Size: px
Start display at page:

Download ""

Transcription

1

2

3

4

5

6

7

8

9

10

11

12

13 Department of Immigration and Citizenship Service Fee Forecast and Comparison for Wickham Point Immigration Detention Centre March 2011

14 1. Introduction The Department of Immigration and Citizenship (the Department) has a plan for a new immigration detention centre (the Centre) at Wickham Point in Darwin. The Centre will be privately leased and is expected to accommodate 1,500 beds at its full capacity. The Department currently has existing contractual arrangements with Serco (Australia) Pty Ltd (Serco) for the provision of a range of services for the immigration detention centres around Australia. The services include: People in Detention Services Facilities Management and Support Services Business Services Security Services Transport and Escort Service. The contract also provides for the pass through/mark-up of certain identified costs The Department has received an offer from the Centre s prospective lessor (Foxy) to provide some of the services currently managed by Serco for the other detention facilities. The services offered by Foxy comprise the majority (but not all) of the services specified under the Schedule of the DIAC Contract with Serco for the provision of Facilities Management and Support Services as well as a number of services provided under the Pass Through/Mark-up Costs arrangements. PricewaterhouseCoopers (PwC) has been requested to undertake a comparative analysis of pricing offered by Foxy against comparable services offered by Serco at other Immigration Detention Centres to assist the Department in determining whether the offer represents value for money. 2. Executive summary s 47C(1) Our assessment of the fees for maintenance services provided by Serco at Northern IDC and Curtin IDC suggests that the comparable services have been provided at between per head per day. The estimated fees for the comparable services per annum based on these rates are between. Foxy s quote is fixed at per head per day or per annum at the Centre s full capacity. There are a number of external factors which significantly limit the conclusions that can be drawn from this comparative analysis. 2 February 2011

15 3. Purpose This paper has been prepared to assist the Department in making a decision as to whether the offer by Foxy for the provision of maintenance services at Wickham Point IDC represents value for money. This paper is not intended for general circulation or distribution, nor is it to be reproduced or used for any purpose other than as outlined above, without our written consent in each specific instance. We do not assume any responsibility for liability for any losses suffered as a result of the circulation, publication, reproduction or other use of this paper contrary to the provisions of this paragraph. We reserve the right to review and amend all opinion included or referred to in this paper and, if we consider it necessary, to revise such in the light of any information which becomes known to us after the date of the paper or if additional sources of information, not referred to Sources of information contained in the paper, are provided to us. We have not verified any of the information presented to us nor done anything in the nature of an audit of the information given to us. Consequently, we express no opinion on the reliability or completeness of the information supplied to us and upon which our paper is based. 4. Our approach We have taken the following steps to undertake this analysis:- Reviewed the offer by Foxy for the provision of maintenance services at Wickham Point IDC; Reviewed the scope of work and associated pricing tables set out in schedule 5 of the Detention Services Contract between DIAC and Serco for the provision of services at Northern IDC; Reviewed the scope of work and associated pricing tables proposed by Serco for provision of services at Curtin IDC; Reviewed the actual fees rendered for NIDC and CIDC from July 2010 to February 2011 including fixed, variable and pass through/mark-up costs under each service requirement Undertook a comparison of the maintenance services offered by Foxy against those set out under Schedule of the Detention Services Contract between DIAC and Serco to identify the comparable range of services delivered at those sites; Identified the cost of delivering the comparable range of services at full capacity at Curtin IDC (1,200 People in Detention) and Northern IDC (546 People in Detention); Extrapolated, on a pro-rata basis, the cost of delivering comparable services at Curtin IDC and Northern IDC to estimate an indicative cost of delivering the comparable services at Wickham Point IDC at full capacity (1,500 People in Detention) Compared the indicative cost of delivering comparable services at Wickham Point IDC at full capacity against the offered cost by Foxy. 3 February 2011

16 The following factors need to be taken into account in conjunction with the calculations provided in this paper. The cost forecasts under the Serco arrangement have been calculated based on a simple pro rata basis, as no other alternative mechanism appears to exist to predict the future variables and pass through/mark-up costs that are unique for the Centre. The variables and the pass through/mark-up costs fluctuate significantly. Accordingly the pro rata based estimates may not represent the actual service fees under such categories. All dollar figures in the paper are inclusive of GST unless otherwise specified. 5. Limitation We note that there are a range of factors which impact significantly on the conclusions that can be drawn from the comparative analysis of the Foxy offer against the cost of delivering comparable services under the existing Serco contract: The fee for the provision of facilities management services at existing sites under the Detention Services Contract between DIAC and Serco is part of a holistic fee for the provision of a range of costs. Whilst the pricing tables at Schedule 5 allocate a portion of these costs for the delivery of maintenance services, these are not necessarily indicative of the actual costs to Serco in delivering maintenance services as a stand alone service; The Detention Services Contract between DIAC and Serco is very complex, particularly in terms of the statement of works, the volume of requirements and the standard of services required. Whilst the Foxy offer comprises a range of similar services, it is not clear to what extent this will involve performance of the detailed requirements and service standards as are included in the Detention Services Contract. Definition of the exact scope of services and performance standards is likely to impact significantly on the cost of delivering the services. Serco s costing mechanism and the fees schedules contained in the contracts are not necessarily indicative of the actual service fees that are going to be charged to the Department. The actual service fees are heavily driven by the variables and the pass through costs that undermine the certainty of the actual service fees. Unique circumstances exist at each of the various sites for which appropriate assumptions may be required. For example, service delivery at Curtin IDC is based on a remote model with labour costs based on a casual workforce operating on a fly-in, fly-out basis which impacts significantly on the overall cost of delivering services at this site. The impacts of such assumptions are not easily quantifiable and are not reflected in the comparative assessment that has been undertaken. The pricing model for delivery of maintenance services at NIDC was developed as part of a holistic model for delivery of services across the entire Detention Services Network. Accordingly there are limitations in the conclusions that can be drawn regarding the cost of delivering maintenance services at NIDC as a stand alone facility. Foxy s quote is fixed on a per head basis and does not include a detailed breakdown of individual cost items or underlying assumptions. Due to limited degree of information, it is impractical to compare Foxy s quote directly to the Serco s costs for other facilities. 4 February 2011

17 The pricing model for delivery of services by Serco at CIDC has been proposed by Serco but is yet to be accepted by the Department. The service fee has been paid in accordance with this model as an interim arrangement whilst contract variation negotiations progress, however the pricing proposal is yet to be formally accepted by DIAC or assessed as representing value for money. 6. Sources of information Monthly tax invoices from July 2010 to February 2011 for the Northern Immigration Detention Centre. Monthly tax invoices from July 2010 to February 2011 for the Curtin Immigration Detention Centre. s 22(1)(a)(ii) s 22(1)(a)(ii) from to dated 24 February Serco Detention Services Contract Immigration Detention Centres Volume Foxy offer Foxy s quote is per head per day or per annum at the full capacity (1,500 persons) and includes the following services:- Management of assets; Maintenance of assets; Catering food and labour (including over-time); Cleaning all areas including clients; Linen service; Rubbish removal; Water and sewerage; Electricity and gas; Telecommunication (installation only, usage still to be met by the Department); Staff transport; Insurance; Environmental management; and Occupational Health and Safety (OH&S). It does NOT include:- 5 February 2011

