Frequently asked questions: Standard Permit Consultation Fire Prevention Internal & external use 30 January 2015.

Size: px
Start display at page:

Download "Frequently asked questions: Standard Permit Consultation Fire Prevention Internal & external use 30 January 2015."

Transcription

1 Frequently asked questions: Standard Permit Consultation Fire Prevention Internal & external use 30 January Why are we introducing the new and revised Standard Permits (SPs)? There have been a number of high profile waste fires which have had a significant impact on the local community, have required huge effort from emergency responders and resulted in large clean- up costs. We are introducing changes to our SPs and bespoke permits to reduce fire risk. These changes are aimed at preventing fires and if a fire starts, minimise its impact. From 1 May 2015 all newly permitted sites storing combustible materials (waste wood, tyres, RDF etc) will require a fire prevention plan, approved by us before the permit is issued. We expect that as a minimum, the fire prevention plan will meet the standards set out in our Regulatory Standards - Fire Prevention Plan document. 2. What is the Regulatory Standards Fire Prevention Plan document? Regulatory Standards Fire Prevention Plan (Version 2, January 2015) is replacing Technical Guidance Note 7.01 ( Reducing fire risk at sites storing combustible materials). We expect this new guidance note to be made available on the GOV.UK website by the end of February 2015 at the latest. Where an operator is proposing a fire prevention plan which deviates from the minimum requirements set out in the Regulatory Standards, we will require detailed impact and modeling assessments to satisfy us that: the likelihood of fire, the potential impact of fire on the public health of the local community and the environment (air, land and water), the resources required by the emergency services, and the clean-up/remediation costs are equivalent or less than that which would result from the site applying the minimum requirements in our Regulatory Standards. 3. What are we doing to the Standard Permits? We have identified all those SPs which allow the keeping or treating of combustible waste. There are 21 of these and they all need changing to require a fire prevention plan. Some of the 21 also need further amendment to mitigate other fire risks. Changes to these 21 SPs are mirrored by 21 new SPs for the same activities. The difference between the two lists of 21 SPs is that for:

2 new SP sites, we require a fire prevention plan approved by us, before the permit can be issued. existing SP sites, a fire prevention plan approved by us will be required within 18 months or immediately following a fire. We will assess how soon a site requires a fire prevention plan within the 18 months and notify the operator accordingly. The Operator should already be incorporating the requirements for our regulatory standards on fire prevention into their Environment Management system. However, we consider greater visibility should be given to this issue and that is why we are introducing a specific permit condition (see Question 8). We have identified all those SPs which allow the keeping or treating of combustible waste. There are 21 of these and they all need changing to require a fire prevention plan. Some of the 21 also need further amendment to mitigate other fire risks. The consultation closes on 6 March A consultation response document will then be published followed by the new set of SPs. The changes reflect an updated assessment of fire risk in each of the generic risk assessments. 4. What are the changes for wood waste processing sites? For the new wood waste SPs, we are now consulting on a requirement for the site to be more than 200m from a dwelling or workplace and a reduction to the maximum annual tonnage from 75,000 down to 5,000 tonnes. If an operator cannot comply with any of the SP conditions, then they will need to make an application for a bespoke permit if they wish to continue to operate. The consultation on the new SPs will close on 6 March A consultation response document will be published followed by publication of the new set of SPs. 5. Why have we reduced the permitted annual tonnage for wood waste so significantly? We have had to respond to a number of high profile wood fires recently and these have included sites storing 5,000 tonnes of wood or more. A number of these incidents have resulted in unacceptable impact on the local community and also in the amount of effort expended by emergency responders and the costs of clean-up following the incident. It has become apparent that the previous tonnage limit (75,000 tonnes annual throughput and 10,000 tonnes stored at any one time) presents a potentially significant risk which can only be adequately controlled through a bespoke permit. 6. What is the risk for transfer station activities conducted without a building? For those SPs allowing treatment or storage of combustible material outside a building, we are introducing limits on the duration of waste storage for a maximum of 3 months in total. This is to limit the risk of spontaneous combustion. 7. What about the other SPs which allow several combustible wastes including waste wood? For SPs which allow several waste streams, up to 5,000 tonnes of combustible waste in total can be accepted per year if storage/treatment is to take place outside. No combustible waste may be stored

