1 Section 2 - Project Description

2 TABLE OF CONTENTS 2. PROJECT DESCRIPTION PROJECT OVERVIEW Overview - Bitumen Extraction and Processing Components Well Pairs Well Pads Central Processing Facility (CPF) Overview - Utility and Transportation Components Overview - Site Selection Project Facilities GEOLOGY AND RESOURCES Geological Data and Control Exploration Drill Hole Program Information Seismic Survey Program Information Results of Exploration Program Information Regional Geology Regional Stratigraphy Beaverhill Lake Group McMurray Formation Clearwater Formation Grand Rapids Formation Joli Fou Formation Quaternary Local Geology Site Stratigraphy Log and Core Characteristics Seismic Characterization of the McMurray Formation within the Project Area Bitumen Reservoir Characterization Bitumen Reservoir Modeling Bitumen Reservoir Quality Bitumen Reservoir Resource Gas and Water Zones Hydrogeology RESERVOIR RECOVERY PROCESS Recovery Process Selection Recovery Process Description Bitumen Production Rate and Recovery Estimates Caprock Integrity March 2010 Section 2-i

3 Caprock Integrity Testing Caprock Integrity Modeling Reservoir Process Monitoring Potential Follow-up Processes for Improved Recovery WELL PADS AND WELLS Well Pads Drilling and Completions SAGD Producers and Injectors Drilling SAGD Producers and Injectors Completions Water Source Wells (WSW) Observation Wells Drilling Fluid and Solid Waste Disposal Well Performance Monitoring Casing Failure Monitoring Program CENTRAL PROCESSING FACILITY (CPF) Central Processing Facility Layout Bitumen Production System Well Pads Test Separator Group Separator Produced Fluids Gathering Lines Pad Auxiliaries Inlet Separation and Cooling Cooling Diluent Addition Desand Vessel Free Water Knock Out and Treater Emulsion Chemical Treatment Produced Water Deoiling System Slop Handling System Produced Water Treatment System and Boiler Feedwater Evaporator Waste Brine Removal Steam Generation System Fuel Gas and Produced Gas Recovery System Gas Flaring System Flaring System Cooling and Heating Systems Above Ground Interconnecting Pipeline System March 2010 Section 2-ii

4 Production Gathering System Vapour Gathering System Steam Distribution System Gas Distribution Central Processing Facility - Utilities Electrical Power Emergency Power Sanitary and Potable Water System Utility Steam Utility Water Sanitary Sewer System Drainage Sump Instrument Air System Fire and Gas Detection Chemical Use Stormwater System MATERIAL AND ENERGY BALANCE Material Balance Water Hydrocarbon Liquids Measurement, Accounting, and Reporting Plan (MARP) Energy Balance Fuel Gas Produced Gas Energy WATER MANAGEMENT Volume of Make Up Water Source of Make Up Water Sanitary and Potable Water Supply Requirements and Source Site Management Central Processing Facility Well Pads and Roads Waste Water Disposal Processed Water Disposal Sewage Treatment OFFSITE CONNECTIONS Transportation Construction March 2010 Section 2-iii

5 Operations Road Construction Requirements Electrical Supply Fuel Gas Supply Fresh Water Supply and Storage Diluent and Oil Sales Pipelines HEALTH, SAFETY, AND ENVIRONMENTAL MANAGEMENT Policies The Environment Health and Safety Integrated Environmental Health and Safety Management Plan Loss Control and Environmental Compliance Program Emergency Response Plan Waste Management Plan Substance Release Monitoring Fire Control Plan List of Tables Table Open Hole Log to Core Comparison McMurray C Net Pay... 8 Table Criteria used to Estimate Bitumen Resources... 9 Table Average Values of Key RDA Reservoir Parameters Table Bitumen Resource Estimate for the Algar Lake RDA Table Pad Bitumen Resources & Recoveries - 5 Year Well Life Estimated Table Total Pad Bitumen Resources & Recoveries - 5 Year Well Life Estimated Table Typical Key Elevations Table Caprock Permeability Tests Table External Emission Sources - CPF Table Storage Tanks Table Typical Water Source and Users Listing Table Water Balance Streams and Measurement Table Bitumen Balance Streams and Measurement Table Gas Balance Streams and Measurement Table Energy Produced to Energy Input Ratio Table Waste Management Plan March 2010 Section 2-iv

6 List of Figures Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Project Index Map McMurray Sand Isopach Type Log AA/ W4M Type Log AA/ W4M McMurray Interval Detail Type Log AA/ W4M Sand Facies Examples from Core Photos Cross Section A-A Cross Section B-B Cross Section C-C Top of the 1st Paleo/Devonian/Base of McMurray Subsea Structure Top of McMurray Interval to 1 st Paleo/Devonian Isopach Top of the McMurray Subsea Structure Wabiskaw Shale to McMurray Isopach Clearwater to McMurray Isopach Wabiskaw Shale Marker Structure Clearwater Subsea Structure Grand Rapids to Clearwater Isopach Grand Rapids (top of Mannville) Structure Lower Grand Rapids Marker Structure Example 3D Seismic Section 3D Seismic McMurray C to 1st Paleo McMurray C Channel Sands Net Sand Base Structure McMurray C Channel Sands Net Sand Subsea Top Structure McMurray C Channel Sands - Bottom Water/Gas Zone Isopach McMurray B Channel Sands - Bottom Water/Gas Zone Isopach Well Pads and Well Bore Trajectories Circulation Phase SAGD Process Well Pads and Drainage Drainage Areas and 6% Isopach Well Pads A and B Well Pair Locations Cross Section A-A' Well Pads A and B Well Pair Locations Cross Section B-B' Typical 10 Pair Slant Pad Layout Typical Well Completions Circulation Phase/Gas Lift Phase SAGD Producer Wellhead SAGD Injector Wellhead Water Source Well Completion Observation Well (Temperature) Observation Well (Temperature & Pressure) Central Processing Facility Plot Plan Central Processing Facility Flow Diagram & Material Balance Energy Balance March 2010 Section 2-v

7 2. PROJECT DESCRIPTION 2.1 PROJECT OVERVIEW Grizzly Oil Sands (Grizzly) proposes to build an 1800 m 3 /d (11,300 bopd) SAGD Project approximately 45 km southwest of Fort McMurray (Figure 1.1.1). The Grizzly Algar Lake SAGD lease area consists of three oil sands leases OSL # , OSL # and OSL # The Algar Lake SAGD Project is located on OSL #49 with the first stage of development occurring in Sections 10, 11, 14, W4M (Figure 1.3.1). Grizzly intends to construct the central processing facilities (CPF) in two phases each having a capacity of 900 m 3 /d, as shown in Figure The two CPF and four pads are identified as Stage 1 of the Algar Lake SAGD Project. With further delineation work, additional pads will be identified for future stages of production Overview - Bitumen Extraction and Processing Components The Project is designed to produce 1800 m 3 /d of bitumen (11,300 bopd) with an expected project life of approximately 20 to 30 years. Stage 1 of the Project is expected to supply bitumen through Phase 1 and 2 of the CPF construction. Additional pads will need to be identified and approved within 10 years of start-up. The estimated total bitumen to be recovered for Stage 1 ranges from 4 to 5 million m 3 (25to31 million barrels). Grizzly is only seeking approval for the Stage 1 well pads and wells in this application. The first stage of the Project consists of three major components: a central processing facility (CPF) consisting of two 900 m 3 /d (5,650 bopd) modules; well pads (4) and well pairs (40); access roads, powerlines and pipelines connecting well pads to the CPF; and associated facilities. The CPF component is where the extracted bitumen is processed to meet sales oil specifications. Produced water and make-up water is treated and recycled as boiler feedwater (BFW) for steam generation. Steam from the CPF is transported by pipeline to the well pads and distributed to the various wells. Produced water and bitumen from the wells is measured at the facilities on the well pads and aggregated into a single pipeline for transportation to the CPF. Sales oil (dilbit) is trucked to local markets for upgrading to synthetic crude oil or transportation into export markets. Stage 1 of the bitumen extraction will consist of four well pads with 40 well pairs including steam injectors and bitumen producers, downhole pumps, access roads, power lines, and pipelines. Several associated facilities are required to support the SAGD Project including an access road, water pipeline, water source wells and gas pipeline. The access road into the CPF will be constructed from an existing all-weather road in Section W4 north parallel to an March 2010 Section 2-1