18 Malicious damage; or Security or emergency management The following table outlines the service lines provided by Serco for other detention centres and the comparable services offered by Foxy. Foxy offer appears to include the items marked with. The marked items have been selected by description and may not necessarily comparable to the services that are contained the contract with Serco. In particular, it is unclear whether the offer by Foxy includes a commitment to provide the required services in accordance with the detailed requirements and service standards as prescribed under the Detention Services Contract between DIAC and Serco. Services People in Detention Services Well-Being of People in Detention Reception, Transfer, Accommodation and Discharge of People in Detention Individual Management Property of People in Detention Facility Management and Support Management of Assets Maintenance of Assets Centre Security and Emergency System Catering Cleaning Services (Admin only) Environment Management Occupational Health and Safety (OH&S) Management of Emergencies Business Services Business Services Plan Human Resource Management Alternative Detention Contract and Relationship Management Records Management Information Technology Requirements Incident Management Business Continuity Reporting of Service Delivery Quality Management and Continuous Improvement Stores Security Services Delivery of Security Services Entry Control Centre Security Transport and Escort Services Transport Escort Included 6 February 2011

19 Pass Through/Mark-up Costs Scheduled Maintenance Ground and Infrastructure Maintenance Alternative Detention Disbursements (Linen, Cleaning, etc.) Utilities Capital Works Loose Asset Purchases Additional Storage 8. History of Serco s service fees - NIDC The service fees charged for NIDC from July 2010 to February 2011 are outlined below. The items are the service requirements Foxy has proposed to provide which are relevant for the comparison further discussed below. Services Comparison Fixed Variable PTC Total People in Detention Services Well-Being of People in Detention Reception, Transfer, Accommodation Individual Management Property of People in Detention Facility Management and Support Management of Assets Maintenance of Assets Centre Security and Emergency Sys Catering Cleaning Services (Admin only) Environment Management Occupational Health and Safety Management of Emergencies Business Services Business Services Plan Human Resource Management Alternative Detention Contract and Relationship Mgt Records Management Information Technology Requirement Incident Management Business Continuity Reporting of Service Delivery Quality Mgt and Continuous Imp 7 February 2011

20 Services Comparison Fixed Variable PTC Total Stores Security Services Delivery of Security Services Entry Control Centre Security Transport and Escort Services Transport Escort Pass Through/Mark-up Costs Scheduled Maintenance Ground and Infrastructure Alternative Detention Disbursements (Linen, Cleaning, etc.) Utilities Capital Works Loose Asset Purchases Additional Storage Total Total Not GRAND TOTAL 9. History of Serco s service fees - CIDC The service fees charged for CIDC from July 2010 to February 2011 are also outlined below. Services Comparison Fixed Variable PTC Total People in Detention Services Well-Being of People in Detention Reception, Transfer, Accommodation Individual Management Property of People in Detention Facility Management and Support Management of Assets Maintenance of Assets Centre Security and Emergency Sys Catering Cleaning Services (Admin only) Environment Management Occupational Health and Safety 8 February 2011

21 Services Comparison Fixed Variable PTC Total Management of Emergencies Business Services Business Services Plan Human Resource Management Alternative Detention Contract and Relationship Mgt Records Management Information Technology Requirement Incident Management Business Continuity Reporting of Service Delivery Quality Mgt and Continuous Imp Stores Security Services Delivery of Security Services Entry Control Centre Security Transport and Escort Services Transport Escort Pass Through/Mark-up Costs Scheduled Maintenance Ground and Infrastructure Alternative Detention Disbursements (Linen, Cleaning, etc.) Utilities Capital Works Loose Asset Purchases Additional Storage Total Total Not GRAND TOTAL 10. Cost forecast based on service history NIDC can accommodate 546 persons at it full capacity. Where NIDC was run at its fully capacity, the average rate per head per day charged for the period from July 2010 to February 2011 and the estimated fee per annum for the services are outlined per below. 9 February 2011

22 CIDC can accommodate 1,200 persons at it full capacity. Where CIDC was run at its fully capacity, the average rate per head per day charged for the period from July 2010 to February 2011 and the estimated fee per annum for the services are outlined per below. 11. Comparison The table below provides a comparison, based on the Foxy s fixed quote and the estimates from s 47C(1) the Serco s fee history outlined above. 12. Additional information required As outlined above under Limitation, there are significant limitations in the conclusions that can be drawn from a comparative assessment of the Foxy offer against the cost of delivering similar services by Serco at other Immigration Detention Centres. i In order to facilitate a more comprehensive assessment of value for money, DIAC may wish to consider one or more of the following options: Obtain from Foxy a detailed breakdown of individual cost items and underlying assumptions. This would allow an assessment of the reasonableness of assumptions 10 February 2011

23 proposed by Foxy in the development of its pricing proposal and also how this compares to what Serco is required to fulfil under its existing arrangements. Request Serco to provide an offer for the provision of maintenance services as part of its broader delivery of services at Wickham Point IDC so as to allow for a more directly comparable assessment of the offer between the two potential providers. Request the provision of an offer for the delivery of maintenance services at Wickham Point IDC from other potential providers through an open market or direct tender process so as to allow for a comprehensive assessment of the market value of the requested services 11 February 2011

24 Department of Immigration and Citizenship Service Fee Forecast and Comparison for Wickham Point Immigration Detention Centre May 2011

25 1. Introduction The Department of Immigration and Citizenship (the Department) has a plan for a new immigration detention centre (the Centre) at Wickham Point in Darwin. The Centre will be privately leased and is expected to accommodate 1,500 beds at its full capacity. The Department currently has existing contractual arrangements with Serco (Australia) Pty Ltd (Serco) for the provision of a range of services for the immigration detention centres around Australia. The services include: People in Detention Services Facilities Management and Support Services Business Services Security Services Transport and Escort Service. The contract also provides for the pass through/mark-up of certain identified costs The Department has received an offer from the Centre s prospective lessor (Foxy) to provide some of the services currently managed by Serco for the other detention facilities. The services offered by Foxy comprise the majority (but not all) of the services specified under the Schedule of the DIAC Contract with Serco for the provision of Facilities Management and Support Services as well as a number of services provided under the Pass Through/Mark-up Costs arrangements. PricewaterhouseCoopers (PwC) has been requested to undertake a comparative analysis of pricing offered by Foxy against comparable services offered by Serco at other Immigration Detention Centres to assist the Department in determining whether the offer represents value for money. 2. Executive summary s 47C(1) Our assessment of the fees for maintenance services provided by Serco at Northern IDC and Curtin IDC suggests that the comparable services have been provided at between per head per day. The estimated fees for the comparable services per annum based on these rates are between Foxy s quote is fixed at per head per day or per annum at the Centre s full capacity. 2 May 2011

