1 OPTIONS for Replacing Boiler Plant Report to Tenants Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers Tel: JULY 2003.
2 Replacing Boiler Plant Existing boilers and associated plant Installation of new gas fired high efficiency boilers Risers Options Notes regarding option A Recommendation... 6 Page 2 of 7
3 1. Existing boilers and associated plant There are several serious problems concerning the existing boilers and distribution systems. Of the originally installed four oil fired boilers, only two are now capable of operating and one of the remaining two is now leaking. Due to the age of the plant it will not be possible to repair the boilers and on failure, which could happen at any time, the building will be without any heat. The existing boiler plant has a probable efficiency of less than 50% compared to modern condensing gas fired units at 95%. The hot water is currently being produced from an external rented oil fired unit which was originally intended as a temporary measure until the boilers were replaced, this unit is expensive at approximately 2, per month and has been installed without planning permission. The existing boiler room plant and basement pipework are both insulated with asbestos, making any repairs that become necessary very expensive. The existing hot water distribution is by means of galvanised pipework and fittings. Since the temporary hot water unit is connected to the main system by means of un-insulated copper pipework corrosion has occurred ( mixing copper and galvanised causes de-zincification ), probably throughout the building to the hot water system, this is now beginning to manifest itself as leaks. Such leaks will become more frequent in the near future. The services to the building are all in very poor condition and careful consideration should be given to a total renewal carried out in phases over a period. Replacement of the boilers, asbestos removal and the replacement of the hot water distribution system is critically urgent. To reduce funding requirements several programs of work over varying periods have been studied. This report outlines the various options that have been considered. Unless a total renewal of the hot water system is considered now, to reduce future corrosion to the remaining old system it is necessary to install new galvanised pipework (same as existing) and then replace this with copper when the total system is proceeded with. Obviously this is not financial sense, but if funds are not immediately available is the only way forward. The costs of the options do not include for the renewal of the hot water distribution system and assume galvanised pipe work. I should also mention the earlier discussions in connection with the provision of individual heating systems to the flats. This was rejected for a number of reasons. Page 3 of 7
4 First, the smaller flats have little room to include such a system. Secondly, the installation of such a system would require new pipework within the flats and possibly new gas distribution in the block. Thirdly, the running costs of a new boiler should be no more that the costs of individual systems. More importantly, centrally provided constant hot water should be provided in a luxury block which Sussex Lodge will eventually become. 2. Installation of new gas fired high efficiency boilers It is not possible to install a mix of new gas and old oil fired boilers working into a common chimney stack such as exists at Sussex Lodge. Large boilers require separate flues discharging at roof ridge level. Flues from new gas fired boilers cannot be installed within the existing brick chimney stack whilst the existing oil fired boilers are in use, or available for use. Small boilers at about 50 kw each could be installed with simple flue pipes protruding through the wall at low level to atmosphere. Some modern larger boilers consist of several 50 kw modules built into one frame. By separating the modules, each would be considered separate boilers which would permit low level flue outlets. In this case no scaffolding or expensive flue liners would be required. These boilers form a considerable plume. The existing boiler plant is rated at 1,100 kw but the actual duty now required is approximately 650 kw (by using modern techniques especially for hot water generation) if all flats are occupied. Normally 40% of the flats are unoccupied. During these periods, and provided the heating is turned down to frost protection level, 400 kw is adequate. The boiler capacity required will be further reduced as the remaining flats in the block replace their original Crittall steel windows with double glazed units. A totally new modern high efficiency installation created in the garage, clearing the existing boiler room installation and basement asbestos will cost approximately 200,000 if arranged as one contract to be carried out during one summer. To match the varying load, a final scheme incorporating 3 boilers rated at 220 kw each is to be preferred. The temporary boiler is expensive and unsightly. The remaining two existing boilers could fail at any time. Repairing them may not be possible. I have also been asked to report on the possibility of a phased installation. Sensibly there are four possible alternative ways forward: Page 4 of 7
