1 Using GETS for Medical Technology Management: A drill down case study A. C. B. Eboli 1, E. T. Silva 1, E. T. Costa 1,2, J. W. M. Bassani 1,2 1 Universidade Estadual de Campinas UNICAMP / Centro de Engenharia Biomédica CEB, Campinas, SP, Brasil 2 Universidade Estadual de Campinas / Departamento de Engenharia Biomédica Faculdade de Engenharia Elétrica e de Computação DEB/FEEC/UNICAMP, Campinas, SP, Brasil Abstract This paper presents the application of software for medical technology management in a particular case study. It is outlined the structure of the software and how it can provide proper information on a given technology (Intensive Care Unit Ventilators) and help the Clinical Engineering Team to detect problems and find solutions to minimize the downtime of such life support equipment. We present the analysis of the occurrence of maintenance calls of 125 ventilators with different ages (0-5, 5-10, 10-15, >15 years). We have found that, although expecting that older equipment should need more servicing, brand new ventilators presented an increasing number of calls even though when in the warranty period requiring manufacturers staff visiting and/or taking the equipment to their facilities in order to solve the problems. This have impacted on the execution time and overall CE staff performance that, with GETS data information in hand, was able to look for the best solution through negotiation with manufacturers technical staff. Although data presented is related to ventilators, it became clear that GETS is an unquestionable tool for proper technology management in Brazilian hospitals. It is expected that it be freely distributed for public hospitals and allow regulatory agencies and government organs to perform public policies based on real data coming from hospitals and clinical units. Keywords clinical engineering, health institutes, management of medical technology, web-based software. and standardization of nomenclature and of the function of equipment. But this is still not enough. It is necessary to know the state of the technology and establish an unbiased evaluation strategy. It is considered that the feedback obtained by health care professionals, manufacturers, or even outsourced maintenance teams (whose main objective is intended to earn profits) is not unbiased. So the best way to approach this problem is to obtain quantitative data on the behavior (e.g. performance) of the technology, without forgetting its complex interaction with users and maintenance staff and its constructive aspects [2]. The Biomedical Engineering Center (CEB) has extensive experience in managing the entire technology park of UNICAMP s Health Area. Based on this experience, and aiming at studying the best generic approach to the problem of managing the technology in use on Brazilian s HCC, it was developed a method for managing the technology park based on CE information, generated from the equipment acquisition process, its installation, preventive and corrective maintenance, up to its deactivation. In order to apply this method in the context of CE in our country, the project whose structure is shown in Fig. 1 relies on the construction of a National Laboratory for Management of Health Technology (LNGTS), which is being funded by the Brazilian Ministry of Health (MS) with investment of resources via FINEP. I. INTRODUCTION Clinical Engineering (CE) Teams in Brazil, although in continuous grow in recent years, is still insufficient to attend the number of Health Care Centers (HCC), and poorly organized in various regions of the country, partly due to the lack of proper tools and standardization to assist in managing the technology park [1]. The government, that finances the acquisition and distribution of many of the medical technologies to HCCs, tries to control their location and functionality, but faces enormous difficulties to get information about their operating conditions in HCCs. This has reflexes, making it difficult to define the amount of resources to invest in maintenance. Brazil and probably others countries, has not management control of the installed technology, since not even a good inventory in order to extract quantitative information is available in most hospitals [2]. To know what really exists is important and requires technical knowledge Fig. 1: Data Network of Clinical Engineering, illustrating the spread of GETS system in several Health Centers (HCC) and Clinical Engineering Centers (NEC) connected to the network controlled by the Information Center of Technology in Health (CITS). CAISM, HC and HEMO are university hospitals at UNICAMP. 1 1 All abbreviations in acronyms used in figures, tables and text were kept in Portuguese since it is the natural output of GETS.

2 As a fundamental part of LNGTS, a web-based software called GETS was developed, which is responsible for gathering information from the several agents that act in the system in an orderly way. This software is based on previously defined concepts and standardization [4] allowing CE to grow in the HCCs in a coordinated way and with appropriate tools. In this paper we present GETS system application to the study of ventilators maintenance profile in a case study at our institution health care area. LNGTS and GETS II. METHODOLOGY The organizational structure of LNGTS with GETS allows the interaction of the Information Center of Technology in Health (CITS) with Clinical Engineering Centers (NECs) and with institutions of strategic importance such as regulatory agencies (e.g. ANVISA), Ministry of Health (MS) and the Brazilian Public Health System (SUS), besides the possible interaction with Institutions involved in Research and Development (P&D) and with the business sector. In order to form this large data network and the CITS operate in a robust way, it is part of the project some standardization [4] such as: equipment nomenclature, maintenance flows, information on actions taken, and others which are critical to maintain the database updated over the years. Any standardization performed assumes that the system needs to be replicable, robust and usable via web to conquer the scope desired and the resulting social impact. The system shall be distributed freely to public HCCs, providing conditions to support its implementation and for continuous education of technical staff in order to disseminate common procedures in health technology management. Each NEC must contain a minimum structure which includes a home team to monitor all processes involving the equipment life cycle. CITS, based at CEB/UNICAMP, that is a Center with extensive experience in CE, will supply registering information about the technology and secure that the standardizations is maintained and updated all over the years to the NECs in addition to gradually provide training courses to teach people from institutions or companies interested in create a NEC, thus enlarging the CE horizons in the country. A NEC can also operate in standalone mode. The set of information about cost, failure, age, time and repair profile, generated in a non-bureaucratic form, based on multiple feedbacks from actual CE data (specification, purchase, installation, maintenance, decommissioning) allows the evaluation of the applied technology in an uniform, robust and practical way. Agencies and organs such as MS and ANVISA can act more effectively on the control of the technology, with proper information on its standard local use and overall performance. In practical terms, LNGTS will allow to evaluate, for example, if a given equipment with unsatisfactory performance in a specific NEC maintains the same profile in others NECs, and similarly the technical assistance and the CE as a whole. In addition to standardizations, the other important point of GETS is that each intervention in a given equipment (throughout its life cycle) is recorded in the system as a trajectory (also standardized), composed by micro-processes involved in the Service Orders (OS) flow (Fig. 2) [5]. In the trajectory highlighted in the figure, the OS is open (SOS), referred to a maintenance group (AE), then assigned to the technician (EE), who executes and ends the OS (OSP) and later the OS is closed after the user accepts the repaired equipment (CO). Each transition composing the trajectory implies that the person responsible for a particular action changes and is obliged to feed GETS database with all OS information. More details are shown in [5]. The analysis of trajectories allows seeing the behavior of the technology, maintenance service profile, cost and time spent on interventions [4] [5]. The transitions analysis allows the estimation of cost and time delay of each micro-process since it is possible to assign a standard operating cost to the micro-processes [5]. T1: SOS-AE-EE-OSP-CO T2: SOS-AE-EE-AE-OSP- CO T3:...AV... T4:...AM Time SOS-AE EE-OSP-CO Transition Activity Cost Technical and administrative Information Fig. 2: Diagram of transitions generated from GETS, illustrating that when micro-processes are activated (using a screen with input and output data), they form transitions that construct the OS trajectories, according to the pathway of each intervention (acquisition, installation, corrective maintenance, preventive, etc.) The highlighted states and transitions form the simplest trajectory. [5]

