1 Upper Perkiomen School District Network Infrastructure Review Executive Summary Prepared by 1001 James Drive, Suite A15 Leesport, PA Date: March 10, 2015 Report Version: 1.0.2

2 Table of Contents Introduction... 1 Executive Summary... 1 Analysis and Findings... 2 Computer Room Upgrade... 2 Microsoft Enrollment for Education Solutions (EES) Program... 3 Network Switches... 3 Network Firewall, Security and VPN... 4 Server and Disk Storage Hardware Upgrade... 4 Migration from Novell to Microsoft Active Directory... 4 Network Hardware/Software Upgrade and Maintenance... 5 Implementation of Centralize Security and Management with AD... 6 Voice Network Software and Hardware Upgrade... 6 Wireless Coverage Improvement... 6 Workstation Hardware and Operating System Replacement... 7 Data Cabling... 7 Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page i

3 Upper Perkiomen School District Network Review Execute Summary May 10, 2015 Introduction This study was commissioned by Upper Perkiomen School District to evaluate the existing network infrastructure, the ability for the district to effectively implement and support technology to meet curriculum and administrative needs, and to provide analysis and recommendations to position the network to support the district s curriculum and administrative needs for the next five years. As requested, this executive summary briefly documents high level network findings and recommendations for discussion and budget planning purposes. A detailed findings report will follow shortly. The information used for this review was gathered via interviews with the IT staff, principals, teachers and the administration; from existing network information and inventory provided by the technology department; and by a sampling review of the network infrastructure. Executive Summary The district s network is in a state where the majority of the network hardware and software is no longer supported by the manufacturer, reaching end of life, or has not been maintained adequately over the past several years. This includes but is not limited to network switch hardware, server hardware, disk storage array, workstation hardware, server and workstation operating systems, voice services, voice network and other critical services. This situation has placed the district s network infrastructure in a state where it s not able to effectively support existing and upcoming business and curriculum requirements. A significant portion of the network infrastructure must be upgraded to supported standards and implementation practices to successfully support the district s technology needs for the next five years. This executive summary describes the major deficiencies at a high level, provides a recommended course of action for each item, and provides budget planning estimates when available. The more comprehensive findings report will be issued in the near future to provide additional details and to address additional items needing resolution. Like many school districts and business, recent economic challenges and the increased reliance of technology have encouraged Upper Perkiomen School District to examine its current network infrastructure, applications and support structure to better position the district to effectively meet its technology needs for the next five years. This final analysis will provide an overview of Upper Perkiomen s current network infrastructure, applications and support structure, as well as recommendations to improve each of these areas. Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page 1

4 Analysis and Findings The remainder of this review describes the more urgent findings that need to be addressed. Budget planning estimates to address the items are noted as available. Computer Room Upgrade The district will continue to need a computer room for the foreseeable future to support its network infrastructure, applications and operations. The existing computer room is located at the High School and needs to be upgraded to bring it to current standards, to support the implementation of network equipment and improve general network operations. Doing so will allow the district to continue to consolidate data and network support hardware into a central location. This in turn will have the desired effect of enhancing network reliability, improve access to data, and reduce network support and maintenance overheads. The existing computer room has multiple significant deficiencies that the upgrade will address: 1. Additional floor space is needed for the computer room to provide space for new equipment racks and to provide a more efficient working environment. 2. Additional equipment rack enclosures are needed to support the consolidation of existing network equipment and to implement new equipment needed to upgrade aging hardware. The existing racks are at 100% capacity and are not sized to current industry standards for network equipment racking specifications. 3. Install cabling ladder racks to provide structure cable management for data and power cables. This will address problems with existing cable management in the room 4. Provide power to the back room racks from the main UPS for the computer room. The back room racks are supported by smaller independent UPS units rather than the main computer room UPS. 5. Confirm that the existing UPS unit is able to fully service the room with clean 208V 3 phase power. This will provide improved power management and diversity for the equipment racks. It will also provide the option to use 220V service to equipment, which more computer room implementations are using to reduce power requirements and increase equipment efficiency. The existing UPS is current at 33% capacity and should has adequate capacity to support the proposed expansion. 6. Redesign the A/C to support a larger room and provide A/C redundancy. The room is currently support by the building A/C, which is not active during the winter months. It is also supported by two portable backup A/C units. 7. Install a dry fire suppression system. A dry fire suppression system will help to more effectively protect equipment and retain the integrity of equipment and the data that it houses in the event of an actual or accidental discharge. 8. Install and Emergency Power Off (EPO) system to automatically power down the computer room equipment and all related environment services during an emergency or fire. This is normally tied to the computer room fire suppression system to fully shutdown the environment during a fire event. Two preliminary options are being reviewed regarding the additional floor space requirements for the computer room. The first option, if feasible, is to redesign the existing computer room to more efficiently use floor space. This will require a temporary relocation of the existing computer room hardware, perhaps to the library work room Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page 2

5 next to the computer room. The second option is to relocate the computer room to another location within the High School. This will require the construction of a new room with the required environment control systems, the relocation of the computer room UPS, and the rerouting of computer room power. An engineering study, architectural review, network design and budget analysis is needed to determine the most feasible and cost effective option to pursue. If the decision is made to relocate the computer room, new rack systems are available for consideration that will potential reduce room construction costs. Capital Cost: The cost to implement a new computer room varies significantly depending on the requirements of the district. For budget planning purposes, an average estimate of $250,000 to $300,000 should be considered for construction and equipment costs, and $35,000 for design and engineering costs. Microsoft Enrollment for Education Solutions (EES) Program IU13 has partnered with Microsoft to offer to Pennsylvania schools the ability to participate in a licensing partnership that has been tailored specifically to meet the needs of the Commonwealth's school districts. These programs have been customized so that any school in Pennsylvania will be able to take advantage of the benefits of Microsoft's Enrollment for Education Solutions (EES) program without the constraints of meeting minimum purchasing requirements plus benefit from a discounted pricing structure. The program provides access to software products such as Microsoft Windows 7, Microsoft Windows 8, Microsoft Office 2010 and 2013, Microsoft Server 2008 and 2012, Exchange Server, SQL, SharePoint, Microsoft System Center Endpoint Protection (anti virus) and SCCM for device management and software distribution. It also provides low cost access to products such as Microsoft Visio and Microsoft Project. The EES program is a subscription based program with one annual payment due each year. The program licensing fee is based on a school district's annual full time equivalent (FTE) count and/or a school's annual student enrollment figure, rather than on a computer or device count total. The software itself may be installed on all district owned hardware. Recommendation: Purchase the Microsoft EES network to bring workstation and server operating systems, Microsoft Office products, , security and software distribution to current Microsoft standards. The Microsoft products will also be used to replace the existing Novel environment. Cost: Based on 446 district employees and 3,747 students, the annual subscription fee is $36, Network Switches The network infrastructure switches are composed of a mix of Cisco, HP and Meraki hardware. Based on the inventory provided for this review, many of the switches have or are about to reach end of life as noted below. The only exception are the recently purchase Meraki switches. 1. (29) Cisco switches will reach end of life and support on July 31, (1) Cisco switch reached end of life and support on May 2, (9) HP switches reached end of life and support on January 31, (2) HP switches reached end of life and support on January 1, (13) Meraki switches are in place to support wireless and will be supported until February 21, The Cisco and HP switches in place are 10/100 Mbps switches and are not able to support the Gigabit speeds for the new devices. There are also an unknown number of unmanaged switches supporting labs and small groups of workstations that will need to be upgraded to support gigabit speeds. Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page 3

