1 Jefferson Community & Technical College Downtown Campus 109 East Broadway Louisville, Kentucky 40202

2 Introduction Jefferson Building, 1921 Bravura has developed a Physical Development Plan to evaluate and update the use of the Jefferson Community and Technical College s Downtown campus facilities with the integration of future needs. One of the primary goals of this plan involves the evaluation and recommendation of site considerations for the proposed Allied Health Building, along with the urgent and growing need for student and faculty parking options on the Downtown Campus. Additionally, the Planning Team will test the six-year plan for JCTC and access the possible modifications with current needs for the campus. Planning Process Over the past months, Bravura s planning and design team has studied the JCTC Downtown Campus with a range of constituents. The general phases of the study include: Analysis Planning Goals and Objectives History Visioning Issues Context and Site Analysis Existing Building Inventory Exploration Guiding Principles Planning Strategies Framework Plan Future Campus Buildings Finalization Concepts and Strategies KCTCS 6-year priorities Refinement and Adoption of comprehensive, unified set of ideas that comprise the master plan. These steps were performed in concert with the JCTC faculty, staff and administration as well as state representatives. These groups provided valuable input and evaluation during each step of the study process. Bravura wishes to thank all who participated in the preparation of this Physical Development Master Plan. DT 1

3 JCTC - DOWNTOWN CAMPUS MASTER PLAN JCTC DOWNTOWN CAMPUS Mission Jefferson Community and Technical College (JCTC) is a comprehensive, public, two-year college providing students a wide variety of study programs including allied health, business, engineering and information technologies, general education transfer courses, and trade and industry technologies. JCTC offers twentyseven Associate in Applied Science, Associate in Arts and Associate in Science curricula, including degree, diploma and certificate programs, along with baccalaureate studies for transfer to senior colleges and four-year universities. In addition, continuing education, job training, distance learning and other related services are available to strengthen the existing workforce and enrich the lives of the community at large. JCTC Downtown Campus Map The JCTC system had an enrollment of over 15,500 students in The downtown campus currently serves over 6,000 students, with a goal of 8,500 students by According to published information, the student population in 2005 was 54 percent female, 14 percent African-American, and 3 percent Asian or Hispanic 75 percent work at least part-time, 19 percent have a degree or other credential. The average age was 26. DT 2

4 Analysis History Jefferson Community and Technical College (JCTC) is a multicampus, post secondary institution with its primary facilities located in Louisville, Kentucky. Founded in 1968 as Jefferson Community College (JCC), the downtown campus was originally operated by the University of Kentucky. Over the next three decades, JCC expanded to include locations in southwest Jefferson County, Shelby County, and Carroll County, before joining the state-wide Kentucky Community and Technical College System (KCTCS) in The downtown campus remains the largest of the system s sixteen colleges. In 2005, JCC and the Jefferson Technical College merged, creating Jefferson Community and Technical College. In 1964, the University of Kentucky Board of Trustees formed the Community College System, and in 1965 voters approved a bond issue allowing the City of Louisville to acquire a site for a downtown campus. In 1966, the former Presbyterian Theological Seminary complex (cir ) at First and Broadway was purchased and converted to classroom and office use. The two-year college officially opened in 1968 with approximately 800 students. In 1972, the Hartford Tower, a twelve-story classroom and laboratory building, was constructed just north of the Seminary Building, at First and Gray Streets. 5 4 Enrollment continued to increase and in 1975 the three-story Vocational Technical Institute (VTI) was opened along Chestnut, between First and Second Streets. Also opened in 1975 was Phase I of the Learning Resource Center (LRC), housing Library and classroom functions. Phase II of the LRC was completed in 1978, visually connecting the Hartford Tower on the east side of First Street with the VTI facility to the north. JCTC purchased the Baldwin United Building on the corner of First and Broadway in Now called the Broadway Building, it is used primarily for administrative and academic affairs. During this period the main surface parking lot was expanded to include the southwest corner of Second and Broadway. In 2000, the Jefferson Educational Foundation purchased the multi-story Portland Building, located diagonally across Broadway. Referred to as the Jefferson Educational Center (JEC), the former hotel was remodeled and leased back to the college and serves as a student affairs and maintenance operations facility. In 2003, Phase I renovation work was completed on the original Seminary Building. Upcoming Phase II work is expected to begin in 2007 and includes restoration of the historical interiors. Also in 2007, plans for a major allied-health classroom facility were proposed Hartford Tower 2. Jefferson Building 3. Broadway Building 4. Learning Resource Center (Library) 5. Vocational Technical Institute (VTI) 6. Jefferson Education Center (Portland Building) 7. Brown Theater 6 N DT 3 Existing building inventory and site plan, 2008

5 JCTC - DOWNTOWN CAMPUS MASTER PLAN Previous Master Plans The original Campus Development Master Plan was introduced in 1966, and was based upon a maximum enrollment of 6,000 students requiring a total of 660,000 square feet. The plan anticipated the immediate need for a second building, the Hartford Tower, on land adjacent to the Seminary Building. For the main campus along Chestnut between First and Second Streets, the plan laid out a straightforward internal courtyard design with five academic buildings placed around the perimeter. Anchoring the courtyard and facing the Hartford Tower, was a major student activity center. At that time, commercial structures occupied the south end of the block, preventing the courtyard plan from extending to Broadway. This original plan was followed by revisions in 1974 and Subsequent construction of the VTI Building and the LRC were generally consistent with the recommendations of the 1966 plan. Student parking, however, was not adequately addressed in either plan. Ultimately, the critical need for student parking curtailed the completion of both the student center and the Second Street classroom building. Instead, surface parking became the core of the campus, effectively severing the vital pedestrian connection between east and west. Regrettably, the current building layout leaves the campus without a major outdoor gathering space or a central student center. recommended a student center opposite the Hartford Building. Although limited below-grade parking was suggested to replace the existing surface parking, the proposal fell far short of satisfying the actual parking requirements. In 2002, a Landscape Development Plan was completed. Rather than re-examining the long-term physical layout of the campus, the study inventoried existing landscaping and site amenities, and recommended practical, short-term improvements. New standards for site furnishings, landscape treatments, signage and lighting were proposed to enhance the appearance and function of the existing parking area and the overall campus environment. Lack of funding has kept major elements of both the 1996 and the 2002 Plans from being implemented. Today, the demand for parking remains the primary challenge to future growth of the JCTC downtown campus. An updated Physical Development Plan was prepared in 1996 that re-evaluated the various influences that could effect future development. It presented a broad framework that established general guidelines for phased growth, but remained adaptable to program changes. The final plan extended the original courtyard concept south to Broadway with a ring of three-story classroom buildings around the perimeter. The plan also Original Campus Master Plan, 1966 DT 4

