1 Regulatory Notice FINRA, the SEC and CFTC Issue Joint Advisory on Executive Summary Following Hurricane Sandy, which caused widespread damage on the northeast coast of the United States in October 2012, FINRA, the Securities and Exchange Commission s (SEC) Office of Compliance Inspections and Examinations and the Commodity Futures Trading Commission s (CFTC) Division of Swap Dealers and Intermediary Oversight jointly reviewed firms business continuity and disaster recovery planning. FINRA, the SEC and CFTC are issuing the attached advisory to encourage firms to review their business continuity plans and to provide best practices to help improve responses to, and to reduce recovery time after, significant large-scale events. Questions concerning this Notice may be directed to your firm s Regulatory Coordinator. August 2013 Notice Type Guidance Suggested Routing Compliance Legal Operations Senior Management Key Topics Referenced Rules & Notices FINRA Rule FINRA. All rights reserved. FINRA and other trademarks of the Financial Industry Regulatory Authority, Inc. may not be used without permission. Regulatory Notices attempt to present information to readers in a format that is easily understandable. However, please be aware that, in case of any misunderstanding, the rule language prevails. 1
2 Hurricane Sandy caused significant and wide-ranging damage across the northeast coast of the United States on October 28 and October 29, 2012, which led to the closure of the equities and options markets on October 29 and October 30, These events prompted the Securities and Exchange Commission s Office of Compliance Inspections and Examinations ( SEC ), the Financial Industry Regulatory Authority ( FINRA ), and the Commodity Futures Trading Commission s Division of Swap Dealers and Intermediary Oversight ( CFTC ) to jointly review the business continuity and disaster recovery planning of firms. The SEC, FINRA and CFTC contacted firms with a significant market presence to gain an understanding of how the firms were impacted by the events surrounding Hurricane Sandy; specific emphasis was given to firms implementation of their business continuity plans ( BCPs ) and disaster recovery procedures. The SEC, FINRA and CFTC communicated with several firms regarding the impact of Hurricane Sandy on trading, customer relations, financial and regulatory obligations, and technology, among other topics. As a result, the SEC, FINRA and CFTC compiled the following best practices and lessons learned. The regulators encourage firms to review their business continuity plans and consider implementing these best practices and lessons learned as appropriate to help improve responses to, and to reduce recovery time after, significant large scale events. Widespread Disruption Considerations Firms should consider the possibility of widespread lack of telecommunications, transportation, electricity, office space, fuel and water in their BCPs. Consideration should be given to multiple, redundant services and the proximity of vendors to the potential disaster area. Remote access is an important component of business continuity planning. Firms should consider their employees ability to work from home during a crisis and determine what steps can be taken to ensure adequate staffing during a crisis event. Firms should also consider enhancing the capabilities of staff that work from home by identifying technology and communications products and services that could increase efficiency. Since the use of remote access relies heavily on fully functional telephone and internet service, firms should consider alternatives to telework in their BCPs, particularly for key control functions such as compliance, risk management, back office operations and financial and regulatory reporting. Alternative Locations Considerations When considering alternative locations (i.e., back-up data centers, back-up sites for operations, remote locations, etc.) firms should consider the implications of a region wide
3 disruption. Firms are encouraged to consider geographic diversity when determining the physical location of alternative sites. An alternative site, particularly a system back-up location, in close proximity to the primary site may not sufficiently protect the firm from the effects of a region wide event. Firms should consider whether their primary site and alternative sites rely on the same critical utility services, such as electricity, transportation and telecommunications. Firms should consider the accessibility of alternative sites and the ability of staff to travel to the site in the event of a transit shutdown or closure of major roadways. Consideration should be given to staff ability to travel to remote locations, the methods of transportation to move staff to the site and living and lodging expenses related to relocating staff. Firms should further consider establishing pre-arranged contracts with shuttle service providers to facilitate the staff s transport to the work location. Also, familiarizing staff of the transportation alternatives prior to a contingency event may facilitate the process and help ensure that the transportation alternatives are efficiently used. Firms should consider the appropriate number of staff necessary at any alternative site to perform critical activities, including risk functions, control