6 Recommendation: Replace all of the main closet switches with a single Cisco platform that supports gigabit speeds and that has a common and integrated management platform. Capital Cost: $201,398 O&M Cost: TBD Only a small number of switches will require maintenance since the majority of them will be covered by life time warrantees. Implementation Cost: $20,000 $25,000 Network Firewall, Security and VPN The existing Cisco ASA 5520 platform is viable through September 30, 2018 for the district current firewall needs. The firewall access rules themselves need to be updated to bring them to current configuration practices. The most significant firewall restriction is that Cisco AnyConnect (VPN) is not implemented, preventing authorized users and vendors from being able to securely and easily access the network from outside the district. Today, external access to the district s network is not based on a user, but rather the IP network they are attached to. This prevents the ability to securely manage who is accessing the district s network from the Internet. The Cisco ASA is able to support Cisco AnyConnect, which is the most current VPN client to allow users access to the district s network from various platforms (Windows, MAC, mobile devices, etc). Recommendation: Update the firewall and VPN environment to current standards. Capital Cost: TBD need to get pricing for the VPN licenses. O&M Cost: TBD need to get pricing for the VPN licenses. Implementation Cost: $5,000 $6,000 to get the firewall itself ready and VPN access procedures documented. Server and Disk Storage Hardware Upgrade The existing server and disk storage platform is aged and does not have the adequate disk storage to support the district s business and academic needs. Currently, there isn t enough disk capacity to support existing user requirements, forcing users to store district and curriculum data on external storage devices such as USB drives. A replacement platform design and size is highly dependent on the district s curriculum direction. Recommendation: A new server and disk storage platform should be considered. The final number of servers and disk storage that will be needed requires additional research of the existing storage usage as well as formalization of the business and curriculum space needs. Costs: A high end estimated cost for the necessary server and disk storage hardware is approximately $450,000 to $575,000 depending on the amount of required storage and redundancy requirements. Storage is the most expensive item in this estimate. Migration from Novell to Microsoft Active Directory Many organizations, private enterprises and school districts have migrated from Novell to Microsoft Active Directory (AD). Reasons include that Microsoft AD is a more widely accepted platform for small and large organizations, it provides a more robust enterprise wide platform to better manage security, devices, data and applications. Also, there are a significant number of technicians and organizations readily available to support AD. Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page 4

7 Implementation Cost: This is a significant migration effort for the district and requires additional time to review the needs and implementation costs. This migration is also highly dependent on the enhancement of the server and disk storage platforms selected. Based on similar migrations, the cost to upgrade and/or migrated all of the above systems will be approximately $100,000 to $150,000. This includes the migration of workstations to the new environment, the definition of users, and the migration of data to the new environment. Network Hardware/Software Upgrade and Maintenance All hardware and software maintenance contracts need to be reviewed and purchases where needed. The district does have some maintenance contracts for items such as Novel and VMWare; however, maintenance contracts do not exist for the server and disk storage environment. This means that the district must self ensure hardware repairs and is not in a position to get vendor support for hardware support problems. Also, where software contracts are in place, the district has not been applying the entitled software upgrades. The lack of maintenance has placed the district s network into a compromised state that includes the inability to adequately support business and curriculum needs. It has also placed the district in a situation where lengthy and complex upgrades must now be implemented to get the network to a current level of support. The following are some of the items that are currently out of date: 1. VMWare is the platform used to support and manage all of the production virtual servers used by the district. VMWare maintenance is significantly out of date as follows: a. VMWare cluster one is built with VMWare 4.0. Support for this version ended on June 21, IT reported that maintenance has not been applied to this platform since its initial build. b. VMWare cluster is built with VMWare 5.0. Support for this version ends on August 24, 2016, so there is still time to get this platform upgraded. This cluster was built in 2012 and its being reported that maintenance has not been applied to this platform since its initial build. 2. Microsoft Server 2003, which will no longer be supported after July 14, Many of these servers were built around Standard maintenance has not been applied to these servers since their initial build. Services supported by this platform include: a. Server user to manage the HP EVA disk storage platform. b. Follett Destiny library catalog c. Server used to manage cluster one of the production VMWare virtual server environment. d. Server used to manage cluster two of the production VMWare virtual server environment. e. Food service. 3. Microsoft Server This is still a viable server platform. However, some of these servers were building as far back as March 28, 2013 and maintenance has not been applied to these servers since then. 4. Microsoft XP devices being used as servers. Microsoft support was discontinued on April 8, Services supported by this platform include: a. Edwards printer management services for the district. b. MS ATRT, ME Compass Data, ME Weathernet. It needs to be verified that these applications have been moved to new servers. 5. Novell Version 10 is in place, which was release on July It s been reported that maintenance has not been applied to the platform for the past five years. Version 11 became available on March 24, 2009 and Version 12 on October 28, Cisco IP Phone System is currently on Version 7 of the software, which is no longer supported and preventing the use of newer model handsets. As a result, the district is having to go to the second hand Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page 5