3 for longer than 3 months in total. None of the SPs involving only combustible wastes can be used for sites operating within 200m of dwellings or work places. However, for waste wood only, the justification presented in the generic risk assessment is based on a fire scenario. This justification applies equally to all combustible wastes but the justification presented in the risk assessments for the SPs dealing with several waste types is based on noise / odour. The risk assessments will be updated. We use a loss of containment scenario to exclude use of SPs for sites close to controlled waters, SSSIs, RAMSARs etc. This approach has been extended to cover a fire-risk scenario. 8. Why are we using a fire prevention plan condition and not using the Management System condition? Using a specific permit condition, means that we are being explicit about the need for and the contents of a fire prevention plan. In particular, for existing permitted sites, the new condition will specify 12 elements that we need to see covered in a plan. As a minimum, the plan must be compliant with our regulatory standards and if not, then it must be of equivalent or superior standard (see Question 2). For new applicants for these SPs, we require a fire prevention plan approved by us, before we issue a permit. This enables us to apply stricter controls and refuse a permit for those operators providing an unsatisfactory fire prevention plan. 9. What happens to existing SP holders who are impacted by this change? Existing SP holders will have to produce a fire prevention plan within 18 months of the changes, or immediately following a fire. How soon after the changes, will be dependent on our assessment of the risk. Operators of wood waste sites caught by the changes (distance from dwellings/workplace or tonnage limits) will need to decide whether they intend to: bring their activities into compliance with the revised SP; cease operations; or, make a new application for a bespoke permit. Small scale transfer stations without a building will need to demonstrate within their fire prevention plan how they intend to manage the storage of materials such that no combustible waste is stored for longer than 3 months. 10. Is this tied in with the withdrawal of the Regulatory Position Statement for dockside storage of RDF and wood chip? We have two Regulatory Position Statements (RPSs) which allow Operators to store up to 8,000 tonnes of wood waste and 10,000 tonnes of Refuse Derived Fuel (RDF) at a dock pending export without the need for a Permit. We have now extended the availability of these RPSs (RPS 128 and 131) to 30 April On 30 April, these RPSs will be withdrawn and Operators must have: ceased all activities and cleared the site, or

4 submitted an application for an appropriate SP or bespoke permit. 10. What permit type should Operators currently benefitting from the RPS apply for? Until the new set of SPs are published and made available, Operators can apply using the existing SPs but these will be superseded once we publish the new standard rules set (see Question 3 and 4). Operators should note the proposed changes. If they apply for an existing SP but cannot comply with the SP when amended (probably May / June time) they will need to apply for a bespoke permit. We advise that the Operator meets the new limit of a maximum of 5,000 tonnes of combustible waste each year and a maximum storage time for combustible materials of 3 months from the outset to avoid having to make two applications. Operators that wish to continue activities and are unable to comply with the conditions of the relevant SP must submit an application for a bespoke permit. 11. How will we notify Operators using the RPSs of the changes? We would like Area staff to notify their Operators carrying out dock-side storage of waste wood and/or RDF that that the RPS will be withdrawn. A letter template is provided in Annex A. E&B have informed the Wood Recycling Association, Environmental Services Association and the Associated British Ports of the changes and new requirements. All holders of the relevant SPs have been written to directly. 12. Where can I get further information or advice? Operators can speak to their local area officer for further advice. E&B contacts are Pete McGillivray or Howard Leberman. This FAQ will be updated as we move through this transition period. 06 January 2015

5 Appendix A Letter template to Operators carrying on a waste activity under RPS 128, RPS 131 Dear [Insert Name], Waste activities operating under Regulatory Position 128, 131 or SR2015 No7: Household, commercial and industrial waste transfer station with treatment (no building). On the 30 April 2015, we are withdrawing our Regulatory Position Statements which allow dock-side storage of refuse derived fuel and waste wood without the need for a permit RPS 128 and 131. If you wish to continue to operate your waste activity, you must submit an application to us by 30 April 2015 for either a standard rules permit or a bespoke permit. You can submit a standard rules application using SR2015 No7: Household, commercial and industrial waste transfer station with treatment (no building) or other appropriate standard rules application. Do note that we are also consulting on changes to our standard rule set for the storage and treatment of combustible wastes. Our consultation on the new standard rules will end on 6 March 2015 and publication of the revised rules will then follow. Our proposals for the new rule set introduce the following requirements: All new waste operations will require a fire prevention plan approved by the Environment Agency. All existing waste operations will require a fire prevention plan, approved by the Environment Agency, within 18 months of publication of the new standard rules or sooner depending on an Agency initiated risk assessment of the process. For waste wood and other combustible wastes, the maximum annual throughput will be 5,000 tonnes and the maximum storage period, 3 months. For waste wood and other combustible wastes, sites must be greater than 200m away from a work place or dwelling. Although the existing standard rules do not reflect these requirements, we recommend that you are able to comply with these new requirements if you wish to continue under a standard rules permit. If you cannot, you should apply for a bespoke permit. You can find further information in the attached Frequently Asked Questions. Yours faithfully/sincerely [Insert Area Officer name]

