1 Running head: COMPONENTS OF A DISASTER RECOVERY PLAN 1 Components of a Disaster Recovery Plan DeVry Institute of Technology

2 2 Components of a Disaster Recovery Plan Disasters do strike without warning. Extreme weather events represent one end of the stick. On the other end, human error can render an organization's business inoperable ranging from a few hours to several days. Whatever the circumstances, it s critical for an organization to have a disaster recovery plan in place. A disaster recovery plan (DRP) is a plan designed to reduce the impact of a disaster and shorten the time needed to recover from a disaster whether natural or man-made. (Whitman, & Mattord, 2007, p. 524). The DRP provides an efficient solution that can be used to recover all essential business processes in a specific time frame. The DRP document should include specific and detailed guidelines and procedures for restoring lost or damaged organizational I.T capability. The DR team must have a team leader, this leader should also be a member of the contingency planning management team (CPMT). Disaster recovery team is made up of several teams based on the size of the organization. These teams are the disaster management team, communications team, computer recovery (hardware) team, systems recovery (OS) team, network recovery team, storage recovery team, applications recovery team, data management team, vendor contact team, damage assessment and salvage team, business interface team, logistics team, and other teams as needed. The Disaster management team is the command and control team responsible for planning and coordination activities during a disaster, this team coordinates all efforts and receives reports and feedback from other teams and accordingly assigns work to them. The communications team is made up of members from the public relations and legal departments. They express the needs from the upper management and giving

3 3 feedback to anyone in need of additional information about the organization s efforts in recovering from the disaster such as the press or the families of employees. The computer recovery (hardware) team works towards recovering physical computing assets that might be useable after the disaster. Systems recovery (OS) team recovers and restores operating systems and could also re-establish user accounts and remote connectivity in conjunction with the network team. The Network recovery team focuses on extent of damage to the network hardware infrastructure as well as Internet and intranet connectivity. They work towards re-establishing connectivity by repairing or replacing damaged or destroyed parts. They work closely with the Internet service provider (ISP) to re-establish connectivity. The Storage recovery team deals with network attached storage (NAS), they work with the others to recover data/information and re-establish operations. The applications recovery team recovers applications and reintegrates users back into the systems once the previous groups have systems back up and running. The data management team works with all of other teams, their key focus is on data restoration and recovery which could be on-site, off-site, or online transactional data. This team is expected to swiftly assess the recoverability of data from systems on site and follow with recommendations to the management team as to whether off-site data recovery is needed. The vendor contact team coordinates with suppliers and vendors to replace damaged or destroyed materials, equipment, or services, based on the feedback from the other teams. The damage assessment and salvage team this team is specialized at providing initial assessment of the extent of damage to materials, inventory, equipment, and systems on location. They are in-charge of physically recovering salvageable items to be relocated to a location where

4 4 the other teams can evaluate them. This team is also in charge for coordinating physical security with law enforcement and any private security service. The Business interface team works with the rest of the organization to assist in the recovery of non-technology functions. The most critical functions are rebuild first. As the liaison between business and IT, this team makes certain that each team can work on their own recovery efforts, without interfering with each other. The Logistics team is in-charge for providing needed supplies, space, materials, food, services, or facilities needed at the primary location. Finally, other teams could be implemented as needed based on specialized needs to assist in the recovery operations. After the DR teams and members are identified, The DR Team takes the Incident Response (IR) team s incident-handling procedures and starts developing its unique procedures for the DR plan i.e. the DR team transforms the incidents to disasters However any through DR plan will include three key activities and components which are during the disaster, after the disaster, and before the disaster. In addition, there to other activities which are Plan Testing, Training, and Exercises and Plan Maintenance During the disaster phase, planners develop, expand, and document the procedures that need be carried out while the disaster is in progress. These procedures are grouped and assigned to teams and team members. For example, network administrators tasks would differ from managerial tasks, so it is critical for members of planning committee to draft a set of functionspecific procedures during the disaster. However, certain disasters may hinder organizational response, unless the team members are at on-site when the disaster strikes. For such disasters,

5 5 evacuation plans/exits, shelters locations, fire suppression systems, and other emergency reaction items such as first aid kits must be organized and located into accessible and easy-to-read documents which could be referred to during the disaster. In the after the disaster phase, after the procedures and guidelines for handling or reacting to a disaster are drafted, the DR team planners develop and document the procedures that must be taken immediately and swiftly after the disaster has come to an end. It should be noted that, separate functional areas could develop various procedures. Finally, if the damage from the disaster is considerable enough, crisis management procedures may be needed. In the before the disaster phase, the planners scheme a third set of procedures cataloging tasks that need be performed in order to prepare for the disaster. These procedures include information/data backups, disaster recovery preparations, staff training schedules, testing plans, copies of service agreements, and business continuity plans, if implemented by the organization. The Plan Testing, Training, and Exercises phase focuses on training management and staff in the proper performance of their specific roles as laid down in the disaster recovery plan to test the cogency and effectiveness of the DR plan as well as prepare the various teams to use it. Any issues that arise in the plan during training are incorporated into the draft document. Once the drafts have been reviewed and tested, the final assembly can commence. Finally, in the Plan Maintenance phase, the DR plan is updated regularly to remain current with I.T enhancements. It is advisable for the DR lead team to revisit the plan once a year to update the necessary changes. In conclusion, every organizations is vulnerable to encountering a severe incident, preventing it from continuing every day operations at any time. Beyond disasters such as

