APPENDIX A. 625 Fisgard Street, Victoria, BC V8W 2S6 T: F:

Size: px
Start display at page:

Download "APPENDIX A. 625 Fisgard Street, Victoria, BC V8W 2S6 T: 250.360.3000 F: 250.360.3079 www.crd.bc.ca"

From this document you will learn the answers to the following questions:

  • What is the purpose of DRAFT?

  • What is the official name of the organization that provides the information for the use of the sea?

  • What county is Antigonish located in?

Transcription

1 APPENDIX A 625 Fisgard Street, Victoria, BC V8W 2S6 T: F: July 31, 2015

2 TABLE OF CONTENTS 1.0 INTRODUCTION Background Phase 2 Objectives Project Team Methodology Use and Limitations Literature Review Amendments to the Provincial Flood Hazard Area Land Use Management Guidelines Adaptation Frameworks Decision-Making Process Adaptation Measures Planning Tools: Climate Change Action Plans Regulatory Tools: Flood Construction Level, Setbacks, Development Permits and Covenants Structural and Non-Structural Protection Impacts and Challenges Property Values Insurance/Mortgage Liability Summary Regional SLR Adaptation Planning Sea Level Rise Scenarios Draft SLR Adaptation Planning Framework Asset Vulnerabilities Higher natural boundary/permanent flood in Year 2100 (1m SLR + HHWLT scenario) Erosion Storm Events What we heard Findings from Around the Region Participation Vulnerability SWOC Analysis Agreement Disagreement Policy Options Planning Tools Regulatory Tools Education and Outreach Studies Land Use Considerations Conclusion Next Steps Lessons Learned Tables Table 1. DRAFT SLR Adaptation Framework Table 2. Workshop Series Participants Table 3. Regional Vulnerability Scan Table 4. Regional SWOC Analysis SLR Planning Project Phase 2 Report Table of Contents Page i

3 1.0 INTRODUCTION This report documents the results of a literature review and local government workshop activity undertaken to identify and evaluate policy options to address hazards associated with sea level rise along the southern coast of Vancouver Island. The input received from the local government workshop activity was used to support the development of a high-level approach to sea level rise adaptation planning across the region, and identify a series of adaptation tools to address sea level rise impacts. 1.1 Background The Capital Regional District (CRD), in partnership with municipalities/electoral areas and with funding from Natural Resources Canada s Climate Change Impacts and Adaptation Program (NRCan), Tides Canada, the City of Victoria and the District of Saanich has completed a Sea Level Rise Planning Project. In British Columbia, local governments have floodplain management responsibilities. The intent of the Sea Level Rise Planning Project was to further understand potential implication of future sea level rise inundation and identify potential sea level rise adaptation approaches appropriate for regional municipalities/electoral areas. The Sea Level Rise Planning Project was undertaken in two phases. Phase 1: The first phase of the project prepared a Coastal Sea Level Rise Risk Assessment to further understand regional coastal vulnerabilities to sea level rise. This phase included using provincial simplified methodology to map potential sea level rise inundation using both a static sea level rise and 1:500-year storm surge scenario for the Years 2050, 2100 and This phase also included a coastal economic risk assessment for the Year 2100 storm surge scenario. This project, completed by AECOM (2015), is complete. Phase 2: This project identified a regional adaptation planning approach and describes a range of planning, regulatory and site-specific adaptation tools to respond to impacts associated with sea level rise. This phase included the development of a planning process and adaptation framework for municipalities to evaluate potential sea level rise adaptation tools. This phase also included a regional education and awareness component for municipal staff from across local government departments. 1.2 Phase 2 Objectives The purpose for the second phase of the project was to coordinate a regional policy response to the vulnerabilities identified in the Coastal Sea Level Rise Risk Assessment (AECOM, 2015). Specific objectives were to: 1. Educate CRD and municipal government staff on potential sea level rise implications and adaptation approaches. 2. Support the development of regional and municipal sea level rise adaptation frameworks. 3. Identify potential adaptation measures appropriate for urban and rural coastal communities. 4. Identify the tools that are needed to implement the adaptation measures. SLR Planning Project Phase 2 Report Page 1

4 1.3 Project Team A project team, consisting of representatives from several municipalities, provided direction and input into the project scope. The project team was comprised of: CRD Climate Action/Juan de Fuca Planning City of Victoria Sustainability/Planning District of Saanich Sustainability Town of Sidney Planning District of North Saanich Planning BC Ministry of Environment Climate Action Secretariat (observer) The CRD Climate Action Inter-Municipal Working Group (IMWG) provided further review and input on the process and deliverables. The CRD IMWG members that participated were staff from all of the capital region municipalities and electoral areas, apart from the City of Langford. 1.4 Methodology The second phase of the project was undertaken in three steps. 1. Literature Review and Adaptation Planning: A literature review was completed to identify adaptation tools used by similar coastal jurisdictions. Results from the literature review are provided in Chapter 2. Criteria were then derived from the literature review to develop a draft regional adaptation framework, including a vulnerability scan and a capacity analysis to facilitate the identification of potential adaptation measures. The draft adaptation framework is presented in Chapter 3. The vulnerability scan and capacity analysis are included in Appendix A. 2. Education and Outreach: Working through the CRD Climate Action IMWG, a two-part workshop series was held to provide background information to interested municipal staff on the science of sea level rise and to receive input from municipalities on adaptation planning. The first part of the workshop series was a 2-hour seminar open to staff from local government planning, engineering, emergency management, finance, communications and sustainability departments. The second part of the workshop series was a 2-hour meeting offered to individual municipalities to complete a vulnerability scan and capacity analysis. Cross-departmental representation was encouraged for these meetings. Results from the meetings with municipalities are provided in Chapter Tool Identification: Based on the input received through the vulnerability scan and capacity analysis, an overall approach to sea level rise adaptation planning was confirmed. The preferred approach is to use planning, regulatory and some site-specific tools to address sea level rise vulnerabilities. Specific tools for each approach are described in Chapter Use and Limitations This report presents the options that the CRD and municipalities/electoral areas may consider in sea level rise adaptation planning. Information provided in this report was developed from a literature review and staff interviews. It is the responsibility of each local government to determine an appropriate approach for sea level rise planning. It is assumed that additional factors and considerations may impact or influence final policy decisions that will be taken by individual local governments. SLR Planning Project Phase 2 Report Page 2

5 It is important to note that the Province undertook draft amendments to the 2004 Flood Hazard Area Land Use Management Guidelines (FHALUMG) concurrently with the Sea Level Rise Planning Project. The FHALUMG provide direction for coastal hazard mapping and regulatory responses under s.910 of the Local Government Act. The final amendments may affect how local governments choose to address impacts related to sea level rise in BC (see Section 2.1 for more information). While there may be some overlap in potential policy responses, tsunami hazards were not included in this project scope. The region has completed a Modelling of Potential Tsunami Inundation Limits and Run-Up study (AECOM, 2013). The results of both projects could be combined in the future should this be of interest to the region. SLR Planning Project Phase 2 Report Page 3

6 2.0 LITERATURE REVIEW A literature review was undertaken to collect information and examples on the policy responses, including various regulatory and non-regulatory tools, of coastal jurisdictions to address vulnerabilities to sea level rise. The Sea Level Rise Adaptation Primer: A Toolkit to Build Adaptive Capacity on Canada s South Coasts 1 provided a starting point for the literature review. Tools reviewed included adaptation frameworks plans, bylaws, legal instruments, development permits and infrastructure design considerations. Interviews and discussions with planners and engineers from other BC jurisdictions were also conducted as part of the literature review. Furthermore, given the scope the FHALUMG, the 2014 draft amendments have been considered in the review of potential adaptation measures. Sources from the following jurisdictions were reviewed and where possible, electronic links are provided for reports, bylaws and plans. Jurisdiction Document Type Source BC Ministry of Environment National Oceanic and Atmospheric Association (NOAA) City of Vancouver Planning Tool Guideline Planning Tool Bylaw Report/Study Sea Level Rise Adaptation Primer: A Toolkit to Build Adaptive Capacity on Canada s South Coasts Draft Amendments to the provincial 2004 Flood Hazard Land Use Management Guidelines What Will Adaptation Cost? An Economic Framework for Coastal Community Infrastructure Building By-law No (re: FCL) Flood Construction Level Administrative Report (confidential) District of Squamish N/A Interview / Discussion about dike design project Town of Qualicum Beach N/A Interview / Discussion about Waterfront Master Plan project Halifax Regional Municipality Plan Sea Level Rise Adaptation Planning for Halifax Harbour Municipality of the County of Antigonish Municipality of the District of Barrington Swinomish Indian Tribal Community The Cooperators San Francisco Plan Plan Plan Report/Analysis Plan Municipal Climate Change Action Plan Municipal Climate Change Action Plan Swinomish Climate Change Initiative Climate Adaptation Action Plan Partners for Action: Preparedness of Fifteen Canadian Cities to Limit Flood Damage Guidance for Incorporating Sea Level Rise in Capital Planning in San Francisco: Assessing Vulnerability, Risk and Adaptation (DRAFT) 2.1 Amendments to the Provincial Flood Hazard Area Land Use Management Guidelines The provincial Flood Hazard Area Land Use Management Guidelines (2004) provide direction for local governments to implement land use management plans and make subdivision approval decisions for flood hazard areas. The policy intent of the Guidelines is to reduce or prevent injury, human trauma and loss of life, and to minimize property damage during flooding events. 2 The Guidelines follow the precautionary principle, stating that regulating land development is the most practical and cost effective 1 Province of British Columbia Sea Level Rise Adaptation Primer: A Toolkit to Build Adaptive Capacity on Canada s South Coasts. Ministry of Environment. 2 Province of British Columbia Flood Hazard Area Land Use Management Guidelines. Ministry of Water, Land and Air Protection. P. 5. SLR Planning Project Phase 2 Report Page 4