functions, finance and treasury activities, and ensure that adequate space is available. Firms should also consider including designations of key operations and supervisory staff to oversee activities. Firms should consider the generator capacity at the alternative site (i.e., Does it restore partial or full power?) and whether appropriate capacity is allocated to critical users, activities and systems in advance. Firms are also encouraged to explore the expansion of surplus generator capacity and fuel prior to a contingency event to support expanded business functionality. Firms should consider whether their alternate location site has adequate resources. Firms are encouraged to consider whether the site has sufficient staff workspace (e.g., desks, chairs, telephones, etc.), equipment (e.g., computers, printers, network connectivity, etc.) and supplies (e.g., paper, toner, etc.) to accommodate the staff and to carry on operations. In addition, firms should consider keeping their BCPs, contact lists and other necessary documents, procedures and manuals at the alternative site, ideally in paper form in the event that electronic files cannot be accessed. Firms should consider making pre-arrangements for reserving space at remote locations such as hotels or other office space and contemplate moving staff to the alternative location in advance of a significant BCP event. Vendor Relationships Firms should consider critical vendor relationships. Firms should consider examining whether vendors that provide critical services such as clearance and settlement, banking and finance, trading support, fuel, telecommunications, electricity and other utilities also have adequate BCPs. Firms should also consider taking into account that many of these providers could be impacted by the same communication, transportation and electricity challenges facing the firm. 2
4 Firms should also consider categorizing vendors (low-risk, high-risk, etc.) and evaluate the risk in BCP plans. Firms should contemplate having pre-arranged contracts in place with multiple fuel suppliers and schedule deliveries in advance of an event. Telecommunications Services and Technology Considerations Reliance on a single telecommunications service provider may lead to significant communications disruptions when that service provider is unable to operate. Firms should consider contracting with multiple telecommunications carriers to provide a failover to a different carrier to maintain fax, voice mail, and landline and VoIP services. Firms should also consider evaluating how a telecommunication provider s contingency plans will affect the firm s ability to operate. Firms should consider using multiple telecommunication providers, secondary phone lines, cloud technology, temporary phone lines, mobile telecom units and Wi-Fi for staff without power, as well as back-up mobile phone services with different carriers. Firms are encouraged to provide customers, trading counterparties and regulators with updated contact information should alternate telephone lines be used. Firms should consider multiple alternative staffing scenarios including remote access, staff relocation or staffing at alternative sites. Firms should consider enhancing their telecommunications infrastructure to ensure that staff remains fully functional while working from home during brief and extended periods of time. Communication Plans Communications with Customers and Other External Third Parties Firms should consider a plan for providing customers and trading counterparties with contact information so that business can continue. Firms should consider taking measures to ensure that their website is kept up-to-date with information about the firm s operational status and general contact information during a disruption event. Introducing firms should consider publishing contact information for clearing firms on their websites to enable customers to execute liquidating orders or wire transfers through their clearing firms should the firm be inoperable. Clearing firms are encouraged to be in a position to authenticate the validity of customer requests. Firms should consider whether to establish relationships with multiple broker-dealers to facilitate alternative market entry points. Firms should consider implementing a communication plan that allows firms to better communicate and coordinate with regulators, exchanges, emergency officials and other firms. Such coordination should reduce the likelihood of inconsistent communications. Firms are encouraged to participate in industry groups and task forces that may assist firms in strengthening their communication plans. 3
