1 Scott A. Smith Finance Director (603) One Government Way Somersworth, New Hampshire (603) City of Somersworth, New Hampshire OFFICE OF THE FINANCE DIRECTOR REQUEST FOR BID Roof Repair and Replacement Water and Wastewater Treatment Facilities All Bids must be submitted with the attached bid certificate, in a sealed envelope, plainly marked, Bid #B addressed as follows: Somersworth City Hall Attn: Scott A. Smith, Director of Finance One Government Way Somersworth, NH All proposals/bids must be received by July 24, 2014 at 2:30 p.m. EST at which time they will be publicly opened and read aloud at the Somersworth City Hall. *IMPORTANT: If you are not interested in submitting a quotation on this particular bid request, but wish to remain on our active bid list, please sign and return the attached form with a NO BID indication. Failure to respond in this manner will result in deletion from our bid list. Vendors wishing to respond to a bid request with alternates to specifications must notify the Finance Office no less than five (5) days prior to the bid request opening date. If the proposed changes are acceptable, the City will advise other potential respondents, thereby maintaining equality in the bid process. Failure to advise the City could result either in rejection of the alternate proposal or in an untimely extension of the sealed bid process. Vendors may be asked, as part of the bid evaluation process, to supply company financial information. This data will be held in the strictest confidence and be utilized only to help assess the stability of a responding firm. The records will be returned to you after identifying the successful respondent to the bid request.
2 Request Type Proposal/Bid Page 2 of 16 BACKGROUND The City of Somersworth is requesting bids from qualified Contractors to replace and repair the roofing on two City of Somersworth facilities: I. The Water Treatment Facility, 9 Wells St., Somersworth, NH consists of two roof sections that require replacement. The original facility was constructed in 1895 and has a high slope slate roof with copper flashing (approximately 4,300 square feet, Contractor to field verify). An addition to the water treatment facility was built in 1991 and has a low slope membrane roof (approximately 9,000 square feet, Contractor to field verify). The low slope membrane roof is to be replaced in kind with additional rigid insulation to be provided. However, there are two alternates for the work proposed for the high slope slate roof: Alternate 1: Repair of the existing slate roof in place, or Alternate 2: Remove and replace the slate roof with an asphalt shingle roof. There is an alternate for replacing the existing rolled copper gutters with new rolled copper gutters as follows: Alternate 3: Remove and replace existing copper gutter with new quarter round integrated solid copper gutter with copper straps and fasteners and repair/replace fascia as needed for a complete installation. II. The Wastewater Treatment Facility, 99 Buffumsville Road, Somersworth, NH has a low slope ballasted membrane roof (approximately 13,875 square feet, Contractor to field verify). This membrane roof is to be removed and replaced in kind. The City is requesting a bid for each facility, and a total for both facilities. Although the City desires to contract with a single Contractor for both facilities, the City reserves the right to award each contract individually if it is determined to be in the best interest of the City. Pre-Bid Walk Through Inspection: A non-mandatory pre-bid walk through inspection of each facility roof has been scheduled for July 10, 2014 at 1:00PM The City highly recommends that all Contractor s bidding on the projects attend the Pre-Bid walk through. Filename Request for Bid Utility Building Roof Repairs B Page 2 of 16
3 Request Type Proposal/Bid Page 3 of 16 SCOPE OF WORK I. Water Treatment Facility Bid Item #1 - Membrane Roof (1991) Section: 1. The work consists of: removal of existing membrane roof, damaged rigid insulation and metal roof edge; and installation of new, fully adhered EPDM membrane, new rigid insulation, and new metal roof edge. 2. Roof to be fully adhered 60-mil reinforced EPDM membrane roof system. 3. The Contractor is to be certified by the roof manufacturer as having the necessary experience and equipment to install the specified system. 4. Remove and dispose of existing roof membrane, flashings, terminations, and metal roof edge. 5. Cut out and dispose of any wet or damaged rigid insulation. Fill voids with new insulation flush with existing insulation. Payment for removal and replacement of rigid insulation to be by unit price. 6. Install 2 inch polyisocyanurate roof insulation (25 psi) over existing insulation. Mechanically attached to roof deck per roof manufacturer s installation instructions. Stagger joints of new insulation with joints of existing insulation. 7. Install new kiln dried wood blocking at perimeter of roof system to match new insulation added thickness. 8. Clean all roof surfaces of debris, contaminants, and moisture in preparation for new roofing. 9. Install fully adhered 60-mil reinforced EPDM per manufacturer s installation instructions. 10. Base flashings to extend 8-inches minimum above roof. Pipe boots shall extend 6-inches minimum above roof. Use 6 inch wide seam product for splicing adjoining seams of membrane per manufacturer s requirements. 11. Provide terminations, flashings, and sealants per manufacturer s recommendations at roof perimeter and penetrations. 12. Install roof drain per manufacturer s recommendations. Maintain roof drain function during reroofing. 13. Provide pre finished aluminum (0.050 gauge minimum) embedded gravel stop roof edge. Color to match existing. 14. Complete roof system installation is required in the same work day. Each day s work shall be weather tight. Apply temporary protection as required. 15. Clean up and protect finished work until substantial completion. 16. All work must have a 2 year workmanship guarantee and a 15 year manufacturer s standard roof system warranty. Filename Request for Bid Utility Building Roof Repairs B Page 3 of 16