2009 No. 890 ENVIRONMENTAL PROTECTION. The Waste Batteries and Accumulators Regulations 2009

2009 No. 890 ENVIRONMENTAL PROTECTION. The Waste Batteries and Accumulators Regulations 2009 STATUTORY INSTRUMENTS 2009 No. 890 ENVIRONMENTAL PROTECTION The Waste Batteries and Accumulators Regulations 2009 Made - - - - *** 2009 Laid before Parliament *** 2009 Coming into force in accordance with

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]

Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number] Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]

More information

The Regulations require that the permit holder operates the facility in such a way that risk of pollution.

The Regulations require that the permit holder operates the facility in such a way that risk of pollution. Environmental permits for waste operations and industrial sites Making your views known May 2011 This fact sheet describes how we consult people, and the kind of information we find useful when we are

More information

Consultation Focus Groups. Household Waste & Recycling Collection Contract 2017

Consultation Focus Groups. Household Waste & Recycling Collection Contract 2017 Consultation Focus Groups Household Waste & Recycling Collection Contract 2017 Why are we here? To consider a range of options for Household Waste & Recycling collection services from 2017 To guide the

More information

Oman Environmental Services Holding Company

Oman Environmental Services Holding Company Oman Environmental Services Holding Company Population 654,000 3 Schools with a total of 909 students 1970 Less waste generated 10 km of paved roads and 1,700km of unpaved roads 1 small Hospital with unreliable

More information

6 CONSIDERATION OF ALTERNATIVES

6 CONSIDERATION OF ALTERNATIVES 6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements

More information

Service Schedule for BT Website Search Marketing Services

Service Schedule for BT Website Search Marketing Services 1. SERVICE DESCRIPTION Service Overview 1.1 The Service includes the creation and maintenance of a search engine marketing campaign and the construction and hosting of a landing page website as further

More information

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES 2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES 2.1 This chapter outlines how the need for this proposed development has been established, where planning policy supports it, the alternative

More information

Industrial Emissions Directive - Information sheet #1 Identifying sites for permitting as installations

Industrial Emissions Directive - Information sheet #1 Identifying sites for permitting as installations Industrial Emissions Directive - Information sheet #1 Identifying sites for permitting as installations This information sheet supports the process of identifying newly prescribed activities. It covers

More information

Slide 1. Enviros Consulting Ltd

Slide 1. Enviros Consulting Ltd Slide 1 Regulation of Waste Management Activities Past, Present and Future! Steve Bell Technical Manager Waste Management Thursday, 26 July 2007 Presentation Aims An insight of where we have come from

More information

Ingredion ANZ Pty Ltd

Ingredion ANZ Pty Ltd Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)

More information

QSS 0: Products and Services without Bespoke Contracts.

QSS 0: Products and Services without Bespoke Contracts. QSS 0: Products and Services without Bespoke Contracts. Amendment History Version Date Status v.1 Dec 2014 Updated For 2015 deployment Table of Contents 1. DEFINITIONS 3 2. INTRODUCTION 3 3. WORKING WITH

More information

WAVERLEY BOROUGH COUNCIL ENVIRONMENTAL SERVICES DEPARTMENT WASTE AND RECYCLING

WAVERLEY BOROUGH COUNCIL ENVIRONMENTAL SERVICES DEPARTMENT WASTE AND RECYCLING WAVERLEY BOROUGH COUNCIL ENVIRONMENTAL SERVICES DEPARTMENT WASTE AND RECYCLING Requirements for Refuse and Recycling Provision on New Developments Guidance Notes for Applicants and Agents 1. Waste policy

More information

Number of incidents. Non-permitted activities

Number of incidents. Non-permitted activities Pollution incidents 214 evidence summary July 215 1. Introduction Following an increase in the number of serious pollution incidents in 213, the total number of serious pollution incidents decreased by

More information

Pollution Incident Response Management Plan (PIRMP)

Pollution Incident Response Management Plan (PIRMP) Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:

More information

Guidance notes on part C2 General varying a bespoke permit

Guidance notes on part C2 General varying a bespoke permit Guidance notes on part C2 General varying a bespoke permit Please read these guidance notes carefully before you fill in the forms. This guidance will help you complete part C2 of the application form

More information

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems in

More information

Protection of the Environment Operations Act 1997

Protection of the Environment Operations Act 1997 New South Wales Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 under the Protection of the Environment Operations Act 1997 Her