3 GETS is operational in CEB/UNICAMP since March 2010, making it possible to monitor the work developed by the CEB s CE for UNICAMP Health Area. Two aspects are identified quite clearly with GETS: first the evaluation of teams production and performance in meeting the demands of HCCs, that allows identify the volumes, delays, and services profiles; and secondly the monitoring and evaluation of technologies used, and their behavior. The first set of indicators obtained from GETS refers to the amount of OS s request, executed, pendent, analyzed by any of the available filters or a set of them, such as period, maintenance group, OS class, HCC, department, equipment type, etc. The second set of indicators refers to the OS s execution time (ET). ET assessment may be by trajectory (from OS request to its closing), or by transition (time of each individual micro-process). It is always interesting to calculate the average or median of these filtered values for the NEC as a whole, and then compare them with the overall values. Regular tests will help to create a profile of expected behavior in each case, and when an indicator come out of expected range one should investigate the reasons for that (a drill down study). The procedure for finding information from GETS does not consider irrelevant the views of the teams involved. In fact, the warnings offered by the system, from the initial search and drill-downs, are key points in the search for answers to possible problems and help the CE team to interact with health administrators and clinical staff as well as with the business sector. III. RESULTS In making the analysis of data at the end of 2010, one of several indicators assessed was the rating of the equipment that demanded more service calls (MC), external service from manufacturers or their representative (SE) and total costs with respect to the maintenance costs done by CEB CE team. From this set, a class of equipment was highlighted by being present in the top five of all those lists: the intensive care ventilators, called here UTI ventilators. Although these devices represent only 1.1% of the nearly 12,000 equipments served by CEB, they represented in the period analyzed the 5 th type of equipment with higher call for MC, the 2 nd greatest demand and cost for SE, the 4 th in cost for parts and pieces and the 2 nd largest volume of technical hours worked. Ventilator is a life-support equipment and its maintenance must always be safe and fast, and due to the fact that there are virtually no spare of such equipment in the hospital, we decided to use GETS database on ventilators as a case study. From this initial observation, we attempted to trace the age profile of these devices: as the ventilator gets older there is evidence of significant increase in the number of maintenance calls [6]. The results on age have shown an unexpected behavior (Fig. 3). The UTI ventilators are distributed almost evenly in the age groups 0-5 years, 5-10, 10-15, >15 years (29%, 23%, 21% e 27%), and also the MC OS s demand was almost similarly distributed by age group (26%, 27%, 20%, 27%). There is evidence that the equipments considered new have also shown a high number of failures. Fig. 3: Analysis of the distribution of UTI ventilators by age group, with the quantity of equipment, amount of corrective maintenance OS s (MC) and the quantity of equipment without corrective maintenance (without MC) in the period studied. (# quantity of) Based on this information, seeking more precise answers to the profile of these equipments, it was necessary to survey other indicators available on GETS in order to understand why such a profile was so different from the expected. It was observed that 30.4% of the equipment showed no failure during the period studied, whereas 69.6% that present MC had execution time (ET) of six days 2, with an average of two OS s per device (and there was also a case with up to 5 OS s for the same equipment). Table I summarizes some of the indicators found with GETS relative to ventilators. TABLE I PROFILE OF UTI VENTILATORS EXTRACTED FROM GETS INDICATORS. Indicator 2 All times are calculated by the median, in days. Occurrence % ET* (median in days) Attendance and repair in HCC 45.8 % 5 Attendance and repair in NEC 54.2 % 7 OS s with simplest trajectory (SOS-AE-EE- OSP-CO) 32.4 % 2 OS s with transport of equipment (AV) 28.3 % 11 OS s with changing of execution group (AE-AE) 14.5 % OS s dependent of user liberate equipment (ADE) 2.9 % 71 OS s with acquisition of spare parts (AM) 9.8 % 31 OS s with external servicing (SE) 17.3 % 38 SE with equipment in warranty 56.7 % 23 SE with call of manufacturer s technical staff (VT) 50 % 17 SE with equipment sent to manufacturer site for repair (CE) 50 % 52 * ET is the execution time.

