1 Rapport Rapporttittel PSA Well Integrity Survey, Phase 1 summary report - Rapport nummer Gradering Offentlig o Unntatt offentlighet o o Begrenset Fortrolig o Strengt fortrolig Involverte Organisasjonsenhet F-Boring & brønnteknologi Deltakere i revisjonslaget Forfatter/saksbehandler B.Vignes, J.Andreassen, S.A.Tonning Dato F-B&B + konsulenter (AGR/RCC) Rapport og prosjektinformasjon Sammendrag The Petroleum Safety Authority (PSA) has from February 26 to June 26 performed a Well Integrity Survey as a pilot project that is primarily based on supervisory audits and requested input from 7 operating companies and pre-selected offshore facilities/wells. The wells assessed were primarily a representative selection of producers and injectors with variation of age and development categories. A number of well-related failures and shortfalls have been identified in the past with significant impact and potential for serious accidents. Sub-standard operations have in some cases been conducted in spite of the Management Regulations requirements to barriers (Section 2, Barriers). This pilot project (Phase 1) is based on input from every fifth active development well on the Norwegian Continental Shelf (NCS), which largely constitutes the basis for the evaluations of the well integrity status. Key results from the audits are: It has been confirmed that each company generally need to improve focus on well integrity issues. Well integrity and barrier philosophy need common attention from the industry in order to comply with the regulations, including premises relating to the 2 barrier concept, and thereby reducing the potential for well related accidents. The pilot project indicates that averagely 18 % of the production- and injection wells were to some degree impaired by well integrity issues, including 7% full shut in. The impairments are clearly representing a generous potential for improvements both to HSE and production. The company management should also improve focus on well integrity issues in their supervisory audits. There is a need to align with a common way of documenting well integrity within the industry. The methods for describing the well barriers/barrier envelopes vary in the industry and even within the same operating company. There is a general lack of user friendly access to and quality of the well integrity data. The hand-over process and related documentation need to be improved. Improved attention on verification and condition monitoring of well barriers and well integrity is needed. The industry need to further develop/ acquire suitable technology for condition monitoring of wells to improve on systematic/ preventive maintenance and to keep better control on degradation mechanisms. There is a need for improved competence and training involving personnel both from the Operators and Contractors. The operating companies involved appeared positive to the PSA initiative for this pilot project and there seems to be a common understanding and agreement that well integrity is an area that requires improved attention. For this purpose, a Phase 2 of this project will be discussed with the operating companies during autumn 26. Norske emneord Well integrity, brønnintegritet, barriers, barrierer, brønnbarrierer

2 2 of 23 Prosjekttittel Well integrity survey phase1 Antall sider 24 - Prosjektnr Brønnintegritet Opplag PSA Well Integrity Survey (Phase 1), Summary Report Contents: Contents of the PSA Well Integrity Survey (Phase 1) Summary Report... 2 Introduction... 3 Scope of Work... 4 Project method and execution... 5 Results... 1 Conclusions Project phase2 - Discussion References and abbreviations... 24

3 3 of 23 Introduction Several well incidents have been reported in the past, with significant impact and potential for serious accidents (several companies various well categories). This could typically be a result from ageing effects or wrong design, unclear understanding of barriers, weaknesses in well design and planning processes, insufficient validation of premises, well convertions and other reasons. Direct complaints from work force representatives indicate varied comprehension of well barriers, lack of overview, including variable approaches for corrective actions. It has been difficult for key personnel to get access to essential well-data/premises if/when well control situations occur. There are also differences in the way the well integrity/ barrier concept is being implemented. There are cases with insufficient systematic control of the technical capability of entire barrier envelopes and limited standardization according to the NORSOK D-1 (Rev.3) recommendations for well barriers. Examples comprise design capabilities exceeded in operation, excessive exposure time with intentions for increased oil recovery, and nontechnical benchmarking and missing continuity from design through operation and maintenance. PSA has experienced shortcomings for handling non-conformities and management of changes / conversions and lack of recognition of the entire well barrier envelope with elements as safety critical equipment, which demands systematic maintenance and control. Further, there are indications on insufficient transfer of critical information during license acquisitions and change of operator, and a general need for improved hand-over documents in operations In order to get a better picture of the well integrity status, PSA initiated this spring a pilot project, Phase 1, based on spot checks of selected wells from some of the oil companies. Companies involved have taken part in clarification meeting(s) and has received a separate report describing the general findings related to their input. A continuation work is aimed to be in cooperation with the operating companies based on the results from the audits and this pilot project (Phase 1). Scope of Work The following was used as scope of work for the audits and phase1 pilot project: The phase 1 pilot project shall be initiated and executed by the PSA drilling & well technology discipline with assistance of other PSA disciplines as required and consultants from AGR/RCC for specific tasks. This entailed plans to execute audits towards 7 operating companies and on the initial basis of 12 installations with 581 wells. The audits were conducted towards representative operating companies and a sufficient number of wells to enable a general evaluation. The audits were based on identical questionnaires and followed through by clarification meeting(s) with each individual company as needed.

4 4 of 23 The consultants from AGR/RCC assisted PSA with evaluation of barrier schematics and general discussions based on the replies prior to and after the applicable audits. Dedicated audit reports were prepared for each operating company comprised. An anonymous summary report (this report) was prepared after the 7 audits were performed, for experience transfer to the industry in general. This report will be presented on the PSA internet site. Project method and execution The plan for a pilot project (Phase 1) was presented to the OLF-Drilling Managers Forum in a meeting in order to promote and to get initial feedback prior to launching it. The focus on well barriers and plans for a pilot project was positively responded to by the participants of that meeting. Seven selected operating companies received an audit notification from PSA at the end of February 26. The candidates were: BP: ConocoPhillips: ExxonMobil: Hydro: Shell: Statoil: Talisman: Valhall DP Ekofisk X and Eldfisk A Jotun B Grane, Njord and Oseberg Øst Draugen Statfjord C w/satellites (North and East), Veslefrikk and Åsgard. Gyda The selected companies were requested to provide status of well integrity issues for certain pre-selected offshore facilities/ wells as of All the companies confirmed that the well status as of provided a representative picture of the existing well-situation for the selected installations. From a total number of development wells (2682) on the NCS, 12 installations with associated 581 wells were originally identified as potential candidates for the pilot project. After the initial feedback from the industry, the relevant number of well candidates was reduced in order to carry out the planned assessment: 1. From the development wells initially addressed, the P&A category and other non productive wells were excluded in order to focus on active wells and potentially active wells. The production- and, injection wells (in total 46 wells) were thereafter assessed on the basis reported barrier shortfalls. 2. Every 5th wells on an installation were then picked for the particular assessment of barrier schematics and hand-over documents, within general guiding limits of maximum 3 producers, 2 injectors and 1 disposal well per installation (in total 58 wells). 3. Well data/ information associated with uncertainties were subject to relevant corrections during the following clarification meetings.

