Channel Stabilization with Basic Flow Calculations
|
|
- Douglas Freeman
- 8 years ago
- Views:
Transcription
1 Channel Stabilization with Basic Flow Calculations Description Selection Criteria The selection of a channel lining will greatly influence how a drainage channel performs, the amount of erosion and scour, the frequency and cost of maintenance, appearance, aesthetics, and even safety. In addition, the amount of sediment and nutrients conveyed can be influenced greatly by the type of channel lining selected. This BMP examines different factors and some basic design parameters for channels and channel linings. Suitable applications are any areas which regularly receive and convey concentrated stormwater runoff, such as drainage channels, ditches, or swales. Channel linings can also be used in areas which occasionally convey stormwater runoff, such as overland relief swales or emergency spillways. Every drainage channel, ditch, or swale must have some type of channel lining. By default and if not specified, then the existing channel lining is native soil or rock. The least expensive and most beneficial lining is usually a grass channel if design parameters do not indicate excessive velocities, regular submergence, inadequate flow capacity, or potential maintenance problems. Grass channels are easy to maintain, flexible and self-healing, attractive in appearance, remove pollutants (see 9.5 Filter Strips and Swales), and decrease the amount of runoff by allowing stormwater infiltration and evapotranspiration. Grass channels are an example of a flexible lining (may also be called a soft or green lining) which include vegetation as the principal means of preventing erosion. A variety of temporary and permanent geosynthetic products can help to establish a soft lining; common examples are erosion control matting, excelsior blankets, geogrids filled with soil, or turf reinforcement mats. Soft linings are aesthetically pleasing, flexible, and easy to install and maintain. Some drawbacks to soft linings are the potential for damage by heavy traffic, excessive drought or pollution. Riprap and concrete and some geosynthetic channel linings are examples of rigid or hard linings. These channel linings are used when design velocities exceed permissible values for soft linings, or to improve flow capacity by reducing roughness and flow losses. Hard linings must be installed in a controlled manner with proper materials, compaction, bedding, and anchoring in order to prevent scour, undercutting or settlement. By law, anyone who works within or along a stream must obtain an Aquatic Resource Alteration Permit (ARAP) from the TDEC Division of Water Pollution Control. The ARAP is required for activities such as: dredging, widening a stream channel, straightening a stream channel, building a dock or boat ramp, altering a wetland, utility line crossings or streambank stabilization. Visit the TDEC permitting website for more information at Page 1 of 10
2 Best Management Practices Manual Related BMPS which impact the selection of channel linings include: Matting (MA) Geotextile (GE) Diversion Ditch (DI) Riprap (RR) Slope Drain (SD ) Basic Flow Calculations This section contains a description of basic flow computations for use in designing an open channel, ditch or swale. Drainage channels and ditches should generally be designed by a professional engineer to ensure that adequate drainage capacity and allowable flow velocities are provided. Open-channel computations are usually in the form of Manning s equation: V = (1.49 / n ) R H 2/3 S 1/2, where V = average velocity in channel (feet per second) n = Manning s roughness coefficient (dimensionless) R H = hydraulic radius of channel = A / W P (expressed in feet) S = energy grade line = channel slope for uniform flow (dimensionless) A = cross-sectional flow area (square feet) W P = wetted perimeter of flow (feet) The total flow through the channel (Q, expressed in cubic feet per second) is equal to the velocity times the cross-sectional flow area: Q = V A Figure 1 Basic Flow Computation Manning s Equation 1.21 sq ft area = 0.5 x 1.1 x feet W P = ( ) 0.5 B = 4 feet 1.82 sq ft area 3.48 feet W P Given: D = 1.10 feet n = S = 0.01 ft / ft 2:1 slope 4.40 sq ft area 4.00 feet W P 3:1 slope channel geometry Computed: A = 7.43 sq ft W P = 9.94 feet R H = feet V = 4.91 fps Q = 36.5 cfs Page 2 of 10