8 market to get handsets that are compatible with the system. The supporting vendor recommends that the system be reinstalled to get it to Version 10 of the platform. The alternative is to incrementally upgrade from V7, V8, V9 and finally V10. Recommendation: All of the above platforms need to be brought to current operating standards. The actual platforms to be implemented are highly dependent on the replacement platforms that are purchased for this effort. Also, maintenance contracts should be purchased for critical network, server and application support software. Software Cost: 1. The necessary Microsoft Server and Exchange licenses will be covered as part of the EES program described earlier. 2. VMWare software is covered as part of VMWare s software maintenance plans. It needs to be determined if the district is under a maintenance plan. 3. Novell will be replaced with Microsoft AD, at which time the Novell maintenance plans will no longer be needed. Whether or not Novell needs to be upgraded prior to then still needs to be determined since an upgrade may be needed to make Novell compatible with the Microsoft platforms being implemented. 4. Cisco Voice software is covered as part of the Cisco maintenance plan. Maintenance Costs: TBD Implementation Cost: This is covered as part of the migration from Novell to Microsoft Active Directory. Implementation of Centralize Security and Management with AD The Microsoft environment provides a robust management platform for Microsoft based devices. It also provides a robust security platform for Microsoft devices, RADIUS and LDAP. Recommendation: With the implementation of the Microsoft Server platform and the migration of all users to the platform, migrate other services such as VPN, network device access, data access, etc. to the AD platform. Cost: The necessary Microsoft server licenses will be covered as part of the EES program described earlier. Implementation Cost: Based on similar migrations, the cost to migrate to the AD security and management platform will be approximately $11,000 to $22,000. Voice Network Software and Hardware Upgrade As reference earlier, the voice network is significantly out of date and needs to be upgraded. Cost: A discussion needs to take place with the voice support vendor to get an estimated cost for this upgrade. Wireless Coverage Improvement The district recently migrated to a Meraki wireless platform across all of their buildings. There are reports that wireless coverage is spotty and at times unavailable. One of the noted problems is that many of the wireless access points are installed along the hallways. This implementation practice is outdated for high wireless usage areas for multiple reasons including but not limited the power scale back of wireless coverage due to the close proximity of wireless access points within each other, and the number of wall and other surfaces that wireless signals need to penetrate in order to reach devices in classrooms. Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page 6

9 Recommendation: Move wireless access points into the classroom and add units as needed to provide a minimum 50% coverage pattern (every other classroom). Additional wireless access points may need to be purchased to provide the minimum 50% coverage or to supplement high wireless access areas. Cost: This will require a walkthrough of all buildings to identify current and proposed location for wireless access points. This will then determine the number of additional wireless access points that will be needed, any additional cabling requirements and the labor to install the units. Workstation Hardware and Operating System Replacement There are a considerable number of workstations within the district that are executing Windows XP and that have only 1 GB of memory. These workstations are not eligible for Windows 7 or 8 given their slow processors and the need for a minimum of 4 GB of memory (8 GB recommended). Also, support for XP was discontinued on April 8, These workstations must be replaced. Cost for replacement option 1: Currently, the district has 1,194 of the 1,858 workstations within the district are XP based systems. There are also an additional 115 non XP workstation that are older than five years. Based on experience from other districts, replacement cost should be budgets at an average of $850 per device for a total of 1,027,650. The EES program will cover the cost of Microsoft Windows operating system and Microsoft Office products for these devices. Cost for replacement option 2: There is a workstation plan being developed by curriculum that may reduce the number of XP devices to replace as well as the cost of the device. The plan reallocates workstation distribution to potentially reduce the XP workstation replacement count down to 767 devices for a total cost of $651,950 at $850 per device. Note: There is a new HP tablet being considered as well that will potentially drop the workstation cost for Option 2 down to $403,000 at $400 per device. Additional testing of this device is needed to ensure that it will meet the district s needs for 4 5 years. Data Cabling It was reported that the majority of the buildings have both Cat5e and fiber cabling to each of the classrooms. The Cat5e cabling, if installed according to Cat5e cabling standards, will support device speeds of up to 1 Gbps, which is the common speed for network devices purchased over the past several years. The fiber to the classrooms is not needed and will most likely not be used in the foreseeable future. Marlborough Elementary is cabled using Cat5 (not Cat5e) cabling standards and will need to be fully upgraded in order to support gigabit device speeds, which includes workstations and wireless access points. The existing Cat5 cabling is rated for 100 Mbps. This cable will not support gigabit device speeds and will generate errors when the new gigabit network switches are installed. This in turn will result in poor network reliability for Marlborough Elementary. Recommendation: Upgrade the cabling for this building to a minimum of Cat5e. A Cat6 platform should be considered if plans are to retain the building for the next five years. Cost: The cost to install Cat5e and Cat6 cable is approximately $ per cable run. A required cable count for the building needs to be performed. Also, the implementation of wireless workstations and devices will reduce the number of needed cable runs. Upper Perkiomen School District Network Infrastructure Review Executive Summary May 10, 2015 Page 7

ACME Enterprises IT Infrastructure Assessment

ACME Enterprises IT Infrastructure Assessment Prepared for ACME Enterprises March 25, 2014 Table of Contents Executive Summary...2 Introduction...2 Background...2 Scope of IT Assessment...2 Findings...2 Detailed Findings for Key Areas Reviewed...3

More information

IT Assessment Report. Prepared by: Date: BRI Works www.bri.works 321 East Main Street, Suite 200 Charlottesville VA 22902 434.951.