More information

An Introduction to BREEAM and the Code for Sustainable Homes

An Introduction to BREEAM and the Code for Sustainable Homes www.islington.gov.uk An Introduction to BREEAM and the Code for Sustainable Homes Ropemaker, a BREEAM Excellent office development in South Islington 1 Two key methods for assessing the sustainability

More information

Walton Centre. Document Control. Document History Date Version Author Changes 01/10/2004 1.0 A Cobain

Walton Centre. Document Control. Document History Date Version Author Changes 01/10/2004 1.0 A Cobain Page 1 Walton Centre Document Control Document History Date Version Author Changes 01/10/2004 1.0 A Cobain Page 2 Table of Contents Section Contents 1 Introduction 2 Responsibilities Within This Document

More information

Data Submission Manual

Data Submission Manual Data Submission Manual Part 04 - How to Pass Business Rule Verification ("Enforce Rules") 2 Data Submission Manual Version: 3.1 Version Changes 3.1 04/2014 Minor textual revision P 5.3.3.2 Addition of

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL

IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL ENVIRONMENTAL SETTING Within the City, solid waste management, including collection and disposal services

More information

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed

More information

This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines

This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee OB-007, Risk Management. It was

More information

Date: 12 th December 2013

Date: 12 th December 2013 Mr Ross Taylor Parsons Brinckerhoff Amber Court William Armstrong Drive Newcastle Upon Tyne NE4 7YQ Our ref: EPR/FP3838EB/A001 Your ref: EPR/FP3838EB/RFI Date: 12 th December 2013 Dear Mr Taylor We need

More information

WASTE MANAGEMENT UTILITY BUSINESS PLAN 2016-2018

WASTE MANAGEMENT UTILITY BUSINESS PLAN 2016-2018 WASTE MANAGEMENT UTILITY BUSINESS PLAN 2016-2018 Kennedale Eco Station design rendering CR_2495 Attachment 1 TABLE OF CONTENTS p. 3 INTRODUCTION p. 4 STRATEGIC FRAMEWORK VISION MISSION 30-YEAR WASTE MANAGEMENT

More information

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of

More information

Illegally Dumped Asbestos Clean Up Program Guidelines

Illegally Dumped Asbestos Clean Up Program Guidelines Illegally Dumped Asbestos Clean Up Program Guidelines October 2013 Contents Introduction... 1 Assessment criteria... 2 Eligibility... 3 Application process... 5 Further information... 8 Glossary... 10

More information

Hazard/Incident Recording, Reporting and Investigation

Hazard/Incident Recording, Reporting and Investigation Hazard/Incident Recording, Reporting and Investigation Power and Water Corporation Procedure 1 Purpose... 1 2 Scope... 1 3 References... 2 4 Roles and Responsibilities... 2 5 Definitions... 6 6 Records...

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

ENVIRONMENT CONSERVATION AMENDMENT BILL

ENVIRONMENT CONSERVATION AMENDMENT BILL REPUBLIC OF SOUTH AFRICA ENVIRONMENT CONSERVATION AMENDMENT BILL (As introduced in the National Assembly as a section 76 Bill; Bill published in Government Gazette No. 2289 of 1 August 2003) (The English

More information

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL MODEL FINAL VERSION 1, MARCH 2003 ACKNOWLEDGMENTS This Manual is based on Environment Australia s Model EMS 1 and has been adapted for use by Victorian Government agencies by Richard Oliver International.

More information

CABINET 26 JULY 2011 PROCUREMENT OF LONG TERM WASTE TREATMENT FACILITIES REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT

CABINET 26 JULY 2011 PROCUREMENT OF LONG TERM WASTE TREATMENT FACILITIES REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT K CABINET 26 JULY 2011 PROCUREMENT OF LONG TERM WASTE TREATMENT FACILITIES REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Purpose of Report PART A 1. The purpose of this report is to seek Member approval

More information

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September

More information

The Smoke and Carbon Monoxide Alarm (England) Regulations 2015

The Smoke and Carbon Monoxide Alarm (England) Regulations 2015 The Smoke and Carbon Monoxide Alarm (England) Regulations 2015 Q&A Booklet for the Private Rented Sector landlords and tenants September 2015 Department for Communities and Local Government Crown copyright,

More information

1.1 The Scheme shall be cited and referred to as the Waste Management Fees and Charges (Scotland) Scheme 2015 ( the Scheme ).