3 Chattanooga Hamilton County Area Water Quality Programs Manning s equation is for open-channel flow and assumes a constant uniform flow rate at a specified slope. There are many factors which can affect this assumption, such as varying channel widths and slopes, downstream flow restrictions, backwater from dams or other berms, culvert entrance and exit losses, headwater at culverts or bridges, channel bends, varying lining materials, etc. Any of these factors will generally require that an experienced professional engineer be responsible for design and analysis. In addition, channels with unusual shapes, composite materials or uneven sections will generally require that a professional engineer with knowledge and experience should be responsible for the design and analysis. In addition, channels with unusual shapes, composite materials or uneven sections will generally require that a professional engineer with knowledge and experience should be responsible for the design and analysis. The major difficulty in estimating velocity and flow is usually the selection of Manning s roughness coefficient n. Typical values are listed in Table 1 and Table 2. See Table 3 for n values of grass channels, based upon type and height of vegetation, and product of velocity (V) and hydraulic radius (R H ). Subcritical and Supercritical Flow It is useful to know whether a flow is subcritical (also called tranquil flow, backwater flow or downstream control) or supercritical (also called rapid flow or upstream control). This is determined by computing the Froude number; a value of F R less than 1 is subcritical and a value greater than 1 is supercritical. Subcritical flow is greatly preferred because it has a lower velocity than supercritical flow. A value of F R between 0.8 and 1.2 indicates that the channel is close to critical flow, and that small changes in channel cross section, flows, slopes, etc., may cause the water surface to change radically or even create a hydraulic jump or standing wave. Open channels should not be designed at or near critical flow conditions. F R = ( ( Q 2 * T) / (g * A 3 ) ) 1/2, where F R = Froude number (dimensionless) Q = discharge or flow (cubic feet per second) T = top width of water surface (feet) g = gravitational constant = 32.2 feet/ second 2 A = cross-sectional flow area (square feet) (for Figure 1) F R = ( ( * 9.5) / (32.2 * ) ) 0.5 = 0.98 The example channel in Figure 1 is approximately at critical flow and should be changed. Since subcritical flow is the preferred flow regime, this can be accomplished by widening the channel, flattening the side slopes, increasing the Manning s roughness coefficient n, or decreasing the channel slope. Critical depth (D C ) indicates the flow depth for which the specific energy (E) is at a minimum value for a given discharge. Specific energy is computed by the equation: E = D + V2 / (2g) For the example in Figure 1, the specific energy is feet. Using the example in Figure 1, a roughness coefficient value of corresponds to any of several channel linings in Table 1 such as: Bare earth, straight and uniform, short grass Erosion control matting (excelsior mat) Rocky channel, smooth and very uniform Page 3 of 10
4 Best Management Practices Manual Using same geometry as shown in Figure 1 with a grass channel lining instead will yield the following two sets of answers for the same given flow of 36.5 cfs. In general, a conservative design will use unmowed grass to check conveyance and mowed grass to check for velocities. So the design depth would be 2.06 feet and the design velocity would be 3.56 fps. Table 1 Manning s Roughness Coefficient Channels Closed Conduits n Brick Cast-iron pipe Cemented rubble Concrete pipe Corrugated metal pipe, plain, regular corrugations Corrugated metal pipe, asphalt-paved invert, flowing full Closed Conduits n Corrugated metal pipe, asphalt-paved, 50% flow depth Corrugate metal pipe, large corrugations (1 or 2 deep) Plastic pipe, smooth/corrugated (consult manufacturer) PVC pipe Steel pipe Vitrified clay Open Channels n Asphalt pavement Bare earth, straight and uniform, no vegetation Bare earth, straight and uniform, with some short grass Bare earth, winding and sluggish Bare earth, winding and sluggish, with some short grass Brick Cemented rubble Concrete channel, unfinished Concrete channel, troweled Concrete channel, troweled with exposed gravel finish Concrete channel with mortared or riprap sides Concrete gutter, finished and troweled Erosion control matting (excelsior mat or straw netting) Erosion control matting (jute net) Grass Table 3 Gravel or aggregate, compacted Gravel bottom, with weeds on banks Riprap, dumped (n chosen from D50 size) See 5.8 Riprap Riprap, grouted and placed as a smooth uniform channel Rocky channel, smooth and uniform Rocky channel, irregular and winding Weeds and brush, uncut, only on banks Weeds and brush, uncut, across entire channel Page 4 of 10