IT Assessment Report. Prepared by: Date: BRI Works www.bri.works 321 East Main Street, Suite 200 Charlottesville VA 22902 434.951. IT Assessment Report Prepared by: Date: BRI Works www.bri.works 321 East Main Street, Suite 200 Charlottesville VA 22902 434.951.7979 Table of Contents Executive Summary 3 IT Summary 3 Assessment Goal

More information

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015 WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015 Platform Architecture Standards: End User Software Platform Architecture Standards: End User Hardware Platform Architecture Standards: Hand Held

More information

Case Study: Oconomowoc Area School District

Case Study: Oconomowoc Area School District Prepared for CESA #1, Sponsored by Cisco Systems, Inc. Case Study: Oconomowoc Area School District Prepared by Rich Kaestner, CoSN TCO/VOI Project Director March 16, 2008 If a broadband fiber network were

More information

District IT Infrastructure Upgrade Plan

District IT Infrastructure Upgrade Plan District IT Infrastructure Upgrade Plan This document contains two different plans, one consisting of accomplishing all upgrades at one time the other is a plan to accomplish all upgrades over a 3 year

More information

Technology Department Infrastructure & Support

Technology Department Infrastructure & Support Technology Department Infrastructure & Support The Technology Department Team Executive Director of Technology Technology Coordinator Network Engineer Application Administrator Application Specialist Infrastructure

More information

Seward County Community College

Seward County Community College Seward County Community College REQUEST FOR PROPOSALS Telephone System Replacement Response to Vendors Questions Issued: January 5, 2006 1. Please clarify counts, which includes detail on receptionist

More information

System Requirements for Microsoft Dynamics SL 2015

System Requirements for Microsoft Dynamics SL 2015 System for Microsoft Dynamics SL 2015 Overview This document contains the minimum client hardware requirements, server recommendations and Terminal Server minimum hardware requirements supported by the

More information

Computer Hardware, Network and Software Recommendations

Computer Hardware, Network and Software Recommendations Computer Hardware, Network and Software Recommendations The Right IT Person The right IT person, computer consultant is important, very similar to a technician they have varying skill sets and understanding

More information

* * * AGENDA TRANSMITTAL FORM * * *

* * * AGENDA TRANSMITTAL FORM * * * MONTEREY REGIONAL WATER POLLUTION CONTROL AGENCY * * * AGENDA TRANSMITTAL FORM * * * MEETING DATE: SEPTEMBER 28, 2015 AGENDA ITEM: AGENDA TITLE: 6 H APPROVE CONTRACT FOR RTP NETWORK CENTER CONSOLIDATION

More information

MCSE SYLLABUS. Exam 70-290 : Managing and Maintaining a Microsoft Windows Server 2003:

MCSE SYLLABUS. Exam 70-290 : Managing and Maintaining a Microsoft Windows Server 2003: MCSE SYLLABUS Course Contents : Exam 70-290 : Managing and Maintaining a Microsoft Windows Server 2003: Managing Users, Computers and Groups. Configure access to shared folders. Managing and Maintaining

More information

QUALIFICATION GUIDELINES

QUALIFICATION GUIDELINES The NetTech 603 Seagaze Drive #117 Oceanside, CA 92054 Phone: (800) 642-7116 Web: www.4nettech.com E-mail: info@4nettech.com QUALIFICATION GUIDELINES For Networks to be covered under The NetTech's maintenance

More information

IT Plan Agency Submitted

IT Plan Agency Submitted Page 134 of Agency IT Plan Contact Data Larry Zubke Director of Technology ND Judicial Branch 600 East Boulevard Avenue Bismarck, ND 58505 701 328-4218 LZubke@ndcourts.gov Review of Agency's IT Architecture

More information

FINANCIAL SERVICES BOARD

FINANCIAL SERVICES BOARD PROVISIONING OF AN ICT SERVICE MANAGEMENT SOLUTION The following questions were received by the Financial Services Board on bid FSB2013/011 and are answered accordingly: QUESTION 1 The bid response format

More information

MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator

MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator Job Number: 07229P Date Finalized: 7/14/11 Service Department: Information Accountable To: Director, Information

More information

Click to Continue 9/3/2013

Click to Continue 9/3/2013 Click to Continue 9/3/2013 Next This toolkit is intended to supplement and expedite the personal training and support that Yellow Dog Software provides you during your implementation process. Click to

More information

Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems... 3. Improve Processes...

Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems... 3. Improve Processes... Table of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems... 3 Improve Processes... 3 Innovation... 4 IT Planning & Alignment

More information

VVC Technology & Information Resources Catalog of Services

VVC Technology & Information Resources Catalog of Services 1. Information Technology a. Accounts i. Account Management (1) Credential Management (a) Your IT Department manages system credentials on all systems excepting Financial 2000, SnowWhite, Charming and

More information

Request for Proposal MDM0031012338. Offeror s Questions for RFP for Virtual Private Network Solution (VPN)

Request for Proposal MDM0031012338. Offeror s Questions for RFP for Virtual Private Network Solution (VPN) Request for Proposal MDM0031012338 Offeror s Questions for RFP for Virtual Private Network Solution (VPN) 1. How much throughput must the VPN support long-term? Answer: 10 GB firewall, 4 GB 3DES/AES VPN

More information

Hardware and Software Requirements. Release 7.5.x PowerSchool Student Information System

Hardware and Software Requirements. Release 7.5.x PowerSchool Student Information System Release 7.5.x PowerSchool Student Information System Released October 2012 Document Owner: Documentation Services This edition applies to Release 7.5.x of the PowerSchool software and to all subsequent

More information

2013-2016. Three Year District Technology Plan. Pasco School District #1 July 1, 2013 to June 30, 2016

2013-2016. Three Year District Technology Plan. Pasco School District #1 July 1, 2013 to June 30, 2016 2013-2016 Three Year District Technology Plan Pasco School District #1 July 1, 2013 to June 30, 2016 Development History August 2012 November 2012 December 2012 December 2012 February 2013 March 2013 April

More information

QHR Accuro EMR IT Hardware Requirements

QHR Accuro EMR IT Hardware Requirements QHR Accuro EMR IT Hardware Requirements Hardware Requirements for Accuro EMR Table of Contents Local Install Platform:... 3 Server Requirements:... 3 Workstation Requirements:... 4 Peripheral Requirements:...