4 Request Type Proposal/Bid Page 4 of 16 Bid Item #2: Slate Roof Repairs Section (see Alternate 2 for Copper Gutter) 1. The work consists of repairing existing slate roofing, flashings, and replacement of copper gutters to provide for a fully functional slate roof. 2. Provide qualified workers, trained and experienced in installing slate roofing systems of this configuration. 3. All work to be in accordance with the latest editions of the SMACNA and NRCA Roofing Manuals. 4. The Owner has maintained a small stockpile of replacement slate on site and will provide a portion of slate remaining from the original building roofing for spot repairs. The Contractor is to field verify the amount of slate stockpiled and its serviceability for use in the field. Original slate should be used for the most visible repair areas of the building. 5. Slate shall be Grade A, (ASTM S1), hard, dense rock, punched or drilled for two nails each. Cracked slate shall not be used. Exposed corners shall be full. New slate shall match existing as close as possible in color, thicknesses and lengths of the existing slate. Salvage and reuse intact and serviceable existing slate materials whenever possible. 6. The slate roofing underlayment shall be 30 pound asphalt saturated rag felt per ASTM D 226, flashed under existing underlayment. Provide self-adhered waterproofing membrane at eaves and valley repairs. 7. Flashing shall be 20 ounces per square foot, light cold-rolled temper (H00) copper conforming to ASTM B The roofer shall use large head slaters' solid copper nails, 2 inch or longer. Nails should penetrate the roof deck a minimum of 1 inch. 9. As much as possible all nail heads shall be covered by slate. Exposed nails are only permissible where unavoidable. Exposed nail heads shall be covered with elastic cement. 10. All repair areas shall be covered with slate in a proper and weatherproof manner. Match existing roof exposure and hip and ridge construction. 11. Install new flashings at all roof penetrations. 12. Repair all copper roof flashings in areas of roof repair as required with the exception of roof edge. Match existing flashing construction and configuration. 13. Replacement gutters shall be a dark brown 6 half round aluminum gutter of one piece construction that shall closely match the existing gutter s profile. All joints to be locked and sealed. Repair/replace fascia as needed prior to installing new gutters. All copper gutters, fasteners, and hardware removed shall be delivered to the City of Somersworth Public Works Department. Filename Request for Bid Utility Building Roof Repairs B Page 4 of 16
5 Request Type Proposal/Bid Page 5 of Replace existing copper downspouts with new aluminum downspouts (matching). Deliver copper downspouts to the City of Somersworth Public Works Department. 15. Upon completion, all areas of the existing building roof shall be repaired to provide a sound, visibly whole roof. The roof must be left watertight and neat in every respect, and subject to the Owner s approval. 16. The Contractor shall furnish the Owner with a stock of 200 lbs extra slate for future roof repairs. 17. Furnish a warranty to the Owner against defects in material and workmanship of slate roof repair areas for a period of 2 years and a period of 5 years for work related to metal flashing, gutters and downspouts. Alternate 1: New Asphalt Shingle Roof (replaces Bid Item #2 and Alternate 2) 1. The work consists of: removal and disposal of existing slate roofing and associated metal flashings, gutters and downspouts; and replacement with new asphalt shingle roofing and metal flashings. 2. All work shall be in accordance with NRCA Roofing Manual (latest edition) and the written installation requirements of the roofing materials manufacturer. 3. Asphalt shingle to be lifetime warranty Certainteed Grand Manor asphalt shingle roofing in Colonial Slate color. 4. Remove and dispose of existing slate roofing, metal flashings, gutters and downspouts. All copper materials are the property of the City of Somersworth and are to be delivered by the Contractor to the City of Somersworth Public Works Department. 5. Remove copper gutter and downspouts and deliver to Owner. Repair/replace damaged and worn fascia as required. 6. Clean all roof surfaces of debris and contaminants in preparation for new roofing. 7. Install roof underlayment and asphalt shingle roofing when ambient temperature is above 45 degrees F. 8. Provide self-adhered waterproofing membrane underlayment: (2) overlapped sheets (5-6 width) at eaves and (1) sheet (3 width) in valleys per manufacturer s recommendations. The turret location shall get full coverage of self adhered waterproofing membrane underlayment. 9. Provide synthetic roof underlayment at remainder of roof: Roof underlayment to be CertainTeed Diamond Deck, synthetic polymer-based scrim reinforced underlayment. 10. Install new flashings at all roof penetrations. 11. Fasten underlayment and roof shingles with standard round wire deformed shank roofing nails, hot dipped galvanized; minimum inch head diameter; minimum Filename Request for Bid Utility Building Roof Repairs B Page 5 of 16