6 Visioning Issues The Planning Team conducted a campus-wide Visioning Session on December 4, 2006 for the purpose of collecting ideas, opinions, needs and strategies for the future programmatic and physical growth of the Downtown Campus. The compiled comments of this session guided the Planning Team towards a comprehensive needs assessment, and created the framework plan for the future physical development of the campus. Many of these comments became Guiding Principles, applicable to all five campuses. Additional Planning Team meetings were held to clarify issues and propose alternatives. A final presentation was given to JCTC President, Dr. Anthony Newberry, the Division Chairs, and faculty members on April 24, The critical issues addressed during this session are presented in descending order of recurrence and consensus. Parking Present situation is difficult for students, faculty and visitors and limits long-term growth. There is an immediate need for adequate and convenient parking. Initiate a comprehensive campus parking study to quantify the demand and action plan. Technology Currently inadequate and outdated. Upgrade technology and make it more reliable. Enhance its use and availability. Cultivate a campus image of high-tech services. Learning Principles/Interaction Implement student-centered (learning vs. teaching) principles and philosophy. Provide gathering spaces, lounges, study areas and flexible classrooms. Create opportunities for student interaction, independent learning, group work, elearning, and multicultural understanding. Provide more exterior landscaped gathering spaces. Updated Learning Areas Facilities are currently outdated and not very visually stimulating. Modernize learning areas and renovate, update and redecorate existing facilities. Improve access to buildings. Provide helpful and attractive signage. DT 5

7 Visioning Issues JCTC - DOWNTOWN CAMPUS MASTER PLAN Student Service Areas and Amenities Current student services are inconvenient and not user friendly. Consolidate student affairs and activities into a Campus Center. Improve customer service. Consider admissions, assessment, counselors, orientation, mentoring, financial aid, intervention, academic support, library, resource center, recreation, entertainment, student activities, cafeteria/cafe, technology center, common meeting rooms, social activities, one-stop registration. Create a catalytic space for campus users. Downtown Interaction Promote opportunities for community interaction and partnerships. Downtown is a positive and unique influence and environment for the campus. Foster greater community involvement in campus activities. Create a recognizable sense of place for the institution. Make the campus more unified and more welcoming. Maintain a safe environment and promote the perception of security and safety. Faculty Development Provide facilities for faculty and staff development. Foster more interaction and communication between faculty members. Reduce duplication of programs and processes. DT 6

8 Analysis Site Analysis The core of the Downtown Jefferson Community College campus is bounded on the north by West Chestnut Street, on the east by Interstate 65, on the south by Broadway, and on the west by Second Street. The Jefferson Educational Center is located on the southwest corner of Broadway and Second Street. Classes for the College s Theater Arts Program are currently held at the Brown Theatre Building, on the corner of Fifth Street and Broadway. Significant features surrounding this urban campus include the Holiday Inn to the south, the Crescent Center condominium complex to the west, and the YMCA and Community Health Building to the north. The College is located one block east of St. Francis High School and two blocks east of the Louisville Free Public Library. High-rise office and residential buildings are located northwest of the campus, and a hospital/medical complex is located on adjacent property northeast of the campus. Pedestrian Circulation Consistent with its urban environment, streets and sidewalks surround the JCTC downtown campus on all sides. Students, visitors, faculty and staff comprise the majority of pedestrian activity. These groups are found primarily along the perimeter sidewalks, traversing through the main parking lot, and casually gathering around building entrances and drop-off zones. The student population is highest during morning classes, but decreases dramatically in the afternoons and evenings. Few classes are in session on Fridays, leaving the buildings and parking lots largely vacant. On-campus parking is limited; many commuting students park on the streets or in nearby garages and walk to class. Others utilize public transportation or ride sharing. Bicycle use is thought to be minimal. Gray Street offers a direct connection to the Medical Center, and it is expected that foot traffic will increase as more students attend off-campus courses or seek part-time employment at one of the nearby hospitals. Students JCTC Downtown Campus, looking northeast also frequent off-campus restaurants and businesses such as the McDonalds, the YMCA, 4 th Street Live, and the Louisville Public Library. Pedestrian movement is heavy at all major intersections and parking driveways, creating potential conflicts with vehicles. With its wide roadway and confusing signals, the Broadway/ Second Street crossing to and from the JEC Building, is considered particularly dangerous. To minimize the conflicts across Broadway, many of the JEC academic functions could be relocated into a future building on the main campus. Similarly, the random, mid-block crossings from the main parking lot to the Hartford Tower and Jefferson Building represent a significant hazard to both pedestrians and vehicles along First Street. The Master Plan will recommend that these crossings be controlled and clearly marked. The internal campus walkway system is often under-sized or missing altogether. Students are required to cut through the parking area to reach the buildings. Socializing often takes place in and around the parked vehicles. Some sidewalks and paths are in need of maintenance and are challenging to those with disabilities. The location of benches and tables are often not conducive to studying or socializing. Student services and amenities are dispersed throughout campus and difficult to locate. Pedestrian circulation within the campus forms a strong triangular pattern across the main parking lot. Students move north-south from parking to the LRC and VTI buildings. A partial concourse or spine links the LRC Building and the sunken courtyard of the VTI Building. Diagonal movement is heaviest east-west between the LRC, across First Street to the Hartford Tower/Jefferson Building; and to a lesser degree connects the Hartford Tower with the Broadway and JEC buildings to the southwest. These important circulation patterns will be used to inform and guide the recommendations of the Master Plan. DT 7

9 JCTC - DOWNTOWN CAMPUS MASTER PLAN Vehicle Circulation Four major streets border the downtown campus: Broadway to the south; Chestnut Street to the north; First Street to the east; and Second Street to the west. During peak periods, when commuter rush hour and class sessions coincide, traffic can be especially heavy. Congestion at intersections and parking entrances leads to backups, and pedestrian safety becomes a major concern. Broadway is a primary six-lane east-west connector serving the southern portion of the CBD. Limited on-street parking is permitted, with TARC bus stops near First Street. Because of its width, Broadway carries a large volume of commerce and commuter traffic throughout the day. Second Street is a major five-lane north-south commuter connector into the CBD and across to Indiana. On-street parking is not allowed. The main student parking lot, along with an existing faculty lot, is entered and exited mid-block on Second Street. Grid lock is common during rush hour. is lightly traveled. The signal light is used primarily by crossing students. Metered on-street parking is permitted on both sides of the street. Parking spaces along First and Gray are typically occupied when classes are in session. Generally, college traffic moves in a counterclockwise direction around the campus. Students using northbound Interstate 65 exit onto Brook Street and turn westbound onto Broadway or Gray Street to enter campus. The nearest exit from southbound I-65 is at Jefferson Street, four blocks to the north. North and southbound Interstate 65 is elevated as it passes adjacent to the east side of the campus. Access to I- 65 is limited, and its imposing bulk creates serious environmental issues. Southbound traffic leaving campus can pickup I-65 from First Street, south of Broadway. The northbound I-65 ramp is off of Liberty Street. Chestnut Street is a secondary four-lane eastbound connector with ramp access to southbound I-65 just east of First Street. Onstreet parking is prohibited, but TARC stops are frequent, with a direct connection to the JCTC Technical campus on Eighth Street. First Street is a four-lane southbound commuter street flowing away from downtown. Several entrance ramps to southbound I-65 are available south of Broadway. Metered on-street parking is permitted on both sides of the street, but a designated student drop-off is not present. A popular TARC bus stop is located near Broadway. The convenient transfer service to Broadway adds to the already crowded intersection. Gray Street is a minor four-lane east and westbound street that terminates into First between Broadway and Chestnut. Except for its proximity to the medical campus, Gray Street Context Analysis Site Circulation DT 8