6 6 electronic warfare, terrorist attacks, man-made disasters such as fire or political disasters such as the ones seen in Egypt and other unforeseen possibilities can cause bring an organization to a halt. Anticipating disaster and preparing is critical and advisable, as does regular testing of IT services and back-ups. A well-structured and coherent disaster recovery plan will enable an organization to recover rapidly and efficiently from an unforeseen disasters, thus avoiding significant organization interruption and or loss.

7 7 References Whitman, M. E., & Mattord, H. J. (2007). Principles of incident response and disaster recovery. Boston, Mass: Thomson Course Technology.

SCOPE; ENFORCEMENT; AUTHORITY; EXCEPTIONS

SCOPE; ENFORCEMENT; AUTHORITY; EXCEPTIONS Title: DRAFT USG Continuity of Operation Plan Policy Policy Number: 2009-Julian Date Topical Security Area: Document Type: Standard Pages: Words: Lines: 5 1,387 182 Issue Date: May-09 Effective Date: Immediately

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN BUSINESS CONTINUITY PLAN Business Name: Phone # Cell # Emergency Contact Information: Dial 9-1-1 in an Emergency Non-Emergency: Police: Fire: Insurance Provider: Emergency Planning Team: I. CRITICAL OPERATIONS

More information

Disaster Recovery Plan

Disaster Recovery Plan Disaster Recovery Plan Date: February 2, 2009 Revision: 9.0 EXTERNAL BUSINESS CONTINUITY PLAN PAGE 1 of 13 Federal regulation states, and internal corporate policies require, that Penson Financial Services,

More information

Disaster Recovery Plan

Disaster Recovery Plan Disaster Recovery Plan Date: Revision: 8.0 EXTERNAL BCP PLAN PAGE 1 OF 12 Federal regulation states, and internal corporate policies require, that Penson Financial Services, Inc. (Penson) develop Business

More information

Technology Recovery Plan Instructions

Technology Recovery Plan Instructions State of California California Information Security Office Technology Recovery Plan Instructions SIMM 5325-A (Formerly SIMM 65A) September 2013 REVISION HISTORY REVISION DATE OF RELEASE OWNER SUMMARY OF

More information

Business Continuity and Disaster Preparedness Plan

Business Continuity and Disaster Preparedness Plan Business Continuity and Disaster Preparedness Plan This document is based on the Ready Business Business Continuity and Disaster Preparedness Plan at http://www.ready.gov/business/_downloads/sampleplan.pdf,

More information

Here is the basic information needed in the contractors EP plan:

Here is the basic information needed in the contractors EP plan: Contract Monitor: The attached forms are used to answer the following questions regarding your contractor s emergency plan. If your contractor has already submitted their plan, there s no need for them

More information

How to Plan for Disaster Recovery and Business Continuity

How to Plan for Disaster Recovery and Business Continuity A TAMP Systems White Paper TAMP Systems 1-516-623-2038 www.drsbytamp.com How to Plan for Disaster Recovery and Business Continuity By Tom Abruzzo, President and CEO Contents Introduction 1 Definitions

More information

Business Unit CONTINGENCY PLAN

Business Unit CONTINGENCY PLAN Contingency Plan Template Business Unit CONTINGENCY PLAN Version 1.0 (Date submitted) Submitted By: Business Unit Date Version 1.0 Page 1 1 Plan Review and Updates... 3 2 Introduction... 3 2.1 Purpose...

More information

DRAFT Disaster Recovery Policy Template

DRAFT Disaster Recovery Policy Template DRAFT Disaster Recovery Policy Template NOTE: This is a boiler plate template much information is needed from to finalizeconsider this document pre-draft FOREWARD... 3 Policy Overview...

More information

SECTION 15 INFORMATION TECHNOLOGY

SECTION 15 INFORMATION TECHNOLOGY SECTION 15 INFORMATION TECHNOLOGY 15.1 Purpose 15.2 Authorization 15.3 Internal Controls 15.4 Computer Resources 15.5 Network/Systems Access 15.6 Disaster Recovery Plan (DRP) 15.1 PURPOSE The Navajo County

More information

Disaster Preparedness Plan. "[Click Here and type your Company Name]" Prepared By: Date:

Disaster Preparedness Plan. [Click Here and type your Company Name] Prepared By: Date: isaster Preparedness Plan "[Click Here and type your Company Name]" Prepared By: ate: isaster Preparedness Plan Table of Contents '" isaster Supply Checklist '" Emergency Contact List '" Employee Contact

More information

FORMULATING YOUR BUSINESS CONTINUITY PLAN

FORMULATING YOUR BUSINESS CONTINUITY PLAN WHITE PAPER Page 0 Planning for the Worst Case Scenario: FORMULATING YOUR BUSINESS CONTINUITY PLAN 9 Wing Drive Cedar Knolls, NJ 07927 www.nac.net Page 1 Table of Contents Overview... 2 What is Disaster

More information

Business Continuity Planning and Disaster Recovery Planning

Business Continuity Planning and Disaster Recovery Planning 4 Business Continuity Planning and Disaster Recovery Planning Basic Concepts 1. Business Continuity Management: Business Continuity means maintaining the uninterrupted availability of all key business

More information

PPSADOPTED: OCT. 2012 BACKGROUND POLICY STATEMENT PHYSICAL FACILITIES. PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan

PPSADOPTED: OCT. 2012 BACKGROUND POLICY STATEMENT PHYSICAL FACILITIES. PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan OCT. 2012 PPSADOPTED: What is a professional practice statement? Professional Practice developed by the Association Forum of Chicagoland

More information

Disaster Recovery Plan Documentation for Agencies Instructions

Disaster Recovery Plan Documentation for Agencies Instructions California Office of Information Security Disaster Recovery Plan Documentation for Agencies Instructions () November 2009 SCOPE AND PURPOSE The requirements included in this document are applicable to

More information

Unit Guide to Business Continuity/Resumption Planning

Unit Guide to Business Continuity/Resumption Planning Unit Guide to Business Continuity/Resumption Planning (February 2009) Revised June 2011 Executive Summary... 3 Purpose and Scope for a Unit Business Continuity Plan(BCP)... 3 Resumption Planning... 4 Assumptions

More information

SCHEDULE 25. Business Continuity

SCHEDULE 25. Business Continuity SCHEDULE 25 Business Continuity 1. Scope 1.1 This schedule covers TfL s requirements in respect of: any circumstance or event which renders, or which TfL considers likely to render, it necessary or desirable

More information

Fundamentals of Business Continuity Planning Have a Plan!

Fundamentals of Business Continuity Planning Have a Plan! Fundamentals of Business Continuity Planning Have a Plan! Michael Kadar, MBCP, CISSP 2008 MK Continuity & Availability LLC kadarsro@talkamerica.net InfraGard Meeting Walsh College, Novi March 25, 2008

More information

Constructing a successful business continuity plan

Constructing a successful business continuity plan Constructing a successful business continuity plan By Alan Berman Alan Berman Being prepared is the cornerstone of having a business continuity plan regardless of the size of a company. Ultimately, getting

More information

Data Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: bronackt@dcag.com Fax: (718) 380-7322

Data Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: bronackt@dcag.com Fax: (718) 380-7322 Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery

More information

IT Disaster Recovery Plan Template

IT Disaster Recovery Plan Template HOPONE INTERNET CORP IT Disaster Recovery Plan Template Compliments of: Tim Sexton 1/1/2015 An information technology (IT) disaster recovery (DR) plan provides a structured approach for responding to unplanned

More information

<Client Name> IT Disaster Recovery Plan Template. By Paul Kirvan, CISA, CISSP, FBCI, CBCP

<Client Name> IT Disaster Recovery Plan Template. By Paul Kirvan, CISA, CISSP, FBCI, CBCP IT Disaster Recovery Plan Template By Paul Kirvan, CISA, CISSP, FBCI, CBCP Revision History REVISION DATE NAME DESCRIPTION Original 1.0 2 Table of Contents Information Technology Statement

More information

Disaster Recovery: Helping Non-Profits to Plan, Prepare & Recover. By: Lynn Do

Disaster Recovery: Helping Non-Profits to Plan, Prepare & Recover. By: Lynn Do Disaster Recovery: Helping Non-Profits to Plan, Prepare & Recover By: Lynn Do It is Prepare to Ensure Business Continuity A way of doing business and continuing to stay in business in the event of a disaster

More information

Building and Maintaining a Business Continuity Program

Building and Maintaining a Business Continuity Program Building and Maintaining a Business Continuity Program Successful strategies for financial institutions for effective preparation and recovery Table of Contents Introduction...3 This white paper was written

More information

CIS 523/423 Disaster Recovery Business Continuity

CIS 523/423 Disaster Recovery Business Continuity CIS 523/423 Disaster Recovery Business Continuity Course Description A study of disaster recovery and business continuity as related to the information technology function in organizations. Topics will

More information

REGIONAL CENTER DISASTER RECOVERY PLAN

REGIONAL CENTER DISASTER RECOVERY PLAN APPENDIX L REGIONAL CENTER DISASTER RECOVERY PLAN I. ADMINISTRATIVE INFORMATION: A. Introduction to Operational Recovery Plan B. Procedures to update and Distribute ORP C. Process to test ORP D. Plans

More information

Disaster Recovery Plan (Business Continuity) Template

Disaster Recovery Plan (Business Continuity) Template Brochure More information from http://www.researchandmarkets.com/reports/2786932/ Disaster Recovery Plan (Business Continuity) Template Description: The Disaster Planning Template is over 200 pages and

More information

OKHAHLAMBA LOCAL MUNICIPALITY

OKHAHLAMBA LOCAL MUNICIPALITY OKHAHLAMBA LOCAL MUNICIPALITY I.T DISASTER RECOVERY PLAN 2012/2013 TABLE OF CONTENTS 1. INTRODUCTION 1 1.1 PURPOSE 2 1.2 OBJECTIVES 2 1.3 SCOPE 2 1.4 DISASTER RECOVERY STRATEGY 2 1.5 DISASTER DEFINITION

More information

Business Continuity Planning

Business Continuity Planning Business Continuity Planning We believe all organisations recognise the importance of having a Business Continuity Plan, however we understand that it can be difficult to know where to start. That s why

More information

B U S I N E S S C O N T I N U I T Y P L A N

B U S I N E S S C O N T I N U I T Y P L A N B U S I N E S S C O N T I N U I T Y P L A N 1 Last Review / Update: December 9, 2015 Table of Contents Purpose...3 Background...3 Books and Records Back-up and Recovery...4 Mission Critical Systems...

More information

PAPER-6 PART-4 OF 5 CA A.RAFEQ, FCA

PAPER-6 PART-4 OF 5 CA A.RAFEQ, FCA 1 Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-4 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand

More information

ICT & Communications Services Disaster & Recovery Plan

ICT & Communications Services Disaster & Recovery Plan ICT & Communications Services Disaster & Recovery Plan Advanced IT Services with George Spencer Academy www.aitn.co.uk Advanced IT Services - Arthur Mee Road, Stapleford, Nottingham. NG9 7EW Email: info@advanceditservices.co.uk

More information

85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff

85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff 85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff Because a business continuity plan affects all functional units within the organization, each functional unit must participate

More information

Offsite Disaster Recovery Plan

Offsite Disaster Recovery Plan 1 Offsite Disaster Recovery Plan Offsite Disaster Recovery Plan Presented By: Natan Verkhovsky President Disty Portal Inc. 2 Offsite Disaster Recovery Plan Introduction This document is a comprehensive

More information

#316 The Security Elements of Business Continuity & Disaster Recovery Plans

#316 The Security Elements of Business Continuity & Disaster Recovery Plans #316 The Security Elements of Business Continuity & Disaster Recovery Plans Ken Doughty CISA CBCP ODAS kdoughty@ozemail.com.au Presentation Outline Introduction Overview of Business Continuity Security

More information

Creating a Business Continuity Plan for your Health Center

Creating a Business Continuity Plan for your Health Center Creating a Business Continuity Plan for your Health Center 1 Page Left Intentionally Blank 2 About This Manual This tool is the result of collaboration between the Primary Care Development Corporation

More information

Continuity of Operations Planning. A step by step guide for business

Continuity of Operations Planning. A step by step guide for business What is a COOP? Continuity of Operations Planning A step by step guide for business A Continuity Of Operations Plan (COOP) is a MANAGEMENT APPROVED set of agreed-to preparations and sufficient procedures

More information

William Rider Manager Disaster Recovery & Data Security The Johns Hopkins Health System & University

William Rider Manager Disaster Recovery & Data Security The Johns Hopkins Health System & University William Rider Manager Disaster Recovery & Data Security The Johns Hopkins Health System & University Competitive Leadership- Twelve Principles For Success Brian Billick Chapter 3 Be Be Prepared The time

More information

IT Disaster Recovery and Business Resumption Planning Standards

IT Disaster Recovery and Business Resumption Planning Standards Information Technology Disaster Recovery and Business IT Disaster Recovery and Business Adopted by the Information Services Board (ISB) on May 28, 1992 Policy No: Also see: 500-P1, 502-G1 Supersedes No:

More information

IF DISASTER STRIKES IS YOUR BUSINESS READY?

IF DISASTER STRIKES IS YOUR BUSINESS READY? 1 IF DISASTER STRIKES IS YOUR BUSINESS READY? DISASTER RECOVERY and BUSINESS CONTINUITY: WHAT YOU NEED TO KNOW Realize the Power of Technology Many business owners put off disaster planning, perhaps thinking

More information

Post-Class Quiz: Business Continuity & Disaster Recovery Planning Domain

Post-Class Quiz: Business Continuity & Disaster Recovery Planning Domain 1. What is the most common planned performance duration for a continuity of operations plan (COOP)? A. 30 days B. 60 days C. 90 days D. It depends on the severity of a disaster. 2. What is the business

More information

EMERGENCY RESPONSE PLAN. This Emergency Response Plan describes the functions and procedures of USA Track & Field,

EMERGENCY RESPONSE PLAN. This Emergency Response Plan describes the functions and procedures of USA Track & Field, EMERGENCY RESPONSE PLAN This Emergency Response Plan describes the functions and procedures of USA Track & Field, Inc. ( USATF ) and sets forth the principles that will guide USATF s actions in response

More information

July 30, 2009. Internal Audit Report 2009-08 Information Technology Business Continuity Plan Information Technology Department

July 30, 2009. Internal Audit Report 2009-08 Information Technology Business Continuity Plan Information Technology Department Internal Audit Report 2009-08 Introduction. The Municipality depends heavily on technology and automated information systems, and their disruption for even a few days could have a severe impact on critical

More information

DISASTER RECOVERY AND CONTINGENCY PLANNING CHECKLIST FOR ICT SYSTEMS

DISASTER RECOVERY AND CONTINGENCY PLANNING CHECKLIST FOR ICT SYSTEMS Appendix L DISASTER RECOVERY AND CONTINGENCY PLANNING CHECKLIST FOR ICT SYSTEMS I. GETTING READY A. Obtain written commitment from top management of support for contingency planning objectives. B. Assemble

More information

Disaster Recovery Plan (DRP) / Business Continuity Plan (BCP)

Disaster Recovery Plan (DRP) / Business Continuity Plan (BCP) Preface Computer systems are the core tool of today s business and are vital to every business from the smallest to giant organizations. Money transactions, customer service are just simple examples. Despite

More information

Does it state the management commitment and set out the organizational approach to managing information security?

Does it state the management commitment and set out the organizational approach to managing information security? Risk Assessment Check List Information Security Policy 1. Information security policy document Does an Information security policy exist, which is approved by the management, published and communicated

More information

EMERGENCY PREPAREDNESS PLAN Business Continuity Plan

EMERGENCY PREPAREDNESS PLAN Business Continuity Plan EMERGENCY PREPAREDNESS PLAN Business Continuity Plan GIS Bankers Insurance Group Powered by DISASTER PREPAREDNESS Implementation Small Business Guide to Business Continuity Planning Surviving a Catastrophic

More information

Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan

Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan Revision History REVISION DATE NAME DESCRIPTION Draft 1.0 Eric Wimbish IT Backup Disaster Table of Contents Information

More information

Documentation. Disclaimer

Documentation. Disclaimer HOME UTORprotect DOCUMENTATION AMS/ROSI SERVICES CONTACT Documentation Disaster Recovery Planning Disaster Recovery Planning Disclaimer The following project outline is provided solely as a guide. It is

More information

Disaster Recovery Plan Review Checklist. A High-Level Internal Planning Tool to Assist State Agencies with Their Disaster Recovery Plans

Disaster Recovery Plan Review Checklist. A High-Level Internal Planning Tool to Assist State Agencies with Their Disaster Recovery Plans Disaster Recovery Plan Review Checklist A High-Level Internal Planning Tool to Assist State Agencies with Their Disaster Recovery Plans November 2008 DISASTER RECOVERY PLAN REVIEW CHECKLIST - FOR INTERNAL

More information

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY The Define/Align/Approve Reference Series NEEDS BASED PLANNING FOR IT DISASTER RECOVERY Disaster recovery planning is essential it s also expensive. That s why every step taken and dollar spent must be

More information

Interactive-Network Disaster Recovery

Interactive-Network Disaster Recovery Interactive-Network Disaster Recovery BACKGROUND IT systems are vulnerable to a variety of disruptions, ranging from mild (e.g., short-term power outage, disk drive failure) to severe (e.g., terrorism,

More information

The University of Iowa. Enterprise Information Technology Disaster Plan. Version 3.1

The University of Iowa. Enterprise Information Technology Disaster Plan. Version 3.1 Version 3.1 November 22, 2004 TABLE OF CONTENTS PART 1: DISASTER RECOVERY EXPECTATIONS... 3 OVERVIEW...3 EXPECTATIONS PRIOR TO AN INCIDENT OCCURRENCE...3 EXPECTATIONS PRIOR TO A DISASTER OCCURRENCE...4

More information

ICT Disaster Recovery Plan

ICT Disaster Recovery Plan 7 Appendix A ICT Disaster Recovery Plan Definition of a Disaster A computer disaster is the occurrence of any computer system or associated event which causes the interruption of business, leading in the

More information

Disaster Recovery Planning

Disaster Recovery Planning Disaster Recovery Planning This is a brief guide, with a suggested table of contents, to help you get started with putting together your Disaster Recovery Plan (DRP) Pensar can assist you in completing

More information

Workforce Solutions Business Continuity Plan May 2014

Workforce Solutions Business Continuity Plan May 2014 Workforce Solutions Business Continuity Plan May 2014 Contents 1. Purpose... 3 2. Declaration of Emergency... 4 3. Critical Operations... 4 3.1 Communication... 4 3.1.1 Internal Communication During Emergencies...

More information

CISM Certified Information Security Manager

CISM Certified Information Security Manager CISM Certified Information Security Manager Firebrand Custom Designed Courseware Chapter 4 Information Security Incident Management Exam Relevance Ensure that the CISM candidate Establish an effective

More information

Tufts Health Plan Corporate Continuity Strategy

Tufts Health Plan Corporate Continuity Strategy Tufts Health Plan Corporate Continuity Strategy July 2015 OVERVIEW The intent of this document is to provide external customers and auditors with a highlevel overview of the Tufts Health Plan Corporate

More information

Business Continuity Glossary

Business Continuity Glossary Developed In Conjuction with Business Continuity Glossary ACTIVATION: The implementation of business continuity capabilities, procedures, activities, and plans in response to an emergency or disaster declaration;

More information

Disaster Recovery And Contingency Plan Design and Implementation Manual For Utilities

Disaster Recovery And Contingency Plan Design and Implementation Manual For Utilities Disaster Recovery And Contingency Plan Design and Implementation Manual For Utilities Depend on Our People. Count on Our Advice. SM Member TELERGEE Alliance DISASTER RECOVERY AND CONTINGENCY PLAN DESIGN

More information

Each section has handy hints and advice on completing your plan along with links to further information which you can download and print.

Each section has handy hints and advice on completing your plan along with links to further information which you can download and print. Information on business continuity plans for businesses with 10 or fewer employees You will find that it is quick, easy and inexpensive to create a business continuity plan. This is a basic five-step guide

More information

5-02-15. Andres Llana, Jr. INSIDE. Upper Management s Role; Delegating Responsibilities; Minimum Plan Outline; Business Impact Analysis

5-02-15. Andres Llana, Jr. INSIDE. Upper Management s Role; Delegating Responsibilities; Minimum Plan Outline; Business Impact Analysis 5-02-15 INFORMATION MANAGEMENT: STRATEGY, SYSTEMS, AND TECHNOLOGIES CONTINGENCY PLANNING FOR SMALL- TO MEDIUM-SIZED BUSINESSES Andres Llana, Jr. INSIDE Upper Management s Role; Delegating Responsibilities;

More information

business continuity plan for:

business continuity plan for: business continuity plan for: Insert your company name here Our statement of Business Continuity is: > To ensure all employees are competent to do their tasks, and to provide adequate training > To review

More information

Contingency Planning and Disaster Recovery for BOMA

Contingency Planning and Disaster Recovery for BOMA Contingency Planning and Disaster Recovery for BOMA Steve Elliot President & CEO Elliot Consulting Hazards & Vulnerabilities Continuity of Business Operations Normal Business Processes SALES MANUFACTURING

More information

The Commonwealth of Massachusetts

The Commonwealth of Massachusetts A. JOSEPH DeNUCCI AUDITOR The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH ONE ASHBURTON PLACE, ROOM 1819 BOSTON, MASSACHUSETTS 02108 TEL. (617) 727-6200 No. 2008-1308-4T OFFICE OF THE STATE

More information

How to write a DISASTER RECOVERY PLAN. To print to A4, print at 75%.

How to write a DISASTER RECOVERY PLAN. To print to A4, print at 75%. How to write a DISASTER RECOVERY PLAN To print to A4, print at 75%. TABLE OF CONTENTS SUMMARY SUMMARY WHAT IS A DRP AND HOW CAN IT HELP MY COMPANY? CHAPTER PREPARING TO WRITE YOUR DISASTER RECOVERY PLAN

More information

Hong Kong Baptist University

Hong Kong Baptist University Hong Kong Baptist University Disaster Recovery Standard FOR INTERNAL USE ONLY Date of Issue: JULY 2012 Revision History Version Author Date Revision 1.0 Information Security Subcommittee (ISSC) July 2012

More information

Oklahoma Bar Association Disaster Plan

Oklahoma Bar Association Disaster Plan Oklahoma Bar Association Disaster Plan Introduction An emergency is a condition or situation that requires immediate attention beyond what can be provided in a routine manner. An emergency will exist when

More information

This white paper describes the three reasons why backup is a strategic element of your IT plan and why it is critical to your business that you plan

This white paper describes the three reasons why backup is a strategic element of your IT plan and why it is critical to your business that you plan This white paper describes the three reasons why backup is a strategic element of your IT plan and why it is critical to your business that you plan and execute a strategy to protect 100 percent of your

More information

Continuity of Operations Actions

Continuity of Operations Actions Continuity of Operations Actions Executive Summary California must be prepared to continue operations during any type of threat or emergency, and must be able to quickly and effectively resume essential

More information

Exhibit to Data Center Services Service Component Provider Master Services Agreement

Exhibit to Data Center Services Service Component Provider Master Services Agreement Exhibit to Data Center Services Service Component Provider Master Services Agreement DIR Contract No. DIR-DCS-SCP-MSA-002 Between The State of Texas, acting by and through the Texas Department of Information

More information

PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA

PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA 1 Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand

More information

Preparing a Disaster Recovery Plan (Church)

Preparing a Disaster Recovery Plan (Church) Preparing a Disaster Recovery Plan (Church) In the event of a serious fire, a church may be required to close during the rebuilding period. The rebuilding process can take up to two years or more. Heritage

More information

Massachusetts Institute of Technology. Functional Area Recovery Management Team Plan Development Template

Massachusetts Institute of Technology. Functional Area Recovery Management Team Plan Development Template Massachusetts Institute of Technology Functional Area Recovery Management Team Plan Development Template Public Distribution Version For further information, contact: Jerry Isaacson MIT Information Security

More information

Title : Business Continuity Plan Section : Operating Guidelines. Procedure # : 049 Effective : Nov 2010 Page : 1 of 7 Review : May 2017

Title : Business Continuity Plan Section : Operating Guidelines. Procedure # : 049 Effective : Nov 2010 Page : 1 of 7 Review : May 2017 Page : 1 of 7 Review : Statement Student Transportation Services Brant Haldimand Norfolk (STSBHN) requires a plan of action in case an event or sudden staff vacancy was to render the operation not capable

More information

DISASTER RECOVERY PLAN

DISASTER RECOVERY PLAN DISASTER RECOVERY PLAN Section 1. Goals of a Disaster Recovery Plan The major goals of a disaster recovery plan are: To minimize interruptions to normal operations. To limit the extent of disruption and

More information

BUSINESS CONTINUITY PLAN OVERVIEW

BUSINESS CONTINUITY PLAN OVERVIEW BUSINESS CONTINUITY PLAN OVERVIEW INTRODUCTION The purpose of this document is to provide Loomis customers with an overview of the company s Business Continuity Plan (BCP). Because of the specific and

More information

Disaster Recovery. 1.1 Introduction. 1.2 Reasons for Disaster Recovery. EKAM Solutions Ltd Disaster Recovery

Disaster Recovery. 1.1 Introduction. 1.2 Reasons for Disaster Recovery. EKAM Solutions Ltd Disaster Recovery Disaster Recovery 1.1 Introduction Every day, there is the chance that some sort of business interruption, crisis, disaster, or emergency will occur. Anything that prevents access to key processes and

More information

Appendix 6c. Final Internal Audit Report Disaster Recovery Planning. June 2007. Report 6c Page 1 of 15

Appendix 6c. Final Internal Audit Report Disaster Recovery Planning. June 2007. Report 6c Page 1 of 15 Appendix 6c Final Internal Audit Report Disaster Recovery Planning June 2007 Report 6c Page 1 of 15 Contents Page Executive Summary 3 Observations and Recommendations 8 Appendix 1 - Audit Framework 13

More information

Information Security Management: Business Continuity Planning. Presentation by Stanislav Nurilov March 9th, 2005 CS 996: Info. Sec. Mgmt.

Information Security Management: Business Continuity Planning. Presentation by Stanislav Nurilov March 9th, 2005 CS 996: Info. Sec. Mgmt. Information Security Management: Business Continuity Planning Presentation by Stanislav Nurilov March 9th, 2005 CS 996: Info. Sec. Mgmt. Overview BCP: Definition BCP: Need for (Why?) BCP: When BCP: Who

More information

TUFTS HEALTH PLAN CORPORATE CONTINUITY STRATEGY FREQUENTLY ASKED QUESTIONS OVERVIEW CORPORATE CONTINUITY PROGRAM.

TUFTS HEALTH PLAN CORPORATE CONTINUITY STRATEGY FREQUENTLY ASKED QUESTIONS OVERVIEW CORPORATE CONTINUITY PROGRAM. TUFTS HEALTH PLAN CORPORATE CONTINUITY STRATEGY FREQUENTLY ASKED QUESTIONS July 2015 OVERVIEW The intent of this document is to provide external customers and auditors with a high-level overview of the

More information

SCHEDULE 3.9 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT DISASTER RECOVERY PLAN GUIDELINES

SCHEDULE 3.9 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT DISASTER RECOVERY PLAN GUIDELINES SCHEDULE 3.9 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT Disaster Recovery Plan Guidelines Northrop Grumman will provide a comprehensive disaster recovery plan that incorporates Disaster Recovery Institute

More information

Learning about an Emergency Management Plan GET READY NOW!

Learning about an Emergency Management Plan GET READY NOW! GET READY NOW! This supplemental document was designed to be used in conjunction with the Guide to an Emergency Management Plan (October 2014). It is meant to further support the emergency planning process

More information

Table of Contents... 1

Table of Contents... 1 ... 1 Chapter 1 Introduction... 4 1.1 Executive Summary... 4 1.2 Goals and Objectives... 5 1.3 Senior Management and Board of Directors Responsibilities... 5 1.4 Business Continuity Planning Processes...

More information

Vermont Division of Emergency Management and Homeland Security Business Disaster Preparedness Workbook

Vermont Division of Emergency Management and Homeland Security Business Disaster Preparedness Workbook Vermont Division of Emergency Management and Homeland Security Business Disaster Preparedness Workbook Con nuity of Business Planning Each year thousands of businesses and organizations are affected by

More information

Can Your Centre Recover from a IAAO. June 4, 2013 Lead by The Ontario Universities Application Centre

Can Your Centre Recover from a IAAO. June 4, 2013 Lead by The Ontario Universities Application Centre Can Your Centre Recover from a Disaster? IAAO June 4, 2013 Lead by The Ontario Universities Application Centre B Agenda 1.OUAC s Disaster Recovery Activity 2.Definitions i i 3.Has anyone had a disaster?

More information

Disaster Recovery Policy

Disaster Recovery Policy Disaster Recovery Policy INTRODUCTION This policy provides a framework for the ongoing process of planning, developing and implementing disaster recovery management for IT Services at UCD. A disaster is

More information

Disaster Recovery Planning Process

Disaster Recovery Planning Process Disaster Recovery Planning Process By Geoffrey H. Wold Part I of III This is the first of a three-part series that describes the planning process related to disaster recovery. Based on the various considerations

More information

BUSINESS CONTINUITY PLANNING. Business Continuity Management Plan. Version 1.4

BUSINESS CONTINUITY PLANNING. Business Continuity Management Plan. Version 1.4 BUSINESS CONTINUITY PLANNING Business Continuity Management Plan Version 1.4 October 2015 Table of Contents 1 OVERVIEW... 5 2 STRUCTURE OF THE DOCUMENT... 5 3 OBJECTIVE... 6 4 SCOPE... 6 4.1 EXECUTIVE

More information

Business Continuity and Disaster Planning

Business Continuity and Disaster Planning WHITE PAPER Business Continuity and Disaster Planning A guide to preparing for the unexpected Robert Drewniak Director, Strategic & Advisory Services Disasters are not always the result of high winds and

More information

Business Continuity Plan For Disaster Recovery in the event of a Critical Incident

Business Continuity Plan For Disaster Recovery in the event of a Critical Incident Business Continuity Plan For Disaster Recovery in the event of a Critical Incident April 2013 Table of Contents 1.0 Introduction... 3 2.0 Definitions... 3 3.0 General Information... 3 3.1 Review and Training...

More information

Disaster Response and Business Continuity Plan

Disaster Response and Business Continuity Plan Disaster Response and Business Continuity Plan 1. Plan to Stay in Business Business Name : Power Mate Technology Co., Ltd. Address : No. 36, 22rd Road, Taichung Industrial Park, Taichung City, Taiwan Telephone/

More information

Disaster Recovery Business Continuity Premium Edition

Disaster Recovery Business Continuity Premium Edition Brochure More information from http://www.researchandmarkets.com/reports/2787481/ Disaster Recovery Business Continuity Premium Edition Description: The Disaster Recovery Plan (DRP) Template PREMIUM Edition

More information

CONTINUITY OF OPERATIONS PLAN TEMPLATE

CONTINUITY OF OPERATIONS PLAN TEMPLATE CONTINUITY OF OPERATIONS PLAN TEMPLATE For Long-Term Care Facilities CALIFORNIA ASSOCIATION OF HEALTH FACILITIES DISASTER PREPAREDNESS PROGRAM TABLE OF CONTENTS TABLE OF CONTENTS...2 SECTION 1: INTRODUCTION...3

More information

SAMPLE IT CONTINGENCY PLAN FORMAT

SAMPLE IT CONTINGENCY PLAN FORMAT SAMPLE IT CONTINGENCY PLAN FORMAT This sample format provides a template for preparing an information technology (IT) contingency plan. The template is intended to be used as a guide, and the Contingency

More information

Clinic Business Continuity Plan Guidelines

Clinic Business Continuity Plan Guidelines Clinic Business Continuity Plan Guidelines Emergency notification contacts: Primary Role Name Address Home phone Mobile/Cell phone Business Continuity Plan Coordinator QSP Business Continuity Plan Coordinator

More information

A Business Continuity Plan for Government. George Bomar Dianne Casey Texas Department of Licensing and Regulation

A Business Continuity Plan for Government. George Bomar Dianne Casey Texas Department of Licensing and Regulation A Business Continuity Plan for Government George Bomar Dianne Casey Texas Department of Licensing and Regulation A practiced logistical plan for how an organization will recover and restore partially or

More information

Disaster Recovery Policy

Disaster Recovery Policy Disaster Recovery Policy Organizational Functional Area: Policy for: Executive Division Bank Disaster Recovery Program Board Reviewed: September 14, 2011 Department/Individual Responsible for Maintaining/Updating