Automation of ROS DAM

Size: px
Start display at page:

Download "Automation of ROS DAM"

Transcription

1 Automation of ROS DAM BPCG Mitigation Presenter MaryHelen Donnelly Operations and Reliability Products New York Independent System Operator Market Issues Working Group KCC May 15, 2012

2 Agenda Background Existing Manual Process Proposed DAM BPCG process Tariff Sections to be Updated Next Steps 2

3 Background Purpose of this project is to align the application of manually applied DA and RT BPCG mitigation measures RT currently handled by Settlements software DAM currently handled manually by MMA All BPCG mitigation standards/thresholds will remain the same as today, but application of DAM BPCG mitigation will be handled by Settlements software 3

4 Existing DAM BPCG Mitigation Manual Process For every market day a generator receives a DAM BPCG payment, MMA performs a manual evaluation of the following mitigation measures: Economic Withholding Conduct, Att. H, Section Incremental Energy and Minimum Generation Bids: An increase exceeding 300 percent or $100 per MWh, whichever is lower; provided, however, that Incremental Energy or Minimum Generation Bids below $25 per MWh shall be deemed d not to constitute t economic withholding. Impact, Att. H, Section an increase of 200 percent, or 50 percent for Generators in a Constrained Area in Bid Production Cost guarantee payments to a Market Party for a Generator for a day; 4

5 Existing DAM BPCG Mitigation Manual Process Cont d If conduct and impact tests triggered, MMA opens a consultation with MP Notification / Consultation requirements, Att. H, Section Consultation initiated by the ISO to determine if mitigation is appropriate: Applies to Market-Party-specific and/or Generator-specific mitigation, but not to mitigation that is applied pursuant to Sections , , or of these mitigation measures. If through the application of an appropriate p index or screen or other monitoring of market conditions, conduct is identified that (i) exceeds an applicable threshold, and (ii) has a material effect, as specified above, on one or more prices or guarantee payments in an ISO Administered Market, the ISO shall, as and to the extent specified in Attachment O or in Section of these Mitigation Measures, contact the Market Party engaging in the identified conduct to request an explanation of the conduct. Action NYISO may take after consultation, Att. H, Section If the criteria i contained in Section are met, the ISO may substitute t a default bid or bid parameter for a Bid or bid parameter submitted for an Electric Facility. The default bid or bid parameter shall establish a maximum or minimum value for one or more components of the submitted Bid or Bid parameters, equal to a reference level for that component determined as specified in Section The default bid is used to re-calculate the associated BPCG payment 5

6 Proposed DAM BPCG Process Existing DAM BPCG mitigation thresholds will not change. Method of application is changing from manual process to Settlements software process. This mitigation is not and will not be performed by AMP so it does not affect commitment or LBMP. Applies to all DAM BPCG payments not covered by AMP ROS generators NYC generators when AMP is not triggered 6

7 Proposed DAM BPCG Process Will parallel current RT BPCG Mitigation process in Settlements software For every market day a generator receives a RT BPCG payment, Settlements software will perform an evaluation of conduct. If conduct is triggered, Settlements software will perform an evaluation of BPCG impact. If impact is identified, RT BPCG payment will be re-calculated to reflect mitigation per Tariff section MPs that have provided appropriate contact information to the NYISO will be notified by of the mitigation and will have the opportunity to consult per Tariff section

8 Proposed Tariff Changes Current Tariff language g for BPCG mitigation has separate sections for RT and DAM BPCG mitigation. Updated Tariff language age will be simplified such that DAM and RT BPCG will be covered in same language/section. Tariff sections to be updated include: and

9 Next Steps Present Tariff language at July MIWG Present concept and Tariff language at August BIC Present concept and Tariff language at September MC Present concept and Tariff language at November BOD Proposing implementation ti as 2013 project 9

10 The New York Independent System Operator (NYISO) is a not-for-profit corporation that began operations in The NYISO operates New York s bulk electricity grid, administers the state s wholesale electricity markets, and conducts comprehensive planning for the state s bulk electricity system. 10

Market Solutions to Loop Flow

Market Solutions to Loop Flow Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1 Agenda Background Recommendation Next Steps Solution

More information

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products Business Intelligence Products etariff Public Website Module This project will add the etariff Public Website module to www.nyiso.com. This is a small effort with new enhancements for the MPs. It allows

