1 Automation of ROS DAM BPCG Mitigation Presenter MaryHelen Donnelly Operations and Reliability Products New York Independent System Operator Market Issues Working Group KCC May 15, 2012
2 Agenda Background Existing Manual Process Proposed DAM BPCG process Tariff Sections to be Updated Next Steps 2
3 Background Purpose of this project is to align the application of manually applied DA and RT BPCG mitigation measures RT currently handled by Settlements software DAM currently handled manually by MMA All BPCG mitigation standards/thresholds will remain the same as today, but application of DAM BPCG mitigation will be handled by Settlements software 3
4 Existing DAM BPCG Mitigation Manual Process For every market day a generator receives a DAM BPCG payment, MMA performs a manual evaluation of the following mitigation measures: Economic Withholding Conduct, Att. H, Section Incremental Energy and Minimum Generation Bids: An increase exceeding 300 percent or $100 per MWh, whichever is lower; provided, however, that Incremental Energy or Minimum Generation Bids below $25 per MWh shall be deemed d not to constitute t economic withholding. Impact, Att. H, Section an increase of 200 percent, or 50 percent for Generators in a Constrained Area in Bid Production Cost guarantee payments to a Market Party for a Generator for a day; 4
5 Existing DAM BPCG Mitigation Manual Process Cont d If conduct and impact tests triggered, MMA opens a consultation with MP Notification / Consultation requirements, Att. H, Section Consultation initiated by the ISO to determine if mitigation is appropriate: Applies to Market-Party-specific and/or Generator-specific mitigation, but not to mitigation that is applied pursuant to Sections , , or of these mitigation measures. If through the application of an appropriate p index or screen or other monitoring of market conditions, conduct is identified that (i) exceeds an applicable threshold, and (ii) has a material effect, as specified above, on one or more prices or guarantee payments in an ISO Administered Market, the ISO shall, as and to the extent specified in Attachment O or in Section of these Mitigation Measures, contact the Market Party engaging in the identified conduct to request an explanation of the conduct. Action NYISO may take after consultation, Att. H, Section If the criteria i contained in Section are met, the ISO may substitute t a default bid or bid parameter for a Bid or bid parameter submitted for an Electric Facility. The default bid or bid parameter shall establish a maximum or minimum value for one or more components of the submitted Bid or Bid parameters, equal to a reference level for that component determined as specified in Section The default bid is used to re-calculate the associated BPCG payment 5
6 Proposed DAM BPCG Process Existing DAM BPCG mitigation thresholds will not change. Method of application is changing from manual process to Settlements software process. This mitigation is not and will not be performed by AMP so it does not affect commitment or LBMP. Applies to all DAM BPCG payments not covered by AMP ROS generators NYC generators when AMP is not triggered 6
7 Proposed DAM BPCG Process Will parallel current RT BPCG Mitigation process in Settlements software For every market day a generator receives a RT BPCG payment, Settlements software will perform an evaluation of conduct. If conduct is triggered, Settlements software will perform an evaluation of BPCG impact. If impact is identified, RT BPCG payment will be re-calculated to reflect mitigation per Tariff section MPs that have provided appropriate contact information to the NYISO will be notified by of the mitigation and will have the opportunity to consult per Tariff section
8 Proposed Tariff Changes Current Tariff language g for BPCG mitigation has separate sections for RT and DAM BPCG mitigation. Updated Tariff language age will be simplified such that DAM and RT BPCG will be covered in same language/section. Tariff sections to be updated include: and
9 Next Steps Present Tariff language at July MIWG Present concept and Tariff language at August BIC Present concept and Tariff language at September MC Present concept and Tariff language at November BOD Proposing implementation ti as 2013 project 9
10 The New York Independent System Operator (NYISO) is a not-for-profit corporation that began operations in The NYISO operates New York s bulk electricity grid, administers the state s wholesale electricity markets, and conducts comprehensive planning for the state s bulk electricity system. 10
Market Solutions to Loop Flow
Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1 Agenda Background Recommendation Next Steps Solution
More information2012 Proposed Projects. Project Title Project Description. Business Intelligence Products
Business Intelligence Products etariff Public Website Module This project will add the etariff Public Website module to www.nyiso.com. This is a small effort with new enhancements for the MPs. It allows
