1 TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping
2 MATERIAL SUBMITTAL JOB NAME: TEXAS A&M SAN ANTONIO CENTRAL ACADEMIC BUILDING & PATRIOTS CASA CONTRACTOR: VICTORIA AIR CONDITIONING, LTD. SYSTEM: UNDER FLOOR PRE-INSULATED CHILLED AND HOT WATER PIPING MANUFACTURER: INSUL-PIPE SYSTEMS DATE: APRIL 8, 2013
3 SPECIFICATIONS (1) SYSTEM: SERVICE TEMP: CARRIER PIPE: OUTER JACKET: HOT WATER & CHILLED WATER +35 F TO +250 F SCH 40 STEEL WELDED FITTINGS & JOINTS PVC MINIMUM THICKNESS.060 INCHES All under floor chilled and hot water supply and return distribution piping shall be factory pre-insulated as manufactured by INSUL-PIPE SYSTEMS, INC. Austin, Texas. Carrier pipe shall be, domestic, black, steel A-53 Grade B, ERW schedule 40. Fusion welding shall join fittings and straight runs for all piping sizes. Insulation shall be foamed-in-place polyurethane with a density of not less than 2.5 lbs. per cubic foot to a thickness specified. Insulation shall be completely encased within a seamless PVC jacket of not less than.060 inches thick for jacket sizes up to 16 and within a seamless low pressure rated High Density Polyethylene (HDPE) jacket for sizes 18 and larger, and able to withstand H-20 highway loading. Insulation at each end of each length of pipe shall be protected with a heat shrink end seal bonded both to the carrier pipe and the outer jacket. Piping cuts made in the field must be provided with end-seals equal to factory type. Coupling joints on straight runs shall be field insulated by wrapping the coupling with a PVC wrap, pouring polyurethane insulation into the annular space, cleaning off the excess, and sealing with tape provided. Fittings shall be field insulated by wrapping a PVC fitting cover around the exposed fitting, pouring polyurethane insulation into the annular space cleaning off the excess, and sealing with tape provided. Vapor barrier jacketing material for fittings and joints shall be of the same material as the pipe jacketing. Installation shall be as per manufacturer s instructions. Backfilling shall be carefully done with a layer of clean washed sand or pea gravel, 6 thick, completely surrounding the buried pipes.
4 INSUL-PIPE SYSTEMS STEEL CORE * PVC CLAD * SERVICE TEMP: +35 F TO +250 F PROJECT: Texas A&M San Antonio Central CONTRACTOR: Victoria Air Conditioning Academic Building and Patriot s Casa PIPING SYSTEM: CARRIER PIPE: OUTER JACKET: Under floor, pre-insulated chilled and hot water supply and return piping system. DOMESTIC STEEL - ASTM A-53 Grade B ERW, SCH 40. Beveled ends for welded fittings and connections. Polyvinylchloride (PVC) white, low pressure rated, seamless, ASTM D-1784, Class B for jacket sizes up to 16 and within a HDPE jacket for sizes 18 and larger. Able to withstand H-20 highway loading. Thickness as shown below. INSULATION: Polyurethane, conforming to ASTM C-591, 2.5 PCF density per ASTM D1622, 90 to 95% closed cell content per ASTM D2856, poured in place, K =.17 per 75 degrees F per ASTM C 518, compressive strength of 30 psi minimum, flexural strength of 25 psi minimum per ASTM D790, water absorption of 2% of volume maximum per ASTM D2842, and water permeability of 3 perm inches maximum per ASTM E96. Thickness shown below. END SEALS: JOINT COVERS: FITTINGS: Factory applied, waterproof heat shrink covering the urethane insulation at each end of each joint of pipe and bonded both to the carrier pipe and the outer jacket. Couplings are field insulated by covering with a PVC wrap, pouring polyurethane foam insulation into the annular space, cleaning off the excess, and sealing with tape provided. Fittings shall be field insulated by wrapping a PVC fitting cover mold around the exposed fitting, pouring polyurethane foam insulation into the annular space, cleaning off the excess and sealing with tape provided. NOMINAL INSULATION JACKET JACKET INSULATION HEAT PIPE THICKNESS O.D. THICKNESS R TRANSFER SIZE INCHES INCHES INCHES VALUE BTU/LF/FDT ½ INSUL-PIPE SYSTEMS - AUSTIN, TEXAS SPEC #1
5 SPECIFICATIONS (2) SYSTEM: SERVICE TEMP: CARRIER PIPE: OUTER JACKET: CHILLED WATER, HOT WATER -300 F TO +250 F TYPE K COPPER - SOLDER JOINTS & FITTINGS PVC - MINIMUM THICKNESS.060 INCHES All under floor chilled water and/or hot water distribution piping shall be factory pre-insulated as manufactured by INSUL-PIPE SYSTEMS, INC., AUSTIN, TEXAS. Carrier pipe shall be type K, hard drawn copper of domestic manufacture. Fittings and couplings for all piping sizes shall be joined by 95/5 lead solder or brazing. Insulation shall be foamed in place polyurethane with a density of not less than 2.5 lbs. per cubic foot to a thickness of not less than 1.5 inches. Insulation shall be completely encased within a seamless PVC jacket of not less than.060 inches thick. Insulation at each end of each length of pipe shall be protected with a heat shrink end seal bonded both to the carrier pipe and the outer jacket. Piping cuts made in the field must be provided with end-seals equal to factory type. Coupling joints on straight runs shall be field insulated by wrapping a PVC wrap around the coupling then pouring polyurethane insulation into the annular space, cleaning off the excess, and sealing with tape provided. Fittings shall be field insulated using a urethane field foam pack by pouring urethane between the fitting and the PVC fitting cover supplied by the manufacturer. Vapor barrier jacketing material for fittings and joints shall be of the same material as the pipe jacketing. Installation shall be as per manufacturer s instructions. Backfilling shall be carefully done with a layer of clean washed sand or pea gravel, 6 thick, completely surrounding the buried pipes.
6 INSUL-PIPE SYSTEMS COPPER CORE * PVC CLAD * SERVICE TEMP -300 F to +250 F PROJECT: Texas A&M San Antonio Central CONTRACTOR: Victoria Air Conditioning Academic Building and Patriot s Casa PIPING SYSTEM: CARRIER PIPE: OUTER JACKET: INSULATION: END SEALS: JOINT COVERS: FITTINGS: Under floor pre-insulated chilled and hot water supply and return piping. COPPER, hard drawn, Type K as specified, 20-foot lengths. Polyvinylchloride (PVC), white, low pressure rated, seamless, ATM D-1784, Class B, Type 1. Thickness as shown below. Polyurethane, conforming to ASTM C-591, 2.5 PCF density per ASTM D1622, 90 to 95% closed cell content per ASTM D2856, poured in place, K =.17 per 75 degrees F per ASTM C518, compressive strength of 30 psi minimum, flexural strength of 25 psi minimum per ASTM D790, water absorption of 2% of volume maximum per ASTM D2842, and water permeability of 3 perm inches maximum per ASTM E96. Thickness shown below. Factory applied waterproof heat shrink covering the urethane insulation at each end of each joint of pipe, bonded both to the carrier pipe and the outer jacket. Couplings are field insulated by wrapping a PVC wrap around the coupling joint, then pouring polyurethane insulation into the annular space, cleaning off the excess, and sealing with tape provided. Fittings shall be field insulated by wrapping a PVC fitting cover mold around the exposed fitting, pouring polyurethane foam insulation into the annular space, cleaning off the excess and sealing with tape provided. NOMINAL INSULATION JACKET JACKET INSULATION HEAT PIPE THICKNESS O.D. THICKNESS R TRANSFER SIZE INCHES INCHES INCHES VALUE BTU/LF/F DT ¼ ½ ½ INSUL-PIPE SYSTEMS - AUSTIN, TX SPEC #2
7 Insul-Pipe Systems Installation instructions For Below Ground Installation of Field insulation kits For Pipe with Plain End Couplings Read these important instructions carefully Following Assembly and testing: 1. Seal exposed end of insulation with mastic provided by I-PS at all field cuts. 2. Insulation materials for coupling joints consist of a PVC wrap, A&B Component Pour Urethane, and sealant tape. 3. Insulation material for fittings consists of an A&B Component Pour Urethane, PVC fitting covers, and sealant tape. Fittings: Step one: Position and strap Roll PVC Fitting Extension over Jacket of adjacent pipe seal seams with self seal tape. Step two: Create 2 hole in and wrap molded PVC cover over the fitting and extensions and tape in place. Fitting cover should overlap a few inches onto extension and create a mold for the pour between adjacent pipes over the fitting. Step three: Measure urethane components according to attached chart in equal amounts in preparation for mixing in separate bucket. Stir with paint mixer stick or electric drill for volume of 2 quarts or more in clean mixing bucket. Wait until the foam reacts (starts to cream) and pour quickly into mold. Insure that foam has completely filled mold and spills out of hole. Second pour if necessary into any voids. Step four: After foam has hardened, trim off any excess and seal the fitting cover with self-sealing tape provided by I-P S. Inspect seams for possible release of foam, trim and re-tape. Couplings: Cover coupling with roll PVC provided, sealing seams with tape provided. Poke a hole in sleeve and pour urethane foam into the annular space. Wait for it to react, then clean off the excess and seal with tape provided. 5 PE AB FILL COUPLE AND FITTING AND EXT
8 ROLL COUPLING SLEEVE SELF SEAL TAPE WHITE PVC FITTING COVER ROLL COUPLING 9 WIDE SEALING TAPE A B URETHANE COMPONENTS WITH MEASURING AND MIX CUPS 30 MIL PVC SLEEVE WRAP SELF SEALING TAPE ASSEMBLY OF URETHANE POUR INSULATION KITS FOR FITTINGS AND COUPLINGS
9 Insul-Pipe Systems Insul-Pipe Systems Pipe meets or exceeds all applicable standards and specifications. Conformance is insured through a rigorous quality control program that provides a superior pipe product. Warranty Insul-Pipe Systems warrants its products against defects as to workmanship of product failure to the extent that should defects appear within one year from date of shipment from our factory, that are proven to be the fault of the manufacturer, we will replace the item. This warranty does not include any costs related to removal or reinstallation of these products nor does it include any costs for damages that might arise from defective materials or workmanship. There is no warranty expressed or implied other than that stated above. Disclaimer Technical data contained in this installation guide is furnished without charge or obligation and is given and accepted at the recipient s sole risk. Every effort has been made to verify the information contained within this installation guide. However, Insul-Pipe Systems makes no representation about and is not responsible or liable for use of information contained herein under circumstances or conditions of use different from those described herein, or for which this guide was not intended. In no event shall Insul-Pipe Systems be liable for incidental or consequential damages. Handling and storage Insul-Pipe Systems sections should be handled with care when being unloaded and placed on the jobsite. Damage to the carrier pipe or jacketing may occur if the material is dropped or handled roughly. Webbing belt lifting slings should be used on sections too heavy to be handled by hand. Handle with care Check shipment for damage when received. Make note of any damaged goods on the freight bill. Keep a signed copy of the freight bill for filing a claim through the Freight Company. Storage at the Job site If the pipe is not ready to be installed immediately when received on the job, then it may be stockpiled. Store on level ground and protect ends from debris, dirt, etc. Do no stack more than six layers high. Store in a convenient location away from possible damage from construction equipment and vehicles. Stringing the pipe Pipe when strung, should be placed as near the trench as possible and on the opposite side of the excavated earth. When pipe gaskets are received separate from the pipe, install them in the gasket race at the time of assembly. 1
10 INSUL-PIPE SYSTEMS Installation instructions for Carrier pipe field connections Joints in the field Full joints may be cut to desired length in the following manner: 1. Determine the exact length of carrier pipe desired. 2. Measure, mark and cut pipe all the way through at using the proper cut-off tool for the type of pipe being used. 3. Cut off 4 to 6 of the jacket and insulation to allow room for fitting installation (see amount on factory end). Do not cut into the carrier pipe. Jacket may be cut with a hacksaw or carpenter s saw. Insulation should be cut with a knife down to the carrier pipe. Remove cut off insulation and jacket, clean exposed carrier pipe and proceed with installation. 4. Seal exposed end of insulation with material provided by Insul-Pipe Systems. 2
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
More informationSECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
More informationSECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
More informationNAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
More informationSECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
More informationSUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationEcoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls
Pre- insulated pipe systems ecoflex Wall Penetration installation guide Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre-insulated Pipe Systems
More informationSECTION 33 11 00.13 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS
SECTION 33 11 00.13 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS PART 1: GENERAL 1.01 SECTION INCLUDES Furnishing and installing up to 16-inch high density polyethylene (HDPE) pipe and fittings for
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationSECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
More informationINDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
More information725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
More informationDocument Library TS Data Sheet 08609. 3M Windo-Weld Super Fast Urethane. Data Sheet. Public
Document Library TS Data Sheet 08609 Public Rev:3 Effective: 09/14/2007 Status: Active 3M Windo-Weld Super Fast Urethane Data Sheet 3M Part No.(s) 3M Part Descriptor(s) 08609 3M Windo-Weld Super Fast Urethane
More informationChapter 7 Plumbing Connections
Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions
More informationPipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems
Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,
More informationSpecifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More information07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationSpecification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
More informationSEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationModel Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts
More informationDIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION
SECTION 230713- ALUMAGUARD ENGINEER SPECIFICATION DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,
More informationCITY OF SELMA, TEXAS Inspection Checklist: Commercial
Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides
More informationSECTION 15190 HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section 15010.
SECTION 15190 HVAC INSULATION PART ONE - GENERAL PART 1 - GENERAL 1.01 DESCRIPTION A. All work specified in this Section is subject to the provisions of Section 15010. B. All insulation products shall
More informationResidential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
More informationSECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
More informationElectrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationPRE INSTALLATION MANUAL
REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)
More information3M Scotchcast Mine and Portable Cable Splice Kit 8096-4
3M Scotchcast Mine and Portable Cable Splice Kit 8096-4 Installation Instructions 1.0 Kit Contents: 2 Funnels 3 EPDM Rubber Cold Shrink Cold Shrink Insulator 1 Wrap-around Mold Assemblies 2 Rubber Mold
More informationSECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
More informationEngineering Specifications
PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationDIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
More informationDELTA Premium Moisture Management Systems for Foundations.
DELTA protects property. Saves energy. Creates comfort. DELTA Premium Moisture Management Systems for Foundations. DELTA Premium Moisture Management Systems provide the best protection for foundations.
More information4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
More informationINSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
More informationSuggested Specifications: Steel Pipe for Water Transmission
Suggested Specifications: Steel Pipe for Water Transmission. Suggested Specifications - Steel Pipe for Water Transmisssion Cement-mortar Lined and Tape Coated PART 1 - GENERAL 1.01 Description Scope of
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More informationAll work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.
DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which
More informationNative InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
More informationSECTION 02401 - SANITARY SEWER PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationDRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a
More informationThe Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe
The Most Advanced Name in Drainage Systems Sanitary Sewer Pipe SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling,
More informationNCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
More informationSECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
More informationDivision 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
More informationSun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationSECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos
More informationSecondary Containment Comparison ATI Ultra COAT vs HDPE
When choosing a secondary containment system it must be chosen based on its ability to withstand long term contact with the natural elements (weather), whatever the tanks hold (unrefined oil, fuels, acids,
More informationCCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
More informationComment Form on Proposed Gut Rehabilitation Alternatives
Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line
More informationSPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
More informationCONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
More informationB. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSECTION 15064 PVC PRESSURE PIPE AWWA C900
SECTION 15064 PVC PRESSURE PIPE (AWWA C900) PART 1 GENERAL 1.01 DESCRIPTION This section includes materials, installation, and testing of polyvinyl chloride (PVC) pressure pipe conforming to AWWA C900.
More informationSECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
More informationCONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More information32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
More informationRenovating Your Basement
building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:
More informationB. Types of mechanical insulation specified in this section include the following:
SECTION 23 0700 HVAC INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Extent of mechanical insulation required by this section is indicated on drawings and schedules, and by requirements of this section. B.
More information1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
More informationAPPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING
APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING Appendix C Moisture Guidelines Determining moisture content is an essential part of quality control within the flooring installation process. Flooring
More informationA. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
More informationSANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
More information08003-1 WATER SERVICE 2
08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4
More informationInstallation Guide. Recommendations for Installation of IPS & PIP Pressure Pipe
Installation Guide Recommendations for Installation of IPS & PIP Pressure Pipe INDEX Index......... 1 Diamond Plastic Pipe....... 2 PVC Installation Guide...... 2 Handling & Storage....... 2 Receiving
More informationSunMor SM-V30 Solar Water Heater Installation Manual
SunMor SM-V30 Solar Water Heater Installation Manual Rev. 1.02 Congratulations on the purchase of your new SunMor SM-V30 from Nature s Comfort LLC! You must read this entire instruction manual before beginning
More information09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1
C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationGrade Level Spill Containment Manholes
Grade Level Spill Containment Manholes Installation Instructions 705-5 Gallon 715-15 Gallon 725-25 Gallon Manual # Revision Date Changes from Previous Revision F-1307 7 Mar. 2012 Removed reference to pipe
More informationInstallation Instructions Hustler 6-BTV Trap Vertical
Installation Instructions Hustler 6-BTV Trap Vertical ASSEMBLY 1. Check the package contents against the parts list on page 2. 2. WARNING. Installation of this product near power lines is dangerous. For
More information60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING
60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed
More informationSECTION 15056 DUCTILE-IRON PIPE AND FITTINGS
SECTION 15056 PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. A written request to use Ductile
More informationRecommended Fuel Piping Specification For UPP Piping, UL-971
Recommended Fuel Piping Specification For UPP Piping, UL-971 1.0 General The primary delivery piping system shall be for suction or pressure applications and have semi-rigid coaxial type double wall construction,
More informationZero peel strength of acrylic pressure sensitive adhesive is at about 45 C (-50 F).
PRODUCT BULLETIN Aluminum Polyimide Acrylic (3M 966) PSA First Surface Aluminum Coated Polyimide Tape with Acrylic 3M 966 Adhesive TAPES Sheldahl Brand Materials first surface aluminized polyimide tape
More informationEXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
More informationWindow Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationSealant. 30" Model No. 35020. D: 17-7/8" TO 18-3/8" (454 to 466mm) W: 29-3/4" TO 30-1/4" (756 to 768mm) Under Countertop Installation
INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE London Kitchen Sinks 24" Sink model number 35030 30" Sink model number 35020 36" Sink model number 35040 Thank you for selecting Porcher. To ensure this product
More informationGUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced
More informationConstruction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
More informationA D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
More informationA. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein.
13310 FABRIC SHADE STRUCTURES FOR PLAYGROUND AREAS ************************************************************************************************************************ SPECIFIER: CSI Master Format
More informationSECTION 15109 PRESTRESSED CONCRETE CYLINDER PIPE
SECTION 15109 PRESTRESSED CONCRETE CYLINDER PIPE PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, materials, tools, equipment, services, and incidentals necessary
More informationGuide Specifications for Maple Flooring Systems
Guide Specifications for Maple Flooring Systems MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual
More information