8 existing powerline and pipeline corridor then west to the Algar plant site on the west side of Little Horse Creek (Figure 1.3.1). Where possible the other associated facilities will be constructed adjacent to the access road Well Pairs Grizzly will be using the SAGD recovery process for the Project. Injectors will be drilled along a horizontal track that is 5 m above the producers. The horizontal sections of a well pair will be spaced 60 to 70 m laterally from the horizontal sections of the next pair. The horizontal length of the wells will average 800 m. The well pairs will be started up using a 90 day circulation phase on both the injectors and the producers. This involves injecting steam to the toe through a toe injection string, with the condensed hot water returning up a heel string. After sufficient bitumen mobility has been achieved between the injector and the producer, the well pair will be converted to SAGD operation using gas lift as the lift mechanism. Additional details on the recovery process can be found in Section Well Pads Stage 1 of the Project will require four well pads each with ten well pairs. Wellheads will be spaced 10 to 15 m apart on the surface of the well pads. Detailed well pad information is provided in Section Central Processing Facility (CPF) Grizzly plans to use proven technologies for bitumen/water separation, produced water treatment/reuse and steam generation. In the reservoir, bitumen is heated by injection steam (which forms a steam chamber) to a temperature where its viscosity is reduced allowing it to flow to the producing well. Lift gas is injected into the well and provides the means for bringing the bitumen, produced gas and produced water to the surface facility at the pad. The surface pad facility is described in detail in Section 2.4. At the pad, the bitumen and produced water are separated from the produced gas (gas flashed off from the bitumen), lift gas and steam in the group separator. The produced gas/steam mixture and bitumen/produced water mixture are pipelined to the CPF in separate pipelines. A description of the CPF facilities is provided in Section 2.5. At the CPF, produced gas from the group separator is used as fuel for the boiler. Production (bitumen/produced water mixture) from the group separator is cooled and mixed with diluent. Diluent reduces the viscosity of the bitumen prior to entering the inlet cooling and separation system. This system consists of inlet coolers, a desand vessel, a free water knock (FWKO) and a treater. After the treater, the product stream, known as dilbit (diluted bitumen) or sales oil, is stored in the dilbit storage tanks for shipment by truck. At the CPF, produced water (PW) separated from the bitumen is treated and reused as boiler feedwater (BFW) for the steam boiler. Produced water and any required makeup water is cooled and sent to the induced gas floatation (IGF) and filter units for oil removal. After oil removal, the PW is flows to an evaporator where BFW quality water is produced by evaporation of produced water with subsequent concentration of impurities in the evaporator blowdown stream. March 2010 Section 2-2

9 There will be some waste materials generated from the CPF. These wastes consist of slop oil (rag layer), sand/reservoir solids and evaporator blowdown water. Slop oil consists of tight emulsions that cannot be recycled on site cost effectively. Rag layers form in the desand vessel, FWKO and treater. Sand and reservoir solids that accumulate in the desand vessel will be trucked out to approved waste disposal facilities when the vessel is taken offline for cleaning. Waste water from the water treatment plant will come in the form of evaporator blowdown. These wastes will be hauled offsite for third party disposal Overview - Utility and Transportation Components Grizzly is currently evaluating a number of suppliers for natural gas and diluent for the plant site. As well, discussions are in progress with a number of potential purchasers of the sales oil. Natural gas will be transported to site by pipeline. Electricity will be generated onsite using a gas turbine with cogeneration. Export of power is not being considered at this time. The diluent and sales oil will be hauled by truck. The proposed access road to the plant site and from the CPF to the well pads, is shown on Figure Overview - Site Selection Project Facilities For locating the Project facilities, Grizzly engaged in a process to identify the various site selection options where economic, environmental and social sensitivities or constraints would determine the most suitable locale. This process has been referred to as constraints mapping and is further explained in Section For locating the facilities, numerous site selection criteria were considered such as: the CPF be centrally located to the bitumen reservoir; the CPF be located in close proximity to existing utilities; the CPF be located on high ground for easier construction; the well pads be located to minimize operating distance between the pad site and the CPF, yet still optimize resource recovery; and the location of project facilities and infrastructure be optimized by incorporating key design and environmental features which encourage maximum resource utilization and minimize environmental impacts. 2.2 GEOLOGY AND RESOURCES This section evaluates the geology and resources of the Algar Lake Project Area with both regional mapping and more detailed data within the initial SAGD Resource Development Area (RDA) Geological Data and Control Exploration activities conducted to date including exploratory wells and 3D seismic are shown on Figure The Algar Lake Project Area covers the 100% owned Crown Oil Sand Lease # (OSL #049). Grizzly has drilled a total of 58 core holes within the Project Area March 2010 Section 2-3

10 and there were three pre-existing oil sand evaluation wells. Grizzly acquired a high-resolution 3- D survey covering 2050 ha within the lease OSL #49 area in Grizzly also owns adjoining oil sand leases where they have drilled an additional six core holes in addition to eight preexisting wells (Figure 2.2.1). The JACOS Hangingstone SAGD project is located 10 km to the southeast. Data from the JACOS Hangingstone project has been invaluable in assessing the potential of the Algar Lake project. The proposed Resource Development Area (RDA) currently has 38 oil sand evaluation wells. It covers a large portion of a southwest to northeast oriented McMurray C channel trend that cuts through OSL #049 as shown by the McMurray net pay (>6% bulk mass bitumen) isopach in Figure The McMurray C sand comprises 100% of the expected recoverable resource in the Project Area Exploration Drill Hole Program Information Grizzly has drilled the following oil sands evaluation wells in the Project Area and RDA: 26 oil sands exploration holes in drilling season in the Project Area; 22 in the RDA 24 oil sands exploration holes in drilling season in the Project Area; 9 in the RDA 8 oil sands exploration holes in drilling season in the Project Area; all 6 in the RDA 3 pre-existing wells in the Project Area: 1 pre-existing well in the RDA. Open-hole electric logs were run to total depth (Array Induction, Neutron-Density-gamma Ray, and Sonic) and continuous core was taken over the McMurray in all Grizzly wells. All Grizzly cored wells were analyzed for Dean Stark Analysis of bitumen/water saturation and porosity. Permeability/overburden testing was performed on 15 wells in the Project Area, 13 of which are in the RDA. The core analysis lab performed a core to log correlation and a facies description for each well. Bitumen viscosity and density were obtained from fluids extracted from the AA/ W4 well. For purposes of net pay mapping, parameters using the weightpercent bitumen from core analysis and open log values were used. Effective porosities and bitumen saturations used in the mapping were derived from shale-volume corrected densityneutron logs and resistivity, calibrated to the core information. Thus, the log, core and seismic data provide sufficient information for characterizing bitumen distribution and resources Seismic Survey Program Information In 2008, Grizzly conducted a 3D seismic program covering 2050 ha (5066 acres) within OSL #049, covering 95% of the RDA (Figure 2.2.1). The seismic was shot with a 60 m by 60 m shot and receiver grid, yielding 20 m by 20 m subsurface bins. The seismic data helps distinguish interfaces within the McMurray formation and strongly images the contact with the underlying Paleozoic carbonates. Interpretation of these seismic reflections can have a high degree of confidence in the mapping horizon structure and thickness, but the seismic records are not an ideal tool for mapping reservoir quality. March 2010 Section 2-4