More information

Deliverability Testing

Deliverability Testing Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008 Definition

More information

NEW YORK INDEPENDENT SYSTEM OPERATOR, INC. WORKING CAPITAL POLICY AND PROCEDURE

NEW YORK INDEPENDENT SYSTEM OPERATOR, INC. WORKING CAPITAL POLICY AND PROCEDURE Note: This Policy is an interim policy which clarifies the provisions for working capital funding in the current NYISO tariffs, as delineated below. This Policy is subject to change, subsequent to FERC

More information

New York State of the Market System - NYISO Success Project

New York State of the Market System - NYISO Success Project Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting. Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM

Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting. Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM Agenda Final Proposal Benefits Assessment Look Ahead Prices Fees

More information

Demand Response Programs: Lessons from the Northeast

Demand Response Programs: Lessons from the Northeast Demand Response Programs: Lessons from the Northeast Charles Goldman E. O. Lawrence Berkeley National Laboratory CAGoldman@lbl.gov Mid Atlantic Demand Response Initiative Meeting Baltimore MD December

More information

NYISO Demand Response Programs: Enrollment

NYISO Demand Response Programs: Enrollment NYISO Demand Response Programs: Enrollment Donna Pratt Demand Response Market Product Specialist New York Independent System Operator DR-Expo Chicago, Illinois October 16-17, 2007 New York Independent

More information

Preliminary Project Description

Preliminary Project Description Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

External Business Requirements Specification

External Business Requirements Specification External Business Requirements Specification Changes to Bidding and Mitigation of Commitment Cost Version 1.0 November 29, 2010 Table of Contents 1. INTRODUCTION... 4 1.1 PURPOSE... 4 1.2 REFERENCES...

More information

Monitoring Competitive Markets

Monitoring Competitive Markets Monitoring Competitive Markets Pennsylvania Public Utility Commission John A. Levin, Assistant Counsel Statutory Authority Pennsylvania Public Utility Commission Pennsylvania Public Utility Code Business

More information

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in 17.1 LBMP Calculation Method The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by either the Real-

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

2015 Project Schedule Milestone Update

2015 Project Schedule Milestone Update 2015 Schedule Milestone Update Robb Pike Director, & Product Management New York Independent System Operator Ryan Smith Senior Manager, Enterprise Product & Management New York Independent System Operator

More information

Emergency Demand Response Program Manual

Emergency Demand Response Program Manual MANUAL 7 Emergency Demand Response Program Manual June 2016 Version: 7.2 Effective Date: 06/03/2016 Committee Acceptance: 05/18/2016 BIC This document was prepared by: NYISO Demand Response Operations

More information

RMR Settlement Example

RMR Settlement Example RMR Settlement Example Bob Logan Senior Market Design Specialist New York Independent System Operator ICAPWG August 25, 2015 KCC 2000-2015 New York Independent System Operator, Inc. All Rights Reserved.

More information

August 15, 2012 10:00 a.m. 1:30 p.m.

August 15, 2012 10:00 a.m. 1:30 p.m. NYISO Business Issues Committee Meeting Minutes NYISO Business Issues Committee Meeting Minutes August 15, 2012 10:00 a.m. 1:30 p.m. 1. Introductions, Meeting Objectives, and Chairman s Report The chair

More information

Accounting and Billing Manual

Accounting and Billing Manual MANUAL 14 Accounting and Billing Manual December 2014 Version: 3.3 Effective Date: 12/29/2014 Committee Acceptance: BIC 12/10/2014 This document was prepared by: NYISO Customer Settlements New York Independent

More information

2016 2020 Strategic Plan New York Independent System Operator

2016 2020 Strategic Plan New York Independent System Operator 2016 2020 Strategic Plan New York Independent System Operator Since the inception of New York s competitive market... $6.4 billion in reduced fuel costs due to system efficiency improvements that exceeded

More information

Demand Response, Dynamic Pricing, and the Smart Grid in New York

Demand Response, Dynamic Pricing, and the Smart Grid in New York Demand Response, Dynamic Pricing, and the Smart Grid in New York James T. Gallagher Sr. Manager for Strategic Planning New York Independent System Operator jgallagher@nyiso.com Consumer Advisory Council