7 way to achieve provincial goals. Local government must consider the Guidelines in making bylaws under section 910 of the Local Government Act. The responsibility for flood plain mapping was downloaded from the Province to local government in Provincial amendments to the Guidelines were undertaken concurrently with the Sea Level Rise Planning Project. The purpose of the amendments is to update requirements for buildings, subdivision and zoning that allow for sea level rise to the Year Specifically, the draft amendments set out two methodologies for establishing the Year 2100 flood construction level (FCL) and building setbacks. Several municipalities within the CRD, including CRD staff, participated in a technical working group tasked with providing review and input into the amendments. It is the responsibility of each municipality/electoral area to review, interpret and consider implementation of the amended FHALUMG. It should be noted that Phase 1 mapping provided municipalities with a general estimation of the area subject to a FCL to facilitate review of the proposed amendments. Additional analysis by a suitably qualified Professional Engineer, experienced in coastal engineering, is required to confirm the mapping and establish a FCL. Additional policy analysis may also be required by each municipality to understand the economic, social and environmental implications of adopting a FCL. 2.2 Adaptation Frameworks Given the complexity and uncertainty associated with sea level rise adaptation, communities and other regulatory bodies look to risk-based frameworks to select strategies best suited to anticipated impacts. Adaptation frameworks are structured around four land use adaptation strategies that are well-recognized in the climate change literature. 3 Each strategy responds to an identified risk, hazard, vulnerability or impact for a particular area or asset, and can be implemented through a variety of measures. The four adaptation strategies are summarized below: 1) Avoid: Do not build assets in areas vulnerable to sea level rise impacts 2) Protect: Continued occupation of areas while preventing sea level rise impacts 3) Accommodate: Continued occupation of areas while allowing for tolerable sea level rise impacts 4) Managed or Planned Retreat: Withdrawal of assets from areas vulnerable to sea level rise impacts These frameworks rely on the identification of risk, hazard, vulnerability or impact for a given asset or land use. While the Phase 1 study provided valuation data for land, roads and key public assets, the data requires additional spatial resolution and evaluation in order to identify risks, hazards and vulnerabilities. 2.3 Decision-Making Process Communities generally apply their chosen adaptation framework by using a four-step decision-making process that is grounded in climate action science. The process details the analytical inputs needed to support a robust decision that considers social, environmental and economic factors. The stepwise framework is critical for addressing the complexity of sea level rise issues, and some of the uncertainty associated with identifying and modelling sea level rise impacts. Figure 1 outlines the four-step process. This process was adapted from NOAA (2013). 3 Ausenco Sandwell Climate Change Adaption Guidelines for Sea Dikes and Coastal Flood Hazard Land Use Draft Policy Discussion Paper. BC Ministry of the Environment. SLR Planning Project Phase 2 Report Page 5

8 Figure 1. SLR Decision-Making Process Step 1: Identify SLR scenarios Step 2: Select adaptation strategies Step 3: Select adaptation measures Step 4: Develop implementation tools Model SLR scenarios to identify inundation levels Identify low-, medium- and highhazard areas Identify social, environmental and economic criteria Identify potential implementation gaps Conduct economic valuation of asset loss, including business, social and transportation disruptions Conduct coarse grain analysis to match strategy to hazard Conduct fine grain analysis of costs and benefits to select desired adaptation measures Prepare tools to assist with implementation of adaptation measures Phase 1 of this project identified preliminary sea level rise scenarios based on provincial methodology (Ausenco Sandwell, 2011) for identifying coastal inundation hazards. These scenarios provide baseline information to satisfy Step 1 in the SLR decision-making process; however, would require review by a Professional Engineer, experienced in coastal engineering for use in any regulatory context. Phase 2 of this project assisted municipalities to develop a plan to move through the remaining steps in the decision-making process. 2.4 Adaptation Measures As highlighted in the Sea Level Rise Adaptation Primer (2013), there is a combination of adaptation measures that can be used to address impacts from sea level rise. The following summarizes adaptation measures from coastal jurisdictions Planning Tools: Climate Change Action Plans Many municipalities in the Pacific Northwest and the Maritimes have developed Climate Change Action Plans to identify sea level rise adaptation measures. These action plans are based in rigorous scientific study. As they relate to sea level rise, the action plans identify sea level rise planning areas and recommend a combination of: Structural and non-structural protection focused on site-specific vulnerabilities Regulatory tools to address impacts on private land Policy and procedural tools to guide public works and projects to mitigate sea level rise impacts One benefit to these plans is that different sea level rise scenarios and their attendant impacts can be publicly presented through a planning process that allows for the deliberation of policy solutions. Although the plans have no statutory authority, they provide a mechanism through which to start the discussion about sea level rise impacts and policy implications. These planning processes recognize that regulatory tools are best suited to addressing the long-term impacts of sea level rise; however, are a challenge to implement as land use changes through zoning, bylaws and other legal instruments are likely to be met with public opposition. SLR Planning Project Phase 2 Report Page 6

9 2.4.2 Regulatory Tools: Flood Construction Level, Setbacks, Development Permits and Covenants Flood Construction Level and Setbacks A FCL and setbacks are regulatory tools to manage land uses within areas subject to impacts from sea level rise. A FCL establishes the minimum elevation for habitable buildings in relation to anticipated flood levels and a setback regulates the minimum distance from the coastal hazards. In BC, a FCL may be set by a local government as per s.910 of the Local Government Act, in accordance with the FHALUMG. To comply with the FCL, property owners may use structural elevation and flood-proofing to meet the minimum elevation. The cost of identifying the FCL is the responsibility of the local government. Property owners may incur some costs on engineering studies to comply with the FCL. Municipalities in the Lower Mainland have adopted FCLs and setbacks as regulatory tools to manage land use within areas subject to coastal flooding. Several jurisdictions, including the City of Vancouver, are in the process of updating the FCLs to account for rising seas. These jurisdictions have chosen to use the joint probability method set out in the FHALUMG. It should be noted that this method is costly to implement when compared to a more simplified Ausenco Sandwell (2011) methodology. Development Permits Development permits or development agreements are another regulatory tool by which land can be managed to address impacts from sea level rise. The development permit can be used to specify conditions that would protect development from hazards such as erosion, inundation and wave effects in the form of objectives and guidelines. Development permits, determined in conjunction with a map or plan that delineates a Sea Level Rise Planning Area, could provide greater flexibility to municipalities than a FCL by allowing for the use of additional structural and non-structural tools. Development permits may also be a potential interim measure to regulate development prior to adoption of a FCL. Additional analysis would be required to set objectives and guidelines in order to demonstrate how the FHALUMG were considered in the development of this tool. Covenants Covenants are used by local government to enter into an agreement with landowners to place limits on land use, building and subdivision to further a public purpose. Covenants are frequently used where lands are subject to geotechnical hazards such as flooding or erosion. Covenants require the landowner to use the land in accordance with a qualified professional s report and indemnify the local government against liability arising out of the use of the land. Covenants are actively used by some municipalities/electoral areas within the capital region. The FHALUMG amendments suggest the use of a covenant to regulate development at the end of the building lifespan, in addition to building requirements and indemnification against liability Structural and Non-Structural Protection Structural and non-structural protection requires specialized, site-specific study by a qualified professional. Several municipalities in the Lower Mainland rely on dikes for coastal flood protection. The design, construction and maintenance of structural protection is cost and resource intensive. A complete cost-benefit analysis should be undertaken to determine whether structural protection is feasible for any municipality within the capital region. Current provincial examples of this work include the District of Squamish s conceptual and detailed design dike project and the Town of Qualicum Beach s planning process to identify the feasibility of structural and non-structural protection as part of an overall Waterfront Master Plan for approximately 9 km of coastline. SLR Planning Project Phase 2 Report Page 7