1.1 The Scheme shall be cited and referred to as the Waste Management Fees and Charges (Scotland) Scheme 2015 ( the Scheme ). The Scottish Environment Protection Agency, in exercise of its powers under Section 41 of the Environment Act 1995 and in accordance with Section 42 thereof HEREBY with the approval of the Scottish Ministers,

More information

NEWMAN UNIVERSITY DISCIPLINARY POLICY AND PROCEDURE

NEWMAN UNIVERSITY DISCIPLINARY POLICY AND PROCEDURE 1. Scope and Purpose NEWMAN UNIVERSITY DISCIPLINARY POLICY AND PROCEDURE 1.1 Newman University [hereafter referred to as the University] recognises disciplinary rules and procedures are necessary for the

More information

SOLID WASTE. Part B ASSET MANAGEMENT PLAN (2015-2045)

SOLID WASTE. Part B ASSET MANAGEMENT PLAN (2015-2045) Masterton District Council SOLID WASTE Part B ASSET MANAGEMENT PLAN (2015-2045) March 2015 All rights reserved. No part of this publication may be reproduced, adapted, published or transmitted in any form

More information

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND

More information

There are several options you can use to pay for your Planning and Building Control Fees or documents.

There are several options you can use to pay for your Planning and Building Control Fees or documents. A Guide to Fees for Planning Applications in England from 22 November 2012 There are several options you can use to pay for your Planning and Building Control Fees or documents. 1. By Chip and Pin at the

More information

The regulators requirements for the operation of an AD facility. Gitty Ankers Senior Environment Officer Devon and Cornwall

The regulators requirements for the operation of an AD facility. Gitty Ankers Senior Environment Officer Devon and Cornwall The regulators requirements for the operation of an AD facility Gitty Ankers Senior Environment Officer Devon and Cornwall Cornwall Renewable Energy Show 27 July 2012 Introduction Waste past and present

More information

How to comply with your environmental permit

How to comply with your environmental permit How to comply with your environmental permit 1 How to comply with your environmental permit We are the Environment Agency. We protect and improve the environment and make it a better place for people and

More information

FUELING AND FUEL STORAGE

FUELING AND FUEL STORAGE FUELING AND FUEL STORAGE BENCHMARK Implement spill prevention measures whenever fuel is handled or stored. Report, minimize, contain and clean up spills that do occur. FUELING BMPS Spills of diesel, oil,

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

Charging for Pre-Application Advice. Guidance Note London Borough of Newham. March 2015

Charging for Pre-Application Advice. Guidance Note London Borough of Newham. March 2015 Charging for Pre-Application Advice Guidance Note London Borough of Newham March 2015 This guidance note provides information regarding the Council s preapplication advice service and the relevant charges.

More information

Petroleum (Consolidation) Regulations 2014

Petroleum (Consolidation) Regulations 2014 Petroleum (Consolidation) Regulations 2014 Introduction of new Petroleum Regulations On 1 October 2014 the Petroleum (Consolidation) Regulations 2014 are scheduled to come into force. Who do the Regulations

More information

GOOD MANAGEMENT PRACTICE GUIDE FOR HOUSES IN MULTIPLE OCCUPATION MAY 2004. The Regional Strategic Housing Authority for Northern Ireland

GOOD MANAGEMENT PRACTICE GUIDE FOR HOUSES IN MULTIPLE OCCUPATION MAY 2004. The Regional Strategic Housing Authority for Northern Ireland GOOD MANAGEMENT PRACTICE GUIDE FOR HOUSES IN MULTIPLE OCCUPATION MAY 2004 The Regional Strategic Housing Authority for Northern Ireland Introduction This Guide is supplementary to the Statutory Registration

More information

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6

More information

How To Inspect A Blood Bank

How To Inspect A Blood Bank Site visit inspection report on compliance with HTA minimum standards Belfast Cord Blood Bank HTA licensing number 11077 Licensed for the procurement, processing, testing, storage, distribution and import/export

More information

Construction (Design and Management) Regulations 2007

Construction (Design and Management) Regulations 2007 MEETING Finance, Procurement and Property Committee AGENDA ITEM 14 MEETING DATE 9 th July 2007 DOCUMENT NUMBER FEP 1052 SUBJECT REPORT Construction (Design and Management) Regulations 2007 (12/06/07) by

More information

Noise Design Advice. Noise can be a major factor to consider in any new development.

Noise Design Advice. Noise can be a major factor to consider in any new development. Noise Design Advice Noise can be a major factor to consider in any new development. This design advice is to help those involved in development in Leeds achieve an acceptable noise environment for people

More information

Appendix 6 Storage and Collection of Waste and Recycling

Appendix 6 Storage and Collection of Waste and Recycling Appendix 6 Storage and Collection of Waste and Recycling Appendix 6 Storage and Collection of Waste and Recycling September 2008 (Version 2) 1 Appendix 6 Appendix 6 Design and Sustainability SPD Storage

More information

This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines

This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee OB-007, Risk Management. It was

More information

This document provides a summary of some of the decisions taken by SEPA on the definition of waste.