5 5 of 23 The well data /information were used to assess how comprehensive the well integrity problem is on the NCS, and in general terms to determine what the main issues/ challenges were. Reference is made to the following flow diagram. What kind of barrier/ barrier element Yes failure/ issue/ uncertainty? Yes Cat. A: Well is shut In, E.g.: Leaks, over criteria, well contr., Scope: How comprehensive is the well integrity problem on the NCS, and what are the main issues/ challenges? Impact? Cat. B: Working under conditions/ exemptions E.g.: No gas lift Determine injury/ damage/ production impact/ financial loss Selection of wells for pilot examination No Cat. C: Insignificant deviation for current operation Well integrity failure / issue? (or uncertainty) Cat. D: External conditions E.g.: weather conditions, other activities, union dispute, No Yes Cat. E: Shut in on the basis of reservoar related issues E.g.: high water cut Well barrier intact Shut in well? Cat. F: Shut in because of topsides bottlenecks, planned testing and maintenance Incl.: SD&P No Well OK / active Cat.G: Shut in while awaiting P&A The data from the selected wells based on the approach above was requested to be supplied in a pre-made spreadsheet template, example below (initially with 581 wells addressed). The well identification and types were provided from the Norwegian Petroleum Directorate (NPD) wells database. Operator: Installation: PL: Well bore name Type of well Well bore status Well details: e.g. WAG, water injection, gas injection, oil producer, water producer, disposal, Well Integrity problems [Y/N], If [N] go to Column N. Type of barrier element failure/ uncertainty? Red Wellhead Plugged WAG Yes Casing leak Yellow Sub sea Producing Oil producer with gas lift Yes Annulus communication Impact? A: Well is shut in B: Working under conditions/e xemptions C: Well ok A: Well is shut in B: Working under conditions/ exemptions Well barrier failure/ uncertainty Risk reducing measures/ conditions Well barrier schematic with barrier element assessment available, similar to Norsok D- 1 (NB To be attached) [Y/N] When was the well shut in? [MM,YYYY ] Enhanced monitoring Yes jan. 4 Main reason to well barrier failure Barrier failures in planning and implementation. Casing wear Estimated loss of production pr. day/ impact of failure XXX Production without gas lift Yes jan. 6 Thread failure? XXX Other impact of failure (measures to secure/ SD&P action / restoration demand) Intervention demand. Corrective action needed Green Platform Producing Oil producer No Yes Wells closed by other reasons than integrity problems Other reasons Category reference to flow diagram: D. External conditions E. Reservoir technical F. Topsides bottlenecks, planned testing & maintenance, SD&P. G. Abandonment, awaiting P&A G. Abandonment, awaiting P&A Securing method When was the well shut in/ secured [MM,YYYY] Installed deep set plug mar. 6 Further, the notification included a questionnaire: The questionnaire was sent together with the dedicated spread-sheet above, to the 7 preselected operating companies. The questions from A to K are listed as follows:

6 6 of 23 A. Does the well picture / outcome of the XLS- form represent a typical distribution for todays situation on the facitily [yes/no- briefly explain differences if any]? B. Are key design premisses/input, design tools/procedures, well history and current technical condition validated and made easy accessible for key personnel [yes/no/in process brief description of shortfalls, if any]? C. Does hand-over documents include sufficient well information, with inclusion of premisses/ potential anomalies/ technical condition /operating limits? (E.g.: Updated schematics, exposures, test records/ demands, safety factors/criteria, references to key governing documents and changes/ deviations/ precautions with regard to well integrity an well control issues.) [yes/no/being modified brief description of shortfalls, if any]? D. Are there established technical requirements to well barrier envolopes /elements, regular condition monitoring, and are procedures implemented for managing well integrity issues [yes/no/in process brief description of shortfalls, if any]? E. Are the company requirements relating to well barriers/ barrier practice consistent with Norsok D-1 (for all wells) [yes/ no/ similar brief description of gaps or other standards, if applicable]? F. Is there a consistent practise within the company for managing well integrity issues [yes/ no/ specific for each facility - brief description of variations, if any]? G. Are management of change and non-conformance handling consistantly practised [yes/ no/ - brief description of variations/ shortfalls, if any]? H. Are requirements to competence and training defined and implemented, - for satisfactorly/common understanding of the well barrier concept, barrier performance requirements, records assurance, and actions required upon indications of impairment. [yes/ no brief description of gaps, if any]? I. How do you promote openness and reporting of undesirable well incidents, similarly as you report other undesirable incidents, and the exchange of experience towards other units within the company, contractors/ service companies, authorities or other stakeholders [satisfied with the reporting and the use of exchange of well incidents/ needs to improve the reporting routines and the exchange of experience brief description of the challenge, if any]? J. Are the causes of the loss of barrier integrity systematically mapped and used in order to reduce the probability of similar incidents in other wells operated by the company[yes/no/in process brief description of shortfalls, if any]? K. Are the company observing specific performance indicators pertaining to well integrity [yes/ no brief description of performance indicators, if any]? The received answers were analyzed by the PSA Drilling and Well Technology engineers in cooperation with the consultants from AGR/RCC for selected areas. For the assessment of selected well barrier drawings and hand-over documents, a particular comments-form was developed. This form employed a barrier drawing/template on the basis

7 7 of 23 of Norsok standard D-1 (rev.3) recommendations for well barrier schematic illustration, with the provisions for well barrier element description, table references and comments. The operating companies answers and documentation were put into this template and used as a tool for the PSA to evaluate gaps, identify needs for clarifications, and to provide detailed comments to the Companies. An example of the template used is indicated as follows: Operator : Installation : Last updated : Revision: Well bore name : By : Type of well : EXAMPLE well barrier schematic illustration Well bore status : Well details : Reference documentation: TRSCSSV 4 ½ Well integrity problem(s) Well barrier elements Primary barrier Table ref. If any, indicated by _ S Comments (Acceptance criteria/deviations) 13 3/8" csg MD Secondary barrier 9 5/8" csg 5" Tubing TOC 9 MD TOP of Liner MD MD (CBL) 9 5/8" csg m MD Observation(s): 7" liner PBR 4265 m MD 7" Liner m MD 4 ½ liner m MD 4 ½ Liner m MD

8 8 of 23 PSA s immediate comments in similar work-forms as indicated by the template above were amended with the specific audit reports for information. The clarification meetings were conducted as audits with the 7 operating companies involved in this pilot study, during the period from 5.5. to The purposes of the clarification meetings were: To get a correct and uniform comprehension of received documentation about well integrity If relevant, calibrate/ verify received documentation Communicate PSA`s immediate impression of received documentation. Identify possible outstanding points with the company clarify the path forward to conclude the pilot survey on well integrity Information about PSA s intentions regarding reporting was given.

9 9 of 23 Results The general impression from the audits and assessment of provided well information showed that the companies recognize the well integrity challenges, and they had plans for increased efforts and focus on safety and integrity of their wells. The resources and capabilities to manage relevant well integrity issues were varying between the operating companies, but areas for improvements were identified for all the companies. More cooperation and standardization are believed to be beneficial to rectify the shortfalls and to improve the general progress. The received well-information varied in quality, and very few well integrity data from the requested wells were fully in compliance with the Management Regulations, section 2, concerning Barriers: The operator or the one responsible for the operation of a facility, shall stipulate the strategies and principles on which the design, use and maintenance of barriers shall be based, so that the barrier function is ensured throughout the life time of the facility. It shall be known what barriers have been established and which function they are intended to fulfill and what performance requirements have been defined in respect of the technical, operational or organizational elements which are necessary for the individual barrier to be effective. It shall be known which barriers are not functioning or have been impaired. The party responsible shall take necessary actions to correct or compensate for missing or impaired barriers. Further to the Activities Regulations, section 76 Well barriers: During drilling and well activities there shall at all times be at least two independent and tested well barriers after the surface casing is in place, cf. also the Facilities Regulations Section 47 on well barriers. If a barrier fails, no other activities shall take place in the well than those intended to restore the barrier. Several other regulations that also apply to the above subject are to varying degree not adhered to. General findings/ comments/ areas for improvements are made anonymous and included in the following table and supplemental comments:

