1 Transportation and Transit Subject Working Group October 5, :00 p.m.-8:00 p.m. Vernon Chamber of Commerce 3801 Santa Fe Avenue Vernon, CA INTRODUCTIONS AND MEETING OVERVIEW On Monday, October 5, 2009, the I-710 Project Team met with the Transportation and Transit Subject Working Group (TSWG) at the Vernon Chamber of Commerce offices in the City of Vernon. The purpose of the meeting was to: Update the group on project happenings since the last meeting of the TSWG on August 17, including progress by the engineering, environmental, and community participation teams. Present geometrics and traffic methodologies. Review port cargo forecasts in light of the economic downturn. Present an update on power supply for future demand if electrified transportation and goods movement technologies are adopted. TSWG members in attendance were John Maniatakis (Vernon LAC); Jonathan Switzer (Carson LAC); Carol Berkeley (South Gate LAC); Connie Turner (Southern California Edison); Bob Eula (Commerce LAC); and Mario Sotelo (alternate, Commerce LAC). Other meeting attendees included George Bass (Bell LAC), David Randall (Montebello Unified School District representative to the Environmental SWG); Ian MacMillan (LA Unified School District); and Kevin Wilson (City of Vernon). In attendance from the Project Team were Devon Cichoski (Metro); Jerry Wood (GCCOG); Allison Morrow (Caltrans); Larry Cottrill and Jolene Hayes (POLB); Michael Keenan (POLA); Shannon Willits (URS); and Pat McLaughlin and Andi Nelson (MIG). MIG facilitator Pat McLaughlin called the meeting to order and began with a round of selfintroductions. She briefly reviewed the agenda for the evening.

2 GEOMETRICS AND TRAFFIC METHODOLOGIES After a review of project happenings, Ms. McLaughlin turned the meeting to the three presentations scheduled for the evening. She introduced Shannon. Willits of URS; Mr. Willits presented the geometrics and traffic methodology of the I-710 Corridor Project EIR/EIS. He reviewed current problems, interchanges, conceptual design, recommended local and freeway-to-freeway interchange types, traffic forecasts, key considerations and status of geometrics. A hard copy of the presentation was distributed to committee members and other participants. Group questions and comments regarding geometrics and traffic methodologies included: TSWG member Carol Berkeley asked about the type of design at the existing Firestone interchange. She would like this type of design for interchanges in Imperial, where the existing interchange is quite dangerous. o It is a partial cloverleaf design. Committee members suggested that every jurisdiction would like to have a partial cloverleaf interchange design. The engineering team will look at both partial cloverleaf and single point designs for each interchange along the I-710 corridor. TSWG member Bob Eula explained that in 2004, the City of Commerce passed a resolution for truck lanes to go directly into the rail yards. Truck traffic along streets adjacent to the rail yards is a continuing critical issue for Commerce. o Mr. Willits explained that the technical team is required to design freeway connections to tie into a public facility. The team has designed a connection from I-710 to a street that is opposite the Hobart Rail yards Main Gate, which provides an alternative route to Washington and Atlantic for trucks. A second connection ties into Indiana Avenue, opposite Union Pacific rail yards. These connections will alleviate truck traffic in the area and will be located on BNSF property and commercial/industrial zoned land. The use of these properties satisfies both public and private sector interests. All of the design objectives are achieved by these connections. Ian McMillan asked when the geometric package would be available to the Transportation Subject Working Group. o The comprehensive package will be reviewed for technical accuracy by subgroups of the Technical Advisory Committee (TAC) and then by the LACs. After LAC review the revised packages can be brought to the TSWG in late November or December. The TSWG can decide on the extent of committee review. TSWG member Bob Eula asked if there had been discussion regarding a new connection from northbound I-710 to southbound I-5. o Input from the community and staff denote that a new connection at this location is not warranted at this time. URS and Caltrans are coordinating and having a meeting next week to discuss the I-710 and I-5 projects. Ms. McLaughlin asked if Mr. Willits met the needs of the group in the presentation of geometrics and traffic methodologies. The group agreed with appreciative applause. Page 2 of 5

3 PORT CARGO FORECASTS TSWG members raised concern that the current economic downturn has impacted past port cargo forecasts. The I-710 Corridor project is relying on port cargo forecasts for long-term planning along the corridor. Ms. McLaughlin introduced Michael Keenan of the Port of Los Angeles, who, in turn, introduced Larry Cottrill, Director of Long Term Planning for the Port of Long Beach. Mr. Keenan then led the group through a PowerPoint presentation which addressed port cargo projections in the context of the current recession. Cargo volumes are down, and are expected to recover to pre-recession levels by 2014, with steady growth continuing from there. The maximum projected port cargo volume (of between 40 and 45 million annual twenty-foot equivalent units (TEUs)) is now projected for the year 2035, instead of the early-to-mid 2020s, as pre-recession projections had indicated. A hard copy of the presentation was distributed to committee members and other participants. Group questions and comments regarding port cargo forecasts included: One participant asked if projections had been adjusted for inflation (nominal GNP). o Yes, the projections have been adjusted for inflation. Ian McMillan confirmed that the projections demonstrated an annual growth of five percent for port cargo between 2009 and He questioned the possibility of an upward growth that is two percent below the original projection (seven percent annual growth). Another participant did not think this growth was possible. o Although five percent does not seem as though it is a substantial difference, the port is growing more slowly and growing out of a deficit. Additionally, as compared to the previous forecast, the port is pushing the port cargo capacity out 10 to 12 years (2030) and total cargo each year is about 40 percent less than previous years. During the boom, there was over 10 percent annual growth. The 2007 projections included a reduction in annual growth to seven to nine percent annual growth. The US Economy grows at three percent each year. As the economy globalizes, trade grows each year and is becoming a larger segment of the economy. Ms. McLaughlin thanked Mr. Keenan for his presentation of port cargo forecasts. POWER SUPPLY UPDATE Ms. McLaughlin introduced Russell Neal of Southern California Edison (SCE). Mr. Neal presented SCE s ability to power I-710 Electrical Goods Movement systems. He reviewed issues and needs, the existing transmission system, load growth methodology, and substation capacities. Mr. Neal concluded that SCE will have more than adequate power to supply any electric goods movement system along the I-710 corridor. The planning process ensures load growth is served, and adjustments to the system can be made to support transportation projects. A hard copy of the presentation was distributed to committee members and other participants. Group questions and comments regarding the power supply update included: Page 3 of 5