10 Analysis View of main student parking area looking southeast. The center of campus is dominated by asphalt and automobiles. Parking The main student parking area is accessed from Second Street and accommodates approximately 580 vehicles. It extends north from Broadway, between First and Second, visually dominating the southwest corner of campus. The driveway into the lot is narrow, making left hand turns dangerous. Parking requires a permit, although the entry gate is typically not operating and the attendant booth is unoccupied. The lot reaches capacity quickly on most weekdays; forcing students to circle until a space is found, or leave the lot to search for on-street parking. The existing asphalt lot is poorly organized with minimal landscaping or site lighting. Students leaving the lot may exit back onto Second or onto First Street. The single, gated driveway to First Street discharges directly across a crowded sidewalk and between parked vehicles. View of Second Street showing the Crescent Centre housing development and recent streetscape improvements. The parking area is entered from Second Street. Faculty, staff and visitor parking is confined to three small lots around the main campus. The primary visitor and faculty parking lot is accessed from westbound Broadway, directly west of the Broadway Building. This lot contains only about 17 standard spaces. Maneuvering is difficult due to the constricted drive lanes. Directional signage for visitor parking is inadequate, and there are no information booths or kiosks. Connected to the visitor lot with a gate, is a dead-ended 38 space faculty lot. Another 80 space faculty lot near the VTI Building will be reduced by the future Allied Health project. A remote 29 space dead-end faculty lot is located near the corner of Gray and First Streets. Additional faculty and visitor parking is available in the JEC garage across Broadway. Approximately 132 student spaces are currently being leased under I-65, with another 100 spaces provided by Norton Hospital. The potential for off-campus expansion exists primarily to the west across Second, northwest at Chestnut, and to the south across Broadway at the Holiday Inn. Surface parking may also be available south of the JEC Garage. The Master Plan will recommend the acquisition of these properties, if available. Other off-campus sites for building or parking expansion will be identified on the conceptual site plan. Long term, the construction of nearby student housing, and better mass transit options will have an impact. View of southbound traffic on First Street. Serious conflicts exist between pedestrians and vehicles. DT 9 Parking will remain a priority for the future growth of JCTC, underscoring the need for a comprehensive parking analysis to study future demand. Clearly, improvements to the existing circulation and parking configuration are required. Structured parking provides opportunities to effectively consolidate and manage these issues. Equally important, valuable land would become available for new campus buildings and public open space.

11 JCTC - DOWNTOWN CAMPUS MASTER PLAN Contextual Analysis The JCTC Downtown campus occupies two and one-half city blocks located just south of the CBD. Its high density urban environment is unique among the system campuses. Traffic, noise, and lack of green space are a few of the many issues facing the college. The Master Plan will evaluate the external influences that may impact the design of the campus and suggest approaches to guide future development. To the south, Broadway offers an expansive, formal edge to the campus. Traditionally, building facades are set back from the curb to accommodate the twenty-four foot wide sidewalks, used during civic events. Building heights are typically higher, consistent with the scale of a grand boulevard. The threestory Broadway Building, acquired to provide college administration offices, violates this set-back by crowding the corner at First Street. Without other JCTC buildings along Broadway, the public face of the campus has become the sprawling student parking lot. The primary corner at Second and Broadway lacks the proper signage suitable for a campus gateway. Located diagonally across Broadway, the Jefferson Educational Center (Portland Building) is a seven-story building housing student services, faculty and facilities management offices and other quasi-educational organizations. The remodeled building, a former hotel, is isolated and disconnected from the main campus, forcing students to cross busy Broadway. On the west side of Second Street, a two-story McDonalds has become a surrogate student center. Other buildings on Broadway include a Holiday Inn, a gas station, fast food franchises and a small strip retail center. To the west, Second Street presents a quieter image to the campus. A 1990 s mid-rise condominium tower with a threestory townhouse component establishes a definite street edge. Future campus buildings should respond with a similar setback, building height and massing. Recent streetscape improvements, including landscape buffers and benches provide a pleasant experience for the pedestrian. A defunct parking structure, along with other surface lots, should be considered as potential sites for a future garage. With the proposed Louisville arena within walking distance to the north, a jointly operated publicprivate garage is conceivable. Context Analysis Campus Concept DT 10

12 Analysis The north side of campus on Chestnut Street is dominated by the brooding three-story VTI classroom building. With its dark glazing, concrete exterior and hidden corner entrances the building is not easily recognized as part of the campus. As with the other major pedestrian corners, better signage is needed. Generous landscaping, however, softens the façade and entry plazas. Across Chestnut Street, taller buildings, like the YMCA hold the street edge. The east side of campus is the most problematic. First Street bisects the college, physically separating the Hartford Tower and Jefferson Building from the LRC and VTI Buildings, and putting pedestrians and vehicles at risk. Rather than dividing the campus, First Street should be envisioned as entering and passing through the campus. Pedestrian movement should take precedent over vehicles, reinforcing the strong east-west circulation patterns. Existing hardscape treatments surrounding the Hartford Tower are in various states of disrepair. The struggling street trees and planters offer little visual relief, and in fact hinder connections with the street. Noisy, dirty and unsightly, Interstate 65 is a formidable presence along the eastern edge of the campus. For the area around the elevated Hartford tower plaza, the Master Plan will recommend a combination of screen walls, landscape buffers, and building expansion. The freeway does offer direct views into the center of the campus, however. The 12-story Hartford Tower can be seen for a considerable distance from both directions. Building signage should be encouraged to take advantage of this opportunity. Broadway Building crowds the sidewalk edge, blocking views of the impressive stonework. The building could also benefit from a proper entrance on the north façade. The recessed south-facing courtyard, although suffering from neglect and an inappropriate redesign, remains one of the few semi-private open spaces available. With the main student parking lot as its focus, the campus is fragmented, disorganized, and lacks a sense of arrival. Future campus buildings should be built to the street edge, adding density, and defining the college boundaries. Student activities and amenities should be centralized and inviting. Replacing surface parking with landscaped open space will create larger common areas for students to gather and socialize. Improved walkways, furnishings and signage will make circulation across campus more direct and pleasant. Overall, the current JCTC Downtown Campus lacks a sense of identity and cohesion, both internally and externally. The Master Plan will address these issues and propose methods to: 1. Consolidate and connect campus buildings, parking and services to promote better interaction between faculty and students. 2. Create a safe, open learning environment that presents an attractive, identifiable campus image to the community. The Jefferson Building is recognized as the jewel of the campus. Recent restoration efforts have given new life, and new uses, to the former seminary building. With its decorative collegiate gothic architecture, the building displays a strong, iconic presence to the community. Regrettably, the adjacent North South West DT 11