4 For CEB CE team, it is expected that more than half of the OS s follow the simplest trajectory (SOS-AE-EE-OSP- CO), which indicates a profile of fast servicing and low cost (no need for additional material or SE). However this was not observed in the indicators of the UTI ventilators (Table I): only about a third followed this trajectory and with twice the expected time (2 days). Almost a third of the OSs have used transport of equipment between HCC and NEC (identified by micro-process AV), which involved more time and operational cost. In the OSs with slower trajectories, 2.9% of them depended on the users to allow access to the equipment for servicing (this means that, possibly, the equipment was used in procedures that did not need immediate intervention of our technicians or could wait until a solution for a specific problem arises without compromising its use in patients). The availability of the equipment took 71 days (median), which shifts the time negatively, showing the scarcity of equipment in the HCC. Another important information of the slower trajectories is that 9.8% of them have shown the need for materials acquisition (AM), taking up to 31 days for this task. External Service occurred in 17.3% of the trajectories with a median time of 38 days (time only for SE, not including the whole OS time), and 56.7% of these were executed while the equipment was in warranty (median of 23 days for complete attendance), and the other 43.3% not in warranty at a median cost of R$1, A half of SE occurred with visit from manufacturer s technical staff (VT) and it has taken 17 days for that external service to be complete. The other half of SE occurred with external repairs with transporting of the equipment to the technical assistance of the manufacturer, in 52 days. Comparing these values with the median of whole CEB trajectories which is 7.53% with SE, the ventilators OS s showed a profile composed of very large execution times with many delays and external services. Observing that a substantial part of them was corrective maintenance on warranty and technical visit from manufacturer staff, it was expected a shorter time to solve the problems but it was not the actual situation. In addition to the indicators in Table I, the ventilators OSs have used 7.13% of the general budget for CEB maintenance by CE staff, being 11.53% of the spending on SE and 4.71% of the spending in AM. Considering that the warranty repairs should not have costs, this profile of high costs attributed to new equipments is another indicator also considered alarming. This profile obtained from numbers and indicators can also be seen in the graphical analysis of the trajectories, shown in Fig. 4. It is expected that a group of equipment presents a few set of trajectories as an accepted behavioral profile, concentrating the majority of the OSs (80-90%) in this narrow set of trajectories (paths 5-10). Unfortunately, this is not observed in Fig. 4 for UTI ventilators, where the high dispersion in the profile indicates the complexity of the OSs attendance directly affecting the overall performance. Fig. 4 shows that for the ventilators, five trajectories represent little more than 60% of the total OSs, but if we add five other trajectories we still do not reach 70% of the OSs (we expect 80-90% as seen before). So, as already seen with Table I data, the graphical analysis suggests a complex service, without a standard, slow and expensive to this category of equipment. Fig. 4: Analysis of UTI ventilators trajectories: five distinct trajectories concentrate only 61.4% of OSs, and if we add another five possible trajectories we still do not reach 70% of OSs. This shows a very complex behavior, negatively affecting overall performance of service. Therefore, it is noteworthy that some important indicators were higher than expected, as the amount of OSs with SE, the high rate of warranty repairs and the high number of calls for maintenance of new equipment (0-5 years) that, according to [6], should present less calls for maintenance. These results led us to individualize the study by ventilators manufacturer and to study the kind of defects found in the equipments. Just over 82% of the equipment are concentrated in five major manufacturers, representing nearly 95% of the OSs, distributed as shown on Table II. Maker TABLE II INFORMATION OF UTI VENTILADORES SEPARETED BY MANUFACTURER Amount of equipm ents Median age (years) % of all equipm ents Amount of MC % of MC #OS/ #EQ A % % 24/12 B % % 41/17 C % % 21/10 D % % 42/21 E % % 37/ % % 172/125 Another highlight was the high execution time when there was the need for external servicing, even in cases of visits of manufacturers technical staff and when the equipments were in warranty, as shown in Table III. For each of the makers studied were extracted the information of the defect found in their equipments. The main results were: maker A 46% of defects on the command keyboard; maker B 44% of defects were on the

