1 Streamlining the First Year: Block Scheduling Project Sponsor: Emanuel Pollack, Interim Vice Provost for Undergraduate Affairs Project team lead Mike Kamowski, Director, Office of Student Systems Services Project Management Plan Prepared By: Mike Kamowski Date: September 10, 2015 Content Purpose Scope Expected Outcomes Project Management Deliverables Assumptions Assessment Plan Monitoring and Control Roles and Responsibilities Communications Plan Change Process Adapted from rethink PSU Project Management Template. Licensed under a Creative Commons Attribution-Non-Commercial-ShareAlike 4.0 International License.
2 Purpose The Block Scheduling initiative is to determine the feasibility of implementing block scheduling using Banner XE Registration at UIC. Block scheduling is an integral part of learning communities. It allows students to be in the same cores sections. This has been proven successful at other colleges and universities. The committee s goal is to define, create and obtain approval for the processes needed to implement block scheduling. After approval, then the requirements and an implementation strategy will be developed. Scope The scope of this project is related to three phases. The first phase is to review and define the business process for using Block Scheduling at UIC. The process will also include the College agreement for the business process to be successfully implemented. The second phase will determine the requirements and set up for Banner XE Registration. The second phase will start once the agreements have been signed by the colleges. The final or third phase is to implement Block Scheduling for the Fall 2016 incoming students. The target date for Phase 3 is June Other functionality for Banner XE Registration is not in scope for this project. Expected Outcomes This project is divided into three phases. The outcome and phase descriptions are: 1. Phase 1: This phase is to review and define the Block Scheduling process. The key components are: a. Review Banner XE registration b. Identify the issues, concerns and develop the business process for creating and maintaining blocks using Banner XE Registration. c. Create a document outlining all of the issues/concerns, college agreements and business process. d. Obtain document approval from CAAD/Dean s Council/Undergraduate Policy Council 2. Phase 2: This phase is the requirement and testing phase. The key components are a. Define all of the college requirements for Block Scheduling. b. Create a Business Process and Configuration document for each participating college. c. Test Configuration using XE Registration and make refinements to meet the requirements. d. Obtain configuration sign-off from the colleges. e. Go/No go decision based on the testing outcomes and college sign-off. 3. Phase 3: This phase is to implement the feature for a Fall 2016 pilot group for incoming students. The pilot would be conducted from June through July during Orientation. The key components are: a. Implementation Plan for Banner XE Registration for Block Scheduling including: i. Communication Plan for Block Scheduling 2 P a g e
3 ii. Training Plan for end users iii. Implementation timeline Project Management Deliverables The project lead, in collaboration with the project manager, will be asked to produce a variety of materials, for management and reporting purposes. The deliverable documents are: - Project Management Plan This document - College Agreement Document: The college agreement document outlines the proposed business process. The colleges will have to agree to what is stated in this document before starting Phase 2. - Business Process and Configuration Documents: This Phase 2 document will outline for each participating college the business process and a go/no go decision. - Comprehensive Implementation plan: This Phase 3 document will include implementation strategy, communication plan and timeline for implementing Block Scheduling. - Meeting documents Meeting notes will be stored in the Box account - Regular Status reports Status Reports will be provided every two months during the project. - Final Implementation Project Report: This report will be completed in the Fall 2016 term to discuss the project implementation and any issues or concerns. It will include recommendations about improving the process and whether the project should be expanded beyond the pilot stage. Assumptions The success of the Block Scheduling implementation assumes the following: - The explicit support of the project sponsor as well as the Office of Project Management for Student Success Initiatives for the success of this project. - The project participants and identified stakeholders have the time to accommodate this project in addition to their daily workload. - Regular status reports on the progress of the work will be shared with the campus to ensure the necessary buy in. - The colleges will agree to the Phase 1 College Agreement Document. Some key decisions are: o The colleges agree to work with each other in setting aside entire sections for other colleges. o The colleges agree to provide the necessary staff for the proposed committees. o The participants agree to work with their students to understand the block concept. o Everyone needs to understands the issues and risks as outlined in the document. - There are no show stoppers when testing Banner XE Registration - The necessary OSSS and AITS resources are available to implement Banner XE registration. 3 P a g e