13 JCTC - DOWNTOWN CAMPUS MASTER PLAN Context and Site Analysis Summary 1. The geographic perimeter of the main campus property should respond to and enhance the urban character of its edges. 2. Any new buildings on Broadway should be respectful of view corridors to the Jefferson Building in terms of setbacks and spatial crowding. 3. Access from across First Street and from the Hartford Plaza should be enhanced. 4. Parking is in great demand. Areas for future parking need to be identified. Main student parking lot, looking southeast 5. The campus and surrounding context is urban in density and scale. 6. The campus has no established hierarchy of pedestrian circulation paths. 7. The existing campus architecture should function as an edge of the interior campus open space. 8. Community spaces within the buildings are needed to promote student, faculty and staff interaction. Hartford Tower plaza, looking southwest Aerial view of First Street DT 12

14 Analysis Existing Building Inventory 7. Brown Theatre 6. Jefferson Education Center Admissions Records Payments Dean s Office Student Services Financial & Assessment Offices Facilities Management Business Fiscal Planning Human Resources Theater Arts (located off-campus on Broadway between 3rd and 4th Streets) 5. Vocational Technical Institute Allied Health Business Health Music Art Child Care Cafeteria DT Learning Resource Center Library Reading Labs Seminar Rooms

15 JCTC - DOWNTOWN CAMPUS MASTER PLAN 1. Hartford Tower Social Sciences Math Natural Sciences Bookstore Auditorium 5 2. Jefferson Building Conference Center (Proposed) English Communication Language Arts Broadway Building Senior Administration Academic Services English Languages Communication Existing building inventory and site plan, 2008 N KEY 1. Hartford Tower 2. Jefferson Building 3. Broadway Building 4. Learning Resource Center 5. Vocational Technical Institute 6. Jefferson Education Center 7. Brown Theater DT 14

16 Analysis Jefferson Building, 1921 The Jefferson Building Originally constructed in 1903, the building once known as the Seminary Building, is now listed on the National Register of Historic Places. In 2003, Phase I renovation work was completed on the east and west wings. The work involved interior remodeling of classrooms, faculty offices and support spaces. Building systems were also upgraded and the limestone facade was cleaned and repaired. For Phase II, the Commonwealth hired a preservation consultant to assess the needs and costs of restoration and preservation of original artwork and architectural details. An architectural/engineering team evaluated the center section of the building, including: the chapel, refectory, lobby, and second floor library. Work proposed includes: the addition of an elevator, improvements to HVAC, electrical, lighting, security, sound and video systems, and egress and ADA remediation. The goal is to adapt the center section for use as a Conference Center, available for use by both the college and the public. The planned renovation will reinforce the college s goal to acknowledge and enhance the significance of the Jefferson Building as the preeminent campus icon Jefferson Building Timeline Building plans developed by Louisville architect, William J. Dodd. Construction completed in In the early 1960 s, the Kentucky General assembly authorized the formation of a state-wide community college system. The City of Louisville approves the purchase of the Seminary Building, formerly the Presbyterian Seminary, for the location of the Jefferson Community College. Louisville architecture firm, Lewis & Henry completes the building s renovation. The college opens its doors to approximately 800 students. Phase I Renovation - Classroom renovations in the east and west wings of the building. Phase II Renovation - Design Documents are prepared for the renovation of the building s center section. DT 15

17 JCTC - DOWNTOWN CAMPUS MASTER PLAN Jefferson Building courtyard, 2008 Jefferson Building courtyard, circa 1938 The exterior building courtyard, modified during a building renovation in 1969, should be redesigned in a manner compatible with the original 1909 concept. The redesigned courtyard should feature a simple, formal plan in keeping with the documented historic walkways and landscaping. Proposed Jefferson Building Courtyard Plan, 2007 DT 16

18 Analysis Hartford Tower Sited on an elevated plaza along the east side of First Street, Hartford Tower is the second building to be added to the JCTC Downtown Campus. The 12-story building provides offices and classrooms for Social Sciences, Math and Natural Science programs. Located directly behind the Jefferson Building, Hartford Tower shares a major utility tunnel that begins north of the building at street level and spans the lower level. Additionally, the lower level supports a maintenance facility, and lecture hall. The building s entry is elevated above street level and is surrounded by a concrete paver plaza that is adjacent to the north facade of the Jefferson Building. The first floor lobby is surrounded by three walls of glass on the east, south and west sides and is used mainly as an informal gathering place for students. Plans are in development for a redesigned building entrance on the west side with improved access to the west plaza and street. A new north entrance is also proposed for the Jefferson Building. The Master Plan recommends a new landscaped exterior arrival plaza that would link the two entrances, create more greenspace, and present an attractive, welcoming campus image to the street edge. The existing plaza, on the east side of Hartford Tower is harsh and uninviting. To better utilize the space, the Master Plan Guidelines recommend a one to two story building addition in this location. On the upper level floors, major renovations to classrooms and lab facilities are anticipated. Included in this renovation are: exterior window and roof replacement, new floor coverings, improvements to lighting and sound, renovation of elevators, HVAC improvements, information technology improvements, interior and exterior signage and security systems Hartford Tower Timeline The second building on the campus provided additional classrooms in a 12-story building. Phase 1 Renovation - Finishes to Lab Spaces, HVAC upgrades. Phase 2 Renovation - Design Documents are prepared for the renovation of classrooms and lab space. Proposed Hartford Tower Plaza Plan, 2007 DT 17

19 JCTC - DOWNTOWN CAMPUS MASTER PLAN Existing Hartford Tower plaza SOUTH FIRST STREET Proposed Hartford Tower Plaza Plan, 2007 DT 18

20 Analysis VTI Building, looking southwest Vocational Technical Institute The Vocational Technical Institute (VTI) building currently provides lab space for Allied Health programs that will be relocated into the new Allied Health facility on adjacent property. Once the Allied Health building is completed, space within the VTI Building will be renovated and updated to be utilized by other instructional programs. Renovations to this facility would include: HVAC, plumbing, electrical systems; structural repairs to the catwalks due to material settlement; abatement of asbestos-containing adhesive material used in sections of the building; and upgrades to bring the building into compliance with current life safety, building code and ADA guidelines VTI Building Timeline Construction Completed Plans for the Early Childhood Education Program located in the basement of the VTI Building include: renovation of 8,000 SF of existing space devoted to this program; 1,000 SF of general classroom space to be converted for use by this program; and expansion of the outdoor playground area. Food services and student lounge areas are located on the lower level of the building and have access to an exterior courtyard on the building s south side. The lower level courtyard is also accessible by stairs connected to upper level terraces. This area is expected to be significantly remodeled as part of the Allied Health Project. DT 19