4 One committee member asked about SCE s ability and interest in providing power to the ports through the I-710 planning horizon (2035). o Mr. Neal explained that SCE is in the process of working with the ports. SCE s planning horizon is 2019 and the I-710 corridor project s is One committee member inquired about the cause of the power outages and rolling blackouts during the summer months in California. o Mr. Neal explained that power generation infrastructure was built rapidly in the last few years. Additionally, SCE is required to sell a portion of the power to third parties. These factors contributed to the rolling blackouts in the last couple of years. One committee member asked if SCE has considered nuclear as a power source in the future. o Mr. Neal explained the controversy and stigmatism associated with nuclear and concluded that it is under continuing discussion as an option. One committee member wondered if the recession has had an impact on SCE. o The recession has provided a bit of a respite for the company, allowing it to catch up with growing demand. One committee member identified the transmission of renewable power as an impasse to providing for the I-710 project and future growth. While there are new power sources and generation facilities, the member wondered if transmission of power would be a problem. o Future growth will likely require additional power. The State will require 33 percent of power to be generated by renewable sources by SCE is continuing to seek and study the best routes for transmission of power from renewable energy facilities, such as wind farms, in effort to allow for renewable power use. For the time being, existing transmission infrastructure is sufficient and will meet anticipated power needs. One committee member suggested using future technology to generate electricity locally, including solar panels on railcars and renewable energy technology along the I-710 corridor. o These are possibilities for the longer term as power demands from zero emissions vehicles are explored. One committee member added that wind, geothermal, and renewable energy storage capabilities could be possibilities in the future as technology is developed. CONCLUSION AND NEXT STEPS Ms. McLaughlin thanked all group members and the evening s presenters, and concluded that meeting discussions are essential for ensuring that the project meets the desired outcomes for the community. She asked the group for additional questions and comments. One committee member wondered if there is potential for solar panels on overhead structures. o There is a high cost to install solar panels on a small scale (five times as much as installing solar panels in bulk). The project team is looking at installing solar panels on warehouses and parking lots. Since solar power is intermittent, the power supply needs to include a second, constant source. With constantly Page 4 of 5

5 She then asked the group for desired future meeting topics. The group did not suggest any meeting topics at this time. Ms. McLaughlin reminded members of the Corridor Advisory Committee meeting taking place October 15, noting that the CAC may identify more issues that they would like the TSWG to discuss per the charge of the Subject Working Groups. She encouraged TSWG members to attend the CAC meeting. Ms. McLaughlin adjourned the meeting at 8:30 p.m. Page 5 of 5

Southern California International Gateway Project Description

Southern California International Gateway Project Description Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the

More information

One Region. One Voice. One Future. SOUTHERN CALIFORNIA

One Region. One Voice. One Future. SOUTHERN CALIFORNIA One Region. One Voice. One Future. SOUTHERN CALIFORNIA The Heart of America s Freight Movement System Nearly 50% of the nation s seaborne cargo enters Long Beach and Los Angeles ports. Then it has to be

More information

City of Vernon Request for Expressions of Interest and Information (RFI)

City of Vernon Request for Expressions of Interest and Information (RFI) City of Vernon Request for Expressions of Interest and Information (RFI) Potential Wind Energy Project/Wind-Solar Energy Project City of Vernon Light & Power Department 4305 Santa Fe Avenue, Vernon CA

More information

California Self-Help Counties and Transportation Funding

California Self-Help Counties and Transportation Funding California Self-Help Counties and Transportation Funding 2015 IBTTA Washington Briefing Tuesday, March 31, 2015 Michael Blomquist Toll Program Director Riverside County Transportation Commission Traditional

More information

KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning

KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning MINUTES Field Visit for Local Officials and Stakeholders Bluegrass Crossings Regional Business Centre Improved Access Road Study Ritatsu Manufacturing (Board Room) Beaver Dam, Kentucky June 11, 2014 1:30

More information

Metropolitan Setting l

Metropolitan Setting l Metropolitan Setting l GENERAL CHARACTERISTICS Los Angeles lies at the heart of one of the most complex metropolitan regions in the United States. As a major center of commerce, finance, and industry in