26 3. Purpose This paper has been prepared to assist the Department in making a decision as to whether the offer by Foxy for the provision of maintenance services at Wickham Point IDC represents value for money. This paper is not intended for general circulation or distribution, nor is it to be reproduced or used for any purpose other than as outlined above, without our written consent in each specific instance. We do not assume any responsibility for liability for any losses suffered as a result of the circulation, publication, reproduction or other use of this paper contrary to the provisions of this paragraph. We reserve the right to review and amend all opinion included or referred to in this paper and, if we consider it necessary, to revise such in the light of any information which becomes known to us after the date of the paper or if additional sources of information, not referred to Sources of information contained in the paper, are provided to us. We have not verified any of the information presented to us nor done anything in the nature of an audit of the information given to us. Consequently, we express no opinion on the reliability or completeness of the information supplied to us and upon which our paper is based. 4. Our approach We have taken the following steps to undertake this analysis:- Reviewed the offer by Foxy for the provision of maintenance services at Wickham Point IDC; Reviewed the scope of work and associated pricing tables set out in schedule 5 of the Detention Services Contract between DIAC and Serco for the provision of services at Northern IDC; Reviewed the scope of work and associated pricing tables proposed by Serco for provision of services at Curtin IDC; Reviewed the actual fees rendered for NIDC and CIDC from July 2010 to February 2011 including fixed, variable and pass through/mark-up costs under each service requirement Undertook a comparison of the maintenance services offered by Foxy against those set out under Schedule of the Detention Services Contract between DIAC and Serco to identify the comparable range of services delivered at those sites; Identified the cost of delivering the comparable range of services at full capacity at Curtin IDC (1,200 People in Detention) and Northern IDC (546 People in Detention); Extrapolated, on a pro-rata basis, the cost of delivering comparable services at Curtin IDC and Northern IDC to estimate an indicative cost of delivering the comparable services at Wickham Point IDC at full capacity (1,500 People in Detention) Compared the indicative cost of delivering comparable services at Wickham Point IDC at full capacity against the offered cost by Foxy. The following factors need to be taken into account in conjunction with the calculations provided in this paper. 3 May 2011

27 The cost forecasts under the Serco arrangement have been calculated based on a simple pro rata basis, as no other alternative mechanism appears to exist to predict the future variables and pass through/mark-up costs that are unique for the Centre. The variables and the pass through/mark-up costs fluctuate significantly. Accordingly the pro rata based estimates may not represent the actual service fees under such categories. All dollar figures in the paper are inclusive of GST unless otherwise specified. 5. Limitation We note that there are a range of factors which impact significantly on the conclusions that can be drawn from the comparative analysis of the Foxy offer against the cost of delivering comparable services under the existing Serco contract: The fee for the provision of facilities management services at existing sites under the Detention Services Contract between DIAC and Serco is part of a holistic fee for the provision of a range of services. Whilst the pricing tables at Schedule 5 allocate a portion of these costs for the delivery of maintenance services, these are not necessarily indicative of the actual costs to Serco in delivering maintenance services as a stand alone service; The Detention Services Contract between DIAC and Serco is very complex, particularly in terms of the statement of works, the volume of requirements and the standard of services required. Whilst the Foxy offer comprises a range of similar services, it is not clear to what extent this will involve performance of the detailed requirements and service standards as are included in the Detention Services Contract. Definition of the exact scope of services and performance standards is likely to impact significantly on the cost of delivering the services. Serco s costing mechanism and the fees schedules contained in the contracts are not necessarily indicative of the actual service fees that are going to be charged to the Department. The actual service fees are heavily driven by the variables and the pass through costs that undermine the certainty of the actual service fees. Unique circumstances exist at each of the various sites for which sensible assumptions may be required. For example, service delivery at Curtin IDC is based on a remote model with labour costs based on a casual workforce operating on a fly-in, fly-out basis which impacts significantly on the overall cost of delivering services at these sites. The impacts of such assumptions are not easily quantifiable and are not reflected in the comparative assessment that has been undertaken. The pricing model for delivery of maintenance services at NIDC was developed as part of a holistic model for delivery of services across the entire Detention Services Network. Accordingly there are limitations in the conclusions that can be drawn regarding the cost of delivering maintenance services at NIDC as a stand alone facility. The pricing model for delivery of services by Serco at CIDC has been proposed by Serco but is yet to be accepted by the Department. The service fee has been paid in accordance with this model as an interim arrangement whilst contract variation negotiations progress, however the pricing proposal is yet to be formally accepted by DIAC or assessed as representing value for money. 4 May 2011

28 Foxy s quote is fixed on a per head basis and does not include a detailed breakdown of individual cost items or underlying assumptions. Due to limited degree of information, it is impractical to compare Foxy s quote directly to the Serco s costs for other facilities. 6. Sources of information Monthly tax invoices from July 2010 to February 2011 for the Northern Immigration Detention Centre. Monthly tax invoices from July 2010 to February 2011 for the Curtin Immigration Detention Centre. s 22(1)(a)(ii) s 22(1)(a)(ii) from to dated 24 February Serco Detention Services Contract Immigration Detention Centres Volume Foxy offer Foxy s quote is per head per day or per annum at the full capacity (1,500 persons) and includes the following services:- Management of assets; Maintenance of assets; Catering food and labour (including over-time); Cleaning all areas including clients; Linen service; Rubbish removal; Water and sewerage; Electricity and gas; Telecommunication (installation only, usage still to be met by the Department); Staff transport; Insurance; Environmental management; and Occupational Health and Safety (OH&S). It does NOT include:- Malicious damage; or Security or emergency management 5 May 2011

29 The following table outlines the service lines provided by Serco for other detention centres and the comparable services offered by Foxy. Foxy offer appears to include the items marked with. The marked items have been selected by description and may not necessarily comparable to the services that are contained the contract with Serco. In particular, it is unclear whether the offer by Foxy includes a commitment to provide the required services in accordance with the detailed requirements and service standards as prescribed under the Detention Services Contract between DIAC and Serco. Services People in Detention Services Well-Being of People in Detention Reception, Transfer, Accommodation and Discharge of People in Detention Individual Management Property of People in Detention Facility Management and Support Management of Assets Maintenance of Assets Centre Security and Emergency System Catering Cleaning Services (Admin only) Environment Management Occupational Health and Safety (OH&S) Management of Emergencies Business Services Business Services Plan Human Resource Management Alternative Detention Contract and Relationship Management Records Management Information Technology Requirements Incident Management Business Continuity Reporting of Service Delivery Quality Management and Continuous Improvement Stores Security Services Delivery of Security Services Entry Control Centre Security Transport and Escort Services Transport Escort Pass Through/Mark-up Costs Scheduled Maintenance Ground and Infrastructure Maintenance Included 6 May 2011

30 Alternative Detention Disbursements (Linen, Cleaning, etc.) Utilities Capital Works Loose Asset Purchases Additional Storage 8. History of Serco s service fees - NIDC The service fees charged for NIDC from July 2010 to February 2011 are outlined below. The items are the service requirements Foxy has proposed to provide which are relevant for the comparison further discussed below. Services Comparison Fixed Variable PTC Total People in Detention Services Well-Being of People in Detention Reception, Transfer, Accommodation Individual Management Property of People in Detention Facility Management and Support Management of Assets Maintenance of Assets Centre Security and Emergency Sys Catering Cleaning Services (Admin only) Environment Management Occupational Health and Safety Management of Emergencies Business Services Business Services Plan Human Resource Management Alternative Detention Contract and Relationship Mgt Records Management Information Technology Requirement Incident Management Business Continuity Reporting of Service Delivery Quality Mgt and Continuous Imp Stores Security Services Delivery of Security Services Entry Control 7 May 2011