21 JCTC - DOWNTOWN CAMPUS MASTER PLAN LRC Building, looking northeast Learning Resource Center The Library is located in the Learning Resource Center. Needed upgrades and renovations to the building include: Roof replacement, HVAC and ductwork upgrades, electrical upgrades, flooring, doors and hardware replacement, and asbestos abatement. The Master Plan recommends that the Library be relocated to a new student center. Developmental and resource activities would continue to operate in the building. Long-term, the existing building could provide valuable expansion space for the growing allied health programs. Ultimately, the north half of the campus could be dedicated exclusively to health-related sciences Learning Resource Center Timeline Phase I Construction Completed Phase II Addition Completed LRC Building, looking southeast DT 20

22 Analysis Broadway Building, looking north Broadway Building The Broadway Building currently houses senior administrative functions including the Office of the President, the Office of the Provost, and Academic Affairs. The Master Plan recommends that any new buildings along First Street be set back from the street edge to improve the site lines of the Jefferson Building and open views into the center of the campus from Broadway. Ultimately, this will require the demolition of the Broadway building, assigning a new classroom building and book store to this site. Administration functions currently housed in the Broadway Building would relocate to the Jefferson Building. English, Language Arts, Communication programs would be located in a new building on this site Broadway Building Timeline Building leased from Baldwin United Company Building purchased by KCTCS Looking west along Broadway DT 21

23 JCTC - DOWNTOWN CAMPUS MASTER PLAN The Brown Theatre Building The College s Theater Arts program is located offcampus, in the Brown Theatre Building, on Broadway between Third and Fourth Streets. The Master Plan recommends relocating this program to the main campus. Jefferson Education Center Formerly known as the Portland Building, The Jefferson Education Center is owned by the Jefferson Community College Education Foundation, Inc. The 122,000sf building provides facilities for Business and Financial Planning, Fiscal Planning, Student Services, Admissions, Human Resources, Facilities Management and offices, and includes a 245 space parking structure. JEC Building, looking south 2000 Jefferson Education Center Timeline The Jefferson Education Center purchased by the Jefferson Community College Education Foundation, Inc. Both the building and parking structure need renovation to be brought into compliance with current building code and accessibility standards. Hazardous material abatement is necessary, and HVAC, plumbing and electrical systems require upgrading. Also needed is a flexible information technology system designed to accommodate future advances in communication technologies. Once the rehabilitation is complete, the JEC Building can be used for administrative and support services, as a parking garage, or a combination of both. DT 22

24 Exploration Planning Strategies The issues summarized in the Visioning Session are a recap of comments from Faculty, Staff and Administration of JCTC and KCTCS. These comments became the basis for exploration of the potential impact of future development on the Downtown Campus and led to the creation of specific Planning Strategies. The results of the Visioning Session, together with an analysis of the current campus environment and site constraints, including pedestrian and vehicular circulation, existing facilities, and surrounding urban context, the Planning Team was able to identify six Guiding Principles for the Master Plan. Guiding Principles Jefferson Building Acknowledge and enhance the significance of the Jefferson Building as the preeminent campus icon. Integrate East and West Integrate the east and west sides of the campus across First Street. Strengthen the existing diagonal circulation patterns and view corridors. Connectivity Consolidate and connect campus buildings, parking and services to promote better interaction between faculty and students. Urban Edges Respond to and reinforce the existing urban character around the borders of the campus by considering setbacks, building heights, and access points. Defensible Exterior Spaces Create a safe, open learning environment that presents an attractive, identifiable campus image to the community. Image and Presence Create an atmosphere of learning and pride. DT 23

25 Guiding Principles JCTC - DOWNTOWN CAMPUS MASTER PLAN Jefferson Building 1. The historic Jefferson Building should be celebrated and enhanced as an important icon of the institution. 2. Any new buildings on Broadway should be respectful of view corridors to the Jefferson Building in terms of setbacks and spatial crowding. 3. Access from across First Street and from the Hartford Plaza should be enhanced. Integrate East and West 1. The Jefferson Building and the Hartford Tower should be more visually and functionally integrated with the campus development west of First Street. 2. Create site development features to visually span First Street. 3. Create a diagonal spatial relationship to the north campus buildings and concourse. 4. Create a diagonal spatial relationship to any Broadway development. 5. Visually emphasize the campus boundaries from Second Street to Interstate 65. Connectivity 1. The relationships of buildings, parking, and site features should promote and enhance the easy and informal interaction between the students, faculty and staff. 2. Consolidate student services and amenities in a central and accessible location. 3. Provide adequate interior and exterior interactive spaces throughout the campus. 4. Establish identifiable paths for connecting components. DT 24

26 Guiding Principles Urban Edges North Consider maintaining the green frontal setback on Chestnut Street with additional plant materials. Improve the college signage at building entrances to create a sense of identity. South Consider a green frontal setback for any development facing Broadway, similar to the Jefferson Building. Because of the width of Broadway, consider building heights of four floors or more. East Develop ways to minimize the noise and visual distraction of the elevated interstate highway. Strengthen the relationship between the JCTC Campus and the Medical Center Campus. West Any new construction on Second Street should establish an urban edge along the campus perimeter. To relate to the scale of the neighborhood, building heights of forty feet or less are recommended. DT 25

27 JCTC - DOWNTOWN CAMPUS MASTER PLAN Defensible Exterior Spaces 1. The relationships of buildings, parking, and site features should allow for broad visual perception of any interior or exterior unsupervised spaces and give all campus users a sense of personal security. 2. Visual relationship between adjacent streets and campus public spaces should be maintained and enhanced. Avoid blind areas. 3. Landscape features, building features, and site lighting should be designed to promote personal safety standards. Image and Presence 1. Create an atmosphere for Learning and Pride. 2. Presents an identifiable college campus image. 3. Promotes a sense of pride of place, a personal sense of belonging, and a unifying institutional identity. 4. Create a sense or order, convenience, and responsiveness for the campus users. Campus Structure and Site Strategies Summary 1. Identify edges and claim boundaries as part of the campus. 2. Improve pedestrian environment. Visually reinforce pedestrian crossings along First Street. 3. Create a signature feature or space that encourages student gatherings and enhances the college experience. 4. Create a strong public image for the college along Broadway. DT 26