This document provides a summary of some of the decisions taken by SEPA on the definition of waste. Page no: Page 1 of 9 1. Background This document sets out a framework of factors to be considered in establishing whether a particular substance or object is likely to fall within the scope of the definition

More information

Project Appraisal and Scrutiny Committee Recommendation

Project Appraisal and Scrutiny Committee Recommendation Cambridge City Council To: Report by: Scrutiny committee: Wards affected: Executive Councillor for Environmental and Waste Services. David Cox ENVIRONMENT SCRUTINY None Project Name: Replace existing contracts

More information

History of the SPCC Rule

History of the SPCC Rule 2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally

More information

AN GARDA SIOCHANA POLICY ON MONITORED INTRUDER ALARMS

AN GARDA SIOCHANA POLICY ON MONITORED INTRUDER ALARMS AN GARDA SIOCHANA POLICY ON MONITORED INTRUDER ALARMS 1 AN GARDA SIOCHANA POLICY ON MONITORED INTRUDER ALARMS... 3 1. Introduction... 3 2. Policy Operation... 5 2.1 Withdrawal of Garda Response... 5 2.2

More information

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE

More information

1.0 Policy Statement / Intentions (FOIA - Open)

1.0 Policy Statement / Intentions (FOIA - Open) Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies

More information

Business Continuity Template

Business Continuity Template Emergency Management Business Continuity Template The Regional Municipality of Wood Buffalo would like to give credit to the Calgary Emergency Management Agency (CEMA) and the Calgary Chamber of Commerce

More information

Version 0.3 25 September 2014

Version 0.3 25 September 2014 Guide for Grant Agreement Preparation Version 0.3 25 September 2014 Disclaimer: This document is aimed at assisting applicants and beneficiaries for Horizon 2020 funding. Its purpose is to explain the

More information

Landfill Disposal Capacity Value using Excel Model

Landfill Disposal Capacity Value using Excel Model A&WMA and OENIA 2015 Waste Management and GHG Reudction Conference Toronto, Ontario, October 7, 2015 Landfill Disposal Capacity Value using Excel Model Tian Gou, P.Eng. tgou@golder.com AGENDA Full Cost

More information

CD 1/14/2015 10:17:00 AM LP 1/14/2015 10:37:00 AM V.1

CD 1/14/2015 10:17:00 AM LP 1/14/2015 10:37:00 AM V.1 CD 1/14/2015 10:17:00 AM Client Information Insured: Postal Address: Trading Addresses Full Description of Activities: FCA Client Classification: Waste Managememtn Resources Ltd 7-10 Penhall Road, London,

More information

The Midas Collaborative Matched Savings Program General Program Policies and Procedures

The Midas Collaborative Matched Savings Program General Program Policies and Procedures The Midas Collaborative Matched Savings Program General Program Policies and Procedures 1 of 16 TABLE OF CONTENTS Introduction...3 Definitions...3 Savings...4 Earned Income...4 Bank Accounts...4 Minimum

More information

How To Comply With The Loss Prevention Certification Board

How To Comply With The Loss Prevention Certification Board Loss Prevention Standard LPS 1014: Issue 5.3 This Loss Prevention Standard is the property of BRE Global Ltd. and is made publicly available for information purposes only. Its use for testing, assessment,

More information

Waste Infrastructure Requirements for England. Centre for Environmental Policy Imperial College London

Waste Infrastructure Requirements for England. Centre for Environmental Policy Imperial College London Waste Infrastructure Requirements for England Centre for Environmental Policy Imperial College London March 2014 This page was left blank intentionally. 2 Table of Contents Abbreviations... 4 Table of

More information

Risk Mitigation Applied to Decision Making. Steve Wenke 2012 Northwest Hydro Operators Forum September 26,2012

Risk Mitigation Applied to Decision Making. Steve Wenke 2012 Northwest Hydro Operators Forum September 26,2012 Risk Mitigation Applied to Decision Making Steve Wenke 2012 Northwest Hydro Operators Forum September 26,2012 Risk Based Decision Making Briefly Discuss a change in our Capital Allocation Process Briefly

More information

Records Retention and Disposal Schedule. Waste Management

Records Retention and Disposal Schedule. Waste Management Records Retention and Disposal Schedule Waste Management Version control Version Author Policy Approved By Approval Date Publication Date Review Due V 1.0 Information Governance Unit Philip Jones, Head