10 1 of 23 Theme / subject: Operator 1 Operator 2 Operator 3 Operator 4 Operator 5 B - Well documentation validated, easy accessible, userfriendly Approved barrier information not easily accessible Well information neither easily accessible nor user friendly Well information neither easily accessible nor user friendly for older wells Availability and quality of well information is limited due to storage in a variety of databases C - Handover documentation Format and contents of handover documentation needs clarification Format and contents of handover documentation needs clarification and coordination within company platforms Format and contents of handover documentation needs clarification Contents of handover documentation needs improvement D - Condition monitoring, degradation mechanism More active use of condition monitoring of barrier elements and downhole equipment should be evaluated More active use of condition monitoring of barrier elements and downhole equipment should be evaluated More active use of condition monitoring of barrier elements and downhole equipment should be evaluated More active use of condition monitoring of barrier elements and downhole equipment should be evaluated E - NORSOK D-1 use and adherence Need for improved documentation of well barriers based on the principles in Norsok D1 rev3. Need for improved documentation of well barriers based on the principles in Norsok D1 rev3. Need for improved documentation of well barriers based on the principles in Norsok D1 rev3. Need for improved documentation of well barriers based on the principles in Norsok D1 rev3. Competence and training of offshore operations personnel related to well barriers needs improvement Lack of performance requirement, competence and training related to well integrity issues Lack of performance requirement, competence and training related to well integrity issues I - Openness and experience transfer Active use of experience transfer needs improvement Active use of experience transfer needs improvement J - Reliability analysis Limited use of reliability analysis were used to improve understanding of failure mechanisms and robustness of well barriers/well barrier elements Limited use of reliability analysis were used to improve understanding of failure mechanisms and robustness of well barriers/well barrier elements Active use of experience transfer needs improvement Limited use of reliability analysis were used to improve understanding of failure mechanisms and robustness of well barriers/well barrier elements Lack of routines/procedures for diagnosis and status for leaks in well barriers Operator 6 Operator 7 A - Well data / response Competence and training of relevant personnel related to well barriers onshore and offshore needs improvement K - Key performance indicators L - Special challenges (optional ) Well specific barrier schematics are missing Format and contents of handover documentation needs clarification Routines for and contents of handover documentation needs clarification More active use of condition monitoring of barrier elements and downhole equipment should be evaluated More active use of condition monitoring of barrier elements and downhole equipment should be evaluated Handover documentation should include well drawings and barrier schematics More active use of condition monitoring of barrier elements and downhole equipment should be evaluated Need for improved coordination of company internal documentation of well barriers based on the principles in Norsok D1 rev3 Competence and training of relevant personnel related to well barriers onshore and offshore needs improvement Lack of involvement of contractors personnel in competence and training related to well barrier issues Lack of knowledge of and involvement in major ongoing internal company barrier project F - Unified approach in the company / between installations GManagement of change H - Competence and training Validation and availability of barrier information is not easy for the users Use of words and abbreviations in documents needs improvement and standardization Well Integrity Survey, Phase 1, 26 Active use of experience transfer needs improvement Limited use of reliability analysis were used to improve understanding of failure mechanisms and robustness of well barriers/well barrier elements Use of words and abbreviations in documents needs improvement and standardization Use of words and abbreviations in documents needs improvement and standardization Revision Competence and training of relevant company personnel (located in Norway and abroad) working with well barriers needs improvement

11 11 of 23 There are obviously many common issues for improvement within the seven companies according to the previous table: Issues for improvement and the number of companies Number of companies A - well data 6 B - well dokumentation 7 C - handover documentation 7 D - regular condition monitoring 5 E - NORSOK D-1 1 F - consistent practise within the company G - management of change H - competence and training I - openness and exchange of experience J: reliability analyses 1 K - preformance indicators 3 L - other challenges Issue for improvement This figure illustrates that at least the following four issues B: well documentation C: handover documentation D: regular condition monitoring H: competence and training are categories/areas where all the operating companies likely need to improve within. As a supplement to the previous table the following specific comments have been provided in response to the barrier schematics, hand-over documents presented and other comments conveyed in connection with the audits: B - Well documentation: - Different approaches for transfer of well barrier responsibilities and insufficient transfer of critical information during operations and licence acquisitions may result in reduced barrier control. - Need improved/ user-friendly access and visualization of key well information/ premises - The quality of documentation suffers in where the document control originally was weak, and where validation efforts not have been prioritized. - Different reporting standards, changes in well depth references (RKB), and variation in the use of terms and abbreviations are also sources to uncertainties.

12 12 of 23 C - Handover documentation: - Several companies include pressure test verification charts in their handover documentation, without interpretation. These data could be several years old and do not necessarily represent the current status. Well integrity or well barrier schematic illustrations, verifications and how to monitor status, was not easy accessible. - While completion schematics are typically updated and available, included in the handover documents, the barrier schematic illustrations and with descriptions don t seem to receive similar focus. D - Barrier requirements and Condition monitoring: - Changes from established practice take generally (too) long time to implement - Consideration to and evaluations of initial casing design for the lifetime of the well, and possible impact by changes to different well usage (example, from production to injection), appears to receive insufficient attention. - While studies from the UK Sector identifies considerable shortfalls with structural integrity problems in surface-/ conductor and riser arrangements as a growing problem for ageing ageing well constructions, - these issues seems to receive more limited attentions offshore Norway. E - Comments related to Norsok D-1 familiarization and use: - The Norsok D-1 defined requirements/ guidelines, including the established well barrier philosophy, appears to be less known and adhered to than PSA expected at the time when the audits were conducted. - The lack of information on well names, dates and revision numbers complicates easy overview of the status on well barriers. Color coding and descriptions of the barrier envelopes varies from company to company, but also within the same company. - The barrier illustrations are in several cases not containing details on perforations, X-mas tree, cement presence, and in some cases lacking barrier elements. Such well details, and with possible inclusion of dimensions and depth data, could be considered for new/updated versions. - Verification details of the casing cement barriers are often lacking. Hence, proper planned top of cement (TOC), packer setting depth and later proper zonal isolation for later plugging and abandonment (P&A) could imply uncertainties. - Questionable recognition of PBRs, Sliding Side Doors (SSD), Side Pocket Mandrels with dummy and Gas Lift Valves as barriers elements. Questionable (high) positioning of ASVs and Production Packers in the wells were also noted. Casing connections suitability for gas lift. G - Handling situations with discrepancies and changes with regard to well/operation premises - Some variations and indications on shortfalls noted with regard to how (essential) information on exceptions and changes are conveyed to key personnel.

13 13 of 23 H - Competence and training: - The questionnaire revealed a need for strengthening knowledge, communication and requirements to well barriers and status. The companies generally expressed high interest in sharing / exchanging training material for practical use. - Training sessions with case assessments seems to be a recognized approach that also contributes to experience transfer. In order to also strengthen the risk perception among this personnel, these training sessions may also be used to demonstrate how regular failure modes (impairment of one barrier) significantly raises the risk level.