6 Request Type Proposal/Bid Page 6 of shank diameter; shank to be sufficient length to penetrate 1 inch into decking for shingles, ¾ for underlayment. Provide (4) nails per shingle. 12. Flashings shall be 20 ounces per square foot, light cold-rolled temper (H00) copper conforming to ASTM B Supply and install new F-8 residential style copper drip edge metal with continuous nailing flange anchoring at eave and rake locations. 14. Install metal valley flashing. Overlap valley flashing a minimum 5 inches with asphalt shingles. 15. Install hip and ridge accessory shingles at hips and ridges, attach per manufacturer s recommendations. 16. Replacement gutters shall be a dark brown 6 half round aluminum gutter of one piece construction that shall closely match the existing gutter s profile. All joints to be locked and sealed. Repair/replace fascia as needed prior to installing new gutters. 17. Replace existing copper downspouts with new aluminum downspouts (matching). 18. Complete roof system installation is required in the same work day. Each day s work shall be weather tight. Apply temporary protection as required. 19. Clean up and protect finished work until substantial completion. 20. All work must have a 2 year workmanship warranty and a standard 30-year Manufacturer s warranty for asphalt shingles. Alternate 2: New Rolled Copper Gutter, Downspouts, Brackets, and Fasteners (replaces line items 12 & 13 for Bid Item #2) 1. The work consists of: removal and replacement of existing copper gutters and downspouts with new quarter round integrated solid copper gutters, brackets, fasteners, and downspouts. Match existing construction details and configuration. All gutter joints to be locked and soldered. Deliver all copper gutters, fasteners, brackets, and downspouts removed to the City of Somersworth Department of Public Works. 2. Repair/replace damaged and worn fascia as needed prior to installing gutters. 3. Repair/replace copper downspouts as required for weather-tightness. II. Wastewater Treatment Facility Bid Item # 3: Membrane Roof 1. The work is to consist of removal and replacement of the existing ballasted membrane. 2. The Contractor is to be certified by the roof manufacturer as having the Filename Request for Bid Utility Building Roof Repairs B Page 6 of 16
7 Request Type Proposal/Bid Page 7 of 16 necessary experience to install the specified system. 3. Move and shift existing river rock ballast as required to perform roof work. Prior to moving ballast, field verify thickness in order to match existing thickness in final ballast placement. 4. Remove and dispose of existing EPDM membrane, flashings and metal roof edge. 5. Remove and replace any damaged roof edge and attachment blocking 6. Cut out and dispose of any wet or damaged rigid insulation. Fill voids with new insulation flush with existing insulation. Payment for removal and replacement of rigid insulation to be by unit price. 7. Clean all roof surfaces of debris, contaminants and moisture in preparation for new roofing. Prepare and clean surfaces for new construction. 8. Install ballasted 60-mil reinforced EPDM membrane loose laid over existing insulation. 9. Base flashings to extend 8 inches minimum above roof. Pipe boots shall be 6 inches minimum above roof. Use 6 inch wide seam product for splicing adjoining seams of membrane per manufacturer s requirements. 10. Supply and install all flashings, terminations, and sealants at roof perimeter, penetrations, and terminations in accordance with manufactures instructions. 11. Complete roof system installation is required in the same work day. Each day s work shall be weather tight. Apply temporary protection as required. 12. Place existing river rock ballast to match and provide additional ballast as necessary to match original conditions. 13. Clean up and protect finished work until substantial completion. 14. All work must have a 5 year workmanship guarantee and a 15 year manufacturer s standard roof system warranty. Additional Job Requirements The following are the City s expectations of the Contractor while work is occurring. 1. All work areas are to be swept and left neat and clean after each day s work is completed and at the end of the project. 2. Work shall not unduly disrupt the day-to-day activities of the Utilities. Business hours for the facilities are Monday through Friday 7:00 am to 4:00 pm. Work shall be performed between these hours. The Contractor s hours may be extended to 5:00 pm or to sunset, whichever is sooner, with specific authorization from the Director of Public Works and Utilities. 3. The Contractor is responsible for all job site safety means and methods including specific requirements for low slope and high slope roof work. 4. The Contractor is expected to provide safeguards and protection for the buildings Filename Request for Bid Utility Building Roof Repairs B Page 7 of 16
8 Request Type Proposal/Bid Page 8 of 16 and grounds below the area of roof work to insure that no damage to property or injury to pedestrians occurs. 5. The Contractor is responsible for all permits and fees required. All work shall adhere to all Federal, State, and Local building codes, and safety rules and regulations. 6. The Contractor shall provide a warranty for workmanship and weather-tightness in the roof system for 5 years fro membrane and asphalt shingle roofs and 2 years for slate roof repair from the date of substantial completion of the work. The warranty will be for labor and materials and for issues resulting from normal weather and operating conditions. Normal weather is defined as any weather event for which the President of the United States has not declared a natural disaster in Strafford County. 7. Work shall be completed by October 15, Completion date may be extended, by the City in writing, for any reason determined to be in the best interest of the City. INSURANCE REQUIREMENTS The Contractor s Public Liability and Property Damage Insurance shall provide adequate protection against Public Liability, Property Damage, and Vehicular Liability. The Contractor shall supply a copy of insurance coverage as detailed below to the City before the start of any work on this project. Minimum Insurance requirements, naming the City of Somersworth as additional insured, are as follows: a. Workmen's Compensation Insurance Legal Requirements b. Commercial General Liability Limits of Liability Bodily Injury: $2,000,000 per occurrence $2,000,000 aggregate Property Damage: $2,000,000 per occurrence $2,000,000 aggregate c. Combined Single Limit, Bodily Injury and Property Damage $2,500,000 per occurrence - $2,500,000 aggregate The Contractor shall comply with all Federal, State and local laws and ordinances including Social Security, Unemployment Insurance, Pensions, etc Filename Request for Bid Utility Building Roof Repairs B Page 8 of 16