More information

GOSHEN REDEVELOPMENT COMMISSION MINUTES OF THE REGULAR MEETING HELD MAY 12, 2015

GOSHEN REDEVELOPMENT COMMISSION MINUTES OF THE REGULAR MEETING HELD MAY 12, 2015 GOSHEN REDEVELOPMENT COMMISSION MINUTES OF THE REGULAR MEETING HELD MAY 12, 2015 CALL TO ORDER / ROLL CALL The Goshen Redevelopment Commission met in a regular meeting on May 12, 2015 at 4:00 p.m. in the

More information

Tehachapi Renewable Transmission Project (TRTP)

Tehachapi Renewable Transmission Project (TRTP) SM Tehachapi Renewable Transmission Project (TRTP) February 2009 Why We Are Here Today Provide background on SCE s commitment to renewable energy Discuss the operational and economic importance of the

More information

IMPROVING TRUCK MOVEMENT IN URBAN INDUSTRIAL AREAS: APPLICATIONS OF GIS, ACCIDENT & FIELD DATA

IMPROVING TRUCK MOVEMENT IN URBAN INDUSTRIAL AREAS: APPLICATIONS OF GIS, ACCIDENT & FIELD DATA IMPROVING TRUCK MOVEMENT IN URBAN INDUSTRIAL AREAS: APPLICATIONS OF GIS, ACCIDENT & FIELD DATA 11 th World Conference on Transport Research Susan L. Bok Los Angeles Department of Transportation May 7,

More information

Using Freight Advanced Traveler Information Systems to Promote Urban Freight Mobility

Using Freight Advanced Traveler Information Systems to Promote Urban Freight Mobility Using Freight Advanced Traveler Information Systems to Promote Urban Freight Mobility Randy Butler FHWA Freight Operations and Technology FRATIS Program Manager Freight Specific ITS Applications are Needed

More information

Now is the time to look into your future

Now is the time to look into your future Why so many average Japanese office workers are quietly investing in The California Countdown to 2020 Let us show you what they re so excited about why this investment is set to take off and how you can

More information

Minutes. Tuesday, October 21, 2014. Los Angeles County Metropolitan Transportation Authority. RIITS Configuration Management Committee

Minutes. Tuesday, October 21, 2014. Los Angeles County Metropolitan Transportation Authority. RIITS Configuration Management Committee Tuesday, October 21, 2014 Minutes Los Angeles County Metropolitan Transportation Authority RIITS Configuration Management Committee One Gateway Plaza Pasadena Conference Room 22nd Floor Members present:

More information

Resume Excerpts from the Escambia Board of County Commissioners Meeting held on 03/14/1989

Resume Excerpts from the Escambia Board of County Commissioners Meeting held on 03/14/1989 1 EXCERPTS FROM THE BOARD OF COUNTY COMMISSIONERS RESUME This document contains excerpts from the Escambia County Florida Board of County Commissioners Resume document. This document is NOT to be considered

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO Executive Summary The Miami-Dade County Metropolitan Planning Organization (MPO) has prepared a Truck Route System Plan for Miami-Dade County. The MPO and its consultants have worked closely with the MPO

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

DOCKETED Docket Number: Project Title: TN #: Document Title: Description: Filer: Organization: Submitter Role: Submission Date: Docketed Date:

DOCKETED Docket Number: Project Title: TN #: Document Title: Description: Filer: Organization: Submitter Role: Submission Date: Docketed Date: DOCKETED Docket Number: 15-MISC-04 Project Title: Fuels and Transportation Merit Review TN #: 206813 Document Title: SCAQMD Catenary Truck Project Presentation Description: Presentation for CEC Merit Review

More information

NOTICE OF THE CLASS DISTRIBUTION PLAN. A court has authorized this notice. This is not a solicitation from a lawyer.

NOTICE OF THE CLASS DISTRIBUTION PLAN. A court has authorized this notice. This is not a solicitation from a lawyer. NOTICE OF THE CLASS DISTRIBUTION PLAN A court has authorized this notice. This is not a solicitation from a lawyer. THIS NOTICE MAY AFFECT YOUR RIGHTS. PLEASE READ THIS ENTIRE NOTICE CAREFULLY. TO THE

More information

Electrical Grid Continuity in California Port Operations. Making Our Clients Successful

Electrical Grid Continuity in California Port Operations. Making Our Clients Successful Electrical Grid Continuity in California Port Operations METRANS International Urban Freight Conference Matt Wartian, Ph.D. William Lyte & Eric Putnam, P.E. Making Our Clients Successful Overview Port

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

NEW YORK STATE THRUWAY AUTHORITY NEW YORK STATE CANAL CORPORATION MINUTES AUDIT AND FINANCE COMMITTEE MEETING NO. 15.