14 14 of 23 Numbers and figures from the study Number of wells drilled at the Norwegian Continental Shelf: Exploration: 195 wells Development: 2682 wells Total: 3777 wells Active development wells at NCS per Production: 1539 wells Injection: 369 wells Total: 198 wells "Active" wells at NCS per Injection 369 wells Production 1539 wells INJECTION PRODUCTION The figure above shows 369 injection wells and 1539 production wells on the Norwegian Continental Shelf per The production wells include water producers, gas producers and oil producers. The injection wells include gas injector, water injector and WAG. Subsea and platform wells- production and injection per Number of wells Serie Injection Production Injection Production Platform Subsea The figure above shows distribution between subsea and platform wells on the NCS

15 15 of 23 The pilot survey on well integrity comprised 7 companies, 12 installations and initially 581 wells (ref Scope of Work): Company and field name Number of wells Total Valhall Ekofisk X Eldfisk A Jotun Grane Njord Oseberg Øst Draugen Statfj.C Statfj. Nord Statfj. Øst Veslefrikk Åsgard Gyda BP CoPno Exxon Hydro Shell Statoil Talisman Company Figure above: The pre-selected companies, facilities with the original number of wells. The pilot well integrity survey initially addressed 581 wells. However, the active production and injection wells are focused in the pilot survey. Number of active development wells selected in the pilot survey per : Producion: : 323 wells Injection: : 83 wells Total: 46 wells "Active" development wells - production and injection per injection wells 323 production wells Production: Injection: Active development wells in the pilot well integrity survey.

16 16 of 23 Platform and subsea wells- production and injection wells included in the pilot well integrity survey 3 25 Number of wells Serie Injection Production Injection Production Platform Subsea Platform and subsea wells - production and injection wells included in the well integrity survey. The total number of producing and injecting platform and subsea wells at the NCS per are 1255 platform wells, and 653 subsea wells. The pilot well integrity survey includes 3 platform wells and 16 subsea wells that are producing or injecting, and this is considered quite representative for assessments in connection with this study. Subsea wells have generally more limited access for condition monitoring relating to barriers. 46 production- and injection wells have reported whether there were well integrity failures/ issues or uncertainties per An average of 18% of these wells are reported to have a well integrity failure/issue or uncertainty per Wells with integrity failure/issue or uncertainty 8 7 Number of wells Serie1 1 Producer Injector Total Producer wells, injector wells and total 41 producer and 34 injector wells (in total 75 wells) are reported with integrity failure/issue or uncertainty.

17 17 of 23 Well integrity impact Well integrity impact Number of wells Producer Injector A: Shut in B: Working under conditions Well integrity impact category A, B and C 1 C: Insignificant deviattion for current operations Well integrity impact (A, B, C) for producer and injector wells. The figure above illustrates the number of wells with well integrity impact A: well is shut in, B: working under conditions/ exemptions, C: insignificant deviation for current operation for producer and injector wells. Reported wells with integrity failures/issues or uncertainty in category A, B and C: - Category A, shut in: 28 of 46 wells (7 %) Producer: 18 of the 323 wells Injector: 1 of the 83 wells - Category B, working under conditions/exemptions: 38 of 46 wells (9 %) Producer: 22 of the 323 wells Injector: 16 of the 83 wells - Category C, Insignificant deviations for current operations: 9 of 46 wells (2 %) Producer: 8 of the 323 wells Injector: 1 of the 83 wells Shortfall in ability for extraction is assumed to be roughly 1 % for the well categories above. (The number of wells closed by other reasons than integrity problems are reported to be 37, and causal category E for reservoir technical issues is clearly dominant.).

18 18 of 23 Age of development wells on the NCS The age of wells are based on the well bore completion year as registered in the NPD database per Number of wells Age of development wells sorted by the operating companies per Age in Years The figure above illustrates the wells age in years, the number of wells and the relevant operating companies. The figure shows that most of the development wells are -12 years old and that the oldest wells on the NCS per is 32 years old. Age of production and injection wells on the NCS per TOTAL TALISMAN STATOIL SHELL SAGA PHILLIPS PERTRA MOBIL HYDRO ESSO ELF CONPHIL CONOCO BP AMOCO 6 Number of wells to 4 5 to 9 1 to to 19 2 to to 29 3 to 34 Production Injection Age in years The figure above illustrates the age in years and the number of producing and injecting wells. Most of the producing and injection wells are -14 years old on the NCS per Age of "active" platform and subsea wells on the NCS per Number of wells to 4 5 to 9 1 to to 19 2 to to 29 3 to 34 Platform Subsea Age in years

19 19 of 23 The figure illustrates the age in years and the number of active platform and subsea wells. Active wells in this study means producing and injecting wells. Most of the platform and the subsea wells are -14 years old. Age of the wells in the pilot well integrity survey Age of the pre-selected development wells in the well integrity survey and the companies Number of wells Talisman Statoil Shell Hydro ExxonMobil ConocoPhillips BP Age in years The figure above indicates that most of the development wells are -12 years old in the pilot well integrity survey. The oldest well in the pilot well integrity survey is 28 years old. Pilot well integrity survey age of wells and well integrity failure/issue or uncertainty. Age of wells with well integrity failure/issue or uncertainty per Number of wells Serie to 4 5 to 9 1 to to 19 2 to to 29 Age in years The figure above illustrates the age of the wells with well integrity failures/issues or uncertainty. 75 wells of the 46 wells focused in this study with integrity problems. The figure can be seen together with previous distribution on well age, and will illustrate that many of the well integrity problems are associated with wells from the early 199`s. A peak for integrity impairment intensity is identified from 1-14 years ago The production- and injection wells from the early 199 s have averagely twice as high impairment intensity as for the older wells.

20 2 of 23 Conclusions In our opinion the supplied well integrity data for this pilot survey are representative for the general well status on the NCS for the well categories addressed. The results and suggested areas for improvements could therefore also imply challenges for a wider range of wells and facilities on the NCS. Many of the active wells selected for this analysis are old and drilled prior to the latest revision of Norsok D-1. As the well barrier concept and associated requirements are based on recognized principles an are not new to the offshore industry, it may be considered quite surprising that well integrity shortfalls appear to be such a commonly large and increasing problem. The impact and challenges are considerable both with regard to exploitation of petroleum and HSE. PSA had by referencing to the Norsok D-1 in the latest regulations, expected to find a firmer or more consistent/standardized system for well barrier control with the operating companies. Gaps and challenges exist both within and between the companies. The several well incidents in the past and other reasons mentioned above and the results of this audit, Phase 1 study, revealed that the industry need to have increased focus on their barrier philosophy. There is a tendency to accept the theoretical calculations without proper and required verification. This is specially related to cement jobs. Degradation mechanisms are rarely considered. Long-term considerations and catering for flexibility in well design could be improved. E.g.: Casing design/ connections versus possible future need for gas lift, and other types of conversions. Control of barrier status is considered as an important HSE factor that could limit leaks, failures and accidents. Well known status enables the companies to take the right actions in a proactive manner before any major losses and expenses. It is recommended that the operating companies review their in-house management systems for compliance with the requirements in the regulations for barriers and how this is distributed and actively used internally in order to reduce the chances for any incidents. Norsok D-1 is describing means of control by standardized sketches and tables for barrier requirements. Standardization in this format or similar including key dimensions and depths could be beneficial for the industry. The need for having 1% control of the well integrity at all time is of utmost importance to eliminate potential risks in connection with increased transfer of ownership of licenses on the NCS. PSA will focus on the need for improved visualization of essential well information, the industry s work with the barriers/well integrity using a risk based approach, and efforts made to identify main problem issues and corrective measures for prudent action. PSA has by this pilot project seen a need for a more complete overview of the condition of wells on the NCS, in order to get right attention on wells that represents potential hazards to personnel and the environment. A Phase 2 covering all wells on the NCS is therefore under consideration for start this autumn. Our objective for the phase 1 and phase 2 well integrity project is that the industry are managing their offshore activities in a responsible manner with effective systems to prevent situations with potentially unsafe wells ( Only safe wells on the NCS ). This can be reached