9 Request Type Proposal/Bid Page 9 of 16 BID BOND All bids must be submitted with a Bid Bond in the amount of five percent (5 %) of the Bid Price. Bid Bonds may be presented in the form of a contract executed between the BIDDER and a Surety Company, a certified check, or cash. P ERFORMANCE BOND The successful BIDDERS(s) shall execute a Performance Bond in the amount of one hundred percent (100%) of the Bid Price. The BIDDER, Owner and a Surety Company shall execute Bond. PAYMENT BOND The successful BIDDER shall provide a Payment Bond in the amount of one hundred percent (100%) of the Bid Price, executed between the BIDDER, Owner and a Surety Company WARRANTY 2 year workmanship guarantee on all slate roof repair work performed; 5 year workmanship guarantee on all membrane and asphalt shingle roof installation work performed; 15 year Manufacturer s warranty on all membrane roof materials installed; 30 year Manufacturer s warranty on all asphalt shingle roof materials installed. PRIME CONTRACTOR REQUIRMENTS Prime Contractor means a contractor who enters into a contract with the City of Somersworth to perform the work prescribed by the contract. Filename Request for Bid Utility Building Roof Repairs B Page 9 of 16
10 Request Type Proposal/Bid Page 10 of 16 Subcontractor means an individual, partnership, limited liability company, association, corporation, subsidiary, or joint stock company that performs contracting services, and its members, managers, officers, shareholders, representatives, trustees, or receivers appointed by any court of competent jurisdiction to whom the Prime Contractor sublets any portion of the contracted work. Prime Contractors bidding the work shall not sublet more than 49% of the contract value (in aggregate) to one or more qualified Subcontractors for this project. All Subcontractor s must provide insurance certificates and must meet the same standards as the Prime Contractor to perform work for the City of Somersworth. Filename Request for Bid Utility Building Roof Repairs B Page 10 of 16
11 Request Type Proposal/Bid Page 11 of 16 BID FORM REFERENCES: At least three (3) references of other municipalities or businesses for whom similar services have been provided shall be included with the bid response: Filename Request for Bid Utility Building Roof Repairs B Page 11 of 16
12 Request Type Proposal/Bid Page 12 of 16 Bid Sheet BID ITEM #1 WATER TREATMENT PLANT (WTP) MEMBRANE ROOF (1991 SECTION) Submit with your Bid Proposal manufacturer, brand, and specifications of all roofing materials you intend to use (attach cut sheets) Cost: Lump Sum $ Cost in Words (written governs if discrepancy): BID ITEM #2 - WTP SLATE ROOF REPAIRS (1895 SECTION) Submit with your Bid manufacturer, brand, and specifications of all roofing materials you intend to use (attach cut sheets) Cost: Lump Sum $ Cost in words (written governs if discrepancy): ALTERNATE #1 WTP NEW ASPHALT SHINGLE ROOF (replaces Bid Item #2 and Alternate 2) Submit with your Bid manufacturer, brand, and specifications of all roofing materials you intend to use (attach cut sheets) Cost: Lump Sum $ Cost in words (written governs if discrepancy): Filename Request for Bid Utility Building Roof Repairs B Page 12 of 16
13 Request Type Proposal/Bid Page 13 of 16 ALTERNATE #2 WTP NEW ROLLED COPPER GUTTER, DOWNSPOUTS, BRACKETS, and FASTENERS (replaces line items 12 & 13 from Bid Item #2) Submit with your Bid Proposal manufacturer, brand, and specifications of all materials you intend to use (attach cut sheets) DEDUCT LINE ITEMS 12 & 13 FROM BID ITEM #2: $ ADD ALT#2 Cost: Lump Sum $ ADD ALT#2 Cost in Words (written governs if discrepancy): BID ITEM #3 WASTEWATER TREATMENT FACILITY MEMBRANE ROOF (1895 SECTION) Submit with your Bid manufacturer, brand, and specifications of all roofing materials you intend to use (attach cut sheets) Cost: Lump Sum $ Cost ii words (written governs if discrepancy): SUPPLEMENTAL UNIT PRICES: SU-1 REPLACE WET OR DAMAGED RIGID INSULATION: Cost Per Square Foot $ Cost in Words (written governs if discrepancy): per sf Filename Request for Bid Utility Building Roof Repairs B Page 13 of 16
14 Request Type Proposal/Bid Page 14 of 16 BID CERTIFICATE The undersigned represents that they are authorized to bind the bidder to the bid amount specified and hereby offers to provide to the City of Somersworth the commodities and services as contained in the attached competitive sealed bid specifications at the price stated in complete accordance with all conditions of the bid specifications. Furthermore, The undersigned certifies that this bid is in all respects bona fide, fair, and made without collusion or fraud with any other person. As used in this section the word person means any natural person, joint venture, partnership, corporation or other business or legal entity Official Entity Name FOB Information: Address: City, State, Zip Availability: address: State of Incorporation Warranty/guarantee: Price holds for: : SSN or EIN: Telephone #: Fax #: Signature: : Check here if appropriate : (X) NO BID Any deviations from the above stated specifications must be so noted and any bid prices must be reflective o/these deviations Filename Request for Bid Utility Building Roof Repairs B Page 14 of 16
