1 Demonstrate and apply knowledge of project management in mechanical engineering version 2 Page 1 of 5 Level 6 Credits 15 Purpose This unit standard is intended primarily for use in diploma courses in mechanical engineering. It covers knowledge of project management principles, tools, and techniques, and their application to a real or simulated project. People credited with this unit standard are able to demonstrate knowledge of project management in mechanical engineering, and apply that knowledge to a project of moderate size. Subfield Domain Status Mechanical Engineering Applied Principles of Mechanical Engineering Registered Status date 26 November 2007 Date version published 19 March 2010 Planned review date 31 December 2015 Entry information Accreditation Standard setting body (SSB) Open. Evaluation of documentation and visit by NZQA and industry. Competenz Accreditation and Moderation Action Plan (AMAP) reference 0013 This AMAP can be accessed at Special notes 1 For project management in real industrial situations where the candidate has project management responsibility, see Unit 21771, Manage a mechanical engineering project.
2 Page 2 of 5 2 References ISO 10006:2003. Quality management systems Guidelines for quality management in projects. Association for Project Management. APM Body of Knowledge. 5 th edition. High Wycombe: APM Publishing Ltd, ISBN Project Management Institute, Inc. A Guide to the Project Management Body of Knowledge (PMBOK Guide). 3 rd edition. Newton Square: Project Management Institute, Inc., ISBN X. 3 Definitions Critical path the sequence of scheduled project activities which determine the duration of the project. Gantt chart a project management tool showing graphically the duration and progress of project tasks against time. Mechanical engineering project a project, the primary focus of which is the installation and commissioning of mechanical engineering plant or machinery, or the development of a new product involving mechanical engineering. Other disciplines may also be involved in achieving the project objectives. PERT Program Evaluation Review Technique. A project management tool for analysing the tasks within a project. A PERT chart shows the interdependence of tasks within the project. Project Closeout Stage typically includes meetings with team, customer, sponsor, and contractors; final invoicing; project review of targets, costs, time, and lessons learnt; management sign-off. Project Execution and Control Stage typically includes contract establishment; design; manufacture; installation; commissioning; contract variation control; claims management; project status reporting. Project Initiation Stage typically includes establishment of project charter; identification of scope, objectives, organisation requirements, contractual arrangements, engineering specifications, stakeholder requirements, budget and time constraints; initial team meeting. Project Management the effective control of resources through a process designed to achieve specific outcomes within time and financial constraints. Project Planning Stage typically includes WBS; application of time and costs; Risk Analysis and Response Plan; development of Project Schedule, including Gantt and PERT charts with critical path and reporting milestones; tendering and contracting plan; organisation chart; procurement plan; quality management plan; management sign-off. Recognised methodology a project management methodology according to one of the guidelines listed under References. WBS Work Breakdown Structure. 4 Evidence presented for assessment against this standard should be based on the methodology of at least one of the references in Special Note 2.
3 Page 3 of 5 Elements and performance criteria Element 1 Demonstrate knowledge of project management in mechanical engineering. Performance criteria 1.1 The aims of good project management are explained in accordance with a recognised methodology. reference to effective management of time, scope, cost, internal resources, external resources including contractors. 1.2 The roles of key personnel in the management of a successful project are discussed in accordance with a recognised methodology. key personnel senior management; sponsor or budget manager; project manager; stakeholders; team members; suppliers of internal and external services and materials. 1.3 The stages of a successful project are explained with reference to the key activities, critical success factors, and major items of documentation at each stage, in accordance with a recognised methodology. stages initiation, planning, execution and control, closeout. 1.4 Gantt and PERT charts and the concept of Critical Path are explained in accordance with a recognised methodology.
