ANNOUNCEMENT ABU DHABI EDUCATION COUNCIL PROCUREMENT & CONTRACTS DIVISION TENDERS ANNOUNCEMENT

Size: px
Start display at page:

Download "ANNOUNCEMENT ABU DHABI EDUCATION COUNCIL PROCUREMENT & CONTRACTS DIVISION TENDERS ANNOUNCEMENT"

Transcription

1 ANNOUNCEMENT ABU DHABI EDUCATION COUNCIL PROCUREMENT & CONTRACTS DIVISION TENDERS ANNOUNCEMENT 1. The Abu Dhabi Education Council (ADEC) is pleased to invite all firms who are licensed and registered Service Providers in the UAE and who would be interested to bid for the following public tenders: S/N Tender Number Tender Description 1 ADEC/2015/1114 PRO Services Quality Assurance and Testing Services for ICT 2 ADEC/2015/1112 Infrastructure, Devices and CCTV Implementations in ADEC Schools 3 ADEC/2015/1115 Management of ADEC warehousing Activities 2. Companies are invited to visit the Council s web site Procurement and Contracts link to view the above Tenders scope of work. 3. Bidders interested in participating in the above tenders must send a confirmation No later than (confirmation closing date) Wednesday, 2nd September 2105,12:00 Pm to tenders@adec.ac.ae attaching a signed Form of Bidder s Response template included within the Scope of Work documents. 4. Interested bidders are required to complete their registration prior to the confirmation Closing date mentioned in point 3 above by visiting the following link: 5. Upon receiving the confirmation s, ADEC shall float online tenders only to the Bidders who expressed their interest in participating in any of the above mentioned tenders inclusive of the RFP documents (instruction to bidders, terms and conditions, as well as submission details/requirements...etc) 6. Bidders clarifications - if any - shall be sent by the bidders and attended to by ADEC only during the online tender period and as per the timetable that will be communicated with the bidder in the RFP document. 7. All interested bidders shall visit regularly the above stated link till the confirmation closing date to view any additionally uploaded documents 8. The Council has the right at any time to cancel the above stated tenders without any legal obligations. 9. This Public Advertisement and its content shall be considered an integral part of the above stated tenders and their Terms and conditions once issued.

2 Request for Proposal From ABU DHABI EDUCATION COUNCIL Relating to Quality Assurance and Testing Services for ICT Infrastructure, Devices and CCTV Implementations in ADEC Schools RFP No. ADEC/2015/1112 Document 2 of 4 Scope of Work (Note: This document was published for Bidders to review and decide their capabilities to carry out the project scope. The rest of the RFP Documents 1, 3, 4 and Forms will be floated online to Bidders who expressed their interest in participating in this tender).

3 Table of Contents 1 Introduction Summary of Required Services Detailed Requirements ICT Infrastructure and Devices QA Overview Quality Assurance Criteria... 6 Q01 - Passive Checklist... 7 Q02 - Passive Checklist Photos... 7 Q03 - Line of Business Testing... 8 Q04 - Line of Business Testing Screenshots... 8 Q05 - Data Outlet Validation... 8 Q06 - NRFU Validation... 9 Q07 - NRFU Validation Data... 9 Q08 - NIP Validation... 9 Q09 - NIP Validation data... 9 Q10 - BoQ Validation... 9 Q11 - Wireless Survey Q12 - Network Performance Testing Q13 - Video Conferencing Q14 - Audio Visual Q15 - Desktop PCs Q16 - Multifunction Printers Q17 - Interactive Boards Q18 - IPT Q19 - Standard Users Applications Q20 - Snag list Q21 - Quality report Recommendation Checklist Detailed Requirements - QA for CCTV Implementations Overview Quality Assurance Criteria Q01 - Passive Components Validation Q02 - Active Components Validation Q03 - BoQ Validation Q05 - CCTV Functional Testing Q06 CCTV User Training Assessment Optional Tests Quality Report RFP No. ADEC/2015/1112 Document 2 of 4 Page 2 of 23

4 1 Introduction The Abu Dhabi Education Council (ADEC) has implemented a state-of-art network infrastructure across all schools as a key building block providing connectivity between all schools and the ADEC primary datacenter. Reliable, high performance and secure network connectivity is essential for critical applications such as esis and other centrally-hosted applications, as well as future services planned for deployment to schools. With the Schools Network Infrastructure Programme ADEC established a set of standards for all schools including secured wired and wireless network services. All present and future schools must be maintained to these standards. ADEC is keen to have all their Infrastructure works, devices implementation and applications installation QA ed in order to reduce the number of incidents calls coming to the help desk during the early stage schools opening. In order to avoid late snags from floating to surface and affecting the schools operations, ADEC requires from a third party vendor to ensure that the QA is being implemented and controlled thru all the project and not only during the project closure and handover to ADEC from suppliers. In this regard, the successful bidder should have: 1. Proven capability to handle such critical quality control and assurance 2. Capability to mobilize team within highly spread geographical areas within very short period of time, that is days and not weeks 3. Having the talented staff to perform the required checklist as detailed below 4. Be proactive and hence eliminate problems before even appearing 5. Financially stable 6. Have a long history of achievements and references in the Abu Dhabi market and especially in government entities Our main goal is to achieve: 1. Appropriate cable management is done and no loose cables are exposed so safety is taken care of which comes first 2. Quantity match with the approved distribution plan 3. Quality is maintained as per ADEC Standards and Guidelines 4. No items are stored in the school without installation 5. QA process activities are to occur at different stages of the project lifecycle: a. At Site Building stage where the ODF & MDF are checked for construction Compliance b. Power source and cooling are provided and adhere to the ADEC guidelines c. MDF/IDFs are dust free as announced by the contractor on site d. Once cabling is done, a QA checklist to be carried out to confirm quantity and distribution as per approved data outlet distribution report e. Active implementation carried out as per quantity and quality agreed upon f. Quality check on all cable termination for IWB, CCTV and Audio Visual equipment g. Quality check on all devices (Desktop, pcs, printers, etc..) installed RFP No. ADEC/2015/1112 Document 2 of 4 Page 3 of 23

5 2 Summary of Required Services The table below summarizes the services that are required along with the estimated number of sites during the next 3 years. In the commercial proposal, the bidders has to provide pricing for each service and also include any additional possible charges for travel expenses to areas outside Abu Dhabi City (i.e. Western Region) Service Number of Sites Service Duration (Estimated) QA for ICT Infrastructure (structured cabling, LAN, WLAN, WAN) 20 Bidder to specify in the proposal Re-visit for the above 20 QA for ICT Infrastructure (including devices and CCTV) 50 Bidder to specify in the proposal Re-visit for the above 50 QA for CCTV Implementation 220 Bidder to specify in the proposal Re-visit for the above 220 The QA team needs to mobilize in site within 2 weeks of official request by ADEC Project Owner for any of the above services. The objective of re-visit services is confirm resolving the snags highlighted in the original QA reports. The detailed specifications/requirements for the services are provided in the following sections. ADEC has the right to change/update the detailed checklists based on requirements, but the overall effort for the QA service will not be affected, RFP No. ADEC/2015/1112 Document 2 of 4 Page 4 of 23

6 3 Detailed Requirements ICT Infrastructure and Devices QA 3.1 Overview The Quality Assurance supplier will attend to ADEC Schools Sites to perform the tests outlined within this statement of work using the agreed quality controls and outputs, which will be provided to the QA supplier in the form of a toolbox. The QA Toolbox will consist of the Quality Assurance deliverables listed below: Q01 - Passive Checklist Q02 - Passive Checklist Photos Q03 - Line of Business testing Q04 - Line of Business testing Screenshots Q05 - Data Outlet Validation Q06 - NRFU Validation Q07 - NRFU Validation Data Q08 - NIP Validation Q09 - NIP Validation Data Q10 - BoQ Validation Q11 - Wireless Survey Q12 Network Performance Testing Q13 - Video Conferencing Q14 - Audi Visual Q15 Desktop pcs Q16 Multifunction Printers Q17 Interactive Boards Q18 - IPT Q19 Standard Users Applications Q20- Snag List Q21- Quality Report In addition to the tests outlined above, and as part of the site visit, the QA supplier will also perform an inspection of the site offices and working areas to verify the work carried out by ADEC s suppliers has in no way compromised the health and safety of the staff. Furthermore, the Quality Assurance team will inspect the site implementation to ensure that the work undertaken has not caused any damage to aesthetics of the site. RFP No. ADEC/2015/1112 Document 2 of 4 Page 5 of 23