31 Centre Security Transport and Escort Services Transport Escort Pass Through/Mark-up Costs Scheduled Maintenance Ground and Infrastructure Alternative Detention Disbursements (Linen, Cleaning, etc.) Utilities Capital Works Loose Asset Purchases Additional Storage Total Total Not GRAND TOTAL 9. History of Serco s service fees - CIDC The service fees charged for CIDC from July 2010 to February 2011 are also outlined below. Services Comparison Fixed Variable PTC Total People in Detention Services Well-Being of People in Detention Reception, Transfer, Accommodation Individual Management Property of People in Detention Facility Management and Support Management of Assets Maintenance of Assets Centre Security and Emergency Sys Catering Cleaning Services (Admin only) Environment Management Occupational Health and Safety Management of Emergencies Business Services Business Services Plan Human Resource Management Alternative Detention 8 May 2011

32 Contract and Relationship Mgt Records Management Information Technology Requirement Incident Management Business Continuity Reporting of Service Delivery Quality Mgt and Continuous Imp Stores Security Services Delivery of Security Services Entry Control Centre Security Transport and Escort Services Transport Escort Pass Through/Mark-up Costs Scheduled Maintenance Ground and Infrastructure Alternative Detention Disbursements (Linen, Cleaning, etc.) Utilities Capital Works Loose Asset Purchases Additional Storage Total Total Not GRAND TOTAL 10. Cost forecast based on service history NIDC can accommodate 546 persons at it full capacity. Where NIDC was run at its fully capacity, the average rate per head per day charged for the period from July 2010 to February 2011 and the estimated fee per annum for the services are outlined per below. 9 May 2011

33 CIDC can accommodate 1,200 persons at it full capacity. Where CIDC was run at its fully capacity, the average rate per head per day charged for the period from July 2010 to February 2011 and the estimated fee per annum for the services are outlined per below. 11. Comparison The table below provides a comparison, based on the Foxy s fixed quote and the estimates from s 47C(1) the Serco s fee history outlined above. 12. Additional information required As outlined above under Limitation, there are significant limitations in the conclusions that can be drawn from a comparative assessment of the Foxy offer against the cost of delivering similar services by Serco at other Immigration Detention Centres. In order to facilitate a more comprehensive assessment of value for money, DIAC may wish to consider one or more of the following options: Obtain from Foxy a detailed breakdown of individual cost items and underlying assumptions. This would allow an assessment of the reasonableness of assumptions proposed by Foxy in the development of its pricing proposal. Request Serco to provide an offer for the provision of maintenance services as part of its broader delivery of services at Wickham Point IDC so as to allow for a more directly comparable assessment of the offer between the two potential providers. Request the provision of an offer for the delivery of maintenance services at Wickham Point IDC from other potential providers through an open market or direct tender process so as to allow for a comprehensive assessment of the market value of the requested services 10 May 2011

34 11 May 2011

Individual Management Services Provided to People in Immigration Detention

Individual Management Services Provided to People in Immigration Detention The Auditor-General Audit Report No.21 2012 13 Performance Audit Individual Management Services Provided to People in Immigration Detention Department of Immigration and Citizenship Australian National

More information

Energy Procurement Practice Guide

Energy Procurement Practice Guide Carbonproof Energy Procurement Practice Guide The material provided in this guide has been produced in conjunction with our partner Energetics Pty Ltd. 2011 Energetics Pty Ltd and AgriFood Skills Australia.

More information

APES 230 Financial Planning Services

APES 230 Financial Planning Services APES 230 Financial Planning Services Prepared and issued by Accounting Professional & Ethical Standards Board Limited ISSUED: April 2013 Copyright 2013 Accounting Professional & Ethical Standards Board

More information

IN THE COURT OF QUEEN S BENCH OF ALBERTA JUDICIAL DISTRICT OF CALGARY

IN THE COURT OF QUEEN S BENCH OF ALBERTA JUDICIAL DISTRICT OF CALGARY Action No. 0901-18786 IN THE COURT OF QUEEN S BENCH OF ALBERTA JUDICIAL DISTRICT OF CALGARY IN THE MATTER OF THE COMPANIES CREDITORS ARRANGMENT ACT, R.S.C. 1985, c. C-36, AS AMENDED AND IN THE MATTER OF

More information

Project Management Competency Standards

Project Management Competency Standards BSB01 Business Services Training Package Project Management Competency Standards CONTENTS BSBPM401A Apply scope management techniques...3 BSBPM402A Apply time management techniques...8 BSBPM403A Apply

More information

Subclass 457: Health Insurance Standard Template Letter

Subclass 457: Health Insurance Standard Template Letter Subclass 457: Health Insurance Standard Template Letter On behalf of , I certify that the following person(s)

More information

STATEMENT 3.340 AUDITING GUIDELINE PROSPECTUSES AND THE REPORTING ACCOUNTANT

STATEMENT 3.340 AUDITING GUIDELINE PROSPECTUSES AND THE REPORTING ACCOUNTANT The guidance on reports on working capital requirements (paragraphs 67 to 71) and reports on borrowings (paragraphs 72 to 75) in this AG 3.340 is applicable for engagements where the investment circular

More information

ARTWORK COMMISSION AGREEMENT

ARTWORK COMMISSION AGREEMENT ARTWORK COMMISSION AGREEMENT THIS AGREEMENT is made the day of in the year BETWEEN the Minister for Works of Level 6, 16 Parkland Road, Osborne Park, WA 6017 being the body corporate created under Section

More information

MEDIATORS DECLARATION PEACEWISE MASTER POLICY

MEDIATORS DECLARATION PEACEWISE MASTER POLICY Marsh Pty Ltd ABN 86004651512 PO Box H176 AUSTRALIA SQUARE NSW 1215 PROFESSIONAL INDEMNITY INSURANCE MEDIATORS DECLARATION PEACEWISE MASTER POLICY Professional Indemnity Declaration for Mediators who have

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy October 2014 1 October 2014 Contents: Introduction 1. STATEMENT OF INTENT AND POLICY OBJECTIVES 2. RESPONSIBILITIES AND ACCOUNTABILITIES FOR HEALTH AND SAFETY 2.1 The Director

More information

WATER AND SEWERAGE FINANCIAL MANAGEMENT PLANNING

WATER AND SEWERAGE FINANCIAL MANAGEMENT PLANNING WATER AND SEWERAGE FINANCIAL MANAGEMENT PLANNING ABSTRACT Chris Adam, Cardno MBK (Qld) Pty Ltd In recent years, the utilities industries have been subject to far greater commercial scrutiny than ever before.