10 Smaller-scale structural protection in the form of seawalls and soft structural approaches tend to be used by smaller property owners on a site-by-site basis. Jurisdictions such as the Regional District of Nanaimo (RDN) regulate the construction of seawalls through a development permit. The development permit requires that soft structural protection be used unless proven otherwise. The policy intent for this requirement is to minimize the potential for negative environmental impacts such as scouring and erosion to the shoreline on adjacent properties. 2.5 Impacts and Challenges As described in the Coastal Sea Level Rise Risk Assessment (AECOM 2015), the social, economic and environmental consequences of coastal inundation will affect communities, coastal ecosystems and public infrastructure. It is local government s responsibility to make decisions about floodplain hazards and adopt land management strategies to address potential impacts. However, it must be recognized that land management decisions may also result in social, economic and environmental impacts Property Values There is concern that planning and regulatory tools have the potential to negatively impact property values. Decreased property values are a concern for landowners who may have significant savings invested in waterfront property as well as for the municipal tax assessment base. Unfortunately, there are limited studies on the impact of property values from local government sea level rise planning responses 4. Notwithstanding these concerns, it is important to note that examples from Calgary, the eastern seaboard of the United States and the US Pacific Northwest, saw property values fall sharply after a flood event due to market forces 4. This suggests that if action is not taken to regulate development in hazard-prone areas, coastal properties remain at risk to devaluation because of hazard exposure Insurance/Mortgage There is concern that property owners within areas potentially affected by sea level rise will experience difficulty receiving insurance coverage or securing mortgage approvals. Canada currently does not offer flood insurance. The insurance and real estate industries are actively engaged in better understanding impacts associated with flooding and coastal hazards, however, have not released any major policy recommendations to date. In the United States, insurance and mortgage lenders work with the Federal Emergency Management Agency (FEMA) to regulate flood insurance. As described above, hazard-prone areas in the United States may have greater difficulty securing insurance Liability There is concern about municipal liability in relation to planning and responding to coastal inundation hazards. It is the responsibility of each local government to receive a legal opinion on the interpretation and applicability of the amended FHALUMG in relation to s.910 of the Local Government Act. 2.6 Summary The amended FHALUMG will assist local governments to develop bylaws related to floodplain mapping and the establishment of flood construction levels as they relate coastal inundation hazards. It is the responsibility of each municipality to review, interpret and consider implementation of the amended FHALUMG. The literature review highlights that a risk-based adaptation framework and a science-driven decisionmaking process are critical to sea level rise adaptation planning. These planning tools are a pre-requisite for the selection and implementation of sea level rise adaptation measures. Local governments in the Maritimes and the Pacific Northwest incorporate these tools in the development of Climate Change Adaptation Plans. 4 Ebbwater Consulting The Impact of Flood Hazard on Real Estate Values. Retrieved July 2015 from: SLR Planning Project Phase 2 Report Page 8

11 Once a framework and decision-making process is in place, the selection of adaptation measures can be facilitated through a comparison of tools based on social, economic and environmental criteria. A review of the measures adopted by other jurisdictions highlights that: 1) Regulatory tools are generally preferred to address the long-term impacts of sea level rise. Public education and communication is needed in order to successfully implement these tools as they tend to result in changes to the management of public and private land. As these tools are just beginning to be adopted in areas facing coastal inundation from rising seas, there are still many lessons to be learned about how to move forward with implementation. Regulatory tools should be considered in relation to the amended FHALUMG once they are finalized. 2) Studies and implementation of adaptation measures can be costly. However, recent experiences of jurisdictions with climate-related disasters (e.g., Hurricane Juan, Calgary floods, Superstorm Sandy) show that investment in prevention is less expensive in the long run than the total cost of disaster relief and rebuilding. The selection of appropriately scaled studies should be guided by a cost-benefit analysis. Findings from the literature review have been used to inform preliminary adaptation planning undertaken for Phase 2 of the Sea Level Rise Planning Project. SLR Planning Project Phase 2 Report Page 9

12 3.0 REGIONAL SLR ADAPTATION PLANNING Sea level rise adaptation planning is science-driven and risk-based. This section reviews the approach used to develop a proposed adaptation planning process for the capital region and presents a draft adaptation framework. A preliminary list of potential regional impacts associated with sea level rise is also identified. 3.1 Sea Level Rise Scenarios Phase 1 of the Sea Level Rise Planning Project developed coastal inundation scenarios for municipalities in the capital region for the Years 2050, 2100 and The scenarios map areas potentially affected by sea level rise, provide a baseline for identifying vulnerable assets and are a preliminary evidence base to direct adaptation planning. The evidence base includes economic valuation of assets within potentially affected areas and transportation disruption, community disruption and business disruption case studies. Detailed methodology and results are provided in the Coastal Sea Level Rise Risk Assessment (AECOM 2015) report. Tsunami hazard mapping was not in the scope of the project. 3.2 Draft SLR Adaptation Planning Framework Based on the results of the literature review, the project team identified the need to develop a sea level rise adaptation framework to inform the planning process. As a high-level planning tool, the framework helped municipalities conduct a coarse-grain analysis of overall adaptation strategies in order to identify a targeted list of potential adaptation measures. The framework also helped to identify opportunities and gaps to be addressed through ongoing adaptation planning such as data needs, public education and outreach, and planning priorities. Five (5) overall criteria categories, with multiple indicators to capture social, environmental and economic considerations related to sea level rise, were used to develop the adaptation framework and to support the analysis of adaptation tools. The criteria categories are: Effectiveness: The relative success of the measure to mitigate potential SLR effects Impact: The degree to which the measure results in ancillary impacts Readiness to implement: The requirements needed to implement the measure Opportunity: The degree to which the measure can be operationalized across departments and in conjunction with other projects Priority/timing: The timeline needed to implement the measure The draft sea level rise adaptation framework is presented in Table 1. The framework identifies adaptation strategies best suited to achieving desired outcomes based on asset characteristics, vulnerability/hazard/risk, and timing. From this coarse-grain analysis, a list of more detailed adaptation measures was identified for review and analysis. The adaptation framework was used in conjunction with a vulnerability scan and a capacity analysis to identify potential actions that could be undertaken on a regional basis and by individual municipalities. The vulnerability scan and the capacity analysis are included in Appendix A. SLR Planning Project Phase 2 Report Page 10

13 Table 1. DRAFT SLR Adaptation Framework Avoid Protect Accommodate Retreat 1 Outcomes Do not build vulnerable assets in areas impacted by SLR impacts Continued occupation of areas while preventing SLR impacts Continued occupation of areas while allowing for tolerable SLR impacts Withdrawal of vulnerable assets from areas impacted by SLR impacts 2 Timing + Asset Characteristics Long-term Planned future assets Planned replacement Short-medium term Existing assets Ongoing Existing Planned future assets Planned replacement Long-term Existing assets 3 Assets in Need of Adaptation <<To be completed by municipality based on results of vulnerability scan>> 4 Adaptation Measures (SLR Adaptation Capacity Scan) Policies + standards Restrict development (zoning) Legal (acquisition, easement, tenure, trust) Build grey infrastructure Retrofit incentives Build green or grey infrastructure Retrofit assets Adopt policies + standards Regulate development (FCL) Relocate assets Policies + standards Restrict development (zoning) Legal (acquisition, easement, tenure, trust) Legal (indemnification covenant) Retrofit incentives 5 Social, Environmental and Economic Cost Lost development potential/decrease property values & associated tax base Tend to be expensive (major capital investments); cost to government Cost to asset-owner can vary Lost development potential/decrease property values & associated tax base 6 Tools Planning, design, zoning, training and/or communication/outreach tools required to assist with implementation. SLR Planning Project Phase 2 Report Page 11