NEW YORK STATE THRUWAY AUTHORITY NEW YORK STATE CANAL CORPORATION MINUTES AUDIT AND FINANCE COMMITTEE MEETING NO. 15. NEW YORK STATE THRUWAY AUTHORITY NEW YORK STATE CANAL CORPORATION MINUTES June 23, 2009 Minutes of a meeting of the New York State Thruway Authority/Canal Corporation Audit and Finance Committee, held

More information

MINUTES. REGULAR MEETING GLENDALE TRANSPORTATION & PARKING COMMISSION October 23, 2000

MINUTES. REGULAR MEETING GLENDALE TRANSPORTATION & PARKING COMMISSION October 23, 2000 MINUTES REGULAR MEETING GLENDALE TRANSPORTATION & PARKING COMMISSION October 23, 2000 The regular meeting of the Glendale Transportation & Parking Commission of Monday, October 23, 2000, was called to

More information

Federal Emergency Management Agency

Federal Emergency Management Agency Federal Emergency Management Agency Washington, D.C. 20472 January 9, 2002 W-02003 MEMORANDUM FOR: FROM: SUBJECT: Write Your Own (WYO) Principal Coordinators and the NFIP Servicing Agent Howard Leikin

More information

Traffic Volume Counts

Traffic Volume Counts Traffic Volume Counts Prepare 1. Communicate with other staff/departments 2. Review historical data trends 3. Review citizen input 4. Request traffic control Select Location 1. Select the proper location

More information

**The Winter 2010 edition of The Road Ahead newsletter is available online.

**The Winter 2010 edition of The Road Ahead newsletter is available online. RTC e-news Brief for January 29, 2010. This e-newsletter was created to keep you informed about key activities and issues pertaining to Your RTC. I encourage you to share this information with your board

More information

ALAMEDA CORRIDOR TRANSPORTATION AUTHORITY PROGRAM & OPERATING BUDGET

ALAMEDA CORRIDOR TRANSPORTATION AUTHORITY PROGRAM & OPERATING BUDGET ALAMEDA CORRIDOR TRANSPORTATION AUTHORITY PROGRAM & OPERATING BUDGET FISCAL YEAR 2007/2008 Adopted June 21, 2007 Table of Contents Transmittal Letter...i Policy Overview...1 Budget Development & Overview...9

More information

Project Development Trends and Updates: October 2014

Project Development Trends and Updates: October 2014 Tuesday, October 28, 2014 9:00 a.m. Pacific 11:00 a.m. Central Noon Eastern Project Development Trends and Updates: October 2014 Agenda Proposed Amendments to CEQA Guidelines Implementing SB 743: Changes

More information

Board of Council - General Comments and Rejections

Board of Council - General Comments and Rejections VILLAGE NEIGHBORHOOD COUNCIL OFFICERS MARY GONZALEZ PRESIDENT BOB CHU VICE-PRESIDENT RON JOHNSON SECRETARY JANE BROWN TREASURER CITY OF LOS ANGELES CALIFORNIA VILLAGE NEIGHBORHOOD COUNCIL REGULAR MEETING

More information

Field Experiments with Bluetooth Sensors

Field Experiments with Bluetooth Sensors Field Experiments with Bluetooth Sensors Yinhai Wang, Yegor Malinovskiy, Yao-Jan Wu and Un-Kun Lee STAR Lab University of Washington Ted Bailey and Matt Neely WSDOT 1 Presentation Outline Concept Bluetooth

More information

THIS MONTH S LUNCH IS SPONSORED BY: EDUCATION COOPERATION UNIFORMITY

THIS MONTH S LUNCH IS SPONSORED BY: EDUCATION COOPERATION UNIFORMITY For more information, visit www.octec.net EDUCATION COOPERATION UNIFORMITY The Official Newsletter of the Orange County Traffic Engineering Council 2013-2014 Issue 2 Our October Program: DYNAMIC INTERSECTION

More information

Solar Resource Measurement Importance. Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015

Solar Resource Measurement Importance. Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015 Solar Resource Measurement Importance Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015 1 Overview of SCE Large service territory 14 million residents 4.9

More information

Truck Diversion Forecasts. DRAFT Executive Summary

Truck Diversion Forecasts. DRAFT Executive Summary Truck Diversion Forecasts DRAFT Executive Summary February 2008 The Texas Department of Transportation Transportation Planning and Programming Division La Entrada Al Pacifico Feasibility Study Truck Diversion

More information

Business Continuity Program Overview

Business Continuity Program Overview Business Continuity Program Overview 1 Presentation Objective Provide a brief overview of business continuity (BC) Discuss the BC Model used by POLB to prepare an All- Hazard BC Plan Review the current

More information

How To Plan A High Speed Rail System

How To Plan A High Speed Rail System National Capital Region Transportation Planning Board 777 North Capitol Street, N.E., Suite 300, Washington, D.C. 20002-4290 (202) 962-3310 Fax: (202) 962-3202 TDD: (202) 962-3213 DATE: May 6, 2010 Meeting

More information

Los Angeles San Diego. Coastal Rail Corridor. San Diego Segment. Building Today. Boarding Tomorrow.

Los Angeles San Diego. Coastal Rail Corridor. San Diego Segment. Building Today. Boarding Tomorrow. LOSSANSan Luis Los Angeles San Diego Obispo Coastal Rail Corridor San Diego Segment Building Today. Boarding Tomorrow. Building Today Boarding Tomorrow LOSSAN Los Angeles, San Diego, San Luis Obispo Coastal

More information

Energy and. Resources

Energy and. Resources Tasmaniann Government 20122 Submission to Nation Buildin g 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure,

More information

MINUTES. Hall, Wood, Schumacher, Blackburn, Packard. PUBLIC REPORT OF ANY ACTION TAKEN IN CLOSED SESSION: No reportable action.