7 3.2 Quality Assurance Criteria Upon completion of the Quality Assurance of the site, the vendor will produce a Quality Report. The Quality Report will designate the site as having one of the three Site output statuses defined in the table below. Site Accepted Site Accepted with Snags Site Rejected Site ready for handover to ADEC Site has minor defects but does Site has major defects that Operations with no significant defects not affect the site handover to ADEC Operations affect the site handover to ADEC Operations The Quality Assurance performed fall within the categories defined in the table below. Acceptance or rejection of the site will be dependent on meeting the specific success criteria defined for each of the Quality Assurance validations. Category Statement Example 1 Health & Safety Inadequate work that can be harmful to Site Personnel (Students, Staff,...) 2 Functionality Implemented site services are not functioning 3 Documentation Site document standards (Toolbox) are not adhered to. 4 Commercial Discrepancies between what is commercially agreed for payment and actual work carried out 5 Operations Work carried out has an impact on site personnel conducting their normal day to day activities Debris and leftovers that can cause harmful incidents Electric power outlets fixed without isolators. Sharp edges that may cause injury or damage to personal property. Internet LAN, WAN, WLAN Unable to perform LoB testing Data outlet defects Missing Site document Documents contents are wrong or inaccurate Number of equipment mismatch Wrong equipment installed Damage to classroom equipment e.g. overhead projectors, instruments, Smart boards. In the event that a site designated as Site Rejected due to failing the QA criteria, third party Quality Assurance verifier will provide responsible supplier with a list of discovered defects in the form of a snag list. The supplier must then revisit the site in question and perform the necessary remediation actions to resolve the snags and update the snag list accordingly adding their comments to each snag item (e.g. fixed, component replaced, no fault found and tested ok, etc.) RFP No. ADEC/2015/1112 Document 2 of 4 Page 6 of 23

8 Q01 - Passive Checklist The Quality Assurance team will inspect the site passive installation and report on the level of adherence to the approved ADEC guidelines and reference documents. The QA team will validate and record their findings Pass/Fail in each corresponding template and record any defects/non-conformity to Guidelines in the Snag list. Rack layout & Type MDF & IDF location verification M&E Trunking The site will be designated a site output status based upon the following Success Criteria: In the event that one hundred percent (100%) of test items on the Passive Checklist result in Pass, the site output status will be Site Accepted. In the event that failures of test items within the Passive Checklist are less than five percent (5%) and where the failures do not present a risk to the health and safety of the pupils and staff, and does not compromise the function or operation of the site, the site output status will be Site Accepted with Snags. In the event that failures of test items within the Passive Checklist are greater than five percent (5%) of the total number of tests, or failures present a risk to the health and safety of the pupils and staff, or failures compromise the function or operation of the site, the site output status will be Site Rejected. Q02 - Passive Checklist Photos The Quality Assurance team will inspect the site passive installation and provide evidence of site adherence to quality standards in the form of photos. Photos will include: Visible compromises to the health and safety of the students and staff as a result of works carried out by ADEC s suppliers Visible damage to the site aesthetics that has resulted from the works carried out by ADEC s suppliers Visible non-conformity to the standards and guidelines defined for the site infrastructure Photographic evidence that Rack layout & Type adheres to standards Photographic evidence of MDF & IDF location verification Photographic evidence of M&E adheres to standards Photographic evidence that all trunking adheres to standards RFP No. ADEC/2015/1112 Document 2 of 4 Page 7 of 23

9 Q03 - Line of Business Testing The Quality Assurance team will validate access to ADEC s Line of Business (LoB) applications from all areas of the site. The QA team will complete LoB testing (LAN) from a minimum one port connected to every VLAN in every IDF in a site. Line of Business testing refers to the set of ADEC services that the site s end users are expected to make use of as part of their daily work. Such services, accessed by Staff, Students and Guests, through both the Wired and Wireless network include Internet, ADEC Portal, ERP, E-SIS and the ability to copy data between the site and the ADEC Head Quarters. The QA team will use Checklists and testing scripts to cover the following validation criteria: LoB over LAN LoB over WLAN Provide Snags & Site statistics The site will be designated a site output status based upon the following Success Criteria: In the event that one hundred percent (100%) of test items on the Line of Business testing result in Pass, the site output status will be Site Accepted. In the event of a failure of any test items within the LoB Checklist, the site will not meet the LoB success criteria, the site output status will be Site Rejected. Q04 - Line of Business Testing Screenshots The Quality Assurance team will perform Line of Business testing and provide evidence of successful completion from the site in the form of screenshots. Screenshots will include: LoB over LAN (All VLANs from all IDFs in the site) LoB over WLAN (All WLANs- STAFF, Student, Guest) Q05 - Data Outlet Validation The QA team will conduct CAT6 performance validation of one hundred percent (100%) of data outlets. Fluke cable scanner devices configured as per supplier recommendations, and in adherence to the cable scanner s manufacturer specifications, will be used to perform end to end testing and record all findings (Pass/Fail). The site will be designated a site output status based upon the following Success Criteria: In the event that one hundred percent (100%) of data outlet validations result in Pass, the site output status will be Site Accepted. In the event of failure to less than five percent (5%) of the data outlets tested within a floor, the site output status will be Site Accepted with Snags In the event of failures to more than five percent (5%) of the data outlets tested within a floor, the site output status will be Site Rejected. RFP No. ADEC/2015/1112 Document 2 of 4 Page 8 of 23

10 The QA supplier will provide evidence of successful testing, in the form of Cable Test reports for all validated data outlet Q06 - NRFU Validation The Quality Assurance team will perform Network Ready for Use (NRFU) and similar documents testing in all area for all active components, the NRFU tests will validate the configuration of all active components within the site using the NRFU template provided by ADEC and provide a snag for each set of tests per device or supplier. The site will be designated a site output status based upon the following Success Criteria: In the event that one hundred percent (100%) of test items on the NRFU validation tests result in Pass, the site output status will be Site Accepted. In the event of a failure of any test items within NRFU validation tests that do not compromise the function and operation of the site, the site output status will be Site Accepted with Snags. In the event of a failure of any test items within NRFU validation tests that do compromise the function and operation of the site, the site output status will be Site Rejected. Q07 - NRFU Validation Data The Quality Assurance team will perform NRFU testing and provide evidence of successful completion of NRFU testing of the site in the form of completed NRFU document. Q08 - NIP Validation The Quality Assurance team will validate the configuration of active components by reviewing and validating the Network implementation Plan (NIP) and similar documents. The NIP tests will validate the configuration of all active components within the site using the NIP template provided by ADEC. The site will be designated a site output status based upon the following Success Criteria: In the event that one hundred percent (100%) of test items on the NIP validation tests result in Pass, the site output status will be Site Accepted. In the event of a failure of any test items within NIP validation tests that do not compromise the function and operation of the site, the site output status will be Site Accepted with Snags. In the event of a failure of any test items within NIP validation tests that do compromise the function and operation of the site, the site output status will be Site Rejected. Q09 - NIP Validation data The Quality Assurance team will perform NIP validation and provide evidence of successful completion of NIP validation of the site in the form of completed NIP document. Q10 - BoQ Validation The Quality Assurance team will use the Site BoQ as built document and validate assets installed in the site showing the quantities delivered to the site. RFP No. ADEC/2015/1112 Document 2 of 4 Page 9 of 23

11 Validation of BoQ as built will include: Quantities of equipment Type of equipment Validation of Serial Number Validation of Asset tag number The site will be designated a site output status based upon the following Success Criteria: In the event that one hundred percent (100%) of BoQ validation tests result in Pass, the site output status will be Site Accepted. In the event of a failure of any test items within BoQ validation tests that do not compromise the function and operation of the site or the commercial agreement, the site output status will be Site Accepted with Snags. In the event of a failure of any test items within BoQ validation tests that do compromise the function and operation of the site, or the commercial agreement, the site output status will be Site Rejected. Q11 - Wireless Survey The Quality Assurance team will perform validation that the Wireless LAN coverage meets the requirements defined by ADEC. The coverage will be measured using the already supplier AirMagnet survey tool software, and a Wireless Survey report (including coverage heat map) will be produced. The site will be designated a site output status based upon the following Success Criteria: In the event that one hundred percent (100%) required coverage areas meet ADEC s coverage requirements, the site output status will be Site Accepted. In the event that greater than ninety percent (85%) required coverage areas meet ADEC s coverage requirements, the site output status will be Site Accepted with Snags. In the event that less than ninety percent (85%) required coverage areas meet ADEC s coverage requirements, the site output status will be Site Rejected. Q12 - Network Performance Testing The Quality Assurance team will perform Network Performance Testing to ensure network performance meets the requirements defined by ADEC. For all school area the network performance will be measured from at least one data outlet connected to all IDFs in the site, using the performance testing approach defined by ADEC. The QA team will produce a Network Performance Test report. The site will be designated a site output status based upon the following Success Criteria: In the event that network performance is above eighty percent (80%) of the required network performance, the site output status will be Site Accepted. RFP No. ADEC/2015/1112 Document 2 of 4 Page 10 of 23