14 3.3 Asset Vulnerabilities The vulnerability scan helped refine a list of potential impacts to land uses and municipal assets. These potential impacts provide an additional evidence-based approach to direct adaptation planning. Although further study would be required to confirmed site-specific impacts, the literature review and interviewees identified the following: Higher natural boundary/permanent flood in Year 2100 (1m SLR + HHWLT scenario) Low-lying areas such as beaches, estuaries and wetlands are sensitive to rising sea levels. These areas are most susceptible to long-term effects associated with permanent daily inundation and higher natural boundary over the 100-year planning horizon. Assets located within low-lying areas are more vulnerable to the following impacts: Coastal flooding Saltwater intrusion in wells Harbour infrastructure may require upgrades (electrical, docks) Private structures/properties damaged Loss of cultural sites Alternation/loss of cherished landscapes Damage/loss of municipal infrastructure (mostly trails/parks/roads?) Loss of natural ecosystems Damage to pump stations/lift stations Contaminated site issues Provincial guidance as set out in FHALUMG may result in potentially negative impacts on land values that will be challenged by private property owners Erosion Coastal erosion results in negative biophysical effects to natural infrastructure and built landscapes. Erosion is a natural process caused by wave energy, tidal currents and wind, which can be exacerbated by more frequent and intense storm events. Localized erosion impacts may also be worsened by coastal armouring through the construction of structural protection such as sea walls. Assets located in areas experiencing erosion are more vulnerable to the following impacts: Roads and bridges may wash out and cut access Loss of private property/buildable land Loss of municipal infrastructure such as roads and underground utilities Loss of natural ecosystems Storm Events High winds, high waves and heavy rains occurring at the same time as large tides may cause short-term disruption of daily activities as well as long-term impacts on public and private assets. Assets located in areas experiencing storm events are more vulnerable to the following impacts: Increased surface water on roads, bridges and properties Physical damage to public and private buildings and other assets in flood-prone areas Wastewater system overflows and backups Environmental damage from spills/overland floods Clean up costs Damage to coastlines, trees, etc Public health and safety SLR Planning Project Phase 2 Report Page 12

15 4.0 WHAT WE HEARD FINDINGS FROM AROUND THE REGION Sea level rise will profoundly affect the way coastal municipalities look, develop and operate. This section presents the results from the two-part workshop series held with municipalities around the region. The meetings were structured around two exercises a vulnerability scan and a capacity analysis. The vulnerability scan helped identify land use and key asset vulnerabilities resulting from potential impacts of sea level rise. The issues raised as part of the vulnerability scan are consistent with those identified in the sea level rise literature. An overview of strengths, weaknesses, opportunities and constraints based on input received from the capacity analysis is also presented, along with a summary of areas of agreement and disagreement. It should be noted that during project planning, the capacity analysis was intended to help municipalities compare and select different adaptation measures. Participants found this exercise to be a challenge as a sea level rise adaptation requires the use of multiple tools. This finding helped confirm that a regional approach to adaptation planning is needed to ensure that municipalities have the knowledge and support to move forward with implementation of the tools of their choice. The capacity analysis was helpful for identifying areas of agreement and disagreement as well as knowledge gaps. This information provided the basis for the list of tools and actions provided in Chapter Participation The two-part workshop series was well attended by municipalities around the region. Eleven municipalities attended the seminar and nine municipalities, including the Juan de Fuca Electoral Area and CRD corporate staff, participated in the meetings offered to individual municipalities. A video recording of the seminar was provided to staff who could not attend. Meetings with municipalities who did not participate could be scheduled at a later date to assist with sea level rise adaptation planning. Participation included a mix of staff from across departments, including planning, engineering, emergency management and finance. This mix of participants ensured the cross-pollination of perspectives, and allowed the meeting to cover a range of topics from infrastructure to land use, emergency preparedness and long-range financial planning. Invitations were circulated through Climate Action IMWG representatives. Participation and meeting objectives is summarized in Table 2. SLR Planning Project Phase 2 Report Page 13

16 Table 2. Workshop Series Participants Description Part 1: Sea Level Rise Seminar Date: May 7, 2015 Location: CRD Headquarters Time: 1.5 hours Seminar with presentations by leading professional engineers with experience in coastal engineering Mr. Eric Morris (P.Eng.) from Kerr Wood Leidall and Dr. John Clague, P. Geo from Simon Fraser University on: The state of sea level rise in the region, including short-term fluctuations and wave effects. A review of the amendments to the Flood Hazard Area Land Use Management Guidelines & different methodologies for determining flood construction levels. Adaptation strategies relevant to local conditions. Part 2: Sea Level Rise Adaptation Planning Meeting Date: Late May (dates TBD) Location: At municipal halls Time: 2 hours Guided discussion facilitated through a vulnerability scan and a capacity analysis. Meeting objectives were to: Work through the proposed methodology for SLR planning and adaptation: Identify inputs to populate the draft SLR Adaptation Framework. Apply the analytical tool to identify capacity to implement adaptation measures. Gather comments to refine the proposed methodology. Identify opportunities and gaps to prioritize future work. Central Saanich Regrets Colwood Date: June 24, 2014 Time: 1 3 p.m. 10 participants CRD Date: Thur., May 28, 2015 Time: 10 a.m. noon Esquimalt Date: Fri., June 5, 2015 Time: 10 a.m. noon 4 participants + representatives from DND Highlands Regrets Islands Trust Regrets Langford Regrets Regrets Metchosin Regrets North Saanich Regrets Date: Tues., June 23, 2015 Time: 2:30 4:30 p.m. 2 participants Oak Bay Date: Wed., June 17, 2015 Time: 2 4 p.m. 5 participants Saanich Date: Thur., June 4, 2015 Time: 1 3 p.m. 12 participants Sidney Regrets Date: Tues., June 23, 2015 Time: 10:30 a.m. 12:30 p.m. 8 participants Sooke Regrets Victoria Date: Tues., June 16, 2015 Time: 1:30 3:30 p.m. 5 participants View Royal Date: Fri., July 3, 2015 Time: a.m. 2 participants SLR Planning Project Phase 2 Report Page 14

17 4.2 Vulnerability During the municipal meetings, participants discussed the degree of sensitivity and resilience of each land use category/asset to impacts related to coastal erosion and inundation resulting from sea level rise. The following rating scales were used to guide the discussion: Name Description Rating Scale Sensitivity Resilience The degree to which an asset is affected by inundation or erosion resulting from rising seas and/or storm events. An asset s inherent ability to adjust to potential impacts, moderate damage, or cope with consequences without the need for intervention. (L) Low: Asset is easily replaced, disruption from loss or failure is minor, relatively few people are impacted (M) Med: Moderate cost to repair/replace, impacts a relatively greater number of people, disruption is/can be mitigated (H) High: Major cost to repair/replace, critical to public health and safety/provides essential service, can t be mitigated (?) Unsure/Don t Know: Insufficient data/information (H) High: Can accommodate SLR impacts/modifications are easy (M) Med: May tolerate SLR impacts/modifications are easy (L) Low: Can t tolerate SLR impacts/modifications are difficult (?) Unsure/Don t Know: Insufficient data/information Table 3 describes the aggregated results from the municipal meetings. It is important to note that vulnerability is site-specific and, therefore, may be higher or lower depending on a location. Table 3. Regional Vulnerability Scan Land Use / Asset Type Sensitivity Resilience Notes Residential/Commercial/Employment Low-lying Coastal bluff Infrastructure Pump stations/lift stations Roads Harbours/Marinas Parks Environment Estuary Sand/Beach/Gravel Coastal Bluff L-M L H L M L-M H H L-M M H M M H H H H H General agreement among municipalities/electoral areas that sensitivity increases as density increases. Roads susceptible to erosion have a higher sensitivity. Dallas Road at McNeill Bay Cordova Bay Road. Roads that provide an essential service link that could be severed if flooded have a higher sensitivity. Highway 14 south of Shirley Portion of Helmcken Road. General agreement that parks can act as an existing SLR buffer for municipalities. Natural coast lines provide adaptive capacity to addressing impacts related to sea level rise. Additional research is needed to better understand the value of these ecosystem services. Pilot studies may be available to integrate coastline management into an SLR adaptation plan. SLR Planning Project Phase 2 Report Page 15

18 4.3 SWOC Analysis The SWOC analysis presents a snapshot of regional strengths, weaknesses, opportunities and constraints related to sea level rise adaptation planning. These findings have helped inform the responses and actions presented in Chapter 5. Table 4. Regional SWOC Analysis Strengths FHALUMG provides two methods for calculating the FCL Natural coastal areas (unarmoured shorelines) provide best approach for disrupting wave energy Existing seawalls can be raised if needed Park lands buffer private property from SLR impacts Existing institutional coordination, regionally through Inter-Municipal Working Group and locally through cross-departmental interaction Emergency management plans are a resource for adaptation planning Some OCPs provide policy direction for adaptation planning Shoreline setbacks/dps can be updated with SLR considerations as per FHALUMG Some approving officers/building inspectors currently requiring geotechnical studies that include SLR criteria Opportunities Introduce SLR policies or criteria in upcoming master planning projects (e.g.: Official Community Plan updates, Utilities Master Plan, etc ) Integrate SLR adaptation BMPs into pilot redevelopment projects Integrate SLR criteria into RFPs when infrastructure is replaced (roads, pump stations) Access external funding for future study/data collection DND has conducted studies for jetty upgrades that may be of interest to other marina/harbour jurisdictions Weaknesses Aging pump station infrastructure makes it difficult to access replacement parts if infrastructure fails Approving officers/building inspectors interpret/apply geotechnical requirements differently, stemming from different consultant methodology and lack of clarity between s.56 of the Community Charter and the proposed FHALUMG amendments No dedicated/assured funding for studies and implementation Accelerated property loss in areas prone to erosion Additional study/new policies and regulations needed to move forward with adaptation on private land Armoured coastlines reduce non-structural options Unknown impacts to property values from changes in mortgage lending/insurance regimes Regulatory changes are likely to face public opposition Potential devaluation of properties with high residential tax base is a risk to local government Constraints Information gaps with decision-makers and public Coordinated approach to shoreline management on private coastal lots Easement or acquisition along the shoreline requires permission from private landowners and is time and resource intensive Areas with active development applications require interim policy direction Public opposition to enacting measures that limit ability to develop on property Public apathy as this is not an immediate concern Current lack of funding to support future study SLR Planning Project Phase 2 Report Page 16

