1 NEW CAPACITY IMPLEMENTATION AND DEVELOPMENT PLAN FOR THE TRANSPORTATION NETWORK Document prepared by Snam Rete Gas S.p.A. in compliance with the Rule 137/02 issued by the Regulatory Authority for Electricity and Gas. Thermal Year 2013/2014

2 Foreword Snam Rete Gas (hereafter, SRG) announces its plan for new capacity and development of its transportation network, elaborated on the basis of the information currently available, in compliance with article 4, subsection 1 letter b, of Rule no. 137/02 issued by the Regulatory Authority for Electricity and Gas (Autorità per l Energia Elettrica e il Gas - AEEG) 1. The transportation network development projects included in this plan are the result of analyses and assessments made by SRG, based on capacity requirement forecasts, according to available elements and information. The infrastructure development plans described in this document do not constitute a legallybinding commitment for SRG, who therefore reserves the right to modify them whenever deemed necessary considering any new element, such as market development differing from present forecasts. 1 The provision of information in this document, translated in English from the Italian version, is carried out in compliance with the E.U. Regulation No. 715/2009. In case of any inconsistency, of whatever nature, between English and Italian versions, the Italian version shall prevail. 2 New Capacity Implementation and Development Plan for the Transportation Network

3 Contents 1 PLANNED INFRASTRUCTURE The overall plan The national network The regional network The main projects Development of the transportation network for Southern Entry Points Passo Gries and Tarvisio Exports Other National Network development projects Reinforcement in Lombardy (regional network) Gavi Pietralavezzara natural gas pipeline (regional network) Conversion of the Calabria Region to Natural Gas (regional network) CAPACITY PLAN Entry Points interconnected with foreign pipelines Entry Points interconnected with LNG terminals Exit Points interconnected with foreign pipelines Methods for Calculating Transportation Capacity Simulation programs Operating constraints Delivery pressures Maximum pressures in the natural gas pipelines Minimum Pressures in the Natural Gas Pipelines Operation of the compressor stations Inflows and outflows to/from the network ATTACHEMENT LIST DEVELOPMENT PROJECTS NATIONAL NETWORK REGIONAL NETWORK New Capacity Implementation and Development Plan for the Transportation Network

4 1 PLANNED INFRASTRUCTURE 1.1 The overall plan The new capacity implementation and development plan for the transportation network (hereafter, plan) includes projects already under construction and projects under feasibility studies whose implementation could start later on. It also includes other projects that are currently being planned and for which the only engineering and permit acquisition activities are scheduled to be started later on. Planned infrastructures are the result of analyses and assessments made on the basis of: - natural gas consumption forecasts in Italy; - users requirements for capacity at the Entry and Exit Points; - new requests by players interested in new Entry/Exit or Redelivery Points. The implementation of these projects depends upon the actual development of the requirements and their planning is subject to revisions that could result in significant changes with respect to the view herewith expressed. Projects on the national transportation network represent the core part of the plan, while the ones on the regional transportation network constitute the remaining part. The total length of the new natural gas pipelines forecasted in the plan amounts to about 3,750 km, with respect to an overall length of the transportation network in operation of 32,245 km, at 1st September According to the plan, installed capacity of the compressor stations will grow from 864 MW at the beginning of 2012/2013 Thermal Year (46 compressor units at 11 stations), to 1,200 MW (8 new units at the existing stations, and 15 new units installed at 6 new stations). 1.2 The national network The projects for national network development are mainly aimed at creating infrastructure for new import and export capacity. Concerning import capacities, works for developing the transportation network from the Entry Points in Southern Italy are in progress and the engineering and permit acquisition activities are under way for some other network development works on the lines from the South and from the Northeast. These works are functional to projects under discussion for the supply of gas through new pipelines from foreign countries or LNG terminals; they may be implemented once system users will be engaged to use transport capacity, as provided by law n.239/04 and by ARG/gas 2/10 provisions by the Regulatory Authority for Electricity and Gas, as taken into account by the network code. 4 New Capacity Implementation and Development Plan for the Transportation Network

5 Concerning export capacities, works have been started in the reinforcement of the North transportation network that will expand the transportation network in the Po Valley, thus allowing zero physical inflows at the Entry Point of Passo Gries and generating new exit capacities from the Exit Points of Passo Gries and Tarvisio towards Northern and Eastern Europe, respectively. The remaining main development projects on national network include the new connection with Cornegliano Laudense storage field in Lombardy and the connection of Geogastock storage field located in Salandra in Basilicata. The total length of the new national network pipelines forecasted in the plan amounts to about 2,900 km, with respect to an overall national network length of 9,409 km, operated by SRG at 1 st September The regional network The plan includes 155 regional network reinforcement and extension projects distributed across the country, 84 of which are under implementation. Among them, the main ones are in Liguria (Gavi - Pietralavezzara) and Lombardy (Travagliato - Mornico al Serio, Lainate - Olgiate Olona, Osnago-Besana, Besana Giussano and Bussero-Osnago). In Calabria several network extension works are under way to allow the regional shift programme to natural gas. The plan also includes numerous works to interconnect industrial and thermoelectric plants as well as distribution networks to the transportation network. Some of these are already under way while other will not be implemented until the confirmation of interest by means of the signature of connection agreements. During the first 8 months of 2013, approximately 21 connections were started and 80 additional connections per year are foreseen, in the time horizon of the plan. The total length of the new regional network natural gas pipelines amounts to about 851 km, with respect to an overall regional network length of 22,836 km, operated by SRG at 1st September New Capacity Implementation and Development Plan for the Transportation Network

6 1.4 The main projects The main projects of transportation capacity development are represented in the plan below and are described in detail in the following paragraphs. Development North East Imports Development Exports Development South Imports Import via Sardinia Development South Imports 6 New Capacity Implementation and Development Plan for the Transportation Network

7 1.5 Development of the transportation network for Southern Entry Points In Southern Italy activities connected to the realization of the 6 th line of the Messina - Palmi natural gas sealine have started in order to provide new transportation capacity at the future Entry Point interconnected with national production fields, whose arrival point will be situated in the Gela area. 1.6 Passo Gries and Tarvisio Exports The project in progress presents a first phase finalized to increase flexibility and safety of market supply in the North West Area of the Country, allowing first physical export flows. During the second phase, that completes and integrates network reinforcements of the first phase, conditions for higher export capacities are set. Phase 1 The first phase foresees the reinforcement of transportation infrastructures of East-West line across the Po Valley, by realizing a new manifold station in Sergnano and the pipelines Zimella Cervignano (170 km DN 1400), Cremona Sergnano 2 (50 km DN 1200), Poggio Renatico Cremona 3 (149 km DN 1200). Furthermore the reinforcement of the compressor stations in Masera and Istrana 2 and of the measuring station in Masera 4 are foreseen, allowing the handling of the outflows from Passo Gries and Tarvisio. 2 Pipeline Cremona-Sergnano and reinforcement of Istrana plant already put into operation at the end of Pipeline Poggio Renatico Cremona put into operation since October Reverse flow of Masera compressor unit and adjustment of Masera s measuring station put into operation since July New Capacity Implementation and Development Plan for the Transportation Network

8 Phase 2 The new pipelines construction will also allow the replacement of about 315 km of the existing lines of Minerbio-Cremona, Cremona-Sergnano, Zimella-Sergnano and Sergnano- Cervignano, replacements due to technical reasons and to the progressive urbanization of Emilia, Veneto and Lombardy areas. The Cremona-Sergnano natural gas pipeline will also allow the connection to the National Network of the new Bordolano storage field. The above mentioned projects will allow the handling of the outflows from Passo Gries and Tarvisio towards Northern and Eastern Europe for quantities of 5 MScm/day and 18 MScm/day, respectively 5. The second phase consists in the construction of the pipelines Cervignano-Mortara (60 km DN1400) and Minerbio Poggio Renatico (20 km DN1200), of two new compressor stations in Minerbio (2x12 MW) and Sergnano (3x15 MW) and the reinforcement of the existing compressor station of Poggio Renatico (1x25 MW). The above mentioned projects will increase physical Exit flows in Passo Gries Interconnection Point until 40 MScm/day 6. 5 In both cases outflow in one point needs physical inflow in the other point. 6 Maximum concurrent physical flow in Exit in Passo Gries and Tarvisio. 8 New Capacity Implementation and Development Plan for the Transportation Network