More information

Demand Response FAQs

Demand Response FAQs 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail meter participate

More information

Compiled Comments on the Billing and Price Corrections Task Force Comments submitted through July 8 th, 2005

Compiled Comments on the Billing and Price Corrections Task Force Comments submitted through July 8 th, 2005 Compiled Comments on the Billing and Price Corrections Task Force Comments submitted through July 8 th, 2005 From Epic Merchant Energy: Brad, Here are comments with regard to price changing in NYISO Real

More information

Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies. Mary K. McGarvey Management Committee November 29, 2006

Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies. Mary K. McGarvey Management Committee November 29, 2006 Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies Mary K. McGarvey Management Committee November 29, 2006 1 Overview Calculation Methodologies: Allocation of bad

More information

May 20, 2013. Submitted Electronically. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

May 20, 2013. Submitted Electronically. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 10 Krey Boulevard Rensselaer, NY 12144 May 20, 2013 Submitted Electronically Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: New York Independent

More information

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013 ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices Version 10.0 April 17, 2013 ISO-NE Transmission, Markets and Services Tariff Cross Sound Cable Business Practices Version

More information

Convergence Bidding Stakeholder Conference Call

Convergence Bidding Stakeholder Conference Call Convergence Bidding Stakeholder Conference Call Margaret Miller Senior Market Design & Policy Specialist Convergence Bidding Stakeholder Conference Call August 13, 2009 Agenda 1:00 1:15 - Plan for Stakeholder

More information

Implementation Challenges of Incorporating Greenhouse Gas Compliance Costs

Implementation Challenges of Incorporating Greenhouse Gas Compliance Costs www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 Revision History Date Version Description Author 2013-07-12 1.0 Xu, Lin Note: Consistent with Attachment G to the Business Practice Manual

More information

Overview of Reliability Demand Response Resource

Overview of Reliability Demand Response Resource Overview of Reliability Demand Response Resource Radha Madrigal Customer Service Department May 8, 2014 Agenda Product overview and purpose Define Reliability Demand Response Resource Agreements & registration

More information

Power Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy

Power Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy Power Supplier Statement - Billing Date Energy(MWh) 3 Forward Energy 33 Balancing Energy Energy Settlement ($) 31 Forward Energy 34 Balancing Energy 314 ELR DAM Contract Balancing Payment $ 32 DAM Bid

More information

2009 Product Enhancements

2009 Product Enhancements Energy Marketplace Product Enhancements Comprehensive Bid Management System Phase 4 & 5 The Comprehensive Bid Management System project will address the pressing need to stabilize and modernize NYISO's

More information

TRANSMISSION SERVICES MANUAL

TRANSMISSION SERVICES MANUAL TRANSMISSION SERVICES MANUAL Transmission Services Manual Version: 2.0 Revision Date: January 20, 2005 Committee Approved: January 19, 2005 Effectivity Date: February 1, 2005 Disclaimer The information

More information

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m.

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. Addressing Affected System Impacts of Generator Interconnection: Processes and Principles Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. 1. Introduction Mercy Parker Helget Sr. Stakeholder Engagement

More information

The ISO s Working Capital Fund shall be maintained according to the provisions of this

The ISO s Working Capital Fund shall be maintained according to the provisions of this 28 Attachment V ISO Working Capital Fund The ISO s Working Capital Fund shall be maintained according to the provisions of this Attachment V to the ISO OATT. 28.1 Purpose of the ISO Working Capital Fund

More information

Credit Management and the ERCOT Nodal Market

Credit Management and the ERCOT Nodal Market Credit Management and the ERCOT Nodal Market Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal Market Implementation and is not intended

More information

Congestion Management Settlement Credits Dispatch Technical Working Group February 13, 2012

Congestion Management Settlement Credits Dispatch Technical Working Group February 13, 2012 Congestion Management Settlement Credits Dispatch Technical Working Group February 13, 2012 Agenda Dispatch Design Principles Review constraints Review the purpose of Congestion Management Settlement Credits

More information

Redlined BSCP201 text for CP1425 Consequential changes to BSCP201 following EMR

Redlined BSCP201 text for CP1425 Consequential changes to BSCP201 following EMR Redlined BSCP201 text for CP1425 Consequential changes to BSCP201 following EMR This CP proposes changes to Sections 2.1, 3.2, and 3.3 of BSCP201. We have redlined these changes against Version 2.0. There