5 Communications with Staff Firms should consider establishing a centralized process for accounting for all staff members rather than relying on each business unit to contact staff individually. Firms should also update emergency contact lists frequently (e.g., as staff members are added or removed) so staff can be contacted with firm updates. Firms should consider adopting more diverse methods of communication with employees including allowing staff, particularly critical staff, to carry multiple communications devices on multiple carriers (e.g., multiple mobile phones, softphones and T-1 lines). Regulatory and Compliance Considerations Firms should consider time-sensitive regulatory requirements, since a crisis event can occur at any time. For example, some firms put a lower prioritization on month-end financial processes, which increased challenges due to the storm s proximity to month end, and caused delays in firms production of certain month end data for regulatory computations and financial reporting. Firms should regularly update their BCPs to include new regulatory and SRO requirements. Firms run the risk of failing to comply with new regulatory and SRO requirements when their BCP is not regularly updated. For example, the Chicago Mercantile Exchange and National Futures Association enacted new requirements for the daily reporting of financial data in It appeared that this new requirement may not have been included in some firms BCP processes and therefore may not have been properly prioritized. Review and Testing Firms should consider conducting full BCP tests and participating in industry testing, at least annually, but more frequently if changes are made. Firms should consider full staff BCP tests to evaluate whether all day-to-day functions, including trade processing, can be performed regardless of staff location. In addition, firms are encouraged to keep their BCPs up to date and to amend their BCPs to incorporate testing results. Regarding business continuity training, firms should consider conducting annual or more frequent training on their BCPs to familiarize all personnel with the plan and their critical pre-established roles. In addition, firms should consider incorporating stress tests into their BCPs. For example, firms could perform a stress test on their liquidity position and review the level of excess customer reserves. Based on this analysis, firms may be better prepared to adjust liquidity or excess reserves (e.g., term repos versus overnight, ability to liquidate money market funds, ability to meet margin calls in a potentially volatile market, adding excess segregation reserves) prior to an event. 4
Business Continuity. Investment Adviser Association Compliance Conference Arlington, Virginia March 6-7, 2014
Business Continuity Investment Adviser Association Compliance Conference Arlington, Virginia March 6-7, 2014 Jennifer L. Klass Morgan, Lewis & Bockius LLP 101 Park Avenue New York, New York 10178 212.309.7105
Business Continuity. Disaster Recovery Plan
Business Continuity Disaster Recovery Plan Emergency Contact Persons Phyllis Hollis, President & CEO O: (212) 916 3888 Cell: (917) 804 8021 Email: [email protected] Kinchen Bizzell, Managing Director,
Business Continuity Plan Summary
\ Business Continuity Plan Summary Emergency Contact Persons: Our firm's two emergency contact persons are Travis Hudak, owner (801-550-0387), e-mail: [email protected] and Michael Child, owner (801-518-
Business Continuity Plan
Business Continuity Plan Introduction This manual documents the business continuity plan for Eastwood Wealth Management, an LPL Financial branch office that conducts business in: equity, fixed income,
Business Continuity Plan Template for Introducing Brokers. [Firm Name] Business Continuity Plan (BCP)
Business Continuity Plan Template for Introducing Brokers [Firm Name] Business Continuity Plan (BCP) This template is provided as an optional guide to small introducing firms to assist them in fulfilling
LEMLEY, YARLING & CO. LEMLEY, YARLING MANAGEMENT CO. BUSINESS CONTINUITY PLAN
I. Emergency Contact Persons LEMLEY, YARLING & CO. LEMLEY, YARLING MANAGEMENT CO. BUSINESS CONTINUITY PLAN Our firm s two emergency contact persons are: Ralph J. Lemley, [email protected], (608) 624-5777
GWM GROUP INC Business Continuity Plan (BCP)
GWM GROUP INC Business Continuity Plan (BCP) I. Emergency Contact Persons *Reviewed: June 03 rd, 2013 *Revised: March 19 th, 2014 *Revised: May 20 th, 2014 Our firm s two emergency contact persons is:
BUSINESS CONTINUITY PLAN (BCP)
BUSINESS CONTINUITY PLAN (BCP) This is the Business Continuity Plan ( BCP ) for Wolfe Research Securities (the Firm ). Emergency Contact Persons The Firm s two emergency contact persons are: David Malat
JANSSEN PARTNERS, INC. Business Continuity Plan (BCP)
JANSSEN PARTNERS, INC. Business Continuity Plan (BCP) Emergency Contact Persons Our firm s two emergency contact persons are: Peter Janssen, President, Tel. 641-209-5940, Cell 516-456-7059, Fax 641-843-7036,
Business Continuity Plan (BCP)
1. Emergency Contact Persons CSCM s primary emergency contact persons are: John Stepp, Managing Director and CEO Phone #: 913 485 8809 Michael Horton, Branch Manager Phone #: 316 259 4449 These names will
Business Continuity Plan Template for Small Introducing Firms. [Firm Name] Business Continuity Plan (BCP)
Business Continuity Plan Template for Small Introducing Firms [Firm Name] Business Continuity Plan (BCP) Updated May 12, 2010 This optional template is provided to assist small introducing firms in fulfilling
PPSADOPTED: OCT. 2012 BACKGROUND POLICY STATEMENT PHYSICAL FACILITIES. PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan
PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan OCT. 2012 PPSADOPTED: What is a professional practice statement? Professional Practice developed by the Association Forum of Chicagoland
: Chief Executive Officers of all Licensed Commercial Banks, Primary Dealers, Central Depository Systems (Pvt) Ltd. and LankaClear (Pvt.) Ltd.