5 To help cash flow it is possible to install 1, and then 2 and finally the 3rd boiler on a phased basis backing up with the old oil boilers in the early stage. Using temporary smaller connecting pipes until phase 3 would also reduce the expenditure in the first year but cost more in total. 3. Risers The existing risers date back to the construction of the building and are uninsulated. They are galvanised iron. They need to be replaced with new copper risers at the same time as or shortly after the boilers because the distribution system in the garages will be in copper. This will allow copper piping to be used throughout the block as the plumbing systems within the flats is renewed over a period. However, this will require the plumbing replacement program to be carried out over the very near future as otherwise the new copper distribution in the garage and the copper risers would cause further damage to the old galvanised system (see separate specification). The cost of this has not been included in this specification and will be the subject of a further report. 4. Options A ( 1 ) Wait until the heating season is over and install one 220kW boiler in the garage area and connect into old system in the boiler room such that the old boilers can also be used in the coldest weather. Four new 3 diameter flues would have to temporarily run to roof level on the OUTSIDE of the existing brick stack in order to be able to use the oil fired boilers when necessary. cost 77,000 A ( 2 ) As above but install 2 boilers now ( 440 kw ) cost 98,000 see further notes regarding this option B Wait until the heating season is over and install 3 new boilers (giving 660 kw) in the existing boiler room with new flues within the existing brick stack This would require the full duty to be installed now but could use old pumps, valves pipes etc.(not recommended ) cost 128,000 C Wait until heating season is over and install 3 new boilers in Garage area to enable existing boiler room to be cleared for other uses (cost of clearing not included). Flues can be installed inside the brick chimney stack. Page 5 of 7
6 This would require new pumps and valves (recommended subject to cash availability) cost 156,000 D Install a series of smaller wall hung boilers in garage area, local low level flues. These flues will produce a considerable plume. This would permit, say, 50% of the final required duty to be installed now, temporarily retaining old oil fired boilers which could be brought onto line in the coldest weather. cost 94,000 All of these prices include removing only sufficient asbestos for the work to be undertaken, the new gas supply and design costs. Items A, C & D will require an enclosure to be built from brick or plaster board and studding with a steel barrier to prevent damage by cars. I have not costed this. A further means of escape may be necessary from the basement. All prices include a very high efficiency hot water generating plate heat exchanger 4.1. Notes regarding option A The cost of option A1 at 77,000 (1x220 kw boiler) has been achieved by temporary connections into the old system and using smaller pipes and equipment than will be required for the final scheme. Some 17,000 would be wasted in the longer term, for example, 1 emergency fire gas shut off valves have been allowed initially instead of the 4 that will finally be required when the further two necessary boilers are installed, the 1 being discarded later. Four (or 8) 3 (75mm) flues on the outside of the chimney stack may require planning permission although it should be possible to obtain a temporary structure licence. If, say, 20% of flats are un-occupied, hence not requiring showering or baths and with the central heating turned down, 440 kw will be sufficient for the winter without the need to operate the old oil boilers. This would allow the flues to be placed inside the brick stack and avoid the cost of changing them later. Option A2 is based on installing small pipes for just 2 boilers and changing them to larger when the third boiler is installed. It would of course be more sensible to install the pipework and pumps now sized for the final project even if only two boilers were installed but this will cost a further 33,000 in the first phase, but giving a lower total at the completion of installing the 3rd boiler (160,000 instead of 167,000). This 2 boiler scheme is a gamble on weather and occupancy. 5. Recommendation If finance permits it, I strongly recommend that a total new system is installed now as a single capital expenditure of around 200,000. If spread equally over 45 flats (in fact, the charges would be shared according to the service charge proportions) this figure equates to 4,270 per flat. The block s fuel bill should drop from around 41,000 pa to nearer 14,000 pa and there will also be a saving of around 18,000 Page 6 of 7
7 pa in boiler rental and maintenance costs. The annual savings for the block should be of the order of 45,000, which indicates a 4 ½ year payback to give a reliable new plant. The payback would be shorter if controlled valves were installed to enable heating to be switched down to trickle for unoccupied flats. There are significant advantages to building a new plant room in the garages. The installation in a custom built area will be much simpler than if the installation had to take place alongside existing plant whish is still in use. Changeover will be effected in 1-2 days causing minimum inconvenience to tenants. In addition, asbestos would need to be removed from the existing boiler plant room before these works were undertaken. If it is absolutely necessary to reduce immediate expenditure as much as possible, I would recommend option A2, but delay fitting the second boiler until further funds are available perhaps November or December. This would give a contract commitment of some 79,000 but also allow the fitting of the second boiler at a further cost of 19,000 in the winter, and then a third at some future date if occupancy demanded it. Page 7 of 7
STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2
STANDARD for Plumbing, Heating, Hot Water, Cold Water & Electrical work undertaken by owners within the building known as Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers
More informationCOMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23
COMMERCIAL REPORT / STOCK CONDITION SURVEY For Sydenham Hill Estate Sydenham Hill London SE 23 Submission Prepared by Gas Advisory Services Limited Date: 4 th June 2013 Gas Advisory Services Limited Phoenix
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationBOILER REPLACEMENT. and Associated Works PERFORMANCE SPECIFICATION. Sussex Lodge London W2 & 16 Stanhope Terrace London W2
and Associated Works PERFORMANCE SPECIFICATION Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers Tel: 01932 873 653 Doc ref: 0075/D1 JUNE 2003. Page 1 of 29 1. GENERAL REQUIREMENTS...