15 Request Type Proposal/Bid Page 15 of 16 Preparation of Bids/Proposals GENERAL TERMS AND CONDITIONS Bids shall be submitted on the forms provided and must be signed by the bidder or the bidder s authorized representative. The person signing the bid shall initial any corrections to entries made on the proposal form. Unless otherwise stated in the Request for Bid/Proposal, the bidder agrees that the bid shall be open for acceptance for sixty (60) calendar days from the date of submittal to the City of Somersworth. Acceptance or Rejection of Bids/Proposals The City of Somersworth reserves the right to reject any or all bids, to waive technical or legal deficiencies, and to accept any bid that is determined to be in the best interest of the City. The City of Somersworth also reserves the right to reject the bid of a bidder that has failed to perform properly or complete on time contracts of a similar nature. Delivery of Bids/Proposals Bids must be submitted in a sealed envelope, and shall be addressed to the City at the address and to the attention of the official as outlined in the bid documents. All bids must be submitted prior to the specified date and time. Any bids received after the specified date and time will not be considered and will not be opened. Bids delivered via facsimile, , or any format other that within a sealed envelope shall not be considered. Withdrawal of Bids/Proposals A bidder will be permitted to withdraw their bid unopened after it has been deposited if such request is received in writing prior to the time specified for opening the bid. Public Opening of Bid/Proposals Bids will be publicly opened and read aloud at the time and place as indicated in the bid documents. Any bidder, authorized agent, or other interested party may be present. Bid/Proposal Ownership and Costs Upon submission, bids become the property of the City of Somersworth. The cost of preparing and submitting a bid is the sole responsibility of the bidder and shall not be chargeable in any manner to the City. The City will not reimburse any bidder for any costs associated with the preparation and submission of a bid. Filename Request for Bid Utility Building Roof Repairs B Page 15 of 16
16 Request Type Proposal/Bid Page 16 of 16 Examination of Proposed Materials The submission of a bid shall be deemed a representation and warranty by the bidder that it has investigated all aspects of the RFP, that it is aware of the applicable facts pertaining to the RFP process and its procedures and requirements, and that it has read and understands the RFP. No requests for modification in the provisions of the bid shall be considered after its submission on the grounds that the bidder was not fully informed as to any fact or condition. Statistical information, which is contained within a RFP or any addendum thereto, is for informational purposes only. The City disclaims any responsibility for this information that may subsequently be determined to be incomplete or inaccurate Quantities Quantities of materials, whether to be used on projects, or purchased directly by the City, are provided for informational purposes only unless otherwise specifically stated. The City disclaims any responsibility for this information that may subsequently be determined to be incomplete or inaccurate. Bidders are responsible to verify the accuracy of these estimates. Buy Local The City of Somersworth reserves the right to award any bid to local vendors, as determined by the City, even in the event they may not be the lowest qualified vendor, if it is determined to be in the best interest of the City. The City will consider such factors as overall cost, prior service, and any other pertinent information available when making such decisions. Insurance Requirements The successful bidder shall procure and maintain insurance, in the amounts and coverage detailed by the proposal documents at the bidder s sole expense. The successful bidder shall be required to present to the City of Somersworth a certificate of insurance in the amounts required naming the City of Somersworth as an additional insured. Bid Results After the bids are opened and read, the bid results will be available for the public. Bidders that desire a comprehensive list of the bid results may do so by attending the bid opening, or requesting such, in writing, to the Director of Finance and Administration. The award of a bid shall not be considered official until such time that a Purchase Order, fully executed contract, or an award letter has been issued by the City of Somersworth. No presumption of award shall be made by any bidder until such documents have been executed and are in hand. Verbal notification of award is not considered official. Any action by the bidder to assume otherwise is done so at their own risk and the City will not be held liable for any expense incurred by a bidder that has not received an official award. Filename Request for Bid Utility Building Roof Repairs B Page 16 of 16
ADDENDUM #2 November 4, 2015 IFB-15-881
ADDENDUM #2 November 4, 2015 IFB-15-881 Roof Replacement Housing Authority of Kansas City 920 Main Street, Suite 701 Kansas City, MO 64105 NOTICE TO ALL POTENTIAL RESPONDENTS The following addendum to
More informationLarry Haight's Residential Roofing Co, Inc 15203 NE 95th Street Redmond, Washington Phone: (425) 881-9771 Fax: (425) 869-1010
Larry Haight's Residential Roofing Co, Inc 15203 NE 95th Street Redmond, Washington Phone: (425) 881-9771 Fax: (425) 869-1010 Custom bid generated for: Job site address: Lake Villas Condominium Attention:
More informationAsphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
More informationINVITATION TO BID. Contractor Services Associated with:
INVITATION TO BID Contractor Services Associated with: COMMUNITY CENTER AT 330 WINDSOR AVENUE ROOF REPAIR AND RESTORATION PROJECT 330 WINDSOR AVENUE WINDSOR, CT 06095 THIS IS A REQUEST FOR PROPOSALS AND
More informationFinal inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
More informationNEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
More informationBig Stone County Courthouse Slate Roof Shingle Replacement. Request For Proposals
Big Stone County Courthouse Slate Roof Shingle Replacement Request For Proposals Proposals must be delivered in person or mail by: 12:00 P.M., August 28, 2013 Faxed proposals will not be accepted Return
More informationSECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
More informationSECTION 07320 ROOFING TILE
SECTION 07320 ROOFING TILE PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Vitrified clay roofing tiles. 2. Tile accessories. 3. Felt underlayment. 4. Self-adhering sheet underlayment. 5. Snow guards.