4 Page 4 of 5 Element 2 Apply knowledge of project management to a mechanical engineering project of moderate size. project of moderate size would typically involve moderate investment; at least 20 project activities; a definite schedule target; installation and commissioning of plant or machinery, or development of a new product; a project team of at least 5 people; candidates are expected to use project management software in the preparation of WBS and project schedule; a supplied range of templates may be used in the preparation of the various documents. Performance criteria 2.1 A project charter is prepared in accordance with given project requirements and a recognised methodology. charter to contain at least project objective, project organisation, stake holders, overall scope, constraints, contract tendering requirements, cost estimate, cost/benefit analysis, high level schedule, risks. 2.2 A project plan is prepared in accordance with a recognised methodology. plan to contain at least scope, WBS, project schedule including Gantt and PERT charts with critical path, contracting schedule, risk plan, resources plan, project budget, quality plan, change management plan, procurement plan. 2.3 Project progress is tracked on the project schedule in accordance with a recognised methodology and the project management software. 2.4 An introduced change and an unexpected delay are managed in accordance with the project plan. 2.5 A project status report is prepared in accordance with a recognised methodology. 2.6 A project closure document is prepared in accordance with a recognised methodology. closure document to include at least reference to review of project outcomes against baseline requirements, deviations, ongoing support or maintenance, sign-off.
5 Page 5 of 5 Please note Providers must be accredited by NZQA, or an inter-institutional body with delegated authority for quality assurance, before they can report credits from assessment against unit standards or deliver courses of study leading to that assessment. Industry Training Organisations must be accredited by NZQA before they can register credits from assessment against unit standards. Accredited providers and Industry Training Organisations assessing against unit standards must engage with the moderation system that applies to those standards. Accreditation requirements and an outline of the moderation system that applies to this standard are outlined in the Accreditation and Moderation Action Plan (AMAP). The AMAP also includes useful information about special requirements for organisations wishing to develop education and training programmes, such as minimum qualifications for tutors and assessors, and special resource requirements. Comments on this unit standard Please contact Competenz if you wish to suggest changes to the content of this unit standard.
Coordinate, develop, and manage the sales team to achieve objectives
Page 1 of 6 Coordinate, develop, and manage the sales team to achieve objectives Level 6 Credits 10 Purpose People credited with this unit standard are able to: develop objectives for sales team; evaluate
Promote security system and service sales
Page 1 of 5 Promote security system and service sales Level 3 Credits 2 Purpose This unit standard is for people who work, or intend to work, as security system or service sales representatives, or in
Compile and action switching plans to maintain electricity supply power network security
Page 1 of 6 Compile and action switching plans to maintain electricity supply power network security Level 4 Credits 9 Purpose People credited with this unit standard are able to: plan network operating;
NZQA registered unit standard 25872 version 2 Page 1 of 5. Develop and implement a project plan to deliver on an Infrastructure works contract
Page 1 of 5 Title Develop and implement a project plan to deliver on an Infrastructure works contract Level 5 Credits 15 Purpose People credited with this unit standard are able to: explain relationship
Carry out laser printer operator duties for direct mail production
Carry out laser printer operator duties for direct mail production 20942 version 2 Page 1 of 5 Level 3 Credits 15 Purpose People credited with this unit standard are able to: follow safety requirements
CONSTRUCTION HEALTH AND SAFETY, AND INJURY PREVENTION Research and develop accident and incident investigation procedures on construction sites
1 of 7 level: 4 credit: 4 planned review date: December 2003 sub-field: purpose: Construction People credited with this unit standard are able to: research accident and/or incident investigation and reporting
Monitor electricity supply power network system
Page 1 of 5 Monitor electricity supply power network system Level 4 Credits 10 Purpose People credited with this unit standard are able to: continuously monitor power supply trends, communication, and