28 Framework Plan Future Campus Buildings Allied Health Building One of the main goals of the Master Planning process was to evaluate and make site recommendations for the location of a new Allied Health Building. Major considerations in siting the new facility included: displacement of existing parking spaces; proximity to the Vocational Technical Institute, logistical and visual relationship to the Medical Center; proximity to existing and planned college resources and facilities; location for connections to central steam supply; and potential disruption to other campus facilities during construction. Bravura evaluated three locations within the existing surface parking lot between First and Second Streets, and north of Broadway to Chestnut Street. Site Options for the Allied Health Building Option A Positive Factors 1. Good logistical and visual relationship to the Medical Center. 2. Moderately convenient to the existing Vocational Technical Institute. 3. Minimal disruption to other campus facilities during construction. 4. Good proximity to existing and planned common college resources and facilities. Negative Factors 1. Parking Displacement: 146 spaces. 2. A new campus facade on Broadway is delayed until future phases are implemented. 3. Too remote for actual connections to the existing Vocational Technical Institute. Site Diagram Option A Option B Positive Factors 1. Provides a fresh new campus facade on Broadway. 2. Moderate disruption to other campus facilities during construction. 3. Moderate proximity to existing and planned common college resources and facilities. Negative Factors 1. Parking Displacement: 115 spaces. 2. Logistically and visually remote from the Medical Center. 3. Logistically remote from the existing Vocational Technical Institute. 4. Too remote for connections to central steam supply, increasing utility costs. Site Diagram Option B 5. Potentially requires demolition of the existing Broadway administration building. DT 27

29 JCTC - DOWNTOWN CAMPUS MASTER PLAN The final recommendation (Option C) locates the Allied Health Building within close proximity of the Vocational Technical Institute, and within moderate proximity to existing and planned common facilities, while providing a good logistical and visual relationship to the Medical Center. Even though the option to present a new campus facade on Broadway is delayed, the relationship between the Allied Health Building and the VTI offers the advantage of shared resources; good proximity to the central steam supply, reducing utility costs; and the smallest displacement of existing parking spaces. Recommended Site for the Allied Health Building Future Allied Health Building, 2008 Recommended Site Option C Positive Factors 1. Good logistical and visual relationship to the Medical Center. 2. Convenient access to the existing Vocational Technical Institute. 3. Good potential for connection to the central steam supply. 4. Moderate proximity to existing and planned common resources and facilities. 5. Smallest displacement of parking: 85 spaces. Site Diagram Option C N Negative Factors 1. A new campus facade on Broadway is delayed until future phases are implemented. 2. Potential disruption to existing Vocational Technical Institute during construction. DT 28

30 Framework Plan Future Campus Buildings Student Center The framework plan indicates a site for a Student Center centrally located on the campus facing the Hartford Tower.. Siting the facility in this location reinforces the integration of the east and west sides of campus across First Street, and strengthens the existing diagonal circulation patterns and view corridors. The Student Center will function as the nucleus of campus activities, creating opportunities for social events, independent learning, group work, elearning, and multicultural understanding. The relocation of the Library, the addition of a theater or lecture hall, and a student commons with food services and coffee shop, will all promote better interaction between faculty, students and the community. N Student Center View of proposed Student Center and Campus Green DT 29

31 JCTC - DOWNTOWN CAMPUS MASTER PLAN Education Center (Student Services) The framework plan recommends constructing a facility that would consolidate student affairs into a campus center that would offer testing, registration, advisory, administration support, and financial aid processing in one building, possibly relocating these services from the Jefferson Education Center. Utilizing a triage approach to services is expected to greatly improve student retention at the downtown campus. The prominent location on the corner of Second Street and Broadway provides a facility that would define the critical southwest corner of campus and present the first point of contact for many students and visitors. Education Center Classroom Buildings The framework plan recommends replacing the aging Broadway Building with a new classroom building. Senior administration functions would be relocated to the Jefferson Building. English, Language Arts, and Communication programs currently taught in the Jefferson Building would be transferred to the new classroom building. To allow views of the venerable Jefferson Building, the new building is set back from the corner. A new bookstore would occupy the ground floor of this important entry to campus. Additional academic, classroom or lab space could be located in a series of new buildings along Second Street. Depending on the future parking needs, some or all, of the buildings could include a multistory parking garage. Classroom Building Maintenance Facility The 2007 JCTC Strategic Needs Analysis for Capital Projects identifies a need for a 3,600 SF Maintenance Facility to store, maintain and coordinate the maintenance equipment for the Downtown Campus. Since there is no dedicated facility for storage, inappropriate space is currently utilized by necessity. A free-standing facility would enhance the efficiency of the maintenance program and provide a specific place for shipping and receiving. The framework plan suggests a location on the north side of Gray Street in the triangular area bounded by the interstate ramp, First Street and Gray Street. Maintenance Facility DT 30

32 Framework Plan Future Campus Buildings Parking The framework plan identifies potential parking sites and offers a flexible solution to the urgent need for adequate student parking. A rehabilitated JEC Building could be adapted and expanded for use as a larger parking garage. Many of the current student service functions would be relocated to a new building on the corner of First and Broadway. Portions of the ground floor could remain as administration offices or leased to retail tenants. Depending on the demand and the availability of nearby properties, the master plan also recommends a garage along Second Street. Combined with future academic buildings, such a location offers convenient access to the campus on land already owned by JCTC. Other opportunities for securing adjacent parking facilities with shared stakeholders should be investigated. The property on the corner of Chestnut and Second Street, and mid-block between Second and Third Streets could become available for JCTC parking. The City of Louisville and the Parking Authority of River City (PARC) may have an interest in partnering with the college on both of these campus sites. Main student parking lot Potential sites for structured parking N DT 31

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

john jay college of criminal justice

john jay college of criminal justice AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

Schenk-Atwood Neighborhood Business District Master Plan

Schenk-Atwood Neighborhood Business District Master Plan Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,

More information

CITY COUNCIL PACKET MEMORANDUM

CITY COUNCIL PACKET MEMORANDUM CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,

More information

Capital Projects Town Hall Meeting

Capital Projects Town Hall Meeting Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In

More information

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD Boundaries The Near West Side Comprehensive Plan covers a broad area immediately west of Milwaukee s downtown.

More information

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition

More information

FLORIDA ATLANTIC UNIVERSITY

FLORIDA ATLANTIC UNIVERSITY 3 Supporting Data The purpose of the Element is to develop an understanding of the overall physical form of the development within the University and its relationship to the surrounding community, and

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces. I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned

More information

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE APPENDIX F PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE Table of Contents The Setting Background Planning Objectives Neighborhood Protection The Concept Plan Exhibits Cottonwood Mall Site 1

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal

Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal Robert Hamilton Robert A. Hamilton MRAIC, OAQ Robert Hamilton is Senior Associate responsible for Architectural

More information

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012 DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012 Project Review: DCAC Meeting #2 March 8, 2012 Reviewed stakeholder meetings Online survey findings Market Assessment Macro Market Factors,

More information

New Jersey City University Gilligan Student Union Center

New Jersey City University Gilligan Student Union Center New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,

More information

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning

More information

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD UDRB APPLICATION CITY OF MIAMI VISION STATEMENT: To Be an International City that Embodies Diversity, Economic Opportunity, Effective Customer Service and a Highly Rated Quality of Life OBJECTIVE: The