More information

PROPERTY MANAGEMENT AGREEMENT

PROPERTY MANAGEMENT AGREEMENT Harris Real Estate (Rentals) Pty Ltd T/A Level 1 134 Fullarton Road ROSE PARK SA SA 5067 Tel: 08 8334 2700 Fax: 08 8334 2727 email: reception@harrispm.com.au 1/7/2013 / Lawsoft Pty Ltd PROPERTY MANAGEMENT

More information

Auditing Standard ASA 520 Analytical Procedures

Auditing Standard ASA 520 Analytical Procedures ASA 520 (October 2009) Auditing Standard ASA 520 Issued by the Auditing and Assurance Standards Board Obtaining a Copy of this Auditing Standard This Auditing Standard is available on the Auditing and

More information

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011 BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under

More information

Future of Work. Vocational Education and Training Policy

Future of Work. Vocational Education and Training Policy Future of Work Vocational Education and Training Policy 1. Congress re-affirms its support for a strong vocational education and training (VET) system that provides for effective union representation,

More information

SourceIT User Notes. Specific Clauses. Licence and Support Contract Commercial off-the-shelf Software RELEASE VERSION 2.

SourceIT User Notes. Specific Clauses. Licence and Support Contract Commercial off-the-shelf Software RELEASE VERSION 2. SourceIT User Notes Specific Clauses Licence and Support Contract Commercial off-the-shelf Software RELEASE VERSION 2.3 DECEMBER 2012 AGIMO is part of the Department of Finance and Deregulation SourceIT

More information

Schedule of Prices. Project Name Contract No. Contract Number

Schedule of Prices. Project Name Contract No. Contract Number Schedule of Prices Project Name Contract No. Contract Number C3-LS-BP-Issue 2 SP Page 1 Printed 1 March 2011 >: 1. When preparing the schedule

More information

(INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03

(INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03 INDEPENDENT CONTRACTOR PACKAGE (INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03 Contents Preface 2 Checklist 3 Helpful Hints 4 Frequently Asked Questions 5 Agreement with an Independent

More information

Long Term Financial Planning

Long Term Financial Planning Long Term Financial Planning Framework and Guidelines Long Term Financial Planning Framework and Guidelines for Western Australian Local Governments p1. Contents Foreword 4 1. Introduction 7 2. Purpose

More information

INTERNAL AUDIT SERVICES Glenorchy City Council Internal audit report of Derwent Entertainment Centre financial business and operating systems

INTERNAL AUDIT SERVICES Glenorchy City Council Internal audit report of Derwent Entertainment Centre financial business and operating systems INTERNAL AUDIT SERVICES Internal audit report of Derwent Entertainment Centre financial business and operating systems ADVISORY Contents Executive summary...2 Internal audit findings...4 Summary of other

More information

1. Schedule 1 Maintenance and Support Agreement

1. Schedule 1 Maintenance and Support Agreement 1. Schedule 1 Maintenance and Support Agreement The following terms and conditions represent an Agreement for Klyp Pty Ltd ACN 115 436 363 (Klyp) to provide Software Maintenance and Support Services to

More information

Public Accounting Licence Requirements for Assurance Engagements Specified in the CICA Handbook -- Assurance

Public Accounting Licence Requirements for Assurance Engagements Specified in the CICA Handbook -- Assurance Public Accounting Licence Requirements for Assurance Engagements Specified in the CICA Handbook -- Assurance Update: May, 2009 Various sections in the CICA Handbook Assurance that refer in some manner

More information

Resource Allocation and Unit Pricing Implementation Project Closure Report

Resource Allocation and Unit Pricing Implementation Project Closure Report Resource Allocation and Unit Pricing Implementation Date: 28 February 2014 Disability and Community Services Department of Health and Human Services Acknowledgements The contribution of the following individuals

More information

Release 3.2 Oct 2009.

Release 3.2 Oct 2009. This document contains the terms and conditions of the Linix Ltd support services contract. All support and consultancy advice given by Linix Ltd to our customers is covered by the terms of this contract.

More information

The primary goal of the Human Resources activity is to support and assist managers and staff to meet their goals and objectives.

The primary goal of the Human Resources activity is to support and assist managers and staff to meet their goals and objectives. HUMAN RESOURCES 1.0 INTRODUCTION The Human Resources activity has the following key result areas: Recruitment and Induction of staff Remuneration Learning and development Performance management Staff retention

More information

Review of PIRSA s Cost Recovery Policy and practices, including their application to the Fisheries and Aquaculture Industries Primary Industries and

Review of PIRSA s Cost Recovery Policy and practices, including their application to the Fisheries and Aquaculture Industries Primary Industries and Review of PIRSA s Cost Recovery Policy and practices, including their application to the Fisheries and Aquaculture Industries Primary Industries and Regions SA 29 July 2015 Contents Executive Summary...

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

Consultancy Project. Procurement Review. Leonard Cheshire Disability. March 2010

Consultancy Project. Procurement Review. Leonard Cheshire Disability. March 2010 Consultancy Project Procurement Review Leonard Cheshire Disability March 2010, Registration No. 06819590 1 Procurement Review - Objective Broadband Service Executive Summary Review current arrangements

More information

INTERNATIONAL PRODUCTION IN AUSTRALIA

INTERNATIONAL PRODUCTION IN AUSTRALIA INTERNATIONAL PRODUCTION IN AUSTRALIA GOODS & SERVICES TAX (GST) & CAST/CREW WITHHOLDING TAX GUIDE FOR FOREIGN PRODUCERS Prepared by Moneypenny Services in conjunction with Disclaimer The information has

More information

AMENDED CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS PERIOD ENDED JULY 31, 2015. (Expressed in Canadian Dollars)

AMENDED CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS PERIOD ENDED JULY 31, 2015. (Expressed in Canadian Dollars) AMENDED CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS PERIOD ENDED JULY 31, 2015 1 NOTICE OF NO AUDITOR REVIEW OF CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS Under National Instrument 51-102,

More information

Standard 5. Patient Identification and Procedure Matching. Safety and Quality Improvement Guide

Standard 5. Patient Identification and Procedure Matching. Safety and Quality Improvement Guide Standard 5 Patient Identification and Procedure Matching Safety and Quality Improvement Guide 5 5 5October 5 2012 ISBN: Print: 978-1-921983-35-1 Electronic: 978-1-921983-36-8 Suggested citation: Australian

More information

TECHNICAL RELEASE TECH 09/14BL ACCOUNTANTS REPORTS ON COMMERCIAL PROPERTY SERVICE CHARGE ACCOUNTS

TECHNICAL RELEASE TECH 09/14BL ACCOUNTANTS REPORTS ON COMMERCIAL PROPERTY SERVICE CHARGE ACCOUNTS TECHNICAL RELEASE TECH 09/14BL ACCOUNTANTS REPORTS ON COMMERCIAL PROPERTY SERVICE CHARGE ACCOUNTS ABOUT ICAEW ICAEW is a professional membership organisation, supporting over 140,000 chartered accountants

More information

The 4 th Michael Kirby Contract Law Moot Melbourne, Australia CLARIFICATIONS

The 4 th Michael Kirby Contract Law Moot Melbourne, Australia CLARIFICATIONS The 4 th Michael Kirby Contract Law Moot Melbourne, Australia 29 th September 2 nd October 2014 CLARIFICATIONS Please note the following: 1. The clarification immediately below Clarification 29 is to be

More information

Steps to recovery. Queensland flood crisis. 19 January 2011

Steps to recovery. Queensland flood crisis. 19 January 2011 Steps to recovery Queensland flood crisis 19 January 2011 Immediate considerations Business interruption You may have experienced operational outages, IT interruptions as well as disruption to your manufacturing

More information

MIDSHIRES CARE LIMITED T/A HELPING HANDS HOME CARE TERMS & CONDITIONS OF BUSINESS

MIDSHIRES CARE LIMITED T/A HELPING HANDS HOME CARE TERMS & CONDITIONS OF BUSINESS Terms & Conditions MIDSHIRES CARE LIMITED T/A HELPING HANDS HOME CARE TERMS & CONDITIONS OF BUSINESS DEFINITIONS The terms and conditions set out below constitute an agreement ( Agreement ) between Midshires

More information

Management Systems Recognition Booklet

Management Systems Recognition Booklet Management Systems Recognition Booklet Page 1 of 15 Contents Revision History... 4 Related Documents... 4 1 Management Systems Recognition Booklet... 5 2 Accreditation Status... 5 3 The Recognition Process...