11 Results of Exploration Program Information The exploration conducted to date (Section ) has led to the characterization of a SAGD bitumen resource within Project Area. An area with 15 to 20 m of clean bitumen pay was fully delineated in the areas covered by the first four pads. This pay has been mapped to the west and south of the initial four pads, however, some additional drilling will be done to completely delineate those bitumen resources. Additional areas of thick pay in the northern portion of the Project Area will be followed up with additional exploratory drilling Regional Geology Grizzly Oil Sands evaluated the regional geology for the Algar Lake project centered in and adjoining Township Range 12W Regional Stratigraphy Figures and are type-logs from data in the 1AA/ W4M well which is centrally located in the RDA. Figure is a type log show the complete wellbore electric log with formation tops used in regional geologic study. Figure is a more detailed type log of the well that shows additional core data along with facies descriptions used in the McMurray sands. Figures are photo examples of McMurray sand facies types found in the Project Area. The position of the facies types are indicated by green bars on the core photo column of the detailed type log (Figure 2.2.4). Figures 2.2.6, 2.2.7, and are cross sections constructed to illustrate the general stratigraphy in both the Project Area and RDA. The Mannville Group in north eastern Alberta is composed predominantly of unconsolidated sediments belonging to three formations. From oldest to youngest, these are the McMurray, the Clearwater, and the Grand Rapids. The bitumen resource is within the McMurray C Formation, the lowest unit in the Lower Cretaceous Mannville Group that is preserved in the Algar Lake Project Area. The McMurray Formation unconformably overlies the Devonian Beaver Hill Lake Group. It was deposited subsequent to a prolonged period of subaerial exposure and erosion that created incised valleys controlling the distribution of McMurray reservoir sands. The lowermost sands are typically fluvial in origin, but estuarine or shoreface environments predominate higher in the section. In both fluvial and estuarine environments, multiple channel incision events resulted in thick, amalgamated channel sand deposits. As shown on Figures to 2.2.8, there is no known Tertiary Pre-Upper Cretaceous (La Biche/Joli Fou) erosion more than 20 to 35 meters below the surface. The consistently developed Clearwater formations show competent caprock development throughout the Project Area and the overlying Grand Rapids formation exhibits no missing section due to later erosional events Beaverhill Lake Group Wells in the area penetrate the upper part of the Devonian Beaverhill Lake Group, which is comprised of the argillaceous lime mudstones and of the Waterways Formation. These limestones do not contain bitumen resources within the area and are an effective barrier to flow. Figure illustrates the regional structure of the top of the Beaverhill Lake Group and is also referred to as the 1st Paleo (Paleozoic) top. March 2010 Section 2-5

12 McMurray Formation The thickness of the McMurray formation ranges from 22 to 40 m (Figure ) within the Project Area. It is composed of unconsolidated sands and shales/muds. Its thickness is largely controlled by the eroded topography of the underlying 1st Paleo top (Figure 2.2.9). The lowermost sediments of the McMurray Formation are deposited in incised valleys. The formation indicates a gradual transition from sands deposited in high-energy fluvial environments to lower energy estuarine and shallow marine sands and shales at the top. The ERCB has standardized the nomenclature of several units in the McMurray Formation (EUB, 2003). From bottom to top, these are McMurray C Channel, McMurray B2, McMurray B1, McMurray A2, McMurray A1 and the Wabiskaw C Sequences. The most common correlation in the Project Area from the study indicates the presence of the McMurray C, McMurray B, and Wabiskaw C zones. For the mapping in this application the Wabiskaw C and McMurray B zones are combined with the top referred to as McMurray and the base the same as the McMurray C top. The McMurray interval is shown in higher detail on the type log from the 1AA/ W4 well (Figure 2.2.4). The McMurray C channel is generally 10 to 25 m thick within the Project Area. The lower part of the channel is dominated by thick, well-sorted very fine to fine grained sands, often high angle cross bedding, with only minor laminated mudstone and shale clast breccia intervals. This typically grades upward into middle and upper point bar/tidal deposits that vary from sand dominated channel to sand dominated shale intervals with low angle cross bedding. The amount shale content and degree of bioturbation often increases upward. The sands within the C channel are bitumen saturated within the RDA. Above the McMurray C channel is an approximately 5 to 9 m thick coarsening upward succession referred to as the McMurray B Sand Sequence. The McMurray B grades from heavily bioturbated muds at the base to moderately bioturbated, silty sands upward. The upper 2 to 3 m of this succession is of reservoir quality in this area, but the underlying low energy, often bioturbated, muddy sands present a significant barrier to steam chamber development. As a result, no net pay has been assigned to this unit, although there is bitumen present. Overlying the B Sand sequence is a regionally extensive 2 m thick blanket of glauconitic muddy sand that caps the McMurray, and may represent an amalgamation of the B1, A2 and A1 McMurray and possible basal Wabiskaw C sequences. The regional structure of the McMurray shows a gentle southward dip (Figure ), with a slight localized high in the RDA. This is likely related to differential compaction over the preserved McMurray C sand deposits, with the sandy channel deposits compacting less than the mud-dominated sediments on either side Clearwater Formation The Wabiskaw Shale member is the lowermost part of the Clearwater Formation. It comprises consistently developed 8 to 10 m thick (Figure ) coarsening-upward marine succession of shales to sandy silts with a thin (<2 m thick) glauconitic silty sand at top (Figure 2.2.4). The remainder of the Clearwater consists of approximately 30 m of mud overlain by 25 m of muddy siltsones or sands with usually several thin low porosity limestone beds. The consistent nature of March 2010 Section 2-6

13 deposition in Clearwater shales and silts is shown on the cross sections (Figures to 2.2.8). No Clearwater sand aquifers have been found in the Algar Lake Project Area. The Clearwater Formation regionally thickens slightly to the south, (Figure ), and both the Wabiskaw structure top (Figure ) and Clearwater structure top (Figure ) closely mimics that of the McMurray (Figure ). The Clearwater section has no apparent faulting or permeable zones making for excellent, competent caprock for SAGD projects Grand Rapids Formation The Grand Rapids Formation is composed of two members, Lower and Upper. The Lower Grand Rapids member is a 30 to 45 m thick and often has a 2 to 12 m porous sand interval near the top that is water wet in the Project Area (Figure 2.2.3). The Upper Grand Rapids is 50 to 65 m thick and consists of stacked coarsening upward sand cycles separated by impermeable thin marine shales, giving the Grand Rapids a total thickness of 90 to 105 m, thinning southward (Figure ). The Grand Rapids Formation has a gentle southward dip; the N-S high seen in the lower formations is still slightly expressed in the top of the Grand Rapids (top of the Mannville) and Lower Grand Rapids structure maps (Figure and Figure ) Joli Fou Formation The Joli Fou Formation is tight Cretaceous marine shale overlying the Grand Rapids Formation. Its upper contact is usually an erosional truncation by the Quaternary usually occurring within 20 m below the surface. There are consistently developed marker beds that are sometimes referred to as the Viking at about 15 m and 35 m above the Grand Rapids but their exact age and correlation is uncertain Quaternary Quaternary glacial deposits in the area consist of gravel, sand and mud less than 20 to 30 m in thickness and lay uncomformably over the Joli Fou/Viking. No significant Quaternary channels appear to be present in the area Local Geology Site Stratigraphy Figure shows the McMurray in the 1AA/ W4/00 oil sand evaluation well. It is a typical example of the McMurray sand stratigraphy within the Algar Lake RDA. Effective porosities and oil saturations calculated from logs show good correlation with the core analyses results. Figures 2.2.6, 2.2.7, and Figure show the McMurray sand correlation through much of the RDA. A well summary report for wells within the RDA is included as Appendix 4 and includes the depth, subsea elevation and thickness of the McMurray sand pay Log and Core Characteristics The RDA has 38 total wells (Grizzly drilled 37) of which Grizzly ran electric logs and cored the entire McMurray sand section. There is good agreement between electric log and core data throughout the RDA. The type log in Figure shows close agreement to average E-log porosity and oil saturations and the corresponding core parameters. Table shows a comparison of log and core data for all wells within the RDA. March 2010 Section 2-7

14 Table Open Hole Log to Core Comparison McMurray C Net Pay Datum (KB) Net Pay Depth Net Average Porosity Average Oil Saturation Location Elevation Top (m) Base (m) Pay (m) E-Log % Core % E-Log % Core % 1AA/ W4/ % 35.3% 83.2% 81.4% 1AA/ W4/ % 33.1% 81.7% 84.9% 1AA/ W4/ % 34.9% 78.9% 73.9% 1AA/ W4/ % 33.6% 80.6% 80.3% 1AA/ W4/ % 35.3% 83.2% 81.4% 1AA/ W4/ % 36.0% 64.6% 65.7% 1AA/ W4/ % 33.6% 70.9% 71.0% 1AA/ W4/ % 33.5% 75.3% 70.8% 1AA/ W4/ % 27.9% 42.7% 39.0% 1AA/ W4/ % 29.7% 60.0% 52.5% 1AA/ W4/ % 47.1% 1AA/ W4/ % 34.3% 79.4% 74.8% 1AA/ W4/ % 34.3% 73.9% 74.6% 1AA/ W4/ % 34.2% 76.0% 71.2% 1AA/ W4/ % 33.1% 57.7% 75.3% 1AA/ W4/ % 29.1% 54.5% 52.7% 1AA/ W4/ % 33.5% 77.9% 74.0% 1AA/ W4/ % 35.8% 84.3% 78.7% 1AA/ W4/ % 33.4% 76.2% 65.1% 1AA/ W4/ % 33.2% 67.6% 68.3% 1AA/ W4/ % 36.7% 74.3% 76.7% 1AA/ W4/ % 35.4% 74.8% 79.0% 1AA/ W4/ % 34.4% 79.9% 71.5% 1AA/ W4/ % 32.4% 77.4% 79.3% 1AA/ W4/ % 33.5% 75.7% 73.1% 1AA/ W4/ % 31.7% 75.4% 75.0% 1AA/ W4/ % 34.5% 70.0% 82.3% 1AA/ W4/ % 33.4% 71.5% 68.8% 1AA/ W4/ % 30.8% 65.3% 65.2% 1AA/ W4/ % 31.8% 67.7% 61.0% 1AA/ W4/ % 29.3% 55.9% 54.1% 1AA/ W4/ % 33.5% 74.4% 72.0% 1AA/ W4/ % 34.1% 74.8% 68.8% 1AA/ W/ % 31.0% 67.8% 66.6% 1AA/ W4/ % 31.9% 67.8% 60.5% 1AA/ W4/ % 30.5% 69.2% 64.1% 1AA/ W4/ % 31.7% 69.8% 69.0% 1AB/ W4/ % 30.6% 70.6% 66.4% March 2010 Section 2-8

15 Seismic Characterization of the McMurray Formation within the Project Area In 2008, Grizzly acquired a high quality 3D seismic program that covers all of the initial stages of development within the RDA. Employing closely spaced source and receiver lines Grizzly obtained excellent data sufficient to image the formations above and below the McMurray. Integrating the current well control with the seismic data has allowed for the imaging of the underlying 1st Paleo top erosional surface which forms the base of the McMurray SAGD pay and construction of maps which indicate the overall thickness of the McMurray sand. Figures and show some examples of the seismic data quality, formation picks tied to seismic horizon data, and a resulting map example showing an isotime of the interval that includes the McMurray C sand pay. The quality of the data that extends across the riparian areas, therefore not accessible to drilling core holes or seismic acquisition, is generally good but does create some areas with poor near surface anomalies that can be difficult to depth correct. Summary of 3D seismic survey acquisition parameters: 60 m source and 60 m receiver line intervals with 20 m group intervals; resulting bin size of 20 m by 20 m; single hole dynamite source using 0.25 kg charges at 4.5 m depth; 1 ms sample rate with ARAM 24 bit recording equipment; and survey processed by Calgary based Edge Technologies in April/May Bitumen Reservoir Characterization The oil sands pay zone was identified and characterized through integration of open-hole logs, cores, and seismic data into a resource model Bitumen Reservoir Modeling Table shows the criteria for the bitumen resource estimates. Based on the net pay maps and average reservoir properties within the pay zone from core analyses, resource values were estimated using a minimum criterion of 6 weight-percent bitumen for pay, and a minimum thickness of 10 m for net pay. Table Criteria used to Estimate Bitumen Resources Parameter Value Bitumen Saturation (core) > 6% Bitumen Saturation (log) RT > 20 Ohms Porosity (Sandstone matrix log density) > 27% Gamma Ray (log) <75 API Minimum Net pay >10m & >15m Bitumen Reservoir Quality Within the RDA, the reservoir s oil sands pay zone thickness ranges between 0 and 22.8 m (Figure 2.2.2). Table lists the average values of these reservoir properties within the area, based primarily on the core analysis and well data. March 2010 Section 2-9

16 Table Average Values of Key RDA Reservoir Parameters Parameter Value Pay Zone Thickness (m) 18 Lateral Well Spacing (m) 66 Horizontal Well Length (m) 800 Porosity (%) 33 Oil Saturation (%) 75 Initial Reservoir Pressure (kpa) 2350 Initial Reservoir Temperature (ºC) 15 Bitumen Viscosity at T RES (cp) > 1,000,000 Horizontal Permeability (D) 1-5 Vertical Permeability (D) Bitumen Reservoir Resource Bitumen resources were calculated for the RDA of the project using the parameters described in Tables and along with the McMurray Net Sand Isopach (Figure 2.2.2). The results are shown in Table In addition, Figures and show the structural position of the top and base of the McMurray C sand net pay. Table Bitumen Resource Estimate for the Algar Lake RDA McMurray C Sand Bitumen Resource Estimates Net Pay Cutoff >10m >15m Total Area Hectares Original Bitumen In Place OBIP MM m Original Bitumen In Place OBIP MM bbls Recoverable Bitumen In Place OBIP MM m Recoverable Bitumen In Place OBIP MM bbls Grizzly estimated the bitumen resource for the entire RDA areas of >10m and >15m thicknesses. Initial SAGD stages in the RDA will be in the >15m area. Based on computer simulations, analytical work and results from nearby SAGD projects, 40 to 60% of the original bitumen in place (OBIP) should be recoverable. Estimates provided in Table are based on an estimated 50% recovery of the total OBIP. Additional information related to bitumen recovery is provided in Section Bitumen Production and Recovery Estimates Gas and Water Zones There has been no bottom water found within the RDA in the McMurray C Channel (Figure ). Thin zones of McMurray C sand bottom water were only seen in the lower 3.5 m of breccia beneath a mudstone bed in the 1AA/ W4/00 and in 3.75m in the 1AA/ W4. In both cases the thin bottom water zones appear to be localized and not present in within any current planned stages of the RDA. Some McMurray C sand bottom water is present on some wells to the north of RDA, but is not connected to exploitable sands within the RDA. No gas was identified within wells the Project Area in the McMurray C sand zones. Traces of natural gas may be present in the McMurray B zone to the east of the SAGD project area in Section W4M but none in the McMurray C zone (Figure ). Wet to lean March 2010 Section 2-10

17 appearing sands were commonly encountered in the lower part of the McMurray B Sand Sequence (Figure ), but these lean zones were typically no more than 3 to 4 m thick and overlain by bitumen-saturated sands of the upper part of the B sequence. It is unlikely the steam chamber will develop through the uppermost McMurray C into the overlying McMurray B muddy bioturbated sands and mudstones. Core permeability data taken from this zone shows less than 165 millidarceys in this zone. Grizzly does not currently assign any recoverable resources to the McMurray B sequence Hydrogeology Source water for the Project will come from water wells drilled into the Lower Grand Rapids Formation. The hydrogeology of OSL #49 and the Project Area are described in detail in the Hydrogeology Report (Consultant s Report #4). A summary of this report is provided in Section RESERVOIR RECOVERY PROCESS Recovery Process Selection Steam Assisted Gravity Drainage was chosen as the preferred reservoir recovery process as it has been demonstrated to be an efficient process for reserves recovery in analogous reservoirs. Oil pay at the Algar Lake SAGD Project is characterized by a clean base sand overlain by a layer of interbedded sand and mud. While it is uncertain if substantial reserves recovery will occur from the overlying material, the application of SAGD can be expected to recover in the order of 50% of the OBIP contained in the cleaner interval. The McMurray Formation on the Algar Lake SAGD Project has an overburden thickness of about 250 m. At this depth, surface mining is not technically or economically viable. The bitumen viscosity is in excess of 1,000,000 cp at the initial reservoir temperature of approximately 15 o C, and is essentially immobile. Due to this high initial bitumen viscosity, primary recovery processes will not be applicable. Solvent assisted thermal processes may have potential. These processes involve the injection of a hydrocarbon solvent, either with the steam or heated by the steam, to reduce the bitumen s viscosity, and thus permit gravity flow into horizontal wellbores. This technology could be applicable to the Algar Lake SAGD Project in the future, once the process is sufficiently proven in the field. Grizzly will continue to monitor the development of this technology Recovery Process Description Grizzly plans to utilize the Steam Assisted Gravity Drainage (SAGD) process for the Algar Lake SAGD Project. Grizzly will drill and complete 40 horizontal well pairs from four surface pads (Stage 1), as shown in Figure Each well pair consists of a producer and an injector. The producer will be drilled first, with a flat trajectory at a vertical height of about 1m above the base of the McMurray Formation (see Section 2.4 for additional details regarding SAGD wells drilling and completions). The injector March 2010 Section 2-11