March 29, 2006 BCP Guidelines No: 01/2006 To : Chief Executive Officers of all Licensed Commercial Banks, Primary Dealers, Central Depository Systems (Pvt) Ltd. and LankaClear (Pvt.) Ltd. Introduction
Business Continuity Plan (BCP)
Business Continuity Plan (BCP) I. Emergency Contact Persons Our firm's emergency contact person is: David Kassir, President (703) 533-0030, [email protected]. These names will be updated
SecureVest Financial Group, Inc. Argentis Advisors Business Continuity Plan (BCP)
SecureVest Financial Group, Inc. Argentis Advisors Business Continuity Plan (BCP) I. Emergency Contact Persons August, 2015 Our firm s three (3) emergency contact persons are August Cellitti (973) 723-9078,
Disaster Recovery Plan
Disaster Recovery Plan This guide sets forth items to consider in the review of the firm s disaster recovery plan. You should form a committee to assess the plan and should assign activities under the
ViewTrade Securities, Inc. Business Continuity Plan (BCP) 2015
ViewTrade Securities, Inc. Business Continuity Plan (BCP) 2015 I. Emergency Contact Persons Our firm s two emergency contact persons are: James St.Clair, President, (561) 703-6699, [email protected];
Mazzone & Associates, Inc.
Mazzone & Associates, Inc. Business Continuity Plan (BCP) Introduction. As a result of our ever-changing and evolving world, it has become necessary for firms in the financial services industry to take
CLIENT 1 ST ADVISORY GROUP BUSINESS CONTINUITY PLAN (BCP)
CLIENT 1 ST ADVISORY GROUP BUSINESS CONTINUITY PLAN (BCP) I EMERGENCY CONTACT PERSON Our firm s emergency contact persons for the Clearwater, FL office are: Craig Phillips, CFP, 727-450-2301 x 108 or 727-422-9301,
Statement of Business Continuity Management
Statement of Business Continuity Management National Financial, a Fidelity Investments Company, National Financial Services LLC Revision Date: December 1, 2009 At National Financial and National Financial
NexTrend Securities, Inc. Business Continuity Plan (BCP)
NexTrend Securities, Inc. Business Continuity Plan (BCP) I. Emergency Contact NexTrend Securities, Inc. (the firm ) emergency contact person: Name: Mark Cherlin Position: Executive Representative and Registered
Supervisory Policy Manual
This module should be read in conjunction with the Introduction and with the Glossary, which contains an explanation of abbreviations and other terms used in this Manual. If reading on-line, click on blue
Regulatory Notice 10-57
Regulatory Notice 10-57 Risk Management Funding and Liquidity Risk Management Practices Executive Summary In adverse circumstances, whether the result of firm-specific events or systemic credit events,
FIELDSTONE 120 West 45th Street, Suite 1400, New York, NY 10036 TEL: (212) 626-1400 FAX: (212) 626-1414
FIELDSTONE 120 West 45th Street, Suite 1400, New York, NY 10036 TEL: (212) 626-1400 FAX: (212) 626-1414 Fieldstone Services Corp. Business Continuity Plan (BCP) General guidance and background: Please
Building a strong business continuity plan
Building a strong business continuity plan Protect your clients and firm with a well-planned business continuity plan A solid business continuity plan (BCP) is about more than simply staying in compliance.