More information

CITY OF WOODBURY ORDINANCE NO. 1803

CITY OF WOODBURY ORDINANCE NO. 1803 CITY OF WOODBURY ORDINANCE NO. 1803 AN ORDINANCE OF THE CITY OF WOODBURY, WASHINGTON COUNTY, MINNESOTA PROVIDING THAT THE CITY CODE BE AMENDED BY CHAPTER 24, ZONING, ARTICLE III - ZONING DISTRICTS AND

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT OBJECTIVES The project applicant seeks to develop three different underutilized sites in Downtown Los Angeles, including the careful rehabilitation of an important City

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

Fast Track A Successful Redevelopment: The Palm Beach Outlets Story

Fast Track A Successful Redevelopment: The Palm Beach Outlets Story Fast Track A Successful Redevelopment: The Palm Beach Outlets Story SPEAKERS Rick Greene, AICP City of West Palm Beach Brian Seymour, Esq. Gunster Ken Tuma, PE UDKS Josh Long, AICP Gunster Grand Opening

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two. Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part

More information

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2013-00004 Hollymead Town Center Block VI Planning Commission Public Hearing: July 29, 2014 Staff: Claudette Grant Board of Supervisors

More information

DENSITY AND PUBLIC SPACE AT BISHOP STREET

DENSITY AND PUBLIC SPACE AT BISHOP STREET DENSITY AND PUBLIC SPACE AT BISHOP STREET Niehoff Urban Studio Senior Planning Capstone Spring 2015 Justin M. Lightfield U N I V E R S I T Y O F C I N C I N N A T I Table of Contents Overview... 3 Design

More information

Education, Entrepreneurship & Urban Revitalization

Education, Entrepreneurship & Urban Revitalization Education, Entrepreneurship & Urban Revitalization Over-The-Rhine Architecture, Urban Planning, and Economics students worked with Public school administrators to envision a new Entrepreneurial and a revitalized

More information

KATHIE CANNING EXECUTIVE DIRECTOR

KATHIE CANNING EXECUTIVE DIRECTOR OVEMBER 20, 2013 DISTRICT NOVEMBER ADVISORY BOARD MEETING KATHIE CANNING EXECUTIVE DIRECTOR AGENDA INTRODUCTION/OVERVIEW 2014 PROJECTIONS COMPETITIVE OVERVIEW 2013 CLIENT ADVISORY BOARD CAPITAL IMPROVEMENT

More information

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the

More information

Concept Design Synopsis

Concept Design Synopsis Washington Headquarters Services Facilities Services Directorate The Pentagon Electric Upgrade (Substation No. 2) Concept Design Synopsis September 4, 2014 Prepared for Consultations with VA SHPO, ACHP,

More information

GEORGIA COLLEGE & STATE UNIVERSITY

GEORGIA COLLEGE & STATE UNIVERSITY MASTER PLAN GEORGIA COLLEGE & STATE UNIVERSITY 1 EXECUTIVE SUMMARY Prepared by Sasaki Associates, Inc. Georgia College & State University Campus Master Plan with Lord, Aeck & Sargent The Jaeger Company

More information

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft. Montgomery County Community College West Campus Expansion 60,000 Sq. Ft. Warehouse adaptive reuse of the former Vaughn Knitting Mill, a major architectural component of Pottstown s Industrial Heritage.

More information

TABLE OF CONTENTS TABLES FIGURES

TABLE OF CONTENTS TABLES FIGURES TABLE OF CONTENTS Introduction...1 1. On-Site Stacking...2 2. Number of School Driveways...2 3. School Driveway Standards...3 3A. Driveway Spacing...3 3B. Driveway Location...4 3C. Driveway Lane Widths

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

TAMPA S UNIVERSITY MALL ANNOUNCES MAJOR REDEVELOPMENT PLANS. Construction is slated to begin as soon as first quarter 2016

TAMPA S UNIVERSITY MALL ANNOUNCES MAJOR REDEVELOPMENT PLANS. Construction is slated to begin as soon as first quarter 2016 PRESS RELEASE FOR IMMEDIATE RELEASE Contact: Elizabeth Cross Daniel Jimenez +1 305 428 6373 +407.839.3191 elizabeth.cross@cbre.com danieljimenez@cbre.com TAMPA S UNIVERSITY MALL ANNOUNCES MAJOR REDEVELOPMENT

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN. 1980 Festival Plaza Drive, Las Vegas, Nevada 89135

Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN. 1980 Festival Plaza Drive, Las Vegas, Nevada 89135 Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN 1980 Festival Plaza Drive, Las Vegas, Nevada 89135 PROPERTY HIGHLIGHTS LEED Certified Silver, core and shell. Green building initiatives

More information

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida

More information

MEMORANDUM www.jjr-us.com

MEMORANDUM www.jjr-us.com Truax Campus Parking Analysis February 19, 2010 1 7 SUBJECT DATE PAGE OF PAGES Madison College Facilities Master Plan 50070.000 PROJECT NO. Fred Brechlin, Department of Facilities Management (608) 246-6837

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01

More information

Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes

Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes New Haven, Connecticut 1 2 Yale University s Rudolph Building formerly known as the Art and Architecture Building was designed in 1963 by the modern master and then chair of the School of Architecture,

More information

City of Kamloops Notre Dame Corridor Access Plan

City of Kamloops Notre Dame Corridor Access Plan FINAL REPORT This report is prepared for the sole use of ICBC. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract.

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

Rufus 2.0 - Block 19. Project #3015022 DRB Recommendation Meeting #1 May 21, 2013

Rufus 2.0 - Block 19. Project #3015022 DRB Recommendation Meeting #1 May 21, 2013 Rufus 2.0-1 Table of Contents 1 Purpose of Recommendation Meeting #1... 2 2... 3 Masterplan Aerial View 3 Open Space Aerial View 4-5 Three-Block Site Plan 6 Concepts 7 Design Guideline Priorities 8 Model

More information

Downtown Core Sub-district

Downtown Core Sub-district 3-10 Land Use Downtown Core Sub-district District development will be most intense and most urban in character in the Downtown Core. The objective is to establish this area as a citywide and regional retail

More information

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects To r r e y P i n e s H i g h S c h o o l M a s t e r P l a n Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION The vision for the

More information

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING

More information

City of Plano COMPREHENSIVE PLAN EDUCATION ELEMENT TABLE OF CONTENTS INTRODUCTION 8-1

City of Plano COMPREHENSIVE PLAN EDUCATION ELEMENT TABLE OF CONTENTS INTRODUCTION 8-1 City of Plano COMPREHENSIVE PLAN EDUCATION ELEMENT TABLE OF CONTENTS INTRODUCTION 8-1 MAJOR CONCEPTS 8-1 Creating Educational Opportunities 8-1 Adapting to Changing Demographics 8-1 Facilities Siting and