More informationDeliverability Testing
Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008 Definition
More informationNEW YORK INDEPENDENT SYSTEM OPERATOR, INC. WORKING CAPITAL POLICY AND PROCEDURE
Note: This Policy is an interim policy which clarifies the provisions for working capital funding in the current NYISO tariffs, as delineated below. This Policy is subject to change, subsequent to FERC
More informationNew York State of the Market System - NYISO Success Project
Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State
More informationCoordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting. Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM
Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM Agenda Final Proposal Benefits Assessment Look Ahead Prices Fees
More informationDemand Response Programs: Lessons from the Northeast
Demand Response Programs: Lessons from the Northeast Charles Goldman E. O. Lawrence Berkeley National Laboratory CAGoldman@lbl.gov Mid Atlantic Demand Response Initiative Meeting Baltimore MD December
More informationNYISO Demand Response Programs: Enrollment
NYISO Demand Response Programs: Enrollment Donna Pratt Demand Response Market Product Specialist New York Independent System Operator DR-Expo Chicago, Illinois October 16-17, 2007 New York Independent
More informationPreliminary Project Description
Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State
More informationExternal Business Requirements Specification
External Business Requirements Specification Changes to Bidding and Mitigation of Commitment Cost Version 1.0 November 29, 2010 Table of Contents 1. INTRODUCTION... 4 1.1 PURPOSE... 4 1.2 REFERENCES...
More informationMonitoring Competitive Markets
Monitoring Competitive Markets Pennsylvania Public Utility Commission John A. Levin, Assistant Counsel Statutory Authority Pennsylvania Public Utility Commission Pennsylvania Public Utility Code Business
More informationThe Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in
17.1 LBMP Calculation Method The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by either the Real-
More informationTable of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure
No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time
More information2015 Project Schedule Milestone Update
2015 Schedule Milestone Update Robb Pike Director, & Product Management New York Independent System Operator Ryan Smith Senior Manager, Enterprise Product & Management New York Independent System Operator
More informationEmergency Demand Response Program Manual
MANUAL 7 Emergency Demand Response Program Manual June 2016 Version: 7.2 Effective Date: 06/03/2016 Committee Acceptance: 05/18/2016 BIC This document was prepared by: NYISO Demand Response Operations
More informationRMR Settlement Example
RMR Settlement Example Bob Logan Senior Market Design Specialist New York Independent System Operator ICAPWG August 25, 2015 KCC 2000-2015 New York Independent System Operator, Inc. All Rights Reserved.
More informationAugust 15, 2012 10:00 a.m. 1:30 p.m.
NYISO Business Issues Committee Meeting Minutes NYISO Business Issues Committee Meeting Minutes August 15, 2012 10:00 a.m. 1:30 p.m. 1. Introductions, Meeting Objectives, and Chairman s Report The chair
More informationAccounting and Billing Manual
MANUAL 14 Accounting and Billing Manual December 2014 Version: 3.3 Effective Date: 12/29/2014 Committee Acceptance: BIC 12/10/2014 This document was prepared by: NYISO Customer Settlements New York Independent
More information2016 2020 Strategic Plan New York Independent System Operator
2016 2020 Strategic Plan New York Independent System Operator Since the inception of New York s competitive market... $6.4 billion in reduced fuel costs due to system efficiency improvements that exceeded
More informationDemand Response, Dynamic Pricing, and the Smart Grid in New York
Demand Response, Dynamic Pricing, and the Smart Grid in New York James T. Gallagher Sr. Manager for Strategic Planning New York Independent System Operator jgallagher@nyiso.com Consumer Advisory Council
More informationDemand Response FAQs
1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail meter participate
More informationCompiled Comments on the Billing and Price Corrections Task Force Comments submitted through July 8 th, 2005
Compiled Comments on the Billing and Price Corrections Task Force Comments submitted through July 8 th, 2005 From Epic Merchant Energy: Brad, Here are comments with regard to price changing in NYISO Real
More informationProposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies. Mary K. McGarvey Management Committee November 29, 2006
Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies Mary K. McGarvey Management Committee November 29, 2006 1 Overview Calculation Methodologies: Allocation of bad
More informationMay 20, 2013. Submitted Electronically. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