MINUTES. Hall, Wood, Schumacher, Blackburn, Packard. PUBLIC REPORT OF ANY ACTION TAKEN IN CLOSED SESSION: No reportable action. MEETING OF: DATE OF MEETING: TIME OF MEETING: PLACE OF MEETING: MINUTES CITY OF CARLSBAD CITY COUNCIL (Regular Meeting) Tuesday, February 23, 2016 6:00 p.m. Council Chamber, 1200 Carlsbad Village Drive,

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT Board of Education Report

LOS ANGELES UNIFIED SCHOOL DISTRICT Board of Education Report Report Number: 70-08/09 Date: Subject: Approval of a Power Purchase Agreement to Install a Photovoltaic Solar Panel Array at Three Schools Responsible Staff: Name Office/Division Joseph A. Mehula, Chief

More information

TRUCK ROUTES IN THE REGION MAKE UP AN EXTENSIVE ROAD NETWORK. IN LOS ANGELES COUNTY ALONE, TRUCK ROUTES INCLUDE 892 MILES OF

TRUCK ROUTES IN THE REGION MAKE UP AN EXTENSIVE ROAD NETWORK. IN LOS ANGELES COUNTY ALONE, TRUCK ROUTES INCLUDE 892 MILES OF TRUCK ROUTES IN THE REGION MAKE UP AN EXTENSIVE ROAD NETWORK. IN LOS ANGELES COUNTY ALONE, TRUCK ROUTES INCLUDE 892 MILES OF HIGHWAYS AND 21,000 MILES OF LOCAL STREETS. THIS NETWORK PROVIDES CRITICAL ACCESS

More information

FTP/SIS/FMTP Regional Workshop - Miami

FTP/SIS/FMTP Regional Workshop - Miami FTP/SIS/FMTP Regional Workshop - Miami September 24, 2015 FDOT District 6 Auditorium 1000 N.W. 111 Avenue Miami, Florida 33172 Meeting Highlights Welcome and Introductions Gus Pego, FDOT District 6 Secretary,

More information

GATEWAY CITIES TECHNOLOGY PROGRAM FOR GOODS MOVEMENT OVERVIEW OF EMERGING CONNECTED COMMERCIAL VEHICLES PROGRAM

GATEWAY CITIES TECHNOLOGY PROGRAM FOR GOODS MOVEMENT OVERVIEW OF EMERGING CONNECTED COMMERCIAL VEHICLES PROGRAM GATEWAY CITIES TECHNOLOGY PROGRAM FOR GOODS MOVEMENT OVERVIEW OF EMERGING CONNECTED COMMERCIAL VEHICLES PROGRAM Presented May 8, 2014 GATEWAY CITIES LOGISTICS CORRIDOR Anchored by Ports of Long Beach and

More information

THE PORT OF LOS ANGELES

THE PORT OF LOS ANGELES THE PORT OF LOS ANGELES Executive Director's Report to the Board of Harbor Commissioners DATE: MARCH 24, 2010 FROM: CLEAN TRUCK PROGRAM CONTRACT WITH VISION MOTOR CORPORATION OF SANTA MONICA, CALIFORNIA

More information

RANCHO SANTIAGO COMMUNITY COLLEGE DISTRICT Board of Trustees (Regular meeting) Monday, April 25, 2011 2323 North Broadway, #107 Santa Ana, CA 92706

RANCHO SANTIAGO COMMUNITY COLLEGE DISTRICT Board of Trustees (Regular meeting) Monday, April 25, 2011 2323 North Broadway, #107 Santa Ana, CA 92706 RANCHO SANTIAGO COMMUNITY COLLEGE DISTRICT Board of Trustees (Regular meeting) Monday, April 25, 2011 2323 North Broadway, #107 Santa Ana, CA 92706 Vision Statement (Board of Trustees) Rancho Santiago

More information

How To Know The State Of Intermodal Trucking In The United States

How To Know The State Of Intermodal Trucking In The United States The State of Intermodal Drayage David M. McLaughlin CONECT 2009 1 State of the Intermodal Industry Circa 2007 Consistent growth: 32% Increase 2000-2006 Dramatic increase in fuel costs from $1.40 per gallon

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

RealityVision & The Port of Los Angeles Improving Security Responsiveness at the Nation s Busiest Cargo Port

RealityVision & The Port of Los Angeles Improving Security Responsiveness at the Nation s Busiest Cargo Port Reality Mobile Customer Case Study May 2010 RealityVision & The Port of Los Angeles Improving Security Responsiveness at the Nation s Busiest Cargo Port RealityMobile 13921 Park Center Road, Suite 400

More information

LA: THE DREAM STARTS HERE BUILDING LOS ANGELES INTO A GLOBAL CAPITAL OF CLEAN TECHNOLOGY

LA: THE DREAM STARTS HERE BUILDING LOS ANGELES INTO A GLOBAL CAPITAL OF CLEAN TECHNOLOGY LA: THE DREAM STARTS HERE BUILDING LOS ANGELES INTO A GLOBAL CAPITAL OF CLEAN TECHNOLOGY Mayor s Office of Economic Development Mayor s Office of Energy & Environment Office of Mayor Antonio R. Villaraigosa

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

This section summarizes the relevant transportation policies, laws, and regulations that apply to the proposed project.

