source of the spill if possible. * Attempt to secure the source of the spill. * Make a preliminary assessment as to what the spill
More informationSPILL PREVENTION PLAN
SPILL PREVENTION PLAN ASPHALT BATCH PLANT NIRB FILE # 15XN046 Presented to NIRB September 2015 TABLE OF CONTENTS PAGE 1. SPILL CONTROL PLAN... 1 1.1 RESPONSE EQUIPMENT... 1 1.2 GENERAL PROCEDURES IN CASE
More informationOIL POLLUTION REPONSE POLICY
OIL POLLUTION REPONSE POLICY Ref: (a) Town of Nantucket Waterways Bylaw, Chapter 137 (b) Town of Nantucket Coastal Oil Spill Plan (c) Massachusetts Geographic Response Plan Tactics Guide (http://grp.nukaresearch.com/cigrp.htm)
More informationCivil Engineering Sector Labour-Management Health and Safety Committee
PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION
More informationKurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program
Kurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program LDEQ Water Regulations Spill Prevention and Control (SPC) Authorized
More informationFarm Fuel Tank Safety Guide
Farm Fuel Tank Safety Guide This brochure is provided by North Dakota Department of Emergency Services, your Local Emergency Planning Committee, and the State Emergency Response Commission along with assistance
More informationSpill Control Prevention Plan (SCPP)
Spill Control Prevention Plan (SCPP) FACILITY INFORMATION PLEASE PRINT Facility Name: Mailing Address: Physical address if different: Owner Name: Owner Address: Primary Contact Name: Work Phone Number:
More informationFuel Storage Who to ask: tank farm owners/operators
Fuel Storage Fuel Storage Who to ask: tank farm owners/operators 89. How many tank farms are there in the village and who owns them? Fuel tank farm The questions in the following section should be answered
More informationAPPENDIX 7-B. Hazardous Materials Management Plan
S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction
More informationSpill Prevention, Control & Cleanup SC-11
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to
More informationSpill Prevention Control and Countermeasure (SPCC) Regulations Fact Sheet
Spill Prevention Control and Countermeasure (SPCC) Regulations Fact Sheet REGULATORY SUMMARY The Spill Prevention Control and Countermeasure (SPCC) regulations strive to prevent oil from entering navigable
More informationThe Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview
The Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview January 2012 Presented by: Annie Macmillan, Stephanie Congo The purpose of the SPCC rule is to prepare and implement a plan
More informationSPCC for Food Services
Welcome to the University s Annual Oil Spill Prevention, Control and Countermeasures (SPCC ) Compliance Awareness Training for Food Service Employees. Completing this training will fulfill your annual
More informationA Guide for Used Oil Transporter Training Programs. Following are excerpts from laws and rules pertaining to Used Oil Transporter Certification
A Guide for Used Oil Transporter Training Programs Introduction An used oil transporter that transports over public highways more than 500 gallons of used oil annually, not including oily waste, must become
More informationSpill Prevention, Control, and Countermeasures (SPCC) Course Material
Introduction Welcome to the Spill Prevention, Control, and Countermeasures (SPCC) Training course. The ultimate goal of this course is to help you recognize the ways you can avoid pollution of the local
More informationMPM. Customer Service Representative Training. Class C Fuel Spill Handling
MPM Customer Service Representative Training Class C Fuel Spill Handling The Class C Operator "Class C operator" means an individual who has daily on-site presence and responsibility to handle emergencies
More informationSafety Manual Title: Spill Prevention & Response Review Date: 6/1/2014
Operation s Purpose The purpose of this plan is to document spill prevention and response requirements. Each Elkhorn Construction, Inc. jobsite will develop a spill prevention and response plan based on
More informationSpill Response Procedures & Sorbent Materials
Spill Response Procedures & Sorbent Materials Document Number: 146 Introduction Emergency spill response is an important part of a company's safety and health program. In the event of a spill, well-prepared
More informationSOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES
SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES Municipalities are responsible for any contaminant spill or release that occurs on property they own or operate. Particular areas of concern include any facilities
More informationABOVE-GROUND STORAGE TANKS
ABOVE-GROUND STORAGE TANKS Above-ground storage tanks in Georgia are regulated by the State Fire Marshall and by the EPA. Above-ground tanks containing 1,100 gallons or less do not require any secondary
More informationTitle: Aircraft Parking
Environmental Standard Operating Procedure Originating Office: Revision: Prepared By: Approved By: MCAS Miramar Environmental Original Environmental Management Department William Moog Management Department
More informationUDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
More informationAppendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public
Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source
More informationExtraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the
More informationPollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County
FORWARD In 1991, the Broward County Environmental Protection and Growth Management Department, who was then known as the Department of Natural Resource Protection (DNRP), initiated the development of Pollution
More informationSPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN. for the PIÑON RIDGE MILL 16910 HIGHWAY 90 BEDROCK, COLORADO 81411. Prepared by:
SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN for the PIÑON RIDGE MILL 16910 HIGHWAY 90 BEDROCK, COLORADO 81411 Prepared by: ENERGY FUELS RESOURCES CORPORATION September 2009 SPILL PREVENTION, CONTROL,
More informationENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN
ENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN November 2011 University of Northern Colorado Hazardous Materials Management Plan I. General II. III. IV. Responsibilities Definition
More informationEnvironmental Standard Operating Procedure Originating Office: MCAS Miramar Environmental Management Department
Environmental Standard Operating Procedure Originating Office: MCAS Miramar Environmental Management Department Revision: Original Prepared By: Environmental Management Department Approved By: William
More informationPesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act
Chapter 26 Pesticide Spills In This Chapter Keywords Accidents After learning the information in this chapter, you will be able to: 1. Define a spill. 2. Describe when a spill must be reported to the Spills
More informationMAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident
More informationMARINA ENVIRONMENTAL MANAGEMENT POLICY
MARINA ENVIRONMENTAL MANAGEMENT POLICY Clean Water & A Clean Environment Are Essential To Good Boating The Abbey Marina Is Committed To Being Environmentally Compatible STATEMENT OF PURPOSE: CLEAN & PROTECT
More informationFor an Incidental Oil Spill:
Table 2 Oil Spill Procedural Checklist In the event of a spill or accidental release of fuel oil or other combustible material on premises, WWU personnel follow the procedural checklist outlined below.
More informationTITLE 29: EMERGENCY SERVICES, DISASTERS, AND CIVIL DEFENSE CHAPTER I: EMERGENCY MANAGEMENT AGENCY SUBCHAPTER d: STATE EMERGENCY RESPONSE
TITLE 29: EMERGENCY SERVICES, DISASTERS, AND CIVIL DEFENSE CHAPTER I: EMERGENCY MANAGEMENT AGENCY SUBCHAPTER d: STATE EMERGENCY RESPONSE PART 430 EMERGENCY AND WRITTEN NOTIFICATION OF AN INCIDENT OR ACCIDENT
More informationSPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)
SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC) UNIVERSITY RISK MANAGEMENT Occupational and Health Programs 19 Hagood Avenue, Suite 908 Charleston SC 29425 843-792-3604 Revised: June 2015 Spill
More informationSpill Prevention, Control and Countermeasures (SPCC) 40 CFR 112. For Bulk Facilities
Spill Prevention, Control and Countermeasures (SPCC) 40 CFR 112 For Bulk Facilities Section 311(c) and/or (e) Administrative Order if threat or actual discharge At time of inspection, could not conclude
More informationCHAPTER 62-740 PETROLEUM CONTACT WATER
CHAPTER 62-740 PETROLEUM CONTACT WATER 62-740.010 Declaration of Intent (Repealed) 62-740.020 Applicability 62-740.030 Definitions 62-740.040 General 62-740.100 Management Practices for Producers of PCW
More informationHow To Safely Handle A Spill
WD DWGB 22 6 2010 Best Management Practices for Fueling and Maintenance of Excavation and Earthmoving Equipment Env Wq 401, Best Management Practices for Groundwater Protection, applies to a variety of
More informationSpill Prevention, Control, and Countermeasures (SPCC) Regulations Update
Spill Prevention, Control, and Countermeasures (SPCC) Regulations Update The current deadline for most facilities (including typical mining and aggregate operations) is November 10, 2011. All facilities
More informationSPCC Rule Review. Spill Prevention Control & Countermeasures NON-TRANSPORTATION RELATED ONSHORE AND OFFSHORE FACILITIES
SPCC Rule Review Spill Prevention Control & Countermeasures NON-TRANSPORTATION RELATED ONSHORE AND OFFSHORE FACILITIES Code of Federal Regulations Title 40 CFR Part 112 40 CFR PART 112 Prevention requirements:
More informationTULANE UNIVERSITY SPILL PREVENTION CONTROL & COUNTERMEASURE (SPCC) PLAN FOR OIL STORAGE AREAS
TULANE UNIVERSITY SPILL PREVENTION CONTROL & COUNTERMEASURE (SPCC) PLAN FOR OIL STORAGE AREAS Office of Environmental Health and Safety (504) 988-5486 FAX (504) 988-1693 Revised: Dec 7, 2011 S\BM\emresponseplans\SPCC2011
More information~CSRMA ALERT~ REVISED SPCC RULE WILL IMPACT MOST POTW S
~CSRMA ALERT~ September 17, 2004 REVISED SPCC RULE WILL IMPACT MOST POTW S A CSRMA member in the San Francisco Bay Area was recently inspected by the EPA and Bay Area Regional Water Quality Control Board
More informationDIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines
More informationSection A SPCC Plan Implementation Checklist This section of the report addresses compliance with certain requirements of Federal Regulations 40 CFR 112. I. STATUS OF SPCC PLAN (40 CFR 112.3) YES NO A.
More informationPetroleum Tanks at Municipal Facilities
January/February 2013 Petroleum Tanks at Municipal Facilities This document was reprinted with permission from the New York Association of Towns Talk of the Towns/Topics magazine January/February 2013
More informationContingency Plan. Facility Name
Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes
More informationChapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
More informationThe Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview
The Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview January 2012 Presented by: Annie Macmillan, Stephanie Congo The purpose of the SPCC rule is to prevent discharges of oil into
More informationBulk Storage Program. Cornell University 8/22/2014
Cornell University 8/22/2014 Written Program Table of Contents 1. Introduction... 2 2. Definitions... 2 3. Roles and Responsibilities... 3 3.1. EHS... 3 3.2. College/Unit... 3 4. Regulatory and Operational
More information*GTA 05-08-003 HAZARDOUS MATERIAL SPILL RESPONSE PROCEDURES
*GTA 05-08-003 HAZARDOUS MATERIAL SPILL RESPONSE PROCEDURES This graphic training aid (GTA) provides a vehicle operator with information to respond to a hazardous material (HAZMAT) release or spill that
More informationSPILL RESPONSE PLAN. What is the Issue? Regulatory Requirements. General Information
An equal opportunity university SPILL RESPONSE PLAN What is the Issue? Accidental spills of petroleum products, common household cleaning products, hazardous materials or hazardous waste, can have negative
More informationDraft. ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINEINE Docket No. PF15-6-000. and
ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINEINE Docket No. PF15-6-000 and DOMINION TRANSMISSION, INC SUPPLY HEADER PROJECT Docket No. PF15-5-000 Draft Prepared by July 2015 TABLE OF CONTENTS 1.0
More informationSpill Prevention, Control. and. Countermeasures Plan
Spill Prevention, Control and Countermeasures Plan 2013 Spill Prevention, Control and Countermeasures Plan for Texas A&M University-Corpus Christi 2013 Prepared By: David Jensen, National Spill Control
More informationDIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN
DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN Last revised June 5th, 2015 Page 1 of 13 Table of Contents 1. PURPOSE... 2 2. ROLES AND RESPONSIBILITIES... 2 3. SAFETY... 2 4. COAL SPILLS... 3 4.1. COAL
More informationSpill Plan Reviewer s Guidance
Spill Plan Reviewer s Guidance WSDOT Hazardous Materials Program May 2013 2 Overview Purpose: Spill prevention planning is a key element for protecting the environment during construction. The Spill Plan
More informationGood Housekeeping Practices for DPW/Fleet Maintenance Facilities
Good Housekeeping Practices for DPW/Fleet Maintenance Facilities Kevin P. Walker C&S Engineers, Inc. Best Management Practices Best Management Practices (BMPs) are measures and/or controls used to prevent
More informationMODULE IV Secondary Containment, Oil Spill Control & Spill Prediction
Page 1 How to Prepare Your Own SPCC Plan: A Step-by-Step Guide for Tier 1 Qualified Facilities Using the US EPA Tier I SPCC Template MODULE IV Secondary Containment, Oil Spill Control & Spill Prediction
More informationUNIVERSITY OF WISCONSIN MADISON
UNIVERSITY OF WISCONSIN MADISON Contractor Spill Contingency Plan (while working on campus) Departments of: Environment, Health & Safety Physical Plant Table of Contents Spill Contingency Plan Most Common
More informationFUEL & OIL SPILL CONTINGENCY PLAN
FUEL & OIL SPILL CONTINGENCY PLAN For Labiche 2006 2D SEISMIC PROGRAM Summer 2006 FUEL AND OIL SPILL CONTINGENCY PLAN NORTHWEST TERRITORIES & YUKON INTRODUCTION Purpose of Plan The purpose of this plan
More informationSpill Prevention Control & Countermeasure (SPCC) for Farms
Spill Prevention Control & Countermeasure (SPCC) for Farms Ag View FS, Inc. & Marshall-Putman Farm Bureau March 19, 2013 Oil Storage on the Farm Today s Topics: EPA SPCC Regulation Secondary Containment
More informationSpill Prevention Control and Countermeasure Plan
Spill Prevention Control and Countermeasure Plan Boston College Prepared by: Rizzo Associates, Inc. March 5, 1997 Reviewed and Updated by: ENSR International May, 1998 Last Update Boston College January,
More informationFACILITY ENVIRONMENTAL COMPLIANCE
FACILITY ENVIRONMENTAL COMPLIANCE 2014 TxDOT Environmental Conference 2014 TxDOT Environmental Conference 2014 TxDOT Environmental Conference Table of Contents 1 Introduction 1 2 Facility Environmental
More informationDANGER WARNING CAUTION
Training and Evaluation Outline Report Task Number: 05-2-7502 Task Title: React to a Hazardous Spill Supporting Reference(s): Step Number Reference ID Reference Name Required Primary TM 38-410 STORAGE
More informationStormwater BMPs: Secondary Containment and Spill Control. September 2012
Stormwater BMPs: Secondary Containment and Spill Control September 2012 Secondary Containment Secondary Containment Helps to minimize the potential for pollution by: Keeping spills in a confined area Preventing
More informationEMERGENCY PREPAREDNESS & RESPONSE PROCEDURE
1 of 12 DOCUMENT REVISION HISTORY Revision No. Date DESCRIPTION OF CHANGES Pages Affected By 00 01/07/2003 Draft Issued For Comment All HSEQ Dept. 01 01/09/2003 Total Change First Approved Issue All HSEQ
More informationCompany Name Chemical Spill Prevention & Clean-up Procedures Program. Last Revised On 00/00/0000
Company Name Chemical Spill Prevention & Clean-up Procedures Program Last Revised On 00/00/0000 PURPOSE The following program will discuss how prevent chemical spills from occurring and setting forth procedures
More informationOIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS. Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040
ABSTRACT OIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040 The SPCC regulations entail numerous requirements for the
More informationSPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN
SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN DEPARTMENT OF PUBLIC WORKS, New Jersey Prepared by Date This is a sample document and is not to be used as an actual SPCC Plan for the applicable
More informationContingency Plan Template. Hazardous Materials and Waste Management Division (303) 692-3300
Contingency Plan Template Hazardous Materials and Waste Management Division (303) 692-3300 October 2008 Contingency Plan A Large Quantity Generator of hazardous waste must have a written contingency plan
More informationLAYNE CHRISTENSEN COMPANY SPILL CONTINGENCY PLAN