5 Chattanooga Hamilton County Area Water Quality Programs Grass channels are frequently grouped into categories based upon the retardance that reflects the height and type of vegetation, flow characteristics of channel, etc. The retardance classification taken from Table 3 is then used in Figure 2 to select a Manning s roughness coeffficient based upon the product of velocity, V, and the hydraulic radius, R H. Solving Manning s equation for a grass surface, due to the variable roughness coefficient, is an iterative process for which a spreadsheet may be helpful. Table 2 Manning s Roughness Coefficient Natural Channels Closed Conduits Natural Stream (less than 100 feet wide at flood stage) Clean, straight, no rifts or deep pools, grass banks* Clean, straight, grass with some stones and weeds* Clean, winding, pools and shoals* Clean, winding, pools and shoals, some stones and weeds* * Values may be increased by the largest of the 4 possible adjustments below: 1. Adjust upward by for lower stages or ineffective flow areas 2. Adjust upward by for larger stone and weeds 3. Adjust upward by to for partially submerged trees / branches 4. Adjust upward by to for entire submerged trees in channel Sluggish reaches, deep pools, many weeds Sluggish, many deep pools, full of weeds, heavy timber Mountain stream, gravel and cobbles, with steep banks Mountain stream, cobbles and boulders, with steep banks In general, n values are lower for larger streams because the banks offer less resistance. Usually larger streams have been modeled by government agencies such as TVA, FEMA, or the City of Chattanooga so that some guidance is available on roughness coefficients used. Manning s n values can be substantially different during summer when vegetation may be overgrown and trees contain branches full of leaves. Adjust values upward if stream flow submerges trees and tree branches. Floodplains (adjacent to natural streams) Cleared land with tree stumps Pasture, no brush, short grass Pasture, no brush, high grass Farmland, no crops Farmland, mature crops Heavy weeds, scattered brush Light brush and trees Medium to dense brush Dense brush, thick trees, undergrowth, fallen logs n n Page 5 of 10
6 Best Management Practices Manual Natural streams have constantly varying cross sections and slopes, so that the Manning s equation should be used carefully with the understanding that other factors may affect flow depth. Therefore, the use of Manning s equation for natural streams should only be for rough estimating purposes. Water surface profile programs (such as HEC-2 and HEC-RAS developed by the US Army Corps of Engineers Hydraulic Engineering Center and WSPRO) can handle multiple roughness coefficients, complex geometry, bridges, culverts, flow obstructions, and varied flow values into consideration. Water surface profiles must be prepared by a professional engineer using the best available data. Table 3 Retardance Classifications for Grass Channels Class Type of Vegetation Condition Yellow bluestem ischaemum A Weeping lovegrass Alfalfa Bermudagrass Blue gamma Kudzu B Reed canarygrass Sericea lespedeza Tall fescue Weeping lovegrass Grass mixture #1 Grass mixture #2 Bahiagrass Bermudagrass Centipedegrass C Crabgrass Kentucky bluegrass Redtop Tall fescue Grass mixture #3 Bahiagrass D Bermudagrass Buffalograss Centipedegrass Kentucky bluegrass Red fescue Sericea lespedeza Tall fescue Grass mixture #4 E Bermudagrass Any type of grass Native grass mixture #1 Summer grass mixture #2 Summer grass mixture #3 Excellent stand, tall, 36 average Excellent stand, tall, 30 average Good stand, uncut, 11 Good stand, tall, 12 Good stand, uncut, 13 Very dense growth, uncut Good stand, cut, 12 to 15 Good stand, not woody, tall, 19 Good stand, uncut, 18 Good stand, uncut, 13 Good stand, uncut Good stand, uncut, 20 Good stand, uncut, 6 to 8 Good stand, cut, 6 to 8 Very dense cover, 6 to 8 Fair stand, uncut, 10 and longer Good stand, headed, 8 to 10 Good stand, uncut, 15 to 20 Good stand, cut or uncut, 6 to 8 Good stand, uncut, 6 to 8 Good stand, cut, 3 to 4 Good stand, cut, 2.5 Good stand, uncut, 3 to 6 Good stand, cut, 3 to 4 Good stand, cut, 3 to 4 Good stand, uncut, 12 Good stand, cut, 2 Good stand, cut, 3 to 4 Good stand, uncut, 4 to 5 Good stand, cut, 1.5 Burned or trampled, any length - prairie grasses, bluestem, blue gamma - tall fescue, red fescue, sericea lespedeza - timothygrass, smooth bromegrass or orchardgrass Spring/autumn grass mixture #4 - orchardgrass, redtop, annual lespedeza Page 6 of 10