18 will be drilled along a horizontal track that lies directly over the producer s horizontal track at a vertical separation of approximately 5 m. The horizontal section length will be approximately 800 m. Well pairs will be spaced 60 to 70 m apart laterally from each other in the reservoir. The horizontal well length and the lateral spacing were based on an analysis of the Stage 1 area geology, wellbore hydraulics studies, a review of analogs, and reservoir simulation. The values of key reservoir parameters are listed in Table The first step in the SAGD process (the circulation phase) is to develop bitumen mobility between the producer and the injector, as well as immediately above the injector (Figure 2.3.2). This will facilitate heated communication between the injector and the producer during the subsequent phase (the operating phase). The well pairs will be circulated for approximately three months. This will be accomplished in both the injector and the producer by injecting steam through the tubing to the toe, and circulating back up the heel string. The maximum bottomhole injection pressure will not exceed the formation fracture pressure, which is conservatively estimated to be approximately 4,000 to 4,500 kpa (at a depth of 250 m). The operating plan calls for injecting steam at a bottomhole pressure of approximately 3000 kpa initially, and progressively reducing the steam injection pressure as the steam chamber grows vertically. Bottomhole steam pressure readings will be monitored (and alarmed) on the control room board to prevent overpressure. Automated steam shutdown controls will intervene if the operators do not reduce the bottomhole steam injection pressure. Once heated communication is established, the circulation of steam into the injector and the producer would be shut down and the operating phase of the SAGD process will then commence. Grizzly will inject steam on a continuous basis into the injector. Approximately 80% of the steam will be injected into the heel injection string, and the remainder will be injected down the toe injection string. The wellbore hydraulics study being conducted suggests that better steam distribution will result if the heel injection string is landed part way into the liner. The exact landing depth is still to be determined, but the work to date suggests that the heel string landing depth should be about 100 m into the liner for an 800 m long horizontal section injection. The injected steam rises. A steam chamber forms and gradually expands with time (Figure 2.3.3). The steam condenses at the edges of the steam chamber. This heats the bitumen and mobilizes it. The hot bitumen and condensed steam flow, due to gravity, down to the production well. The bitumen and condensed steam, plus some connate water, are lifted to surface, using gas lift. During the operating phase, Grizzly will initially target the injector pressure to be about 100 to 200 kpa greater than the producer pressure. The steam injection rate will be varied over the life of a well pair, depending on the reservoir performance around that well pair. Stage 1 s estimated Steam Oil Ratio (SOR) will be approximately 3.50 m 3 /m 3, based on steam (100% steam quality). The actual field results of Stage 1 will be used by Grizzly to optimize the reservoir recovery process and to refine the estimated SOR s for future Algar Lake stages. Grizzly is utilizing gas lift as the artificial lift mechanism for the Algar Lake SAGD Project because the ability to independently produce or inject to the heel and toes of the wells should result in more even steam chamber development over the length of the well pairs and hence, improve overall bitumen recovery. The surface facilities design has taken into account the low wellhead pressures required to implement gas lift. Should Grizzly desire lower reservoir March 2010 Section 2-12

19 operating pressures later in the life of the SAGD well pairs, the producing wells and plant operations can easily be converted to bottomhole pumps from gas lift. Operations personnel will be continuously monitoring bottomhole and surface data. Steam injection rates and pressures, and production rates will be adjusted to achieve optimum reservoir performance. The producer and the injector of any well pair will be operated such that live steam is not produced into the producer. Also, Grizzly will take care to ensure that hot water is not flashing to steam across the producer liner. This operating condition will be achieved through a combination of production rate and steam injection rate adjustments. This should ensure that the liners are not eroded Bitumen Production Rate and Recovery Estimates Bitumen production profiles have been developed using a number of sources, including the following: Grizzly has examined the production performance of the JACOS Hangingstone SAGD project, which is located approximately 10 km southeast of the Algar Lake SAGD Project. This project is considered to be a good analog for the Grizzly Project. Fractical Solutions (Mike McCormack) conducted reservoir characterization studies of the Grizzly Algar Lake property and the JACOS Hangingstone property which provided insight into the relative production rate potential of the two properties. Grizzly commissioned the Taurus Reservoir Solutions to conduct a reservoir simulation study, primarily to determine a safe operating pressure for the project. A summary of the simulation study, done by Dr. Dale Walters of Taurus, is attached as Appendix 5. The report details the development of the base case bitumen production profile and steam injection requirements. The bitumen recovery estimates shown in Table and Table were derived from the information provided in the reservoir characterization studies and the reservoir simulation study Original bitumen in place (OBIP) contained in the reservoir exploitation boxes is depicted on Figure The OBIP calculations assume that the horizontal well length is 800 m, and the width of the Pad areas is equivalent to the 65 m spacing between the 10 well pairs horizontal wells, or 650 m. The heights of the boxes are determined by the pay thicknesses, as mapped on the McMurray C net sand isopach (Figure 2.2.2) which uses a 6% bitumen by weight cut-off. The locations of the initial well pads, and the approximate drainage area for each well pad, and the Net McMurray Sand Isopach used to estimate the OBIP are shown Figure and March 2010 Section 2-13

20 Table Pad Bitumen Resources & Recoveries - 5 Year Well Life Estimated ZONE No. of Well Pairs OBIP (E 03 m 3 ) Bitumen Production (E 03 m 3 ) Bitumen Recovery (%) PAD A Total McMurray C Sand Total McM C Below Producers Total McM C Sand Above Producers Average Well PAD B Total McMurray C Sand Total McM C Below Producers Total McM C Sand Above Producers Average Well PAD C Total McMurray C Sand Total McM C Below Producers Total McM C Sand Above Producers Average Well PAD D Total McMurray C Sand Total McM C Below Producers Total McM C Sand Above Producers Average Well Table Total Pad Bitumen Resources & Recoveries - 5 Year Well Life Estimated ZONE No. of Well Pairs OBIP (E 03 m 3 ) Bitumen Production (E 03 m 3 ) Bitumen Recovery (%) PADS A+B+C+D TOTAL Total McMurray C Sand Total McM C Below Producers Total McM C Sand Above Producers Average Well March 2010 Section 2-14

21 Table lists key elevations for the four pads the McMurray C Sand top and base, the injectors, and the producers. Table Typical Key Elevations Pad McMurray C Top (masl) McMurray C Base (masl) Injector (masl) Producer (masl) A B C D It is estimated that approximately 95% of the water injected as dry steam will be produced. This estimate is based on other operators applications, and some actual field performance data from other projects. Therefore, approximately 5% of the injected water may not be recovered from the reservoir. This retention of injected water in the reservoir necessitates a comparable water makeup volume, in addition to other makeup water requirements. The gas oil ratio (GOR) is expected to range between 3 and 5 m 3 /m 3. For the purposes of the facilities design and the environmental work, a GOR of 8 m 3 /m 3 has been assumed in order to ensure that the design emissions have an adequate safety factor. Sand production is expected to be minimal (< 0.1 % of the bitumen production rate). Grizzly engaged Hycal Energy Laboratories (Dr. Brant Bennion) to conduct laboratory sand control tests for both seamed slot liners and wire wrapped liners for the producers. The testing determines a straight cut slot/seamed slot width or a wire wrap spacing that will restrain all but the finest fraction of the formation sand/fines. At the same time, the pressure drop across the slot or wire wrap gap is measured to ensure that plugging is not occurring. The injector liners will use straight cut slots or slotted/seamed slots. The injector slot width may be moderately smaller than that used in the producer. The Project Stage 1 total bitumen production rate will reach a plateau of approximately 1800 m 3 /d or 11,300 bopd. Prior to Stage 1 bitumen production declining, Grizzly will prepare an application to the ERCB and the AENV to request approval for additional stages, as required, to maintain the Project bitumen production rate at 1800 m 3 /day. Grizzly will utilize the facilities built for Stage 1 to handle all subsequent Stages production and steam requirements. It should be noted that, at this time, well pad locations for additional Stages are preliminary and do not have the requisite drilling density for approval. Stage 2 wells will be drilled and completed as required to offset the declining production near the end of the life of the Stage 1 wells. Grizzly s belief is that there is sufficient resource in the Project Area to operate this project for 20 to 30 years. March 2010 Section 2-15

TD Securities Calgary Energy Conference July 2014

TD Securities Calgary Energy Conference July 2014 TD Securities Calgary Energy Conference July 2014 Forward-Looking Statements Certain statements, estimates and financial information contained in this presentation ("Estimates") constitute forwardlooking

More information

Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes

Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes Directive 042 Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes September 6, 2006 Effective June 17, 2013, the Energy Resources Conservation Board

More information

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons.

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons. Oil and Gas Terms American Petroleum Institute (API): The API is the trade organization for the oil and gas industry, which establishes standards governing industry operations, safety and the manufacturing

More information

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services rick@curaes.com And ye shall know the truth and the truth shall make you free.