MarketAxess Business Continuity Plan Disclosure
MarketAxess Business Continuity Plan Disclosure Copyright 2014 MarketAxess Holdings, Inc. All Rights Reserved Member FINRA (MarketAxess Corporation) and regulated by the FCA (MarketAxess Europe Ltd.) Contents
BUSINESS CONTINUITY AND DISASTER RECOVERY PLAN
BUSINESS CONTINUITY AND DISASTER RECOVERY PLAN Swiss Alpine Wealth Management has developed this Business Continuity and Disaster Recovery Plan (the Plan ) in order to provide guidance regarding the steps
Emergency Contact Person - Firm Policy And Operation
Business Continuity Plan I. Emergency Contact Persons The Firm s emergency contact persons ( Executive Representatives ) are: Dean Cash Chairman and CEO () Pari Choksi Executive Vice President, CFO and
R.M.STARK & CO., INC. BUSINESS CONTINUITY PLAN
INTRODUCTION: The purpose of the Business Continuity Plan is to insure that in the event of a major business disruption to any of the Firm s locations our client s ability to access their accounts, funds,
THORNBURG INVESTMENT MANAGEMENT THORNBURG INVESTMENT TRUST. Business Continuity Plan
THORNBURG INVESTMENT MANAGEMENT THORNBURG INVESTMENT TRUST Business Continuity Plan June 2012 Purpose The purpose of this Business Continuity Plan ( BCP ) is to define the strategies and the plans which
Prudential Practice Guide
Prudential Practice Guide LPG 232 Business Continuity Management March 2007 www.apra.gov.au Australian Prudential Regulation Authority Disclaimer and copyright This prudential practice guide is not legal
2015 CEO & Board University Taking Your Business Continuity Plan To The Next Level. Tracy L. Hall, MBCP
2015 CEO & Board University Taking Your Business Continuity Plan To The Next Level Tracy L. Hall, MBCP MEMBER OF PKF NORTH AMERICA, AN ASSOCIATION OF LEGALLY INDEPENDENT FIRMS 2015 Wolf & Company, P.C.
Creating a Business Continuity Plan. What We ll Cover... What is a BCP? Micky Hogue, CRM
Creating a Business Continuity Plan Micky Hogue, CRM Sandia National Laboratories Albuquerque, NM 505-844-6640 [email protected] What We ll Cover... What is a Business Continuity Plan Why create a BCP?