12 In the event that network performance is above sixty percent (60%) of the required network performance, the site output status will be Site Accepted with Snags. In the event that network performance is below sixty percent (60%) of the required network performance, the site output status will be Site Rejected. Q13 - Video Conferencing The Quality Assurance team will perform Video Conferencing test to ensure performance and audio/video quality meets the requirements defined by ADEC. The Quality Assurance team will perform the following quality activities: Passive Validation BoQ as built Validation Testing of equipment Q14 - Audio Visual The Quality Assurance team will perform audio visual validation to ensure performance and audio/video quality meets the requirements defined by ADEC. The Quality Assurance team will perform the following quality activities: Passive Validation BoQ as built Validation Testing of equipment Q15 - Desktop PCs The Quality Assurance team will perform validation of the desktop pcs against the planned distribution list to ensure performance and functionality meets the requirements defined by ADEC. The Quality Assurance team will perform the following quality activities: Passive Validation BoQ as built Validation Active Validation Q16 - Multifunction Printers The Quality Assurance team will perform validation against the Multifunction Printers system to ensure performance and functionality meets the requirements defined by ADEC. The Quality Assurance team will perform the following quality activities: Passive Validation BoQ as built Validation RFP No. ADEC/2015/1112 Document 2 of 4 Page 11 of 23

13 General testing (Printing / Scanning / Faxing) Q17 - Interactive Boards The Quality Assurance team will perform validation against the Interactive Boards to ensure performance and functionality meets the requirements defined by ADEC. The Quality Assurance team will also perform the following quality activities: Passive Validation BoQ as built Validation Active Validation Q18 - IPT The Quality Assurance team will perform validation against the IPT system to ensure performance and functionality meets the requirements defined by ADEC. The Quality Assurance team will also perform the following quality activities: Passive Validation BoQ as built Validation General testing of the IPT devices Q19 - Standard Users Applications The Quality Assurance team will perform validation against the users applications to ensure performance and functionality meets the requirements defined by ADEC. The Quality Assurance team will also perform the following quality activities: Active validation License Validation General testing for the applications Q20 - Snag list Upon completion of the QA review for each site, the Quality Assurance team will provide a record of all defects found in a Master Snag list document and report it to ADEC s designated suppliers. The suppliers will perform the remediation necessary actions to fix all defects and update the Snag list accordingly. The supplier will provide a signed copy of the updated snag list to ADEC upon completion of remediation. Following remediation by the supplier and upon the request of ADEC, the Quality Assurance team may be required to re-review specific sites to validate that the site meets the Quality Assurance standards defined by ADEC. RFP No. ADEC/2015/1112 Document 2 of 4 Page 12 of 23

14 Q21 - Quality report Upon completion of the QA review for the site, the Quality Assurance team will provide ADEC with a Quality Report communicating their findings and site recommendations. The Quality Report will detail: Recommended site output status (Accepted, Accepted with Snags, Rejected) Summary of the site output status providing a clear rationale in support of the recommended status Overview of each test performed (Toolbox Q1 Q21) providing statistical data to support the site output status Site observations and recommendations to include: o Health & Safety observations o Operational observations o Functional observations o Commercial observations o Aesthetics and decor observations o Comments or observations staff relevant to the works carried out by ADEC s suppliers The Quality Report will be produced by the Quality Assurance team and provided to the programme team who will perform a review of completed Quality Reports. The Quality Report will provide ADEC with the status of the site and identify that the work have been completed to the standards defined by ADEC and are to be accepted into operational support. 3.3 Recommendation Checklist The following checklist is a recommended list where the suppliers are encouraged to modify as to suit best the current purpose. Desktop PC Physical Check-up Record user location (Room #, Office #) Check with Master Distribution list whether this location should have a PC Is furniture available to mount the PC? Are all parts of the basic setup available, that is screen, CPU, Mouse and Keyboard? Are all parts of the computers as planned in terms of model number and so on RFP No. ADEC/2015/1112 Document 2 of 4 Page 13 of 23

15 Are assets tags available on the screen and CPU? Verify asset tag with the master list Are all parts connected to each other in a safe way? Is there power socket available near the PC? Is the power provided from wall mounted or through a power extension? Is there a Data Outlet Connection near to connect the computer? Is the computer connected to the data outlet? Is the patch cord safely laid between the wall socket and the computer? Can you power on the pc? Did the PC reach the login screen for user authentication? Can you login to the pc using the assigned account? OS & Standard Application Is window OS uploaded into the pc and it is the right version? Is Office uploaded into the pc and is the right version? Is Antivirus software active and running into the pc? Are all drivers properly configured and device manager showing no alert at all? Check OS & application alerts and verify that warning logs are non-existent Is the right image (Ghost image) on the computer if available? Are software applications installed as per ADEC guidelines? Is the educational software installed in the PC ESIS Is the interactive board software installed in the PC? Local Printer Is the local printer located as per Master Distribution list? RFP No. ADEC/2015/1112 Document 2 of 4 Page 14 of 23

16 Is there furniture to mount the printer Is the printer the right model? is there power for the printer? Is the power directly from wall socket or extension? Is there connectivity between the printer and the pc? Is the printer and connectivity to the pc safely laid? Is there asset tag on the printer? Verify asset tag with the master list Can you power on the printer? Can you print self-test page? Is the test page clear, that is toner, cartridges, are all new or in a good condition Can you see the printer from the local pc? can you print a test page from the pc? Does the printer need to be shared as local within a group? If yes has it been done? Network Printer Is the network printer located as per Master Distribution list? Is there furniture to mount the printer? Is the printer the right model? is there power for the printer? Is the power directly from wall socket or extension? Is there connectivity between the printer and the data outlet wall socket? Is the printer connectivity to the wall socket safely laid? Is there asset tag on the printer? RFP No. ADEC/2015/1112 Document 2 of 4 Page 15 of 23

17 Verify asset tag with the master list Can you power on the printer? Can you print self-test page? Is the test page clear, that is toner, cartridges, are all new or in a good condition Can you see the printer from the network pc? can you print a test page from the pc? Interactive Board Is the Interactive Board located as per Master Distribution list? is the projector ultra-short threw projector? is there power for the projector? Is there connectivity between the projector and the outlet wall socket? Is the projector connectivity to the wall socket safely laid? Is there asset tag on the projector? Verify asset tag with the master list Can you power on the projector? Can you see login welcome page on the board? Is the screen clear or the resolution is bad? Can you connect from the local pc to the interactive board? Can you present info clearly from the pc to the board? Is the IPT Set located as per Master Distribution list? IPT Sets Is there furniture to mount the IPT? Is the IPT set the right model? RFP No. ADEC/2015/1112 Document 2 of 4 Page 16 of 23

18 Is there connectivity between the IPT and the pc? Is the IPT set and connectivity to the pc safely laid? Is there asset tag on the IPT set? Verify asset tag with the master list Did the IPT set powered on when connected to the data outlet? Do you see the welcome screen and login screen? Can you login using the assigned account? Can you hear tone when lifting the handset? Can you dial an internal extension? Check access privileges as per Master List, that is national and international access RFP No. ADEC/2015/1112 Document 2 of 4 Page 17 of 23

19 4 Detailed Requirements - QA for CCTV Implementations 4.1 Overview The Abu Dhabi Education Council (ADEC) is planning to implement a state-of-art high-availability CCTV Surveillance System across all public schools. Reliable, high performance and secure network connectivity is essential for critical security. All present and future schools must be maintained to these standards. ADEC is keen to have all the CCTV works, devices and system implementation Quality Tested by a 3 rd Party Vendor in accordance with ADEC provided guidelines in order to reduce the number of incidents calls coming to the helpdesk and to provide mission critical surveillance in schools. Main goal of this QA is to achieve: Quality is maintained as per ADEC Standards and Guidelines Quantity match with the approved BoQ CCTV Cameras implementation carried out as per quality agreed upon Appropriate cable management is done and no loose cables are exposed so safety is taken care of which comes first Power source and cooling are provided and adhere to the ADEC guidelines Security Rooms are as per requirements The Quality Assurance supplier will visit School Sites to perform the tests outlined within this statement of work using the agreed quality controls and outputs, which will be provided to the QA supplier in the form of a toolbox. The QA Toolbox will consist of the Quality Assurance deliverables listed below: Q01 Passive Components Validation Q02 Active Components Validation Q03 BoQ Validation Q04 Network Implementation Plan (NIP) Validation Q05 CCTV Cameras / Encoders Testing Q06 CCTV Functional Testing Q07 CCTV User Training Assessment RFP No. ADEC/2015/1112 Document 2 of 4 Page 18 of 23