More information

Well-logging Correlation Analysis and correlation of well logs in Rio Grande do Norte basin wells

Well-logging Correlation Analysis and correlation of well logs in Rio Grande do Norte basin wells Well-logging Correlation Analysis and correlation of well logs in Rio Grande do Norte basin wells Ricardo Afonso Salvador Pernes (March, 2013) ricardo.pernes@ist.utl.pt Master thesis Abstract During drilling

More information

The ever increasing importance of reservoir geomechanics

The ever increasing importance of reservoir geomechanics SPE special Interest Reservoir Group, Calgary March 26, 2014 The ever increasing importance of reservoir geomechanics Antonin (Tony) Settari TAURUS Reservoir Solutions Ltd., Calgary Professor Emeritus,

More information

HDD High Definition Data. defining a new standard for Open Hole, Cased Hole & Production Logging

HDD High Definition Data. defining a new standard for Open Hole, Cased Hole & Production Logging HDD High Definition Data defining a new standard for Open Hole, Cased Hole & Production Logging Get More Accurate Data At No Extra Cost From RECON s Standard Logging Service At 10 samples per foot (33

More information

Petrophysical Well Log Analysis for Hydrocarbon exploration in parts of Assam Arakan Basin, India

Petrophysical Well Log Analysis for Hydrocarbon exploration in parts of Assam Arakan Basin, India 10 th Biennial International Conference & Exposition P 153 Petrophysical Well Log Analysis for Hydrocarbon exploration in parts of Assam Arakan Basin, India Summary Ishwar, N.B. 1 and Bhardwaj, A. 2 *

More information

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED The Hydrocarbon E & P Process In the exploration process, a most probable hydrocarbon bearing rock structure is defined based on seismic

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human

More information

Total E&P Canada Ltd. Surface Steam Release of May 18, 2006 Joslyn Creek SAGD Thermal Operation

Total E&P Canada Ltd. Surface Steam Release of May 18, 2006 Joslyn Creek SAGD Thermal Operation Total E&P Canada Ltd. Surface Steam Release of May 18, 2006 Joslyn Creek SAGD Thermal Operation ERCB Staff Review and Analysis February 11, 2010 ENERGY RESOURCES CONSERVATION BOARD ERCB Staff Review and

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

Wasser Berlin International GWP Forum: Challenges in North America. Alberta s Water Challenges and Opportunities

Wasser Berlin International GWP Forum: Challenges in North America. Alberta s Water Challenges and Opportunities Wasser Berlin International GWP Forum: Challenges in North America Alberta s Water Challenges and Opportunities March 25, 2015 Alexander J.B. Zehnder Scientific Director Water Resources Alberta Innovates

More information

Renewable Energy from Depleted Oil Fields using Geothermal Energy. Ramsey Kweik Southern Methodist University Geothermal Lab

Renewable Energy from Depleted Oil Fields using Geothermal Energy. Ramsey Kweik Southern Methodist University Geothermal Lab Renewable Energy from Depleted Oil Fields using Geothermal Energy Ramsey Kweik Southern Methodist University Geothermal Lab Outline What is Geothermal Energy? Why geothermal in Texas? Types of Power Plants

More information

ENHANCED OIL RECOVERY BY HORIZONTAL WATERFLOODING

ENHANCED OIL RECOVERY BY HORIZONTAL WATERFLOODING ENHANCED OIL RECOVERY BY HORIZONTAL WATERFLOODING Final Report September 6, 2002 September 30, 2005 By Scott Robinowitz Dwight Dauben June Schmeling May 2006 Work Performed Under Contract No. DE-FG26-02NT15452

More information

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) COURSE DESCRIPTION PETE 512 Advanced Drilling Engineering I (3-0-3) This course provides the student with a thorough understanding of

More information

Reservoir Characterization and Initialization at Little Mitchell Creek

Reservoir Characterization and Initialization at Little Mitchell Creek Reservoir Characterization and Initialization at Little Mitchell Creek Shuiquan Li L A R A M I E, W Y, J U LY 2 4 T H, 2 0 1 3 Outline Objectives of the project Geological and geophysical results Progress

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

PRESIDENT ENERGY PLC. ( President or the Company ) PARAGUAY UPDATE

PRESIDENT ENERGY PLC. ( President or the Company ) PARAGUAY UPDATE PRESIDENT ENERGY PLC ( President or the Company ) PARAGUAY UPDATE Highlights Lapacho well flows condensate and gas from the Santa Rosa Formation Management now have enough evidence to view commercialisation

More information

Saleski Phase 1 Project Application Hydrogeology

Saleski Phase 1 Project Application Hydrogeology Saleski Phase 1 Project Application Hydrogeology Prepared for: Laricina Energy Ltd. Prepared by: Millennium EMS Solutions Ltd. #, 4 St Edmonton, Alberta T6E 5R December File # -0 Suite 4 Street Edmonton

More information

RESERVOIR EVALUATION. The volume of hydrocarbons in a reservoir can be calculated:

RESERVOIR EVALUATION. The volume of hydrocarbons in a reservoir can be calculated: RESERVOIR EVALUATION The volume of hydrocarbons in a reservoir can be calculated: 1. directly by volumetric methods 2. indirectly by material balance methods Volumetrics provide a static measure of oil

More information

ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012. Wolfgang Zimmer, Paul Fink

ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012. Wolfgang Zimmer, Paul Fink ADX ENERGY Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012 Wolfgang Zimmer, Paul Fink Decision to test ASX announcement, 3 October 2011 2 Decision to test: First Evidence Wellsite geologists (highly

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2 Introduction Canadian Oilwell Systems Company and it s subsidiaries are suppliers of oil well Electric Submersible Pumping systems (ESPs). Such pumps are used to lift oil from oil wells so that the oil

More information

Remediation Services & Technology

Remediation Services & Technology Remediation Services & Technology Miranda Cruttenden- Well Remediation Engineer Todd Studer- Business Development Manager September 2011 Agenda Near wellbore remediation Causes of formations damage Field

More information

Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle

Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle Objectives Describing Waterflooding Definition Objectives Candidates Patterns Oil, water, and gas saturations Fractional flow Performance measures Practices and problems Reservoir monitoring 1 2 Reservoir

More information

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* WIERTNICTWO NAFTA GAZ TOM 24 ZESZYT 1 2007 Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* NEW TECHNICAL CONSIDERATIONS OF ROMGAZ COMPANY REGARDING DRILLING, COMPLETION AND

More information

Selection and Determination of Tubing and Production Casing Sizes

Selection and Determination of Tubing and Production Casing Sizes CHAPTER 3 Selection and Determination of Tubing and Production Casing Sizes OUTLINE 3.1 Overview 3.2 Overview of Nodal Analysis 3.3 Selection and Determination of Tubing and Production Casing Sizes for

More information

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited. Drilling Rigs and Well Technology RAPID RIGS AND WELL TECHNOLOGY. 2 3 Cairn India has adopted an innovative approach for its onshore drilling program using state-of-the-art custom made Rapid Rig technology

More information

Unconventional Challenges: Integrated Analysis for Unconventional Resource Development Robert Gales VP Resource Development

Unconventional Challenges: Integrated Analysis for Unconventional Resource Development Robert Gales VP Resource Development Unconventional Challenges: Integrated Analysis for Unconventional Resource Development Robert Gales VP Resource Development Opening Remarks The Obvious Fossil fuels will be the main energy supply, accounting

More information

Shale Energy Fluids Management Practices

Shale Energy Fluids Management Practices Shale Energy Fluids Management Practices Forum on Hydraulic Fracturing Bogota, Colombia, December 1, 2014 Presented by Dave Yoxtheimer, PG Hydrogeologist Penn State Marcellus Center for Outreach and Research

More information

Allocation of Costs, and Non Arm s Length Valuation of Shared Goods, on Oil Sands Projects

Allocation of Costs, and Non Arm s Length Valuation of Shared Goods, on Oil Sands Projects Allocation of Costs, and Non Arm s Length Valuation of Shared Goods, on Oil Sands Projects Oil Sands Division January 22, 2012 DISCLAIMER The materials in this Power Point presentation are provided for

More information

Integration of reservoir simulation with time-lapse seismic modelling

Integration of reservoir simulation with time-lapse seismic modelling Integration of reservoir simulation with seismic modelling Integration of reservoir simulation with time-lapse seismic modelling Ying Zou, Laurence R. Bentley, and Laurence R. Lines ABSTRACT Time-lapse