More information

Department of Treasury and Finance

Department of Treasury and Finance Department of Treasury and Finance GUIDELINES FOR THE LIMITATION OF LIABILITY OF SUPPLIERS, CONSULTANTS AND CONTRACTORS Document summary Status Agency responsible Applicable to Scope Administrative instruction

More information

Capital Raising Mandate

Capital Raising Mandate Mar 11 Capital Raising Mandate [Company Name] [Company Name] [Company Address] ATP FINANCIAL PARTNERS PTY LTD ACN 148 187 759 GPO Box 817, Melbourne, VIC, 3001 Phone 61 3 9095 7000 w ww.atpfinancialpartners.com.au

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

inform practice note SUBCONTRACTING ARRANGEMENTS Content Synopsis: Practice Note # 7 May 2007 (Version 1 - May 2007) construction industry development

inform practice note SUBCONTRACTING ARRANGEMENTS Content Synopsis: Practice Note # 7 May 2007 (Version 1 - May 2007) construction industry development construction industry development inform practice note Issued by the Construction Industry Development Board Development through partnership construction procurement and delivery SUBCONTRACTING ARRANGEMENTS

More information

Ordinary Meeting of Council 9 June 2015 22

Ordinary Meeting of Council 9 June 2015 22 Ordinary Meeting of Council 9 June 2015 22 ITEM 6 REF: CM101/15 File: IW-005.04.45.001 BUILDING INSURANCE OF LEASED AND LICENSED BUILDINGS ON COUNCIL LAND This report outlines the recommendations and options

More information

CWU SUBMISSION TO BIS CONSULTATION TUPE REGULATIONS 2006: CONSULTATION ON PROPOSED CHANGES TO THE REGULATIONS

CWU SUBMISSION TO BIS CONSULTATION TUPE REGULATIONS 2006: CONSULTATION ON PROPOSED CHANGES TO THE REGULATIONS CWU SUBMISSION TO BIS CONSULTATION TUPE REGULATIONS 2006: CONSULTATION ON PROPOSED CHANGES TO THE REGULATIONS The Communication Workers Union (CWU) is the largest union in the communications sector in

More information

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 INTRODUCTION Long term financial planning is a key element of the Integrated Planning and Reporting Framework. It is the mechanism that enables local

More information

Policy & Procedure. Specific Instructions to Tenderers for Contracted- Out Services relating to Transfer of Undertakings

Policy & Procedure. Specific Instructions to Tenderers for Contracted- Out Services relating to Transfer of Undertakings Specific Instructions to Tenderers for Contracted- Out Services relating to Transfer of Undertakings 1. Your attention is drawn to SI 131 of 2003 entitled European Communities (Protection of Employees

More information

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices [Project Name] NZTA Contract No. [Contract Number] Schedule of Prices Schedule of Prices SP1

More information

Motor Vehicles - Use of Within NSW Health

Motor Vehicles - Use of Within NSW Health Policy Directive Motor Vehicles - Use of Within NSW Health Document Number PD2014_051 Publication date 18-Dec-2014 Functional Sub group Corporate Administration - Asset Management Corporate Administration

More information

Our Customer Relationship Agreement CO-LOCATION SERVICE DESCRIPTION

Our Customer Relationship Agreement CO-LOCATION SERVICE DESCRIPTION Our Customer Relationship Agreement CO-LOCATION SERVICE DESCRIPTION Internode Pty Ltd ABN 82 052 008 581 Phone: 13 66 33 1/502 Hay Street, Subiaco WA 6008 15 October 2013 Rules of interpretation and capitalised

More information

Strategic Asset Management Framework

Strategic Asset Management Framework STRATEGIC ASSET MANAGEMENT Strategic Asset Management Framework (Second Edition) Achieving better value for South Australians from our investment in State assets Government of South Australia First edition

More information

School Approach to Staff Working Overseas

School Approach to Staff Working Overseas Title Sponsor School Approach to Staff Working Overseas Indi Seehra, Director of Human Resources August 2014 Executive Summary This paper covers the HR implications that should be considered when placing

More information

Statutory Financial Reporting Policy

Statutory Financial Reporting Policy Statutory Financial Reporting Policy Reference Number: 3.15 12/270185 Type: Council Category: Corporate Services Relevant Community Plan Outcome: Demonstrate effective leadership with strong community

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY HEALTH & SAFETY POLICY 1. STATEMENT OF INTENT & POLICY OBJECTIVES The Council, as the governing body of the School, recognises and accepts the responsibilities placed on it as 'Employer' by the Health

More information

Flexi-Wage Self-Employment

Flexi-Wage Self-Employment Flexi-Wage Self-Employment (Previously known as Enterprise Allowance) Flexi-Wage Self-Employment Overview Provides an overview of Flexi-Wage Self-Employment. Flexi-Wage Self-Employment Eligibility Outlines

More information

COLOCATION SERVICE SCHEDULE

COLOCATION SERVICE SCHEDULE COLOCATION SERVICE SCHEDULE 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions Capitalised terms in this Service Schedule not otherwise defined here have the meaning given in the Master Services Agreement:

More information

Information Paper. Superannuation Trustee Liability Insurance. www.apra.gov.au Australian Prudential Regulation Authority.

Information Paper. Superannuation Trustee Liability Insurance. www.apra.gov.au Australian Prudential Regulation Authority. Information Paper Superannuation Trustee Liability Insurance 30 June 2006 www.apra.gov.au Australian Prudential Regulation Authority Copyright The material in this Publication is copyright. You may download,

More information

Financial Management (Public Liability Insurance) Determination 2005*

Financial Management (Public Liability Insurance) Determination 2005* Australian Capital Territory Financial Management (Public Liability Insurance) Determination 2005* Notifiable Instrument NI2005-341 The Treasurer makes the following determination under the Financial Management

More information

Inquiry Regarding Litigation and Claims

Inquiry Regarding Litigation and Claims Auditing Standard AUS 508 (July 2002) Inquiry Regarding Litigation and Claims Prepared by the Auditing & Assurance Standards Board of the Australian Accounting Research Foundation Issued by the Australian

More information

Tipsheet 11 Hired-In Labour

Tipsheet 11 Hired-In Labour Tipsheet 11 Hired-In Labour Client version May 2009 Updated January 2011 Contracts for labour hire what are the insurance issues when using hired in workers? What is hired in labour? Under a labour hire

More information

Student Loans Regulations

Student Loans Regulations Made by the Monash University Council Version incorporating amendments as at 3 November 2011 Part I - General 1. Interpretation In these regulations, unless a contrary intention appears - "campus" means

More information

TERMS & CONDITIONS FULLY MANAGED SERVICE

TERMS & CONDITIONS FULLY MANAGED SERVICE TERMS & CONDITIONS FULLY MANAGED SERVICE For the purpose of this agreement the following definitions will apply:- Keywest Estate Agents Ltd shall be known as The Agent... shall be known as The Owner..