4 Assessment Plan This project is driven by the timeline for completing the phases. The assessment plan is to make sure that the timeline is adhered to in order for the project to be successful. UIC only admits first year student for a Fall term. The deliverables must be completed on time. Otherwise, the project will be delayed a year. Therefore, the assessment is based on: 1. Phase 1: Agreement and sign-off need to be completed by October 15, Phase 2: The requirements and configuration need to be completed by December 15, Phase 3: Implementation needs to be completed by May 15, The assessment will be whether the component parts meet the timeline and deliverables. Monitoring and Control This project has specific deliverables to meet the timeline. The project lead will hold once a month meetings once the Phase 1 document is approved. A tracking spreadsheet will be created to identify any risks or issues with Phase 2 and Phase 3 of this project. Items will be identified as in or out of scope. All out of scope items will be identified as not necessary or required in the next cycle which will be summer Phase three will require AITS resources. The project will require monthly meeting with the team members. AITS will meet with the project lead and members (as necessary) every two weeks to implement the Banner XE Registration in Phase 3. Roles and Responsibilities Role/Assigned Parties Provost and Vice Chancellor Barbara Henley, Vice Chancellor for Student Affairs Eric Gislason, Interim Vice Chancellor for Academic Affairs and Provost Student Success Initiative Implementation Management Team Linda Deanna, Associate Vice Chancellor and Dean of Students Emanuel Pollack, Interim Vice Provost for Undergraduate Affairs List of Responsibilities Ultimate authority and responsibility for the project scope, timeline, and budget Provide high level leadership for the entirety of the project and its needs/goals Assure availability of essential project resources Provide guidelines and support for the initiative and act as the liaison for the leadership, the project teams, and the campus Provide support for executive-level communications Assist in issue management by removing obstacles inhibiting the Project Team or its stakeholders from forward progress Ensure project objectives are being met, in collaboration with the Project Lead and/or Project Manager 4 P a g e
5 Tom Moss, Associate Vice Provost for Undergraduate Affairs Negar Mansourian- Hadavi, Project Manager Project Manager (s) Negar Mansourian- Hadavi, Project Manager Project Sponsor(s) Emanuel Pollack Project Team Robert Dixon Brian Roessler Eileen Doran Milly Crespo Jim Muench Project Lead Mike Kamowski Manage overall scope and schedule for the Initiative, including regular reporting and communication Work closely with the Management Team and the Project Leads to ensure the objectives are being met and issues are addressed Assure alignment of project steps for achieving the project outcomes Dedicates time for initial training and continues to provide support for streamlining the process Mitigate issues and risks Own project management plan, and project documentation, including providing general support and project management framework to Project Lead Make sure there are clear communication paths between all identified project roles Updates the Students Success Initiative s website with regular status reports of all projects. Provides necessary support to ensure the progress of the project Assures availability of essential resources for the project Receives updates on the Project Team meetings and participate as needed Responsible for executive-level communication of the project as applicable Carry out and responsible for daily project tasks Create/contribute to project deliverables as applicable Contribute to creation of project guidelines and procedures as well as regular project updates Serve as first line of defense in issue and risk mitigation Serve as liaisons and project advocate to all project stakeholders Coordinates Project Team meetings and share updates Serves as central point of communication for the project, with the sponsors, the team, and the project manager. Oversees day-to-day operations of the Project Team Co-manages key project documentation with Project 5 P a g e