More informationCapital Expenditure. The common definition of capital expenditure is
Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local
More informationTHE VOID LETTABLE STANDARD
THE VOID LETTABLE STANDARD North West Leicestershire District Council is responsible for allocating empty Council owned homes. The Lettable standard has been agreed in consultation with the tenants of
More informationHome Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
More informationVaillant s plain English guide to. simple, concise and precise
Vaillant s plain English guide to simple, concise and precise Introduction Contents Installing a new boiler 05 Servicing and repairing 13 What s a diverter valve? Why do you need a TRV? And happens when
More informationCompensation Policy. When we have failed to carry out emergency or urgent repairs
Compensation Policy Hexagon aims to give good standards of service in housing and care, but occasionally things do go wrong. If a tenant makes a complaint, we will investigate and put the matter right
More informationEnergy Performance Certificate
Energy Performance Certificate Flat 2 Bagshot House Redhill Street LONDON NW1 4BY Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Ground-floor flat 09 April
More informationGAS HEATING IN COMMERCIAL PREMISES
ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.
More informationHeating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008
Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008 Appendix: Guide to the Condensing Boiler Installation Assessment Procedure for Existing Dwellings CONTENTS PAGE
More information2640 Fountain View Drive Houston, Texas 77057 713.260.0600 P 713.260.0547 TTY www.housingforhouston.com OCCUPANCY TECHNICIAN: PHONE NUMBER:
HOUSING CHOICE VOUCHER PROGRAM A PROPERTY OWNER S GUIDE TO HCVP LEASE-UP OCCUPANCY TECHNICIAN: PHONE NUMBER: Property Manager: Thank you for your interest in leasing to a Housing Choice Voucher Program
More informationFor installation guide see reverse of book
USERS GUIDE LOGIC Combi 24, 30, 35 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance
More informationResponse: The combi boiler. Response: The fit anywhere combi
Response: The combi boiler The Ideal Response is a wall mounted, fanned flue combination boiler which serves a home's central heating system and delivers hot water on demand. It has been designed to be
More informationRepair Responsibilities A Guide for Sadeh Lok Residents
Repair Responsibilities A Guide for Sadeh Lok Residents Sadeh Lok is responsible for most of the repairs that may arise in and around your home, but not all. Each repair type is given a likely priority
More informationProtection of unoccupied or void properties
Real Estate Issue one Protection of unoccupied or void properties Introduction The current economic downturn has lead to a greatly increased number of vacant properties. In some countries rates of unoccupancy
More informationUSERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book
USERS GUIDE LOGIC Combi 24, 30, 35 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance
More informationCase Study: Wood Gasification Boiler Heating for an Exposed Rural Family Home Fuel cost assessment following thirty six months of operation
Case Study: Wood Gasification Boiler Heating for an Exposed Rural Family Home Fuel cost assessment following thirty six months of operation Simple solutions for greener heating Summary Objective: Deliver
More informationCOWENS RISK SOLUTIONS WATER DAMAGE PREVENTION
COWENS RISK SOLUTIONS WATER DAMAGE PREVENTION October 2014 WATER DAMAGE PREVENTION: AVOID COSTLY WATER DAMAGE CLAIMS WITH A WATER DAMAGE MITIGATION PROGRAM Water damage is the number one source of property
More informationApartment and Communal Heating Solutions
Apartment and Communal Heating Solutions Apartment and Communal Heating Due to the increasing requirements for more energy efficient buildings and changes to the Code for Sustainable Homes Legislation,
More informationStove-boiler for solid fuels 12-30 KW Directions for use and assembling
Stove-boiler for solid fuels 12-30 KW Directions for use and assembling February 7, 2012 Contents 1 Technical data 2 1.1 Boiler properties TEMY PLUS 12-30 KW......................... 3 1.2 On Product............................................