5 inner valves; maker C 35% of defects in the batteries; makers D and E number of occurrence were not concentrated on the same defects with slight concentration on structural parts of casters and arms. TABLE III ANALYSIS OF INDICATORS OF SERVICES IN UTI VENTILATORS Makers Simple pathway Time* OS without SE Time* # SE As explained, GETS system provides indicators for many analysis at various levels, and can be detailed up to a certain limit and, if necessary, discussion by the technical staff involved in the equipment maintenance to find ways for identifying particular problems and define the final solution. With the information obtained from GETS system, it was necessary to question the technical staff of CEB CE team servicing these equipments, especially those of manufacturer B, to understand the reasons for such a prestigious maker in the market have equipments presenting bad performance for the clinical staff, contradicting the expectations. Apparently, the problem was very fragile input valve regulation which would easily be damaged under typical gas pipeline pressure oscillations common in most Brazilian hospitals. IV. DISCUSSION SE Time* SE Times min/max A 8.3% 6 14 / 4 2 CE / VT 11 0 / 51 B 31.7% 2 12 / 3 1 CE C 35.0% 1 17 / 6 3 CE 52 5 / 56 D 45.2% 3 8 / 4 4 CE / 62 E 32.4% 1 15 / 4 4 CE 48 5 / 55 General 32.4% 2 CEB * Times were calculated by the median of each OS s time, expressed in days. # quantity of SE GETS system allows the realization of several studies on the HCCs installed medical technology, from monitoring of team performance, the HCC s, the HCC s sectors, the types of equipment, and even makers and models of equipment. In the case presented here, UTI ventilators, the data pointed to indicators out of the expected range on stopping times, external services calls, costs, and recurrence of defects. As the indicators are analyzed, GETS allows individualization of numbers until it reaches the particular set of data that are leading the indicators out of the expected range. So, together with information of maintenance technical team, it is possible to identify the reasons and act looking for the solution of the problem. Sometimes the solution is not straightforward, and could indicate training needs, equipment manufacturing defects, recurrent operational errors, etc. However, in this particular case study, a very interesting conclusion was obtained: new and sophisticated equipments, although having great precision and more capabilities than older ones, may present an increase in the rate of failure, in demand for outsourcing services and in costs. That is because several of these devices are designed and manufactured based on the reality of hospitals of countries rather different than that of Brazilian HCCs. They possibly have extreme sensitivity to fluctuations in pipelines common in our day-to-day, and greater dependency on specific manufacturer tools, including software, reducing the capacity of the home team for repairs due to the lack of technology domain and spare parts, directly affecting the service performance. The reality of most of Brazilians HCCs is that the gases network is not stabilized, especially in older HCCs and those that have undergone several reconstructions over the years. Additionally, it is common the use of the equipment with virtually no downtime due to the non-existence of backup units, and therefore with few preventive interventions, and high turnover of equipment between units of the hospital, with frequent connections and disconnections at different points of the network. V. CONCLUSION We have presented a case study using GETS, a webbased tool for analysis and management of medical technology installed in the several units of the university health care area. Although with only 10 months of actual use by the Clinical Engineering Team based on the Biomedical Engineering Center, it was possible to show the high flexibility and complexity of the system, applied to a very important life supporting equipment used mainly in intensive care units (UTI Ventilators). GETS data analyses with flow graphs and tables have shown specific problems with very new equipments and allowed the CE team to pinpoint the problem that apparently was not with the equipment itself but how it interacts with hospital environment. In general, it was possible to show that strategic decisions may be taken based on the database stored in a standardized way by GETS, allowing hospital administrators, clinical professionals and the clinical engineering staff to better manage the medical technology installed in their facilities. We understand that as our database grows with data coming from several hospital units as well as from other hospitals in the country linked to GETS via LNGTS, more robust shall be the system. We think that it will be easier to detect errors in the design of a given equipment, for instance, because transcending a unique HCC frontier we shall have more reliable data (not based on a single and possibly vicious way of dealing with a particular technology). GETS will also facilitate the staff dealing with specification of technology for proper and best acquisitions. In our case study, it became clear that it is necessary to adequate the gases network of the particular

6 ventilator type (manufacturer B) to adequately operate under harsher environment. ACKNOWLEDGMENT The authors acknowledge the support of CEB Clinical Engineering team for their criticisms and suggestions. Financial Support MS / FNS (nº 4368/2005), FINEP (nº e nº ). REFERENCES [1] L. F. M. Brito, Clinical Engineering in Brazil, in Clinical Engineering Handbook, J.F. Dyro, Ed. New York, NY: Academic Press, 2004, cap. 20, pp (Series in Biomedical Engineering). [2] S. J. Calil, and M. S. Teixeira, "Gerenciamento de Manutenção em Equipamentos Hospitalares," in Equipamentos Médicohospitalares e o Gerenciamento da Manutenção: Capacitação a Distância, BRASIL. Secretaria de Gestão de Investimentos em Saúde. Projeto REFORSUS. Brasília, DF: Ministério da Saúde, cap. 1, pp (in Português) [3] A. F. Souza, Indicadores de desempenho In Gestão de Manutenção em Serviços de Saúde, A. F. Souza, C. H. T. Heringer, J. Santos Jr., and J. R. Moll. São Paulo, SP: Blucher, 2010, cap. 4, pp (in Portuguese) [4] A. C. B. Eboli, Padronização de Informação para um Sistema de Gerenciamento de Equipamentos Médico-Hospitalares, Dissertação de Mestrado em Engenharia Elétrica, Faculdade de Engenharia Elétrica e de Computação, Universidade Estadual de Campinas, Campinas, Brasil, (in Portuguese) [5] J. W. M. Bassani, L. S. Rocha, M. L. Lüders, W. J. Bizinotto, Micro-process based management of medical equipment maintenance, in Annual International Conference of the Engineering in Medicine and Biology Society and Annual Fall Meeting of the Biomedical Engineering Society EMBS/BMES, 24, Houston, USA, 2002, pp [6] N. F. Oshiyama, A. C. Silveira, J. W. M. Bassani Health technology management: medical equipment classification, in IFMBE Proc. vol. 22, European Conference of the International Federation for Medical and Biological Engineering, 4, part 11, Antwerp, Belgium, 2008, pp

REMOTE CONTROL OF REAL EXPERIMENTS VIA INTERNET

REMOTE CONTROL OF REAL EXPERIMENTS VIA INTERNET REMOTE CONTROL OF REAL EXPERIMENTS VIA INTERNET Carine Campos Teixeira, carinect@ita.br Jeeves Lopes dos Santos, jeeves@ita.br Cairo Lúcio Nascimento Júnior, cairo@ita.br Instituto Tecnológico de Aeronáutica,

More information

IDENTIFYING BANK FRAUDS USING CRISP-DM AND DECISION TREES

IDENTIFYING BANK FRAUDS USING CRISP-DM AND DECISION TREES IDENTIFYING BANK FRAUDS USING CRISP-DM AND DECISION TREES Bruno Carneiro da Rocha 1,2 and Rafael Timóteo de Sousa Júnior 2 1 Bank of Brazil, Brasília-DF, Brazil brunorocha_33@hotmail.com 2 Network Engineering

More information

In: Proceedings of RECPAD 2002-12th Portuguese Conference on Pattern Recognition June 27th- 28th, 2002 Aveiro, Portugal