20 4.2 Quality Assurance Criteria Upon completion of the Quality Assurance of the site, QA team will produce a Quality Report. The Quality Report will designate the site as having one of the three Site output statuses defined in the table below: Site Accepted Site Accepted with Snags Site Rejected Site ready for handover to ADEC Operations with no significant defects Site has minor defects but does not affect the site handover to ADEC Operations Site has major defects that affect the site handover to ADEC Operations The Quality Assurance performed by QA Team fall within the categories defined in the table below. Acceptance or rejection of the site will be dependent on meeting the specific success criteria defined for each of the Quality Assurance validations. Category Statement Example 1 Health & Safety Inadequate work that can be harmful to Site Personnel (Students, Staff,...) Debris and leftovers that can cause harmful incidents Sharp edges that may cause serious injury or damage to personal property. 2 Functionality 3 Documentation 4 Commercial Implemented site services are not functioning Site document standards (Toolbox) are not adhered to. Discrepancies between what is commercially agreed for payment and actual work carried out System not powering on Recording not happening Missing Site document Documents contents are wrong or inaccurate Number of equipment mismatch Wrong equipment installed 5 Operations Work carried out has an impact on site personnel conducting their normal day to day activities Damage school equipment during installation RFP No. ADEC/2015/1112 Document 2 of 4 Page 19 of 23

21 In the event that a site designated as Site Rejected due to failing the QA criteria, third party Quality Assurance verifier will provide responsible supplier with a list of discovered defects in the form of a Snag List. The supplier must then revisit the site in question and perform the necessary remediation actions to resolve the snags and update the Snag List accordingly adding their comments to each snag item (e.g. fixed, component replaced, no fault found and tested ok, etc.) As for Accepted sites with Snags, Supplier must take full responsibility in scheduling and reporting their progress on fixing snags (as above). Q01 - Passive Components Validation The Quality Assurance team will inspect the site passive installation and report on the level of adherence to the approved ADEC guidelines and reference documents. Following areas will be tested: Camera physical installation / mounting Environmental / mechanical protection of cameras / connectors Cable concealment / termination CCTV control equipment installation in CCTV rack Power supply for all equipment Verify that health / safety of all those involved is not compromised Q02 - Active Components Validation The Quality Assurance team will inspect the site passive installation and report on the level of adherence to the approved ADEC guidelines and reference documents. Following areas will be tested: All network components e.g. IP cameras, encoders, network switches are reachable / pingable Verify NVR server is up and running and live / recording playback can be performed Verify that PTZ controller is able to control PTZ cameras RFP No. ADEC/2015/1112 Document 2 of 4 Page 20 of 23

22 Q03 - BoQ Validation The Quality Assurance team will use the Site BoQ as built document and validate CCTV assets installed in the site showing the quantities delivered to the site. Validation of BoQ as built will include: Quantities of equipment Types of camera Validation of Serial Number Validation of Asset tag number Q04 CCTV Cameras / Encoders Testing The Quality Assurance team will inspect the site CCTV cameras and report on the level of adherence to the approved ADEC guidelines and reference documents. Following areas will be tested: Verify location is as per the drawings Verity the selection of the camera is as per the Observation Criteria, lighting, field of view, outdoor / indoor, PTZ / fixed focal length, IP / analog camera (based on distance from switch) For non-ptz cameras, verify that lens adjustments are done i.e. focus, focal length, iris, tilt, pan Verify that video stream parameters are as per technical requirements from ADMCC i.e. encoding profile, dedicated IP address per channel, security (HTIPS / 802.1x), resolution (CIF- 4CIF/HD), WB, WDR, fps (12-30), video analytics, streaming protocol (RTP/UDP), multicast support Q05 - CCTV Functional Testing The Quality Assurance team will inspect the site CCTV control equipment and report on the level of adherence to the approved ADEC guidelines and reference documents. Following areas will be tested: Verify that location of control equipment is as per the drawings VMS: must support standard compression formats of H.264 / MPEG4 VMS: must have failover redundancy and must be able to switch to standby server automatically VMS: must support multicast streaming, external connections defined ICD, connection to other systems through WAN / LAN, provide list of cameras to external interface, ability to stream recorded video in a selectable format e.g. name, timestamp, area, metadata, etc. VMS: Be synchronized to GPS / Network time VMS: Should support non-encrypted streaming Servers: must have dual CPUs, redundant power, redundant network link Servers: CPU load must not exceed 70% Storage Servers: Dual CPU / controllers, redundant power, redundant network link RFP No. ADEC/2015/1112 Document 2 of 4 Page 21 of 23

23 Storage Servers: Recording storage should be configured in RAID5 Storage Servers: Retention period of recording as per MCC guidelines Storage Servers: Must have enterprise class HDD with 7,200 RPM spin rate Alarms: Loss of communication, camera signal, system power User privileges: Check user privileges of each user for access rights Date security / integrity: Check access logs to verify unauthorized access e.g. access or delete data by a user not authorized to carry out that action For multicast networks in schools, verify that routing has been done based on PIM-SM Q06 CCTV User Training Assessment The Quality Assurance team will sit down with CCTV Operators to understand the level of training provided by the Supplier on usage of CCTV Systems. Following areas will be tested: CCTV operators should understand the system and are capable of carrying out day-to-day operations. CCTV operators are aware of the responses they are required to take with respect to the nature of events. School should maintain records of all users that are certified to use the CCTV system. A complete record of past operators should also be maintained. 4.3 Optional Tests STORAGE The Quality Assurance team will inspect the site CCTV External Storage and report on the level of adherence to the approved ADEC guidelines and reference documents. Following areas will be tested: Verify BOQ of Storage solution and mounting location in MDF cabinet. Verify that Storage is powered and connected with core switch and CCTV VSM server using specified patch cord color and switch port numbers. Check if storage device is successfully added to the VSM server as additional partition. UPS Verify BOQ and UPS mounting location in MDF cabinet. Verify all MDF PDUs are connected through UPS.Verify use of correct patch cords (brand and color) and connection to core switch in the specified port. Power load should successfully transfer to UPS when utility power of MDF cabinet is disconnected. RFP No. ADEC/2015/1112 Document 2 of 4 Page 22 of 23

24 Verify backup power and re-charge time. One specified server should gracefully shutdown when UPS runs out of power. UPS should be connected to the centralized UPS monitoring software for error/ health notifications 4.4 Quality Report Upon completion of the QA review for the site, the Quality Assurance team will provide ADEC with a Quality Report communicating their findings and site recommendations. The Quality Report will detail: Recommended site output status (Accepted, Accepted with Snags, Rejected) Summary of the site output status providing a clear rationale in support of the recommended status Overview of each test performed (Toolbox Q01 Q06) providing statistical data to support the site output status Site observations and recommendations to include: Health & Safety observations Operational observations Functional observations Commercial observations Aesthetics and decor observations The Quality Report will be produced by the Quality Assurance team and provided to the programme team who will perform a review of completed Quality Reports. The Quality Report will provide ADEC with the status of the site and identify that the work have been completed to the standards defined by ADEC and are to be accepted into operational support. RFP No. ADEC/2015/1112 Document 2 of 4 Page 23 of 23

25 Request for Proposal From ABU DHABI EDUCATION COUNCIL Relating to Quality Assurance and Testing Services for ICT Infrastructure, Devices and CCTV Implementations in ADEC Schools RFP No. ADEC/2015/1112 Form of Proposer s Response Notes: Bidders interested in participating in the above tender must send a confirmation No later than Wednesday, 2nd September 2015, 12:00 PM to tenders@adec.ac.ae by attaching the signed Form of Proposer s Response. It is the Bidders responsibility to ensure that their s were received and acknowledge by ADEC before the mentioned closing date. Upon receiving the confirmation s, ADEC shall float online tenders to the Bidders who expressed their interest in participating in any of the above mentioned tenders inclusive of the RFP documents (instruction to bidders, terms and conditions, as well as submission details/requirements).

26 Form of Proposer s Response [To be typed on Proposer s Letterhead] Vendor Registered with ADEC: Yes, Vendor No.: No (note: please complete your registration before Wednesday, 2nd September 2015, 12:00). [Date] To: ABU DHABI EDUCATION COUNCIL P. O. Box Abu Dhabi - U.A.E. C/O Procurement & Contracts Division TENDER NO. TENDER TITLE : ADEC/2015/1112 : Quality Assurance and Testing Services for ICT Infrastructure, Devices and CCTV Implementations in ADEC Schools Dear Sirs, We acknowledge the receipt of the RFP Invitation Package ADEC/2015/1112 dated.../..../2015. a) You may expect to receive our PROPOSAL on or before... b) We do not intend to submit a proposal because and herewith return the RFP Invitation Package. We wish to advise you of the following details with regard to our main office:- Postal Address: Street Address: Telephone Number: Fax Number: Authorized Contact Person: Address: SIGNED BY:... DATE:... NAME:... TITLE:... RFP No. ADEC/2015/1112 Form of Proposer s Response Page 2 of 2

Request for Proposal

Request for Proposal Request for Proposal Management of ADEC Warehousing Activities RFP No. ADEC/2015/1115 Scope of Work Introduction: The Procurement and Contract Management division (P&C) in Abu Dhabi Education Council (ADEC)

More information

How To Create A Virtual Desktop In Gibidr

How To Create A Virtual Desktop In Gibidr Virtual Desktop Infrastructure for IGIDR Sealed quotations are invited from authorized partners of OEM providing VDI solutions. The sealed quotations should be supplied in two parts Technical Bid (Part

More information

A&H Software House Inc. Web: www.luxriot.com Email: sales@luxriot.com. Luxriot

A&H Software House Inc. Web: www.luxriot.com Email: sales@luxriot.com. Luxriot A&H Software House Inc. Web: www.luxriot.com Email: sales@luxriot.com Luxriot Luxriot Product Features Luxriot is equipped with Unique, Advanced and Industry Standard Surveillance Features: Luxriot is

More information

Amcrest 960H DVR Quick Start Guide

Amcrest 960H DVR Quick Start Guide Amcrest 960H DVR Quick Start Guide Welcome Thank you for purchasing our Amcrest 960H DVR! This quick start guide will help you become familiar with our DVR in a very short time. Before installation and

More information

UNION OF THE REPUBLIC OF MYANMAR MINISTRY OF COMMUNCIATIONS AND INFORMATION TECHNOLOGY INVITATION FOR QUOTATIONS

UNION OF THE REPUBLIC OF MYANMAR MINISTRY OF COMMUNCIATIONS AND INFORMATION TECHNOLOGY INVITATION FOR QUOTATIONS UNION OF THE REPUBLIC OF MYANMAR MINISTRY OF COMMUNCIATIONS AND INFORMATION TECHNOLOGY INVITATION FOR QUOTATIONS Description of goods: I T and office equipment Request for quotation Ref. No. : Date: To:

More information

IP Video Surveillance

IP Video Surveillance IP Video Surveillance Solutions and Services Wireless IP PDA Administration Wireless Access Point Viewer Remote Control IP Video Server IP Network Alarm Management Video Recording Analog Video Server Access

More information

Table of Contents. Chapter1. Introduction...1. 1.1 Before Installation... 1 1.2 System Requirements... 1

Table of Contents. Chapter1. Introduction...1. 1.1 Before Installation... 1 1.2 System Requirements... 1 Table of Contents Chapter1. Introduction...1 1.1 Before Installation... 1 1.2 System Requirements... 1 Chapter2. IVS-110 1-Channel Internet Video Server...2 2.1 Package Content... 2 2.2 Physical Installation...

More information

CDW Standard Image Deployment Service Customer Guide

CDW Standard Image Deployment Service Customer Guide CDW Standard Image Deployment Service Customer Guide Contents Service Description... 2 Why Would My Organization Use This Service?... 2 Benefits of Using CDW Configuration Services... 2 How Is This Service

More information

Revised RFP submission schedule October 15 th 3:00 PM EST Last Day to Submit Questions October 30 th 3:00 PM EST Proposals Due

Revised RFP submission schedule October 15 th 3:00 PM EST Last Day to Submit Questions October 30 th 3:00 PM EST Proposals Due Revised RFP submission schedule October 15 th 3:00 PM EST Last Day to Submit Questions October 30 th 3:00 PM EST Proposals Due III. Scope of Services The work in this section outlines the materials, installation,

More information

PROCUREMENT & CONTRACTS MANAGEMENT DIVISION TENDER ANNOUNCEMENT

PROCUREMENT & CONTRACTS MANAGEMENT DIVISION TENDER ANNOUNCEMENT PROCUREMENT & CONTRACTS MANAGEMENT DIVISION TENDER ANNOUNCEMENT 1. The Abu Dhabi Education Council (ADEC) is pleased to invite licensed companies of UAE to bid for the following tender: Tender Number Tender

More information

Quick Start Guide NVR DS-7104NI-SL/W NVR. www.hikvision.com. First Choice For Security Professionals

Quick Start Guide NVR DS-7104NI-SL/W NVR. www.hikvision.com. First Choice For Security Professionals Quick Start Guide NVR DS-7104NI-SL/W NVR NOTE: For more detailed information, refer to the User s Manual on the CD-ROM. You must use your PC or MAC to access the files. www.hikvision.com Quick Start 1.

More information

IDIS Solution Suite. Backup Service. Software Manual. Powered by

IDIS Solution Suite. Backup Service. Software Manual. Powered by Solution Suite Software Manual Backup Service Powered by Before reading this manual This Operation Manual provides instructions for using Solution Suite, a network integration solution enabling remote

More information

MSP Service Matrix. Servers

MSP Service Matrix. Servers Servers MSP Service Matrix Microsoft Windows O/S Patching - Patches automatically updated on a regular basis to the customer's servers and desktops. MS Baseline Analyzer and MS WSUS Server used Server

More information

Next Generation. Surveillance Solutions. Cware. The Advanced Video Management & NVR Platform

Next Generation. Surveillance Solutions. Cware. The Advanced Video Management & NVR Platform Next Generation Surveillance Solutions Cware The Advanced Video Management & NVR Platform Advanced Open Management Benefit from the most effective CCTV management platform Cware is an advanced video management

More information

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM PROPOSALS REQUESTED BY THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM The Town of Old Orchard Beach will receive sealed bids for an IP based phone system. The project

More information

User Manual V1.0. Remote Software

User Manual V1.0. Remote Software User Manual V1.0 Notice: The information in this manual was current when published. The manufacturer reserves the right to revise and improve its products. All specifications are therefore subject to change

More information

1.0 Scope: 2.0 Site Status and Site Visit:

1.0 Scope: 2.0 Site Status and Site Visit: 1.0 Scope: Vendor is required to supply install and commission Telepresence grade Video Conference (VC) Equipment complying with "Minimum Technical Specifications" given in this document along with software

More information

VS-100. PoE. H.264 PoE Video Server. H.264 Compression H.264 DI/DO. Compression Rate Comparison MJPEG MPEG4 H.264.

VS-100. PoE. H.264 PoE Video Server. H.264 Compression H.264 DI/DO. Compression Rate Comparison MJPEG MPEG4 H.264. H.264 Video Server T he AirLive is a one channel video server for easily upgrade your old CCTV camera to a network-enabled IP camera and hence convert your local surveillance system into a global one.

More information

AXIS Installation Monitor. User s Manual

AXIS Installation Monitor. User s Manual AXIS Installation Monitor User s Manual Overview Setup Single camera setup One or more cameras in a network setup Device menu Monitor window Monitor menu Tips and tricks Overview AXIS Installation Monitor

More information

Alliance Behavioral Healthcare RFP Questions

Alliance Behavioral Healthcare RFP Questions Alliance Behavioral Healthcare RFP Questions 1. Are the LCD monitors required to be commercial grade with an extensive resolution look-up table and 3 year warranty or can consumer grade LCD TV s be proposed.

More information

ADDENDUM No. #3. No Event Date* Deadline to Submit Questions 2/10//2016 10:00 AM. Deadline to City Responses to Questions 2/16/2016 10:00 AM

ADDENDUM No. #3. No Event Date* Deadline to Submit Questions 2/10//2016 10:00 AM. Deadline to City Responses to Questions 2/16/2016 10:00 AM ADDENDUM No. #3 Project Name: RFP NO. High Definition Security Cameras for the City s Gibson Bethel Community Center PR2016-02 Date: February, 3, 2016 Sent: Fax/E-mail/webpage This addendum submission

More information

MAXPRO. NVR Software NETWORK VIDEO RECORDING SOLUTION

MAXPRO. NVR Software NETWORK VIDEO RECORDING SOLUTION NETWORK VIDEO RECORDING SOLUTION Honeywell s MAXPRO is a flexible, scalable and open IP video surveillance system. Supporting Honeywell's high definition (HD) cameras and broad integration with third party

More information

Automating Infrastructure A connectivity perspective for BICSI SEA meeting, November 2011

Automating Infrastructure A connectivity perspective for BICSI SEA meeting, November 2011 Automating Infrastructure A connectivity perspective for BICSI SEA meeting, November 2011 Opportunities in Automating Infrastructure Why Automation in Data Center? Tiers, compartments and complexity Work

More information

USER S MANUAL. AXIS Mobile Monitor

USER S MANUAL. AXIS Mobile Monitor USER S MANUAL AXIS Mobile Monitor AXIS Mobile Monitor Overview Main window Main menu Find Devices Find Devices menu Monitor window Monitor menu Sequence window Sequence menu How to Use AXIS Mobile Monitor

More information

Web: www.stp.hu; www.logipix.eu; www.walkdvr.com

Web: www.stp.hu; www.logipix.eu; www.walkdvr.com StP Technical Development Ltd. version: 1 Contact: Address: 11-13. Késmárk st., 1158 Budapest, Hungary Phone: +36 1 410-0556; +36 20 480-5933 Fax: +36 1 414-0913 E-mail: info@stp.hu Technical support:

More information

CDW Advanced Image Deployment Service Customer Guide

CDW Advanced Image Deployment Service Customer Guide CDW Advanced Image Deployment Service Customer Guide Contents Service Description... 2 Image Deployment Solutions... 2 Why would my organization use this service?... 2 Benefits of Advanced Imaging over

More information

www.vicon-security.com

www.vicon-security.com Data/Spec Sheet 16-Channel Hybrid Digital Video Recorder Configured with ViconNet Video Management Software (VMS) Scalable from one to hundreds of recorders Support for HD video and Megapixel cameras Real-time

More information

1. Central Monitoring System Software

1. Central Monitoring System Software 1. Central Monitoring System Software 1-1. General information CMS program is an application with which users not only watch and control remote DVRs, but also receive video/audio data or alarm signals

More information

Observer RPM. Remote Program Monitor. Post STB-Monitoring, Logging and Troubleshooting

Observer RPM. Remote Program Monitor. Post STB-Monitoring, Logging and Troubleshooting Observer RPM Remote Program Monitor Post STB-Monitoring, Logging and Troubleshooting Pay-TV operators are caught in a hyper-competitive marketplace. They must provide a growing array of linear, ondemand

More information

OAISYS and ShoreTel: Call Recording Solution Configuration. An OAISYS White Paper

OAISYS and ShoreTel: Call Recording Solution Configuration. An OAISYS White Paper OAISYS and ShoreTel: Call Recording Solution Configuration An OAISYS White Paper Table of Contents Introduction... 3 ShoreTel Networks... 4 Trunk Side Recording... 4 Station Side Recording... 6 Active

More information

Central Management System (CMS) USER MANUAL

Central Management System (CMS) USER MANUAL Central Management System (CMS) USER MANUAL LEGAL INFORMATION Reproduction, transfer, distribution or storage of part or all of the contents in this document in any form without the prior written permission

More information

Ten top problems network techs encounter

Ten top problems network techs encounter Ten top problems network techs encounter Networks today have evolved quickly to include business critical applications and services, relied on heavily by users in the organization. In this environment,

More information

VMS A1 Client Software. User Manual (V2.0)

VMS A1 Client Software. User Manual (V2.0) VMS A1 Client Software User Manual (V2.0) Contents Chapter 1 Overview...4 1.1 Description...4 1.2 Running Environment...4 1.3 Function Modules...5 Chapter 2 Live View...7 2.1 User Registration and Login...7

More information

REQUEST FOR PROPOSAL FOR SECURITY CAMERA SYSTEM AT CONWAY LAW ENFORCEMENT CENTER CONWAY, SC 29526

REQUEST FOR PROPOSAL FOR SECURITY CAMERA SYSTEM AT CONWAY LAW ENFORCEMENT CENTER CONWAY, SC 29526 REQUEST FOR PROPOSAL FOR SECURITY CAMERA SYSTEM AT CONWAY LAW ENFORCEMENT CENTER CONWAY, SC 29526 Stephanie Carroll, Technology Coordinator scarroll@cityofconway.com 843 248 1760 LEC Security Camera System

More information

Xerox Mobile Print Cloud

Xerox Mobile Print Cloud September 2012 702P00860 Xerox Mobile Print Cloud Information Assurance Disclosure 2012 Xerox Corporation. All rights reserved. Xerox and Xerox and Design are trademarks of Xerox Corporation in the United

More information

A quick user guide for your LX Apollo DVR

A quick user guide for your LX Apollo DVR A quick user guide for your LX Apollo DVR The LX Apollo series of DVR s is designed specially for the security and surveillance field and is an outstanding digital surveillance product. It has an embedded

More information

Financial Bid Format(All Inclusive)

Financial Bid Format(All Inclusive) Financial Bid Format(All Inclusive) Sl. N. Description In Figure Rate Per Unit In Words 1 ROUTER TYPE A 2 ISP LINK LOAD BALANCER 3 INTERNET SECURITY 4 ROUTER TYPE B 5 USER & DEVICE IDENTITY MANAGEMENT

More information

ivms-4200 Client Software Quick Start Guide V1.02

ivms-4200 Client Software Quick Start Guide V1.02 ivms-4200 Client Software Quick Start Guide V1.02 Contents 1 Description... 2 1.1 Running Environment... 2 1.2 Surveillance System Architecture with an Performance of ivms-4200... 3 2 Starting ivms-4200...

More information

Request for Proposal Technology Services Maintenance and Support

Request for Proposal Technology Services Maintenance and Support Request for Proposal Technology Services Maintenance and Support Maintenance and Support July 19, 2014 Celerity Educational Group is seeking an IT consulting firm to manage Maintenance of our Network Systems

More information

1. Amendment of Section I. Invitation to Bid item no. 6 and 7 are hereby amended as follows: From:

1. Amendment of Section I. Invitation to Bid item no. 6 and 7 are hereby amended as follows: From: Republic of the Philippines Department of Finance INSURANCE COMMISSION 1071 United Nations Avenue Manila BIDS AND AWARDS COMMITTEE SUPPLEMENTAL BID BULLETIN NO. 2 SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING

More information

IP Telephony Management

IP Telephony Management IP Telephony Management How Cisco IT Manages Global IP Telephony A Cisco on Cisco Case Study: Inside Cisco IT 1 Overview Challenge Design, implement, and maintain a highly available, reliable, and resilient

More information

RFP for Case Management & Tracking System for the Office of Advocate General, Madhya Pradesh

RFP for Case Management & Tracking System for the Office of Advocate General, Madhya Pradesh MAP_IT Madhya Pradesh Agency for Promotion of Information Technology Corrigendum 2 RFP for Case Management & Tracking System for the Office of Advocate General, Madhya Pradesh Sr.No. RFP Reference Existing

More information

IDIS Solution Suite. Backup Service. Software Manual. Powered by

IDIS Solution Suite. Backup Service. Software Manual. Powered by Solution Suite Software Manual Backup Service Powered by Before reading this manual This Operation Manual provides instructions for using Solution Suite, a network integration solution enabling remote

More information

Online Training Certifications

Online Training Certifications Online Training Certifications March Networks online certifications provide our certified partners with the knowledge required to install, operate and maintain our industry-leading Visual Intelligence

More information

4-CH Hybrid Digital Video Recorder

4-CH Hybrid Digital Video Recorder 4-CH Hybrid Digital Video Recorder Key Features Hardware Embedded, highly-reliable standalone HDVR Supports 4-ch BNC connectors Supports dual local display (VGA and HDMI) Supports 3.5" SATA x 1 HDD Supports

More information

Information Services Department

Information Services Department Effective: July 1, 2008 Support The Information Services Department (ISD) Help Desk will provide a first point of contact for employees for problems involving computer hardware or software. It will be

More information

5100 SERIES 32-CHANNEL SWITCHBOX NVR

5100 SERIES 32-CHANNEL SWITCHBOX NVR High Definition Surveillance 5100 SERIES 32-CHANNEL SWITCHBOX NVR Powerful IP recording solution supports up to 32 network IP security cameras + + Plug-and-play support for up to 16 compatible IP cameras

More information

presentation Our customers & Partners AE40 www.ae40.com +972-9-743-8410

presentation Our customers & Partners AE40 www.ae40.com +972-9-743-8410 AE40 presentation AE40 Our customers & Partners AE40 profile AE40 founded at 2002 Privately held company VoIP and Video over IP based communication solutions(radio, intercom, public announcements, telephony,

More information

Quick installation guide for the Vista Quantum QNVR Network Video Recorder

Quick installation guide for the Vista Quantum QNVR Network Video Recorder QNVR range Quick Instalation guide Quick installation guide for the Vista Quantum QNVR Network Video Recorder Full manual found on the CD supplied with the NVR Contents SCOPE OF USE... 3 1. FRONT PANEL

More information

IDIS Solution Suite. Streaming Service. Software Manual. Powered by

IDIS Solution Suite. Streaming Service. Software Manual. Powered by Solution Suite Software Manual Streaming Service Powered by Before reading this manual This Operation Manual provides instructions for using Solution Suite, a network integration solution enabling remote

More information

Business Benefits. Infrastructure Management. Adrian Parry Technical Consultant. aparry@commscope.com

Business Benefits. Infrastructure Management. Adrian Parry Technical Consultant. aparry@commscope.com Business Benefits of Intelligent Infrastructure Management Adrian Parry Technical Consultant CommScope EMEA aparry@commscope.com In the future, the road to reliability and consistency in networking will

More information

Technical Standards for Information Security Measures for the Central Government Computer Systems

Technical Standards for Information Security Measures for the Central Government Computer Systems Technical Standards for Information Security Measures for the Central Government Computer Systems April 21, 2011 Established by the Information Security Policy Council Table of Contents Chapter 2.1 General...

More information

ivms-4200 Client Software Technical Specification v1.02

ivms-4200 Client Software Technical Specification v1.02 ivms-4200 Client Software Technical Specification v1.02 Introduction ivms-4200 Client Software is a centralized video management software using a distributed structure for surveillance device control and

More information

DATA/SPEC SHEET VIRTUAL MATRIX DISPLAY CONTROLLER VERSION 8

DATA/SPEC SHEET VIRTUAL MATRIX DISPLAY CONTROLLER VERSION 8 DATA/SPEC SHEET VIRTUAL MATRIX DISPLAY CONTROLLER VERSION 8 V920 - PRODUCT DESCRIPTION Virtual Matrix Display Controller The Virtual Matrix Display Controller (VMDC) is a selfcontained, matrix control

More information

1. Central Monitoring System Software

1. Central Monitoring System Software 1. Central Monitoring System Software 1-1. General information CMS program is an application with which users not only watch and control remote DVRs, but also receive video/audio data or alarm signals

More information

APPENDIX 3 LOT 3: WIRELESS NETWORK

APPENDIX 3 LOT 3: WIRELESS NETWORK APPENDIX 3 LOT 3: WIRELESS NETWORK A. TECHNICAL SPECIFICATIONS MAIN PURPOSE The Wi-Fi system should be capable of providing Internet access directly to a user using a smart phone, tablet PC, ipad or Laptop

More information

Alert Technology Group 46 Empey St, Brantford ON Office 519.750.1516 Toll Free 1.888.750.1516 www.alerttechnologygroup.ca

Alert Technology Group 46 Empey St, Brantford ON Office 519.750.1516 Toll Free 1.888.750.1516 www.alerttechnologygroup.ca Alert Technology Group 46 Empey St, Brantford ON Office 519.750.1516 Toll Free 1.888.750.1516 www.alerttechnologygroup.ca Alert Technology Group is the leader in providing technologically advanced security

More information

Managed Services Agreement. Hilliard Office Solutions, Ltd. PO Box 52510 Phone: 432-617-4677 Midland, Texas 79710 Fax: 432-617-3043

Managed Services Agreement. Hilliard Office Solutions, Ltd. PO Box 52510 Phone: 432-617-4677 Midland, Texas 79710 Fax: 432-617-3043 Managed Services Agreement Hilliard Office Solutions, Ltd. PO Box 52510 Phone: 432-617-4677 Midland, Texas 79710 Fax: 432-617-3043 SERVICE DESCRIPTIONS By purchasing these Services from Hilliard Office

More information

Why the Subsystem Storage Is a Must for the Applications of. Mission Critical Surveillance Projects? Application Notes

Why the Subsystem Storage Is a Must for the Applications of. Mission Critical Surveillance Projects? Application Notes Why the Subsystem Storage Is a Must for the Applications of Mission Critical Surveillance Projects? Application Notes What is Mission Critical? Mission critical surveillance projects indicate any failure

More information

Created By: 2009 Windows Server Security Best Practices Committee. Revised By: 2014 Windows Server Security Best Practices Committee

Created By: 2009 Windows Server Security Best Practices Committee. Revised By: 2014 Windows Server Security Best Practices Committee Windows Server Security Best Practices Initial Document Created By: 2009 Windows Server Security Best Practices Committee Document Creation Date: August 21, 2009 Revision Revised By: 2014 Windows Server

More information

Network Documentation Checklist

Network Documentation Checklist Network Documentation Checklist Don Krause, Creator of NetworkDNA This list has been created to provide the most elaborate overview of elements in a network that should be documented. Network Documentation

More information

Beaver Dam Unified School District Request for Proposal Video Surveillance and Door Access Control Systems

Beaver Dam Unified School District Request for Proposal Video Surveillance and Door Access Control Systems Beaver Dam Unified School District Request for Proposal Video Surveillance and Door Access Control Systems The Beaver Dam Unified School District (BDUSD) is requesting proposals from qualified companies

More information

ivms-4500 (Android) Mobile Client Software User Manual (V3.1)

ivms-4500 (Android) Mobile Client Software User Manual (V3.1) ivms-4500 (Android) Mobile Client Software User Manual (V3.1) UD.6L0202D1111A01 Thank you for purchasing our product. This manual applies to ivms-4500 (Android) V3.1 mobile client software; please read

More information

ibaby Monitor Model: M3s User Manual

ibaby Monitor Model: M3s User Manual ibaby Monitor Model: M3s User Manual Index 1 Introduction...3 1.1 The package contents...3 1.2 Product Features...3 1.3 Product Specifications...4 2 Appearance and Interface...5 2.1 Appearance...5 2.2

More information

UMHLABUYALINGANA MUNICIPALITY IT PERFORMANCE AND CAPACITY MANAGEMENT POLICY

UMHLABUYALINGANA MUNICIPALITY IT PERFORMANCE AND CAPACITY MANAGEMENT POLICY UMHLABUYALINGANA MUNICIPALITY IT PERFORMANCE AND CAPACITY MANAGEMENT POLICY Originator: IT Performance and Capacity Management Policy Approval and Version Control Approval Process: Position or Meeting

More information

Features Reference. About Unified Communication System. Before Using This Machine. Starting a Meeting. What You Can Do During the Meeting

Features Reference. About Unified Communication System. Before Using This Machine. Starting a Meeting. What You Can Do During the Meeting Features Reference About Unified Communication System Before Using This Machine Starting a Meeting What You Can Do During the Meeting Leaving a Meeting Managing Address Book Changing Network Configuration

More information

StarLeaf Cloud Troubleshooter

StarLeaf Cloud Troubleshooter StarLeaf Cloud Troubleshooter 02 September 2014 Contents About the troubleshooter 3 The StarLeaf Phone is not powered 3 Phone is powered but displays a blue screen 3 Quick connect screen 5 The screen displays

More information

Recording. http://www.qnap.com/nvr/compatibilityx01.html. Smart recording (depending on the camera models)

Recording. http://www.qnap.com/nvr/compatibilityx01.html. Smart recording (depending on the camera models) VS-2108L Hardware Spec. CPU Marvell 1.6GHz DRAM 512MB DDRIII RAM Flash Memory 512MB Hard Disk Drive 2 x 3.5" SATA I/II hard disk drive (HDD) NOTE: 1. The system is shipped without hard disk drives. 2.

More information

POSITION DESCRIPTION ICT TECHNICIAN - HELPDESK SUPPORT

POSITION DESCRIPTION ICT TECHNICIAN - HELPDESK SUPPORT POSITION TITLE: LEVEL: HOURS: ICT Technician - Helpdesk Support Level 2 (Administrative & Technical Officers) The Roman Catholic Archbishop of Perth Non-Teaching Staff Enterprise Bargaining Agreement 2012

More information

ICT Category Sub Category Description Architecture and Design

ICT Category Sub Category Description Architecture and Design A A01 Architecture and Design Architecture and Design Enterprise & Business Architecture A02 Architecture and Design Information Architecture A03 Architecture and Design Solution Architecture B Benchmarking

More information

GMS GRAPHICAL MANAGEMENT SYSTEM

GMS GRAPHICAL MANAGEMENT SYSTEM GMS GRAPHICAL MANAGEMENT SYSTEM 1 GMS The integrated security management system for multi-site organizations. Pacom s Graphical Management System (GMS) is the modular client-server application that integrates

More information

Contents. 1.2 Software Installation... 1

Contents. 1.2 Software Installation... 1 Software Manual Contents 1 Software Installation... 1 1.1 Overview...1 1.2 Software Installation... 1 2 Introduction To Basic Function...5 2.1 Login System... 5 2.2 CMS Operating Interface...5 2.2.1 Operating

More information

A&E Specifications RoadRunner Video Surveillance Systems for School Transportation Applications

A&E Specifications RoadRunner Video Surveillance Systems for School Transportation Applications RoadRunner Video Surveillance Systems for School Transportation Applications A. Digital Video Recorder (DVR) System: 1. The system shall be provided in compatible and interchangeable formats that support

More information

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Voice over IP System

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Voice over IP System CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL Voice over IP System The Charter Township of Shelby is soliciting proposals to install a complete Voice over IP telephone system, including call control

More information

ManageEngine Desktop Central Training

ManageEngine Desktop Central Training ManageEngine Desktop Central Training Course Objectives Who Should Attend Course Agenda Course Objectives Desktop Central training helps you IT staff learn the features offered by Desktop Central and to

More information

Boundless Security Systems, Inc. digital video security systems to deter, intervene and investigate

Boundless Security Systems, Inc. digital video security systems to deter, intervene and investigate Security Systems, Inc. digital video security systems to deter, intervene and investigate Comparison of Video Security System Architectures Comparison Table, 2 Digital Video Recorder (DVR) has centralized

More information

Determine dates with you telecom suppliers so that the new office is online before your move for both Phones and Data connections.