More informationDoes Wall Township require an inspection by the building department on resale of a home?
Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,
More informationU.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!
U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or
More informationSession 2: Hot Water Supply
MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:
More informationwww.suttonhousingpartnership.org.uk Asbestos
www.suttonhousingpartnership.org.uk Asbestos images courtesy of www.sxc.hu and/or www.morguefile.com Asbestos Asbestos was widely used until the 1980 s to improve the performance of materials and to provide
More informationINDUSTRY GUIDANCE FOR INSTALLERS ON CONDENSATE DRAINAGE PIPE INSTALLATION. This guidance is endorsed by HHIC members.
1. BACKGROUND INDUSTRY GUIDANCE FOR INSTALLERS ON CONDENSATE DRAINAGE PIPE INSTALLATION This guidance is endorsed by HHIC members. During recent winters the UK has experienced prolonged spells of extremely
More informationTenant & Leaseholder Compensation Policy
Tenant & Leaseholder Compensation Policy Housing Landlord July 202 Version Control Version 3 Status of Policy Sponsor Author/Reviewer Approved Review Date Draft Mark Gaynor, Corporate Director of Housing
More informationC, D Only if fitted by Sadeh Lok. A, B, C Category dependent upon impact on residents enjoyment of their home
Repair Responsibilities A Guide for Sadeh Lok Residents Sadeh Lok is responsible for most of the repairs that may arise in and around your home, but not all. Each repair type is given a likely priority
More informationmain heating: pre1998 ducted warm air system main heating fuel: mains gas main heating SAP efficiency: 70.0% main heating controls: programmer
Archetype: 3250330 Archetype Description: 1965-1975, semi / end terraced dwelling, timber frame walls, oil / gas / electric warm air heating, E This archetype represents 823 dwellings, which accounts for
More informationRepairs: who s responsible?
Your responsibilities as a tenant in a sheltered scheme Condensation Condensation Damage Damage caused by you Domestic appliances We will repair domestic appliances if they have been provided by us Keys
More informationLondon Borough of Redbridge
London Borough of Redbridge Private Rented Sector Scheme www.redbridge.gov.uk 1 London Borough Of Redbridge Private Rented Sector (PRS) Scheme Redbridge Council is aiming to increase its work within the
More informationChurch Property Forms - A Guide to Asbestos Accidents
THE UNITED REFORMED CHURCH - SOUTH WESTERN SYNOD Church Log Book Name of Church Address including Postcode Is the church, or any church building listed? (Specify the grade (I, II*, II) and attach a copy
More informationBuilding Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,
More informationProtect your pipes. Be prepared this winter heat, insulate and protect your home
Protect your pipes Be prepared this winter heat, insulate and protect your home Looking after you and your home is important to us at Scottish Water. This leaflet gives you helpful advice on how to heat,
More informationHow to report a repair
How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,
More informationProtect your pipes. Keep the water cycle running smoothly and be prepared in winter. Heat, insulate and protect your home.
Protect your pipes Keep the water cycle running smoothly and be prepared in winter. Heat, insulate and protect your home. At Scottish Water, we are always working so the water cycle never stops. We believe
More informationUser's Instructions. Alpha HE CB25/33 and HE SY25
User's Instructions Alpha HE CB25/33 and HE SY25 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Boiler Range For Technical help or for Service call... ALPHA HELPLINE Tel:
More informationPRIVATE SECTOR HOUSING RENEWAL POLICY
Background and Local Context PRIVATE SECTOR HOUSING RENEWAL POLICY This Policy is published in response to the New Regulatory Reform Order 2002. The overall picture presented by Woking Borough Council
More informationEnergy Performance Certificate
Energy Performance Certificate Flat 307 Windsor House Cumberland Market LONDON NW1 4DE Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Mid-floor flat 8361-6824-6900-7049-8026
More informationCrawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com
Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809
More informationUSERS GUIDE. LOGIC Heat 12, 15, 18, 24, 30. For installation guide see reverse of book
USERS GUIDE LOGIC Heat 12, 15, 18, 24, 30 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance
More informationDealing with damp and mould growth
Dealing with damp and mould growth Dampness affects many homes in Britain. There are three main causes of dampness. This guide aims to help you to work out what may be the cause of the damp and how you
More informationenercase Multi-Family Apartment Building Heating Control System