Time Management. Herb Pollard III
Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas
SECURITY MANAGEMENT Produce security risk assessments
1 of 6 level: 6 credit: 20 planned review date: March 2007 sub-field: purpose: Security This unit standard is for people who work, or intend to work, as security managers or security consultants, and who
THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT
THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT 1 CONTENTS Introduction 3 Prince2 5 Every as a project tool 6 Major development and building work 7 Further reading and information..9 2 THE COMPLETE GUIDE
Department of Training and Workforce Development Western Australia. RPL Assessment Tool Kit. BSB41507 Certificate IV in Project Management
Department of Training and Workforce Development Western Australia RPL Assessment Tool Kit BSB41507 Certificate IV in Project Management First published 2010 ISBN 978-1-74205-510-7 Department of Training
Department of Training and Workforce Development Western Australia. RPL Assessment Tool Kit. BSB51407 Diploma of Project Management
Department of Training and Workforce Development Western Australia RPL Assessment Tool Kit BSB51407 Diploma of Project Management First published 2010 ISBN 978-1-74205-511-4 Department of Training and
Maintain gaming machine hardware and security in a Class 4 gambling environment
Page 1 of 5 Maintain gaming machine hardware and security in a Class 4 gambling environment Level 3 Credits 4 Purpose People credited with this unit standard are able to, in a Class 4 gambling environment:
Advanced Project Management Incl. MS Projects 5 DAYS
Imsimbi Training proudly presents Advanced Project Management Incl. MS Projects 5 DAYS Imsimbi Training is a fully accredited training provider with the Services Seta, number 2147, as well as a Level 2
Use event management software to manage a conventions and incentives industry project
Use event management software to manage a conventions and incentives industry project 25861 version 1 Page 1 of 5 Level 4 Credits 5 Purpose People credited with this unit standard are able to: demonstrate
Module 1 Diploma of Project Management
Module 1 Diploma of Project Management Project Management Fundamentals in association with This two day course takes participants through all aspects of Project Management and provides in depth examination
PUBLIC SECTOR COMPLIANCE MANAGEMENT Demonstrate knowledge of breach proceedings as an Inspector of Weights and Measures
1 of 5 level: 6 credit: 8 planned review date: December 2006 sub-field: purpose: entry information: accreditation option: moderation option: Public Sector Services People credited with this unit standard
Introductory Certificate. The APM Project Fundamentals Qualification
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
National Diploma in Electricity Supply (Level 6) Level 6. Credits 120. Purpose. Credit Range
NQF Ref 0675 Version 4 Page 1 of 5 National Diploma in Electricity Supply (Level 6) Level 6 Credits 120 Purpose This diploma is for people working in the electricity supply industry and provides the rules
MICROSOFT OFFICE PROJECT - SYLLABUS
MICROSOFT OFFICE PROJECT - SYLLABUS Sessions Session 1 Description 1. INTRODUCTION a. Introduction to CADFORUM and PPM b. Project c. Examples of project d. Project Triangle e. Project Management f. Life
UNIT BR10: PROJECT MANAGEMENT FOR ENGINEERING. Engineering
Unit BR10: Project for Engineering Unit code: T/503/7221 QCF level: 6 Credit value: 15 Aim The aim of this unit is to give learners an understanding of the techniques and skills required for effective
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
Project Management Professional Training
Training Course Course Language Course Duration Project Management Professional Training PMP Project Management Professional Exam Preparation based on PMBOK 5 th Edition ( 35 PDUs) English Total Number
DIPLOMA OF PROJECT MANAGEMENT BSB51407. (Classroom Delivery)
DIPLOMA OF PROJECT MANAGEMENT BSB51407 (Classroom Delivery) This qualification may also be delivered at the workplace Training and Assessment Plan Developed by: NDA Tasmania Diploma of Project BSB51407
Assessment guide. Certificate IV in Project Management BSB41507
Assessment guide Certificate IV in Project Management BSB41507 First produced August 2010. Cayenne Resources. All rights reserved. All materials produced by Cayenne Resources, regardless of format, are
Demonstrate knowledge of energy efficiency and conservation relevant to plumbing and gasfitting
Page 1 of 5 Demonstrate knowledge of energy efficiency and conservation relevant to plumbing and gasfitting Level 2 Credits 6 Purpose This unit standard is for candidates that are intending to work in
Learning Outcome 1 The learner will: Be able to initiate the preliminary stages of a project.