Disaster Recovery Plan Checklist
Disaster Recovery Plan Checklist Your guide for setting up or updating a Disaster Recovery Plan for your business. ArcSource Disaster Recovery Plan Checklist 1. Compile Your Internal Contacts Information
JNK Securities Corp. Business Continuity Plan (BCP) - 2015
JNK Securities Corp. Business Continuity Plan (BCP) - 2015 I. Emergency Contact Persons Our firm s two emergency contact persons are: Scott Kaplan 212.885.6354 [email protected] Curt Snyder 212.885.6314 [email protected]
Prudential Practice Guide
Prudential Practice Guide SPG 232 Business Continuity Management July 2013 www.apra.gov.au Australian Prudential Regulation Authority Disclaimer and copyright This prudential practice guide is not legal
Rockwell Financial Group Business Continuity Plan. Emergency Contact Persons Rockwell Financial Group has two emergency contact persons:
Rockwell Financial Group Business Continuity Plan Emergency Contact Persons Rockwell Financial Group has two emergency contact persons: Michael Halkitis, President/ Finop Primary Contact Information: Phone
Federal Financial Institutions Examination Council FFIEC. Business Continuity Planning BCP MARCH 2003 MARCH 2008 IT EXAMINATION
Federal Financial Institutions Examination Council FFIEC Business Continuity Planning MARCH 2003 MARCH 2008 BCP IT EXAMINATION H ANDBOOK TABLE OF CONTENTS INTRODUCTION... 1 BOARD AND SENIOR MANAGEMENT
NASAA Model Rule on Business Continuity and Succession Planning Model Rule 203(a)-1A or 2002 Rule 411(c)-1A Adopted April 13, 2015
NASAA Model Rule on Business Continuity and Succession Planning Model Rule 203(a)-1A or 2002 Rule 411(c)-1A Adopted April 13, 2015 Every investment adviser shall establish, implement, and maintain written
Summary of Requirements for CME, CBOT, NYMEX and COMEX Clearing Membership And OTC Derivatives Clearing Membership. January 2016
Summary of Requirements for CME, CBOT, NYMEX and COMEX Clearing Membership And OTC Derivatives Clearing Membership CME Clearing ( Clearing House ) is the clearing house division of Chicago Mercantile Exchange
BUSINESS CONTINUITY PLAN
Business Logo Here BUSINESS CONTINUITY PLAN FOR SMALL TO MEDIUM SIZED BUSINESSES DATE :??? VERSION:?? PRODUCED BY DURHAM CIVIL CONTINGENCIES UNIT BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...4
Chairwoman Sue W. Kelly House Financial Services Subcommittee on Oversight and Investigations U.S. House of Representatives
June 29, 2006 Statement of Gregory J. Ferris Managing Director Global Business Continuity Planning Morgan Stanley Testifying on Behalf of The Bond Market Association and Securities Industry Association
PAPER-6 PART-3 OF 5 CA A.RAFEQ, FCA
Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-3 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
7QUESTIONSYOUNEEDTOASKBEFORE CHOOSINGACOLOCATIONFACILITY FORYOURBUSINESS
7QUESTIONSYOUNEEDTOASKBEFORE CHOOSINGACOLOCATIONFACILITY FORYOURBUSINESS ExecutiveBrief P a g e 1 Executive Brief 7 Questions You Need to Ask Before Choosing a Colocation Facility for Your Business Choosing
J.P. Morgan Securities LLC CFTC Supplemental Disclosures
CFTC Supplemental Disclosures February 2015 Assets and Capital Allocation as of February 28, 2015 Asset Allocation Capital Employed Financing (Resales, Borrows) 50.9% 2.0% Inventory by Business Line Public
Disaster Recovery Plan
Disaster Recovery Plan Date: Revision: 8.0 EXTERNAL BCP PLAN PAGE 1 OF 12 Federal regulation states, and internal corporate policies require, that Penson Financial Services, Inc. (Penson) develop Business
Why Should Companies Take a Closer Look at Business Continuity Planning?