BUSINESS enercase Multi-Family Apartment Building Heating Control System What s no longer flying out your windows? Wasted heat and energy dollars enercase Multi-Family Apartment Building Heating Control
More informationREGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE
No. 9195 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced
More informationELECTRODE BOILERS VAPOR POWER INTERNATIONAL
ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in
More informationOperating instructions
Operating instructions Gas condensing boilers MGK-130 MGK-170 MGK-210 MGK-250 MGK-300 Wolf GmbH Postfach 1380 D-84048 Mainburg Tel. +49 8751/74-0 Fax +49 8751/741600 Internet: www.wolf-heiztechnik.de Document
More informationCondition Report SAMPLE. Property address. Client s name. Date of inspection
Client s name Date of inspection Contents 1 A B C D E F G H I J K Introduction to the report About the inspection Summary of the condition ratings About the property Outside the property Inside the property
More informationThe District Energy Manager and Classroom Heating
Mt. Carmel Area School District Energy Conservation Policy Adopted 6/19/06 These guidelines supersede all previous instructions. It is crucial that these energy guidelines be observed in the operation
More informationRepairs and looking after your home
A guide to Repairs and looking after your home Contents Page No. Introduction 1 Information for tenants 2 Information for homeowners 3-4 Information for onsite NHS workers 5 Information for students 5
More informationMaking Your Home Ready For Solar Water Heating
Making Your Home Ready For Solar Water Heating During construction or a major renovation, making a home ready to use solar energy can be easy and inexpensive. When the time comes to install your solar
More informationBoilers and cogeneration/trigeneration. Abhi Sawant Business Development Manager Simons Green Energy
Boilers and cogeneration/trigeneration Abhi Sawant Business Development Manager Simons Green Energy HEATING - COOLING - SUSTAINABLE ENERGY ENERGY EFFICIENCY IN BOILERS, COGENERATION & TRIGENERATION Presented
More informationEnergy Saving Fact Sheet Boilers
Energy Saving Fact Sheet Boilers Turn a burning issue into real energy savings You need a boiler to heat your premises and provide hot water or to generate steam for use in industrial processes. Unfortunately,
More informationFall in love with your heating again. Reduce your heating bills with
Fall in love with your heating again Reduce your heating bills with Worried about your energy bills? We re here to help! With energy prices rising and great pressure on household budgets, it s sensible
More informationHEATING OF DOMESTIC OUTDOOR SWIMMING POOLS
HEATING OF DOMESTIC OUTDOOR SWIMMING POOLS INTRODUCTION 1. There are no general EU regulations and standards for outdoor swimming pool heating. Local regulations in the member countries are covering most
More informationPre-Drywall Inspection Report
SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion
More informationBest Practice Guide BPGCS007
Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce
More informationHomeServices Terms and Conditions
HomeServices Terms and Conditions Contents Definitions 03 The Contract 04 Start date 04 General Exclusions 11 Payment 12 Cancellation 13 Appointments 16 Product Renewal 16 Changes to contract 16 Safety
More informationUNDERSTANDING CENTRAL HEATING SYSTEMS
UNDERSTANDING CENTRAL HEATING SYSTEMS This advice guide is part of a series of free guides produced by the Association of Plumbing & Heating Contractors Ltd. which provide consumers with essential basic
More informationRESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /
More information19 Ellis Park Road, Toronto
19 Ellis Park Road, Toronto Inspection Report September 9, 2015 19 Ellis Park Road, Toronto Inspection Report Overall Condition: This is a solidly built older double-brick home that is in fairly original
More informationCondensing Boiler Efficiency
Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2
More informationArizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST
It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist
More informationThe client organisation that was best at meeting residents needs in the provision of a maintenance service
Wolverhampton Homes NHMF Best Practice Awards 2009 Submission for: - The client organisation that was best at meeting residents needs in the provision of a maintenance service Leaseholders gas maintenance
More informationEnergy Audit Report. Prepared By: Utilitywise plc. Reproduction of this document in whole or in part is forbidden without the consent of:
Energy Audit Report Prepared By: Utilitywise plc Reproduction of this document in whole or in part is forbidden without the consent of: Utilitywise plc Utilitywise House 30-31 Long Row South Shield Tyne