In: Proceedings of RECPAD 2002-12th Portuguese Conference on Pattern Recognition June 27th- 28th, 2002 Aveiro, Portugal Paper Title: Generic Framework for Video Analysis Authors: Luís Filipe Tavares INESC Porto lft@inescporto.pt Luís Teixeira INESC Porto, Universidade Católica Portuguesa lmt@inescporto.pt Luís Corte-Real

More information

Towards Requirements Engineering Process for Embedded Systems

Towards Requirements Engineering Process for Embedded Systems Towards Requirements Engineering Process for Embedded Systems Luiz Eduardo Galvão Martins 1, Jaime Cazuhiro Ossada 2, Anderson Belgamo 3 1 Universidade Federal de São Paulo (UNIFESP), São José dos Campos,

More information

LAST PLANNER, LOOK AHEAD, PPC: A DRIVER TO THE SITE OPERATIONS

LAST PLANNER, LOOK AHEAD, PPC: A DRIVER TO THE SITE OPERATIONS LAST PLANNER, LOOK AHEAD, PPC: A DRIVER TO THE SITE OPERATIONS Antonio Sergio Itri Conte 1 ABSTRACT The paper describes the experience of a civil engineering company of a small town in São Paulo State

More information

Recent Advances in Applied & Biomedical Informatics and Computational Engineering in Systems Applications

Recent Advances in Applied & Biomedical Informatics and Computational Engineering in Systems Applications Comparison of Technologies for Software ization PETR SUBA, JOSEF HORALEK, MARTIN HATAS Faculty of Informatics and Management, University of Hradec Králové, Rokitanského 62, 500 03 Hradec Kralove Czech

More information

Content Sheet 3-1: Equipment Management Overview

Content Sheet 3-1: Equipment Management Overview Content Sheet 3-1: Equipment Management Overview Role in quality management system Equipment management is one of the essential elements of a quality management system. Proper management of the equipment

More information

The ERP Systems in Czech Republic A strategical innovation

The ERP Systems in Czech Republic A strategical innovation The ERP Systems in Czech Republic A strategical innovation José Arnaldo Cardoso Monteiro de Melo I. Introduction Nowadays it is possible to verify that the global tendencies of the market pointed out to

More information

Plant Wide Performance Monitor Bridges Resource Gap

Plant Wide Performance Monitor Bridges Resource Gap Plant Wide Performance Monitor Bridges Resource Gap Presented at ISA2003, Houston, TX October, 2003 Tom Kinney ExperTune Inc. Hubertus, WI www.expertune.com Copyright 2003 Instrumentation, Systems and

More information

Tapping the benefits of business analytics and optimization

Tapping the benefits of business analytics and optimization IBM Sales and Distribution Chemicals and Petroleum White Paper Tapping the benefits of business analytics and optimization A rich source of intelligence for the chemicals and petroleum industries 2 Tapping

More information

REMOTE SYSTEM FOR MONITORING AND CONTROL OF CONTROLLED AREA OF NUCLEAR INSTALLATION

REMOTE SYSTEM FOR MONITORING AND CONTROL OF CONTROLLED AREA OF NUCLEAR INSTALLATION 2011 International Nuclear Atlantic Conference - INAC 2011 Belo Horizonte,MG, Brazil, October 24-28, 2011 ASSOCIAÇÃO BRASILEIRA DE ENERGIA NUCLEAR - ABEN ISBN: 978-85-99141-04-5 REMOTE SYSTEM FOR MONITORING

More information

Keywords: Fuzzy Logic, Control, Refrigeration Systems and Electronic Expansion Valves.

Keywords: Fuzzy Logic, Control, Refrigeration Systems and Electronic Expansion Valves. POTENTIALITIES OF FUZZY LOGIC CONTROL APPLIED TO SMALL VAPOR COMPRESSION REFRIGERATION SYSTEMS Oscar S. H. Mendoza Fábio A. Carvajal José A. Tumialán Gustavo Luiz C. M. de Abreu Universidade Federal de

More information

Evaluating project manager performance: a case study

Evaluating project manager performance: a case study Evaluating project manager performance: a case study Veridiana Rotondaro Pereira, Marly Monteiro de Carvalho University of São Paulo e-mail: veridiana.pereira@poli.usp.br; marlymc@usp.br Abstract: A project

More information

Software Development and Testing: A System Dynamics Simulation and Modeling Approach

Software Development and Testing: A System Dynamics Simulation and Modeling Approach Software Development and Testing: A System Dynamics Simulation and Modeling Approach KUMAR SAURABH IBM India Pvt. Ltd. SA-2, Bannerghatta Road, Bangalore. Pin- 560078 INDIA. Email: ksaurab5@in.ibm.com,

More information

CHEMICAL ABSORPTION OF H 2 S FOR BIOGAS PURIFICATION

CHEMICAL ABSORPTION OF H 2 S FOR BIOGAS PURIFICATION Brazilian Journal of Chemical Engineering ISSN 14-6632 Printed in Brazil Vol. 21, No. 3, pp. 415-422, July - September 24 CHEMICAL ABSORPTION OF H 2 S FOR BIOGAS PURIFICATION M.S. Horikawa 1, F. Rossi

More information

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your

More information

CFD SIMULATION OF IPR-R1 TRIGA SUBCHANNELS FLUID FLOW

CFD SIMULATION OF IPR-R1 TRIGA SUBCHANNELS FLUID FLOW 2013 International Nuclear Atlantic Conference - INAC 2013 Recife, PE, Brazil, November 24-29, 2013 ASSOCIAÇÃO BRASILEIRA DE ENERGIA NUCLEAR - ABEN ISBN: 978-85-99141-05-2 CFD SIMULATION OF IPR-R1 TRIGA