More information

Smart Growth Illustrated: Developer s Guidebook. City of Bentonville Community Development Department October 2006

Smart Growth Illustrated: Developer s Guidebook. City of Bentonville Community Development Department October 2006 Smart Growth Illustrated: Developer s Guidebook City of Bentonville Community Development Department October 2006 1 Table of Contents What is Smart Growth...3 Six Goals of Smart Growth 5 Ten Tools of Smart

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

Traffic Impact Study for the 3817-45 North Broadway Mixed-Use Development Chicago, Illinois. Prepared by

Traffic Impact Study for the 3817-45 North Broadway Mixed-Use Development Chicago, Illinois. Prepared by Traffic Impact Study for the Chicago, Illinois repared by March 30, 2015 1. Introduction This report summarizes the methodologies, results and findings of a traffic impact study conducted by Kenig, Lindgren,

More information

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Community Development Department PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN RECOMMENDATION: This report is for

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

SELECTED SPECIAL EVENTS PROJECTS

SELECTED SPECIAL EVENTS PROJECTS 1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

Schedule A. Civic Addressing Policy. of By-Law

Schedule A. Civic Addressing Policy. of By-Law Schedule A Civic Addressing Policy of By-Law 1. PURPOSE 1.1 This policy will guide the municipal staff, who have been given the responsibility by Council, in assigning property identification numbers,

More information

8. EXTERIOR SITE LIGHTING

8. EXTERIOR SITE LIGHTING 8. EXTERIOR SITE LIGHTING Goal: Exterior lighting should be used to provide illumination for the security and safety of entry drives, parking, service and loading areas, pathways, courtyards and plazas,

More information

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach

More information

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force ACHIEVING THE VISION FOR RESTON Reston Master Plan Special Study Task Force The Reston Master Plan Special Study Task Force was appointed by Hunter Mill District Supervisor Catherine Hudgins to review

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Downtown Community Planning Council Meeting offebruary 18, 2015

Downtown Community Planning Council Meeting offebruary 18, 2015 - san diego Item #12 DATE ISSUED: ATTENTION: SUBJECT: February 13, 2015 Downtown Community Planning Council Meeting offebruary 18, 2015 Consideration of Support for Grant Applications for the San Diego

More information

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER JUNE 7, 2013 SUBMITTED TO: BOSTON REDEVELOPMENT AUTHORITY ONE CITY HALL SQUARE BOSTON, MA 02201

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

FUTURE LAND USE ELEMENT

FUTURE LAND USE ELEMENT GOALS, OBJECTIVES AND POLICIES FUTURE LAND USE ELEMENT GOAL A THE CITY OF FORT WALTON BEACH WILL PLAN FOR AND PROVIDE A HIGH QUALITY OF LIFE TO MEET THE NEEDS OF THE CURRENT AND FUTURE POPULATION, PROVIDING

More information

Fordham University Lincoln Center Campus

Fordham University Lincoln Center Campus Community Board 7 November 19, 2008 1 Existing Conditions 2 Existing Context McMahon W. 60 th St. Lowenstein Law School Amsterdam Ave. W. 62 ND St. Columbus Ave. Fordham Zoning Lot 3 Existing Street Conditions

More information

TRANSPORTATION DEMAND MANAGEMENT PLAN TABLE OF CONTENTS EDGEWATER REDEVELOPMENT PROPOSAL

TRANSPORTATION DEMAND MANAGEMENT PLAN TABLE OF CONTENTS EDGEWATER REDEVELOPMENT PROPOSAL TABLE OF CONTENTS TABLE OF CONTENTS INTRODUCTION PROJECT AND AREA OVERVIEW SECTION OVERVIEW SITE AREA DESCRIPTION OF PRIMARY ROADWAYS PROGRAM SUMMARY TRAFFIC DEMAND ANALYSIS PEDESTRIAN ACCESS NEIGHBORHOOD

More information

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of

More information

How To Relocate To Greenville One

How To Relocate To Greenville One Revised September 7, 2012 Classification Program Title: Traditional Full and Part time Masters of Business Administration, Masters of Business Administration with concentration in Entrepreneurship, Masters

More information

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT MEETING DATE: SEPTEMBER 8, 2015 ITEM NUMBER: 1 SUBJECT: PROPOSED GENERAL PLAN LAND USE ALTERNATIVE FOR THE YEAR 2015-2025 GENERAL PLAN

More information

Context Sensitive Design for Urban Transportation in West Philadelphia

Context Sensitive Design for Urban Transportation in West Philadelphia Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of

More information

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN 1.0 INTRODUCTION... 1 1.1 Purpose of Document... 1 1.2 Master Plan Goal...1 1.3 Design Objectives... 2 1.4 Design Approach... 2 2.0 PROJECT SCOPE...2 2.1 City Context 2 2.2 Regional Context 2 3.0 DESIGN

More information

Brookdale Site. CB6 Update April 1, 2015

Brookdale Site. CB6 Update April 1, 2015 Brookdale Site CB6 Update April 1, 2015 Summary Timeline / Process How does DSNY operate now? Garage project and frequently asked questions Project facts Impact to emergency vehicle access Traffic congestion

More information

Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana

Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana PROJECT PURPOSE The Warsaw + Winona Lake Bicycle and Pedestrian Master Plan establishes a comprehensive framework for a connected bicycle and pedestrian system that will be used for both recreation and

More information

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505.

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505. FOR SALE FOR MORE INFORMATION PLEASE CONTACT: The Friedman Building 1701 18th Avenue South, Seattle 98144 PRICE: $4,800,000 FEATURES: LAND SF: 40,000 SF + Fantastic Large Townhome Site BUILDING SF: 33,332

More information

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES I. INTRODUCTION In May 1990, the Town Council accepted a report from the Commercial Plan Committee that included a recommendation to develop

More information

Lower Manhattan Development Corporation. World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003

Lower Manhattan Development Corporation. World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003 1. Introduction Lower Manhattan Development Corporation World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003 The Lower Manhattan Development Corporation ( LMDC

More information

Angelo State University Construction Report

Angelo State University Construction Report May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 For Meeting of July 21, 2015 DISCUSSION ITEM PRELIMINARY PLANS FUNDING, MISSION BAY EAST CAMPUS PHASE 1 (BLOCK 33) BUILDING,

More information

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT

More information

How To Design A Crash Investigation Site

How To Design A Crash Investigation Site CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

Friday, March 9, 2012 1800 Grant Street, 1st Floor conference room

Friday, March 9, 2012 1800 Grant Street, 1st Floor conference room Office of the Vice President for Finance 1800 Grant Street, Suite 800 Denver, Colorado 80203 (303) 860-5600 Fax: (303) 860-5640 University of Colorado Design Review Board Minutes Friday, March 9, 2012

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in

More information

METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL

METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL Preface This revised plan for redevelopment of the Old Albuquerque High School Metropolitan Redevelopment Area has been prepared pursuant

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information