More information

EMC Integrated Infrastructure for VMware

EMC Integrated Infrastructure for VMware EMC Integrated Infrastructure for VMware Enabled by EMC Celerra NS-120 Reference Architecture EMC Global Solutions Centers EMC Corporation Corporate Headquarters Hopkinton MA 01748-9103 1.508.435.1000

More information

Patriot Hardware and Systems Software Requirements

Patriot Hardware and Systems Software Requirements Patriot Hardware and Systems Software Requirements Patriot is designed and written for Microsoft Windows. As a result, it is a stable and consistent Windows application. Patriot is suitable for deployment

More information

Planning Process and Methodology

Planning Process and Methodology Executive Summary Our mission is to provide students and staff with technology to meet their instructional and administrative needs. This incorporates all aspects of technology including networking, end

More information

Monthly Fee Per Server 75/month 295/month 395/month Monthly Fee Per Desktop/Notebook/ 15/month 45/month 55/month

Monthly Fee Per Server 75/month 295/month 395/month Monthly Fee Per Desktop/Notebook/ 15/month 45/month 55/month SERVICE COVERAGE AND FEE SCHEDULE Base Package Fees Monthly Fee Per Server 75/month 295/month 395/month Monthly Fee Per Desktop/Notebook/ 15/month 45/month 55/month Live Desk Services Live Desk Telephone

More information

UW Oshkosh IT Plan Submission January, 2014

UW Oshkosh IT Plan Submission January, 2014 UW Oshkosh IT Plan Submission January, 2014 Information Technology & University Strategic Objectives 1. How the plan was developed. The University s administrative team drafted seven Key Operational Plans.

More information

Office of Information Technology Service Catalog FY2015

Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Table of Contents Accounts & Passwords... 3 Administrative... 4 Business Tools and Services...

More information

Technology Master Plan Proposal

Technology Master Plan Proposal Fort Bend Independent School District Technology Master Plan Proposal As of June 02, 2014 Infrastructure Only INTRODUCTION AND BACKGROUND Fort Bend ISD (FBISD) has witnessed a tremendous increase in the

More information

Chabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program

Chabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program Chabot-Las Positas Community College District Bond Measure Technology Improvements Supplement to Capital Improvement Program Guidelines for Technology Estimates: The Capital Improvement Program for both

More information

CONSTRUCTION / SERVICE BILLING SYSTEM SPECIFICATIONS

CONSTRUCTION / SERVICE BILLING SYSTEM SPECIFICATIONS CONSTRUCTION / SERVICE BILLING SYSTEM SPECIFICATIONS Jonas Software, March 2013 Contents Introduction... 3 Hardware Specifications... 4 Recommended Server Hardware Specifications... 4 Recommended Workstation

More information

Information Technology Division Technology Operations & Systems Management

Information Technology Division Technology Operations & Systems Management Over the past decade, Texas Tech University has made great strides in protecting the critical information resources of its colleges, institutions and departments. (TOSM) has a 4000 sq/ft data center that

More information

Office of Information Technology Service Catalog FY2015

Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Table of Contents Accounts & Passwords... 3 Administrative... 4 Business Tools and Services...

More information

Services that will be provided to the City include:

Services that will be provided to the City include: The City is requesting proposals from qualified professional network support firms for Information Technology Support Services. The qualified vendor will enable the City to improve and maintain Information

More information

www.cadline.co.uk www.midastechnology.co.uk Page 1 of 5

www.cadline.co.uk www.midastechnology.co.uk Page 1 of 5 Page 1 of 5 Support Are you confident that you have all eventualities covered and that your current IT support provider can handle all of your issues? Are you frustrated with your application supplier

More information

Expert Reference Series of White Papers. Microsoft Assessment and Planning (MAP) Toolkit Version 9.x

Expert Reference Series of White Papers. Microsoft Assessment and Planning (MAP) Toolkit Version 9.x Expert Reference Series of White Papers Microsoft Assessment and Planning (MAP) Toolkit Version 9.x 1-800-COURSES www.globalknowledge.com Microsoft Assessment and Planning (MAP) Toolkit Version 9.x Mark

More information

Information Technology Services

Information Technology Services Information Technology Services Preliminary 2011 13 Initiatives and Priorities Information Technology Initiatives at a Glance In Support of: Data Integrity and Security Acquire funding to support an institutional

More information

Request for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016

Request for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016 Request for Proposals Voice over Internet Protocol Unified Communications System 10-2015/2016 Addendum #2, September 22, 2015 Is there an electronic drawing that shows the system? Attached. What is the

More information

Efficient and easy-to-use network access control and dynamic vlan management. Date: 4.12.2007 http:// F r e e N A C. n e t Copyright @2007, Swisscom

Efficient and easy-to-use network access control and dynamic vlan management. Date: 4.12.2007 http:// F r e e N A C. n e t Copyright @2007, Swisscom Efficient and easy-to-use network access control and dynamic vlan management Date: 4.12.2007 http:// F r e e N A C. n e t Copyright @2007, Swisscom 1 Connection to the enterprise LAN is often (too) easy

More information

Symantec Backup Exec 2014 TM Licensing Guide

Symantec Backup Exec 2014 TM Licensing Guide Product Overview Symantec Backup Exec delivers powerful, flexible, and easy- to- use backup and recovery to protect your entire infrastructure - both virtual and physical. Using modern technology, Backup

More information

BASEHOR-LINWOOD SCHOOL DISTRICT

BASEHOR-LINWOOD SCHOOL DISTRICT BASEHOR-LINWOOD SCHOOL DISTRICT Network Overview- June 2013 Performed by Southeast Kansas Educational Service Center- Contents Introduction... 1 Overview... 1 Observations/Recommendations... 1 District-Wide...

More information

Determine dates with you telecom suppliers so that the new office is online before your move for both Phones and Data connections.

Determine dates with you telecom suppliers so that the new office is online before your move for both Phones and Data connections. IT Office Move - Tips and Check List: Office IT Move Plan Introduction: If you are moving to a New Office and/or Data Center (Cloud), or if this is also a Colocation exercise please note this is a basic

More information

REQUEST FOR PROPOSALS INFORMATION TECHNOLOGY SUPPORT SERVICES. Bid Packets are Due:

REQUEST FOR PROPOSALS INFORMATION TECHNOLOGY SUPPORT SERVICES. Bid Packets are Due: REQUEST FOR PROPOSALS INFORMATION TECHNOLOGY SUPPORT SERVICES Issue Date: Friday, March 15 th, 2013 Closing Date: Monday, April 15 th, 2013 University City District is requesting proposals from qualified,

More information

ITEC 495 Capstone Project Ideas

ITEC 495 Capstone Project Ideas ITEC 495 Capstone Project Ideas Open Source Content Filtering OpenDNS A 25 person architectural firm with one single location needs to implement a low cost, secure, easy to deploy and administer web content

More information

4000 OPERATIONS AND MAINTENANCE OF PLANT

4000 OPERATIONS AND MAINTENANCE OF PLANT 4000 OPERATIONS AND MAINTENANCE OF PLANT Most of the expenditures in this category are specific to the Department of Public Facilities and have been transferred out of the School Department budget. However,