More information

Exploration for natural gas

Exploration for natural gas FACT SHEET NO. 42 Exploration for natural gas Quick facts QGC holds licences from the Queensland Government called Authorities to Prospect that allow us to explore in areas known as tenements We work with

More information

Understanding Hydraulic Fracturing

Understanding Hydraulic Fracturing Understanding Hydraulic Fracturing Natural gas is a safe, abundant and economical source of energy for the planet. North America has relied on natural gas for heating homes and buildings, as a fuel source

More information

SPE-139516 Life beyond 80 A Look at Conventional WAG Recovery beyond 80% HCPV Injection in CO2 Tertiary Floods David Merchant, Merchant Consulting

SPE-139516 Life beyond 80 A Look at Conventional WAG Recovery beyond 80% HCPV Injection in CO2 Tertiary Floods David Merchant, Merchant Consulting CMTC-440075-MS SPE-139516 Life beyond 80 A Look at Conventional WAG Recovery beyond 80% HCPV Injection in CO2 Tertiary Floods David Merchant, Merchant Consulting Copyright 2015, Carbon Management Technology

More information

APPENDIX D RISK ASSESSMENT METHODOLOGY

APPENDIX D RISK ASSESSMENT METHODOLOGY APPENDIX D RISK ASSESSMENT METHODOLOGY There are numerous human-health and ecological issues associated with the construction and operation of any large coal-fueled electric power generation facility.

More information

Dover SAGD Progress Review Thermal Heavy Oil

Dover SAGD Progress Review Thermal Heavy Oil over SA Progress Review Thermal Heavy Oil by evon Canada Corporation (Project Project Operator) (AEUB Approvals 9044, 9045 & 9862) Outline Introduction SA Performance Facilities Regulatory Future Plans

More information

Deep Geothermal energy and groundwater in

Deep Geothermal energy and groundwater in Deep Geothermal energy and groundwater in the UK Jon Busby Deep Geothermal energy and groundwater in the UK Outline 1. UK geothermal 2. Deep saline aquifers 3. Engineered geothermal systems 4. Fractured

More information

Abstract. 1. Introduction

Abstract. 1. Introduction IBP3328_10 IMPROVING HORIZONTAL WELL PLANNING AND EXECUTION USING AN INTEGRATED PLANNING APPROACH AND GEOSTEERING A CASE STUDY EXAMPLE IN BRAZIL DEEP WATER Rajeev Samaroo 1, Gregory Stewart 2, Paolo Ferraris

More information

Waterflooding. A Tried and True Technique for Secondary Oil Recovery. Houston Bar Association Oil, Gas and Mineral Law Section March 26, 2013

Waterflooding. A Tried and True Technique for Secondary Oil Recovery. Houston Bar Association Oil, Gas and Mineral Law Section March 26, 2013 Waterflooding A Tried and True Technique for Secondary Oil Recovery Houston Bar Association Oil, Gas and Mineral Law Section March 26, 2013 F. J. Deacon Marek, P.E President Dallas, Texas Brian R. Sullivan,

More information

RESERVOIR GEOSCIENCE AND ENGINEERING

RESERVOIR GEOSCIENCE AND ENGINEERING RESERVOIR GEOSCIENCE AND ENGINEERING APPLIED GRADUATE STUDIES at IFP School from September to December RGE01 Fundamentals of Geoscience I Introduction to Petroleum Geosciences, Sedimentology RGE02 Fundamentals

More information

How To Use A Water Source Heat Pump

How To Use A Water Source Heat Pump Geothermal Energy Using Water-Source Heat Pumps By VIRSTAR Corporation Geothermal Expertise Since 1978 All information contained herein is the exclusive property of VIRSTAR Corporation, all rights reserved.

More information

Cabot Oil & Gas Corporation

Cabot Oil & Gas Corporation Information you need to know regarding Cabot Oil & Gas Corporation s natural gas production activities and hydraulic fracturing About Cabot Cabot Oil & Gas Corporation (Cabot) is a leading independent

More information

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental

More information

Tuesday, March 17, 2015 Houston, TX. Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY?

Tuesday, March 17, 2015 Houston, TX. Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY? Tuesday, March 17, 2015 Houston, TX Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY? Copyright 2015 International Risk Management Institute, Inc.

More information

Heavy Oil. Canadian Heavy Oil Association. www.choa.ab.ca

Heavy Oil. Canadian Heavy Oil Association. www.choa.ab.ca Heavy Oil Seminar Sponsors Western Economic Diversification Government of Alberta Department of Foreign Affairs and Trade Development (Canada) Export Development Canada PEMEX Alberta Oil Sand Heavy Oil

More information

Gilby Prospect (Twp 35-42, Rge 25w4-7w5)

Gilby Prospect (Twp 35-42, Rge 25w4-7w5) Gilby Prospect (Twp 35-42, Rge 25w4-7w5) (Figure 1- Taylor Hill Exploration Ltd. Gilby Land (Yellow)) Taylor Hill Exploration Ltd. ( Taylor Hill ) currently has a 100 % W.I. in over forty nine and one

More information

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia 4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia O. Ogunsanwo, 1* B. Lee, 2 H. Wahyu, 2 E. Leung, 1 V. Gottumukkala 1

More information

I. STEAM GENERATION, BOILER TYPES

I. STEAM GENERATION, BOILER TYPES I. STEAM GENERATION, BOILER TYPES and BOILER PLANT SYSTEMS 1 Steam Generation Water s Unique Properties: High Thermal Capacity (Specific Heat) High Critical Temperature Ideal Medium for Heat Delivery High

More information

DIESEL FUEL CONDITIONING

DIESEL FUEL CONDITIONING COD FILTRATION DIESEL FUEL CONDITIONING REMOVE WATER & PARTICLES TO EXTEND FUEL INJECTOR LIFE & INCREASE COMBUSTION ENGINE FUEL EFFICIENCY Remove free water to saturation point with high single pass efficiency

More information

Gas storage industry primer

Gas storage industry primer Gas storage industry primer Gas storage industry primer General Underground natural gas storage facilities are a vital and complementary component of the North American natural gas transmission and distribution

More information

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well Smail ALIOUI (1) (1) Sonatrach First Calgary Petroleums, Association Division, Hassi Messaoud, 30500,

More information

Canada s Oil Sands Overview and Bitumen Blending Primer. US National Academy of Science October 23, 2012

Canada s Oil Sands Overview and Bitumen Blending Primer. US National Academy of Science October 23, 2012 Canada s Oil Sands Overview and Bitumen Blending Primer US National Academy of Science October 23, 2012 1 Global Crude Oil Reserves by Country billion barrels 300 250 200 150 100 50 265 211 174 151 143

More information

Canadian Oil Sands. Enhancing America s Energy Security

Canadian Oil Sands. Enhancing America s Energy Security Canadian Oil Sands Enhancing America s Energy Security May 2011 The importance of Canada s oil sands stems from the value of oil to our economy and energy security. Global demand for energy continues to

More information

Search and Discovery Article #40256 (2007) Posted September 5, 2007. Abstract

Search and Discovery Article #40256 (2007) Posted September 5, 2007. Abstract Evaluating Water-Flooding Incremental Oil Recovery Using Experimental Design, Middle Miocene to Paleocene Reservoirs, Deep-Water Gulf of Mexico* By Richard Dessenberger 1, Kenneth McMillen 2, and Joseph

More information

Boiler Blowdown. Boiler Blowdown Benefits. Best Operating Practices for Boiler Blowdown

Boiler Blowdown. Boiler Blowdown Benefits. Best Operating Practices for Boiler Blowdown Boiler Blowdown Even with the best pretreatment programs, boiler feedwater often contains some degree of impurities, such as suspended and dissolved solids. The impurities can remain and accumulate inside

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

Information Request 14

Information Request 14 Information Request 14 Information Request 14 14-1 Responses to Information Request 14 Response to Information Request 14a Response to Information Request 14b Response to Information Request 14c Response

More information

Arkansas Natural Gas Severance Marketing Costs

Arkansas Natural Gas Severance Marketing Costs Arkansas Natural Gas Severance Marketing Costs The following lists present various costs by category as "Allowable" or "Disallowed" as marketing costs. While listing many items, this list may not be all

More information

Figure 2-10: Seismic Well Ties for Correlation and Modelling. Table 2-2: Taglu Mapped Seismic Horizons

Figure 2-10: Seismic Well Ties for Correlation and Modelling. Table 2-2: Taglu Mapped Seismic Horizons GEOPHYSICAL ANALYSIS Section 2.2 P-03 Synthetic Well Tie P-03 V sh Well Tie (checkshot corrected) Time (s) Velocity Density Impedance V sh Synthetic Seismic (m/s) (g/cm 3 ) HD/KB Trace Number GR 20 30V

More information

Recommended Practices Associated with Hydraulic Fracturing Operations

Recommended Practices Associated with Hydraulic Fracturing Operations Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal

More information

Setting the Record Straight: Lifecycle Emissions of Tar Sands

Setting the Record Straight: Lifecycle Emissions of Tar Sands Setting the Record Straight: Lifecycle Emissions of Tar Sands Natural Resources Defense Council November 2010 Why Emissions from Our Fossil Fuel Based, Petroleum Sources Should Be Evaluated and Distinguished

More information

The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol.