6 Manager Ensures project objectives are being met, in collaboration with the Management Team and/or Project Manager Mitigate issues & risks; address problems as they arise, reaching out to available resources, including the project sponsor. Support and execute project communications plan Project Assistant and/or Project Coordinator N/A Support meeting coordination and project documentation, including meeting minutes, project management plan, or status reports, Communication Plan The following chart exhibits how the entire target audiences will be communicated using the tools, channels and roles that have been defined. Tool Purpose Audience Owner Distributor/Channel Frequency Project Status Update Actions and issues follow-up The Initiative Status Report Provide status on project Facilitate completing tasks and resolving issues A roll-up of the individual status reports designated to communicate Student Success Initiative progress status with the campus Project Sponsor(s)/ Management Team/ Project Team All Project Participants The UIC Campus Project Lead Project Lead / Project Manager/ Project Lead Management Team / Project Manager Project Lead and or Project Manager / & Phone Calls Campus mass / Student Success Initiative website Once per month As needed At least once per term Change Process Any proposed changes to the project described here should be submitted in writing to the Student Success Initiative management team. 6 P a g e
Enhancing the Orientation Experience
Enhancing the Orientation Experience Project Sponsor: Linda Deanna, AVCSA, Dean of Students Project Team Lead: Jessica Stewart Project Management Plan Prepared By: Jessica Stewart Date: June 24, 2015 Content
More informationHow to Develop a Credit Accumulation Initiative
Credit Accumulation Initiative Sponsor: Emanuel Pollack, VPUA Team Lead: Tom Moss Management Plan Prepared By: Tom Moss Date: 4/28/2015 Content Purpose Scope Deliverables Management Deliverables Assumptions
More informationEnhancing Career Development Services
Enhancing Career Development Services Project Sponsor: Linda Deanna, AVCSA, Dean of Students Project Team Lead: Thy Nguyen Prepared by: Thy Nguyen Date: 5/26/2015 Content Purpose Scope Project Deliverables
More informationProject Management Plan. Page 1
Academic Affairs School of Preparing SBA Students for Success by Positioning Practicum/Career Skills as a Centerpiece of the Curriculum by Leveraging the Efficiencies of Credit-based Mini-MOOC" Management
More informationAcademic Affairs School of Social Work Online MSW Degree with Specialization in Community and Organizational Practice
Academic Affairs School of Social Work Online MSW Degree with Specialization in Community and Organizational Practice Management Plan P a g e 1 Contents Management Plan Expected Outcomes Scope Governance
More informationProject Management Plan. Page 1
Academic Affairs School of Business Administration Expanding the Sphere of Influence: A Vision for Increased Access Through Highly Effective Online Programming in Business Education Management Plan Page
More informationAcademic Affairs Provost s Office Business Model Analysis Project
Academic Affairs Provost s Office Business Model Analysis Management Plan P a g e 1 Contents Management Plan Purpose Scope Deliverables Governance Roles and Responsibilities Staffing Plan Decision Making
More informationAcademic Affairs Advising & Career Services, Enrollment Management & Student Affairs Online Academic Advising & Career Development Modules
Academic Affairs Advising & Career Services, Enrollment Management & Student Affairs Online Academic Advising & Career Development Modules Project Management Plan P a g e 1 Purpose The primary goal of
More informationAdvisory Council member responsibilities include:
GOVERNANCE AND OVERSIGHT OF THE KUALI PROJECT: The following provides a chart of the Governance and Oversight Structure for the Kuali Project. In addition to the below, is a Functional Council that includes
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationCOMMUNICATIONS MANAGEMENT PLAN <PROJECT NAME>
COMMUNICATIONS MANAGEMENT PLAN TEMPLATE This Project Communications Management Template is free for you to copy and use on your project and within your organization. We hope that you find this template
More informationWeb Function & Design Project Charter UCSC Web Presence & Services Program
Web Function & Design Project Charter UCSC Web Presence & Services Program 5/21/2009 Final Author: ITS Project Management Office THINKING AT THE EDGE Table of Contents 1 PROJECT BACKGROUND... 1 1.1 The
More informationDirector, University Communications
Procedure Name: Originating/Responsible Department: Approval Authority: Date of Original Policy: Event Management Standards University Communications Senior Management Committee NA Last Updated: January
More informationPROJECT CONTROL DOCUMENT
PROJECT CONTROL DOCUMENT PERSISTENT EMAIL (AKA EMAIL MODEL) EM-PCD-001 Draft 06/09/2004 Prepared by Don D Worth UCLA PERSISTENT EMAIL Copyright 2002-2004, The Regents of the University of California All
More informationINTERNAL SERVICES GROUP PMO
Ownership & Awareness Program 1 Program 3 Program 4 Program 5 Program 6 Program 7 Program 2 Cap ability Development Infra structure Program n INTERNAL SERVICES GROUP ESSENTIAL FUNCTIONS Act as an interface
More informationEnterprise Risk Management Panel Discussion
Enterprise Risk Management Panel Discussion Facilitators Bill Cole, VCU and VCUHS CAE Michael Bordoni, former Emory University CAE, now DHG (Dixon Hughes Goodman LLP) Risk Advisory Services Partner Gary
More informationUTSA PeopleSoft Change Management Plan
UTSA PeopleSoft Change Management Plan IMPLEMENTING UTSHARE AT UTSA February 2013 v.1 Table of Contents UTSA PeopleSoft Change Management Plan 1.0 Overview... 2 Goals and Objectives... 2 Critical Success
More informationProcurement Reporting - OBIEE
UC BERKELEY Procurement Reporting - OBIEE Project Charter Tracey Bolton 9/7/2011 0 P age Version 3 Project Name: Prepared by: EDW Procurement Reporting Project Tracey Bolton Date (MM/DD/YYYY): 08/4/2011
More informationOFFICE OF THE VICE CHANCELLOR FOR ACADEMIC AFFAIRS. OFFICE OF THE DEAN Org Code: MADNEG
OFFICE OF THE CHANCELLOR STATE OF HAWAI'I UNIVERSITY OF HAWAI'I UNIVERSITY OF HAWAI'I AT MĀNOA OFFICE OF THE VICE CHANCELLOR FOR ACADEMIC AFFAIRS External Advisory Council** Internal Administrative Council**
More information2016-2018 Board Election Candidate Statement
2016-2018 Board Election Candidate Statement Candidate for: Vice President Fran Reed Marymount University Associate Vice President of Enrollment Management Arlington, VA freed@marymount.edu (703) 284-5906
More informationVoice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview
Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview 1/1 Table of Contents 1. Introduction...3 2. Executive Summary...4 3. Program Definition...5 3.1. Program
More informationEXECUTIVE VICE CHANCELLOR AND PROVOST UNIVERSITY OF CALIFORNIA, RIVERSIDE
EXECUTIVE VICE CHANCELLOR AND PROVOST UNIVERSITY OF CALIFORNIA, RIVERSIDE POSITION AND RESPONSIBILITIES The University of California, Riverside is seeking a distinguished and innovative individual to help
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationEnd-of-Project Report. P a g e 1
Academic Affairs School of Business Administration Expanding the PSU Sphere of Influence: A Vision for Increased Access Through Highly Effective Online Programming in Business Education End-of-Project
More informationControlling for change: A consolidation case study
Controlling for change: A consolidation case study May 20, 2013 Beth Brigdon VP for Institutional Effectiveness Learning Objectives Understand the importance of identifying and engaging key stakeholders
More informationProject Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
More informationAU Policy: Electronic Mass Communication Policy
AU Policy: Electronic Mass Communication Policy Subject: Managing the distribution of electronic to large groups of AU users. Office Responsible for Annual Review of This Policy: University Communications
More informationTraining Programs for Enterprise-Wide Change
Training Programs for Enterprise-Wide Change Top Five Requirements for Programs that Deliver Prepared by VisionCor, Inc. 1 Contents Summary... 3 Before We Get Started... 3 Program Principles... 4 Business
More informationTHE PROCESS OF CURRICULUM DEVELOPMENT
THE PROCESS OF CURRICULUM DEVELOPMENT INTRODUCTION The Cal Poly Pomona Curriculum Development Guide has been compiled to assist you with the task of preparing curriculum proposals to be considered for
More informationUNIVERSITY OF CALIFORNIA Office of Academic Personnel Academic Personnel Manual (APM) Policy Development Process Guide
Overview The at the University of California Office of the President manages the Academic Personnel Manual (APM) policy development process from inception to issuance on behalf of the Provost and Executive
More information[BSU Mobile] [Version Number 1.2] Project Charter. Bridgewater State University Information Technology. BSU Mobile. Project ID: 209358
Project Charter Bridgewater State University Information Technology BSU Mobile Project ID: 209358 VERSION: [1.2] REVISION DATE: [10 May 2013] i Contents Section 1. Project Overview... 1 1.1 Problem Statement...
More informationUniversity of Arkansas at Little Rock Division of Educational, Student Services, and Student Life Strategic Planning Manual 2013-2014
University of Arkansas at Little Rock Division of Educational, Student Services, and Student Life Strategic Planning Manual 2013-2014 Table of Contents I. CHARGE FOR THE DIVISION OF EDUCATIONAL, STUDENT
More informationStrategic Planning Procedure Manual
Strategic Planning Procedure Manual Adopted by the Strategic Planning Committee January 2003; revised December 2007, revised November 2011; revised September 2012; revised October 2014; revised June 2015
More informationCompanion Notes for LTC Process Flowcharts. Notes for Initiation Stage
Companion Notes for LTC Process Flowcharts Contents Notes for Initiation, Planning, Execution/Production and Close Stages Glossary and Acronyms Page 1 4 5 6 Notes for Initiation Stage Purpose The purpose
More informationCommunication Plan. Administrative Information Technology Services University of Illinois. December, 2015
Communication Plan Administrative Information Technology Services University of Illinois December, 2015 Table of Contents Executive Summary... 3 Quick Reference Guide... 3 Purpose... 4 Goals and Objectives...
More informationFacilities Portfolio Management Tool
2016 Facilities Portfolio Management Tool Project Charter Budget- Facilities Oversight Office of Financial Management 4/10/2016 CONTENTS Overview... 2 Purpose Statement... 2 Background... 2 Goals & Objectives...
More informationFINANCIAL PLANNING GUIDELINES FOR PROFESSIONAL DEGREE SUPPLEMENTAL TUITION SELF SUPPORTING PROGRAM FEES PROFESSIONAL SCHOOLS
FINANCIAL PLANNING GUIDELINES FOR PROFESSIONAL DEGREE SUPPLEMENTAL TUITION SELF SUPPORTING PROGRAM FEES PROFESSIONAL SCHOOLS INTRODUCTION This document describes the financial planning required for charging
More informationStrategic Plan 2014 2017
Strategic Plan 2014 2017 The University of Texas at Austin Wellness Network Strategic Plan Contents Mission... 2 Vision... 2 Values... 2 Wellness Network Operations... 3 Summary of Strategic Initiatives...
More informationFall 2014. January. February. March. April. May. June & July. August November. December
Oswego State Draft Information Technology Strategic Plan November 17, 2015 Fall 2014 January February March April May Strategic Planning Steering Committee formed Events & Meetings planned Strategic Planning
More informationITS Project Management
ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS
More informationWhy are PMO s are Needed on Large Projects?
Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects
More informationEffectively Managing EHR Projects: Guidelines for Successful Implementation
Phoenix Health Systems Effectively Managing EHR Projects: Guidelines for Successful Implementation Introduction Effectively managing any EHR (Electronic Health Record) implementation can be challenging.
More informationHow To Write A Project Management Plan
Enter Project Name Project Management Plan (PMP) Kickoff Month, Day, Year 1 Purpose The Project Management Plan (PMP) is a formal, approved document used to manage project execution. The PMP documents
More informationIT1T Integrated Recruitment Systems 2015
UCD IT Services IT1T Integrated Recruitment Systems 2015 Project Initiation Document Version 1.0 2 December 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial Draft
More informationUC Berkeley Campus Data Warehouse Governance and Delivery Organization Proposal Campus Data Warehouse / Business Intelligence Competency Center
Patrick McGrath, David A. Greenbaum IST Data Services In 2005, the UC Berkeley Data Stewardship Council sponsored a project to assess the feasibility, challenges and potential benefits of developing a
More informationPima Community College
Pima Community College Online is Growing Academic Year 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 Classes offered completely on-line 1,118 10% 1,380 13% 1,537 14% 1,575 16% 1,534 17% Total classes
More informationBusiness Analytics and Data Warehousing in Higher Education
WHITE PAPER Business Analytics and Data Warehousing in Higher Education by Jim Gallo Table of Contents Introduction...3 Business Analytics and Data Warehousing...4 The Role of the Data Warehouse...4 Big
More informationFinal. North Carolina Procurement Transformation. Governance Model March 11, 2011
North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes
More informationAmbulance Victoria. Position Description
Position Title: IT Project Manager Team Leader Position Description Division: Information & Technology Department: Solution Delivery Reports To: Manager Solution Delivery Direct Reports: IT Project Managers
More informationUniversity College Dublin Quality Improvement Plan
University College Dublin Quality Improvement Plan Centre for Distance Learning UCD School of Business BSc Sri Lanka August 2011 Contents 1. Introduction 2. Recommendations for Improvements - Follow-Up
More informationAuditing the Software Development Lifecycle ISACA Geek Week. Mike Van Stone Sekou Kamara August 2014
Auditing the Software Development Lifecycle ISACA Geek Week Mike Van Stone Sekou Kamara August 2014 Agenda Introduction Audit Scope Project Initiation SDLC Processes Stakeholders Common Development Methodologies
More informationTo provide a procedure and associated guidelines to facilitate the management of project dependencies.
Management DEPENDENCY MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project dependencies. Overview Dependencies in this Phase are defined as actions,
More informationProject Management Plan Template
Abstract: This is the project management plan document for . This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template Contents REVISION
More informationProfessional Position Description Section I Position Information Position Title
Professional Position Description Section I Position Information Update Only Position Title Senior Financial Planning Analyst Position # 999761 Department Financial Services Classification Level Excluded
More informationMaster of Counselling Program, Academic Quality Assurance Review
TO: Mike Mahon President and Vice Chancellor DATE: May 6, 2015 FROM: Robert A. Boudreau Chair, Academic Quality Assurance Committee RE: Master of Counselling Program, Academic Quality Assurance Review
More informationAdministrative Process Improvement Project. Leadership Review July 12, 2010. TSI Transforming Solutions, Inc. www.transforming.com
Administrative Process Improvement Project Leadership Review July 12, 2010 TSI Transforming Solutions, Inc. www.transforming.com 1 Agenda GA Project Status Update Change Management o Context o The GA project
More informationProject Charter Updated
Enterprise IT Service Management Pilot Proof of Concept Project Charter Updated Prepared By: M. Riley & J. Foster Date of Publication: March 13, 2006 Date Last Revised: April 25, 2007 PMO CH1, 8/01 Document
More informationIt0x Enhanced data storage services Sharepoint Teamsites
UCD IT Services It0x Enhanced data storage services Sharepoint Teamsites Project Initiation Document Version 1.0 2, December 2014 Version History Version Date Summary of Changes Changed by 1 2/12/2014
More informationVisual Communications Project Brief
Visual Communications Project Brief S03/09373 26/03/2003 Version 1.0 Final For Distribution Document Control Page Document Number: S03/09373 File Number: 03-301/01/00023 Document Name: Visual Communications
More informationCON Academic and Student Affairs FY15/16 Core Functions by PCF. Assistant Dean
Associate departmental correspondence and internal activities & Meeting Support Coordinate distance learning classroom scheduling Create/maintain teaching assignments database and spread sheets Administer
More informationTO MEMBERS OF THE COMMITTEE ON LONG RANGE PLANNING: DISCUSSION ITEM EXECUTIVE SUMMARY
L3 Office of the President TO MEMBERS OF THE COMMITTEE ON LONG : For Meeting of July 22, 2015 UCPATH PROJECT UPDATE DISCUSSION ITEM EXECUTIVE SUMMARY UCPath was launched in 2010 as a systemwide UC strategic
More informationUW-Stout Inclusive Excellence Action Plan
Goal 1: Increase the number of Wisconsin high school graduates from all segments who apply, are accepted, and enroll at UW System institutions Marketing materials: Produce DVD/video for parents, counselors
More informationState of California Department of Transportation. Transportation System Data Business Plan
DRAFT Page i State of California Department of Transportation Transportation System Data Business Plan RFO# TSI DPA-0003 September 29, 2011 DRAFT Page ii Table of Contents Executive Summary... 4 Chapter
More informationGetting Started. PRINTABLE COPIES: Access to a printable version of this document and the forms and samples referenced are available at:
Getting Started PRINTABLE COPIES: Access to a printable version of this document and the forms and samples referenced are available at: www.online.ohio.edu/developmentguide 3 P age Online Program Development
More informationWelcome to the Creating Strategic Partnerships: Faculty Affairs Offices and Human Resources Webinar
Welcome to the Creating Strategic Partnerships: Faculty Affairs Offices and Human Resources Webinar This webinar will start at 12:00 pm Please dial 1-888-757-2748, Passcode: 298154 to access the audio
More informationOrganizational Data. Submitted to the Board of Supervisors of the University of Louisiana System and the Louisiana Board of Regents
Organizational Data Submitted to the Board of Supervisors of the University of Louisiana System and the Louisiana Board of Regents In partial fulfillment of the requirements of Act 741 Louisiana GRAD Act
More informationHuman Performance & the Role of Human Resources
DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY Human Performance & the Role of Human Resources Ms. Cheryl Steptoe-Simon July 20, 2016 Human Performance Functions Human Performance Components
More informationProject Management Office (PMO) Charter
Project Management Office (PMO) Charter Information & Communication Technologies 10 January 2008 Information & Communication Technologies Enterprise Application DISCLAIMER Services Project Management Office
More information541-974-5683 (cell) 8462 Eastchase Parkway, #11308 ~ Montgomery, AL 36117 clark_ksa@yahoo.com
541-974-5683 (cell) 8462 Eastchase Parkway, #11308 ~ Montgomery, AL 36117 clark_ksa@yahoo.com PROFESSIONAL PROFILE Seasoned institutional research (IR) professional with strong history of applying engineering,
More informationProject Charter for ITPC-0375
9-16-2011 Page 1 of 12 Project Charter for ITPC-0375 Prepared by: Daryl Fritchey Project Name ITPC-0375 Identity and Access Management (IAM) Implementation IAM Executive Sponsors Chair Michael Hites, Executive
More informationWelcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look
Welcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look at project management to understand the process and some
More informationIT11 - Cloud Services for Off-Site Resilience
UCD IT Services IT11 - Cloud Services for Off-Site Resilience Project Initiation Document Version 1.0 December 2 nd 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial
More informationPosition Description. Enterprise Agreement: Budget Responsibility: Nil
Position Description Position Details Position Scope Title: Division: Project Manager Finance & Corporate Services Enterprise Agreement: Budget Responsibility: Department: Payroll Authority Level: Ambulance
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationUNIVERSITY FLU PANDEMIC PLAN Preparation, Management and Recovery
UNIVERSITY FLU PANDEMIC PLAN Preparation, Management and Recovery Objectives The objectives of establishing and implementing a University Flu Pandemic Plan are: 1. to protect the physical, mental and overall
More informationUniversity of Rhode Island IT Governance
University of Rhode Island IT Governance The Information Technology Review Steering Committee invites you to comment on a proposed IT governance structure for the University. The proposal is based on recommendations
More informationProject Management. In this Guide
A GUIDE TO MINDMANAGER Project Management Project success depends on both the effective management of information and the efficient coordination of resources and schedules. MindManager can help. In this
More informationPHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
More informationDriving Records & Information Management Transformation: Enabling program adoption
October 2014 Driving Records & Information Management Transformation: Enabling program adoption At a glance As companies work to create structured control over information, they often find that people
More informationCURRICULUM CHANGE PROCEDURES FOR THE CSUF CATALOG
CURRICULUM CHANGE PROCEDURES FOR THE CSUF CATALOG COURSE AND CURRICULUM CHANGE PROCEDURES: Request for New Undergraduate Course: A request for a new undergraduate course is made through the submission
More informationCouncil of Graduate Schools (CGS) Consultancy Report. Graduate Admissions Process Review Oregon State University. March 22, 2006
Council of Graduate Schools (CGS) Consultancy Report Graduate Admissions Process Review Oregon State University March 22, 2006 Submitted by: Daniel J. Bennett, Assistant Dean, Graduate Admissions/Student
More informationAIA DC EAC EXECUTIVE COMMITTEE POSITION DESCRIPTIONS
AIA DC EAC EXECUTIVE COMMITTEE POSITION DESCRIPTIONS Appointment to the AIA DC EAC Executive Committee is a three year commitment that follows the sequential path of Vice-Chair, Chair, and Past Chair.
More informationFinal Report of the Interdisciplinary Initiatives Task Force. January, 2013
Final Report of the Interdisciplinary Initiatives Task Force Issue 1: Coordination among Departments January, 2013 The issues that arise here include credit-hour distribution among departments and the
More informationEnterprise Directory Project Pre-Feasibility Study Information and Educational Technology
UC DAVIS: OFFICE OF THE VICE PROVOST INFORMATION & EDUCATIONAL TECHNOLOGY Enterprise Directory Project Pre-Feasibility Study Information and Educational Technology Background Unprecedented growth and an
More informationAngelo State University
Angelo State University Campus-wide Project Management Software Business Justification Project Name: Project Management Software Implementation Proposed By: Jackie Droll & John Russell Department Head/Director/Dean:
More informationPeople at Work Project An Assessment of Psychosocial Hazards in the Workplace Action Planning Guide
People at Work Project An Assessment of Psychosocial Hazards in the Workplace Action Planning Guide This guiding document provides tips and examples of how to develop an effective action plan. It is targeted
More informationCommunity College s Lean Efforts Save Time, Money By Bonnie Slykhuis, Des Moines Area Community College
Community College s Lean Efforts Save Time, Money By Bonnie Slykhuis, Des Moines Area Community College Des Moines Area Community College (DMACC) is located in the heart of Iowa and serves more than 60,000
More informationUoD IT Job Description
UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management
More informationLeveraging SharePoint for Project, Program, and Portfolio Management
Leveraging SharePoint for Project, Program, and Portfolio Management Addressing the Challenges of Communicating, Coordinating, Controlling, and Complying Delivered by Dean W. Farmer, MMS, PMP at the SIUE
More informationBSBA Program Goals. 2. To obtain specialized knowledge of a single business discipline or functional area
BSBA Program Goals I. Business Knowledge 1. To understand the fundamental principles of essential business functions and the relationship of business to individuals, government, society, and other organizations
More informationCentre for Learning and Development
The Leadership and Management Development Strategy was developed to endorse learning and development opportunities to strengthen the leadership and management capacity of the Newfoundland and Labrador
More informationPerformance Management for Faculty and Staff
UNIVERSITY BUSINESS EXECUTIVE ROUNDTABLE Performance Management for Faculty and Staff Custom Research Brief Research Associate Anna Krenkel Research Manager Nalika Vasudevan September 2012 2 of 12 3 of
More informationProject Managers Operations
Date: 15 December 2015 Job Title: Department: Location: Senior Project Manager Operations (Interim Projects & logistics) Project Team North Shore Hospital site, Takapuna, Auckland and Waitakere Hospital;
More informationFramework. 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP
PROJECT MANAGEMENT Framework 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP Topics 1. Benefits Of Project Management 2. Definitions 3. Roles 4. Project Process Groups 5. Best Practices
More informationOffice of Academic and Student Services PROGRAMMING FOR THE NON-TRADITIONAL MARKET IN THE UNIVERSITY OF WISCONSIN SYSTEM
The University of Wisconsin System Office of Academic and Student Services Academic Information Series 5.4 Rev (ACIS-5.4 Rev) PROGRAMMING FOR THE NON-TRADITIONAL MARKET IN THE UNIVERSITY OF WISCONSIN SYSTEM
More informationCARLETON UNIVERSITY POSITION DESCRIPTION. Position Title: Manager, HR Systems Position No.: 298879. Approved by:
CARLETON UNIVERSITY POSITION DESCRIPTION Position Title: Manager, HR Systems Position No.: 298879 Reports to: Department: Assistant Director HR, Talent Programs Human Resources Approved by: (Incumbent/Date)
More informationOE PROJECT CHARTER Business Process Management System Implementation
PROJECT NAME: PREPARED BY: DATE (MM/DD/YYYY): Andrea Lambert, Senior Business Process Consultant, OE Program Office 09/15/2014 PROJECT CHARTER VERSION HISTORY VERSION DATE COMMENTS (DRAFT, SIGNED, REVISED
More informationMEMORANDUM. Board of Regents. Vice President Kathleen Bollard Analyst Thomas Spahr. DATE: June 25, 2012. Issue: New Program Enrollments
Office of the Vice President for Academic Affairs t 303 860 5600 1800 Grant Street, Suite 800 f 303 860 5620 35 UCA OfficeOfAcademicAffairs@cu.edu Denver, CO 80203-1187 MEMORANDUM TO: FROM: Board of Regents
More informationProject Management Methodology
Project Management Methodology 1/6/2015 PAGE 1 OF 28 Version 2.0 Contents INTRODUCTION... 4 1. Overview... 4 PHASE 1 PROJECT INITIATION... 5 1. Governance Model... 6 2. Project Prioritization Process...
More information