More information

Market Operation s Report

Market Operation s Report Market Operation s Report Business Issues Committee Meeting December 14, 2011 Agenda #3 Report Items Market Performance Highlights Market Performance Highlights for November 2011 PRELIMINARY DATA (Most

More information

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England Business Models for Transactive Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England About ISO New England (ISO) Not-for-profit

More information

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive

More information

ATTACHMENT F PLACEHOLDER DISPUTE MECHANISM

ATTACHMENT F PLACEHOLDER DISPUTE MECHANISM ATTACHMENT F PLACEHOLDER DISPUTE MECHANISM 11.7.4 Recurring disputes or exceptions A Scheduling Coordinator may request the ISO to treat as recurring a dispute or exception raised in accordance with Sections

More information

NYISO Compensation Program

NYISO Compensation Program NYISO Compensation Program This document describes the process by which the New York Independent System Operator ( NYISO ) determines the compensation for its executives. Specifically, this document describes

More information

NYISO IT Strategic Initiatives. Progress Update. Business Issues Committee Meeting 24Apr2001. Progress Update

NYISO IT Strategic Initiatives. Progress Update. Business Issues Committee Meeting 24Apr2001. Progress Update Business Issues Committee Meeting 24 April 2001 1 Agenda Review of the Initiative Development Process Review current and future IT architecture Review Migration Plan Discuss Immediate Deliverables Future

More information

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE SETTLEMENT AND BILLING PROTOCOL (SABP) SABP 1 OBJECTIVES, DEFINITIONS AND SCOPE SABP 1.1 Objectives The objective of this Protocol (and of Annex 1) is to inform Scheduling Coordinators, Participating TOs

More information

Re: New York Independent System Operator, Inc. s Notice of Delay to Effective Date; Docket No. ER13-1199-000

Re: New York Independent System Operator, Inc. s Notice of Delay to Effective Date; Docket No. ER13-1199-000 10 Krey Boulevard Rensselaer, NY 12144 June 12, 2013 Submitted Electronically Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street N.E. Washington, D.C. 20426 Re: New York Independent

More information

2015 2019 Strategic Plan New York Independent System Operator

2015 2019 Strategic Plan New York Independent System Operator 2015 2019 Strategic Plan New York Independent System Operator NYISO markets deliver significant benefits by coordinating the commitment and dispatch of generation to ensure that resources are started and

More information

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group ed@cazalet.com www.cazalet.com 650-949-0560

More information

(13-6725) Page: 1/5 DRAFT MINISTERIAL DECISION

(13-6725) Page: 1/5 DRAFT MINISTERIAL DECISION 6 December 2013 (13-6725) Page: 1/5 Ministerial Conference Ninth Session Bali, 3-6 December 2013 UNDERSTANDING ON TARIFF RATE QUOTA ADMINISTRATION PROVISIONS OF AGRICULTURAL PRODUCTS, AS DEFINED IN ARTICLE

More information

Monthly Report. March 2014. Rick Gonzales Rana Mukerji Robert Fernandez

Monthly Report. March 2014. Rick Gonzales Rana Mukerji Robert Fernandez Monthly Report March 2014 Rick Gonzales Rana Mukerji Robert Fernandez TABLE OF CONTENTS Operations Performance Metrics Report Market Operation s Report Daily Loads Project Status Report Regulatory Filings

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Capacity Procurement Mechanism Replacement Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business s Specification (BRS) as provided

More information

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented

More information

Energy Storage Activities at New York Power Authority

Energy Storage Activities at New York Power Authority Energy Storage Activities at New York Power Authority Li Kou, Ph.D. PE Sr. R&TD Engineer New York Power Authority APPA National Conference, Seattle, WA June 19, 2012 1 New York Power Authority Highlights

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

Transactive Energy Framework for Bilateral Energy Imbalance Management

Transactive Energy Framework for Bilateral Energy Imbalance Management Transactive Energy Framework for Bilateral Energy Imbalance Management Farrokh Rahimi, Ph.D. Vice President Market Design and Consulting GridWise Architectural Council Meeting Westminster, CA December