7 Chattanooga Hamilton County Area Water Quality Programs Grass channels are often designed as a parabolic shape without any corners or slope breaks. The following formulas for cross-sectional flow area (A) and hydraulic radius (R H ) are based on the top width of flow (T) and maximum flow depth at the center of channel (D): A = 2/3 (T D) R H = ( T 2 D) / (1.5 T D 2 ) UNMOWED Retardance B: Q = 36.5 cfs n = D = 2.06 feet A = sq ft W P = feet R H = feet V = 1.94 fps MOWED Retardance D: Q = 36.5 cfs n = D = 1.38 feet A = sq ft W P = feet R H = feet V = 3.56 fps Figure 2 Manning s Roughness Coefficient Grass Channels D E C B A V R H (product of velocity and hydraulic radius) Page 7 of 10
8 Best Management Practices Manual A channel lining may be judged adequate or permissible based on two possible criteria, either permissible shear stress or permissible velocity. Permissible shear stress is based on the force necessary to displace or move the soil, aggregate, or other type of channel lining. The formula for normal shear stress (T) at the bottom of a uniform channel is shown below. This value is adjusted for several factors such as side slope, bend angles, shape of channel, etc., before being compared to published values of permissible shear stress. T = γ D S T = shear stress (pounds per square foot) γ = unit weight of water (62.4 pounds per cubic foot) D = flow depth of water (feet) S = channel slope (feet per foot) The simpler design method is to specify a permissible velocity for each type of channel lining. Typical permissible velocities are listed in Table 4. In general, a temporary channel lining should be considered if the design flow velocity for bare soil is greater than 2 feet per second. For preliminary design, a soil may be considered erodible if it has a published K value of 0.35 or greater in the Hamilton County soils map. Table 4 Permissible Velocities Channel Lining Material Permissible Velocity (fps) Silt or very fine-grained materials 1.5 Fine sand, sandy loam, silty loam 2.0 Undisturbed alluvial sediments 3.5 Stiff clay 3.5 Coarse sand or fine gravel (no silt) 4.0 Coarse gravel 5.0 Cobbles, hard pan, shale 5.5 Erodible Soil (silt, loam, sand) 0-5% 5-10% >10% Bermuda grass Bahia grass, Blue Gamma, Kentucky bluegrass Reed canary grass, Tall fescue Mixture (fescue, lespedeza., legumes) Alfalfa, Crabgrass, Kudzu, Sericea lespedeza Weeping love grass, Yellow bluestem Resistant Soil (gravel, clay, cohesive) Bermuda grass Bahia grass, Blue Gamma, Kentucky bluegrass Reed canarygrass, Tall fescue Mixture (fescue, lespedeza., legumes) Alfalfa, Crabgrass, Kudzu, Sericea lespedeza Weeping love grass, Yellow bluestem Page 8 of 10
9 Chattanooga Hamilton County Area Water Quality Programs Maintenance Limitations References Channel linings should be inspected at least weekly during the construction phases to ensure proper functioning and necessary control of erosion and sediment. Inspect channels monthly during the first year after construction to verify that drainage channels work properly as designed and constructed. After the first year, channel linings should be inspected at least quarterly on a permanent basis. Look for erosion, siltation, undercutting or settlement throughout the length of channel. Verify that upstream and downstream portions of channel are not adversely affected. Flexible channel linings need frequent maintenance and inspections to ensure adequate function and erosion control. Soft channel linings can be damaged or stressed due to many factors. Rigid permanent channel linings often result in prevention of habitat establishment. Hard linings may be damaged due to settlement, scour or undercutting despite the best efforts and care taken during installation. Inadequate coverage or depth of channel linings will result in erosion, washout, and poor plant establishment. If the channel grade and liner are not appropriate for the amount of runoff, channel bottom erosion may result. Riprap must be sized correctly and installed according to correct procedures. If the channel slope is too steep or riprap is too small, displacement may occur. Displaced riprap may obstruct channel or cause additional damage (see Section 5.8 Riprap). California Department of Transportation Caltrans Highway Design Manual. Charlotte (City of), and Mecklenburg County. July Charlotte Mecklenburg Storm Water Design Manual. Georgia State Soil and Water Conservation Commission (SSWCC) Manual for Erosion and Sediment Control in Georgia. Fifth Edition. Kentucky Transportation Cabinet. January Drainage Guidance