More information

Aggregates levy: credits in Northern Ireland

Aggregates levy: credits in Northern Ireland Aggregates levy: credits in Northern Ireland Who is likely to be affected? Anyone who accounted for aggregates levy at the full rate on aggregate that was commercially exploited between 1 April 2004 and

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE EMERGENCY (TEMPORARY) TREATED WATER SUPPLIES

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE EMERGENCY (TEMPORARY) TREATED WATER SUPPLIES EMERGENCY (TEMPORARY) TREATED WATER SUPPLIES Document Title: Document Reference: Work Procedure - Emergency (Temporary) Treated Water Supplies Date: October 2013 Approved By: Public Health Team Title:

More information

DIRECT PAYMENT AGREEMENT

DIRECT PAYMENT AGREEMENT DIRECT PAYMENT AGREEMENT Agreement between NHS Kingston Clinical Commissioning Group and the recipient of a direct payment as part of a personal health budget This Agreement is made on [insert date] between:

More information

Automatic enrolment: guidance on certifying money purchase pension schemes

Automatic enrolment: guidance on certifying money purchase pension schemes Automatic enrolment: guidance on certifying money purchase pension schemes April 2014 Contents 1. Background...4 1.1 Automatic enrolment: the employer duty...4 2. Purpose of this guidance...5 2.1 Relevant

More information

Mohawk DI-r: Privacy Breach Management Procedure Version 2.0. April 2011

Mohawk DI-r: Privacy Breach Management Procedure Version 2.0. April 2011 Mohawk DI-r: Privacy Breach Management Procedure Version 2.0 April 2011 Table of Contents 1 Purpose... 3 2 Terminology... 5 3 Identifying a Privacy Breach... 5 4 Monitoring for Privacy Breaches... 6 5

More information

What kind of Energy Performance Certificate is required and when?

What kind of Energy Performance Certificate is required and when? What kind of Energy Performance Certificate is required and when? Energy Performance Certificates are required on the construction, sale or rent of nearly all properties. However there are often questions

More information

The Comprehensive Environmental Response,

The Comprehensive Environmental Response, Purpose and Applicability of Regulations The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980 to clean up the nation s hazardous waste sites

More information

Waste Collection Operations. Loader/Lead Loader - Refuse Collection (A3)

Waste Collection Operations. Loader/Lead Loader - Refuse Collection (A3) SERVICE AREA Waste Management SECTION Waste Collection Operations POST TITLE Loader/Lead Loader - Refuse Collection (A3) Some key points about this job: 1) The role is graded at A3 so will attract a basic

More information

Audit report VET Quality Framework Continuing registration as a national VET regulator (NVR) registered training organisation

Audit report VET Quality Framework Continuing registration as a national VET regulator (NVR) registered training organisation Audit report VET Quality Framework Continuing registration as a national VET regulator (NVR) registered training organisation ORGANISATION DETAILS Organisation s legal name Trading name/s REGIONAL TRAINING

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not

More information

How effective information management helps fleet managers reduce operational risk and enhance commercial performance

How effective information management helps fleet managers reduce operational risk and enhance commercial performance How effective information management helps fleet managers reduce operational risk and enhance commercial performance October 2015 www.alcumusgroup.com Managing risk in the transport and logistics sector

More information

Methodological tool Tool for the demonstration and assessment of additionality

Methodological tool Tool for the demonstration and assessment of additionality CLEAN DEVELOPMENT MECHANISM TOOL01 Methodological tool Tool for the demonstration and assessment of additionality TABLE OF CONTENTS Page 1. INTRODUCTION... 3 2. SCOPE, APPLICABILITY, AND ENTRY INTO FORCE...

More information

[2009] AIR 399 PR986606. Workplace Relations Act 1996 s.159 RAO Schedule - alteration of other rules of organisation

[2009] AIR 399 PR986606. Workplace Relations Act 1996 s.159 RAO Schedule - alteration of other rules of organisation [2009] AIR 399 PR986606 Workplace Relations Act 1996 s.159 RAO Schedule - alteration of other rules of organisation The Civil Air Operations Officers Association of Australia (R2008/259) (R2009/259) T.