More information

Presentation for The National Commission for Energy State Regulation of Ukraine

Presentation for The National Commission for Energy State Regulation of Ukraine Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection

More information

Product Management Update

Product Management Update Product Management Update Prepared By: NYISO Product Management August 2005 Draft for discussion purposes only NYISO Products Business solutions delivered as features, functions and services that enable

More information

What is hourly pricing and what does it mean for you? Customer Meetings May 2006

What is hourly pricing and what does it mean for you? Customer Meetings May 2006 What is hourly pricing and what does it mean for you? Customer Meetings May 2006 Catherine McDonough Project Manager 1 (315) 428-5641 Background In 1998, National Grid (NG) extended hourly pricing to our

More information

How To Understand The Cme Group

How To Understand The Cme Group The Evolution of the CME Group Electricity Complex Bradford G. Leach Director, Energy Research and Product Development CME Group Harvard Electricity Policy Group Sixty-Sixth Plenary Session March 9, 2012

More information

A Locational Analysis of Generation Benefits on Long Island, New York

A Locational Analysis of Generation Benefits on Long Island, New York LBNL-57506 ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY A Locational Analysis of Generation Benefits on Long Island, New York Juan Wang, Jesse Cohen, Jennifer Edwards, and Chris Marnay Environmental

More information

Demand Response Frequently Asked Questions (Last Updated 02/23/16)

Demand Response Frequently Asked Questions (Last Updated 02/23/16) # Questions Answers 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail

More information

FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS

FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS BRIEFING FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS SEPTEMBER 2015 ENERGY TRANSITION ACT ADOPTED ON 22 JULY 2015 NEW SUPPORT MECHANISM THE CONTRACT FOR DIFFERENCE CALCULATION

More information

Frequently Asked Questions for: Settlement Disputes System Submittal Process

Frequently Asked Questions for: Settlement Disputes System Submittal Process Frequently Asked Questions for: Settlement Disputes System Submittal Process California ISO. Copyright 2011. All Rights Reserved TABLE OF CONTENTS SETTLEMENT DISPUTE SYSTEM... 3 Q1: What is a settlement

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Commitment Cost Enhancements Date Created: 10/17/2014 Page 1 of 8 Disclaimer All information contained in this draft Business Requirements Specification (BRS) as provided

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

Code Subsidiary Document No. 0007: Business Continuity Management. September 2015

Code Subsidiary Document No. 0007: Business Continuity Management. September 2015 Code Subsidiary Document No. 0007: September 2015 Change History Version Number Date of Issue Reason For Change Change Control Reference Sections Affected 20150511 11 May 2015 For industry consultation

More information

NYISO 2004 Projects Summary

NYISO 2004 Projects Summary NYISO Projects Summary Budget, Standards & Performance subcommittee meeting October 10, 2003 Table of Contents Project Number A541 A543 A556 A559 A564 A573 A574 A577 A600 A619 A620 A625 A630 A636 A647

More information

California ISO. Report on natural gas price volatility at western trading hubs. May 14, 2015. Department of Market Monitoring

California ISO. Report on natural gas price volatility at western trading hubs. May 14, 2015. Department of Market Monitoring California Independent System Operator Corporation California ISO Report on natural gas price volatility at western trading hubs May 14, 2015 Department of Market Monitoring 1 Introduction Natural gas

More information

REGULATIONS GOVERNING DELIVERABLE FUTURES CONTRACT

REGULATIONS GOVERNING DELIVERABLE FUTURES CONTRACT REGULATIONS GOVERNING DELIVERABLE FUTURES CONTRACT OF THE ISALAMABAD STOCK EXCHANGE LIMITED (As amended on February 23, 2011 and sent for Gazette Notification) REGULATIONS GOVERNING DELIVERABLE FUTURES

More information

Request for Power Supply Proposals to Provide the Following Services:

Request for Power Supply Proposals to Provide the Following Services: Request for Power Supply Proposals to Provide the Following Services: Default Service in: Massachusetts For the Period: August 1, 2016 October 31, 2016 1. Overview REQUEST FOR POWER SUPPLY PROPOSALS 1.1

More information

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button.

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button. ICAP/UCAP Overview Aaron Westcott Awestcott@nyiso.com 518 356 7657 If possible, Please mute your phones Please do not use the hold button. Agenda What is ICAP/UCAP? How are ICAP and UCAP calculated? How

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

Governance. What s a Governance?