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More information1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
More informationTable of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..
Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
More informationGeorgia State University. Urban Life Building Roof Replacement
ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT
More informationResidential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
More informationITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING
DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings
More informationCHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
More informationDrexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
More informationClear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015
Clear Fork Valley Local School District Roofing Repairs Spring/Summer 2015 Instructions to Bidders: Public Notice To Bidders (ORC 3313.46) Notice is hereby given that sealed bids will be received at the
More informationROOF INSPECTION REPORT
ROOF INSPECTION REPORT Date: October 9, 2012 Requesting Firm: FIRST CHOICE INSPECTIONS Santiago Salazar Address: 447 Chilberg Court, San Jose, CA 95133 Phone #: 408-771-7563 Roof Inspected At: 1465 Gerlach
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
More informationNRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
More informationSECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.
SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.
More informationREQUEST FOR PROPOSALS
Page 1 of 6 REQUEST FOR PROPOSALS Issue Date: 2/19/2013 RFP# WHS-2013-001 Title: Services for roofing improvements and annual roof assessments, Windsor School Complex, State Street, Windsor, Vermont Issuer
More informationGUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.
GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07313 [07 31 13]
More informationCHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS
TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes
More informationROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and
More informationREQUEST FOR QUOTES (RFQ)
REQUEST FOR QUOTES (RFQ) Lincoln County Public Works is requesting quotes (RFQ) through its Small Works Roster Process. Quotes are being requested for a project to replace the roof on the Crew Headquarters/Truck
More informationUnity Community Center Metal Roof Installation. Request for Bids
Unity Community Center Metal Roof Installation Unity Barn Raisers Request for Bids May 24, 2012 Town of Unity Communities for Maine s Future Bond funding Unity Barn Raisers PO Box 381 32 School Street
More informationDetached accessory structures that contain no conditioned floor area are exempt.
RESIDENTIAL ROOFING PERMITS: A roofing permit is required for roofing of residential dwellings and garages in accordance with Section R105 of the International Residential Code. Updated 11/2013 City of
More informationTABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"
2 TABLE OF CONTENTS SECTION 1: What is a Standing Seam Metal Roof PAGE 3 SECTION 2: Common Types of Standing Seam Metal Roofs..PAGE 5 SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationCITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
More informationTOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION
TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION April 25, 2014 DUE DATE/LOCATION: Friday, May 9, 2014 Bid forms and references are due by 9:30 A.M. at:
More informationShingle Installation Guide
Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of
More informationSpringdale Public Works Department Specifications and Bid Document Roof Repair on Sign Shop Building at Public Works November 2015 1.
Page 1 of 8 1. INTRODUCTION 1.1 INTRODUCTION This is a Request for Bid (RFB). The format of this document must be followed throughout. 1.2 GENERAL INFORMATION Where the term City is used in the Request
More informationRoofing 101 - Signs that Your Roof Needs Repair/Replacement
By: Cherie Martel Roofing 101 - Signs that Your Roof Needs Repair/Replacement 1. Tell us a little bit about your company and its foundation. In 1963, Samuel T. Martel began a small family run roofing company,
More informationHoliday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.
PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationSECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationADVERTISEMENT FOR BIDDERS
ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
More informationA. This Section includes rubberized asphalt sheet membrane waterproofing systems.
SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationRFP VOICE OVER IP PHONE SYSTEM BID: #14-012- BOE
SPECIFICATIONS AND BID FORMS FOR RFP VOICE OVER IP PHONE SYSTEM MANDATORY WALK-THRU ON THURSDAY, MARCH 13 th from 1:00 P.M. to 3:00 P.M. LOCATION TO BE DETERMINED. BID: #14-012- BOE Due on or before 11:00
More informationHow To Build A Roof Tile Deck
SECTION 07321 COMPOSITE ROOF TILE Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Composite roof tiles. B. Metal roof flashing. C.
More informationREQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS
SECOND ADDENDUM TO RFP DOCUMENTS REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS 11/9/2015 To All Potential Bidders: This
More informationCITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES
CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell
More informationHHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.01 DESCRIPTION SECTION 07610 A. Furnish and install a weather and watertight prefabricated standing seam roof system complete, in place, as shown on the drawings and as specified herein.
More informationWESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC
More informationSPECIFICATIONS & CONTRACT DOCUMENTS FOR MEMBRANE ROOF REPAIR - 2013
SPECIFICATIONS & CONTRACT DOCUMENTS FOR MEMBRANE ROOF REPAIR - 2013 City of Fremont 400 East Military Ave Fremont, Nebraska NOTICE TO BIDDERS PUBLISH THREE (3) TIMES: MEMBRANE ROOF REPAIR - 2013 October
More informationHERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
More informationRequest for Quote Number: 2015-06-PRC Baseball Diamond Backstop Re-Fence
Request for Quote Number: 2015-06-PRC Baseball Diamond Backstop Re-Fence Sealed request for quotes will be received by Brian Tocheri, CAO/Clerk at 341 10 th St. Hanover, Ontario, N4N 1P5 until 2:00 pm,
More informationThe existing roof angle change terminations and flashings when sound and intact can be reused.