Manual. North Carolina Sediment Control Commission. September Erosion and Sediment Control Planning and Design Manual. Smoot, James and Russell Smith. December Soil Erosion Prevention & Sediment Control. University of Tennessee, Department of Civil & Environmental Engineering. United States Bureau of Public Roads. August Design Charts for Open-Channel Flow, Hydraulic Design Series No. 3. United States Bureau of Public Roads. May Design of Roadside Drainage Channels, Hydraulic Design Series No. 4. University of Tennessee Department of Civil and Environmental Engineering. August Soil Erosion Prevention and Sediment Control - Reducing Nonpoint Source Water Pollution on Construction Sites. Virginia, Department of Conservation and Recreation, Division of Soil and Water Conservation Virginia Erosion and Sedimentation Control Handbook, Third Edition. Page 9 of 10
10 Best Management Practices Manual Photos 1-2 An Application of Soft or Green Channel Lining Page 10 of 10
CHAPTER 5 OPEN CHANNEL HYDROLOGY
5.4 Uniform Flow Calculations 5.4.1 Design Charts CHAPTER 5 OPEN CHANNEL HYDROLOGY Following is a discussion of the equations that can be used for the design and analysis of open channel flow. The Federal
More informationOpen Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow
Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationModule 112. Open Channel Hydraulics.EDC National Employee Development Center. Engineering Hydrology Training Series
Module 112 Open Channel Hydraulics.EDC National Employee Development Center Engineering Hydrology Training Series Module 112-0pen Channel Hydraulics Module Description Overview This module provides background
More information2O-1 Channel Types and Structures
Iowa Stormwater Management Manual O-1 O-1 Channel Types and Structures A. Introduction The flow of water in an open channel is a common event in Iowa, whether in a natural channel or an artificial channel.
More informationTravel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
More informationTopic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More information2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
More informationRIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
More informationOpen Channel Flow in Aquaculture
SRAC Publication No. 74 Southern Regional Aquaculture Center March 1995 PR VI Open Channel Flow in Aquaculture J. David Bankston, Jr. 1 and Fred Eugene Baker Open channel flow of water has been used in
More informationDesign Charts for Open-Channel Flow HDS 3 August 1961
Design Charts for Open-Channel Flow HDS 3 August 1961 Welcome to HDS 3-Design Charts for Open-Channel Flow Table of Contents Preface DISCLAIMER: During the editing of this manual for conversion to an electronic
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationBasic Hydrology. Time of Concentration Methodology
Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationCHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow
CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented
More informationMODULE 3 OPEN CHANNEL DESIGN. Wetted parameter Cross-sectional area. Introduction
MODULE 3 OPEN CHANNEL DESIGN Introduction An open channel is defined as any conveyance system where a liquid is moved under the influence of gravity in the presence of an air-water interface. Open channel
More informationA perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
More informationRiprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
More informationCHAPTER 860 OPEN CHANNELS
HIGHWAY DESIGN MANUAL 860-1 CHAPTER 860 OPEN CHANNELS Topic 861 - General Index 861.1 - Introduction An open channel is a conveyance in which water flows with a free surface. Although closed conduits such
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationAppendix 4-C. Open Channel Theory
4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient
More informationChapter 9. Steady Flow in Open channels
Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows
More informationSTATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL. OFFICE OF DESIGN, DRAINAGE SECTION November 2009 TALLAHASSEE, FLORIDA
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL OFFICE OF DESIGN, DRAINAGE SECTION TALLAHASSEE, FLORIDA Table of Contents Open Channel Handbook Chapter 1 Introduction... 1
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationChapter 7 Ditches and Channels
Chapter 7 Ditches and Channels TABLE OF CONTENTS CHAPTER 7 - DITCHES AND CHANNELS... 7-1 7.1 Introduction... 7-1 7.2 Design Policy... 7-2 7.2.1 Federal Policy... 7-2 7.2.2 Commonwealth of Virginia Policy...
More informationBRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationSE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
More informationSTORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
More informationCHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More informationCHAPTER 5 STORMWATER DRAINAGE SYSTEM DESIGN. Table of Contents SECTION 5.1 STORMWATER DRAINAGE DESIGN OVERVIEW
CHAPTER 5 STORMWATER DRAINAGE SYSTEM DESIGN Table of Contents SECTION 5.1 STORMWATER DRAINAGE DESIGN OVERVIEW 5.1.1 Stormwater Drainage System Design...5-1 5.1.1.1 Introduction...5-1 5.1.1.2 Drainage System
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationGuo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December,
Guo, James C.. (004). esign of Urban Channel rop Structure, J. of Flood azards News, ecember, Guo, James C.., (009) Grade Control for Urban Channel esign, submitted to Elsevier Science, J. of ydro-environmental
More informationStorm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More information3. Design Procedures. Design Procedures. Introduction
Design Procedures 3. Design Procedures Introduction This chapter presents a procedure for the design of natural channels. The chapter primarily focuses on those physical properties of the channel required
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More information1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal
Lecture 21 Culvert Design & Analysis Much of the following is based on the USBR publication: Design of Small Canal Structures (1978) I. Cross-Drainage Structures Cross-drainage is required when a canal
More informationSUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
More informationRural Flooding: The Potential Role of Forestry
Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland
More informationWhat is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)
OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure
More informationCHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
More informationDESIGN COEFFICIENT TABLES
DESIGN COEFFICIENT TABLES Hazen-Williams Friction Factor (C) Pipe Material Values for C Range Average Value Typical Design Value High/Low Plastic, PVC, Polyethylene 160/150 150-155 150 pipe or tubing Cement
More informationGuidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
More informationUnderground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationSECTION 5 - STORM DRAINS
Drainage Criteria Manual SECTION 5 - STORM DRAINS 5.1.0 GENERAL This The purpose of this section discusses briefly is to consider the hydraulic aspects of storm drains and their appurtenances in a storm
More informationBMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
More informationPRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
More informationDANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT
DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in
More informationURBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
More informationHomeowner s Guide to Drainage
Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationVarious options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.
Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More information3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
More informationColdwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
More informationCatchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk
Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects
More informationLow Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
More informationSTORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
More informationNeversink River East Branch
Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station
More informationRational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:
Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage
More informationCompost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
More informationFIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE
FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE Author: Audrey G. Beaulac, P.E., CPSWQ Company: (Hoyle, Tanner), Manchester, New Hampshire INTRODUCTION In early July 2013, 2 inches of rain fell
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationNote: first and second stops will be reversed. Bring clothing and shoes suitable for walking on rough ground.
Open Channel Page 1 Intro check on laboratory results Field Trip Note: first and second stops will be reversed Irrigation and Drainage Field Trip Bring clothing and shoes suitable for walking on rough
More informationGREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
More informationSmall Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationLocal Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationSeattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual
Seattle Public Utilities Natural Drainage Systems (NDS) Maintenance Manual 1 Revision Date: December 2007 2 Table of Contents I. Overview... 4 II. How to Use This Manual... 4 III. NDS Contacts... 4 List
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationEnvironmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
More informationSECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
More informationExperiment (13): Flow channel
Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and
More informationAPPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
More informationESTIMATING DISCHARGE AND STREAM FLOWS
ESTIMATING DISCHARGE AND STREAM FLOWS A Guide for Sand and Gravel Operators Prepared by: Joy P. Michaud and Marlies Wierenga, EnviroVision Art and design by: S. Noel, Noel Design, LLC July 2005 Ecology
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationThe Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
More informationPermeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
More informationM6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy)
M6a: Open Channel Flow (, Partially Flowing Pipes, and Specific Energy) Steady Non-Uniform Flow in an Open Channel Robert Pitt University of Alabama and Shirley Clark Penn State - Harrisburg Continuity
More information1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
More informationEvaluation of Open Channel Flow Equations. Introduction :
Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).
More informationCHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
More informationOPEN-CHANNEL FLOW. Free surface. P atm
OPEN-CHANNEL FLOW Open-channel flow is a flow of liquid (basically water) in a conduit with a free surface. That is a surface on which pressure is equal to local atmospheric pressure. P atm Free surface
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationCrossing creeks Stream crossings on farms
Crossing creeks Stream crossings on farms Looking after all our water needs Crossing creeks Stream crossings on farms Looking after all our water needs Department of Water 168 St Georges Terrace Perth
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationHow To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationDRAINAGE CRITERIA MANUAL (V. 2) CULVERTS CONTENTS
DRAINAGE CRITERIA MANUAL (V. 2) CONTENTS Section Page CU 1.0 INTRODUCTION AND OVERVIEW... 1 1.1 Required Design Information... 3 1.1.1 Discharge... 4 1.1.2 Headwater... 4 1.1.3 Tailwater... 5 1.1.4 Outlet
More information2011 HYDRAULICS MANUAL
STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following
More informationStorm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of