The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol. The Role of Groundwater in Alberta s Tight Water Supply Environment Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol. The Role of Groundwater in Alberta s Tight Water Supply Environment Outline Importance

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

Flow Assurance & Operability

Flow Assurance & Operability Flow Assurance & Operability Erosion due to sand production Date Business Name Overview 1. What causes erosion? 2. Sand production and transport 3. Sand management 4. Instrumentation / monitoring of sand

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

Search and Discovery Article #40356 (2008) Posted October 24, 2008. Abstract

Search and Discovery Article #40356 (2008) Posted October 24, 2008. Abstract Quantifying Heterogeneities and Their Impact from Fluid Flow in Fluvial-Deltaic Reservoirs: Lessons Learned from the Ferron Sandstone Outcrop Analogue* Peter E. Deveugle 1, Matthew D. Jackson 1, Gary J.

More information

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain

More information

For personal use only

For personal use only Suite 2, 12 Parliament Place West Perth WA 6005 Ph: +618 9482 0510 Fax: +618 9482 0505 Email: info@emeraldoilandgas.com www.emeraldoilandgas.com 10 January, 2012 Centralised Company Announcements Platform

More information

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida GWPC September 27, 2015 Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida Virginia Walsh, PhD, P.G. Miami-Dade Water and Sewer Department Ed Rectenwald, P.G. MWH

More information

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s Babcock & Wilcox Canada TSSG TM - SAGD-MC a n d I n d u s t r i a l A p p l i c a t i o n s w i t h M u l t i - C

More information

Cooper Energy Limited Oil Field Appraisal Opportunity

Cooper Energy Limited Oil Field Appraisal Opportunity Cooper Energy Limited Oil Field Appraisal Opportunity May 2011 Tunisia Hammamet West Oil Field Bargou Exploration Permit Offshore Gulf of Hammamet Cooper Energy is offering the opportunity to participate

More information

An Introduction to Development in Alberta s Oil Sands

An Introduction to Development in Alberta s Oil Sands An Introduction to Development in Presented By Rob Engelhardt Marius Todirescu Table of Contents EXECUTIVE SUMMARY...- 1-1.0 INTRODUCTION...- 2-1.1 WHAT ARE OIL SANDS?... - 2-1.2 ALBERTA S DEPOSITS...

More information

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Secondary Containment: Regulations & BMPs Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Federal Secondary Containment Safeguarding method in addition to the primary

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS

More information

5.2. Vaporizers - Types and Usage

5.2. Vaporizers - Types and Usage 5.2. Vaporizers - Types and Usage 5.2.1. General Vaporizers are constructed in numerous designs and operated in many modes. Depending upon the service application the design, construction, inspection,

More information

All sediments have a source or provenance, a place or number of places of origin where they were produced.

All sediments have a source or provenance, a place or number of places of origin where they were produced. Sedimentary Rocks, Processes, and Environments Sediments are loose grains and chemical residues of earth materials, which include things such as rock fragments, mineral grains, part of plants or animals,

More information

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water

More information

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS AGH DRILLING, OIL, GAS Vol. 30 No. 1 2013 http://dx.doi.org/10.7494/drill.2013.30.1.221 Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS 1. INTRODUCTION At the same time with

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

Tax Executives Institute

Tax Executives Institute Tax Executives Institute Texas Oil and Gas Transactions May 6, 2013 Circular 230 disclaimer Any US tax advice contained herein was not intended or written to be used, and cannot be used, for the purpose

More information

Eagle Ford Shale Exploration Regional Geology meets Geophysical Technology. Galen Treadgold Bruce Campbell Bill McLain

Eagle Ford Shale Exploration Regional Geology meets Geophysical Technology. Galen Treadgold Bruce Campbell Bill McLain Eagle Ford Shale Exploration Regional Geology meets Geophysical Technology Galen Treadgold Bruce Campbell Bill McLain US Shale Plays Unconventional Reservoirs Key Geophysical Technology Seismic Acquisition

More information

NSPS Subpart OOOO: Applicability and Compliance Basics

NSPS Subpart OOOO: Applicability and Compliance Basics NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com

More information

Graduate Courses in Petroleum Engineering

Graduate Courses in Petroleum Engineering Graduate Courses in Petroleum Engineering PEEG 510 ADVANCED WELL TEST ANALYSIS This course will review the fundamentals of fluid flow through porous media and then cover flow and build up test analysis

More information

Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities

Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities Water Efficiency Water Management Options Boilers for Commercial, Industrial and Institutional Facilities Boiler Water Impurities All boiler make-up water contains impurities. As clean steam is released

More information

The Dalian Developer A new approach to oil spill response

The Dalian Developer A new approach to oil spill response The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012 Contents Introduction

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Irresponsible of Statoil

Irresponsible of Statoil Irresponsible of Statoil Having reviewed all the available information, Bellona feels it is irresponsible of Statoil to resume production at Gullfaks C. All production from the Gullfaks C platform was

More information

Better Prospects. The public relations battle that bubbled up into an ongoing. for Alberta s Oilsands

Better Prospects. The public relations battle that bubbled up into an ongoing. for Alberta s Oilsands Better Prospects for Alberta s Oilsands Cover Better Prospects for Alberta s Oilsands In Situ Oil Sands Alliance forms to be the voice for what it calls the future of oilsands development in the province

More information

The material of which a petroleum reservoir. Effects of the Workover Fluid on Wellbore Permeability. t e c h n o l o g y

The material of which a petroleum reservoir. Effects of the Workover Fluid on Wellbore Permeability. t e c h n o l o g y Effects of the Workover Fluid on Wellbore Permeability Workover fluids used to kill oil wells for many subsurface production operations can cause many damaging problems to the formation near the wellbore.

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 23 Rev: 01 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

Pumping Solutions for Steam Assisted Gravity Drainage (SAGD) Innovation, Design, Manufacture + Aftermarket

Pumping Solutions for Steam Assisted Gravity Drainage (SAGD) Innovation, Design, Manufacture + Aftermarket Pumping Solutions for Steam Assisted Gravity Drainage (SAGD) Innovation, Design, Manufacture + Aftermarket Services: Pumping solutions for a better world 2 SPX - An Introduction SPX is a Fortune 500 multi-industry

More information

C O M P L E T I O N S E R V I C E S

C O M P L E T I O N S E R V I C E S Well Screens Well Screens Contents ProWeld TM ProWeld TM TOP DynoFlo TM DB UniFlo HELICAL Inflow Control Screen UniFlo TM ROI Inflow Control Screen SlimFlo TM Pre-packed CoilFlo TM DB Screen Communication

More information

Geologic History Review

Geologic History Review 1. The climate that existed in an area during the early Paleozoic Era can best be determined by studying (1) the present climate of the area (2) recorded climate data of the area since 1700 (3) present

More information

6 Cavendish Square, London W1G 0PD, England,UK

6 Cavendish Square, London W1G 0PD, England,UK RNS Number : 3190L JKX Oil & Gas PLC 05 May 2010 6 Cavendish Square, London W1G 0PD, England,UK Tel: +44 (0)20 7323 4464 Fax: +44 (0)20 7323 5258 Web site: http://www.jkx.co.uk JKX Oil & Gas plc INTERIM

More information

Periodical meeting CO2Monitor. Leakage characterization at the Sleipner injection site

Periodical meeting CO2Monitor. Leakage characterization at the Sleipner injection site Periodical meeting CO2Monitor Leakage characterization at the Sleipner injection site Stefano Picotti, Davide Gei, Jose Carcione Objective Modelling of the Sleipner overburden to study the sensitivity

More information

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions PETE201 Introduction to Petroleum Engineering (Core) (1-0-1) The course's main goal is to provide the student with an overview of

More information