More information

Delphi+ System Requirements

Delphi+ System Requirements Delphi+ System Requirements Revision 1.1 Newmarket International, Inc. October 24, 2013 Delphi+ System Requirements Users Up to 15 Up to 25 Up to 50 Up to 90 Up to 200 Over 200 Minimum 2008 Server Hardware

More information

About Backing Up a Cisco Unity System

About Backing Up a Cisco Unity System CHAPTER 4 Introduction This chapter describes in general terms backing up a Cisco Unity system. When you back up a Cisco Unity server (and one or more Exchange servers) you need to consider the same issues

More information

Cloud Sure - Virtual Machines

Cloud Sure - Virtual Machines Cloud Sure - Virtual Machines Maximize your IT network The use of Virtualization is an area where Cloud Computing really does come into its own and arguably one of the most exciting directions in the IT

More information

System Requirements for Microsoft Dynamics SL 2015

System Requirements for Microsoft Dynamics SL 2015 System for Microsoft Dynamics SL 2015 Overview This document contains the minimum client hardware requirements, server recommendations and Terminal Server minimum hardware requirements supported by the

More information

MICROSOFT CERTIFIED SYSTEMS ENGINEER Windows 2003 Track

MICROSOFT CERTIFIED SYSTEMS ENGINEER Windows 2003 Track MICROSOFT CERTIFIED SYSTEMS ENGINEER Windows 2003 Track In recent years Microsoft s MCSE programs has established itself as the premier computer and networking industry certification. For the Windows 2003

More information

Diploma in Information Technology Network Intergration Specialist COURSE INFORMATION PACK

Diploma in Information Technology Network Intergration Specialist COURSE INFORMATION PACK Diploma in Information Technology COURSE INFORMATION PACK REGISTRATION AND ACCREDITATION Prestige Academy (Pty) Ltd is a widely recognized and credible institution. Prestige Academy is registered with

More information

Proven Technical and Management skills over a career spanning more than 10 years. Brunswick Vic 3056 Australia

Proven Technical and Management skills over a career spanning more than 10 years. Brunswick Vic 3056 Australia Resume: Michael McNab Systems Administrator and Web Support Proven Technical and Management skills over a career spanning more than 10 years Name: Address: Phone: Email Address: Website: Michael McNab

More information

Chabot Las Positas Community College District

Chabot Las Positas Community College District Chabot Las Positas Community College District Information Technology Services Disaster Recovery Plan Supplement to August 1, 2014 Plan (General Version) Note: Selected charts and tables are blanked out

More information

PROMAPP TECHNICAL INFORMATION

PROMAPP TECHNICAL INFORMATION Promapp Software Architecture Promapp is designed in accordance with Microsoft best practices, developed with the Microsoft.net framework and uses a Microsoft SQL database. The software architecture is

More information

Customized Cloud Solution

Customized Cloud Solution Customized Cloud Solution (Overall Cloud Performance Expectations) Last Updated: June 5, 2012 Prepared by: Polleo Systems, Inc. Notice of Confidentiality: The enclosed material is proprietary to Polleo

More information

Virtualization In Manufacturing Industries. Copyright 2012 Rockwell Automation, Inc. All rights reserved.

Virtualization In Manufacturing Industries. Copyright 2012 Rockwell Automation, Inc. All rights reserved. Virtualization In Manufacturing Industries Rev 5058-CO900C What is Virtualization? Traditionally the OS and its applications were tightly coupled to the hardware they were installed on Virtualization breaks

More information

Application Support (Appdev) Team had a very busy year for 2011-2012.

Application Support (Appdev) Team had a very busy year for 2011-2012. Information Technology Services Department End of Year Report 2011-2012 This report will detail the achievements of the Information Technology Services department at the Oregon Institute of Technology

More information

Interact Intranet Version 7. Technical Requirements. August 2014. 2014 Interact

Interact Intranet Version 7. Technical Requirements. August 2014. 2014 Interact Interact Intranet Version 7 Technical Requirements August 2014 2014 Interact Definitions... 3 Licenses... 3 On-Premise... 3 Cloud... 3 Pulic Cloud... 3 Private Cloud... 3 Perpetual... 3 Self-Hosted...

More information

Server Virtualization and Consolidation

Server Virtualization and Consolidation Server Virtualization and Consolidation An Ideal cost effective solution to maximize your Return on Investment of your organization's hardware infrastructure It is quit evident today that Business owners,

More information

Enterprise Edition Technology Overview

Enterprise Edition Technology Overview Enterprise Edition Technology Overview The Scholastic Achievement Manager, SAM, is the management system and technology platform for all Scholastic Enterprise Edition (EE) applications. Previous versions

More information

Missouri District Case Study March 2004. Consortium for School Networking. A Report and Estimating Tool for K-12 School Districts

Missouri District Case Study March 2004. Consortium for School Networking. A Report and Estimating Tool for K-12 School Districts North Central Regional Technology in Education Consortium at A Report and Estimating Tool for K-12 School Districts Missouri District Case Study March 2004 Introduction...1 Overview and general setting...2

More information

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2012/2013

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2012/2013 WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2012/2013 Platform Architecture Standards: End User Software Platform Architecture Standards: End User Hardware Platform Architecture Standards: Hand Held

More information

City of Sacramento VoIP Deployment Project. Presentation to State of California IP Telephony Working Group

City of Sacramento VoIP Deployment Project. Presentation to State of California IP Telephony Working Group City of Sacramento VoIP Deployment Project Presentation to State of California IP Telephony Working Group Project Scope To Convert 4000+ SBC Centrex analog lines to City owned and operated VoIP Phone System

More information

Enterprise Backup Solution Vendor Questions

Enterprise Backup Solution Vendor Questions Enterprise Backup Solution Vendor Questions What is the size of a single full back up? If Backups comprise 28% of the 19TB, can we assume that a single full (not compressed) is approximately 6TB? The approximate

More information

Disaster Recovery Infrastructure

Disaster Recovery Infrastructure Disaster Recovery Infrastructure An Ideal cost effective solution to protect your organizations critical IT infrastructure with business continuity. Organization's IT infrastructure usually evolves with