9 1.7 Other National Network development projects SRG elaborated additional projects to further reinforce the transportation network in order to support further capacity increases, with particular reference to Entry Points. These projects, at present under feasibility evaluations, involve about 2,400 km of pipelines and about 240 MW of new power in new and/or existing compressor stations. In particular, in view of the importation projects and LNG terminals planned in Southern Italy, feasibility activities to expand the transportation network from the Entry Points in Southern Italy are already being carried out. In Sicily these projects include: - about 130 km of pipeline (DN1200) between Menfi and Piazza Armerina, along the line between Mazara del Vallo and Enna; - reinforcement of Enna compressor station whose construction works have already begun. Between the coasts of Sicily and Campania, about 300 km of the Tyrrhenian Line (DN800/1200) will be laid and the capacity of the new compressor station in Monforte S. Giorgio (ME) will be of 60 MW. Along the South-North line, about 700 km of the new Adriatic Line (DN1200) from Massafra (TA) to Minerbio (BO) and 33MW of compression power at the new compression station in Sulmona are foreseen. With reference to this project, construction works have already been completed on the Massafra- Biccari section in Puglia to improve the reliability and safety of transportation; the activities related to the construction of the compressor station in Sulmona, finalised at guaranteeing the transportation of larger quantities of gas from the storage field of Fiume Treste, which is in expansion by the field operator, have been initiated. The implementation of the aforesaid projects will allow an additional transportation capacity of about 25 MScm/day in Southern Italy Entry Points. Moreover, along the South-North line feasibility activities are foreseen for about 500 km (DN1200) and about 30 MW that will allow an additional transportation capacity of about 25 MScm/day in Southern Italy Entry Points. In Northern-eastern Italy, feasibility activities are being carried out for about 120 km of pipeline (DN1400) between Bordano and Istrana to replace the existing line (DN850), for the new compressor station of Flaibano (75 MW) and for the reinforcement of the station of Istrana. The implementation of these projects will provide a transportation capacity of about 30 MScm/day at the Entry Points situated in Friuli Venezia Giulia. In Central Italy, SRG signed an agreement with the GALSI company for the laying of the Italian section of the import natural gas pipeline from Algeria to Italy via Sardinia, once the final investment decision will be made by GALSI. SRG started the feasibility activities for the Piombino- Collesalvetti natural gas pipeline connection to the National Gas Pipeline Network. 9 New Capacity Implementation and Development Plan for the Transportation Network

10 The implementation of these projects will provide a transportation capacity of 24 MScm/day at the new Entry Point in Porto Botte. The transportation network will also be reinforced from the Entry Point interconnected with the LNG terminal in Panigaglia, for a total of 150 km of DN 900 pipelines. Feasibility activities already in progress could potentially reduce the overall time for the construction of the new infrastructures, which cannot start until transportation agreements have been stipulated with users, in line with the provisions of law n 239/04 and of Rule ARG/gas 2/10 of the Regulatory Authority for Electricity and Gas, as taken into account in the Network Code. 10 New Capacity Implementation and Development Plan for the Transportation Network

11 1.8 Reinforcement in Lombardy (regional network) Some major reinforcement projects are being carried out on the regional network of Lombardy, as reported in the map below. In the North-Western part of the network, the Lainate-Rescaldina section (11km, DN500) of the Lainate Olgiate Olona pipeline, the Osnago - Besana (9 km, diameter DN 750/500), Besana - Giussano (8 km diameter DN 500) and the Bussero Osnago (km 21 diametro DN 750) pipelines are being laid. In the Central-Eastern part, the regional network of eastern Lombardy is being reinforced through the laying of three adjacent natural gas pipelines with a diameter of DN 500, for a total length of about 46 km from Azzano Mella (BS) to Zanica (BG). The Azzano Mella - Travagliato (km 8) and Mornico al Serio - Zanica (km 14) sections were completed and put into operation in 2008 and 2009, respectively, while the Travagliato Mornico al Serio (24 km) section, which will complete the new regional transportation facility, is currently being laid. These works will reinforce the regional transportation infrastructures, thus adapting their performance to the growth of the natural gas market in the related areas. 11 New Capacity Implementation and Development Plan for the Transportation Network

12 1.9 Gavi Pietralavezzara natural gas pipeline (regional network) The project for Gavi - Pietralavezzara natural gas pipeline consists in laying about 26 km of pipeline with a diameter of DN 600, in place of the corresponding DN 400 section of the Cortemaggiore Genoa natural gas pipeline. The natural gas pipeline will increase the transportation capacity of the related regional network and the safety and reliability of the gas transportation service towards Genoa and its surrounding district Conversion of the Calabria Region to Natural Gas (regional network) In Calabria Region, works are under way for the completion of the regional conversion programme to natural gas, which entails constructing 17 supply lines for a total of 244 km, following the stipulation of contracts for connection to the SRG natural gas pipelines by distribution companies. At the present time, 11 of the total foreseen 17 supply lines have been laid and put in operation, for a total length of new lines of about 90 km of the foreseen 244 km, thus allowing the put into operation of 35 new Redelivery Points connected to the distribution network. 12 New Capacity Implementation and Development Plan for the Transportation Network

13 2 CAPACITY PLAN (Firm Capacity in MScm/day; 15 C; 1,01325 bar) 2.1 Entry Points interconnected with foreign pipelines 2.2 Entry Points interconnected with LNG terminals 2.3 Exit Points interconnected with foreign pipelines 13 New Capacity Implementation and Development Plan for the Transportation Network

14 2.4 Methods for Calculating Transportation Capacity The transportation capacities at the Entry, Exit and Redelivery Points of the transportation network are defined in chapter 2 of the Network Code, which also describes the methods used by SRG to calculate these capacities. The transportation capacities at the Entry Points interconnected with foreign pipelines or with LNG terminals and at the Exit Points interconnected with foreign pipelines, described in the plan, are communicated to the Ministry of Economic Development (Ministero dello Sviluppo Economico) and to the AEEG and published on SRG web site according to AEEG Rule no. 137/02. The transportation capacities at the Entry Points, interconnected with foreign pipelines or LNG terminals, are calculated by means of hydraulic simulations of the transportation network, defining the inflows and outflows to/from the network and complying with network operation constraints. The input data of the simulations are the daily flow rate and pressure values at the Entry Points and the daily flow rate values at the Exit/Redelivery points. The results of the simulations are the pressure values at the Exit/Redelivery points, the flow rate and pressure values of the gas flowing through the various sections of the network and the values of the characteristic parameters (e.g. the power and number of revolutions per minute) of the operation of the compressor stations. The transportation capacities may be put at the disposal of users with firm or interruptible transportation services. Firm transportation capacities are calculated in such a way that the resulting capacity value is guaranteed under all circumstances at all times of the Thermal Year. The firm transportation capacities are made available for a period of several years, whereas the annual and seasonal interruptible transportation capacities are calculated and made available on a yearly basis. Their values are determined by adopting less strict operating constraints than those used to calculate the firm capacities. The annual and seasonal interruptible capacities are subdivided into two levels of availability, so as to obtain four types of capacities characterized by ascending interruption priorities: 1st and 2nd level annual and 1st and 2nd level seasonal interruptible capacities. The transportation capacities at the Exit Points interconnected with foreign pipelines are calculated in a similar manner to those used for the Entry Points, taking into account the need to guarantee the transportation capacities at the Exit Points without interfering with the supply of the markets connected to the network in Italy. The transportation capacities at the Exit Points interconnected with foreign pipelines are made available on a yearly basis. Further information about the process to determine the transportation capacity on the SRG network - including the technical characteristics of the simulation system - is provided below. 14 New Capacity Implementation and Development Plan for the Transportation Network

15 2.4.1 Simulation programs The computerized system used for the transportation simulations consists of a set of programs for simulating mesh networks and compressor stations in a steady state. The system currently used is called SIRE2000 and was designed on the basis of specifications laid down by SRG. Interaction between the system and SRG operators takes place through a graphical interface, which is used to enter the data required by the system and to analyse the results of the simulation. The main characteristics of the system enable the operator to: create a model of the network consisting of sections of gas pipeline and calculation points corresponding to physical elements such as: o main nodes connecting pipelines; o detachment points of off-takes or distribution networks; o changes in diameter or altimetry of the pipelines. Calculation points are also set at the intake and delivery of compressor stations, at the Entry Points interconnected with import pipelines/lng terminals and production fields, and at the interconnections with the storage fields; concentrate the gas inflows and outflows to and from the network at the calculation points; simulate the network to calculate the following parameters, by solving a system of transportation equations on the basis of formulae and models recognized by scientific literature and the technical gas associations: o pressure, temperature and composition of the gas at the calculation points; o flow rate and composition of the gas in every section of the gas pipeline; o operating points of the compressor stations; use a model for the compressor stations based on: o application of the control criterion of the station for distributing the flow between the units; o realistic simulation of the operating point of compressors and turbines, using a mathematical model that describes the characteristic curves of each individual machine obtained from the field measurements (where available) or the expected curves provided by the manufacturers; this simulation provides quite an accurate determination of the operating range of the plants based on the actual limit curves (antisurge, minimum and maximum number of revolutions, maximum power); o calculation of the characteristic parameters of the compressor units based on the model of the machines (e.g. gas consumption, power required by the compressor, power provided by the turbine, number of revolutions per minute). 15 New Capacity Implementation and Development Plan for the Transportation Network

16 The calculation models used adopt the following main basic equations: Calculation of head losses Equation of state for calculating Z and derived factors Calculation of friction factor Calculation of viscosity Fergusson Equation Redlich-Kwong Equation Colebrook Equation Dean-Stiel Method Operating constraints Delivery pressures The minimum contractual pressures for delivery at the Entry Points, agreed upon with the operators interconnected with the transportation network as early as the interconnection plant sizing phase, are published on the web site of SRG, in accordance with the provisions laid down by the Network Code. The delivery pressure values presently in operation are: Entry Point Minimum contractual pressure (barg) Tarvisio 52,5 Gorizia 58 Passo Gries 7 49 Mazara del Vallo 75 Gela 70 Panigaglia 70 Cavarzere Maximum pressures in the natural gas pipelines The pressure inside a gas pipeline must never exceed the maximum operating pressure of the pipeline. The maximum operating pressure is indicated on the Fire Prevention Certificate (Certificato di Prevenzione Incendi - CPI) issued by the provincial Fire Department when authorising pipeline operation. In transportation simulations, values 1 bar lower than the maximum operating pressure are considered as maximum pressures to avoid the risk of exceeding maximum operating pressure by 7 Pressure read at the measuring station of Masera. 16 New Capacity Implementation and Development Plan for the Transportation Network

17 effect of changes in the height of the pipeline or transient transportation conditions. Some sections of the pipelines downstream of the Entry points of Passo Gries and Tarvisio, laid in the early seventies and almost completely duplicated or triplicated with new lines, are operated at maximum pressures lower than the maximum operating pressure of the pipelines Minimum Pressures in the Natural Gas Pipelines The minimum pipeline pressure constraints take into account: the minimum operating pressures of the compressor stations, adjusted to cope with pressure fluctuations on the network during the day or possible surges; the compression ratios of the compressor stations, which, on the SRG transportation network, take on values of between 1.4 and 1.5 (70/50 barg on the transportation network with a CPI of 70 barg and 75/50 barg on the transportation network with a CPI of 75 barg); the need to maintain a minimum pressure level at the terminals of the networks that branch off from the nodes and from the transportation network so as to meet the withdrawal peaks that would otherwise tend to empty the pipes at peak hours (the amount of gas in the pipelines is directly proportionate to the pressure); the minimum redelivery pressures at the storages, adjusted to cope with pressure fluctuations on the network during the day or possible surges. The minimum pressure constraints in the gas pipelines are set at the input of the compressor stations and at the main nodes of the transmission network so that the pressure is always higher than the minimum allowed values at all points of the simulated network. The minimum pressure is 49 barg at the nodes of Mortara and Sergnano and 54 barg at the node of Minerbio. A value of 49 barg should be considered as the minimum pressure at the input of the compressor stations Operation of the compressor stations In the transportation simulations, the compressor stations operate under the following conditions: station power, defined as the sum of the power outputs of the turbines in operation, equivalent to 95±1% of the maximum available power (MW); number of compressor and turbine revolutions per minute, equivalent to 100±1% of the nominal revolutions per minute (RPM). The operating ranges defined above ensure safety margins which, taking into account the approximations inherent in simulating the operation of the units, enable the operating conditions that may actually arise during normal operation (mainly transitory events associated with daily fluctuations in transportation) to be tackled. In order to ensure the reliability of the transmission system under normal operating conditions, a certain number of spare compressor units are kept at each station, to guarantee that the total power of the spare units is equivalent to or greater than the power of each unit in operation. 17 New Capacity Implementation and Development Plan for the Transportation Network

18 For example, at a station made up of two compressor units with a rated power of 10 MW and two compressor units with a rated power of 25 MW, the maximum rated power for which spare units are available is 45 MW. Other limitations in the management of stations are determined by: the mapping of the compressors installed, which delimits the range of heads/flow rates allowed for each machine; the reduction coefficients of the power output of the turbines and of the efficiency of the compressors, which take into account the ageing of the machines; the head losses at the filters, the air coolers and the station s pipe-works Inflows and outflows to/from the network The gas inflows and outflows to and from the network are defined on the basis of the general criteria described here below. Redelivery Points The withdrawals of gas from the Redelivery Points are not constant throughout the year but are subject to seasonal variations 8. The outflows are therefore estimated considering a wide range of scenarios, which represent a forecast of the characteristic daily flow of each Redelivery Point, in different periods of the year. The annual firm and interruptible transportation capacities are calculated considering a summer consumption scenario, which represents the most severe scenario for the Entry Points from the South and the North-East, characterized by lower gas consumption with respect to other scenarios. In this scenario, gas put into the Entry Points must be transported for long distances to the storage fields situated in the North-Western, North-Eastern and Central areas of Italy. The annual transportation capacities (firm and interruptible) calculated in this scenario may therefore be guaranteed at any other time of year. For the Entry Point of Passo Gries, situated near the storage fields and major consumption centres, the seasonal effect on transportation is less accentuated and it must therefore be checked on each occasion which scenario allows the firm transportation capacity to be guaranteed at any time of year. The seasonal interruptible transportation capacities of the Entry Points from the South and the North-East are calculated on the basis of the winter scenarios; for the reason indicated above, interruptible seasonal capacity has never been made available for the Entry Point of Passo Gries. Transportation Capacities at Exit Points of Passo Gries, Tarvisio and Gorizia are evaluated on the basis of a winter scenario which represents the most severe one. As a matter of fact in this scenario gas export volumes must be transported with gas volumes assigned to the local market 8 For example, the difference in withdrawals for heating between the winter and the summer and the seasonal trends of some sectors of industry. 18 New Capacity Implementation and Development Plan for the Transportation Network

19 that, in winter time, are the highest of the year. Therefore capacity transportation evaluated under such a scenario can be guaranteed during the whole year. Storage and national production fields The storage fields are characterised by outflows from the network in the summer scenarios and inflows to the network in the winter scenarios. In summer scenarios an outflow to the storage fields of 60 MScm/day is considered. This value is consistent with the hypothesis of putting into storage, in the summer period (150 days), a total volume of gas for a storage replenishing campaign after a particularly cold winter. In winter scenarios, an inflow from the storage fields capable of compensating for the difference between the inflows (import and national production) and outflows (redelivery points and export) on the network is considered, taking into account the output capacity and the historical output flow rate of each individual field. The inflows to the transmission network from the national production fields are determined on the basis of the forecasts made by the operators of the production fields on the annual production volume and the production volumes of each individual field taken from the historical data, assuming a constant production rate during the year. 19 New Capacity Implementation and Development Plan for the Transportation Network

20 3 ATTACHEMENT LIST DEVELOPMENT PROJECTS NATIONAL NETWORK DENOMINATION Diameter (mm) Length (km) SEALINE MESSINA-PALMI 6 LINEA MET. BICCARI-CAMPOCHIARO MET. GRADO-VILLESSE MET.ZIMELLA-CERVIGNANO NUOVO NODO DI SERGNANO MET. MINERBIO-POGGIO RENATICO MET. CERVIGNANO-MORTARA MET.PONTREMOLI-CORTEMAGGIORE ALL. TERM. GNL BRINDISI LNG DI BRINDISI ,01 ALL. API NOVA ENERGIA GNL DI FALCONARA ,1 ALL. GNL NUOVE ENERGIE P.TO EMPEDOCLE ALL GAS NATURAL TERMINALE GNL DI TRIESTE ITAL GAS STORAGE S.R.L. DI CORNEGLIANO ALL. STOCCAGGIO GEOGASTOCK DI SALANDRA 750 0,1 ALL. ENI S.P.A. DIV. E&P DI GELA 500 0,4 NUOVO NODO DI MINERBIO - - POT. C.LE DI ENNA (REVAMPING) NUOVA C.LE DI SULMONA POT. C.LE DI POGGIO RENATICO NUOVA C.LE DI SERGNANO NUOVA C.LE DI MINERBIO MET. AGRIGENTO-P.ARMERINA MET.MENFI-AGRIGENTO SEALINE MONFORTE S.G-POLICASTRO MET.POLICASTRO-MONTESANO MET. S.PIER NICETO-MONFORTE S.GIORGIO MET. SESTINO-MINERBIO MET. FOLIGNO-SESTINO MET. SULMONA-FOLIGNO MET. FALCONARA-RECANATI MET. RECANATI-FOLIGNO MET. TARANTO-MASSAFRA MET.MELILLI-BRONTE MET. BORDANO-FLAIBANO MET. FLAIBANO-ISTRANA MET. VILLESSE-GONARS MET. PIOMBINO-COLLESALVETTI NUOVA C.LE DI MONFORTE S.GIORGIO POT. C.LE DI ISTRANA NUOVA C.LE DI FLAIBANO MET. LA SPEZIA-PONTREMOLI MET. TRIESTE-S.DORLIGO DELLA VALLE MET. LECCE-BRINDISI GALLESE-ORVIETO SULMONA-ORICOLA MELIZZANO-CAMPOCHIARO MONTESANO-BUCCINO MET. TERRANUOVA-MINERBIO SEALINE OLBIA-PIOMBINO MET. PORTO BOTTE-OLBIA POT. C.LE DI TERRANUOVA NUOVA C.LE DI OLBIA Units (n ) Power (MW) 20 New Capacity Implementation and Development Plan for the Transportation Network

GAS TRANSMISSION TARIFFS YEAR 2013 1 st JANUARY 2014 31 st DECEMBER 2014

GAS TRANSMISSION TARIFFS YEAR 2013 1 st JANUARY 2014 31 st DECEMBER 2014 GAS TRANSMISSION TARIFFS YEAR 2013 1 st JANUARY 2014 31 st DECEMBER 2014 Gas transmission tariffs have been calculated according to the provisions of the Delibera 514/2013/R/GAS published on 14 rd November

More information

gas & power natural gas

gas & power natural gas gas & power 30 % 25 20 15 10 5 12.0 11.4 10.4 18.6 19.6 21.8 29.9 STRATEGIES Consolidate market leader position in Italy Secure and increase market share in valuable markets in Europe Develop the LNG business

More information

The completion of the Italian commercial platform and the development of the market

The completion of the Italian commercial platform and the development of the market The Implementation of the Third Package in the Gas Sector: the European Approach and the Italian Market The completion of the Italian commercial platform and the development of the market Clara Poletti,

More information

PIPELINE PROCESS ENGINEERING FLOW ASSURANCE PIPELINE SERVICES MULTIDISCIPLINARY ENGINEERING

PIPELINE PROCESS ENGINEERING FLOW ASSURANCE PIPELINE SERVICES MULTIDISCIPLINARY ENGINEERING PIPELINE PROCESS ENGINEERING FLOW ASSURANCE PIPELINE SERVICES MULTIDISCIPLINARY ENGINEERING MISSION Streamline is a young and dynamic Pipeline Engineering Company with Offices in Milan, Italy. Our Mission

More information

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives By: Konstantinos E. Maroulis General Manager Director of Gas Transmission, Administration & Finance Hellenic

More information

Sviluppo Italia incubators network. Regional companies coordination Incubators network development/information network

Sviluppo Italia incubators network. Regional companies coordination Incubators network development/information network Sviluppo Italia incubators network Regional companies coordination Incubators network development/information network BUSINESS INCUBATORS The business incubator is a territorial development tool designed

More information

Regione Provincia Distretto Abruzzo Chieti DISTRETTO 009 Abruzzo Chieti DISTRETTO 010 Abruzzo Chieti DISTRETTO 011 Abruzzo Chieti DISTRETTO 015

Regione Provincia Distretto Abruzzo Chieti DISTRETTO 009 Abruzzo Chieti DISTRETTO 010 Abruzzo Chieti DISTRETTO 011 Abruzzo Chieti DISTRETTO 015 Regione Provincia Distretto Abruzzo Chieti DISTRETTO 009 Abruzzo Chieti DISTRETTO 010 Abruzzo Chieti DISTRETTO 011 Abruzzo Chieti DISTRETTO 015 Chieti Conteggio 4 Abruzzo L'Aquila DISTRETTO 001 Abruzzo

More information

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) Claudio Cavandoli, Alessandro Crippa EDISON S.p.A., Engineering Department ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) 1 ANCILLARY SERVICES SUPPLIED TO THE GRID:

More information

The LNG supply chain scenarios: the downstream from port to land

The LNG supply chain scenarios: the downstream from port to land The LNG supply chain scenarios: the downstream from port to land Glasgow (United Kingdom, Scotland) September 15th, 2015 Eng. Simone Pacciardi Technical consultant La Spezia Port Authority The Port of

More information

Rifiuti tra crescita e decrescita

Rifiuti tra crescita e decrescita Rifiuti tra crescita e decrescita Giacomo D Alisa Università di Roma, Sapienza Università Autonoma di Barcellona Rifiuti tra crescita e decrescita L insostenibilità della crescita Il metabolismo dei rifiuti

More information

Indicative Redelivery Period (*) 145.000 9 June 24 June 2012. 145.000 17 June 4 July 2012

Indicative Redelivery Period (*) 145.000 9 June 24 June 2012. 145.000 17 June 4 July 2012 22/05/2012 Spot Capacity Subscription Courtesy English Translation (not binding only the Italian version is binding) 1. Adriatic LNG (the Operating Company or Adriatic LNG ) makes the following Spot regasification

More information

The Italian Gas Market:

The Italian Gas Market: The Italian Gas Market: Challenges and Opportunities Anouk Honoré NG 76 June 2013 The contents of this paper are the author s sole responsibility. They do not necessarily represent the views of the Oxford

More information

Filippo Garlanda PhD: Places and Times of the City and the Territory THEME: Sustainable Development for Tourism Destinations

Filippo Garlanda PhD: Places and Times of the City and the Territory THEME: Sustainable Development for Tourism Destinations Filippo Garlanda PhD: Places and Times of the City and the Territory THEME: Sustainable Development for Tourism Destinations Sustainable development and territory administration Sustainable development

More information

RETAIL CLIENT TYPE INTERVENTION LOCATION YEAR m²

RETAIL CLIENT TYPE INTERVENTION LOCATION YEAR m² RETAIL Ferri SpA Commercial Building Internal Layout - Exterior Communication 2001 4200 Mete SpA Store Internal Layout - Exterior Communication 2002 1520 Semeraro Immobiliare Srl Commercial Building Architectural

More information

Cover: Lorenzo Mattotti, La ricchezza

Cover: Lorenzo Mattotti, La ricchezza Report on the First Half of 2004 Cover: Lorenzo Mattotti, La ricchezza Report on the First Half of 2004 contents Report on the first half of 2004 Management report 4 First half 2004 highlights 6 Key economic,

More information

MEASUREMENT OF THE LNG DELIVERED AND THE GAS REDELIVERED

MEASUREMENT OF THE LNG DELIVERED AND THE GAS REDELIVERED MEASUREMENT OF THE LNG DELIVERED AND THE GAS REDELIVERED 1) INTRODUCTION... 2 2) MEASUREMENT OF THE LNG DELIVERED... 2 2.1) DETERMINING THE AMOUNT OF LNG DELIVERED... 2 2.2) MEASUREMENT SYSTEM FOR THE

More information

Potential Development of Solar Thermal Power in Italy

Potential Development of Solar Thermal Power in Italy Potential Development of Solar Thermal Power in Italy Vittorio Brignoli 1 Solar Thermal Power framework in Italy 2008 First Decree for STP: 2 Mm², storage obligation, terrain protection 2010 Italian Action

More information

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software th International Conference on Structural Mechanics in Reactor Technology (SMiRT ) Espoo, Finland, August 9-4, 9 SMiRT -Division 3, Paper 56 Investigations of a Long-Distance MW Heat Transport System with

More information

Report on Energinet.dk s handling of the emergency supply situation from Thursday, 8 November 2007 at 20:00 to Friday, 9 November at 24:00

Report on Energinet.dk s handling of the emergency supply situation from Thursday, 8 November 2007 at 20:00 to Friday, 9 November at 24:00 Report on Energinet.dk s handling of the emergency supply situation from Thursday, 8 November 2007 at 20:00 to Friday, 9 November at 24:00 26 November 2007 PAH/FWI 1. Background On Thursday, 8 November

More information

QUALITY AND PLANNING OF SERVICES

QUALITY AND PLANNING OF SERVICES SYNERGIA Knowledge and management for social change QUALITY AND PLANNING OF SERVICES CURRICULUM ABOUT SYNERGIA ACTIVITIES Milan, 2010 Via Mauro Macchi 44-20124 Milano Italy - Tel. +39/02/72093033 - Fax

More information

Fiscal federalism in Italy at a glance

Fiscal federalism in Italy at a glance Fiscal federalism in Italy at a glance Distribution of fiscal revenues (2006) Local Governments 7% Distribution of public expenditure (2006) Local Governments 19% Regions 24% State 53% Source: Region of

More information

Ministero dello Sviluppo Economico

Ministero dello Sviluppo Economico Ministero dello Sviluppo Economico Marcello Capra Department of Energy (Italian Delegate European SET Plan) EU and Italian Policy on Smart City European Smart City Conference Green City Energy ONtheSEA

More information

STORAGE CODE. Edison Stoccaggio S.p.A.

STORAGE CODE. Edison Stoccaggio S.p.A. STORAGE CODE ù Contents STORAGE CODE VERSION 14. AUGUST 2014 I ù Contents CONTENTS INTRODUCTION TO THE DOCUMENT... 1 THE OPERATORS AND OTHER PARTIES... 2 SECTION 1 INFORMATION CHAPTER 1 REGULATORY FRAMEWORK...

More information

Deliverable 3.a (Combining former deliverables 3.1; 3.2; 3.5)

Deliverable 3.a (Combining former deliverables 3.1; 3.2; 3.5) City Supporting partner LOMBARDY REGION (ITALY) A2A CALORE & SERVIZI SRL Map showing local heating and cooling demand and supply MILANO, STREET MAP: MILANO, ANNUAL HEAT DEMAND EXTRACT FROM PETA (STRATEGO

More information

THERMAL ENERGY STORAGE

THERMAL ENERGY STORAGE energia alternativa air conditioning THERMAL ENERGY STORAGE - Thermal Energy Storage Thermal energy storage () is particularly suited to air conditioning and industrial refrigeration systems. Usually traditional

More information

INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION LIFE+ MHYBUS LIFE 07-ENV/IT/000434

INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION LIFE+ MHYBUS LIFE 07-ENV/IT/000434 Feb. 15, 212 Sheet: 1 of 27 INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION Ref. Number: LIFE+ MHYBUS LIFE 7-ENV/IT/434 Project Acronym: MHYBUS Project

More information

SIMONE Capacity Tools and Gas Transport Commercial Management System Integration

SIMONE Capacity Tools and Gas Transport Commercial Management System Integration SIMONE Capacity Tools and Gas Transport Commercial Management System Integration Zdravko Oklopčić, Končar KET Martin Stýblo, SIMONE Research Group Summary: Calculation of Available Capacity is very important

More information

THE MINISTRY OF THE ECONOMY, LABOUR AND ENTREPRENEURSHIP

THE MINISTRY OF THE ECONOMY, LABOUR AND ENTREPRENEURSHIP THE MINISTRY OF THE ECONOMY, LABOUR AND ENTREPRENEURSHIP 1174 Pursuant to Article 3, point 5 of the Gas Market Act (Official Gazette 40/2007, 152/08), the Minister of the Economy, Labour and Entrepreneurship

More information

Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States

Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States Assessment of the Adequacy of Natural Gas Pipeline in the Northeast United States U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Energy Infrastructure Modeling and Analysis

More information

Monitoring and evaluating the Italian programme for urban sustainable mobility

Monitoring and evaluating the Italian programme for urban sustainable mobility Monitoring and evaluating the Italian programme for urban sustainable mobility Maurizio Tomassini ISIS Istituto di Studi per l Integrazione dei Sistemi 1 Foreword The project has been developed jointly

More information

REXEL. 23 Branches 4 Distribution. delivery within 24h from order confirmation. employees CLOSE TO OUR CUSTOMERS PROVIDING SERVICE EXCELLENCE

REXEL. 23 Branches 4 Distribution. delivery within 24h from order confirmation. employees CLOSE TO OUR CUSTOMERS PROVIDING SERVICE EXCELLENCE REXEL in Italy 23 Branches 4 Distribution Centers delivery within 24h from order confirmation 400 employees CLOSE TO OUR CUSTOMERS PROVIDING SERVICE EXCELLENCE Installers Small, medium and large specialised

More information

Avoiding climate-damaging methane emissions during pipeline repairs

Avoiding climate-damaging methane emissions during pipeline repairs Avoiding climate-damaging methane emissions during pipeline repairs Krakow, October 14 th, 2011 Christian Hadick (Pipeline Intervention) and Axel Scherello 2 Reduction of natural gas emissions Reduction

More information

It is the network that goes everywhere and that will always go farther.

It is the network that goes everywhere and that will always go farther. Sustainability Report 2011 Snam transports, transforms, preserves and distributes a future. A future where Italy is a pioneer. And where Europe is even closer. That future already exists. Uniting the community.