More informationwww.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
More informationservice breakdown emergency 3in1 Plan What the SGS Service Plan provides What happens if you have a breakdown Cover provided by the Plan Dear
3in1 Plan Dear As per our recent conversation, the SGS Service Plan offers complete peace of mind because for a small premium your central heating equipment will be serviced and covered in the event of
More informationExample Specialist Other contact
Callout Examples CO 001 CO 002 CO 003 CO 004 CO 005 CO 006 CO 007 CO 008 CO 009 CO 010 CO 011 CO 012 CO 013 CO 014 CO 015 CO 016 CO 017 CO 018 CO 019 CO 020 CO 021 CO 022 CO 023 CO 024 CO 025 Example Specialist
More informationADVICE NOTE WATER LEAKS. How to prevent water leaks in your flat
ADVICE NOTE WATER LEAKS How to prevent water leaks in your flat 2 CONTENTS Note: As the leading trade body for residential leasehold management, ARMA is also an important resource for leaseholders. Our
More informationAIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries
More informationWhat you should insure and what s included in our insurance
GUIDE TO INSURANCE What you should insure and what s included in our insurance CONTENTS Contents 1 GENERAL RESPONSIBILITIES 3 1.1 Introduction 3 1.2 The types of insurance 3 1.3 The general principles
More informationEnergy Saving Ideas for Your Box Plant
General Session Energy Saving Ideas for Your Box Plant Moderator: Jeff Pallini Fosber America, Inc. Program Overview: Immediate Ideas: Jim Simko of Simtek Systems, Inc. Mid-Term Ideas: John Donahue of
More informationProtect your pipes. Keep the water cycle running smoothly and be prepared in winter. Heat, insulate and protect your home.
Protect your pipes Keep the water cycle running smoothly and be prepared in winter. Heat, insulate and protect your home. At Scottish Water, we are always working so the water cycle never stops. We believe
More informationChimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko
INSTALLATION MANUAL Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko Ventilated Notified entity Building Technical and Research Institute Prague notification no. 1020 This instruction refers to double-layer
More informationCONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) When is a permit required? Section 403.42 and Section 403.62 of the Uniform Construction Code states: Any owner
More informationWATER LEAKS AND DAMAGE
WATER LEAKS AND DAMAGE OUTLINE A quarter of all insurance claims made on flats are for damage caused by water leaks. The damage caused costs millions of pounds, heartache to those involved and disputes
More informationEnergy Performance Certificate
Energy Performance Certificate Flat 3 Dwelling type: Mid-floor flat 30, Brunswick Square Date of assessment: 23 September 2008 HOVE Date of certificate: 23 September 2008 BN3 1ED Reference number: 8398-6021-5510-4127-8022
More informationBOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER
BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE
More informationOperating instructions
6302 6959 02/2006 GB For the user Operating instructions Logano G215 WS Oil and gas-fired boilers Please read thoroughly before use. Overview Regulations and directives Installation: 90/396/EEC gas appliance
More informationDaikin Altherma Hybrid Heat Pump
your comfort. our world. Daikin Altherma Hybrid Heat Pump Smart heating technology for the best of both worlds Heating Integrated Solutions Ventilation Air Conditioning Refrigeration Forward thinking About
More informationDaikin Altherma Hybrid Heat Pump
Daikin Altherma Hybrid Heat Pump Smart technology for the best of both worlds NATIONAL HEAT PUMP 19 JUNE 2014 ICC BIRMINGHAM WINNER Forward thinking Now is the time to rethink the way we heat our homes
More informationDuo-tec Combi HE A Range. User s Operating Instructions & Important Warranty Information. Gas Fired Wall Mounted Condensing Combination Boiler
User s Operating Instructions & Important Warranty Information Duo-tec Combi HE A Range Gas Fired Wall Mounted Condensing Combination Boiler Please keep these instructions in a safe place. If you move
More informationApplication for the Alteration of a Gas Supply
Application for the Alteration of a Gas Supply SSE Enterprise Utilities is a trading name of SSE Utility Solutions Limited which is part of the SSE Group. The Registered Office of SSE Utility Solutions
More informationSteam System Efficiency. Bill Lumsden Leidos Engineering
Steam System Efficiency Bill Lumsden Leidos Engineering Steam System Efficiency Steam System Efficiency Key Take-aways: Review of the properties of ice, water, and steam Learn the basics of steam trap
More informationThermal Imaging for Home Inspectors
Thermal Imaging for Home Inspectors Structural member placement The gabled end of a cathedral ceiling. Note the studs and the ceiling joists with blocking. What is that glow in the upper right hand corner?