More information

FIRE RISK ASSESSMENT SW13 0HA

FIRE RISK ASSESSMENT SW13 0HA FIRE RISK ASSESSMENT at Carmichael Court Grove Road London SW13 0HA ON BEHALF OF Farrar Property Management Date of assessment: 14/01/2013 Recommended review date: January 2015 CONTENTS 1.0 INTRODUCTION

More information

Madrid Agreement and Protocol Concerning the International Registration of Marks

Madrid Agreement and Protocol Concerning the International Registration of Marks INFORMATION NOTICE NO. 23/2014 Madrid Agreement and Protocol Concerning the International Registration of Marks Amendments to the Common Regulations under the Madrid Agreement and Protocol 1. At its forty-eighth

More information

Sample Business Associate Agreement Provisions

Sample Business Associate Agreement Provisions Sample Business Associate Agreement Provisions Words or phrases contained in brackets are intended as either optional language or as instructions to the users of these sample provisions. Definitions Catch-all

More information

CCBE POSITION ON THE PROPOSAL FOR A DIRECTIVE OF THE EUROPEAN PARLIAMENT AND THE COUNCIL

CCBE POSITION ON THE PROPOSAL FOR A DIRECTIVE OF THE EUROPEAN PARLIAMENT AND THE COUNCIL CCBE POSITION ON THE PROPOSAL FOR A DIRECTIVE OF THE EUROPEAN PARLIAMENT AND THE COUNCIL ON CONSUMER RIGHTS DIRECTIVE COM(2008) 614/3 CCBE position on The Proposal for a Directive of the European Parliament

More information

Appendix 3K Suggested letter to be used for the duty solicitor not available report

Appendix 3K Suggested letter to be used for the duty solicitor not available report Appendix 3K Suggested letter to be used for the duty solicitor not available report Dear (Duty Solicitor) DUTY SOLICITOR APPARENTLY NOT AVAILABLE I attach three reports where the Commission s Call Centre

More information

Director Quality & Student Services

Director Quality & Student Services Policy Owner Contact Officer: Policy Number: Approved by: Director Quality & Student Services Student Advisory Manager QMKPO002 Senior Management Group Date Approved: October 2012 Last Reviewed: 6 May

More information

Standard Operating Procedure. Authority to access and monitor University IT Account holder communications and data

Standard Operating Procedure. Authority to access and monitor University IT Account holder communications and data Standard Operating Procedure Title: Authority to access and monitor University IT Account holder communications and data Version: 2.0 Effective Date March 2016 Summary Describes the approval process and

More information

CHAGUARAMAS TERMINALS LTD.

CHAGUARAMAS TERMINALS LTD. POLICY MANUAL All rights reserved to CrewsInn Limited. No part of this document may be reproduced in any form or by any means, without permission in writing from the company CHAGUARAMAS TERMINALS LTD.

More information

Guide to inquiries into disputes about bulk interconnection services

Guide to inquiries into disputes about bulk interconnection services Guide to inquiries into disputes about bulk interconnection services Part 3 of the Australian Postal Corporation Regulations 1996 December 2012 Commonwealth of Australia 2012 This work is copyright. Apart

More information

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans Background What is a Spill Prevention, Control and Countermeasure (SPCC) Plan? An SPCC plan is a written document that describes

More information

Risk Evaluation and Mitigation Strategies: Modifications and Revisions Guidance for Industry

Risk Evaluation and Mitigation Strategies: Modifications and Revisions Guidance for Industry Risk Evaluation and Mitigation Strategies: Modifications and Revisions Guidance for Industry The portion of this guidance document setting forth the submission procedures for risk evaluation and mitigation

More information

The PPC Permit. Simon Holbrook SPG Manager - Warrington

The PPC Permit. Simon Holbrook SPG Manager - Warrington The PPC Permit Simon Holbrook SPG Manager - Warrington Introduction The role of the Area Inspector and the SPG BAT as an on-going process What to expect in your Permit Changes on the Horizon The Area Inspector

More information

Policy 7 Management of Asbestos

Policy 7 Management of Asbestos Policy 7 Management of Asbestos 1.0 Introduction Development & Infrastructure recognise both the need to protect their employees from the risks associated with encountering asbestos and the potential for

More information

SMS Text Messaging to Service Users Policy

SMS Text Messaging to Service Users Policy SMS Text Messaging to Service Users Policy Reference No: Version: 2 Ratified by: P_IG_24 LCHS Trust Board Date ratified: 29 th July 2014 Name of originator/author: Name of responsible committee/individual:

More information

Cumbria Constabulary. Business Continuity Planning

Cumbria Constabulary. Business Continuity Planning Cumbria Constabulary Business Continuity Planning 0 Cumbria Shared Internal Audit Service Images courtesy of Carlisle City Council except: Parks (Chinese Gardens), www.sjstudios.co.uk, Monument (Market

More information

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN Last revised June 5th, 2015 Page 1 of 13 Table of Contents 1. PURPOSE... 2 2. ROLES AND RESPONSIBILITIES... 2 3. SAFETY... 2 4. COAL SPILLS... 3 4.1. COAL

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information