More information

Table 1. Daily newspapers: national circulation (2012)

Table 1. Daily newspapers: national circulation (2012) 422 Annex Annex Table 1. Daily newspapers: national circulation (2012) Area Corriere della Sera north west 205,985,561 8.34 On sale La Repubblica centre 189,241,106 7.67 On sale La Gazzetta dello Sport

More information

ROVIGO Liquefied Natural Gas (LNG) TERMINAL

ROVIGO Liquefied Natural Gas (LNG) TERMINAL ROVIGO Liquefied Natural Gas (LNG) TERMINAL Prepared by: Giorgio Locatelli (University of Lincoln) and Mauro Mancini (Politecnico di Milano) Contacts: Giorgio Locatelli University of Lincoln Lincoln School

More information

Company Presentation

Company Presentation Company Presentation 1 Company Presentation Company History Certification Organization References Customers Business Systems Division Plants Division 2 Company Sysco S.p.A. designs, manufactures and installs

More information

MALTA GAS PROJECT FEASIBILITY STUDY ( EVALUATION ) FINAL REPORT

MALTA GAS PROJECT FEASIBILITY STUDY ( EVALUATION ) FINAL REPORT MALTA GAS PROJECT FEASIBILITY STUDY ( EVALUATION ) FINAL REPORT INDEX 1. Introduction. 2. Executive Summary. 3. Gas Market Identification. 3.1. Macro Economic Energy Scenario. 3.2. Power Demand: Base Case.

More information

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems Sandra Scalari Enel Ingegneria e Ricerca SpA Copenhagen, May 27-28 th 2014 Enel Presentation Generation Shift & Market in Europe Enel

More information

References on tunnels

References on tunnels Tunneled access to multistorey parking inside the Park of the Castle, Brescia Client: Brescia mobilità S.p.A. Head designer: Via Ingegneria SrL Eng. Matteo Di Girolamo Assignment: Preliminary and detailed

More information

Resilience-Based design of Natural Gas Pipelines

Resilience-Based design of Natural Gas Pipelines Resilience-Based design of Natural Gas Pipelines G. P. Cimellaro, O. Villa Department of Structural, Geotechnical & Building Engineering (DISEG), Politecnico di Torino, 10129 Turin, ITALY A.M. Reinhorn&

More information

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district

More information

Università degli Studi di Verona WELCOME GUIDE ERASMUS. Staff Training Week 25-29.05.2015

Università degli Studi di Verona WELCOME GUIDE ERASMUS. Staff Training Week 25-29.05.2015 Università degli Studi di Verona 2014 2015 WELCOME GUIDE ERASMUS Staff Training Week 25-29.05.2015 WELCOME GUIDE University of Verona (IVERONA01) Palazzo Giusti - via San Zeno in Monte 1 - Verona Tel.:

More information

Recommended Practice for Software Acquisition

Recommended Practice for Software Acquisition Recommended Practice for Software Acquisition PSIG 003/2000 Objective: To develop a set of practices that may be used in the acquisition of pipeline simulation software. Pipeline Simulation Interest Goup,

More information

Points and Capacity Limits in Phase 2. Revised APPENDIX 1

Points and Capacity Limits in Phase 2. Revised APPENDIX 1 Points and Capacity Limits in Phase 2 Revised APPENDIX 1 Appendix 1: Points and Capacity Limits 2 1. Introduction This Appendix contains the updated listing, description and Capacity delimitation of Points

More information

Part 2 ENERGY SUPPLY SECURITY 2014

Part 2 ENERGY SUPPLY SECURITY 2014 ENERGY SUPPLY SECURITY 2014 Part 2 The following member country profile is an excerpt from Chapter 4 of the publication Energy Supply Security 2014 and is not intended as a stand-alone publication. CHAPTER

More information

Chapters 7. Performance Comparison of CI and SI Engines. Performance Comparison of CI and SI Engines con t. SI vs CI Performance Comparison

Chapters 7. Performance Comparison of CI and SI Engines. Performance Comparison of CI and SI Engines con t. SI vs CI Performance Comparison Chapters 7 SI vs CI Performance Comparison Performance Comparison of CI and SI Engines The CI engine cycle can be carried out in either 2 or 4 strokes of the piston, with the 4-cycle CI engine being more

More information

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT I / 7 Natural Gas Transport. General principle The most efficient and effective method of natural gas distribution from the place of production to the

More information

PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS

PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS Regione Lombardia ALER Bergamo Lecco Sondrio Treviglio via Dei Mulini n. 10/20 via Filzi n. 11/13 Prospectus Template provided by TEH-Ambrosetti.

More information

Proposta di studio multicentrico A.I.S.F. Genetica della PBC e PSC

Proposta di studio multicentrico A.I.S.F. Genetica della PBC e PSC Proposta di studio multicentrico A.I.S.F. Genetica della PBC e PSC Coordinatore Pietro Invernizzi A.I.S.F., Rome, 25 February 2011 STUDY 1 Primary biliary cirrhosis Identification of common and uncommon

More information

Curriculum vitae. Dott. Ing. Giovanni Solcia. Personal information First name / Surname Address

Curriculum vitae. Dott. Ing. Giovanni Solcia. Personal information First name / Surname Address Curriculum vitae Personal information First name / Surname Address GIOVANNI SOLCIA Via Pisacane 9-20010 Cornaredo (MI) - Italy Telephone 0039 338 6018568 Fax 0039 02 9197 1525 E-mail g.solcia@sfera.mi.it

More information

dbproject Engineers and Consultants in Noise and Vibration

dbproject Engineers and Consultants in Noise and Vibration engineering & consulting Engineers and Consultants in Noise and Vibration 24040 MADONE (BG), Via Papa Giovanni XXIII, 26/a telefono e fax 035.99.50.99 website www.db-project.it e-mail info@db-project.it

More information

CONTRIBUTION OF TAP TO THE ITALIAN ECONOMY

CONTRIBUTION OF TAP TO THE ITALIAN ECONOMY Analysis No. 256, June 2014 CONTRIBUTION OF TAP TO THE ITALIAN ECONOMY Matteo Verda The decision of building the Trans Adriatic Pipeline (TAP) represented a major breakthrough in the development of the

More information

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By ABSTRACT Migdalia Hernandez, City of Sanford P.O. Box

More information

Advanced Applications that Enhance Business and Operational Processes in the Gas Pipeline Industry

Advanced Applications that Enhance Business and Operational Processes in the Gas Pipeline Industry Advanced Applications that Enhance Business and Operational Processes in the Gas Pipeline Industry Energy Solutions International Mike Bryant, Florida Gas Transmission VISION FOR THE GAS MARKET Energy

More information

PASSION AND SKILL FOR ENERGY

PASSION AND SKILL FOR ENERGY PASSION AND SKILL FOR ENERGY Company profile Gamma Energy is an engineering and construction company that has been working for several years in the energy sector carrying out "turnkey" plants. Gamma Energy

More information

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT Prepared for The Electric Reliability Council of Texas JUNE 2013 Black & Veatch Holding Company 2011.