19 4.4 Agreement Municipalities tend to agree on the high-level approach to sea level rise adaptation planning, including the need for a coordinated response. Areas of agreement, described below, provide a starting point for the region in terms of moving forward with sea level rise adaptation planning. Sea Level Rise Scenario The Year 2100 sea level rise scenario is the baseline planning horizon for sea level rise adaptation. This scenario is consistent with provincial amendments to the FHALUMG. Tools Planning and regulatory tools tend to be preferred over large-sale structural protection works. There is general agreement that some additional study is needed to confirm specific regulatory requirements. Infrastructure Pump station infrastructure assets are ageing across the region. These assets require upgrading to meet the Year 2100 sea level rise scenario. Cooperation There is an ongoing need for regional cooperation moving forward with sea level rise adaptation planning. Cooperation should strive to create complementary regulatory regimes. Education/Outreach An education and outreach strategy is needed to engage with several different audiences, including potentially impacted landowners, decision-makers and the general public. Liability Some clarification around municipal liability is needed for the interim period while sea level rise adaptation planning is underway. Immediate Actions Many municipalities/electoral areas with active development applications within sea level rise focus areas are interested in adopting immediate regulatory actions. 4.5 Disagreement There is less agreement on the details of how to proceed with planning and implementation. Disagreement tends to reflect different municipal needs, including varying levels of participation, potential for impact resulting from sea level rise, land use regulation and existing political and policy direction on climate- and environment-related issues. Timing There is some disagreement regarding the timing of moving forward with additional study, regulation and public education and outreach. Municipalities/electoral areas with active development applications in areas potentially affected by sea level rise are interested in moving forward with policies and regulation in the near-term. Other municipalities suggest waiting until other major regional policy decisions are resolved before introducing new regulation around sea level rise. Studies Some municipalities are comfortable moving forward with the mapping and study results from the CRD Coastal Sea Level Rise Risk Assessment report (AECOM, 2015). Other municipalities would prefer more detailed studies to enact regulatory tools or plan for site-specific structural and/or nonstructural adaptation. SLR Planning Project Phase 2 Report Page 17

20 Education/Outreach In addition to the potential timing for public education and outreach, there is some disagreement over whether the engagement should be targeted to potentially affected property owners or conducted broadly across the region. Some municipalities could begin working with key property owners immediately on sites where redevelopment is expected, whereas others would prefer to develop clear policy requirements. Political Direction Some municipalities require political direction in order to move forward with adaptation planning. Other municipalities are comfortable with existing direction provided in planning and strategic documents. SLR Planning Project Phase 2 Report Page 18

21 5.0 POLICY OPTIONS The vulnerability scan and the capacity analysis identified that municipalities in the capital region will look to planning, regulatory and some site-specific tools to address impacts resulting from sea level rise. The capacity analysis further identified that education and outreach, and some additional level of study is needed to move forward with the implementation of any sea level rise adaptation measure. The details of an education and outreach strategy, as well as study scope and timing, are to be determined as part of finalizing a broad sea level rise adaptation plan for the region. The tools identified below are drawn from the Sea Level Rise Adaptation Primer: A Toolkit to Build Adaptive Capacity on Canada s South Coasts (2013). The tools are divided into overarching categories, with a brief description and priority rating to guide implementation. The tables encourage a coordinated regional approach, while providing municipalities with the flexibility to move forward with implementation in a manner that best fits with timing, funding and ultimately local adaptation needs. 5.1 Planning Tools Planning tools set overarching direction for the implementation of sea level rise adaptation. Planning tools are critical for regional coordination and for ensuring a consistent approach to adaptation across local government departments. Specifically, planning tools help establish considerations, policy and procedures for long-range planning, and for the design, operation and maintenance of municipal infrastructure and publicly-owned land. Further, tools such as the SLR Adaptation Plan provide a knowledge base and justification for the adoption of regulatory tools, as described below in section 5.2. Actions local governments may consider include: Action P-1 Prepare an SLR Adaptation Plan or report. The plan or report can be based on the results from the individual meetings held with municipalities. The plan or report should: Priority Short-term Confirm mapping and identifies a sea level rise planning area to inform infrastructure and land use responses. Provide an inventory of areas/assets vulnerable to SLR impacts. Set out planning, regulatory and site-specific responses to areas/assets vulnerable to SLR impacts. Prioritize projects such as additional technical study and infrastructure upgrades. Identify potential funding sources. The adaptation plan can be used as a starting point for public dialogue on the implementation of regulatory and non-regulatory tools. P-2 Set policy direction in statutory documents such as the Official Community Plan (OCP) requiring the municipality to address sea level rise impacts. For many municipalities, this direction falls under the development of climate-adaptive tools. Consider including language that prioritizes regulatory and non-structural protection ( green ) tools. Opportunistic Example language : Identify policies and actions for climate change adaptation that strengthen community resiliency to future impacts 5 Incorporate climate change, its potential impacts, and mitigation measures when reviewing new development applications and undertaking long-term planning initiatives. 6 5 City of Victoria District of Saanich Sustainable Saanich Official Community Plan. Bylaw #9073. P SLR Planning Project Phase 2 Report Page 19

October 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9

October 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 October 15, 2013 Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 RE: Business Plan Advancing a Collaborative, Regional Approach to Flood Management in BC s Lower

More information

BC Ministry of Environment

BC Ministry of Environment Process Infrastructure Ports, Marine & Offshore Project No. 143111 Revision Number 0 BC Ministry of Environment Climate Change Adaption Guidelines for Sea Dikes and Coastal Flood Hazard Land Use Guidelines

More information

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Why should communities invest in resiliency? What are the steps communities can take to become more resilient? Community Preparedness for Flood Resiliency Nina Peek, AICP New York Planning Federation Board of Directors Senior Technical Director AKRF, Inc. Focus of Today s Presentation Why should communities invest

More information

Miami-Dade County Roadmap for Adapting to Coastal Risk

Miami-Dade County Roadmap for Adapting to Coastal Risk Miami-Dade County Roadmap for Adapting to Coastal Risk Vulnerability Assessment & Planning Workshop Results & Recommendations Roadmap for Adapting to Coastal Risk Page 1 Introduction GreenPrint is Miami-Dade

More information

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property. 6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment

More information

Town of Chatham Department of Community Development

Town of Chatham Department of Community Development Town of Chatham Department of Community Development TOWN ANNEX 261 GEORGE RYDER ROAD 02633 CHATHAM, MA TELEPHONE (508) 945-5168 FAX (508) 945-5163 FEMA FLOOD MAP UPDATE & PROPOSED ZONING BYLAW AMENDMENT

More information

ART Vulnerability and Risk Assessment Report September 2012 Appendix C. ART GIS Exposure Analysis

ART Vulnerability and Risk Assessment Report September 2012 Appendix C. ART GIS Exposure Analysis Adapting to Rising Tides GIS Exposure Analysis The aim of this appendix is to familiarize the reader with the data and methodology that was used to conduct an analysis of shoreline and community asset

More information

An Initial Assessment of the Impacts of Sea Level Rise to the California Coast

An Initial Assessment of the Impacts of Sea Level Rise to the California Coast An Initial Assessment of the Impacts of Sea Level Rise to the California Coast Photo by D. Revell 2/23/08 California Coastal Records Project Dr. David Revell and Matt Heberger, P.E. Dr. Peter Gleick, Bob

More information

Chapter 6: Mitigation Strategies

Chapter 6: Mitigation Strategies Chapter 6: Mitigation Strategies This section of the Plan describes the most challenging part of any such planning effort the development of a Mitigation Strategy. It is a process of: 1. Setting mitigation

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions What is the Draft Regional Sustainability Strategy (RSS)? The Draft RSS is a road map for how we will work together to reach a shared vision for the region. When was the RSS

More information

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model BY Dr. Leo Brewster, Director Coastal Zone Management Unit, Barbados Presented At UNFCCC Expert