whitepaper Why Should Companies Take a Closer Look at Business Continuity Planning? How Datalink s business continuity and disaster recovery solutions can help organizations lessen the impact of disasters
Federal Financial Institutions Examination Council FFIEC BCP. Business Continuity Planning FEBRUARY 2015 IT EXAMINATION H ANDBOOK
Federal Financial Institutions Examination Council FFIEC Business Continuity Planning BCP FEBRUARY 2015 IT EXAMINATION H ANDBOOK Table of Contents Introduction 1 Board and Senior Management Responsibilities
Wealthfront Brokerage Corporation
Wealthfront Brokerage Corporation Business Continuity Plan Disclosure Wealthfront Brokerage Corporation ( Wealthfront Brokerage ) has developed a Business Continuity Plan on how we will respond to events
Broker-dealer industry update
Highlights of recent accounting and regulatory issues This document highlights key accounting and regulatory issues, new developments and best practices for broker-dealers from the SEC, Public Accounting
IT Disaster Recovery Plan Template
HOPONE INTERNET CORP IT Disaster Recovery Plan Template Compliments of: Tim Sexton 1/1/2015 An information technology (IT) disaster recovery (DR) plan provides a structured approach for responding to unplanned
<Client Name> IT Disaster Recovery Plan Template. By Paul Kirvan, CISA, CISSP, FBCI, CBCP
IT Disaster Recovery Plan Template By Paul Kirvan, CISA, CISSP, FBCI, CBCP Revision History REVISION DATE NAME DESCRIPTION Original 1.0 2 Table of Contents Information Technology Statement
How To Understand The State Of Business Continuity Preparedness
M ARKET STUDY The State of Business Continuity Preparedness Photo by Sergey Nivens Fotolia.com By STEPHANIE BALAOURAS Forrester Research and the Disaster Recovery Journal have partnered to field a number
Statement of Guidance
Statement of Guidance Business Continuity Management All Licensees 1. Statement of Objectives 1.1. To enhance the resilience of the financial sector and to minimise the potential impact of a major operational
DISASTER RECOVERY PLANNING FOR CITY COMPUTER FACILITIES
APPENDIX 1 DISASTER RECOVERY PLANNING FOR CITY COMPUTER FACILITIES March 2008 Auditor General s Office Jeffrey Griffiths, C.A., C.F.E. Auditor General City of Toronto TABLE OF CONTENTS EXECUTIVE SUMMARY...1
Disaster Recovery Plan
Disaster Recovery Plan Date: February 2, 2009 Revision: 9.0 EXTERNAL BUSINESS CONTINUITY PLAN PAGE 1 of 13 Federal regulation states, and internal corporate policies require, that Penson Financial Services,
CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT
CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT JANUARY 2008 GUIDELINE ON BUSINESS CONTINUITY GUIDELINE CBK/PG/14
Attachment #2. BUSINESS CONTINUITY PLAN Plan Development Guidelines
Version 2 May 2004 TABLE OF CONTENTS PURPOSE OF DOCUMENT... 2 ASSOCIATION RULE REQUIREMENT BY-LAW NO. 17.19.... ERROR! BOOKMARK NOT DEFINED. GUIDELINES FOR NING... 2 SCOPE OF THE PLAN... 2 GOVERNANCE AND
GUIDELINES FOR BUSINESS CONTINUITY IN WHOLESALE MARKETS AND SUPPORT SYSTEMS MARKET SUPERVISION OFFICE. October 2004
GUIDELINES FOR BUSINESS CONTINUITY IN WHOLESALE MARKETS AND SUPPORT SYSTEMS MARKET SUPERVISION OFFICE October 2004 1 1. Introduction Guaranteeing the efficiency and correct operation of money and financial
Vendor Management. Outsourcing Technology Services
Vendor Management Outsourcing Technology Services Objectives Board and Senior Management Responsibilities Risk Management Program Risk Assessment Service Provider Selection Contracts Ongoing Monitoring
Data Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: [email protected] Fax: (718) 380-7322
Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery
CITY UNIVERSITY OF HONG KONG Business Continuity Management Standard
PUBLIC Version: 1.0 CITY UNIVERSITY OF HONG KONG Business Continuity Management Standard (Approved by the Information Strategy and Governance Committee in December 2013; revision 1.1 approved by Chief
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0 Unless otherwise stated, these Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies
VitalPBX. Hosted Voice That Works. For You
VitalPBX Hosted Voice That Works For You Vital Voice & Data s VitalPBX VVD Hosted PBX solutions provide you with the stability of a traditional telephone PBX system and the flexibility that only a next
Verizon, 911 Service and the June 29, 2012, Derecho
Verizon, 911 Service and the June 29, 2012, Derecho August 13, 2012 Verizon, 911 Service, and the June 29, 2012 Derecho Late in the evening of Friday June 29, 2012, a severe storm hit the Mid-Atlantic
Business Continuity and Disaster Recovery Planning from an Information Technology Perspective
Business Continuity and Disaster Recovery Planning from an Information Technology Perspective Presenter: David Bird, Director of Sales, Business Technology Consultant phone: 215-672-7100 email: [email protected]