10 Krey Boulevard Rensselaer, NY 12144 May 20, 2013 Submitted Electronically Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: New York Independent
More informationISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013
ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices Version 10.0 April 17, 2013 ISO-NE Transmission, Markets and Services Tariff Cross Sound Cable Business Practices Version
More informationConvergence Bidding Stakeholder Conference Call
Convergence Bidding Stakeholder Conference Call Margaret Miller Senior Market Design & Policy Specialist Convergence Bidding Stakeholder Conference Call August 13, 2009 Agenda 1:00 1:15 - Plan for Stakeholder
More informationImplementation Challenges of Incorporating Greenhouse Gas Compliance Costs
www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 Revision History Date Version Description Author 2013-07-12 1.0 Xu, Lin Note: Consistent with Attachment G to the Business Practice Manual
More informationOverview of Reliability Demand Response Resource
Overview of Reliability Demand Response Resource Radha Madrigal Customer Service Department May 8, 2014 Agenda Product overview and purpose Define Reliability Demand Response Resource Agreements & registration
More informationPower Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy
Power Supplier Statement - Billing Date Energy(MWh) 3 Forward Energy 33 Balancing Energy Energy Settlement ($) 31 Forward Energy 34 Balancing Energy 314 ELR DAM Contract Balancing Payment $ 32 DAM Bid
More information2009 Product Enhancements
Energy Marketplace Product Enhancements Comprehensive Bid Management System Phase 4 & 5 The Comprehensive Bid Management System project will address the pressing need to stabilize and modernize NYISO's
More informationTRANSMISSION SERVICES MANUAL
TRANSMISSION SERVICES MANUAL Transmission Services Manual Version: 2.0 Revision Date: January 20, 2005 Committee Approved: January 19, 2005 Effectivity Date: February 1, 2005 Disclaimer The information
More informationAddressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m.
Addressing Affected System Impacts of Generator Interconnection: Processes and Principles Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. 1. Introduction Mercy Parker Helget Sr. Stakeholder Engagement
More informationThe ISO s Working Capital Fund shall be maintained according to the provisions of this
28 Attachment V ISO Working Capital Fund The ISO s Working Capital Fund shall be maintained according to the provisions of this Attachment V to the ISO OATT. 28.1 Purpose of the ISO Working Capital Fund
More informationCredit Management and the ERCOT Nodal Market
Credit Management and the ERCOT Nodal Market Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal Market Implementation and is not intended
More informationCongestion Management Settlement Credits Dispatch Technical Working Group February 13, 2012
Congestion Management Settlement Credits Dispatch Technical Working Group February 13, 2012 Agenda Dispatch Design Principles Review constraints Review the purpose of Congestion Management Settlement Credits
More informationRedlined BSCP201 text for CP1425 Consequential changes to BSCP201 following EMR
Redlined BSCP201 text for CP1425 Consequential changes to BSCP201 following EMR This CP proposes changes to Sections 2.1, 3.2, and 3.3 of BSCP201. We have redlined these changes against Version 2.0. There
More informationMarket Operation s Report
Market Operation s Report Business Issues Committee Meeting December 14, 2011 Agenda #3 Report Items Market Performance Highlights Market Performance Highlights for November 2011 PRELIMINARY DATA (Most
More informationEnergy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England
Business Models for Transactive Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England About ISO New England (ISO) Not-for-profit
More informationCALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market
CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive
More informationATTACHMENT F PLACEHOLDER DISPUTE MECHANISM
ATTACHMENT F PLACEHOLDER DISPUTE MECHANISM 11.7.4 Recurring disputes or exceptions A Scheduling Coordinator may request the ISO to treat as recurring a dispute or exception raised in accordance with Sections
More informationNYISO Compensation Program
NYISO Compensation Program This document describes the process by which the New York Independent System Operator ( NYISO ) determines the compensation for its executives. Specifically, this document describes
More informationNYISO IT Strategic Initiatives. Progress Update. Business Issues Committee Meeting 24Apr2001. Progress Update
Business Issues Committee Meeting 24 April 2001 1 Agenda Review of the Initiative Development Process Review current and future IT architecture Review Migration Plan Discuss Immediate Deliverables Future
More informationSETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE
SETTLEMENT AND BILLING PROTOCOL (SABP) SABP 1 OBJECTIVES, DEFINITIONS AND SCOPE SABP 1.1 Objectives The objective of this Protocol (and of Annex 1) is to inform Scheduling Coordinators, Participating TOs
More informationRe: New York Independent System Operator, Inc. s Notice of Delay to Effective Date; Docket No. ER13-1199-000
10 Krey Boulevard Rensselaer, NY 12144 June 12, 2013 Submitted Electronically Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street N.E. Washington, D.C. 20426 Re: New York Independent
More information2015 2019 Strategic Plan New York Independent System Operator
2015 2019 Strategic Plan New York Independent System Operator NYISO markets deliver significant benefits by coordinating the commitment and dispatch of generation to ensure that resources are started and
More informationEnabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers
Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group ed@cazalet.com www.cazalet.com 650-949-0560
More information(13-6725) Page: 1/5 DRAFT MINISTERIAL DECISION
6 December 2013 (13-6725) Page: 1/5 Ministerial Conference Ninth Session Bali, 3-6 December 2013 UNDERSTANDING ON TARIFF RATE QUOTA ADMINISTRATION PROVISIONS OF AGRICULTURAL PRODUCTS, AS DEFINED IN ARTICLE
More informationMonthly Report. March 2014. Rick Gonzales Rana Mukerji Robert Fernandez
Monthly Report March 2014 Rick Gonzales Rana Mukerji Robert Fernandez TABLE OF CONTENTS Operations Performance Metrics Report Market Operation s Report Daily Loads Project Status Report Regulatory Filings
More informationBusiness Requirements Specification
Business s Specification Capacity Procurement Mechanism Replacement Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business s Specification (BRS) as provided
More informationUpdate on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting
Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented
More informationEnergy Storage Activities at New York Power Authority
Energy Storage Activities at New York Power Authority Li Kou, Ph.D. PE Sr. R&TD Engineer New York Power Authority APPA National Conference, Seattle, WA June 19, 2012 1 New York Power Authority Highlights
More informationWind Power and Electricity Markets
PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy
More informationTransactive Energy Framework for Bilateral Energy Imbalance Management
Transactive Energy Framework for Bilateral Energy Imbalance Management Farrokh Rahimi, Ph.D. Vice President Market Design and Consulting GridWise Architectural Council Meeting Westminster, CA December
More informationPresentation for The National Commission for Energy State Regulation of Ukraine
Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection
More informationProduct Management Update
Product Management Update Prepared By: NYISO Product Management August 2005 Draft for discussion purposes only NYISO Products Business solutions delivered as features, functions and services that enable
More informationWhat is hourly pricing and what does it mean for you? Customer Meetings May 2006
What is hourly pricing and what does it mean for you? Customer Meetings May 2006 Catherine McDonough Project Manager 1 (315) 428-5641 Background In 1998, National Grid (NG) extended hourly pricing to our
More informationHow To Understand The Cme Group
The Evolution of the CME Group Electricity Complex Bradford G. Leach Director, Energy Research and Product Development CME Group Harvard Electricity Policy Group Sixty-Sixth Plenary Session March 9, 2012
More informationA Locational Analysis of Generation Benefits on Long Island, New York
LBNL-57506 ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY A Locational Analysis of Generation Benefits on Long Island, New York Juan Wang, Jesse Cohen, Jennifer Edwards, and Chris Marnay Environmental
More informationDemand Response Frequently Asked Questions (Last Updated 02/23/16)
# Questions Answers 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail
More informationFRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS
BRIEFING FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS SEPTEMBER 2015 ENERGY TRANSITION ACT ADOPTED ON 22 JULY 2015 NEW SUPPORT MECHANISM THE CONTRACT FOR DIFFERENCE CALCULATION
More informationFrequently Asked Questions for: Settlement Disputes System Submittal Process
Frequently Asked Questions for: Settlement Disputes System Submittal Process California ISO. Copyright 2011. All Rights Reserved TABLE OF CONTENTS SETTLEMENT DISPUTE SYSTEM... 3 Q1: What is a settlement
More informationBusiness Requirements Specification
Business Requirements Specification Commitment Cost Enhancements Date Created: 10/17/2014 Page 1 of 8 Disclaimer All information contained in this draft Business Requirements Specification (BRS) as provided
More informationPJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013
PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity
More informationCode Subsidiary Document No. 0007: Business Continuity Management. September 2015
Code Subsidiary Document No. 0007: September 2015 Change History Version Number Date of Issue Reason For Change Change Control Reference Sections Affected 20150511 11 May 2015 For industry consultation
More informationNYISO 2004 Projects Summary
NYISO Projects Summary Budget, Standards & Performance subcommittee meeting October 10, 2003 Table of Contents Project Number A541 A543 A556 A559 A564 A573 A574 A577 A600 A619 A620 A625 A630 A636 A647
More informationCalifornia ISO. Report on natural gas price volatility at western trading hubs. May 14, 2015. Department of Market Monitoring
California Independent System Operator Corporation California ISO Report on natural gas price volatility at western trading hubs May 14, 2015 Department of Market Monitoring 1 Introduction Natural gas
More informationREGULATIONS GOVERNING DELIVERABLE FUTURES CONTRACT
REGULATIONS GOVERNING DELIVERABLE FUTURES CONTRACT OF THE ISALAMABAD STOCK EXCHANGE LIMITED (As amended on February 23, 2011 and sent for Gazette Notification) REGULATIONS GOVERNING DELIVERABLE FUTURES
More informationRequest for Power Supply Proposals to Provide the Following Services:
Request for Power Supply Proposals to Provide the Following Services: Default Service in: Massachusetts For the Period: August 1, 2016 October 31, 2016 1. Overview REQUEST FOR POWER SUPPLY PROPOSALS 1.1
More informationICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button.
ICAP/UCAP Overview Aaron Westcott Awestcott@nyiso.com 518 356 7657 If possible, Please mute your phones Please do not use the hold button. Agenda What is ICAP/UCAP? How are ICAP and UCAP calculated? How
More informationsink asset load power pool ISO pool participant bids operating constraints ancillary service declarations
G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset
More informationGovernance. What s a Governance?
Governance What s a Governance? Governance FERC - Federal Energy Regulatory Commission NERC - North American Electric Reliability Council. NPCC - Northeast Power Coordinating Council NYSRC - New York State
More informationParagraph 11 Elections and Variables 1
Paragraph 11 Elections and Variables 1 (a) Base Currency and Eligible Currency Base Currency means euro. Eligible Currency means the Base Currency. (b) Credit Support Obligations Delivery Amount, Return
More informationRevenue Metering Requirements Manual
NEW YORK INDEPENDENT SYSTEM OPERATOR MANUAL 25 Revenue Metering Requirements Manual August 2013 Version: 1.0 Effective Date: 09/04/2013 Committee Acceptance: July 27, 2005 This document was prepared by:
More informationTechnical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue
Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting
More informationAttached are the Board materials in relation to these agenda items. Item 4.3 1 ERCOT Public
The Human Resources & Governance (HR&G) Committee is expected to consider HR&G Committee Agenda Item 4.3: Recommendation regarding Proposed 2016 ERCOT Key Performance Indicators (s) at its meeting on December
More informationWHOLESALE SECURITIES. Introduction. Definitions. Structure of Practice Note. Practice Note #7 CURRENT DATE: 7 MARCH 2016
CURRENT DATE: 7 MARCH 2016 NATIONAL STOCK EXCHANGE OF AUSTRALIA Introduction The National Stock Exchange of Australia Limited (NSX) lists Wholesale Securities under Listing Rules Section 2B. This Practice
More informationAt the time of notification, the QF or OSGF shall provide the Company with the following information:
Sheet No. 1 MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY QUALIFYING FACILITY POWER PURCHASE RATE P 1. Availability The Company will purchase electricity from any small power producer or cogenerator
More information2014 Retail Electric Rates. in Deregulated and Regulated States
2014 Retail Electric Rates in Deregulated and Regulated States Published April 2015 2014 Retail Electric Rates in Deregulated and Regulated States Prepared by Paul Zummo, Manager, Policy Research and Analysis
More informationIman Fund. Identify Theft Prevention Program
Iman Fund Identify Theft Prevention Program Background The Federal Trade Commission adopted a rule, applicable to those investment companies that offer transaction accounts, requiring that investment companies
More informationTwo Settlement - Virtual Bidding and Transactions
Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements
More informationDISPATCH AGREEMENT RECITALS
DISPATCH AGREEMENT This DISPATCH AGREEMENT (the Agreement ) is made and entered into as of May 2, 2002, by and between the Department of Water Resources, an agency of the State of California, with respect
More informationRequest title: Securities account and T2S Dedicated Cash account to be defined by CSDs and NCBs. Request ref. no: T2S 0305 URD
General Information (Origin of Request) User Requirements (URD) or GUI Business Functionality Document (BFD) Other User Functional or Technical Documentation (SYS) Request raised by: Target Working Group
More informationNYISO Business Issues Committee Meeting Minutes DRAFT. October 6, 2010 10:00 a.m. 3:00 p.m.
DRAFT NYISO Business Issues Committee October 6, 2010 10:00 a.m. 3:00 p.m. 1. Introductions, Meeting Objectives, and Chairman s Report Mr. Glenn Haake (Dynegy), the Chair of the Business Issues Committee
More informationComprehensive Financial Assurance Requirements Working Draft of Proposed Revisions to NYISO Financial Assurance Requirements
Comprehensive Financial Assurance Requirements Working Draft of Proposed Revisions to NYISO Financial Assurance Requirements Presented to the Scheduling & Pricing Working Group November 15, 2002 Presentation
More informationWhat is System Integration?
What is System Integration? Grant Gilchrist EnerNex Corporation November 29, 2005 Agenda What we mean by integration How it s usually done How to do it right Possible Utility Programs Involving Consumer
More informationPortal Interactions Reports. Settlements dddaniels@spp.org
Portal Interactions Reports Settlements dddaniels@spp.org Content Settlements Financial Reports Determinant Reports Settlement Statements Settlement Invoices EQR Data Download Reports Settlements Timeline
More informationMEMORANDUM OF UNDERSTANDING THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION
MEMORANDUM OF UNDERSTANDING BETWEEN THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR AND THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION AND THE NORTHEAST POWER COORDINATING COUNCIL, CROSS-BORDER REGIONAL
More informationNetwork Upgrades andSIAs Under California Tariff Clarifications
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 July 11, 2013 Re: California Independent
More informationMarket Participants User s Guide
GUIDE 01 Market Participants User s Guide December 2015 Version: 9.1 Effective Date: 12/16/2015 This document was prepared by: NYISO Stakeholder Services New York Independent System Operator 10 Krey Boulevard
More informationMarket reference prices
Market reference prices CfD Expert Group workshop 27 September 2013 Agenda Introduction / aims of the session Quick overview (10.00 11.30) Setting the intermittent reference price Setting the baseload
More informationEBA-GL-2015-02. 23 July 2015. Guidelines. on the minimum list of qualitative and quantitative recovery plan indicators
EBA-GL-2015-02 23 July 2015 Guidelines on the minimum list of qualitative and quantitative recovery plan indicators Contents EBA Guidelines on the minimum list of qualitative and quantitative recovery
More informationRules on Southern Companies Energy Auction Participation
Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies
More informationAliso Canyon Gas-Electric Coordination. Straw Proposal
Aliso Canyon Gas-Electric Coordination Straw Proposal April 15, 2016 Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 4 3. Background... 5 3.1. Aliso Canyon Impact... 5
More informationTECHNICAL BULLETIN. Natural Gas Price Calculation. February 21, 2014. www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.
February 21, 2014 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 Contents Executive Summary... 3 Background... 3 Issue and proposed tariff waiver... 3 Next steps... 7 Appendix: Affected
More informationNYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc.
NYISO Tariffs New York Independent System Operator, Inc. NYISO Tariffs Document Generated On: 10/14/2011 Page 1 5.10 NYCA Minimum Installed Capacity Requirement The NYCA Minimum Installed Capacity Requirement
More information134 FERC 61,226 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued March 24, 2011)
134 FERC 61,226 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Southern
More informationDay-Ahead Scheduling Manual
MANUAL 11 Day-Ahead Scheduling Manual February 2016 Version: 4.1 Revision Date: 02/01/2016 Committee Acceptance: 01/13/16 BIC 01/14/16 OC This document was prepared by: New York Independent System Operator
More informationGeneration and Transmission Interconnection Process
PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents
More informationChapter 9 Settlements and Billing
MDP_RUL_0002_09 Market Rules Chapter 9 Settlements and Billing Public Issue Date: December 2, 2015 Library Record No. MDP_RUL_0002_09 Document Name Market Rules for the Ontario Electricity Market Issue
More information