More information

Best regards President of Italian Dance Sport Federation Christian Zamblera

Best regards President of Italian Dance Sport Federation Christian Zamblera To all IDO Members Rome, 08/04/2014 SUBJECT: INVITATION DANCE IT!!! WORLD CHAMPIONSHIP DISCO DANCE & DISCO FREESTYLE Dear IDO Friends, Welcome to DANCE IT!!! IDO World Championship Disco Dance & Disco

More information

analysis: experience in Italy

analysis: experience in Italy Smart metering Cost-benefit analysis: experience in Italy Ferruccio Villa Head of Electricity Quality of Supply Head of Electricity and Gas Smart Metering fvilla@autorita.energia.it Stefano Scarcella Market

More information

Maintenance Program. 2008, February 6th CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZ DEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS

Maintenance Program. 2008, February 6th CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZ DEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS Maintenance Program 2008, February 6th Agenda Introduction Let s have a look back at 2007 ECT - The available tools 2008 works schedule presentation A plan to reduce works schedule impacts Visit of Cuvilly

More information

SEA LEVEL REAL TIME MONITORING SYSTEM IN THE NORTHEASTERN ITALY

SEA LEVEL REAL TIME MONITORING SYSTEM IN THE NORTHEASTERN ITALY Workshop on Real-time Transmission and Processing Techniques: Improving the Global Sea Level Observing System s contribution to multihazard warning systems Intergovernmental Oceanographic Commission of

More information

Total deliverability gas storage analysis methodology and case study

Total deliverability gas storage analysis methodology and case study Risk, Reliability and Societal Safety Aven & Vinnem (eds) 2007 Taylor & Francis Group, London, ISBN 978-0-415-44786-7 Total deliverability gas storage analysis methodology and case study B. Haukelidsæter

More information

Miur-Contingente-Organici-Nomine-Docenti-201415.xlsx ] Titolari al 23.07.2014 Disponibil ità

Miur-Contingente-Organici-Nomine-Docenti-201415.xlsx ] Titolari al 23.07.2014 Disponibil ità Ordine scuola Provincia Posti o.d. 2014/15 Titolari al 23.07.2014 Disponibil ità Esubero contingente nazionale per nomine Infanzia Normale 81.601 77.582 4.019 2341 Primaria Normale 197.992 191.829 6.226

More information

Measuring the Effects of the 2008-09 Crisis on the Competitiveness of Italian Provinces

Measuring the Effects of the 2008-09 Crisis on the Competitiveness of Italian Provinces Measuring the Effects of the 2008-09 Crisis on the Competitiveness of Italian Provinces DICEA - Department of Civil, Architectural and Environmental Engineering Did the various territories react in the

More information

Who we are. We are 17,000 men and women who form a cooperative banking group with 1,800 branches.

Who we are. We are 17,000 men and women who form a cooperative banking group with 1,800 branches. Who we are We are 17,000 men and women who form a cooperative banking group with 1,800 branches. Over the past 150 years, we have become part of the history of the households and businesses in our local

More information

Experimental study on atmospheric pollutant emissions from heating systems, in Italy

Experimental study on atmospheric pollutant emissions from heating systems, in Italy Experimental study on atmospheric pollutant emissions from heating systems, in Italy Promoted by the Italian Ministry for the Environment, in coperation with : The Lombardy Region, the Piedmont Region,

More information

TECNOCRYO THE COMPANY OF CRYOGENIC GAS

TECNOCRYO THE COMPANY OF CRYOGENIC GAS TECNOCRYO THE COMPANY OF CRYOGENIC GAS TECNOCRYO S.p.A. IS A LEADING COMPANY OF MANUFACTURING AND INSTALLATION OF MACHINES, EQUIPMENTS AND PLANTS FOR THE MANAGEMENT OF CRYOGENIC GASES GAS DISTRIBUTION

More information

SELITECH ENERGY WATER SYSTEMS COMPANY PROFILE

SELITECH ENERGY WATER SYSTEMS COMPANY PROFILE ENERGY WATER SYSTEMS COMPANY PROFILE EN 04/2012 srl are a service company, previously part of SELECO GROUP. They supply design, engineering and supervision of the rehabilitation, renewal or refurbishment

More information

AN OVERVIEW OF THE UK OUTBOUND MARKET

AN OVERVIEW OF THE UK OUTBOUND MARKET AN OVERVIEW OF THE UK OUTBOUND MARKET 2014 2015 (Provisional data - Quarter 1) The latest data published by the Office for National Statistics (ONS) indicates that in the period Jan- March 2015 the overall

More information

Simulation and capacity calculation in real German and European interconnected gas transport systems

Simulation and capacity calculation in real German and European interconnected gas transport systems Chapter 1 Introduction Natural gas is one of the most widely used sources of energy in Europe. The whole supply chain of natural gas, from the gas well through several kinds of elements to final customers,

More information

Milan: a rich region Province of Milan = 3.7 million inhabitants Italy s richest urban agglomeration & one of the wealthy OECD metro regions

Milan: a rich region Province of Milan = 3.7 million inhabitants Italy s richest urban agglomeration & one of the wealthy OECD metro regions The case of Milan Milan: a rich region Province of Milan = 3.7 million inhabitants Italy s richest urban agglomeration & one of the wealthy OECD metro regions 35 34.08 Milan Province 33 31 Highest GDP

More information

Pushing the limits. Turbine simulation for next-generation turbochargers

Pushing the limits. Turbine simulation for next-generation turbochargers Pushing the limits Turbine simulation for next-generation turbochargers KWOK-KAI SO, BENT PHILLIPSEN, MAGNUS FISCHER Computational fluid dynamics (CFD) has matured and is now an indispensable tool for

More information

C S L Forum. 2nd Ministerial Meeting. ITALIAN ROADMAP: Project s Proposal for CSLF

C S L Forum. 2nd Ministerial Meeting. ITALIAN ROADMAP: Project s Proposal for CSLF C S L Forum 2nd Ministerial Meeting ITALIAN ROADMAP: Project s Proposal for CSLF SEPCA: Advanced Technologies for CO 2 Separation and Capture for Existing and Innovative Fossil Fired Power Plants CO 2

More information

Urban environmental indicators

Urban environmental indicators 28 July 2010 Urban environmental indicators Year 2009 Istat presents the results of an urban environmental indicators survey carried out in collaboration with Municipal Statistical Offices and other Organizations

More information

A methodology for monitoring and leakage reduction in water distribution systems

A methodology for monitoring and leakage reduction in water distribution systems Water Utility Journal 2: 23-33, 2011. 2011 E.W. Publications A methodology for monitoring and leakage reduction in water distribution systems M. Nicolini University of Udine Department of Chemistry, Physics

More information

IL NUCLEARE IN ITALIA: SI RIPARTE?

IL NUCLEARE IN ITALIA: SI RIPARTE? IL NUCLEARE IN ITALIA: SI RIPARTE? 27 maggio, Sala Sagittarius, Centro Congressi, Fieramilano - Rho Silvio Bosetti Energy Lab - Laboratorio dell Energia ENERGYLAB: SUPPORT RESEARCH, CREATE INNOVATION,

More information

Island cabotage liberalization Evidence from Sardinia

Island cabotage liberalization Evidence from Sardinia ASSESSORATO DEI TRASPORTI Island cabotage liberalization Evidence from Sardinia Bornholm February 18-19, Sardinia facts and figures Land area: 24.090 km2 Resident population: 1.665.617 (2007) Population

More information

Points and Capacity Limits APPENDIX 1

Points and Capacity Limits APPENDIX 1 Points and Capacity Limits APPENDIX 1 Appendix 1: Points and Capacity Limits 2 1. Introduction The following Appendix contains the listing, description and Capacity delimitation of Points offered in the

More information

An overview of the Italian availability of air quality monitoring data

An overview of the Italian availability of air quality monitoring data MACC-III user workshop Rome, 11 May 2015 An overview of the Italian availability of air quality monitoring data Anna Maria Caricchia, Domenico Gaudioso Italian National Institute for Environmental Protection

More information

Annual Financial Report

Annual Financial Report Annual Financial Report as of 31 st December 2012 Ascopiave Group Annual Financial Report as of 31 st December 2012 1 Ascopiave Group Annual Financial Report as of 31 st December 2012 2 INDEX GENERAL INFORMATION...6

More information

Delegated to CNR on December 23rd, 1987. New synchronous registration system from September 28 th, 2009

Delegated to CNR on December 23rd, 1987. New synchronous registration system from September 28 th, 2009 The.it Registry: a short overview Delegated to CNR on December 23rd, 1987 More than 1,860,000 domain names New synchronous registration system from September 28 th, 2009 Coexistence of the two systems

More information

A TEST RIG FOR TESTING HIGH PRESSURE CENTRIFUGAL COMPRESSORS MODEL STAGES AT HIGH REYNOLDS NUMBER

A TEST RIG FOR TESTING HIGH PRESSURE CENTRIFUGAL COMPRESSORS MODEL STAGES AT HIGH REYNOLDS NUMBER A TEST RIG FOR TESTING HIGH PRESSURE CENTRIFUGAL COMPRESSORS MODEL STAGES AT HIGH REYNOLDS NUMBER P. NAVA, M.PROFETI, M. GIACHI, F.SARRI GE-NUOVO PIGNONE G.P.MANFRIDA UNIVERSITY OF FLORENCE Italia Presented

More information

ITREVISAN s.r.l. - 30026 Portogruaro (VE) - Via S. Giacomo, 143 - Tel / Fax 0421.273617 - E-mail: info@trevisan-srl.it 1. THE ORIGINS ( 1961-1985 )

ITREVISAN s.r.l. - 30026 Portogruaro (VE) - Via S. Giacomo, 143 - Tel / Fax 0421.273617 - E-mail: info@trevisan-srl.it 1. THE ORIGINS ( 1961-1985 ) 1. THE ORIGINS ( 1961-1985 ) The Company Trevisan s.r.l. was founded by Giuseppe Trevisan in 1961, as a soleproprietor firm in the field of electric systems. Since 1966 it has mainly addressed its activity

More information

Joint Heritage the dialogue of different cultures

Joint Heritage the dialogue of different cultures Socrates Comenius SCHOOL DEVELOPMENT PROJECT 2005 2008 Joint Heritage the dialogue of different cultures www,websites WORLD HERITAGE SITES UNESCO Didactic material Resources for teachers and students Istituto

More information

Shortlist of projects. References viaducts, bridges and infrastructures

Shortlist of projects. References viaducts, bridges and infrastructures Shortlist of projects Client: Provincia di Roma Assignment: Detailed design inside the PRUSST asse Tiburtino Nodo di Ponte Lucano Team members: VIA Ingegneria srl Mission: Preliminary design-build contract

More information

Modeling the US Natural Gas Network

Modeling the US Natural Gas Network Modeling the US Natural Gas Network James Ellison Sandia National Laboratories, Critical Infrastructure Modeling and Simulation Group Abstract In order to better understand how the US natural gas network

More information

Nuria Rodriguez-Gomez, Nicola Zaccarelli, Kwabena Pambour, and Ricardo Bolado-Lavin

Nuria Rodriguez-Gomez, Nicola Zaccarelli, Kwabena Pambour, and Ricardo Bolado-Lavin Scenario analysis of gas crisis using the European Gas Assessment Model (EUGas) Nuria Rodriguez-Gomez, Nicola Zaccarelli, Kwabena Pambour, and Ricardo Bolado-Lavin Institute for Energy and Transport, Joint

More information

Institute for Renewable Energy

Institute for Renewable Energy Institute for Renewable Energy EURAC and partners European Academy Bolzano The EURAC is an innovative institute for research and scientific training in South Tyrol. Founded in 1992 as private institution,

More information

Telecom Italia Portfolio Beni Stabili Investor Day

Telecom Italia Portfolio Beni Stabili Investor Day Telecom Italia Portfolio Beni Stabili Investor Day Milan, June 6 th 2012 Core Office Portfolio / Beni Stabili Investor Day / Milan, June 6 th 2012 ALEXANDRE ASTIER Business Development & Telecom Italia

More information

Wind Turbine Power Calculations

Wind Turbine Power Calculations Wind Turbine Power Calculations RWE npower renewables Mechanical and Electrical Engineering Power Industry INTRODUCTION RWE npower is a leading integrated UK energy company and is part of the RWE Group,

More information

5,000,000,000 Covered Bond Programme

5,000,000,000 Covered Bond Programme Data as of 30 June 2015 5,000,000,000 Covered Bond Programme Please note being this report as of June 2015, 30 it does not include: - the V Series new issuance (Eur 750ml, IT0005120198), effective from

More information

Rationalization project of the electricity grid in Valcamonica and Valtellina. Boario Terme, Saturday, September 22, 2007

Rationalization project of the electricity grid in Valcamonica and Valtellina. Boario Terme, Saturday, September 22, 2007 Rationalization project of the electricity grid in Valcamonica and Valtellina Boario Terme, Saturday, September 22, 2007 0 Infrastructural development and the environment: a possible combination Developing

More information

Via Stelvio, 355-21050 Marnate (VA), Italy Tel. +39.0331.600881 - Fax +39.0331.389144 E-mail: info@italcontrol.net - Website: www.italcontrol.

Via Stelvio, 355-21050 Marnate (VA), Italy Tel. +39.0331.600881 - Fax +39.0331.389144 E-mail: info@italcontrol.net - Website: www.italcontrol. [ Tauruslab.net ] Italcontrol srl Via Stelvio, 355-21050 Marnate (VA), Italy Tel. +39.0331.881 - Fax +39.0331.389144 E-mail: info@italcontrol.net - Website: www.italcontrol.net ...your gate to the world

More information

gasnetworks.ie Methodology for forecasting gas demand

gasnetworks.ie Methodology for forecasting gas demand gasnetworks.ie Methodology for forecasting gas demand 1 Contents 1 Introduction 2 1.1 Scope of the report 3 1.2 Use and publication of the forecasts 4 1.3 Structure of the document 5 2 Conceptual background

More information

DEVELOPMENT OF RENEWABLE ENERGY IN SICILY

DEVELOPMENT OF RENEWABLE ENERGY IN SICILY DEVELOPMENT OF RENEWABLE ENERGY IN SICILY Claudio Basso (1), Fabio V. Matera* (2) (1) Regione Siciliana Assessorato Industria Ufficio Speciale per il Coordinamento delle Iniziative Energetiche, Unità Operativa

More information

4D ENGINEERING S.r.l. COMPANY PROFILE

4D ENGINEERING S.r.l. COMPANY PROFILE 4D ENGINEERING S.r.l. COMPANY PROFILE CAPITALE SOCIALE 65.100 ISCR. C.C.I.A.A. 708573 Aut. Trib. Velletri n. 9359/90 Reg. Soc. P.IVA 03869371009 00041 ALBANO LAZIALE ROMA ITALY C.SO MATTEOTTI, 69 TEL.

More information

Power System Operation Procedure: Short Term Projected Assessment of System Adequacy (ST PASA)

Power System Operation Procedure: Short Term Projected Assessment of System Adequacy (ST PASA) ELECTRICITY INDUSTRY ACT ELECTRICITY INDUSTRY (WHOLESALE ELECTRICITY MARKET) REGULATIONS 2004 WHOLESALE ELECTRICITY MARKET RULES Power System Operation Procedure: Short Term Projected Assessment of System

More information

Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato

Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato MPC of Combined Cycle Power Plants Torna al programma Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato C. Aurora, P. Colombo, F. Pretolani - CESI

More information

FAMILY AND THE NEW GENERATIONS

FAMILY AND THE NEW GENERATIONS SYNERGIA Knowledge and management for social change FAMILY AND THE NEW GENERATIONS CURRICULUM ABOUT SYNERGIA ACTIVITIES Milan, 2010 Via Mauro Macchi 44-20124 Milano Italy - Tel. +39/02/72093033 - Fax +39/02/72099743

More information

Dynamic Modeling Of An Ozone Disinfection Facility

Dynamic Modeling Of An Ozone Disinfection Facility Dynamic Modeling Of An Ozone Disinfection Facility Michael Etheridge Black & Veatch 8400 Ward Parkway Kansas City, MO 64114 Presented to the Fourteenth Ozone World Congress August 25 th, 1999 ABSTRACT

More information