Unit Title: Project Management Guided Learning Hours: 210 Level: Level 6 Number of Credits: 25 Learning Outcome 1 The learner will: Be able to initiate the preliminary stages of a 1.1 Identify an appropriate
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
Certificate In Project Management (CIPM)
Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate
Certified Project Management Professional VS-1079
Certified Project Management Professional VS-1079 Certified Project Management Professional Certification Code VS-1079 Vskills certification for Project Management Professional assesses the candidate for
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Project Management Fundamentals with Microsoft Project
Project Management Fundamentals with Microsoft Project Duration: 4 Days PDU Credits: 28 (Category A) This 4-day course is designed to provide practical, hands-on experience in the planning, development,
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
Managing IT Projects. Chapter 2 The PMI Framework
Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area
BSB41513 Certificate IV in Project Management Practice
RPL Assessment Tool Kit AUSTRALIAN SALESMASTERS TRAINING CO RPL Assessment Tool Kit BSB41513 Certificate IV in Project Management Practice Page 1 of 126 BSB415137 Certificate IV in Project Management Practice
PROJECT AUDIT METHODOLOGY
PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit
The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.
Knowledge Areas The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. These are: Project Integration Management Project Scope
Introduction to IT Project Management
Adapted from Managing Information Technology Projects, Chapter 1, Schwalbe Introduction to IT Project Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Sep 17th, 2015 Outline
DRIVER LICENCE ENDORSEMENTS Demonstrate knowledge and skills for driving a forklift on a road for endorsement F (forklifts)
1 of 6 level: 3 credit: 2 planned review date: July 2006 sub-field: Driving replacement information: This unit standard replaced the components relating to endorsement F requirements of unit standard 16670
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
NFSA Project Management Guidelines
NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and
Software Application: Information System Elements. Project Management in Information Technology (IT) Projects. Project Scheduling basics
Software Application: Information System Elements Project Scheduling Basics Working With Resources Fine Tuning the Project Managing the Project Project Presentations Project Management in Information Technology
Company Sponsored Competency Based Workplace Assessment
Company Sponsored Competency Based Workplace Assessment Recognition of prior learning Advanced Diploma of Project Management (Master Project Director) Diploma of Project Management (Registered Project
PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP
TSE015 PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP Course Outline I. Introduction and Course Objectives A. About PMI B. PMP and CAPM
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com
National Certificate in Business Administration and Computing (Level 3)
NQF Ref 0633 Version 3 Page 1 of 6 National Certificate in Business Administration and Computing (Level 3) Level 3 Credits 60 Purpose This national certificate is designed to: recognise a broad range of
Mastering Microsoft Project 2013
This three-day, instructor-led course is intended for individuals who are interested in expanding their knowledge base and technical skills about Microsoft Project. The course begins with the basic concepts
National Certificate in Adult Education and Training (Level 5) with strands in New Zealand Environment, and International Environment
NQF Ref 0379 Version 3 Page 1 of 6 National Certificate in (Level 5) with strands in New Zealand Environment, and International Environment Level 5 Credits 59-60 Purpose The National Certificate in (Level
Project Management Concepts
Project Management Concepts Day Workshop Course PM12 PM12 - Project Management Concepts Course ID: PM12 Credits: 21 PDUs Course Duration: 3 days Course Level: Basic 3 Days 21 PDUs Course Description: In
Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use
PBL: Project Management. Competency: Project Definition
Competency: Project Definition 1. Define project management and the context of modern project management. 2. Describe how to manage projects throughout the five major process groups. 3. Define the characteristics
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
The principles, processes, tools and techniques of project management
Unit 34: Plan and manage a project. 341 The principles, processes, tools and techniques of project management An industrial project, big or small, must be managed effectively to ensure the project s objectives
DEMOLITION Develop hazard management plans for the demolition of complex structures
1 of 6 level: 4 credit: 8 planned review date: November 2005 sub-field: purpose: entry information: accreditation option: moderation option: Civil Works and Services People credited with this unit standard
PMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
National Certificate in Work and Community Skills (Supported Learning)
NZQF NQ Ref 0853 Version 4 Page 1 of 5 National Certificate in Work and Community Skills (Supported Learning) Level 1 Credits 40 This qualification has been reviewed. The last date to meet the requirements
Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.
Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.5 hours Program Description The Advance Project Management Knowledge, Skills
Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects
Project Time Management Chapter 6 Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes
Project Management Concepts and Strategies
Project Management Concepts and Strategies Contact Hours: 24 Course Description This series provides a detailed examination of project management concepts and strategies. It discusses the seven components
Project Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project
Assessment guide. Diploma of Project Management BSB51407
Assessment guide Diploma of Project Management BSB51407 First produced September 2010. Cayenne Resources. All rights reserved. All materials produced by Cayenne Resources, regardless of format, are protected
Syllabus 2nd Edition
Syllabus 2nd Edition 2 Introductory Certificate Syllabus 2nd Edition 2nd Edition Introductory Certificate syllabus All of the syllabus elements should be taken within the context of a project and project.
A COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
Mastering Microsoft Project 2013
Course 55054: Mastering Microsoft Project 2013 Page 1 of 9 Mastering Microsoft Project 2013 Course 55054: 2 days; Instructor-Led Introduction This two-day, instructor-led course is intended for individuals
ESKIPM2(SQA Unit Code- F9CX 04) Project management software
Overview This is the ability to use a software application that plans, organises and monitors completion of the component tasks within a project in logical sequence, given constraints of people and resource
CSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012
King Saud University College of Computer & Information Sciences Department of Computer Science CSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012 1- Decomposing
Project Management Professional (Certified by PMI)
Project Management Professional (Certified by PMI) PMI certified Project Management Professional credential is the most important industryrecognized certification for project managers. This recognition
National Diploma in Construction Management (Level 6)
NZQF NQ Ref 0356 Version 6 Page 1 of 7 National Diploma in Construction Management (Level 6) Level 6 Credits 245 This qualification has been reviewed. The last date to meet the requirements is 31 December
PLANNING AND MONITORING PROJECTS WITH MICROSOFT OFFICE PROJECT 2013 TRAINING
PLANNING AND MONITORING PROJECTS WITH MICROSOFT OFFICE PROJECT 2013 TRAINING OBJECTIVE The purpose of this training is to qualify students to use the Microsoft Project 2013. The course presents the subject
Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days
3 Riverchase Office Plaza Hoover, Alabama 35244 Phone: 205.989.4944 Fax: 855.317.2187 E-Mail: rwhitney@discoveritt.com Web: www.discoveritt.com Mastering Microsoft Project 2013 Course: 55054A Course Length:
Recognition of Prior Learning (RPL) Kit. BSB51407 Diploma of Project Management
Recognition of Prior Learning (RPL) Kit BSB51407 Diploma of Project Management Applicant: Date: Diploma of Project Management RPL Kit 1 Applicant declaration: I have completed the following RPL application
ESKIPM3 Project management software
Overview This is the ability to use a software application that plans, organises and monitors completion of the component tasks within a project in logical sequence, given constraints of people and resource
This qualification has been reviewed. The last date to meet the requirements is 31 December 2018.
NZQF NQ Ref 0370 Version 7 Page 1 of 6 National Diploma in Business Administration (Level 5) Level 5 Credits 120 This qualification has been reviewed. The last date to meet the requirements is 31 December
Project Quality Management
Project Quality Management 22-24 May 2016 Qatar 19-OCT-15 This course is Designed, Developed, and will be Delivered under ISO 29990:2010 Standards Project Quality Management Why Choose this Course? What
TEMPORARY TRAFFIC MANAGEMENT Operate as a Traffic Controller (TC) for low volume and Level 1 roads
1 of 8 level: 3 credit: 4 planned review date: October 2008 sub-field: purpose: Highway Construction and Maintenance This unit standard is for people who may be appointed, subject to guidance and monitoring
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Course Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Course Description This course is the flagship course for Project Management certifications including
Certificate in Construction Project Management
Certificate in Construction Project Management Duration: 6 Months Distance Learning Programme Language: English RICS Member: 895.00 + VAT Non RICS Member 995.00 + VAT Course Summary As a result of the
Release: 1. BSBPMG503A Manage project time
Release: 1 BSBPMG503A Manage project time BSBPMG503A Manage project time Modification History Not applicable. Unit Descriptor Unit descriptor This unit describes the performance outcomes, skills and knowledge
National Certificate in Heating, Ventilating, and Air Conditioning (Mechanical Services) (Level 5)
NQF Ref 0897 Version 3 Page 1 of 8 National Certificate in Heating, Ventilating, and Air Conditioning (Mechanical Services) (Level 5) Level 5 Credits 100 This qualification is expiring. The last date to
National Certificate in Business (Small Business Management) Level 4
NZQF NQ Ref 0172 Version 3 Page 1 of 7 National Certificate in Business (Small Business ) Level 4 Credits 60 This qualification has been reviewed. The last date to meet the requirements is 31 December
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Program Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Program Description The Advance Project Management course is a training offering for professionals
Project Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT)
OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) 3 DAY COURSE INTRODUCTION The principles of project management are generic and therefore can be applied to all projects regardless of business sector.