This section summarizes the relevant transportation policies, laws, and regulations that apply to the proposed project. 6. Transportation 6.1 OVERVIEW This chapter describes the existing transportation conditions in the Southwest Fresno Specific Plan Area. This includes the existing roadway, transit, bicycle, and pedestrian

More information

Implementation Strategy

Implementation Strategy Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination

More information

Education. Continuing Education. Professional Experience

Education. Continuing Education. Professional Experience Home: 4181 Country Club Drive Long Beach, CA 90807 562-427-8165 Contact Info: knatz@usc.edu gknatz@charter.net Cell 562-343-0226 Education Doctor of Philosophy, Biological Sciences, 1979 University of

More information

Anyone wishing to address the Board should sign in at the podium in advance and come forward at the following times:

Anyone wishing to address the Board should sign in at the podium in advance and come forward at the following times: AGENDA OF COMMITTEE MEETINGS AND THE REGULAR MEETING OF THE BOARD OF HARBOR COMMISSIONERS OF THE CITY OF LONG BEACH, TO BE HELD IN THE BOARD ROOM OF THE HARBOR DEPARTMENT ADMINISTRATION BUILDING AT 925

More information

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,

More information

Rick D. Longobart. City of Santa Ana

Rick D. Longobart. City of Santa Ana Rick D. Longobart A Tale of Two Cities Overcoming Economic Obstacles, While Going Green City of Santa Ana Municipal Equipment Maintenance Association, Since 1952, Supporting Fleets for a Better Tomorrow

More information

MINUTES. March 30, 2011 PUBLIC HEARING. of the Danville Metropolitan Planning Organization

MINUTES. March 30, 2011 PUBLIC HEARING. of the Danville Metropolitan Planning Organization MINUTES Hearing Subject: PUBLIC HEARING of the Danville Metropolitan Planning Organization held at the Danville Regional Airport, Eastern Conference Room from 5:30 p.m. to 6:30 p.m. Amendment to the FY

More information

MINUTES OF THE SPECIAL MEETING OF THE BOARD OF THE CASTRO VALLEY SANITARY DISTRICT HELD ON SEPTEMBER 15, 2009

MINUTES OF THE SPECIAL MEETING OF THE BOARD OF THE CASTRO VALLEY SANITARY DISTRICT HELD ON SEPTEMBER 15, 2009 MINUTES OF THE SPECIAL MEETING OF THE BOARD OF THE CASTRO VALLEY SANITARY DISTRICT HELD ON SEPTEMBER 15, 2009 [1. Call to order, Roll Call, and Pledge of Allegiance.] The Special Meeting of the Board of

More information

Make Money by Saving the Planet

Make Money by Saving the Planet AAPA 2015 Marine Terminal Management Training Program Sustainable Port Development and Operations September 17, 2015 Kat Janowicz, MSME, MBA, CEM, LEED GA, Principal Photo: Kat Janowicz Make Money by Saving

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

Tracking Truck Flows for Drayage Efficiency Analysis

Tracking Truck Flows for Drayage Efficiency Analysis Tracking Truck Flows for Drayage Efficiency Analysis Shui Lam Byung Lee Jay Patel California State Univ. Long Beach METRANS SEMINAR Nov. 14, 2015 (Project funded by CALTRANS) Presentation Outline 1. Problem

More information

Doppler Traffic Flow Sensor For Traveler Information Systems. October, 2007 1

Doppler Traffic Flow Sensor For Traveler Information Systems. October, 2007 1 Doppler Traffic Flow Sensor For Traveler Information Systems October, 2007 1 Traffic congestion costs $70B a year Road construction can t keep up with demand Congestion spreading to smaller cities Many

More information

Task 1 Project Management and Project Organization Work Plan

Task 1 Project Management and Project Organization Work Plan City of Palmdale Active Transportation Program Plan Scope of Work At their January 22, 2015 meeting, the California Transportation Commission (CTC) allocated funding for the above-referenced project as

More information

Experts in Rail Maintenance and Infrastructure

Experts in Rail Maintenance and Infrastructure Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail

More information

Technical Advisory Committee on Distributed Generation and Storage Pat Egan - Senior Vice President, Customer Operations

Technical Advisory Committee on Distributed Generation and Storage Pat Egan - Senior Vice President, Customer Operations Technical Advisory Committee on Distributed Generation and Storage Pat Egan - Senior Vice President, Customer Operations April 28, 2016 Agenda NV Energy Technology and Communications Investments Smart

More information

Gateway Cities Subregion Project List

Gateway Cities Subregion Project List Prioritized Project ID Project/Program Category Jurisdiction Project Description Agency Minimum 1 8062 Transit ACCESS Services INC. Access Services Inc. Annual Expenditures Including Service Provider Contracts

More information

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda MAP 21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal

More information

The potential impact of South Africa s current intermodal strategies on national transport costs

The potential impact of South Africa s current intermodal strategies on national transport costs The potential impact of South Africa s current intermodal strategies on national transport costs SARF 2014, CSIR Convention Centre, Pretoria 4 September 2014 Nadia Viljoen Growth and Intelligence Network

More information

CITY OF WINTER GARDEN

CITY OF WINTER GARDEN CITY OF WINTER GARDEN CITY COMMISSION REGULAR MEETING MINUTES A REGULAR MEETING of the Winter Garden City Commission was called to order by Mayor Rees at 6:30 p.m. at City Hall, 300 West Plant Street,

More information

SOUTHERN CALIFORNIA REGIONAL OCCUPATIONAL CENTER BOARD OF EDUCATION MEETING 2300 Crenshaw Boulevard, Torrance, CA 90501 Board Room

SOUTHERN CALIFORNIA REGIONAL OCCUPATIONAL CENTER BOARD OF EDUCATION MEETING 2300 Crenshaw Boulevard, Torrance, CA 90501 Board Room SOUTHERN CALIFORNIA REGIONAL OCCUPATIONAL CENTER BOARD OF EDUCATION MEETING 2300 Crenshaw Boulevard, Torrance, CA 90501 Board Room 6:00 p.m. Open Session CALL MEETING TO ORDER: Time: BOARD MEMBERS: Dr.