LAYNE CHRISTENSEN COMPANY SPILL CONTINGENCY PLAN Policy Issue Date: September 1, 1999 TABLE OF CONTENTS SECTION 1: INTRODUCTION... 1-1 SECTION 2: SPILL/RELEASE REPORTING PROCEDURES... 2-1 2.1 Complying
More informationFile: Spill Response Plan for Hazard Chemicals and Mercury Spills. Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010
File: Spill Response Plan for Hazard Chemicals and Mercury Spills Orig. Date: 12/01/2005 Review Date: January Review Date: March 2010 OSHA: 1910.120 EPA: 40CFR 112.7 Messiah College Spill Response Policy
More informationHobart and William Smith Colleges. Environmental, Health and Safety Program
Hobart and William Smith Colleges Geneva, New York Environmental, Health and Safety Program Copies of the EHS Program: 1. Human Resources Office 2. Office of the President (Provost) 3. Campus Safety Office
More informationNatural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground
Natural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground December 2011 Table of Contents Definition of Terms... 2 Requirements for Secondary
More informationRutgers Environmental Health and Safety
Rutgers Environmental Health and Safety PCB Self-Audit (TSCA Program) Facility Name: Rutgers University, Facility Address: Facility EPA Identification Number: Date of Self-Audit Inspection: Campus/Farm/Field
More informationPLAN APPLICATION HAZARDOUS MATERIALS USE AND SPILL PREVENTION CONTROL (HMPC) PLAN
PLAN APPLICATION HAZARDOUS MATERIALS USE AND SPILL PREVENTION CONTROL (HMPC) PLAN A. GENERAL INFORMATION A1. Business Name: Acme Company Street Address: 1000 Stroll St. City: Louisville State: Kentucky
More informationPollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
More informationSPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN AND SPILL RESPONSE PLAN FOR OIL AND HAZARDOUS MATERIALS
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN AND SPILL RESPONSE PLAN FOR OIL AND HAZARDOUS MATERIALS Box Canyon Hydroelectric Project and Box Canyon Substation/Switchyard Public Utility District No.
More informationChapter 5: Spills Response
Chapter 5: Spills Response When printing materials are spilled, the response required by the owner or operator depends on what is spilled and the quantity. The entities who must be informed of a spill
More informationSPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN Community College of Rhode Island Warwick, Rhode Island
SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN Community College of Rhode Island Warwick, Rhode Island Prepared For: Community College of Rhode Island 400 East Avenue Warwick, Rhode Island 02889 Date:
More informationA GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS
A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS What is a groundwater protection plan? A groundwater protection plan identifies the activities being conducted that can pollute groundwater and
More informationSpill Prevention, Control and Countermeasure (SPCC)
Spill Prevention, Control and Countermeasure (SPCC) History Original promulgation 1973, effective 1974 Codified in 40 CFR 112 (EPA Jurisdiction) Proposed rulemaking 1991, 1993 and 1997 Amended July 17,
More informationPUBLIC WORKS TECHNICAL BULLETIN 200-01-13 31 MARCH 2001
PUBLIC WORKS TECHNICAL BULLETIN 200-01-13 31 MARCH 2001 SOURCE INFORMATION FOR PETROLEUM, OIL, AND LUBRICANT (POL) SPILL CONTAINMENT AND CLEANUP MATERIALS Public Works Technical Bulletins are published
More informationContact Person Sarah Morris-Benavides Revision 1.1 Document Plan 10200.037 Effective Date 07/01/2014 Review Date 03/15/2017.
Ames Laboratory Federal SPCC regulations (40 CFR Part 112) were created under the authority of the Clean Water Act. The stated purpose is " to prevent oil discharges from reaching navigable waters of the
More informationHazardous Waste Determination and Management Plan
Hazardous Waste Determination and Management Plan Prepared By: Triumvirate Environmental Developed: November 2014 Updated: Program Approval Associate Vice President of Public Safety & Administrative Services
More informationABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN
ABC CIRCUITS 10 Circuit Drive Circuit Town, IN 12345 SLUG CONTROL PLAN The purpose of this plan is to provide detailed instructions for slug prevention and control. A complete copy of this plan is maintained
More information