IMCPM04 Project Scheduling and Cost Control. Course Outline
IMCPM04 Project Scheduling and Cost Control Course Outline January 2012 Project Scheduling and Cost Control Course Aim Project Scheduling and Cost Control is a five-day (5 day) course which provides participants
Project Management Dr. James A. Bednar
Project Management Dr. James A. Bednar jbednar@inf.ed.ac.uk http://homepages.inf.ed.ac.uk/jbednar SAPM Spring 2006: Project Management 1 Project Management A project is a temporary endeavour to produce
No man is wise enough by himself. -Plautus
Project Management Facilitation Skills No man is wise enough by himself. -Plautus This course is designed to help managers and facilitators better coordinate their project teams. Participants will learn
How To Get A Kiwi Business Certificate
NQF Ref 0008 Version 5 Page 1 of 5 National Certificate in Business Administration and Computing (Level 2) Level 2 Credits 60 Purpose The business community seeks people who have a broad range of skills
Project Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published by: Project Management
1.3 What is Project Management? 1.4 Relationship Among Project Management, E-mail:info@iibs.ca
1 Project Management Professional (PMP) is a credential offered by the Project Management Institute (PMI).The PMP Certification Exam assesses the adeptness of a professional in applying the knowledge,
Kathy Schwalbe, Ph.D., PMP Augsburg College. ; \ COURSE TECHNOLOGY *» CENGAGE Learning-
MA TECHNOL.0 Sixth Edition Kathy Schwalbe, Ph.D., PMP Augsburg College ; \ COURSE TECHNOLOGY *» CENGAGE Learning- Australia Brazil Japan Korea Mexico Singapore Spain United Kingdom United States IF @wf\
National Certificate in Electricity Supply (Network Operator) (Level 4)
NQF Ref 0892 Version 3 Page 1 of 5 National Certificate in Electricity Supply (Network Operator) (Level 4) Level 4 Credits 88 Purpose This national certificate is awarded to people who have demonstrated
Project Management Fact Sheet:
Project Management Fact Sheet: Developing a Work Breakdown Structure Version: 1.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities.
Recognition of current competence must be carried out by accredited providers or registered workplace assessors in accordance with NZQA guidelines.
NQF Ref 0993 Version 3 Page 1 of 5 National Certificate in Retail (Level 2) Level 2 Credits 50 Purpose This is an entry level qualification for people who are working or intending to work in the retail
Project Management. Give your project teams the competitive edge. Why get qualified as a Project Manager?
Project Management Give your project teams the competitive edge Project Management is a growing profession and an increasingly important one for workplace productivity enhancement and individual career
National Certificate in Business (First Line Management) (Level 4) Level 4
NZQF NQ Ref 0649 Version 7 Page 1 of 7 National Certificate in Business (First Line ) (Level 4) Level 4 Credits 45 This qualification has been reviewed. The last date to meet the requirements is 31 December
APMP. The APM Project Management Qualification. Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6 th edition
The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment
Introduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
National Certificate in Business (First Line Management) (Level 3)
NZQF NQ Ref 0743 Version 5 Page 1 of 6 National Certificate in Business (First Line ) (Level 3) Level 3 Credits 45 This qualification has been reviewed. The last date to meet the requirements is 31 December
Project Management. Planning and Control Techniques. 5th Edition