21 21 of 23 if the industry work to achieve a total overview and real time condition for all wells on the NCS. Based on the results from the audits and phase1 project PSA believe that improved focus and work with well integrity and well barriers will provide situation that improves both safety and production on the NCS. Project phase 2 - Discussion Based on the result of pilot project on well integrity it is PSAs view that a more comprehensive study with a strong problem solving -approach would be commenced as a well integrity project (Phase 2). The scope of work, execution plans, milestones etc need to be discussed with the operating companies through OLF-Drilling Managers Forum during the autumn of 26. However, since most of the relevant operating companies have been part of the phase 1 pilot project, they have already demonstrated detailed knowledge and positive attitude to continue improvement efforts. In this context there are also several suggestions indicated in the audit reports, so there should not be reasons to drop momentum at this stage. Based on the audit results the PSA encourage the industry to: Improve the present lack of approach and systems of reliability and condition based surveillance for well barriers and well integrity aspects to improve well safety in general on the NCS. Provide better visualisation of barriers for both onshore and offshore users to improve the safety level and user friendliness Agree on standard ways of visualisation, technical qualification, documentation and abbreviations. Consider making a standard handover package containing basic well engineering data required to give a full overview of the wells barrier envelop situation from spud to abandonment. Start the process of updating the Norsok drilling standards to include recent experiences related to well barriers. This should include the qualification process for barrier elements and coming technology.

22 22 of 23 Operator: Installation : Last updated : Revision: Well bore name: Well bore status : Prepare by: Checked by: Type of well: Well details : Example illustration Reference documentation: Well integrity problem(s) Well barrier elements Primary barrier Table ref. If any, indicated by _ S Initial test & verfication Monitoring Comments (Acceptance criteria/deviations) Secondary barrier Observation(s): A template as shown above includes references to the Initial test & verification and Monitoring on the basis of the Norsok D-1, Tables in section 15, Well barrier elements acceptance tables. Actual received well barrier illustrations will be entered into the template for evaluation. The objective and regulatory requirement is to have all wells equipped, tested, verified and monitored to be able to take necessary actions to correct or compensate for missing or impaired barriers. This proposal could be considered for further discussion with the aims to put more focus on the well integrity issues and barrier sketches for the individual wells specifically. The project is expected to have risk and cost reducing effect both for short and long term, with visualization of potential risk areas and enabling proactive rectifications of impaired barriers. For phase 2 of this project, PSA may also discuss with the OLF-Drilling Managers Forum the use of an extended template/worksheet similar to what was used in Phase 1 as a tool for the analyses of compliance and verification (ref. example above).

23 23 of 23 References and abbreviations Regulations: Norsok D-1, Well integrity in drilling and well operations (Rev. 3 Aug. 24) Company specific answers and documents from the 7 audits -listed in each of the audit reports The Journal of Offshore Technology, May/June 25: Structural integrity of North Sea Wells PSA well integrity seminar : inar_presentasjoner.htm Abbreviations: PSA - Petroleum Safety Authority NCS - Norwegian Continental Shelf SD&P - Simultaneous Drilling and Production PBR - Polish Bore Receptacle RKB Rotary Kelly Bushing (depth reference) P&A - Plug and Abandonment (permanent plugging) NPD - Norwegian Petroleum Directorate

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY 117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY No.: 117 Established: 01.10.08 Revision no: 4 Date revised: 06.06.2011 Page: 2 Preface This guideline is supported by Norwegian Oil and

More information

Risk management and major accident potential in a safe late phase. Experience from Supervisory Activities.

Risk management and major accident potential in a safe late phase. Experience from Supervisory Activities. Risk management and major accident potential in a safe late phase. Experience from Supervisory Activities. Ingvill Hagesæther Foss Director of supervisory activities Kjell Arild Anfinsen Supervision Coordinator

More information

Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer

Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer ESRA seminar, September 3, 2014, Stavanger Per Holand, ExproSoft Ivar Aasen Operator; Det Norske Production start;

More information

The Need for a Clean Shelf in Norway

The Need for a Clean Shelf in Norway Maximising value from the NCS through teamwork and technology Pareto 1 September 2004 Sveinung Sletten Vice president external affairs Value analysis SDFI portfolio, 2003 500 400 66 14 26 NPV 7%, mrd kr

More information

Ageing and life extension

Ageing and life extension Ageing and life extension April 7th workshop Background NPD recommended NORSOK AGn to start developing guidelines for life extension (2000). NPD initiated a PhD study on ageing and life extension of offshore

More information

How To Get Gas From A Boat

How To Get Gas From A Boat riser_id riser_name operator 373449 10" Oil at ULA PP BP 416111 10" Oil/gas at ULA PP BP 364058 10" Oil/gas at VALHALL FLANKE NORD BP 364069 10" Oil/gas at VALHALL FLANKE SØR BP 429465 10" Oil/gas at VALHALL

More information

ENERGISTICS E&P BUSINESS PROCESS REFERENCE MODEL

ENERGISTICS E&P BUSINESS PROCESS REFERENCE MODEL ENERGISTICS E&P BUSINESS PROCESS REFERENCE MODEL Access, receipt, or use of the E&P Business Process Reference Model is subject to the Energistics Product License Agreement found on the Energistics website.

More information

Goliat Barrier Management

Goliat Barrier Management Goliat Barrier Management ESRA Norge; March 25, 2015 www.eninorge.com Eni: Ole Rekdal Safetec: Helene Ness Hansen PL 229 Goliat Location and Partnership License awarded in 1997 Present licensees Eni Norge

More information

Subsea Standard & Rules What is Subsea?

Subsea Standard & Rules What is Subsea? Subsea Standard & Rules What is Subsea? MEK4450 Standards and Rules Bjørn Søgård, Anders Husby Goals General knowledge of subsea development and production systems Understand the building blocks forming

More information

Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway 13.03.

Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway 13.03. Det norske oljeselskap - Our first diving operation Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway 13.03.13 Diving Operations our starting point Det norske started out with a

More information

Certification of Materials and Components

Certification of Materials and Components OIL & GAS Certification of Materials and Components Standardisation of the industry s approach to quality control and assurance processes Martin Fowlie 12th February 2015 1 DNV GL 2013 12th February 2015

More information

Det norske oljeselskap ASA (DETNOR) - Oil & Gas - Deals and Alliances Profile

Det norske oljeselskap ASA (DETNOR) - Oil & Gas - Deals and Alliances Profile Det norske oljeselskap ASA (DETNOR) - Oil & Gas - Deals and Alliances Profile Det norske oljeselskap ASA (DETNOR) - Oil & Gas - Deals and Alliances Profile Sector Publishing Intelligence Limited (SPi)

More information

Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites

Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites Eva Halland Norwegian Petroleum Directorate Trondheim CCS Conference June 14-16, 2011 1 29.06.2011 Storing of CO 2 offshore

More information

Capital efficiency and execution. London, 7 February 2014 Margareth Øvrum, EVP, Technology, projects and drilling

Capital efficiency and execution. London, 7 February 2014 Margareth Øvrum, EVP, Technology, projects and drilling Capital efficiency and execution London, 7 February 2014 Margareth Øvrum, EVP, Technology, projects and drilling Forward-looking statements This presentation material contains certain forward-looking statements

More information

Health, Safety and Environment Management System

Health, Safety and Environment Management System Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental

More information

NORSOK Standard D-010 Rev. 4, August 2012

NORSOK Standard D-010 Rev. 4, August 2012 Below is a listing of the main changes 1. Definitions of suspension, temporary and permanent abandonment 2. Included more examples of well barrier schematics 3. Included illustrations for permanent abandonment

More information

Petroleum and natural gas industries Well integrity standard

Petroleum and natural gas industries Well integrity standard Petroleum and natural gas industries Well integrity standard ISO 16530-1 Well integrity Lifecycle Governance 2015 BSEE Domestic and International Standards Workshop Houston May 8 th 2015 Presenter Paul

More information

Health, Safety and Environmental Management System

Health, Safety and Environmental Management System Health, Safety and Environmental Management System At Phillips 66 we take the time to work safely, every job, every day. Contents Chairman s Message...1 Operational Excellence...2 HSE Management System

More information

HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER 2011- ISSUE No 01. Doc No: HSEC MS 001

HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER 2011- ISSUE No 01. Doc No: HSEC MS 001 HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT S OCTOBER 2011- ISSUE No 01 Doc No: MS 001 Introduction Celtique Energie is in the business of exploring for oil and gas in proven basins in Europe.