More information

FORECASTING MODEL FOR THE PRODUCTION AND CONSUMPTION OF COTTON FIBER VERSUS POLYESTER

FORECASTING MODEL FOR THE PRODUCTION AND CONSUMPTION OF COTTON FIBER VERSUS POLYESTER 1 FORECASTING MODEL FOR THE PRODUCTION AND CONSUMPTION OF COTTON FIBER VERSUS POLYESTER Elisa Mauro Gomes Otávio Lemos de Melo Celidonio Daniel Latorraca Ferreira Leandro Gustavo Alves Johnnattann Pimenta

More information

DEMAND FORECASTING AND STRATEGIC PLANNING IN ELECTRICITY DISTRIBUTION COMPANIES: A SYSTEM DYNAMICS APPROACH

DEMAND FORECASTING AND STRATEGIC PLANNING IN ELECTRICITY DISTRIBUTION COMPANIES: A SYSTEM DYNAMICS APPROACH DEMAND FORECASTING AND STRATEGIC PLANNING IN ELECTRICITY DISTRIBUTION COMPANIES: A SYSTEM DYNAMICS APPROACH Marciano Morozowski Filho Gladis Bordin Schuch* UFSC/EEL/Labplan UFRGS/Delet Federal University

More information

USING IMMERSIVE VIRTUAL REALITY FOR ELECTRICAL SUBSTATION TRAINING

USING IMMERSIVE VIRTUAL REALITY FOR ELECTRICAL SUBSTATION TRAINING USING IMMERSIVE VIRTUAL REALITY FOR ELECTRICAL SUBSTATION TRAINING Eduardo H. Tanaka 1, Juliana A. Paludo 1, Carlúcio S. Cordeiro 1, Leonardo R. Domingues 1, Edgar V. Gadbem 1 and Adriana Euflausino 2

More information

Mastem: A Mathematics Tutoring Multi-Agent System

Mastem: A Mathematics Tutoring Multi-Agent System Mastem: A Mathematics Tutoring Multi-Agent System Jéssyka Vilela 1, Ricardo Ramos 2, Jaelson Castro 1 1 Universidade Federal de Pernambuco Centro de Informática Av. Jornalista Anibal Fernandes, S/N, Cidade

More information

FAST METHODS FOR SLOW LOOPS: TUNE YOUR TEMPERATURE CONTROLS IN 15 MINUTES

FAST METHODS FOR SLOW LOOPS: TUNE YOUR TEMPERATURE CONTROLS IN 15 MINUTES FAST METHODS FOR SLOW LOOPS: TUNE YOUR TEMPERATURE CONTROLS IN 15 MINUTES Michel Ruel P.E. President, TOP Control Inc 4734 Sonseeahray Drive 49, Bel-Air St, #103 Hubertus, WI 53033 Levis Qc G6W 6K9 USA

More information

JOURNAL OF MEDICAL INFORMATICS & TECHNOLOGIES Vol. 21/2012, ISSN 1642-6037

JOURNAL OF MEDICAL INFORMATICS & TECHNOLOGIES Vol. 21/2012, ISSN 1642-6037 JOURNAL OF MEDICAL INFORMATICS & TECHNOLOGIES Vol. 21/2012, ISSN 1642-6037 FDA, medical software, recall, safety of medical devices. Leszek DREWNIOK 1, Ewelina PIEKAR 1, Mirosław STASIAK 1, Remigiusz MANIURA

More information

Medical Equipment Management. Medical Equipment Management Activities (EC.02.04.01 and EC.02.04.03)

Medical Equipment Management. Medical Equipment Management Activities (EC.02.04.01 and EC.02.04.03) Medical Equipment Management Plan 2015 I. Introduction, Mission Statement, and Scope The Medical Equipment Management Plan defines the mechanisms for interaction and oversight of the medical equipment

More information

SERVICES. Designing, deploying and supporting world class communications solutions.

SERVICES. Designing, deploying and supporting world class communications solutions. Designing, deploying and supporting world class communications solutions. DESIGN Expertise, technologies, tools and ideas Business environments, regulation, expansion and obsolescence are drivers that

More information

The future of industrial asset management: New opportunities for oil and gas, power generation and aviation industries

The future of industrial asset management: New opportunities for oil and gas, power generation and aviation industries Point of View Generating manufacturing Impact The future of industrial asset management: New opportunities for oil and gas, power generation and aviation industries Defining the right operating model for

More information

Building a Business Intelligence System

Building a Business Intelligence System Victoria Hospital Facilities Management Building a Business Intelligence System June 2014 Paresh Soni, Senior Partner Global BI www.globalbi.ca 1 EXECUTIVE SUMMARY At the Victoria Hospital Facilities Management

More information

Preventive Maintenance Development: A Case Study in a Furniture Company

Preventive Maintenance Development: A Case Study in a Furniture Company , July 1-3, 2015, London, U.K. Preventive Maintenance Development: A Case Study in a Furniture Company Bruno. A. Carvalho, Isabel. S. Lopes, Member, IAENG Abstract This article intends to present a project

More information

Optical Submarine Cable Network Monitoring Equipment

Optical Submarine Cable Network Monitoring Equipment Optical Submarine Cable Network Monitoring Equipment NOMURA Kenichi, TAKEDA Takaaki Abstract The introduction of large-capacity wavelength-division multiplexing and OADM (Optical Add/Drop Multiplexing)

More information

of knowledge that is characteristic of the profession and is taught at professional schools. An important author in establishing this notion was

of knowledge that is characteristic of the profession and is taught at professional schools. An important author in establishing this notion was Mathematics teacher education and professional development João Pedro da Ponte jponte@fc.ul.pt Grupo de Investigação DIFMAT Centro de Investigação em Educação e Departamento de Educação Faculdade de Ciências