More information

APPROVAL OF POWER AND WATER S NETWORK SERVICES CLASSIFICATION THIRD REGULATORY CONTROL PERIOD

APPROVAL OF POWER AND WATER S NETWORK SERVICES CLASSIFICATION THIRD REGULATORY CONTROL PERIOD Address all correspondence to: Telephone: (08) 8999 5480 The Utilities Commissioner, GPO Box 915, Darwin NT 0801 Facsimile: (08) 8999 6262 Location: 38 Cavenagh Street, Darwin Website:www.utilicom.nt.gov.au

More information

Guidelines approved under Section 95A of the Privacy Act 1988. December 2001

Guidelines approved under Section 95A of the Privacy Act 1988. December 2001 Guidelines approved under Section 95A of the Privacy Act 1988 December 2001 i Commonwealth of Australia 2001 ISBN Print: 1864961074 Online: 1864961139 This work is copyright. Apart from any use as permitted

More information

CO-LOCATION SPACE SCHEDULE OF SERVICES Schedule 1

CO-LOCATION SPACE SCHEDULE OF SERVICES Schedule 1 CO-LOCATION SPACE SCHEDULE OF SERVICES Schedule 1 1. THIS SCHEDULE - INTERPRETATION 1.1 The terms of this Co-Location Space Schedule of Services ( Schedule 1 ) apply together with, in addition to and form

More information

DHA Service Fee Comparison

DHA Service Fee Comparison DHA Service Fee Comparison > DeCember 2014 Defence Housing Australia www.bis.com.au BIS Shrapnel Pty Limited December 2014 The information contained in this report is the property of BIS Shrapnel Pty Limited

More information

Stroke rehabilitation

Stroke rehabilitation Costing report Stroke rehabilitation Published: June 2013 http://guidance.nice.org.uk/cg162 This costing report accompanies the clinical guideline: Stroke rehabilitation (available online at http://guidance.nice.org.uk/cg162).

More information

WA Health Patient Transport Strategy 2015-2018

WA Health Patient Transport Strategy 2015-2018 WA Health Patient Transport Strategy 2015-2018 health.wa.gov.au Table of Contents Executive Summary 2 WA Health Patient Transport Strategy Framework 3 WA Health Patient Transport Strategy Action Plan 4

More information

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland

More information

Registrar of Community Housing 5. Financial Viability

Registrar of Community Housing 5. Financial Viability 5. Financial Viability Version 2.0 WWW.RCH.NSW.GOV.AU The Registration Process 1 Published by The 2010 This work is copyright. It may be produced in whole or in part for study or training purposes subject

More information

Records Disposal Schedule. NT Fleet Management. Department of Corporate and Information Services. Disposal Schedule No. 2004/2

Records Disposal Schedule. NT Fleet Management. Department of Corporate and Information Services. Disposal Schedule No. 2004/2 DISPOSAL SCHEDULE FOR RECORDS OF THE NT FLEET SEPTEMBER 2003 Records Disposal Schedule NT Fleet Management Department of Corporate and Information Services Disposal Schedule No. 2004/2 June 2004 For information

More information

Defence Housing Australia Service Fee Comparison

Defence Housing Australia Service Fee Comparison > Detached Houses DECEMBER 2014 www.bis.com.au BIS Shrapnel Pty Limited December 2014 The information contained in this report is the property of BIS Shrapnel Pty Limited and is confidential. All rights

More information

Operation of Leisure Management Contract

Operation of Leisure Management Contract Executive Report Report of Head of Parks and Leisure Author: Jonathan Sewell Tel: 01483 444729 Email: jonathan.sewell@guildford.gov.uk Lead Councillor responsible: Matt Furniss Tel: 07891 022206 Email:

More information

TACTEX F1 PRIVATE EQUITY FUND LP SUMMARY OF PRINCIPAL TERMS

TACTEX F1 PRIVATE EQUITY FUND LP SUMMARY OF PRINCIPAL TERMS TACTEX F1 PRIVATE EQUITY FUND LP SUMMARY OF PRINCIPAL TERMS Certain terms and attributes of Tactex F1 Private Equity Fund LP (the Partnership ) are highlighted below. This summary is qualified in its entirety

More information

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT Report No. DRR14/089 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive Date: 15 th October 2014 Decision Type: Non-Urgent Executive Key Title: COMMISSIONING - PROPOSED TOTAL FACILITY

More information

The documents you will receive from us. About our Licensee

The documents you will receive from us. About our Licensee C.A.G Wealth Management Pty Ltd Level 5, 530 Collins Street MELBOURNE VIC 3000 PO Box 453 Collins Street West MELBOURNE VIC 8007 P: +613 9605 0001 F: +613 9605 0002 E: admin@cagwm.com.au W: www.cagwm.com.au

More information

Project Time Management an essential element to project success

Project Time Management an essential element to project success Project Time Management an essential element to project success Abstract This paper discusses the reasons behind the necessity to apply sound Project Time Management principles and processes to projects

More information

How To Manage A National Council Of Education And Care Service (Acecqa)

How To Manage A National Council Of Education And Care Service (Acecqa) Procurement Policy and Procedure Version 0.5 Document Version History Version No. Author Date Comment Draft V0.1 ACECQA 16 August 2011 Initial draft for Board V0.2 ACECQA 19 December 2011 Edited Draft

More information

Capital Expenditure Guidelines

Capital Expenditure Guidelines Division of Local Government Department of Premier and Cabinet Capital Expenditure Guidelines December 2010 These are Director General s Guidelines issued pursuant to section 23A of the Local Government

More information

ERM POWER RETAIL PTY LTD STANDARD LARGE CUSTOMER RETAIL CONTRACT

ERM POWER RETAIL PTY LTD STANDARD LARGE CUSTOMER RETAIL CONTRACT ERM POWER RETAIL PTY LTD STANDARD LARGE CUSTOMER RETAIL CONTRACT This standard large customer retail contract sets out the terms referred to in section 52(1) of the Act. It only applies between ERM Power

More information

Letter of Engagement. Peter Vickers and Associates Pty Ltd Chartered Accountants ACN 003 466 813

Letter of Engagement. Peter Vickers and Associates Pty Ltd Chartered Accountants ACN 003 466 813 6 September 2013 Suite 2, 345 Pacific Highway Lindfield NSW 2070 t: (61-2) 9416 9266 f: (61-2) 9416 9149 e: services@pva.com.au www.vickersgroup.com.au Ms M Client Sydney Street NSW 2086 Dear Michele,

More information

ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE

ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE For discussion on 6 May 2015 PWSC(2015-16)13 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 705 CIVIL ENGINEERING Environmental Protection Sewerage and sewage treatment 233DS Sludge treatment

More information

USE OF SCHOOL VEHICLES - GUIDELINES

USE OF SCHOOL VEHICLES - GUIDELINES REFERENCE DOCUMENTS The University of Adelaide HSW Handbook Field Work http://www.adelaide.edu.au/hr/ohs/handbook/field_work/ The School of Agriculture, Food & Wine Field Work Procedures..\..\..\OHS\AFW

More information

COMMENTARY. GPT Class Action Settlement Raises Concerns about Legal and Funding Fees Charged in Australian Class Actions. Summary.