Determine dates with you telecom suppliers so that the new office is online before your move for both Phones and Data connections. IT Office Move - Tips and Check List: Office IT Move Plan Introduction: If you are moving to a New Office and/or Data Center (Cloud), or if this is also a Colocation exercise please note this is a basic

More information

Data Center Management

Data Center Management Data Center Management How Cisco IT Operates, Manages, and Protects Its Data Center A Cisco on Cisco Case Study: Inside Cisco IT 1 Overview The Cisco IT Operations Data Center on the San Jose, California

More information

1. Central Monitoring System Software

1. Central Monitoring System Software 1. Central Monitoring System Software 1-1. General information CMS program is an application with which users not only watch and control remote DVRs, but also receive video/audio data or alarm signals

More information

PART A. Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras

PART A. Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras PART A Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras General The City of Guelph has standardized on Lenel OnGuard as the corporate access

More information

Cloud Surveillance. Cloud Surveillance NVMS. Network Video Management System. isecucloud. isecucloud

Cloud Surveillance. Cloud Surveillance NVMS. Network Video Management System. isecucloud. isecucloud Cloud Surveillance Network Video Management System isecucloud isecucloud Network Video Management System Introduction In the digital era, the demand for remote monitoring has continued to increase. Users

More information

Remote Monitoring Quick Start Guide

Remote Monitoring Quick Start Guide For more information about your new system, look for QC on our website or in our online support materials at www.q-see.com/support Remote Monitoring Quick Start Guide QC Series Network NVRs efore You Get

More information

Trade Sector Support Program-(Loan BH-L1016) Modernizing Customs Operations Enhancement of Training Facilities

Trade Sector Support Program-(Loan BH-L1016) Modernizing Customs Operations Enhancement of Training Facilities Trade Sector Support Program-(Loan BH-L1016) Request for Proposal (RFP) Modernizing Customs Operations Enhancement of Training Facilities Purchase and installation of audio/visual and wireless equipment

More information

Quick Start Guide. Hybrid DVR DS-9000 Series Hybrid DVR DS-7600 Series Hybrid DVR. NVR DS-9600 Series NVR

Quick Start Guide. Hybrid DVR DS-9000 Series Hybrid DVR DS-7600 Series Hybrid DVR. NVR DS-9600 Series NVR Quick Start Guide Hybrid DVR DS-9000 Series Hybrid DVR DS-7600 Series Hybrid DVR NVR DS-9600 Series NVR Analog DVR DS-9100 Series DS-8100 Series DS-7300 Series DS-7200 Series NOTE: For more detailed information,

More information

More than 6 years of experience in IT Projects/Networking /Systems

More than 6 years of experience in IT Projects/Networking /Systems Mohammed Riyas. V.P Email: riyas101@yahoo.com riyas101@live.com Abu Dhabi Mobile: 055 6693840 U.A.E Passport No: G9871465 Career Objective CURRICULUM VITAE Highly motivated IT Engineer with sound professional

More information

idvr-pro Viewer Software for Mac User Manual ver 0.1

idvr-pro Viewer Software for Mac User Manual ver 0.1 idvr-pro Viewer Software for Mac User Manual ver 0.1 1 Contents 1. Introduction... Error! Bookmark not defined. 1.1 Summary... Error! Bookmark not defined. 2. Install... Error! Bookmark not defined. 2.1

More information

XMEye Android Mobile Monitoring Client English Manual

XMEye Android Mobile Monitoring Client English Manual XMEye Android Mobile Monitoring Client English Manual Written by: The test department Prepared Date: 2014-03-25 Version: V1.0 目 录 1. Introduction... 3 1.1. Brief Introduction... 3 1.2. Main Functions...

More information

Stand Alone Type. Digital Video Recorder USER S MANUAL. (Real time recording 8 & 16 CH DVR) Revision Date : 2010. 6. 30.

Stand Alone Type. Digital Video Recorder USER S MANUAL. (Real time recording 8 & 16 CH DVR) Revision Date : 2010. 6. 30. Stand Alone Type Digital Video Recorder USER S MANUAL (Real time recording 8 & 16 CH DVR) Revision Date : 2010. 6. 30. INDEX 1. Front Panel - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

More information

GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION

GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION 1. INTRODUCTION This document contains product information for the GMS Network Service. If you require more detailed technical information, please

More information

Advanced Network Video And Alarm Management Suite

Advanced Network Video And Alarm Management Suite Advanced Network Video And Alarm Management Suite ViMS. Advanced Network Video & Alarm Management Suite G anz ViMS Command is a powerful IP network based, open standards Video & Alarm Management software

More information

CX Series. Video Recording Server. Quick Start Guide CX784 / CX788 / CX7816. Version 1.05.00

CX Series. Video Recording Server. Quick Start Guide CX784 / CX788 / CX7816. Version 1.05.00 CX Series Video Recording Server CX784 / CX788 / CX7816 Quick Start Guide Version 1.05.00 Contents 1.Introduction...1 1.1.Packages Contents...1 1.2.Hardware Features...2 1.3.Functional Features...4 1.4.Hard

More information

MJPEG Camera Client User Manual

MJPEG Camera Client User Manual MJPEG Camera Client User Manual CONTENTS User Manual 1 WELCOME... 3 1.1Features... 3 1.2Installation Requirements... 3 1.3 Software Installation... 3 2 Software Operation... 5 2.1 Tab bar... 6 2.2 Device

More information

RESOURCES. Telehealth. Provincial Health Services Authority. Telehealth & General Meeting Room Design Requirements

RESOURCES. Telehealth. Provincial Health Services Authority. Telehealth & General Meeting Room Design Requirements RESOURCES Telehealth Provincial Health Services Authority Telehealth & General Meeting Room Design Requirements Prepared by IMITS, LMC Telehealth and C&W Media Services December, 2013 Revised, August 2014

More information

TamoSoft Throughput Test

TamoSoft Throughput Test TAKE CONTROL IT'S YOUR SECURITY TAMOSOFT df TamoSoft Throughput Test Help Documentation Version 1.0 Copyright 2011-2014 TamoSoft Contents Contents... 2 Introduction... 3 Overview... 3 System Requirements...

More information

Chester County Hospital E134 Conference Room. Control for AV system

Chester County Hospital E134 Conference Room. Control for AV system Chester County Hospital E134 Conference Room Control for AV system The following document contains pictorial layouts and button descriptions of the touch panel interface for the audio visual system. 1.

More information

Implementation Methodology for ipatch System

Implementation Methodology for ipatch System SYSTIMAX Solutions Implementation Methodology for ipatch System Issue 2 August 2010 www.commscope.com Contents 1 Introduction 3 2 General Information 4 3 Planning phase 5 4 Design phase 11 5 Procurement

More information

Update for DIP-2040EZ-00N, DIP-2042EZ-4HD and DIP-2042EZ-2HD

Update for DIP-2040EZ-00N, DIP-2042EZ-4HD and DIP-2042EZ-2HD Release Letter Product: Version: DIVAR IP 2000 Family Software version 03.20.0024 Update for DIP-2040EZ-00N, DIP-2042EZ-4HD and DIP-2042EZ-2HD This letter contains latest information about the above mentioned

More information

RFP Attachment C Classifications

RFP Attachment C Classifications RFP 1. Applications IT Architect Analyzes and designs the architecture for software applications and enhancements, including the appropriate application of frameworks and design patterns and the interrelationships

More information

CAT 6 UTP Network Drops

CAT 6 UTP Network Drops Data Wiring of Campuses (Network and Access Points Wiring) District Identifier: 319- ND & AP Wiring Posting Date: 12-16-2015 Background The Calcasieu Parish School Board (CPSB) is requesting proposals

More information

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05 Corrigendum for the Tender for Web Based Project Monitoring Tool & MIS System Bidders Clarification Sl. Clause /Page no Tender Clause Clarification Sought Clarification No. 1 Page No:4 No consortium Consortium

More information