More information

Management Information System - Decision support in public administration. Case study of the Hungarian Central Statistical Office

Management Information System - Decision support in public administration. Case study of the Hungarian Central Statistical Office Management Information System - Decision support in public administration. Case study of the Hungarian Central Statistical Office dr. József KÁRPÁTI Hungarian Central Statistical Office joekarpati@gmail.com

More information

Spend Enrichment: Making better decisions starts with accurate data

Spend Enrichment: Making better decisions starts with accurate data IBM Software Industry Solutions Industry/Product Identifier Spend Enrichment: Making better decisions starts with accurate data Spend Enrichment: Making better decisions starts with accurate data Contents

More information

Goals and Scenarios to Software Product Lines: the GS2SPL Approach

Goals and Scenarios to Software Product Lines: the GS2SPL Approach Goals and Scenarios to Software Product Lines: the GS2SPL Approach Gabriela Guedes, Carla Silva, Jaelson Castro Centro de Informática Universidade Federal de Pernambuco (UFPE) CEP 50740-540, Recife/ PE

More information

10 QUESTIONS TO ASK ECG SOLUTION PROVIDERS

10 QUESTIONS TO ASK ECG SOLUTION PROVIDERS HOW TO SELECT THE BEST ECG MANAGEMENT SOLUTION 10 QUESTIONS TO ASK ECG SOLUTION PROVIDERS BY STEPHEN CHERNOFF October 15, 2009 Inside 1 The Challenge 2 Testing Equipment 3 Customization 4 Interfacing 5

More information

Environmental Data Management, Analysis, and Compliance Systems - Rethinking the Creation and Use of Emissions Data by the Regulated Community

Environmental Data Management, Analysis, and Compliance Systems - Rethinking the Creation and Use of Emissions Data by the Regulated Community Environmental Data Management, Analysis, and Compliance Systems - Rethinking the Creation and Use of Emissions Data by the Regulated Community Robert Emigh, Ph.D. & Connie Prostko-Bell Windsor Technologies,

More information

Novel Automatic PCB Inspection Technique Based on Connectivity

Novel Automatic PCB Inspection Technique Based on Connectivity Novel Automatic PCB Inspection Technique Based on Connectivity MAURO HIROMU TATIBANA ROBERTO DE ALENCAR LOTUFO FEEC/UNICAMP- Faculdade de Engenharia Elétrica e de Computação/ Universidade Estadual de Campinas

More information

An Overview of Distributed Databases

An Overview of Distributed Databases International Journal of Information and Computation Technology. ISSN 0974-2239 Volume 4, Number 2 (2014), pp. 207-214 International Research Publications House http://www. irphouse.com /ijict.htm An Overview

More information

Introduction to Strategic Supply Chain Network Design Perspectives and Methodologies to Tackle the Most Challenging Supply Chain Network Dilemmas

Introduction to Strategic Supply Chain Network Design Perspectives and Methodologies to Tackle the Most Challenging Supply Chain Network Dilemmas Introduction to Strategic Supply Chain Network Design Perspectives and Methodologies to Tackle the Most Challenging Supply Chain Network Dilemmas D E L I V E R I N G S U P P L Y C H A I N E X C E L L E

More information

Using HART with asset management systems

Using HART with asset management systems Using HART with asset management systems Since it s the most broadly deployed smart device platform, is HART the right choice for your plant? Here are some considerations for end users. John Yingst, Sr.

More information

The EQ2 HEMS Enterprise Family of Products KEY FEATURES

The EQ2 HEMS Enterprise Family of Products KEY FEATURES The EQ2 HEMS Enterprise Family of Products KEY FEATURES EQ2 HEMS ENTERPRISE TIME SAVINGS Ability to assign a technician/manager to a Type, Model/Manufacturer or Equipment Device. Ability to float equipment

More information

Navaltik Management, Lda

Navaltik Management, Lda Simple approach to failure modes using a maintenance organisation and management software Marcelo Batista (1), José Fernandes (1) and Alexandre Veríssimo (1) mbatista@manwinwin.com; jcasimiro@navaltik.com;

More information

Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing

Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing Intel Business Center Case Study Business Intelligence Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing SOLUTION SUMMARY The Challenge IT organizations working with reduced budgets

More information

SMART DIAGNOSTICS AFTER-SALES SERVICE TODAY

SMART DIAGNOSTICS AFTER-SALES SERVICE TODAY SMART DIAGNOSTICS AFTER-SALES SERVICE TODAY DIAGNOSTIC LIFECYCLE AFTER-SALES SERVICE TODAY Today s dynamic global markets have become increasingly complex. Companies must deal with major challenges in

More information

Hirsch s index: a case study conducted at the Faculdade de Filosofia, Ciências e Letras de Ribeirão Preto, Universidade de São Paulo

Hirsch s index: a case study conducted at the Faculdade de Filosofia, Ciências e Letras de Ribeirão Preto, Universidade de São Paulo Brazilian Journal of Medical and Biological Research (2007) 40: 1529-1536 Hirsch s index: a case study conducted at the FFCLRP, USP ISSN 0100-879X 1529 Hirsch s index: a case study conducted at the Faculdade

More information

Introduction. Background

Introduction. Background Predictive Operational Analytics (POA): Customized Solutions for Improving Efficiency and Productivity for Manufacturers using a Predictive Analytics Approach Introduction Preserving assets and improving

More information

Dynamic Systems Applied to Bed Management in a Public Hospital Specialized in Cardiology

Dynamic Systems Applied to Bed Management in a Public Hospital Specialized in Cardiology Dynamic Systems Applied to Bed Management in a Public Hospital Specialized in Cardiology João Chang Junior (chang.joao@gmail.com) Centro Universitário da FEI Suzana Bierrenbach de Souza Santos Centro Universitário