More information

Health, Security, Safety and Environment (HSE)

Health, Security, Safety and Environment (HSE) Health, Security, Safety and Environment (HSE) Content: 1 Objective 2 Application and Scope 21 Application of HSE Directive with underlying documents 22 Scope of HSE Management system 3 Framework for our

More information

DEEPWATER HORIZON. Summary report

DEEPWATER HORIZON. Summary report 1 Summary report DEEPWATER HORIZON Lessons learned and follow-up A Norwegian Oil Industry Association (OLF) report with contributions from the Norwegian Clean Seas Association for Operating Companies (NOFO)

More information

Tanzania gas project. From discovery to gas sales

Tanzania gas project. From discovery to gas sales Tanzania gas project From discovery to gas sales An emerging gas sector Major gas discoveries have been made offshore Tanzania and the country emerges as a potential large gas producer in East Africa.

More information

Principles for barrier management in the petroleum industry

Principles for barrier management in the petroleum industry 2013 Principles for barrier management in the petroleum industry PSA 29.01.2013 Foreword Barrier management is about ensuring, on a systematic and continuous basis, that barriers are relevant, effective

More information

Operations and Maintenance Procedures for Natural Gas Systems

Operations and Maintenance Procedures for Natural Gas Systems Operations and Maintenance Procedures for Natural Gas Systems Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Office

More information

How to find field candidates for enhanced recovery by water additives on the NCS

How to find field candidates for enhanced recovery by water additives on the NCS How to find field candidates for enhanced recovery by water additives on the NCS Enhanced Recovery by water additives FORCE Seminar 8. 2. 27 Jan Bygdevoll, Principal Engineer, NPD Why is a field a candidate

More information

Statoil (U.K.) Limited 2008 Offshore Environmental Statement

Statoil (U.K.) Limited 2008 Offshore Environmental Statement Statoil (U.K.) Limited 2008 Offshore Environmental Statement 23 March 2009 Statoil (U.K.) Limited Statoil House 11a Regent Street London SW1Y 4ST (until 19 June 2009) Statoil (U.K.) Limited 1 Kingdom Street

More information

NABL NATIONAL ACCREDITATION

NABL NATIONAL ACCREDITATION NABL 160 NABL NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES GUIDE for PREPARING A QUALITY MANUAL ISSUE NO. : 05 AMENDMENT NO : 00 ISSUE DATE: 27.06.2012 AMENDMENT DATE: -- Amendment

More information

Irresponsible of Statoil

Irresponsible of Statoil Irresponsible of Statoil Having reviewed all the available information, Bellona feels it is irresponsible of Statoil to resume production at Gullfaks C. All production from the Gullfaks C platform was

More information

June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)

June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS) June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS) TABLE OF CONTENTS PAGE PART I INTRODUCTION Corporate Health, Safety and Environment Policy.. 1 Purpose... 2 HSEMS Framework... 3 PART

More information

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act

More information

An Introduction to Oil and Gas Well Servicing

An Introduction to Oil and Gas Well Servicing An Introduction to Oil and Gas Well Servicing Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals & Mining

More information

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA Table of content 1. INTRODUCTION... 2 1.1. Purpose of document... 2 1.2. Det norske oljeselskap... 2 1.3. HSE... 2 2. ABOUT THE IVAR AASEN FIELD... 2 2.1.

More information

SWEDBANK SUMMIT. Det norske presentation. Oslo, 20 March 2014

SWEDBANK SUMMIT. Det norske presentation. Oslo, 20 March 2014 SWEDBANK SUMMIT Det norske presentation Oslo, 20 March 2014 Building a company for the future Strong production growth Current production ~4,000 boepd (Jette, Atla, Jotun, Varg) Ivar Aasen and Johan Sverdrup

More information

Subsea School The training program

Subsea School The training program Subsea School The training program Table of Contents Welcome to the FMC Subsea School... 3 Training Schedules and Participation... 4 SS Subsea Technology Introduction... 5 MPS - Subsea Structures... 6

More information

Plug and Abandonment Forum

Plug and Abandonment Forum Plug and Abandonment Forum Developments in Non-Traditional Plug and Abandonment Methods Thomas Ferg ConocoPhillips Norway June 13, 2013 Efficient P&A Thoughts - Do as Much as Possible Without a Rig Remove

More information

078 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR USE OF MANRIDER

078 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR USE OF MANRIDER 078 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR USE OF MANRIDER Translated version No.: 078 Established: 01.01.2003 Revision no: Rev. date: Page: 2 Summary / Recommendation It is recommended that

More information

RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF

RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF No.: 070 Date effective: 1.02.2001 Revision no.: 01 Date revised: NA

More information

Asset Management Systems Scheme (AMS Scheme)

Asset Management Systems Scheme (AMS Scheme) Joint Accreditation System of Australia and New Zealand Scheme (AMS Scheme) Requirements for bodies providing audit and certification of 13 April 2015 Authority to Issue Dr James Galloway Chief Executive

More information

ACHIEVING COMPLIANCE THROUGH PEOPLE: TRAINING SUPERVISORS TO TACKLE PROCEDURAL NON-COMPLIANCE

ACHIEVING COMPLIANCE THROUGH PEOPLE: TRAINING SUPERVISORS TO TACKLE PROCEDURAL NON-COMPLIANCE ACHIEVING COMPLIANCE THROUGH PEOPLE: TRAINING SUPERVISORS TO TACKLE PROCEDURAL NON-COMPLIANCE Paul Leach 1, Jonathan Berman 1 and David Goodall 2 1 Greenstreet Berman Ltd, London, UK 2 National Grid, UK

More information

Deepwater Horizon Accident Investigation Report

Deepwater Horizon Accident Investigation Report Deepwater Horizon Accident Investigation Report September 8, 2010 This is the report of an internal BP incident investigation team. The report does not represent the views of any individual or entity other

More information

SAFETY and HEALTH MANAGEMENT STANDARDS

SAFETY and HEALTH MANAGEMENT STANDARDS SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents

More information

EST.491. Cost Estimation Challenges and Uncertainties Confronting Oil and Gas Companies

EST.491. Cost Estimation Challenges and Uncertainties Confronting Oil and Gas Companies EST.491 Cost Estimation Challenges and Uncertainties Confronting Oil and Gas Companies Nicolas Alexander Hall and Sarah Delille, PE ABSTRACT Usually, when a company has a history of successfully planning

More information

Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS

Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS Published by the British Institute of Facilities Management BIFM November 2014 1 Why measure performance? Jonah Lomu

More information

CODE OF PRACTICE. Safety Management. Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1

CODE OF PRACTICE. Safety Management. Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1 CODE OF PRACTICE On Safety Management Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1 This Code of Practice is prepared by the Occupational Safety and Health