More information

Federal Emergency Management Agency (FEMA) Preliminary Flood Insurance Rate Maps (FIRMs) and Preliminary Flood Insurance Study (FIS) for New York City

Federal Emergency Management Agency (FEMA) Preliminary Flood Insurance Rate Maps (FIRMs) and Preliminary Flood Insurance Study (FIS) for New York City March 10, 2014 Submitted electronically via http://www.nyc.gov Mayor s Office of Long Term Planning and Sustainability c/o Flood Map Comments 253 Broadway, 10th Floor New York, NY 10007 Federal Emergency

More information

Guideline: A risk assessment approach to development assessment in coastal hazard areas

Guideline: A risk assessment approach to development assessment in coastal hazard areas Guideline: A risk assessment approach to development assessment in coastal hazard areas Prepared by: Environment Planning, Department of Environment and Heritage Protection State of Queensland, 2013. The

More information

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier University of Maryland & National Oceanic and Atmospheric Administration

More information

CASS COUNTY COMMISSION POLICY MANUAL 38.07 ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

CASS COUNTY COMMISSION POLICY MANUAL 38.07 ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9 CASS COUNTY COMMISSION POLICY MANUAL 38.07 SUBJECT: ORDINANCE #1998-2 (FLOOD DAMAGE PREVENTION) ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9 NORTH DAKOTA COUNTY OF CASS ORDINANCE #1998-2 Be it ordained and

More information

GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY, RISK, AND ADAPTATION (DRAFT)

GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY, RISK, AND ADAPTATION (DRAFT) GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY, RISK, AND ADAPTATION (DRAFT) Prepared by the Sea Level Rise Committee of SF Adapt for the San

More information

Oregon Pre-Disaster Mitigation Program Plan Update Training Manual

Oregon Pre-Disaster Mitigation Program Plan Update Training Manual FEMA Oregon Pre-Disaster Mitigation Program Plan Update Training Manual Prepared by: Oregon Partnership for Disaster Resilience OPDR FEMA OPDR FEMA OPDR 2010, University of Oregon s Community Service Center

More information

Coastal Resilience through Integrated Coastal Management. Alan T. White Indian Ocean Tsunami Warning System Program

Coastal Resilience through Integrated Coastal Management. Alan T. White Indian Ocean Tsunami Warning System Program Coastal Resilience through Integrated Coastal Management Alan T. White Indian Ocean Tsunami Warning System Program The coastal zone:an endangered environment Overexploitation and destruction Unplanned

More information

POST-DISASTER REDEVELOPMENT PLANNING

POST-DISASTER REDEVELOPMENT PLANNING TABLE OF CONTENTS POST-DISASTER REDEVELOPMENT PLANNING Addressing Adaptation During Long-term Recovery Florida Department of Economic Opportunity Florida Division of Emergency Management page ii This report

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 N a t i o n a l O c e a n i c a n d A t m o s p h e r i c A d m i n i s t r a t i o n ( N O A A ) C o a s t a l S e r v i c e s C e n t e r March

More information

How To Use The Climate Ready Utilities Program

How To Use The Climate Ready Utilities Program Introduction to the Climate Resilience Evaluation & Awareness Tool Climate Ready Water Utilities Webinar Series Curt Baranowski, US EPA Jim Hawhee, Albemarle-Pamlico NEP February 27, 2013 Use your mouse

More information

Local Government Requirements: A Handbook for CHILD CARE PROVIDERS

Local Government Requirements: A Handbook for CHILD CARE PROVIDERS Local Government Requirements: A Handbook for CHILD CARE PROVIDERS KEY QUESTIONS to ASK YOUR MUNICIPAL/REGIONAL DISTRICT OFFICE: Do local land-use laws allow me to operate a child care facility on my chosen

More information

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1. www.gnb.ca

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1. www.gnb.ca New Brunswick s Flood Risk Reduction Strategy i New Brunswick s Flood Risk Reduction Strategy Province of New Brunswick PO 6000, Fredericton NB E3B 5H1 2014 www.gnb.ca ISBN 978-1-4605-0533-5 (print edition)

More information

Resolution XII.13. Wetlands and disaster risk reduction

Resolution XII.13. Wetlands and disaster risk reduction 12 th Meeting of the Conference of the Parties to the Convention on Wetlands (Ramsar, Iran, 1971) Punta del Este, Uruguay, 1-9 June 2015 Resolution XII.13 Wetlands and disaster risk reduction 1. RECALLING

More information

Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY

Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY Prepared by Nathaly Agosto Filión, Resiliency Manager for the New Jersey Resiliency Network, a program

More information

SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities Climate Resilience Sector Project (RRP TON 46351) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE 1. Sector Performance, Problems, and Opportunities 1. Tonga is being affected by climate change,

More information

Sea Level Rise Adaptation in the Public Sector: Challenges, Solutions, and Opportunities

Sea Level Rise Adaptation in the Public Sector: Challenges, Solutions, and Opportunities White Paper Sea Level Rise Adaptation in the Public Sector: Challenges, Solutions, and Opportunities As climate change progresses, the relentless march of sea level rise (SLR) presents an array of challenges

More information

Sea Level Rise Primer

Sea Level Rise Primer Sea Level Primer Sea Level Rise Primer Why a Sea Level Rise Adaptation Primer? Sea level rise is a new challenge facing coastal communities in Canada. Uncertainty around how much sea levels will rise,

More information

Adaptation to a Changing Climate

Adaptation to a Changing Climate Adaptation to a Changing Climate City Infrastructure Preparedness David MacLeod City of Toronto Environment Office March 3, 2011 WHAT IS CITY INFRASTRUCTURE? Physical (Hard) Infrastructure Buildings Municipal

More information

FLOOD PLAIN DESIGNATION AND PROTECTION

FLOOD PLAIN DESIGNATION AND PROTECTION CITY OF RICHMOND FLOOD PLAIN DESIGNATION AND PROTECTION BYLAW NO. 8204 EFFECTIVE DATE - SEPTEMBER 8, 2008 CONSOLIDATED FOR CONVENIENCE ONLY This is a consolidation of the bylaws listed below. The amendment

More information

chapter 9 conduct a climate change

chapter 9 conduct a climate change CONDUCT A CLIMATE RESILIENCY STUDY The following chapters recommend how to reach CRC Milestone Two, Conduct a Climate Resiliency Study. 2 MILESTONE Chapter 8: Conduct a Climate Change Vulnerability Assessment

More information

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami). Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall

More information

Los Angeles County. Open Pacific Coast Study. California Coastal Analysis and Mapping Project

Los Angeles County. Open Pacific Coast Study. California Coastal Analysis and Mapping Project Los Angeles County Open Pacific Coast Study California Coastal Analysis and Mapping Project December 2011 Open Pacific Coast Counties Phase 1 Phase 2 California Coastal Analysis and Mapping Project Risk

More information

1. GENERAL ADVISORY BASE FLOOD ELEVATION (ABFE) QUESTIONS

1. GENERAL ADVISORY BASE FLOOD ELEVATION (ABFE) QUESTIONS INTRODUCTION As communities begin to recover from the devastating effects of Hurricane Sandy, it is important to recognize lessons learned and to employ mitigation actions that ensure structures are rebuilt

More information

Empowering State and Local Governments To Redirect Decision-Making to Achieve Resiliency

Empowering State and Local Governments To Redirect Decision-Making to Achieve Resiliency Empowering State and Local Governments To Redirect Decision-Making to Achieve Resiliency Recommendations for New Jersey Irene, the October 2011 snowstorm, and most recently Superstorm Sandy were a wake-up

More information

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center To: BOS From: Joseph Michelangelo, P.E. Director of Public Works Re: CDBG-DR Pine Creek Culvert Upgrade Date: April 20, 2015 On June 19, 2014, the Town of Fairfield was awarded the above referenced project

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Anchorage All-Hazard Mitigation Plan October 2004

Anchorage All-Hazard Mitigation Plan October 2004 EXECUTIVE SUMMARY The Municipality of Anchorage (MOA) is vulnerable to a wide range of natural, technological, and human/societal hazards including earthquakes, avalanches, and hazardous material accidents.