January 2, 2015 Summary Specification Re-Skinning an Existing Roof Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Roof with a New C-EPDM Membrane Using The Existing
More informationAlthough we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal
Installing a Low-Slope Exposed EPDM for roof transition Exposed EPDM for resistance to ice damming Sidewall flashing Done with care, a flat roof can provide 0 years or more of leak-free service Gravel
More informationREQUEST FOR PROPOSAL MEDICAL BILLING FOR AMBULANCE SERVICES 2015 FOR THE TOWN OF EXETER FIRE DEPARTMENT
REQUEST FOR PROPOSAL MEDICAL BILLING FOR AMBULANCE SERVICES 2015 FOR THE TOWN OF EXETER FIRE DEPARTMENT PREPARED BY: EXETER FIRE DEPARTMENT 20 COURT STREET EXETER NH 03833 TABLE OF CONTENTS PAGE INVITATION
More informationSECTION 07400 STANDING SEAM METAL ROOF
SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and
More informationSTANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
More informationFLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS
FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS Table of Contents Chapter 1: FLAT ROOF REPAIR - CUT COST WITHOUT CUTTING CORNERS Chapter 2: PVC RECOVER SYSTEM HOW IT WORKS Chapter 3: 8 STRATEGIES TO
More informationNRCA s steep-slope manual is thoroughly revised for 2013
Photo courtesy of Boone Brothers Roofing, Omaha, Neb. NRCA s steep-slope manual is thoroughly revised for 2013 by Maciek Rupar 38 www.professionalroofing.net MARCH 2013 P ublished in January, The NRCA
More informationMETAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:
More informationDIVISION 7 - THERMAL AND MOISTURE PROTECTION
DIVISION 7 - THERMAL AND MOISTURE PROTECTION Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. SECTION 07 1000
More informationSTANDING SEAM SHEET METAL ROOFING
STANDING SEAM SHEET METAL ROOFING GENERAL INFORMATION 1.1 For all standing seam metal roofing work consult Columbia University Facilities Exteriors and Historic Preservation group. 1.2 Fabricator is responsible
More informationFrom the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104
MAHLUM SECTION 00 91 11 ADDENDUM No.1 Date: June 15, 2012 From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104 NOTICE TO ALL CONTRACTORS, SUBCONTRACTORS, AND SUPPLIERS This
More informationMANTON CONSOLIDATED SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS
MANTON CONSOLIDATED SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 16, 2010 1 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF MANTON
More informationCity of Portsmouth, Portsmouth, NH School Department Plumbing Repair Services INVITATION TO BID
INVITATION TO BID Sealed bid proposals, plainly marked "Plumbing Repair Services Contract" will be accepted at the office of the Business Administrator, Portsmouth School Department, 1 Junkins Avenue,
More informationG VYCOR DECK PROTECTOR
G VYCOR DECK PROTECTOR Self-Adhered Flashing Contractor s Guide DECKS AND DETAIL AREAS For longer lasting decks, install Grace Vycor Deck Protector. FROM THE MAKERS OF G Ice & Water Shield What Self-Adhered
More informationSECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
More informationCITY OF ELBERTON, GEORGIA REQUEST FOR PROPOSAL
CITY OF ELBERTON, GEORGIA REQUEST FOR PROPOSAL INVITATION FOR BIDS RFP # 2014 01 RFP TITLE TREE TRIMMING SERVICES FOR POWER LINES ISSUE DATE June 28, 2013 DUE DATE July 29, 2013 at 2:00 PM IMPORTANT NOTE:
More informationInstallation Manual for STANDING SEAM ROOFING
Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high
More informationSINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION
SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)
More informationNOTICE INVITING BIDS. CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03
NOTICE INVITING BIDS CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03 PUBLIC NOTICE IS HEREBY GIVEN that the City of National City, hereinafter referred to as the Agency, invites sealed
More informationSECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
More informationHow To Replace A Roofing System In Florida
Florida Consumer Considerations in Replacing their Roofing System The Florida Roofing, Sheet Metal and Air Conditioning Contractors Association provides the following general information to help Florida
More informationSTANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
More informationSECTION 07411 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Standing-seam metal roof. 2. Metal gutters. 1.2 DEFINITIONS A. Metal Roof Panel Assembly: Metal roof panels, waterproofing membrane (underlayment),
More informationCITY OF CHARLOTTETOWN. REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking Garages
CITY OF CHARLOTTETOWN REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking Garages May 2016 PAGE 2 CITY OF CHARLOTTETOWN REQUEST FOR QUOTATIONS SUPPLY AND INSTALL LIGHTING Municipal Parking
More informationGUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.
GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07314 [07 31 14]
More informationRequest for Bids EPDM Roof Removal and Replacement Harry L. Coomes Recreation Center
Request for Bids EPDM Roof Removal and Replacement Harry L. Coomes Recreation Center The Town of Abingdon is requesting BIDS for professional removal and replacement of the existing EPDM Roofing of the
More informationNAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
More informationTENDER FOR ROOF REPAIR FOR THE NSLC S METEGHAN RETAIL STORE NOVA SCOTIA LIQUOR CORPORATION 93 CHAIN LAKE DRIVE HALIFAX, NOVA SCOTIA B3S 1A3
TENDER FOR ROOF REPAIR FOR THE NSLC S METEGHAN RETAIL STORE NOVA SCOTIA LIQUOR CORPORATION 93 CHAIN LAKE DRIVE HALIFAX, NOVA SCOTIA B3S 1A3 NSLC REFERENCE NO: CN-04-l-16 NSLC Contact: Email: Stephen Bayer
More informationTITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
More informationThe Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems
The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment
More informationINVITATION TO BID CITY OF HOPKINSVILLE
INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD MASONRY RESTROOM FACILITIES FOR
More informationCONTRACTOR GUIDELINES
CONTRACTOR GUIDELINES WORKING IN NEIGHBORHOODS (WIN) HOUSING DIVISION 175 East Second Street, Suite 580 Tulsa, OK 74103 Telephone 918.576.5552 Fax 918.699.3239 Website www.cityoftulsa.org/housing Email
More informationRecord of Work Experiences Trade Qualifier or Pre-Apprenticeship Credits ROOFER
Department of Advanced Education and Skills Apprenticeship and Trades Certification Division Record of Work Experiences Trade Qualifier or Pre-Apprenticeship Credits ROOFER Note to Apprenticeship Applicants
More informationAPPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET
Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing
More informationPeel & Seal Self-Stick Roofing Solutions
Peel & Seal Self-Stick Roofing Solutions Ideal for Low Slope Applications Waterproof and Weatherproof Energy Efficient Tough and Durable Versatile, Effective Sealing Around Protrusions Perfect for Vents,
More informationSECTION 07 54 23 PVC SINGLE PLY ROOFING
SECTION 07 54 23 PVC SINGLE PLY ROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Attached GENERAL CONDITIONS, GENERAL NOTES, INSTRUCTIONS TO BIDDERS, AND BID FORM are components of this section. B. Section
More informationRoofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.
Roofing Systems There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. BUR (Built-Up Roofing) Built-Up-Roofing, BUR is a roof that
More informationRESIDENTIAL ROOF PERMITTING - 101. A REFRESHER WORKSHOP September 11, 2014
RESIDENTIAL ROOF PERMITTING - 101 A REFRESHER WORKSHOP September 11, 2014 Agenda Basics of Permit Application Use of Charlotte County GIS system Florida Product Approvals Top Application Mistakes Standard
More informationROOF ASSEMBLIES AND ROOFTOP STRUCTURES
CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and
More informationTABLE OF CONTENTS. Prefacej... 1
TABLE OF CONTENTS Prefacej... 1 How Can I Receive Copies Of Solicitations?j... 2 Bidder s List... 2 Vendor Registration System... 2 Public Notice/Advertisement... 3 Posting... 3 Internet... 3 Pre-Bid Conferences...
More informationREQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT
REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT The Town of Avon is seeking written responses to a Request for Proposal (RFP) for services of a landscape architect
More informationTOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT
TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT The Milford Board of Library Trustees, as the Awarding Authority, invites the submission of qualifications by responsible
More informationRetaining Wall Replacement at the Currituck County Veterans Memorial Park
CONTRACT DOCUMENTS FOR Retaining Wall Replacement at the Currituck County Veterans Memorial Park Coinjock, NC May 24, 2016 NOTICE TO BIDDERS Bids will be received until 4:00 pm on June 17, 2016 at the
More informationREQUEST FOR PROPOSAL BACKUP SOLUTION PUTNAM PUBLIC SCHOOLS PUTNAM, CONNECTICUT OWNER: ADMINISTRATIVE OFFICES PUTNAM, CONNECTICUT 06260 OWNER CONTACT:
REQUEST FOR PROPOSAL PUTNAM PUBLIC SCHOOLS 126 CHURCH STREET PUTNAM, CONNECTICUT OWNER: PUTNAM PUBLIC SCHOOLS ADMINISTRATIVE OFFICES 126 CHURCH STREET PUTNAM, CONNECTICUT 06260 OWNER CONTACT: NANCY T.
More informationROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof
ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find
More informationCITY OF BEAVERCREEK, OHIO QUOTES FOR MOWING AND GENERAL CLEANUP OF PRIVATE PROPERTIES
CITY OF BEAVERCREEK, OHIO QUOTES FOR MOWING AND GENERAL CLEANUP OF PRIVATE PROPERTIES The City of Beavercreek is seeking quotes for mowing, trimming and general cleanup of private properties found to be
More informationGREENFIELD MIDDLE SCHOOL ROOF PROJECT
CITY OF GREENFIELD GREENFIELD, MASSACHUSETTS RFQ TITLE: GREENFIELD MIDDLE SCHOOL ROOF PROJECT RFQ #: 12-03 Date of Issuance: June 22, 2011 9:00 a.m. Deadline for Receipt Of Bids: July 8, 2011 2:00 p.m.
More informationROOF ASSEMBLIES AND ROOFTOP STRUCTURES
CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and
More informationRead and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings