1 Modelling and mapping of urban storm water flooding Using simple approaches in a process of Triage. Blanksby J.* Kluck J.**, Boogaard F.C. *+ ***, Simpson S.****, Shepherd W.* and Doncaster S.* * Pennine Water Group, Department of Civil and Structural Engineering, University of Sheffield, UK ** Tauw bv, Zekeringstraat 43 g, 1014 BV AMSTERDAM, the Netherlands *** Delft university of Technology. Department of Sanitary Engineering, Faculty of Civil Engineering and Geosciences, Delft University of Technology, P.O. Box 5048, NL-2600 GA, Delft, the Netherlands **** City of Bradford Metropolitan District Council, UK corresponding author: floris.boogaard@tauw.nl Abstract Climate change and densification of urban areas are likely to result in more frequent flooding. The long recognised problems of short peak rainfall intensities which exceed the storm water drainage capacity and heavier long duration rainfall causing additional runoff from saturated urban green space are likely to become more common, increasing the probability of flooded streets, buildings and homes. It is becoming accepted that it will not be possible to solve these problems using traditional European drainage methods, and that storm water needs to be managed on and above the ground surface and that this will require the participation of different groups of stakeholders than have been involved in the past. A major problem is how to convince other officials, concerned with non-water related urban disciplines, of the importance of space for water. This problem is being addressed by the EU Interreg IVB projects Skills Integration and New Technologies (SKINT) 1 and Managing Adaptive Responses to changing Flood Risk (MARE) 2 in the North Sea Region and FloodResilienCity (FRC) 3 in the North West Europe Region. All three projects focus on sharing knowledge and best practices of water management issues within urban areas and are developing methods appropriate for application by municipalities which complement national and regional approaches for modelling and mapping urban storm water. 1 Skills Integration and New Technologies (SKINT) 2 Managing Adaptive Responses to changing Flood Risk (MARE) 3 FloodResilienCity (FRC)

2 Introduction From the 1970s there has been a steady progression in the development of modelling techniques for urban storm drainage. At the beginning of this period the Rational Method and its derivative such as Area Time diagrams had been in use since the mid nineteenth century. However, since the 1970s, the development of computers has enabled introducing in increasingly sophisticated hydrodynamic modelling software supported by better understanding of rainfall and surface and sub surface hydrological processes. The UK progression is typical of development in Europe including: In the 1970s the development of the TRRL Hydrograph method (Watkins, 1977) capable of simulating flows and depth up to pipe full capacity In the 1980s the publication of the Wallingford Procedure (DoE 1983) and the complimentary software WASSP capable of simulating surcharged flow in dendritic systems In the 1990s the enhancement of WASSP in WALLRUS and the development of HYDROWORKS using the St Venant equations and Preissman Slot to enable the modelling of heavily bifurcated systems with backflows. All of these developments used one dimensional modelling techniques whereby the effects of depth of flow on the surface could be determined and the modelling of surface pathways as channels could also be achieved, but this was limited in its application. As a result of this the determination of the routing of excess surface flows was carried out in the field. In this period a considerable effort has been put into the development of user interfaces with graphics facilities using digital mapping techniques to build models and display results and in the UK, software such as InfoWorks and Micro Drainage have considerately enhanced to experience of modelling. In the late 1990s and since the Millennium, there has been an increasing use of two dimensional modelling to simulate the passage of flows over the urban surface. Two different approaches have been adopted; grid based (raster) Triangular Irregular Networks (TINs). These approaches have been used independently or linked to 1D approaches for both urban storm drainage and river modelling and given unlimited resources would be used in all circumstances. However resources are limited and this influences the uptake of modelling and because of this, these models are not applicable for all cases yet. A desk top review of 2D surface modelling practice has been carried out by the English Environment Agency (Neelz and Pender 2009) and further information can be found in this report. This paper considers the impacts of the resource limitations and then identifies how the user focussed approaches of SKINT, MARE and FRC are contributing to identification of different components of flooding and hence the stakeholders who should be involved and fund the investigation, design and implementation of urban flood risk management measures and what modelling approaches and data should be used within the investigation process. Digital Elevation Models LIDAR (Light Detection and Ranging) has become the most common method of collecting elevation data. It can be obtained at a range of resolutions using fixed wing and helicopter areal platforms and vehicular land based platforms. Although conventional and GPS surveying techniques can provide more accurate information on local areas, LIDAR is a much more cost effective means of covering large areas.

3 However, there are a number of factors that need to be considered when using LIDAR based digital elevation models for flood risk modelling. Resolution Typically, airborne LIDAR has a vertical resolution ranging between 5 cm and 15 cm with horizontal resolution ranging between 25 cm and 2 metres. The higher resolutions tend to be more expensive, using helicopter platforms flying low level narrow paths whereas the lower resolutions can be obtained using higher level fixed wing platforms flying wider paths, which are more cost effective. Even higher resolution land based surveys can be carried out with 1cm vertical and 5 cm horizontal resolution. This type of survey provides and effective three dimensional image of a street scene, but does not provide information behind properties The issues relating to resolution are as follows: The higher the resolution, the greater the resource required for data capture, storage and processing. The lower the resolution, the less accurate the representation of the urban surface. There is a need to balance the requirements of terrain modelling with the resources required to produce, manage and use the data, but in both the UK and the Netherlands 1m horizontal resolution Lidar data is often viewed as a starting point Storage and processing LIDAR data is generally provided in ASCII format and stored as a raster grid. This means that a 5cm horizontal resolution vehicular based DEM requires 400 hundred times the storage capacity of a 1m resolution fixed wing DEM, and that excludes the storage of data on the faces of buildings. The impact on data processing is even greater, but this will be discussed on the section on modelling. Representation of the urban surface It goes without saying that urban flow pathways are affected by relatively minor surface features such as narrow walls, earth mounds under hedges, and road kerbs. Although some of these may be picked up by medium resolution LIDAR, it is only the very high resolution DEMs that will provide a truly accurate representation of the ground surface. The effect is particularly significant on convex surfaces, whereas in concave (valleys) they are less important. Nevertheless, LIDAR users should make themselves fully aware of the potential for lower resolution DEMs to provide misleading results. The difficulty in using vehicle based LIDAR behind buildings should also be considered. Currency of the DEM Any DEM is a snapshot in time and is therefore subject to the effects of urban development. Updating DEMs along major rivers or sea fronts is not a major problem, as in urban areas any activities in these locations will be well documented and new levels and alignments will be readily available. However, away from these areas, in the majority of the urban area where surface water flooding is the main problem, the continuous and widespread process of urban renewal will result in many unrecorded changes such as highway resurfacing which can reduce the capacity for roads to act as pathways. In addition, at times of flooding, people can use temporary flood defences such as

4 sandbags which can have a major impact on flow pathways. This is a reason to treat even the highest resolution DEM with caution when it comes to modelling. Another point is that people tend to forget that a model (or the data for a model) can be imperfect at some points if the results appear more and more realistic. This is certainly the case for a DEM, which gives a very realistic representation of the reality. Also the more data is used in a model, or the larger the area modelled, the more errors it contains and the harder it becomes to find all the relevant errors. Passageways, Bridges and Culverts. Unless an areal based LIDAR survey flies directly over a narrow passage it is possible that the signal will not penetrate to the bottom of the passage and hence the ground elevation within the passage will be incorrectly recorded. In the case of bridges, the recorded ground level will be the bridge deck and not the ground under the bridge. Similarly a LIDAR survey will not identify a culvert passing under and embankment. In all cases, the flow pathways will be wrongly identified and so steps should be taken to provide adequate representation by amending ground levels, removing bridge decks and inserting slits across embankments. However, although in the case of passageways the amendment of ground levels has no side effects, in the case of bridges and culverts, the flow pathways over the top of the bridge or embankment are interrupted by the actions taken. Value of DEMs Despite the above, the value of DEMs is not in dispute. There is no other easy way to identify flow pathways and determine the areas putting critical urban infrastructure at risk of flooding. The lesson to be learned from above is that outputs of modelling using LIDAR based DEMs should not be taken at face value and that where actions are to be taken as a result of modelling, then detailed local checks and enhancements should be made. Nevertheless there are many cases where these problems do not exist, or where their effect is minimal such is in large flat areas as occur in the Dutch polders, or the North European Plain, even the lower resolution DEMs can be fit for purpose. Modelling approaches Over the past thirty years most countries in the North Sea and North West Europe Regions have developed a considerable capacity for hydrodynamic modelling of urban drainage, river and coastal systems. The initial developments in 1D models identified within the introduction have proved to be effective, but the large amount of modelling required by the EU Flood Directive has resulted in the development of 2D modelling typically at low (5m) horizontal resolution for both coastal and river systems and also urban areas. The UK is typical of this for river and coastal flood risk modelling and in addition has produced surface water flood risk maps at 5m resolution taking account of but not modelling drainage system capacity for events with return probabilities of once in thirty and once in two hundred years. The surface water modelling and mapping of the whole of England is a huge task, but although best endeavours have been made to resolve issues the models are only appropriate to preliminary flood risk assessments. However, the nature of the 2D models does not distinguish between the different sources of flooding and so additional approaches are required to do this. Additionally, the modelling