More informationNon Domestic BER Assessors Technical Bulletin
Non Domestic BER Assessors Technical Bulletin Issue No. 1/13 May 2013 Contents: 1 Building Services HWS Systems... 2 1.1 Default instantaneous electric heaters... 2 1.2 Identifying dedicated hot water
More informationAir-to-water heat pumps: Making the most of renewables. Richard Pickford, Daikin UK
Air-to-water heat pumps: Making the most of renewables Richard Pickford, Daikin UK 1 Overview 1. ASHPs potential 2. Heat pump system design 3. Installation best practice 4. Renewable Heat Incentive 5.
More informationHigh Performance Hot Water Systems Denver July 2010
High Performance Hot Water Systems Denver July 2010 Gary Klein Affiliated International Management, LLC 916-549-7080 gary@aim4sustainability.com Gary Klein, 2010 Gaps Hot water is a system We need systemic
More informationUser Guide and Important Warranty Information. Heatmax Combi HE Range. Condensing Combination Boiler
You can rely on User Guide and Important Warranty Information Heatmax Combi HE Range Condensing Combination Boiler Please keep these instructions in a safe place. If you move house, please hand them over
More informationIn the average American home, water heating accounts
WATER HEATING In the average American home, water heating accounts for about 20% of total household energy consumption. In Virginia, the average household spends between $200 and $500 per year for heating
More informationWATER INDUSTRY ACT 2012. South Australian Water Heater Installation Requirements. Prepared by the Technical Regulator
WATER INDUSTRY ACT 2012 South Australian Water Heater Installation Requirements Prepared by the Technical Regulator Installation requirements for water heaters serving established Class 1A buildings, established
More informationSAP 2012 IN A NUTSHELL
SAP 2012 IN A NUTSHELL The consultation version of the SAP 2012 methodology was published by the Department of Energy and Climate Change (DECC) on January 4th 2012. This article from Dyfrig Hughes of National
More informationGREENSTAR HEATSLAVE 12/18, 18/25, 25/32
8 716 106 253f 30/3/10 12:59 Page 1 USER INSTRUCTIONS & CUSTOMER CARE GUIDE FLOOR STANDING OIL FIRED CONDENSING COMBINATION BOILER CONVENTIONAL FLUE & ROOM SEALED FLUE GREENSTAR HEATSLAVE 12/18, 18/25,
More informationDealing with. www.stroud.gov.uk. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS
www.stroud.gov.uk Dealing with Management of Asbestos containing materials Many building materials may contain asbestos fibres, often this does not mean that they pose any danger if they are not disturbed.
More informationLandlord Underwriting Guide
Landlord Underwriting Guide Definitions/Excesses The Allianz Landlord Insurance Policy is designed for people who own individual properties or for those who own multiple properties. The Policy provides
More informationWatch out for Winter
Watch out for Winter Watch out for Winter As we begin to brace ourselves for the coming winter, it is so important that we plan ahead and be prepared We should all be mindful about adequately protecting
More informationHot water supply, distribution and use
Guidance Leaflet Reducing use Hot supply, distribution and use All businesses use hot in some way, whether for domestic use, in the manufacturing process or for ancillary activities. As there are considerable
More information[[ ;/LON/P&M/896/8/09 Date: 22-05-2013. Notice inviting quotation for Repairing heating system
[[ ;/LON/P&M/896/8/09 Date: 22-05-2013 TENDER NOTICE Notice inviting quotation for Repairing heating system 1. High Commission of India invites bids from the prospective Heating/Boilers Companies with
More informationTake out an interest-free loan of 1,000 to 100,000
Energy Saving Scotland Small Business Loans Helping Scottish businesses reduce their energy costs Save some money Make some energy efficiency changes Who are we? The Energy Saving Scotland small business
More informationCONTENTS 1 INTRODUCTION 2 POSSIBLE INSTALLATION DIFFICULTIES 3 OUTLINE OF THE ASSESSMENT PROCEDURE 4 PURPOSE OF THE ASSESSMENT PROCEDURE
1 Guide to the Condensing Boiler Installation Assessment Procedure for Dwellings CONTENTS 1 INTRODUCTION 2 POSSIBLE INSTALLATION DIFFICULTIES 3 OUTLINE OF THE ASSESSMENT PROCEDURE 4 PURPOSE OF THE ASSESSMENT
More information