More information

Flood Damage Mitigation And Insurance Costs

Flood Damage Mitigation And Insurance Costs Flood Damage Mitigation And Insurance Costs Friday, September 25, 2015 at 7:00 PM Saturday, September 26, 2015 at 10:00 AM This presentation was prepared by the Town of South Bethany using Federal Funds

More information

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Planning for sea level rise Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Table of contents Introduction 1 New flood levels for

More information

Tools from the US EPA s Climate Ready Water Utilities Initiative (CRWU) EPA Region 3 Conference Extreme Weather Events: Adapt, Mitigate, and Survive

Tools from the US EPA s Climate Ready Water Utilities Initiative (CRWU) EPA Region 3 Conference Extreme Weather Events: Adapt, Mitigate, and Survive Tools from the US EPA s Climate Ready Water Utilities Initiative (CRWU) EPA Region 3 Conference Extreme Weather Events: Adapt, Mitigate, and Survive May 9, 2013 1 Presentation Overview Background on EPA

More information

2015 -- H 5478 S T A T E O F R H O D E I S L A N D

2015 -- H 5478 S T A T E O F R H O D E I S L A N D LC00 01 -- H S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 H O U S E R E S O L U T I O N CREATING THE RHODE ISLAND HOUSE COMMISSION ON ECONOMIC RISK DUE TO FLOODING AND

More information

Hurricane Sandy: The Challenges and Opportunities to Link Disaster Management and Climate Change Adaptation*

Hurricane Sandy: The Challenges and Opportunities to Link Disaster Management and Climate Change Adaptation* Hurricane Sandy: The Challenges and Opportunities to Link Disaster Management and Climate Change Adaptation* Gavin Smith, Ph.D. Associate Research Professor Department of City and Regional Planning University

More information

MONDAY, APRIL 20, 2015 AT 7:00 PM

MONDAY, APRIL 20, 2015 AT 7:00 PM DISTRICT OF SAANICH MINUTES OF THE COUNCIL MEETING HELD IN THE COUNCIL CHAMBERS SAANICH MUNICIPAL HALL, 770 VERNON AVENUE MONDAY, APRIL 20, 2015 AT 7:00 PM Present: Chair: Mayor Atwell Council: Councillors

More information

United States Postal Service Climate Change Adaptation Plan

United States Postal Service Climate Change Adaptation Plan United States Postal Service Climate Change Adaptation Plan Version: June 29, 2012 USPS Climate Change Adaptation Plan 1. Introduction...2 2. Policy Framework...3 Vision & Goals...3 Objectives...3 Responsible

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

CITY OF BELLEAIR BEACH, FLORIDA

CITY OF BELLEAIR BEACH, FLORIDA CITY OF BELLEAIR BEACH, FLORIDA FLOOD INSURANCE INFORMATION Important Information for City of Belleair Beach Residents and Property Owners Regarding Flood, Risk, Insurance, Preparation, Evacuation, Safety

More information

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

Designing and Developing WebGIS SLR tools: NJ Floodmapper

Designing and Developing WebGIS SLR tools: NJ Floodmapper Designing and Developing WebGIS SLR tools: NJ Floodmapper Richard Lathrop, Lisa Auermuller, Jeanne Herb, Marjorie Kaplan, James Trimble, John Bognar & Jennifer Rovito Coastal Community Resiliency Progression

More information

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida Visual Integration of Compound Events A presentation to the Climate Compact of Southeast Florida What is the Compact? Agreement between Broward, Miami-Dade, Monroe, and Palm Beach County Commissions (set

More information

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy Melbourne Water s Submission Draft Victorian Floodplain Management Strategy Waterways, drainage and floodplains are essential to life and liveability. The rivers, creeks, estuaries, wetlands and floodplains

More information

2013 Flood Recovery Framework

2013 Flood Recovery Framework PFC2013-0646 ATTACHMENT 2013 Flood Recovery Framework calgary.ca contact 3-1-1 Onward/ Calgary: A great place to make a living; a great place to make a life. Contents Context...4 Weather conditions...5

More information

Infrastructure Flood Protection Guidance and Best Practices

Infrastructure Flood Protection Guidance and Best Practices The standards and best practices contained in this document are required elements for new projects seeking State funding under the New Jersey Environmental Infrastructure Finance Program (NJEIFP). Further

More information

Municipal Climate Change Action Plans. Background & Overview of Key Elements

Municipal Climate Change Action Plans. Background & Overview of Key Elements Municipal Climate Change Action Plans Background & Overview of Key Elements Presentation Topics 1. Why Should We Plan For Climate Change? 2. Recent Events & Impacts 3. The MCCAP Key Elements Adaptation

More information

Barre City City-wide Policy and Program Options

Barre City City-wide Policy and Program Options Barre City (VERI Land Use Regulations Update policies allowing fill in flood hazard areas. RPC, DEC River Management, VLCT, Allowing landowners to elevate buildings using fill may help protect an individual

More information

MEMORANDUM. Director of Engineering Services

MEMORANDUM. Director of Engineering Services MEMORANDUM TO: FROM: DATE: RE: Mayor and Council June 22,2015 Grant Opportunity- Federal Gas Tax Fund Strategic Priorities Fund (SPF)- Uplands Combined Sewer Separation Project (Revised Application) BACKGROUND:

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Eastern Connecticut Risk & Vulnerability Assessment Workshop

Eastern Connecticut Risk & Vulnerability Assessment Workshop Coastal Resilience New York and Connecticut A Tool for Coastal Planning in a Changing World Eastern Connecticut Risk & Vulnerability Assessment Workshop January 11, 2012 Waterford Town Hall - Auditorium

More information

Policy Statement Goal A: Ecosystem Preservation and Protection. Discussion Draft for Public Consultation Page 1 of 10

Policy Statement Goal A: Ecosystem Preservation and Protection. Discussion Draft for Public Consultation Page 1 of 10 Discussion Draft for Public Consultation Page 1 of 10 Strategic Plan Potential Objectives and Examples of Strategies and Activities for the 2014-2018 Term Discussion Draft for Public Consultation June

More information

Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management. New Jersey Department of Environmental Protection

Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management. New Jersey Department of Environmental Protection Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management New Jersey Department of Environmental Protection U.S. Department of Housing and Urban Development Community Development

More information

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1 City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration

More information

The Army Corps of Engineers and the Flood Risk Challenge

The Army Corps of Engineers and the Flood Risk Challenge The Army Corps of Engineers and the Flood Risk Challenge Presentation to Association of State Flood Plain Managers Steven L. Stockton, P.E. Director of Civil Works June 12, 2013 US Army Corps of Engineers

More information

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants I. Introduction and Purpose This document provides

More information

PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE

PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE PACIFIC CATASTROPHE RISK ASSESSMENT AND FINANCING INITIATIVE NIUE SEPTEMBER 11 COUNTRY RISK PROFILE: NIUE Niue is expected to incur, on average,.9 million USD per year in losses due to earthquakes and

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

Guideline for Stress Testing the Climate Resilience of Urban Areas

Guideline for Stress Testing the Climate Resilience of Urban Areas Netherlands Ministry of Infrastructure and Environment Delta Programme Urban Development and Reconstruction Guideline for Stress Testing the Climate Resilience of Urban Areas Extended summary Version 1.0

More information

Hoboken Resiliency & Readiness Plan

Hoboken Resiliency & Readiness Plan Hoboken Resiliency & Readiness Plan Layers of Protection Mayor Dawn Zimmer Challenge: Hoboken was once an island outcrop. Surrounding tidal marshes were filled in, but City remains vulnerable to storm

More information

LOCAL COASTAL PROGRAM PLANNING GRANTS JOINT APPLICATION ANNOUNCEMENT & INSTRUCTIONS APRIL 23, 2014

LOCAL COASTAL PROGRAM PLANNING GRANTS JOINT APPLICATION ANNOUNCEMENT & INSTRUCTIONS APRIL 23, 2014 LOCAL COASTAL PROGRAM PLANNING GRANTS JOINT APPLICATION ANNOUNCEMENT & INSTRUCTIONS APRIL 23, 2014 The State of California is pleased to announce grant funding for FY14-15 to support local governments

More information

Insurance Questions: Clothes washers and dryers, food freezers and the food in them are covered if there is contents coverage.

Insurance Questions: Clothes washers and dryers, food freezers and the food in them are covered if there is contents coverage. Introduction: Floods occur when runoff from rain or snowmelt exceeds the capacity of rivers, stream channels or lakes and overflows onto adjacent land. Floods can also be caused by storm surges and waves

More information

Looking for property near the ocean?

Looking for property near the ocean? Looking for property near the ocean? Questions and Answers on Purchasing Coastal Real Estate in Massachusetts This brochure focuses on questions you should ask as a potential purchaser of coastal real

More information

Predicting Coastal Hazards: A Southern California Demonstration

Predicting Coastal Hazards: A Southern California Demonstration Predicting Coastal Hazards: A Southern California Demonstration Patrick Barnard United States Geological Survey Coastal and Marine Geology Team Santa Cruz, CA Southern California Multi-hazards Demonstration

More information

Electoral Area H Official Community Plan Review

Electoral Area H Official Community Plan Review Attachment 2 Electoral Area H Official Community Plan Review 1. Introduction & Background The Regional District of Nanaimo (RDN) is planning a review of the Electoral Area H Official Community Plan (OCP).

More information

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION

More information

Section 6: Mitigation Strategy

Section 6: Mitigation Strategy Section 6: Mitigation Strategy The Mitigation Strategy section provides the blueprint for the participating jurisdictions in the Unifour Region to follow to become less vulnerable to the negative effects

More information

Section 6: Mitigation Strategy

Section 6: Mitigation Strategy Section 6: Mitigation Strategy The Mitigation Strategy section provides the blueprint for the participating jurisdictions in the Eno- Haw Region to follow to become less vulnerable to the negative effects

More information

Myths and Facts about the NFIP

Myths and Facts about the NFIP Chapter 4: After the Disaster How the NFIP Works Who needs flood insurance? Everyone. And everyone in a participating community of the National Flood Insurance Program (NFIP) can buy flood insurance. More

More information

Contents Executive Summary... 1 Highlights... 1

Contents Executive Summary... 1 Highlights... 1 Contents Executive Summary... 1 Highlights... 1 Recommendations... 1 Introduction... 2 Regional Comparison... 3 Part A: Information Providers... 3 Part B: Date and Location of Events... 3 Part C: Affected

More information

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Integrated Local Flood Management and Drainage Strategy OVERVIEW Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure

More information

EMERGENCY MANAGEMENT BRITISH COLUMBIA A STRATEGY TO ADVANCE SUPPORT FOR LOCAL AUTHORITY EMERGENCY MANAGEMENT PROGRAMS OCTOBER 14, 2015

EMERGENCY MANAGEMENT BRITISH COLUMBIA A STRATEGY TO ADVANCE SUPPORT FOR LOCAL AUTHORITY EMERGENCY MANAGEMENT PROGRAMS OCTOBER 14, 2015 EMERGENCY MANAGEMENT BRITISH COLUMBIA A STRATEGY TO ADVANCE SUPPORT FOR LOCAL AUTHORITY EMERGENCY MANAGEMENT PROGRAMS OCTOBER 14, 2015 1 MESSAGE FROM THE ASSISTANT DEPUTY MINISTER I am pleased to introduce

More information

Frequently Asked Land Use Permitting Questions Post Superstorm Sandy Updated July 2nd, 2013

Frequently Asked Land Use Permitting Questions Post Superstorm Sandy Updated July 2nd, 2013 Frequently Asked Land Use Permitting Questions Post Superstorm Sandy Updated July 2nd, 2013 Most of the recovery and repair activities public agencies, businesses, and homeowners need to conduct as a result

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

A Seat at the Table: Resource Guide for Local Governments to Promote Food Secure Communities

A Seat at the Table: Resource Guide for Local Governments to Promote Food Secure Communities A Seat at the Table: Resource Guide for Local Governments to Promote Food Secure Communities How It Started In June 2008, the Provincial Health Services Authority, Union of BC Municipalities, and BC Healthy

More information

Association of State Flood Managers Annual Conference Wednesday, June 4, 2014

Association of State Flood Managers Annual Conference Wednesday, June 4, 2014 Association of State Flood Managers Annual Conference Wednesday, June 4, 2014 Hillsborough County, In the Trenches Local Mitigation Eugene Henry, CFM, AICP Hazard Mitigation Manager Floodplain Administrator

More information

Chapter 10. The National Flood Insurance Program

Chapter 10. The National Flood Insurance Program Chapter 10 The National Flood Insurance Program Chapter Overview The National Flood Insurance Program has been mentioned in numerous instances in preceding chapters. Its time has arrived in this course!

More information

Challenges. Estimated Damages from 100-Year Flood

Challenges. Estimated Damages from 100-Year Flood Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of

More information

ART Vulnerability and Risk Assessment Report

ART Vulnerability and Risk Assessment Report ART Vulnerability and Risk Assessment Report September 2012 Chapter 1. Introduction to the ART Vulnerability and Risk Assessment The Adapting to Rising Tides (ART) project is a collaborative effort to

More information

Country overview and assessment

Country overview and assessment 2. BULGARIA This country fiche provides a comprehensive overview and assessment of climate change adaptation in Bulgaria. After detailing the vulnerability of Bulgaria s coastal zones, the responsibility

More information

THE NAIROBI WORK PROGRAMME ON IMPACTS, VULNERABILITY AND ADAPTATION TO CLIMATE CHANGE UNFCCC THE NINE WORK AREAS OF THE NAIROBI WORK PROGRAMME

THE NAIROBI WORK PROGRAMME ON IMPACTS, VULNERABILITY AND ADAPTATION TO CLIMATE CHANGE UNFCCC THE NINE WORK AREAS OF THE NAIROBI WORK PROGRAMME ON IMPACTS, VULNERABILITY AND ADAPTATION TO CLIMATE CHANGE 1 METHODS AND TOOLS WHAT IS? The Nairobi work programme, under the United Nations Framework Convention on Climate Change (), aims to assist countries

More information

DIRECTIONS IN DEVELOPMENT Environment and Sustainable Development. Building Urban Resilience. Principles, Tools, and Practice

DIRECTIONS IN DEVELOPMENT Environment and Sustainable Development. Building Urban Resilience. Principles, Tools, and Practice DIRECTIONS IN DEVELOPMENT Environment and Sustainable Development Building Urban Resilience Principles, Tools, and Practice Abhas K. Jha,Todd W. Miner, and Zuzana Stanton-Geddes, Editors Australian THE

More information

BART Adaptation Strategy for Sea- Level Rise in the San Francisco Bay Area

BART Adaptation Strategy for Sea- Level Rise in the San Francisco Bay Area BART Adaptation Strategy for Sea- Level Rise in the San Francisco Bay Area FTA Project CA-26-6006-00 with support of National Oceanic & Atmospheric Administration San Francisco Bay Conservation & Development

More information

Christian J. Stewart, Christian J. Stewart Consulting James G. Duyndam, Christian J. Stewart Consulting Mark N. Law, Christian J. Stewart Consulting

Christian J. Stewart, Christian J. Stewart Consulting James G. Duyndam, Christian J. Stewart Consulting Mark N. Law, Christian J. Stewart Consulting COASTAL ZONE GIS DATABASE DEVELOPMENT, VISUALIZATION AND DISTRIBUTION IN THE GREAT LAKES - THE LAKE MICHIGAN POTENTIAL DAMAGES STUDY AND THE LOWER GREAT LAKES EROSION STUDY Christian J. Stewart, Christian

More information

Malcolm L. Spaulding Professor Emeritus, Ocean Engineering University of Rhode Island Narragansett, RI 02881

Malcolm L. Spaulding Professor Emeritus, Ocean Engineering University of Rhode Island Narragansett, RI 02881 Malcolm L. Spaulding Professor Emeritus, Ocean Engineering University of Rhode Island Narragansett, RI 02881 USACE Coastal and Hydraulics Laboratory(CHL) Data Infrastructure Workshop January 23, 2014 Overview

More information

10. Infrastructure and the Built Environment

10. Infrastructure and the Built Environment 151 152 10. Infrastructure and the Built Environment Maintaining safe and reliable infrastructure is critical for Washington s economy, environment, and way of life. This chapter addresses climate impacts

More information

FLOOD HAZARD IN THE URBAN ENVIRONMENT: IMPLICATIONS FOR DEVELOPERS, DESIGNERS, AND ATTORNEYS

FLOOD HAZARD IN THE URBAN ENVIRONMENT: IMPLICATIONS FOR DEVELOPERS, DESIGNERS, AND ATTORNEYS FLOOD HAZARD IN THE URBAN ENVIRONMENT: IMPLICATIONS FOR DEVELOPERS, DESIGNERS, AND ATTORNEYS PRESENTED BY: CHAD W. COX, P.E. DANIEL C. STAPLETON, P.E. BOSTON, MA JAN. 24, 2014 PRESENTATION Flood Vulnerability

More information

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers

Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Volume Reduction in the Regional District of Nanaimo s Sanitary Sewers Andy Bell Infrastructure Engineer AECOM Canada Inc Vancouver, CANADA Andrew.Bell@aecom.com Introduction The Ministry of Environment

More information

Translating Dreams into Reality:

Translating Dreams into Reality: Translating Dreams into Reality: Assessing risk in an unpredictable world Surge from Hurricane Sandy crashes over a sea wall in Kennebunk, Maine on October 29, 2012 Judy Gates, Director, Environmental

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

San Francisco Bay Margin Conservation Decision Support System (DSS)

San Francisco Bay Margin Conservation Decision Support System (DSS) San Francisco Bay Margin Conservation Decision Support System (DSS) Presented by Brian Fulfrost1, MS David Thomson2, MS 1 Brian Fulfrost and Associates 2 San Francisco Bay Bird Observatory Transitional

More information