5 approaches described above are highly specialised and expensive to implement. So simplified approaches designed for implementation within municipalities have been designed to: identify the contribution of different types of urban surface to flooding, to identify to those responsible for those surfaces that they should be involved in the management of flood risk, to identify the analytical approach required and the resources needed, and where possible to provide the necessary solutions. For the modelling of flooding in Urban areas a high resolution DEM is needed (at least 1m horizontal resolution) to make sure that possible above ground small water ways likes alleys will be in the DEM, without being blocked by the surrounding houses. For really small alleys this might even be too coarse. However, when using vehicle mounted Lidar with extremely high resolution, including building faces, the amount of data presented can cause confusion and it becomes necessary to leave out some of the data. GIS based modelling Flood component analysis a framework for identifying causes and attributing responsibility for flooding Flood component analysis was developed by David Wilson of Scottish Water as a means of illustrating responsibilities for flooding to the different partners involved in the Glasgow Strategic Drainage Plan. In its initial form the flood component analysis used different modelling techniques to estimate the volume of different sources of flooding, but here GIS based approaches are used as a preliminary assessment. Figure 1 shows the main flood components, with an indication of the impacts of future drivers (climate change and urbanisation) and an example of how the main components may be further sub divided. Possible interactions affecting drainage infrastructure performance Current Surface water and soil Drainage infrastructure Groundwater Streams, rivers and artificial water bodies Coastal water Changing depth of flooding due to climate change and/or urbanisation Depth of flooding + Surface water and soil + Drainage infrastructure + Groundwater + Streams, rivers and artificial water bodies + Coastal water Shorter duration high intensity storm events Impacts of changing rainfall patterns Longer duration, low to medium intensity rainfall events Rural green space Green space at urban fringe Green space within urban area Developed urban surface Sub divisions of surface water and soil

6 Figure 1: Flood component analysis and the impact of future drivers The need for a preliminary flood component analysis There are benefits in carrying out an assessment to identify the potential causes of flooding prior to embarking on detailed diagnostic studies. The results of the assessment will help to identify: The organisations which should be involved Appropriate modelling techniques Data collection needs Resource requirements Costs and their likely distribution. The proposed approach may be used as part of the investigation of a specific flood incident or as a general approach to the assessment of flood risk of high vulnerability infrastructure and buildings. Rationale The approach should be simple and should be capable of automation and should use readily available data Data requirements The analysis requires the following information as a minimum: A digital elevation model Digital maps with layers identifying different types of surfaces Digital flood hazard, probability, risk and extent maps for coastal and river flooding In addition information on the distribution of depth, duration and frequency of local rainfall will provide enhanced outputs, as will basic information of the hydraulic performance of drainage infrastructure. In the absence of the latter, the analysis will enable a preliminary assessment of drainage infrastructure performance to be made where knowledge of the rainfall causing flooding exists. Aim To identify how the following flood components may contribute to flooding Water bodies o Coastal o Rivers o Streams Drainage infrastructure Surface types o Rural green space o Green space at the urban fringe o Urban Green space o Developed urban surfaces Highways Buildings and structures

7 The preliminary flood component analysis process The process has 11 elements as follows: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) Define surface water management zone boundaries (Figure 2) Identify all pathways and sinks Identify pathways and sinks associated with surface water Identify pathways, sinks and flood extents associated with water bodies (Figure 3a) a) Coastal, rivers and large streams b) Small streams Identify contribution from developed urban surfaces (Figure 3b and 3c) a) Highways b) Buildings, structures and associated ground surfaces Identify contribution from green space (Figure 3c) a) Urban Green space b) Green space at the urban fringe c) Rural green space Assess drainage system capacity Assess decay rates for surface water flooding along developed urban surface (Figure 4) Assess decay rates for flooding from small streams along developed urban surface Assess joint probabilities Finalise flood component analysis The catchment covers the City of Bradford area with a distance of up to 15Km West to East and 8 Km South to North Potential Surface Water Management Zones and example of final selection Figure 2: Example of the sub division of a large city catchment into manageable surface water management zones The process is progressive and may be terminated at various points, depending on the available data. On the completion of Element 4 it will be possible to define those areas subject to flooding from: Coastal water Rivers

8 Large streams Small streams Surface water It will also be possible to identify those areas where there are joint probabilities of flooding and in the case of surface water and small streams identify their relative contribution. Example of potential accumulations from overflowing watercourse Example of potential accumulations from highways Example of potential accumulations from developed areas Example of potential accumulations from green space Figure 3: Potential contributions to flooding form urban surfaces under different ownership Legend Accumulation (s.m.) 2,501 10,000 10,001 50,000 50, , , , ,001 1,000,000 > 1,000,000 On completion of Element 7 it will be possible to identify the potential contributions from small streams and different surface types by comparing the accumulations at any point without any modelling.

9 With a minimum of modelling based on rational approaches, Elements 8 and 9 take account of the capacity within the different urban drainage systems to accept and transport surface water runoff from urban green space and blocked or overloaded stream culverts. Having calculated the runoff, this approach, calculates a rate of decay for flooding emanating as it flows along pathways in developed urban areas, and into drainage systems through gullies, providing that the capacity of the drainage systems serving those areas are not exceeded. This provides a method of determining the extent of the impact of runoff from green space saturated by long duration, heavy, (but not intense) cyclonic rainfall, which is the cause of the majority of flooding incidents in and around urban areas in the UK. Runoff from green space enters the highway at points 1 4. Gulleys located at points A - T Graph showing decay in surface water discharge and depth as it flows past gulleys with spare capacity Figure 4: Simple modelling of flood decay as flows from green space enter drainage system Finally, Elements 10 and 11 draw together the results of the preceding elements to provide a preliminary quantification of the different flood components and to inform the different players of their involvement Modelling and communication using simple approaches in a process of triage For a good assessment of the situation and the possible solutions it is important to choose the model which takes into account the right processes. However, sometimes it is better to start using models which do not take into account all processes, but which give a quick and dirty first insight on what might be situation or the effect of possible solutions. We promote the use of an analysis of the ground elevation such as that described above. This provides quick and understandable insight in where water might collect in depressions, how deep these depressions would be and what the catchment area is of the water in a depression. The results are directly presented in maps and should be combined with other maps of the flooding such as recorded flood events and areas vulnerable to flooding, In a workshop these maps are best discussed with the possible stakeholders who should be involved in solving problems of urban flooding: such as local citizens supported by water engineers, urban

10 planners, decision makers, architects etc. This helps to promote the interaction based on local data and can be done using a touch screen on which several GIS-maps have been prepared. Similar methods developed independently in the Netherlands and the UK provide insight in the above ground discharge of storm water. They assume that the storm event is so heavy that the sewer system is completely filled and used. In the Netherlands it is assumed that from typically 60 mm of rainfall (the maximum expected rainfall in one hour for a return period of 100 year), 20 mm is stored in and discharged by the underground drainage system. The other 40 mm is stored on or flows over the surface. Based on the DEM and the type of surface the locations of depressions and the flow path are estimated and presented. There is no flow simulation used, only a evaluation of what is higher and what is lower. This general insight is easily carried out by GIS specialists rather than water engineers and the results can be communicated with urban planners, decision makers and other stake holders who should be involved in solving problems of urban flooding. The principles of such a model are easily understood and it is our experience in the Netherlands that because of this the deficiencies in the model are easily accepted. Used in preliminary assessments such a general approach can also afford not to be correct, because it can quickly be rerun, or people can imagine and point out themselves how the water would flow. This process helps to develop a better understanding of the situation and can result in the synthesis of options. This can stimulate discussion of what measures are acceptable and the prioritisation of the response and what can and can t be solved and what is of no importance. In effect it is a form of triage. The approach can be used to identify where detailed modeling is required and provide a preliminary assessment of options prior to the selection of specific options for more detailed modeling. If in the case of detailed models, an important omission in the data is found after complex simulations have been made, the validity of the whole model can be thrown into question. A complex model not only requires more data and more computational time, it is also far more difficult to check that all essential data is in it correctly. For that reason we recommend to start exploring the situation and possible solutions using simple models in the first case prior to the use of more complex models in critical locations and for critical options. References DoE 1893, Department of the Environment/National Water Council Standing Technical Committee. The Wallingford Procedure, HR Wallingford Kluck J., et al. Modelling and mapping of urban storm water flooding, Novatech Lyon Neelz S., and Pender G., Desktop review of 2D hydraulic modelling packages, Science report, SC080035, Environment Agency, July 2009, ISBN ,

11 Watkins L.H. The TRRL hydrograph method of urban sewer design adapted for tropical conditions, Proceedings of the Institution of Civil Engineers, Part 2, 1977, 63, June,

06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH

06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH 06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH Richard Kellagher 1, Mike Panzeri 1, Julien L Homme 1, Yannick Cesses 1, Ben Gouldby 1 John Martin 2, Oliver Nicholson 2, Mark

More information

Urban Flood Modelling

Urban Flood Modelling Urban Flood Modelling Adrian J Saul Pennine Water Group Department of Civil and Structural Engineering University of Sheffield a.j.saul@sheffield.ac.uk 1 Need for Integrated Urban Drainage within an integrated

More information

Managing sewer flood risk

Managing sewer flood risk Managing sewer flood risk J. Ryu 1 *, D. Butler 2 1 Environmental and Water Resource Engineering, Department of Civil and Environmental Engineering, Imperial College, London, SW7 2AZ, UK 2 Centre for Water

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Groundwater Flooding: a UK Perspective

Groundwater Flooding: a UK Perspective Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

2D Modeling of Urban Flood Vulnerable Areas

2D Modeling of Urban Flood Vulnerable Areas 2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Enhanced DEM-based flow path delineation algorithms for urban drainage modelling

Enhanced DEM-based flow path delineation algorithms for urban drainage modelling Enhanced DEM-based flow path delineation algorithms for urban drainage modelling João Paulo Leitão, S. Boonya-aroonnet, D. Prodanović and Č. Maksimović Belo Horizonte, Brasil October, 2009 Outline Urban

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Objective 4: Enhanced community education, flood awareness and preparedness

Objective 4: Enhanced community education, flood awareness and preparedness Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result

More information

Flood risk assessment through a detailed 1D/2D coupled model

Flood risk assessment through a detailed 1D/2D coupled model CORFU Project Barcelona Case Study Final Workshop 19 th of May 2014 Flood risk assessment through a detailed 1D/2D coupled model Beniamino Russo Aqualogy Urban Drainage Direction Introduction and general

More information

WET10 - THE CITY WATER DEBATE 2015. When Will London Flood? Introduction. Dr Paul Leinster, CBE

WET10 - THE CITY WATER DEBATE 2015. When Will London Flood? Introduction. Dr Paul Leinster, CBE WET10 - THE CITY WATER DEBATE 2015 When Will London Flood? Introduction Roger Hewitt, Past Master of the Water Conservators, opened the event by thanking the Worshipful Companies of the Glaziers and the

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Netherlands Email corresponding author: Jeroen.Kluck@tauw.nl

Netherlands Email corresponding author: Jeroen.Kluck@tauw.nl Modelling and mapping of urban storm water flooding - Communication and prioritizing actions through mapping urban flood resilience Modélisation et cartographie des inondations en zone urbaine : actions

More information

Flood Modelling for Cities using Cloud Computing FINAL REPORT. Vassilis Glenis, Vedrana Kutija, Stephen McGough, Simon Woodman, Chris Kilsby

Flood Modelling for Cities using Cloud Computing FINAL REPORT. Vassilis Glenis, Vedrana Kutija, Stephen McGough, Simon Woodman, Chris Kilsby Summary Flood Modelling for Cities using Cloud Computing FINAL REPORT Vassilis Glenis, Vedrana Kutija, Stephen McGough, Simon Woodman, Chris Kilsby Assessment of pluvial flood risk is particularly difficult

More information

Guideline for Stress Testing the Climate Resilience of Urban Areas

Guideline for Stress Testing the Climate Resilience of Urban Areas Netherlands Ministry of Infrastructure and Environment Delta Programme Urban Development and Reconstruction Guideline for Stress Testing the Climate Resilience of Urban Areas Extended summary Version 1.0

More information

Community Services and Safety Scrutiny Sub-Committee 1 November 2011

Community Services and Safety Scrutiny Sub-Committee 1 November 2011 REPORT TO: Community Services and Safety Scrutiny Sub-Committee 1 November 2011 AGENDA ITEM: 6 SUBJECT: LEAD OFFICER: CABINET MEMBER: Flood Prevention Stephen McDonald Executive Director of Planning and

More information

Title: Guiding Models and Norm Study for Water Storage: A new way of thinking?

Title: Guiding Models and Norm Study for Water Storage: A new way of thinking? Tools Title: Guiding Models and Norm Study for Water Storage: A new way of thinking? Keywords: Regional; communication; inundation; stakeholder engagement; water management; spatial planning Audience:

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al.

Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al. Hydrol. Earth Syst. Sci. Discuss., 5, C2756 C2764, 2010 www.hydrol-earth-syst-sci-discuss.net/5/c2756/2010/ Author(s) 2010. This work is distributed under the Creative Commons Attribute 3.0 License. Hydrology

More information

Modelling of Urban Flooding in Dhaka City

Modelling of Urban Flooding in Dhaka City Modelling of Urban Flooding in Dhaka City Chusit Apirumanekul*, Ole Mark* *Water Engineering & Management, Asian Inst. of Technology, PO Box 4, Klong Luang, Pathumthani 12120, Thailand Abstract Flooding

More information

Homes and Environment Scrutiny Committee. (Environment & Transport)

Homes and Environment Scrutiny Committee. (Environment & Transport) REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Modelling Flood Inundation of Urban Areas in the UK Using 2D / 1D Hydraulic Models

Modelling Flood Inundation of Urban Areas in the UK Using 2D / 1D Hydraulic Models Modelling Flood Inundation of Urban Areas in the UK Using 2D / 1D Hydraulic Models W.J. Syme B.E., M.Eng.Sc. Associate, WBM Pty. Ltd., Australia M.G. Pinnell Bsc Msc MCIWEM Principal Hydrologist, Symonds

More information

Guidance Notes: GARDEN FLOODING

Guidance Notes: GARDEN FLOODING Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

5-Day Training Workshop On Flood Mitigation. On: February 17, 2010. Islamabad. Sequence of Lecture

5-Day Training Workshop On Flood Mitigation. On: February 17, 2010. Islamabad. Sequence of Lecture 5-Day Training Workshop On Flood Mitigation Title: Flood Proofing On: February 17, 2010 At: Organized By: Islamabad NDMA-UNDP Sequence of Lecture Definition; Objectives; Types of flood proofing; Structural

More information

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough

More information

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON 22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:

More information

National Disaster Management Institute

National Disaster Management Institute National Disaster Management Institute CONTENTS one Cause of Urban Flood Disaster two Urban Flood Damage Case three Disaster Prevention Measures for Future Urban Flood four NDMI s Measures & Strategy for

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

What to do if sewage floods your property

What to do if sewage floods your property What to do if sewage floods your property This leaflet will answer some of your questions and concerns, as well as give you helpful information and advice. What we will do for you Sewer flooding is unpleasant

More information

Risk and vulnerability assessment of the build environment in a dynamic changing society

Risk and vulnerability assessment of the build environment in a dynamic changing society Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. linmei.nie@sintef.no

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING

More information

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark Urban run-off volumes dependency on rainfall measurement method - Scaling properties of precipitation within a 2x2 km radar pixel L. Pedersen 1 *, N. E. Jensen 2, M. R. Rasmussen 3 and M. G. Nicolajsen

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Tropical Storm Allison

Tropical Storm Allison Tropical Storm Allison June 13, 2003, 2:41PM Two years after Allison, Houston has reached a watershed moment By KEVIN SHANLEY Houston is exploding with growth. But city building can be a messy business,

More information

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015.

Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015. Product 4 (Detailed Flood Risk) for: Sam Murray (Amey) Site: Land at Kingsnorth Reference: KSL151125 KR79 Date: 30 th November 2015 Contents Flood Map Confirmation Flood Map Extract Model Output Data Data

More information

Appendix B: SWMP Contact List

Appendix B: SWMP Contact List Appendix B: SWMP Contact List South Essex SWMP Working Group List, January 2011 Client Group Matthew Winslow Basildon BC Client SWMP Project Manager matthew.winslow@basildon.gov.uk Emmanuelle Meunier Basildon

More information

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and 1. Purpose (1) It is the purpose of this Ordinance to protect human life, health, and property from flood conditions, to preserve the ability of floodplains to carry and discharge a base flood, and to

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

Wiltshire SWMP Project Governance Framework

Wiltshire SWMP Project Governance Framework Wiltshire SWMP Project Governance Framework Final Framework Prepared on behalf of This document has been prepared in accordance with the scope of Scott Wilson's appointment with its client and is subject

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

Types of flood risk. What is flash flooding? 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology. Main types of climatically influenced flooding:

Types of flood risk. What is flash flooding? 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology. Main types of climatically influenced flooding: GG22A: GEOSPHERE & HYDROSPHERE Hydrology Types of flood risk Main types of climatically influenced flooding: 1. Flash (rapid-onset) 2. Lowland (slow-rise) 3. Coastal (not covered here) But! Causal factors

More information

Impact of rainfall and model resolution on sewer hydrodynamics

Impact of rainfall and model resolution on sewer hydrodynamics Impact of rainfall and model resolution on sewer hydrodynamics G. Bruni a, J.A.E. ten Veldhuis a, F.H.L.R. Clemens a, b a Water management Department, Faculty of Civil Engineering and Geosciences, Delft

More information

CONTROL FLOODING AT LOW AREAS OF MARGINAL EXPRESSWAY TIETÊ RIVER IN THE CITY OF SAO PAULO, BRAZIL

CONTROL FLOODING AT LOW AREAS OF MARGINAL EXPRESSWAY TIETÊ RIVER IN THE CITY OF SAO PAULO, BRAZIL CONTROL FLOODING AT LOW AREAS OF MARGINAL EXPRESSWAY TIETÊ RIVER IN THE CITY OF SAO PAULO, BRAZIL A. P. Canholi 1, W. D. Vichete¹ and J. T. Ishihara 1 1. Hidrostudio Engenharia, Rua Cardoso de Almeida,

More information

3D Model of the City Using LiDAR and Visualization of Flood in Three-Dimension

3D Model of the City Using LiDAR and Visualization of Flood in Three-Dimension 3D Model of the City Using LiDAR and Visualization of Flood in Three-Dimension R.Queen Suraajini, Department of Civil Engineering, College of Engineering Guindy, Anna University, India, suraa12@gmail.com

More information

Challenges. Estimated Damages from 100-Year Flood

Challenges. Estimated Damages from 100-Year Flood Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of

More information

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps 4.14 Netherlands The Netherlands is flood prone for about 60% of its surface. 95 so-called dike-rings protect the polders from being flooded from the North Sea, rivers or lakes. The protection level has

More information

Analysis of pluvial flood damage based on data from insurance companies in the Netherlands

Analysis of pluvial flood damage based on data from insurance companies in the Netherlands Analysis of pluvial flood damage based on data from insurance companies in the Netherlands M.H. Spekkers 1, J.A.E. ten Veldhuis 1, M. Kok 1 and F.H.L.R. Clemens 1 1 Delft University of Technology, Department

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Annexes to Surface Water Management Plan Technical Guidance

Annexes to Surface Water Management Plan Technical Guidance Annexes to Surface Water Management Plan Technical Guidance March 2010 www.defra.gov.uk Publishing organisation Department for Environment, Food and Rural Affairs Flood Management Division, Ergon House,

More information

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami). Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall

More information

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING 1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications

More information

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM Guidance for Flood Risk Analysis and Mapping Changes Since Last FIRM May 2014 This guidance document supports effective and efficient implementation of flood risk analysis and mapping standards codified

More information

Renfrewshire Strategic Flood Risk Assessment

Renfrewshire Strategic Flood Risk Assessment Background Report Renfrewshire Strategic Flood Risk Assessment 16 Renfrewshire Local Development Plan Main Issues Report December 2011 Renfrewshire Local Development Plan Background Report X Renfrewshire

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment local development framework Strategic Flood Risk Assessment LOCAL DEVELOPMENT FRAMEWORK ROYAL BOROUGH OF KINGSTON UPON THAMES Level 1 and 2 April 2011 Contents Executive Summary 5 Part 1 - Aiding Planning

More information

How To Calculate Flood Damage Potential In European Landscape

How To Calculate Flood Damage Potential In European Landscape Background/Introduction RISK ANALYSIS MODULE 3, CASE STUDY 2 Flood Damage Potential at European Scale By Dr. Peter Burek There is good reason to be concerned about the growth of flood losses in Europe.

More information

PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE

PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE 1 The most common cause of flooding is when the river catchment area receives far greater amounts of water than normal,

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

qeb=^ppl`f^qflk=lc=_ofqfpe=fkprobop= ^ka= qeb=p`lqqfpe=dlsbokjbkq= ^=glfkq=pq^qbjbkq= lk= qeb=molsfpflk=lc=cilla=fkpro^k`b= = = ab`bj_bo=ommu

qeb=^ppl`f^qflk=lc=_ofqfpe=fkprobop= ^ka= qeb=p`lqqfpe=dlsbokjbkq= ^=glfkq=pq^qbjbkq= lk= qeb=molsfpflk=lc=cilla=fkpro^k`b= = = ab`bj_bo=ommu qeb=^ppl`f^qflk=lc=_ofqfpe=fkprobop= ^ka= qeb=p`lqqfpe=dlsbokjbkq= ^=glfkq=pq^qbjbkq= lk= qeb=molsfpflk=lc=cilla=fkpro^k`b= = = ab`bj_bo=ommu ^_fl=dlsbokjbkq=pq^qbjbkq= = lk=cillafkd=^ka=fkpro^k`b=clo=p`lqi^ka=

More information

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK... Department for Environment, Food and Rural Affairs Climate Ready Co-creation progress update and an invitation to respond July 2012 Contents Overview of ideas from co-creation activities towards a Climate

More information

Appendix B. Property Owner Questionnaire

Appendix B. Property Owner Questionnaire Appendix B Property Owner Questionnaire WEST WINDSOR TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT PROPERTY QUESTIONNAIRE DIVISION OF ENGINEERING As someone who owns and lives and/or works on a property

More information

Flooding Matters. Introduction

Flooding Matters. Introduction Flooding Matters 19/07/2013 Issue 1 Introduction Hello and welcome to the 1 st Essex County Council flood and water management newsletter, Flooding Matters. As a Lead Local Flood Authority we now have

More information

Irish National Hydrology Conference 2008

Irish National Hydrology Conference 2008 A SPATIAL UNDERSTANDING OF SIGNIFICANT FLOOD RISK IN NORTHERN IRELAND USING SOCIAL, ECONOMIC AND ENVIRONMENTAL FLOOD RISK METRICS BASED ON FLUVIAL, COASTAL, PLUVIAL AND HISTORICAL FLOODING Barry Hankin,

More information

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.

The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table. The Hydrologic Cycle Page 1 of 1 Name Directions: The hydrologic cycle consists of the processes that change and move water through the earth s system. Use the terms below to label the hydrologic cycle.

More information

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1. www.gnb.ca

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1. www.gnb.ca New Brunswick s Flood Risk Reduction Strategy i New Brunswick s Flood Risk Reduction Strategy Province of New Brunswick PO 6000, Fredericton NB E3B 5H1 2014 www.gnb.ca ISBN 978-1-4605-0533-5 (print edition)

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

A Future Flood Resilient Built Environment

A Future Flood Resilient Built Environment www.bre.co.uk White Paper A Future Flood Resilient Built Environment Dr Stephen Garvin, Director Centre for Resilience 01 Contents Introduction 02 The extent of the flood risk to the built environment

More information

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

Flood damage assessment and estimation of flood resilience indexes

Flood damage assessment and estimation of flood resilience indexes Flood damage assessment and estimation of flood resilience indexes Barcelona case study Marc Velasco CETaqua Workshop CORFU Barcelona Flood resilience in urban areas the CORFU project Cornellà de Llobregat,

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

Delivering surface water flood management through collaboration Drain London. Risk-based land use workshop 21 January 2015

Delivering surface water flood management through collaboration Drain London. Risk-based land use workshop 21 January 2015 Delivering surface water flood management through collaboration Drain London Risk-based land use workshop 21 January 2015 Presentation acknowledgements This presentation was developed by Matthew Graham

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

FLOOD INFORMATION SERVICE EXPLANATORY NOTES FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

More information

A new approach to rail asset management.

A new approach to rail asset management. A new approach to rail asset management. Geotechnical and structural monitoring via satellite for the rail industry. With mounting pressures on the UK s ageing infrastructure networks from ever increasing

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006 The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

LIDAR and Digital Elevation Data

LIDAR and Digital Elevation Data LIDAR and Digital Elevation Data Light Detection and Ranging (LIDAR) is being used by the North Carolina Floodplain Mapping Program to generate digital elevation data. These highly accurate topographic

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Guide To Bridge Planning Tools

Guide To Bridge Planning Tools Guide To Bridge Planning Tools The following bridge planning and hydrotechnical analysis tools (Excel spreadsheets, some with associated databases and VBA code), and GIS data-sets are available from the

More information

GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS

GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris

More information

Selection of Drainage Network Using Raster GIS A Case Study

Selection of Drainage Network Using Raster GIS A Case Study International Journal of Engineering Science Invention ISSN (Online): 2319 6734, ISSN (Print): 2319 6726 Volume 2 Issue 8 ǁ August. 2013 ǁ PP.35-40 Selection of Drainage Network Using Raster GIS A Case

More information

SURFACE WATER MANAGEMENT PLAN

SURFACE WATER MANAGEMENT PLAN SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF LEWISHAM Document Information Document Information Title: Surface Water Management Plan for London Borough of Lewisham Owner: Bo Quatresols

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING. Robert J. Muir *

GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING. Robert J. Muir * GIS APPLICATIONS IN URBAN DRAINAGE MASTER PLANNING Robert J. Muir * ABSTRACT: In recent years, GIS applications in water resources management have become widespread and diverse in the Province of Ontario,

More information

Pima Regional Remote Sensing Program

Pima Regional Remote Sensing Program Pima Regional Remote Sensing Program Activity Orthophoto GIS Mapping and Analysis Implementing Agency Pima Association of Governments (Tucson, Arizona area Metropolitan Planning Organization) Summary Through

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information