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

Norwegian Data Inspectorate

Norwegian Data Inspectorate Norwegian Data Inspectorate Narvik kommune Postboks 64 8501 NARVIK Norway Your reference Our reference (please quote in any reply) Date 1111/1210-6/PEJA 11/00593-7/SEV 16 January 2012 Notification of decision

More information

Chapter 1: Health & Safety Management Systems (SMS) Leadership and Organisational Safety Culture

Chapter 1: Health & Safety Management Systems (SMS) Leadership and Organisational Safety Culture Chapter 1: Health & Safety Management Systems (SMS) Leadership and Organisational Safety Culture 3 29 Safety Matters! A Guide to Health & Safety at Work Chapter outline Leadership and Organisational Safety

More information

NORSOK STANDARD S-006 Rev 2, December 2003

NORSOK STANDARD S-006 Rev 2, December 2003 NORSOK STANDARD S-006 Rev 2, December 2003 HSE evaluation of contractors This NORSOK standard is developed with broad petroleum industry participation by interested parties in the Norwegian petroleum industry

More information

OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017

OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017 STRATEGIC CONTEXT OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017 1 This strategy sets out how HSE s Energy Division will regulate health and safety of the offshore oil and gas industry operating on the

More information

To enable transport of wellstream over long distances. Compressor located by the wellheads.

To enable transport of wellstream over long distances. Compressor located by the wellheads. 487 subsea wells Subsea compression is increase of gas wellstream pressure by means of a compressor: To enhance reservoir recovery reducing the back-pressure on the reservoir To enable transport of wellstream

More information

Procedure: OHS CONTRACTOR MANAGEMENT

Procedure: OHS CONTRACTOR MANAGEMENT Procedure: OHS CONTRACTOR MANAGEMENT. Purpose This procedure outlines the occupational health and safety (OHS) requirements for the management of contractors engaged to perform tasks or services for Greater

More information

1 What is the purpose of this document?

1 What is the purpose of this document? Executive Summary Comparing the Oil and Gas Drilling Regulatory Regimes of the, the, the U.K,, and 1 What is the purpose of this document? The National Energy Board (NEB) regulates offshore oil and gas

More information

The Competitive Edge. The Foundation For Competing

The Competitive Edge. The Foundation For Competing Passion - Creativity - Innovation - Initiative - Intellect - Dedication - Compliance - The Competitive Edge The Foundation For Competing Statoil s Subsea Technology Strategy, with selected technology challenges

More information

Asset Integrity - Process Safety Management

Asset Integrity - Process Safety Management Asset Integrity - Process Safety Management Commit to Process Safety Understand Hazards & Risks Manage Risk Learn from experience Process safety culture Compliance with standards Process safety competency

More information

Net operating income Earnings per share Net income

Net operating income Earnings per share Net income Press release 1 August 2008 Record results and high production StatoilHydro's second quarter 2008, operating and financial review StatoilHydro's second quarter 2008 result was influenced by high production

More information

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document. 2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...

More information

1. What is BSEE s vision for the regulatory program?

1. What is BSEE s vision for the regulatory program? Shell Exploration & Production Company One Shell Square P. O. Box 61933 New Orleans, LA 70161-1933 United States of America Tel +1 504 728 4143 Fax +1 504 728 4567 Telex http://www.shell.com/eandp-en Email

More information

International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education.

International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education. ISO 2002 All rights reserved ISO / IWA 2 / WD1 N5 Date: 2002-10-25 Secretariat: SEP-MÉXICO International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000

More information

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011 Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial

More information

Ensuring Asset Integrity through Risk Assessment.

Ensuring Asset Integrity through Risk Assessment. www.unitedsafety.net Ensuring Asset Integrity through Risk Assessment. Quest Wellhead* is a software solution developed by United Safety to help Exploration and Production (E&P) companies maintain a database

More information

CHALLENGES OF ACCURATE COST ESTIMATION FOR FACILITIES PAM BOSCHEE OIL AND GAS FACILITIES EDITOR

CHALLENGES OF ACCURATE COST ESTIMATION FOR FACILITIES PAM BOSCHEE OIL AND GAS FACILITIES EDITOR CHALLENGES OF ACCURATE COST ESTIMATION FOR FACILITIES PAM BOSCHEE OIL AND GAS FACILITIES EDITOR ost estimation for facilities depends C on early concept selection and critical inputs, often complicated

More information

Topsides, Floaters & Onshore Facilities

Topsides, Floaters & Onshore Facilities Topsides, Floaters & Onshore Facilities KVAERNER PARTNER Kvaerner is a specialised engineering, procurement and construction (EPC) company. As a preferred partner for oil and gas operators, Kvaerner is

More information

ANNUAL REPORT 2008. The Draugen field that is operated by Norske Shell started production in 1991 and is operated from Kristiansund.

ANNUAL REPORT 2008. The Draugen field that is operated by Norske Shell started production in 1991 and is operated from Kristiansund. ANNUAL REPORT 2008 BP Norge AS (BPN) is owned by BP Global Investments Ltd and Amoco Norway Oil Company. Both are part of the BP Group which itself is one of the largest integrated Oil & Gas Companies

More information

Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) 7917134922 E-Mail: elindsay@blueyonder.co.

Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) 7917134922 E-Mail: elindsay@blueyonder.co. Edwin Lindsay Principal Consultant, Tel: + 44 (0) 7917134922 E-Mail: elindsay@blueyonder.co.uk There were no guidelines/ regulations There was no training No Procedures No Inspectors Inform All staff of

More information

Quality & Safety Manual

Quality & Safety Manual Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities

More information

Safety Monitor Requirements. October 2015

Safety Monitor Requirements. October 2015 Introduction This document sets out Safety Monitors for the 2015/16 winter, pursuant to National Grid s obligations under the Uniform Network Code (UNC), Section Q. Safety Monitors were introduced in 2004

More information

Checklist for an audit of safety management

Checklist for an audit of safety management Checklist for an audit of safety management Report No. 6.15/160 February 1990 P ublications Global experience The International Association of Oil & Gas Producers (formerly the E&P Forum) has access to

More information

Integrated Risk Management:

Integrated Risk Management: Integrated Risk Management: A Framework for Fraser Health For further information contact: Integrated Risk Management Fraser Health Corporate Office 300, 10334 152A Street Surrey, BC V3R 8T4 Phone: (604)

More information

SECTION B DEFINITION, PURPOSE, INDEPENDENCE AND NATURE OF WORK OF INTERNAL AUDIT

SECTION B DEFINITION, PURPOSE, INDEPENDENCE AND NATURE OF WORK OF INTERNAL AUDIT SECTION B DEFINITION, PURPOSE, INDEPENDENCE AND NATURE OF WORK OF INTERNAL AUDIT Through CGIAR Financial Guideline No 3 Auditing Guidelines Manual the CGIAR has adopted the IIA Definition of internal auditing

More information

New product development within ABC Electronics

New product development within ABC Electronics New product development within ABC Electronics ABC Electronics is involved in design and manufacture of products for the IT industry; it has core technical expertise in acoustics, electronics design and

More information

Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems

Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of

More information

Forebyggende arbeid i letefasen What do we do to prevent major accidents during exploration drilling?