More information

Audit4 Installation Requirements

Audit4 Installation Requirements Audit4 version 8.1+ 2015 Copyright 2012 S4S Pty Ltd Audit4 Support Matrix 2015 The following table provides details on the operating system and database engine support for Audit4 as at March 2015. Operating

More information

Desktop Virtualization in the Educational Environment

Desktop Virtualization in the Educational Environment Desktop Virtualization in the Educational Environment The Problem High Total Cost of Ownership (TCO) for school computers. TCO goes beyond the original purchase price of hardware and software. It includes

More information

Ohio University Office of Information Technology

Ohio University Office of Information Technology Standard Desktop Support General Overview Standard Desktop Support service level of the Office of Information Technology (OIT) is comprised of: The Standard Desktop Support (SDS) Service The general levels

More information

Diploma in Information Technology Network Integration Specialist COURSE INFO PACK

Diploma in Information Technology Network Integration Specialist COURSE INFO PACK Registered as a Private Higher Education Institution with the Department of Higher Education and Training in South Africa under the Higher Education Act 1997 Registration Nr. 2001/HE07/005 Diploma in Network

More information

Three Areas of Focus. * Infrastructure * Systems * Processes

Three Areas of Focus. * Infrastructure * Systems * Processes IT Three Areas of Focus * Infrastructure * Systems * Processes Adding Wireless * FCS core network to Millstream Tech Center * Admin building * Wireless in Millstream Tech Center Cellular * Infrastructure

More information

Information Technology 2016-2021 Strategic Plan

Information Technology 2016-2021 Strategic Plan Information Technology 2016-2021 Strategic Plan Draft Table of Contents Table of Contents... 3 Introduction... 4 Mission of IT... 4 Primary Service Delivery Objectives... 4 Availability of Systems...

More information

North Florida Community College

North Florida Community College North Florida Community College Technology Plan Table of Contents Executive Summary... 3 Technology Vision... 5 Annual Initiatives... 6 2010 Data Center Expansions... 6 The Next 3 Years... 6 Technology

More information

IT Health Check (508) 756 9300 support@akuity.com

IT Health Check (508) 756 9300 support@akuity.com Health check performed by: Jeremy Arndt My Company February 18 th, 2015 IT Health Check OVERALL SCORE 10 Users 3 Servers 1 Network 2 Backups 1 E mail 1 Antivirus 2 High Risk Risk Low Risk IT Health Check

More information

ERP Infrastructure Guide APPENDIX B

ERP Infrastructure Guide APPENDIX B ERP Infrastructure Guide APPENDIX B for State of Georgia State Road and Tollway Authority 47 Trinity Avenue, SW Atlanta, GA 30334 June 2013 Updated by: Updated on: Description of Update: Revision # DRY

More information

ACADEMIC PROGRAM REVIEW PC AGE 145 TALMADGE ROAD EDISON, NJ 08817 REVIEW DATE. Report Amended October 2011

ACADEMIC PROGRAM REVIEW PC AGE 145 TALMADGE ROAD EDISON, NJ 08817 REVIEW DATE. Report Amended October 2011 ACADEMIC PROGRAM REVIEW of PC AGE 145 TALMADGE ROAD EDISON, NJ 08817 REVIEW DATE May 12-13, 2011 Report Amended October 2011 Table of Contents PC AGE Organizational Profile... 3 Academic Program Review

More information

AUGUSTA TECHNICAL COLLEGE INFORMATION TECHNOLOGY PLAN

AUGUSTA TECHNICAL COLLEGE INFORMATION TECHNOLOGY PLAN AUGUSTA TECHNICAL COLLEGE INFORMATION TECHNOLOGY PLAN 2014-2016 Table of Contents Information Technology Plan Table of Contents Mission Statement Current Capabilities Future Plans How to get there AUGUSTA

More information

The future is in the management tools. Profoss 22/01/2008

The future is in the management tools. Profoss 22/01/2008 The future is in the management tools Profoss 22/01/2008 Niko Nelissen Co founder & VP Business development Q layer Agenda Introduction Virtualization today Server & desktop virtualization Storage virtualization

More information

MYOB EXO System Requirement Guidelines. 30 April 2014 Version 2.7

MYOB EXO System Requirement Guidelines. 30 April 2014 Version 2.7 MYOB EXO System Requirement Guidelines 30 April 2014 Version 2.7 Contents 1 System Requirements 4 1.1 Overview 4 1.2 Server Requirements 4 1.2.1 Server Requirements (excluding terminal server) 4 1.2.2

More information

The primary goals of the technology plan are to support the goals of the district strategic plan:

The primary goals of the technology plan are to support the goals of the district strategic plan: STOUGHTON PUBLIC SCHOOLS TECHNOLOGY PLAN 2012-2015 I. MISSION The mission of Stoughton Public School's Technology Program is to provide technology systems and support that meet the needs of students, teachers,

More information

2014-2017 Technology Plan

2014-2017 Technology Plan Rockwood School District We do whatever it takes to ensure all students realize their potential. 2014-2017 Technology Plan Rockwood School District 111 East North St. Eureka, MO 63025 (636) 733-2000 www.rockwood.k12.mo.us

More information

Dragon Medical Enterprise Network Edition Technical Note: Requirements for DMENE Networks with virtual servers

Dragon Medical Enterprise Network Edition Technical Note: Requirements for DMENE Networks with virtual servers Dragon Medical Enterprise Network Edition Technical Note: Requirements for DMENE Networks with virtual servers This section includes system requirements for DMENE Network configurations that utilize virtual

More information

Linexcom Sdn Bhd. ict Group of Companies ver1.2

Linexcom Sdn Bhd. ict Group of Companies ver1.2 Linexcom Sdn Bhd No. 9B, 1 st Floor, Jalan PJS 1/27, 46150 Petaling Jaya, Selangor, MALAYSIA General : +603.7781 6020 Fax : +603.7781 6022 Web Page : http://www.linexcom.com Email : info@linexcom.com ict

More information

SAN RFP Questions and Answers

SAN RFP Questions and Answers SAN RFP Questions and Answers Questions for week ending 10/4/13 Questions from Sterling Computers What is the snapshot retention policy is and percent of change for the primary SAN? a. Is it just a 1 day