COMMENTARY. GPT Class Action Settlement Raises Concerns about Legal and Funding Fees Charged in Australian Class Actions. Summary. November 2013 JONES DAY COMMENTARY GPT Class Action Settlement Raises Concerns about Legal and Funding Fees Charged in Australian Class Actions Key Points The 7 November 2013 and 21 June 2013 judgments

More information

The Uniting Church in Australia - Queensland Synod UnitingCare Queensland. Financial Statements

The Uniting Church in Australia - Queensland Synod UnitingCare Queensland. Financial Statements The Uniting Church in Australia - Queensland Synod Financial Statements Contents Page Consolidated Statement of Profit or Loss and Other Comprehensive Income 1 Consolidated Statement of Financial Position

More information

Village of Nakusp RFQ 2016-1 Source Protection Plan

Village of Nakusp RFQ 2016-1 Source Protection Plan RFQ 2016-1 Source Protection Plan The is requesting quotations from qualified professional consultants or firms to undertake a Source Protection Plan for the Village s surface water sources (Halfway Creek,

More information

CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 (Unaudited) TSX-V: ANF. www.anfieldnickel.com

CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 (Unaudited) TSX-V: ANF. www.anfieldnickel.com CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS September 30, 2015 () TSX-V: ANF www.anfieldnickel.com NOTICE OF NO AUDITOR REVIEW The unaudited condensed consolidated interim financial statements,

More information

Contract Certainty Principles and Guidance Notes

Contract Certainty Principles and Guidance Notes Contract Certainty Principles and Guidance Notes Scope This guidance applies to all reinsurance contracts entered into by an MAS- regulated (re)insurer, or arranged through an MAS-regulated intermediary.

More information

EXPRESSION OF INTEREST DESIGN, DOCUMENTATION AND PROJECT MANAGEMENT UNIT COMPLEX - LOT 8955 PALMERSTON

EXPRESSION OF INTEREST DESIGN, DOCUMENTATION AND PROJECT MANAGEMENT UNIT COMPLEX - LOT 8955 PALMERSTON EXPRESSION OF INTEREST DESIGN, DOCUMENTATION AND PROJECT MANAGEMENT UNIT COMPLEX - LOT 8955 PALMERSTON 1 Context The City of Palmerston (CoP) is the owner of 5 Birripa Court (allotment 8955) Rosebery,

More information

Electricity Settlements Company Ltd Framework Document

Electricity Settlements Company Ltd Framework Document Electricity Settlements Company Ltd Framework Document This framework document has been drawn up by the Department of Energy and Climate Change in consultation with the Electricity Settlements Company.

More information

APES GN 30 Outsourced Services

APES GN 30 Outsourced Services APES GN 30 Outsourced Services Prepared and issued by Accounting Professional & Ethical Standards Board Limited ISSUED: March 2013 Copyright 2013 Accounting Professional & Ethical Standards Board Limited

More information

Providing utility procurement solutions for SME & Corporate customers across the UK & Ireland...

Providing utility procurement solutions for SME & Corporate customers across the UK & Ireland... In Partnership with IU Consult: Providing BMF Members with Competitive Energy Prices The British Marine Federation (BMF) is always looking to find ways to save its members money, so therefore we have partnered

More information

Please contact Human Resources at (419)562-3011 if you need a reasonable accommodation to complete this application.

Please contact Human Resources at (419)562-3011 if you need a reasonable accommodation to complete this application. United Ohio Insurance Company is an equal opportunity employer. United Ohio Insurance Company will comply with any legal obligation to provide reasonable accommodation to otherwise qualified individuals

More information

GUIDE TO SALARY PACKAGING A CAR

GUIDE TO SALARY PACKAGING A CAR GUIDE TO SALARY PACKAGING A CAR TABLE OF CONTENTS INTRODUCTION 3 WHY SALARY PACKAGING A CAR WITH PAYWISE 3 HOW SALARY PACKAGING A CAR WORKS 4 EMPLOYMENT TERMINATION 6 EARLY TERMINATION 6 GET STARTED 6

More information

PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM FOR MANAGEMENT COMPANY

PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM FOR MANAGEMENT COMPANY PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM FOR MANAGEMENT COMPANY Please provide a full answer to every question. Please ensure that all answers are typewritten or printed in block letters within the

More information

Outsourcing Housekeeping Services in Australia: Compliance Considerations

Outsourcing Housekeeping Services in Australia: Compliance Considerations Outsourcing Housekeeping Services in Australia: Compliance Considerations PLAN SOURCE ASSESS DEVELOP MANAGE CHANDLERMACLEOD.COM Overview The hospitality industry in Australia has seen a remarkable increase

More information

Preparation and Presentation of Accounts from Incomplete Records

Preparation and Presentation of Accounts from Incomplete Records AG 1 Issued March 1984 Accounting Guideline 1 Preparation and Presentation of Accounts from Incomplete Records AG 1 COPYRIGHT Copyright 2008 Hong Kong Institute of Certified Public Accountants This Accounting

More information

SECURITY TRADING POLICY Approved 24 December 2010

SECURITY TRADING POLICY Approved 24 December 2010 1. Introduction and Policy Statement ATTICUS RESOURCES LIMITED ABN 34 124 782 038 SECURITY TRADING POLICY Approved 24 December 2010 The ordinary shares of ( Atticus ) are listed on ASX. Atticus aims to

More information

WORKERS COMPENSATION GLOSSARY

WORKERS COMPENSATION GLOSSARY WORKERS COMPENSATION GLOSSARY ACCIDENT An unplanned and unexpected event which occurs suddenly and at a definite place resulting in injury and/or damage. ACCIDENT FREQUENCY The rate of the occurrence of

More information

WA Kalgoorlie-Esperance Apprentice, Trainee and Juniors Audit Program Interim Report 2011

WA Kalgoorlie-Esperance Apprentice, Trainee and Juniors Audit Program Interim Report 2011 WA Kalgoorlie-Esperance Apprentice, Trainee and Juniors Audit Program Interim Report 2011 May 2012 A report by the Fair Work Ombudsman under the Fair Work Act 2009. Date of Publication May 2012 Commonwealth

More information

ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS 4905 2002. Part A

ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS 4905 2002. Part A ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS 4905 2002 Part A This Annexure shall be completed and issued as part of tender documents and subject to

More information

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors Procurement guidance Engaging and managing consultants Includes definitions for consultants and contractors Procurement guidance: Engaging and managing consultants Page 2 of 17 Table of contents Table

More information

Energy Procurement Practice Guide

Energy Procurement Practice Guide EnergyProof Broadacre Energy Procurement Practice Guide 2013 AgriFood Skills Australia Ltd. All rights reserved This is an AgriFood Skills Australia Ltd project developed in partnership with Energetics

More information