Forebyggende arbeid i letefasen What do we do to prevent major accidents during exploration drilling? Forebyggende arbeid i letefasen What do we do to prevent major accidents during exploration drilling? HSE seminar for small and new operators and licensees Per Olav Sætre, November 8 th 2012 Lundin Norway

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

ISO 9001 Quality Systems Manual

ISO 9001 Quality Systems Manual ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human

More information

NORWEGIAN PROJECT MANAGEMENT PRINCIPLES APPLIED IN THE JURONG ROCK CAVERN PROJECT

NORWEGIAN PROJECT MANAGEMENT PRINCIPLES APPLIED IN THE JURONG ROCK CAVERN PROJECT NORWEGIAN PROJECT MANAGEMENT PRINCIPLES APPLIED IN THE JURONG ROCK CAVERN PROJECT FINN FAGERVIK 1, PETTER PLASSBAK 1 and TEO TIONG YONG 2 1 Sintef-Tritech-Multiconsult (STM) Consortium, Singapore E-mail:ff@multiconsult.no

More information

RAISED ACCESS FLOOR KAPP ALUMINIUM TRETUM OFFSHORE

RAISED ACCESS FLOOR KAPP ALUMINIUM TRETUM OFFSHORE RAISED ACCESS FLOOR KAPP ALUMINIUM TRETUM OFFSHORE Tretum Special Offshore Raised Access Floor is a Norwegian product supplied from Kapp Aluminium Tretum Offshore AS. The floor system is designed to meet

More information

Information to action: the pivotal role of accurate diagnosis in the management of well integrity issues

Information to action: the pivotal role of accurate diagnosis in the management of well integrity issues Information to action: the pivotal role of accurate diagnosis in the management of well integrity issues Tobben Tymons Marketing Manager, Wireline, Eastern Hemisphere SPE Aberdeen, 23rd January 2013 Agenda

More information

Rail Network Configuration Management

Rail Network Configuration Management Division / Business Unit: Function: Document Type: Enterprise Services Engineering Procedure Rail Network Configuration Management Applicability ARTC Network Wide SMS Publication Requirement Internal /

More information

Crew Resource Management in CRIOP from 2004

Crew Resource Management in CRIOP from 2004 Crew Resource Management in CRIOP from 2004 Stig.O.Johnsen@sintef.no 1 Agenda Why CRM focus in CRIOP in 2004? Experiences of use Suggested use of CRM 1 Human Factors and CRM Human Factors (in short) a

More information

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions Canada - US Northern Oil and Gas Research Forum Calgary, Alberta December 2 nd, 2010 An Overview An Overview Of Same Season

More information

Dumfries & Galloway Council

Dumfries & Galloway Council Dumfries & Galloway Council Audit of housing and council tax benefit Risk assessment report Prepared for Dumfries & Galloway Council May 2013 Audit Scotland is a statutory body set up in April 2000 under

More information

SELECTION AND USE OF SUBSEA LEAK DETECTION SYSTEMS

SELECTION AND USE OF SUBSEA LEAK DETECTION SYSTEMS RECOMMENDED PRACTICE DNV-RP-F302 SELECTION AND USE OF SUBSEA LEAK DETECTION SYSTEMS APRIL 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

15 Guiding Principles

15 Guiding Principles Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures

More information

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer HIPPS Application in the Gulf of Mexico Christopher Lindsey-Curran BP Senior Subsea Engineer Agenda Introduction and background HIPPS overview Codes and standards System design Regulatory issues Conclusions

More information

Safety Management Program

Safety Management Program Corrective Action Plan (CAP) Safety Management Program Submitted by TransCanada PipeLines Limited and its National Energy Board Regulated Subsidiaries to address non-compliant findings in the National

More information

Safety Challenges in the Arctic

Safety Challenges in the Arctic Safety Challenges in the Arctic International Conference on Integrated Operations in the Petroleum Industry Trondheim, 25.09.13 Børre Johan Paaske, DNV GL Agenda Defining the Arctic Safety and environmental

More information

Offshore Megaprojects - Why we fail and how to fix it

Offshore Megaprojects - Why we fail and how to fix it ------ ---- Track Two: Deepwater Developments: Increasing Demand While Maintaining Quality & Reliability Offshore Megaprojects - Why we fail and how to fix it Roy Robinson Global Contracts Manager for

More information

Implementation of a Quality Management System for Aeronautical Information Services -1-

Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management

More information

Operational Excellence Management System

Operational Excellence Management System Operational Excellence Management System Operational Excellence Management System FTO Services is committed to conducting business in a manner that is compatible with the environmental and economic needs

More information

Introduction to Subsea Production System

Introduction to Subsea Production System Introduction to Subsea Production System 04 Xmas Tree Systems Bjørn Søgård Xmas Tree Systems This module will cover: Main codes for XT equipment XT Principles and functions Typical schematic Main types

More information

Photo: Erik Nærbø. QHSE program. www.odfjelldrilling.com

Photo: Erik Nærbø. QHSE program. www.odfjelldrilling.com Photo: Erik Nærbø 2015 QHSE program www.odfjelldrilling.com 3 Preface 4 policy 4 HSE policy 4 Environmental principles 5 Security Policy 6 Corporate 7 Mobile Offshore Drilling Units 8 Odfjell Well Services

More information

ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN

ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN ANSTO Nuclear Medicine Facility Construction Licence Application Document ANM-Mo99-C-LA-D2 rev 0 ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN Prepared By Australian

More information

Guidance Note: Corporate Governance - Board of Directors. March 2015. Ce document est aussi disponible en français.

Guidance Note: Corporate Governance - Board of Directors. March 2015. Ce document est aussi disponible en français. Guidance Note: Corporate Governance - Board of Directors March 2015 Ce document est aussi disponible en français. Applicability The Guidance Note: Corporate Governance - Board of Directors (the Guidance

More information

Tax Executives Institute

Tax Executives Institute Tax Executives Institute Texas Oil and Gas Transactions May 6, 2013 Circular 230 disclaimer Any US tax advice contained herein was not intended or written to be used, and cannot be used, for the purpose

More information

Operational data First quarter Full year 2010 2009 Change 2009

Operational data First quarter Full year 2010 2009 Change 2009 Press release 5 May 2010 Stronger results in volatile markets Operating and Financial Review Statoil's first quarter 2010 net operating income was NOK 39.6 billion, an 11% increase compared to NOK 35.5

More information

Domestic Shipping. Safety Management System. Company:

Domestic Shipping. Safety Management System. Company: Domestic Shipping Safety Management System Company: Contents: Introduction: 1.0 General 2.0 Safety and Environmental Protection Policies 2.1 Company Safety Policy 2.2 Company Environmental Protection Policy

More information

An organization properly establishes and operates its control over risks regarding the information system to fulfill the following objectives:

An organization properly establishes and operates its control over risks regarding the information system to fulfill the following objectives: p. 1 System Management Standards Proposed on October 8, 2004 Preface Today, the information system of an organization works as an important infrastructure of the organization to implement its management

More information

Rigorous Qualification and Development Program

Rigorous Qualification and Development Program FMC Subsea High Capacity 20K Wellhead System Overview 03/20/2013 UWD HC-20 Subsea Wellhead System Rigorous Qualification and Development Program 2 1 Qualification program Qualification testing is performed

More information

GOVERNANCE AND MANAGEMENT OF CITY COMPUTER SOFTWARE NEEDS IMPROVEMENT. January 7, 2011

GOVERNANCE AND MANAGEMENT OF CITY COMPUTER SOFTWARE NEEDS IMPROVEMENT. January 7, 2011 APPENDIX 1 GOVERNANCE AND MANAGEMENT OF CITY COMPUTER SOFTWARE NEEDS IMPROVEMENT January 7, 2011 Auditor General s Office Jeffrey Griffiths, C.A., C.F.E. Auditor General City of Toronto TABLE OF CONTENTS

More information