More information

REQUEST FOR PROPOSALS FOR INTERNAL CONNECTIONS. INCLUDING EQUIPMENT and. VoIP TELEPHONE SYSTEM FOR THE ALTERNATE HIGH SCHOOL BUILDING

REQUEST FOR PROPOSALS FOR INTERNAL CONNECTIONS. INCLUDING EQUIPMENT and. VoIP TELEPHONE SYSTEM FOR THE ALTERNATE HIGH SCHOOL BUILDING REQUEST FOR PROPOSALS FOR INTERNAL CONNECTIONS INCLUDING EQUIPMENT and VoIP TELEPHONE SYSTEM FOR THE ALTERNATE HIGH SCHOOL BUILDING BLOOM TOWNSHIP HIGH SCHOOL DISTRICT 206, CHICAGO HEIGHTS, ILLINOIS Bloom

More information

SERVICES BRONZE SILVER GOLD PLATINUM. On-Site emergency response time 3 Hours 3 Hours 1-2 Hours 1 Hour or Less

SERVICES BRONZE SILVER GOLD PLATINUM. On-Site emergency response time 3 Hours 3 Hours 1-2 Hours 1 Hour or Less SERVICE SUMMARY ITonDemand provides four levels of service to choose from to meet our clients range of needs. Plans can also be customized according to more specific environment needs. SERVICES BRONZE

More information

REDCENTRIC INFRASTRUCTURE AS A SERVICE SERVICE DEFINITION

REDCENTRIC INFRASTRUCTURE AS A SERVICE SERVICE DEFINITION REDCENTRIC INFRASTRUCTURE AS A SERVICE SERVICE DEFINITION SD021 V2.2 Issue Date 01 July 2014 1) OVERVIEW Redcentric s Infrastructure as a Service (IaaS) enables the to consume server, storage and network

More information

TOSM Server Backup Service

TOSM Server Backup Service TOSM Server Backup Service Memorandum of Understanding The department of Technology Operations and Systems Management (TOSM) provides its customers with various IT-related services, including backups.

More information

DELAWARE CENTER FOR EDUCATIONAL TECHNOLOGY

DELAWARE CENTER FOR EDUCATIONAL TECHNOLOGY DELAWARE CENTER FOR EDUCATIONAL TECHNOLOGY ACTION PLAN FY2003 NOVEMBER 2001 STATE OF DELAWARE Introduction Delaware Center for Educational Technology Action Plan The Delaware Center for Educational Technology

More information

Table of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems...

Table of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems... Table of Contents Table of Contents...2 Introduction...3 Mission of IT...3 Primary Service Delivery Objectives...3 Availability of Systems...3 Improve Processes...4 Innovation...4 IT Planning & Alignment

More information

MICROSOFT ENROLLMENT FOR EDUCATION SOLUTIONS (EES) AGREEMENT

MICROSOFT ENROLLMENT FOR EDUCATION SOLUTIONS (EES) AGREEMENT MICROSOFT ENROLLMENT FOR EDUCATION SOLUTIONS (EES) AGREEMENT Frequently Asked Questions Abstract This Enrollment provides Duval County Public Schools a license for certain specified Microsoft Products

More information

REQUEST FOR QUOTE. All out of date servers contain approximately 1 TB of data that needs to be migrated to the new Windows domain environment.

REQUEST FOR QUOTE. All out of date servers contain approximately 1 TB of data that needs to be migrated to the new Windows domain environment. REQUEST FOR QUOTE The Housing Authority of the City of Hartford is seeking quotations for the following project: Systems Department Enterprise Technology Enhancements The current infrastructure consists

More information

Release 8.2 Hardware and Software Requirements. PowerSchool Student Information System

Release 8.2 Hardware and Software Requirements. PowerSchool Student Information System Release 8.2 Hardware and Software Requirements PowerSchool Student Information System Released January 2015 Document Owner: Documentation Services This edition applies to Release 8.2 of the PowerSchool

More information

Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015

Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015 Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015 END 3.3 Centralia College will plan, implement and utilize a technology system and infrastructure that supports

More information

Select IT Consulting Services RFP 11-01 Technical and Network Support Specialist Services (Lot Group C)

Select IT Consulting Services RFP 11-01 Technical and Network Support Specialist Services (Lot Group C) Computer/Application Support Specialist Computer/Application Support Specialist 1 Typical Functions: Preferred This function requires business work experience with Windows XP, IT experience, work experience

More information

http://www.usac.org/sl/applicants/beforeyoubegin/eligible-services/priority-one.aspx

http://www.usac.org/sl/applicants/beforeyoubegin/eligible-services/priority-one.aspx Coronado Unified School District RFP# 2012-02 Addendum - Wide Area Network Lease Contractor shall indicate on Carrier Proposal Form that Addendum #1 issued on November 10, 2012 and Addendum #2 issued on

More information

The I.T. Experience Service and Pricing List 2015

The I.T. Experience Service and Pricing List 2015 The I.T. Experience Service and Pricing List 2015 Hourly Rates and Additional Services Residential Hourly Rate Hourly Rate All Services $59.00/hr. Business Hourly Rate Hourly Rate All Services $85.00/hr.

More information

City of Coral Gables

City of Coral Gables City of Coral Gables Information Technology Department IT TECHNICAL SUPPORT DIVISION Infrastructure Upgrade Plan Systems, Applications, Network, and Telecommunications Infrastructure OVERVIEW Last revision:

More information

CASE STUDY PRAGUE CITY ARCHIVES SERVER AND STORAGE CONSOLIDATION DEPLOYED SOLUTION: DELL. www.dns.cz/pripadovestudie

CASE STUDY PRAGUE CITY ARCHIVES SERVER AND STORAGE CONSOLIDATION DEPLOYED SOLUTION: DELL. www.dns.cz/pripadovestudie CASE STUDY PRAGUE CITY ARCHIVES SERVER AND STORAGE CONSOLIDATION DEPLOYED SOLUTION: DELL www.dns.cz/pripadovestudie CUSTOMER PROFILE Distributor Profile DNS a.s. www.dns.cz Focus: ICT During its more than

More information

INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES 2012 2013 Program Review

INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES 2012 2013 Program Review INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES 2012 2013 Program Description Technical Services is a service unit in Information Technology Services. The unit: 1. Acquires and distributes new computing

More information