Governance. What s a Governance? Governance What s a Governance? Governance FERC - Federal Energy Regulatory Commission NERC - North American Electric Reliability Council. NPCC - Northeast Power Coordinating Council NYSRC - New York State

More information

Paragraph 11 Elections and Variables 1

Paragraph 11 Elections and Variables 1 Paragraph 11 Elections and Variables 1 (a) Base Currency and Eligible Currency Base Currency means euro. Eligible Currency means the Base Currency. (b) Credit Support Obligations Delivery Amount, Return

More information

Revenue Metering Requirements Manual

Revenue Metering Requirements Manual NEW YORK INDEPENDENT SYSTEM OPERATOR MANUAL 25 Revenue Metering Requirements Manual August 2013 Version: 1.0 Effective Date: 09/04/2013 Committee Acceptance: July 27, 2005 This document was prepared by:

More information

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting

More information

Attached are the Board materials in relation to these agenda items. Item 4.3 1 ERCOT Public

Attached are the Board materials in relation to these agenda items. Item 4.3 1 ERCOT Public The Human Resources & Governance (HR&G) Committee is expected to consider HR&G Committee Agenda Item 4.3: Recommendation regarding Proposed 2016 ERCOT Key Performance Indicators (s) at its meeting on December

More information

WHOLESALE SECURITIES. Introduction. Definitions. Structure of Practice Note. Practice Note #7 CURRENT DATE: 7 MARCH 2016

WHOLESALE SECURITIES. Introduction. Definitions. Structure of Practice Note. Practice Note #7 CURRENT DATE: 7 MARCH 2016 CURRENT DATE: 7 MARCH 2016 NATIONAL STOCK EXCHANGE OF AUSTRALIA Introduction The National Stock Exchange of Australia Limited (NSX) lists Wholesale Securities under Listing Rules Section 2B. This Practice

More information

At the time of notification, the QF or OSGF shall provide the Company with the following information:

At the time of notification, the QF or OSGF shall provide the Company with the following information: Sheet No. 1 MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY QUALIFYING FACILITY POWER PURCHASE RATE P 1. Availability The Company will purchase electricity from any small power producer or cogenerator

More information

2014 Retail Electric Rates. in Deregulated and Regulated States

2014 Retail Electric Rates. in Deregulated and Regulated States 2014 Retail Electric Rates in Deregulated and Regulated States Published April 2015 2014 Retail Electric Rates in Deregulated and Regulated States Prepared by Paul Zummo, Manager, Policy Research and Analysis

More information

Iman Fund. Identify Theft Prevention Program

Iman Fund. Identify Theft Prevention Program Iman Fund Identify Theft Prevention Program Background The Federal Trade Commission adopted a rule, applicable to those investment companies that offer transaction accounts, requiring that investment companies

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

DISPATCH AGREEMENT RECITALS

DISPATCH AGREEMENT RECITALS DISPATCH AGREEMENT This DISPATCH AGREEMENT (the Agreement ) is made and entered into as of May 2, 2002, by and between the Department of Water Resources, an agency of the State of California, with respect

More information

Request title: Securities account and T2S Dedicated Cash account to be defined by CSDs and NCBs. Request ref. no: T2S 0305 URD

Request title: Securities account and T2S Dedicated Cash account to be defined by CSDs and NCBs. Request ref. no: T2S 0305 URD General Information (Origin of Request) User Requirements (URD) or GUI Business Functionality Document (BFD) Other User Functional or Technical Documentation (SYS) Request raised by: Target Working Group

More information

NYISO Business Issues Committee Meeting Minutes DRAFT. October 6, 2010 10:00 a.m. 3:00 p.m.

NYISO Business Issues Committee Meeting Minutes DRAFT. October 6, 2010 10:00 a.m. 3:00 p.m. DRAFT NYISO Business Issues Committee October 6, 2010 10:00 a.m. 3:00 p.m. 1. Introductions, Meeting Objectives, and Chairman s Report Mr. Glenn Haake (Dynegy), the Chair of the Business Issues Committee

More information

Comprehensive Financial Assurance Requirements Working Draft of Proposed Revisions to NYISO Financial Assurance Requirements

Comprehensive Financial Assurance Requirements Working Draft of Proposed Revisions to NYISO Financial Assurance Requirements Comprehensive Financial Assurance Requirements Working Draft of Proposed Revisions to NYISO Financial Assurance Requirements Presented to the Scheduling & Pricing Working Group November 15, 2002 Presentation

More information

What is System Integration?

What is System Integration? What is System Integration? Grant Gilchrist EnerNex Corporation November 29, 2005 Agenda What we mean by integration How it s usually done How to do it right Possible Utility Programs Involving Consumer

More information

Portal Interactions Reports. Settlements dddaniels@spp.org

Portal Interactions Reports. Settlements dddaniels@spp.org Portal Interactions Reports Settlements dddaniels@spp.org Content Settlements Financial Reports Determinant Reports Settlement Statements Settlement Invoices EQR Data Download Reports Settlements Timeline

More information

MEMORANDUM OF UNDERSTANDING THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

MEMORANDUM OF UNDERSTANDING THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION MEMORANDUM OF UNDERSTANDING BETWEEN THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR AND THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION AND THE NORTHEAST POWER COORDINATING COUNCIL, CROSS-BORDER REGIONAL

More information

Network Upgrades andSIAs Under California Tariff Clarifications

Network Upgrades andSIAs Under California Tariff Clarifications California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 July 11, 2013 Re: California Independent

More information

Market Participants User s Guide

Market Participants User s Guide GUIDE 01 Market Participants User s Guide December 2015 Version: 9.1 Effective Date: 12/16/2015 This document was prepared by: NYISO Stakeholder Services New York Independent System Operator 10 Krey Boulevard

More information

Market reference prices

Market reference prices Market reference prices CfD Expert Group workshop 27 September 2013 Agenda Introduction / aims of the session Quick overview (10.00 11.30) Setting the intermittent reference price Setting the baseload

More information

EBA-GL-2015-02. 23 July 2015. Guidelines. on the minimum list of qualitative and quantitative recovery plan indicators

EBA-GL-2015-02. 23 July 2015. Guidelines. on the minimum list of qualitative and quantitative recovery plan indicators EBA-GL-2015-02 23 July 2015 Guidelines on the minimum list of qualitative and quantitative recovery plan indicators Contents EBA Guidelines on the minimum list of qualitative and quantitative recovery

More information

Rules on Southern Companies Energy Auction Participation

Rules on Southern Companies Energy Auction Participation Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies

More information

Aliso Canyon Gas-Electric Coordination. Straw Proposal

Aliso Canyon Gas-Electric Coordination. Straw Proposal Aliso Canyon Gas-Electric Coordination Straw Proposal April 15, 2016 Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 4 3. Background... 5 3.1. Aliso Canyon Impact... 5

More information

TECHNICAL BULLETIN. Natural Gas Price Calculation. February 21, 2014. www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.

TECHNICAL BULLETIN. Natural Gas Price Calculation. February 21, 2014. www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351. February 21, 2014 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 Contents Executive Summary... 3 Background... 3 Issue and proposed tariff waiver... 3 Next steps... 7 Appendix: Affected

More information

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc.

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc. NYISO Tariffs New York Independent System Operator, Inc. NYISO Tariffs Document Generated On: 10/14/2011 Page 1 5.10 NYCA Minimum Installed Capacity Requirement The NYCA Minimum Installed Capacity Requirement

More information

134 FERC 61,226 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued March 24, 2011)

134 FERC 61,226 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued March 24, 2011) 134 FERC 61,226 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Southern

More information

Day-Ahead Scheduling Manual

Day-Ahead Scheduling Manual MANUAL 11 Day-Ahead Scheduling Manual February 2016 Version: 4.1 Revision Date: 02/01/2016 Committee Acceptance: 01/13/16 BIC 01/14/16 OC This document was prepared by: New York Independent System Operator

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Chapter 9 Settlements and Billing

Chapter 9 Settlements and Billing MDP_RUL_0002_09 Market Rules Chapter 9 Settlements and Billing Public Issue Date: December 2, 2015 Library Record No. MDP_RUL_0002_09 Document Name Market Rules for the Ontario Electricity Market Issue

More information