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01 Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT

More information

Section ALTERNATIVES. 3. Alternatives

Section ALTERNATIVES. 3. Alternatives Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of

More information

2009-3. The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network

2009-3. The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network 2009-3 The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network July 2009 This Goods Movement Challenges and Opportunities Report was prepared jointly

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

BC Hydro 2005 Integrated Electricity Plan (IEP) Cranbrook Regional Meeting Final Meeting Notes

BC Hydro 2005 Integrated Electricity Plan (IEP) Cranbrook Regional Meeting Final Meeting Notes Meeting Date and Location November 7, 2005 Prestige Rocky Mountain Resort & Convention Centre 209 Van Horne St., Cranbrook, B.C. Meeting convened at 2:30 p.m. (late start due to travel delays) Attendees

More information

Rail Mileage-Based Asset Management

Rail Mileage-Based Asset Management Customer Service and Operations Committee Board Information Item III-B November 4, 2010 Rail Mileage-Based Asset Management Page 23 of 52 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Yield Curve September 2004

Yield Curve September 2004 Yield Curve Basics The yield curve, a graph that depicts the relationship between bond yields and maturities, is an important tool in fixed-income investing. Investors use the yield curve as a reference

More information

Trucking Advisory Council

Trucking Advisory Council Trucking Advisory Council MINUTES DECEMBER 12, 2012 9:00-11:00AM MST ITD CONFERENCE ROOM 200 BOARD ATTENDEES LIAISON ATTENDEES LIAISON ATTENDEES VIA PHONE OTHER ATTENDEES Bill Moad, Chairman Evan Hayes,

More information

SOUTHERN CALIFORNIA DELIVERS THE GOODS

SOUTHERN CALIFORNIA DELIVERS THE GOODS SOUTHERN CALIFORNIA DELIVERS THE GOODS SOUTHERN CALIFORNIA DELIVERS THE GOODS gateway to the n Southern California s freight infrastructure from ships and ports to rails and roads is integral to our nation

More information

White Paper. Understanding California s Electricity Prices

White Paper. Understanding California s Electricity Prices White Paper Understanding California s Electricity Prices Executive Summary Most industry experts predict that average electricity prices throughout the U.S. will increase significantly over the next decade.

More information

Electric Energy Systems

Electric Energy Systems Electric Energy Systems Electric Energy Systems seeks to explore methods at the frontier of understanding of the future electric power and energy systems worldwide. The track will focus on the electric

More information

MEMORANDUM. Community Organizational Representatives Name Title Organization

MEMORANDUM. Community Organizational Representatives Name Title Organization To: Office of the Comptroller of the Currency From: Steven Sugarman, President and Chief Executive Officer Date: Monday June 9, 2014 Subject: Los Angeles Community Outreach Meeting Minutes Location: Radisson

More information

MINUTES METROPOLITAN TRANSIT AUTHORITY BOARD OF DIRECTORS REGULAR BOARD MEETING February 19, 2009

MINUTES METROPOLITAN TRANSIT AUTHORITY BOARD OF DIRECTORS REGULAR BOARD MEETING February 19, 2009 MINUTES METROPOLITAN TRANSIT AUTHORITY BOARD OF DIRECTORS REGULAR BOARD MEETING Executive Session was held beginning at 10:54 a.m. and ended at 11:15 a.m. The regularly scheduled monthly meeting of the

More information

Grass Lake Community Schools 899 South Union Street Grass Lake, Michigan 49240 (517) 522-5540 Fax (517) 522-8195

Grass Lake Community Schools 899 South Union Street Grass Lake, Michigan 49240 (517) 522-5540 Fax (517) 522-8195 Grass Lake Community Schools 899 South Union Street Grass Lake, Michigan 49240 (517) 522-5540 Fax (517) 522-8195 Grass Lake Community Schools Regular Board of Education Meeting Monday January 13, 2014

More information

Virtual Weigh Stations: The Business Case

Virtual Weigh Stations: The Business Case Virtual Weigh Stations: The Business Case Technical Memorandum Prepared for Partners for Advanced Transit and Highways (PATH) Institute of Transportation Studies University of California, Berkeley and

More information

Highlands Community Charter and Technical Schools Board Meeting Minutes

Highlands Community Charter and Technical Schools Board Meeting Minutes Highlands Community Charter and Technical Schools Board Meeting 1333 Grand Avenue, Sacramento, CA 95838 February 4, 2015 Open Session: 4:00 PM Board Policy Regarding Board : The minutes of open session

More information

APPENDIX J TRAFFIC STUDY

APPENDIX J TRAFFIC STUDY APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,

More information

California Climate Challenge Methodology April 25, 2013

California Climate Challenge Methodology April 25, 2013 California Climate Challenge Methodology April 25, 2013 Feebates Semi Truck Fuel Efficiency Pay- As- You- Drive Insurance Gas Tax Parking Prices Give a rebate to owners of more efficient vehicles while

More information

Selling Residential Solar A Market Based Approach

Selling Residential Solar A Market Based Approach http://dialogue.usaee.org/index.php/component/content/article/28 dialogue articles/v17 no3/104 selling residential solara market based approach United States Association for Energy Economics (USAEE) DIALOGUE,

More information

CITY OF INKSTER PLANNING COMMISSION MINUTES

CITY OF INKSTER PLANNING COMMISSION MINUTES CITY OF INKSTER PLANNING COMMISSION MINUTES An Annual meeting of the Inkster Planning Commission was held on Monday, in the Inkster Council Chamber located at 26215 Trowbridge, Inkster, Michigan. A quorum

More information

ELECTION EXTRA GENERAL ELECTION NOVEMBER 2, 2010 LOCAL PROPOSITIONS IN SAN DIEGO COUNTY COUNTY OF SAN DIEGO

ELECTION EXTRA GENERAL ELECTION NOVEMBER 2, 2010 LOCAL PROPOSITIONS IN SAN DIEGO COUNTY COUNTY OF SAN DIEGO ELECTION EXTRA GENERAL ELECTION NOVEMBER 2, 2010 LOCAL PROPOSITIONS IN SAN DIEGO COUNTY COUNTY OF SAN DIEGO PROPOSITION A: San Diego County Charter Amendment To Ensure Fair And Open Competition For County

More information

-25 A-se =, zai,*,:.-.a -322-295;

-25 A-se =, zai,*,:.-.a -322-295; Los Angeles County Service Authority for Freeway Emergencies %'a- 6' B d,-a 2. *&a, -j 1-a -25 A-se =, zai,*,:.-.a -322-295; I SAFE BOARD MEETING JUNE 28,2012 SUBJECT: ACTION: ADOPT THE FISCAL YEAR 201

More information

SCOTTSDALE TRANSPORTATION COMMISSION REPORT

SCOTTSDALE TRANSPORTATION COMMISSION REPORT SCOTTSDALE TRANSPORTATION COMMISSION REPORT To: Transportation Commission From: Paul Basha, Transportation Director Meeting Date: September 19, 2013 Subject: SR-101 Pima Freeway Improvements ITEM IN BRIEF

More information

California State Transportation Agency Call for Projects for the. 2016 Transit and Intercity Rail Capital Program

California State Transportation Agency Call for Projects for the. 2016 Transit and Intercity Rail Capital Program California State Transportation Agency Call for Projects for the 2016 Transit and Intercity Rail Capital Program Summary: This call for projects details the application requirements and procedures for

More information

David Waligora, Planner; Jeff Gritter, Township Engineer; Sandy Wiltzer, Recording Secretary

David Waligora, Planner; Jeff Gritter, Township Engineer; Sandy Wiltzer, Recording Secretary DRAFT MINUTES OF THE GAINES CHARTER TOWNSHIP PLANNING COMMISSION FOR THE REGULAR MEETING HELD ON March 26, 2015 AT THE GAINES CHARTER TOWNSHIP OFFICES 8555 KALAMAZOO AVENUE SE CALEDONIA, MICHIGAN 49316

More information

Railway Crossing Information System

Railway Crossing Information System Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design

More information

ECONOMIC OUTLOOK. Quantifying the Shale Gas Revolution s Impact on U.S. Industrial Energy Consumption MAY 2014

ECONOMIC OUTLOOK. Quantifying the Shale Gas Revolution s Impact on U.S. Industrial Energy Consumption MAY 2014 MAY ECONOMIC OUTLOOK Quantifying the Shale Gas Revolution s Impact on U.S. Industrial Energy Consumption THE CARLYLE GROUP 1001 PENNSYLVANIA AVENUE, NW WASHINGTON, DC 20004-2505 202-729-5626 WWW.CARLYLE.COM

More information

How To Reduce Energy Use

How To Reduce Energy Use Opportunities for: Reducing Carbon Footprint Slashing Peak Demand Hybrid DX Air Conditioning utilizing ice storage Paul Kuhlman Director, Ice Energy Inc. pkuhlman@ice-energy.com We are experiencing a warming

More information

Load Balancing Using a Co-Simulation/Optimization/Control Approach. Petros Ioannou

Load Balancing Using a Co-Simulation/Optimization/Control Approach. Petros Ioannou Stopping Criteria Freight Transportation Network Network Data Network Simulation Models Network states Optimization: Minimum cost Route Load Balancing Using a Co-Simulation/Optimization/Control Approach

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

Prime Retail Space For Lease!

Prime Retail Space For Lease! Prime Retail Space For Lease! Enroute to Fast Growing Clovis Housing Developments Located on Heavily Trafficked Herndon Arterial Close to Highway 168 On/Off Ramps Adjacent to High Profile Centers NOW OPEN!

More information

Background Information

Background Information Background Information Munich, June 4, 2015 ehighway: a vision of electrified freight traffic As it will not always possible to transfer more freight traffic to the rail, this traffic will have to be carried

More information