More information

A Conceptual Approach to Data Visualization for User Interface Design of Smart Grid Operation Tools

A Conceptual Approach to Data Visualization for User Interface Design of Smart Grid Operation Tools A Conceptual Approach to Data Visualization for User Interface Design of Smart Grid Operation Tools Dong-Joo Kang and Sunju Park Yonsei University unlimit0909@hotmail.com, boxenju@yonsei.ac.kr Abstract

More information

HYRADIX ALPHA 4 PERFORMANCE REVIEW

HYRADIX ALPHA 4 PERFORMANCE REVIEW HYRADIX ALPHA 4 PERFORMANCE REVIEW TECHNICAL BULLETIN: TB-03-001 January 2004 The Center for Fuel Cell Research and Applications a program of the Houston Advanced Research Center www.harc.edu/fuelcell

More information

One approach to the use of the practices of CMMI- DEV V1.3 level 2 in a process of development of Embedded Systems

One approach to the use of the practices of CMMI- DEV V1.3 level 2 in a process of development of Embedded Systems One approach to the use of the practices of CMMI- DEV V1.3 level 2 in a process of development of Embedded Systems Magda A. Silvério Miyashiro IMT Instituto Mauá de Tecnologia São Caetano do Sul, Brasil

More information

Using Productivity Measure and Function Points to Improve the Software Development Process

Using Productivity Measure and Function Points to Improve the Software Development Process Using Productivity Measure and Function Points to Improve the Software Development Process Eduardo Alves de Oliveira and Ricardo Choren Noya Computer Engineering Section, Military Engineering Institute,

More information

Embedded Critical Software Testing for Aerospace Applications based on PUS

Embedded Critical Software Testing for Aerospace Applications based on PUS XI Workshop de Testes e Tolerância a Falhas 119 Embedded Critical Software Testing for Aerospace Applications based on PUS Rodrigo P. Pontes 1, Eliane Martins 2, Ana M. Ambrósio 3, Emília Villani 1 1 Instituto

More information

Risk Management Framework for IT-Centric Micro and Small Companies

Risk Management Framework for IT-Centric Micro and Small Companies Risk Management Framework for IT-Centric Micro and Small Companies Jasmina Trajkovski 1, Ljupcho Antovski 2 1 Trajkovski & Partners Management Consulting Sveti Kliment Ohridski 24/2/1, 1000 Skopje, Macedonia

More information

Application of Building Energy Simulation to Air-conditioning Design

Application of Building Energy Simulation to Air-conditioning Design Hui, S. C. M. and K. P. Cheung, 1998. Application of building energy simulation to air-conditioning design, In Proc. of the Mainland-Hong Kong HVAC Seminar '98, 23-25 March 1998, Beijing, pp. 12-20. (in

More information

Supply chain management by means of FLM-rules

Supply chain management by means of FLM-rules Supply chain management by means of FLM-rules Nicolas Le Normand, Julien Boissière, Nicolas Méger, Lionel Valet LISTIC Laboratory - Polytech Savoie Université de Savoie B.P. 80439 F-74944 Annecy-Le-Vieux,

More information

Information and Responsiveness in Spare Parts Supply Chains

Information and Responsiveness in Spare Parts Supply Chains Information and Responsiveness in Spare Parts Supply Chains Table of Contents 1.0 Motivation... 3 2.0 What is Supply Chain?... 3 2.1 Spare Parts Supply Chain... 4 2.2 Spare Part Supply Chain Characteristics...

More information

Research Article. Analysis On GSM Fault Management Unit. O.A. Osahenvemwen* and O. Omorogiuwa

Research Article. Analysis On GSM Fault Management Unit. O.A. Osahenvemwen* and O. Omorogiuwa Jestr Journal of Engineering Science and Technology Review 4 (1) (2011) 62-67 Research Article Analysis On GSM Fault Management Unit O.A. Osahenvemwen* and O. Omorogiuwa JOURNAL OF Engineering Science

More information

Tuition Reimbursement Program. Handbook

Tuition Reimbursement Program. Handbook EMPLOY EE Tuition Reimbursement Program Handbook For Employees... Ed u c a t i o n m a d e a f f o r d a b l e! A t t h e E r n e s t O r l a n d o L a w r e n c e B e r k e l e y N a t i o n a l L a b

More information

2 Development of strategic planning

2 Development of strategic planning 2 Development of strategic planning 2.1 Four phases in the development of strategic planning Figure 2.1 displays the different stages of the development of strategic management. As the figure shows, we

More information

IMPROVING THE DESIGN-CONSTRUCTION INTERFACE

IMPROVING THE DESIGN-CONSTRUCTION INTERFACE Improving the Design-Construction Interface IMPROVING THE DESIGN-CONSTRUCTION INTERFACE Luis F. Alarcón 1 and Daniel A. Mardones 2 ABSTRACT In building projects customer requirements, constructive aspects

More information

TOTAL QUALITY ACCOUNTING

TOTAL QUALITY ACCOUNTING COMMUNICATIONS Maja Andrijašević* DOI: 10.2298/EKA0876110A TOTAL QUALITY ACCOUNTING ABSTRACT: The focus of competitive battle shifted from the price towards non-price instruments, above all, towards quality

More information

CURRICULUM VITAE. José Wanderley Marangon Lima

CURRICULUM VITAE. José Wanderley Marangon Lima CURRICULUM VITAE José Wanderley Marangon Lima Personal Data Name: José Wanderley Marangon Lima Institution: Federal University at Itajubá - UNIFEI Address: Av. BPS, 1303 37500-903 Itajubá MG Phone: +55

More information

IMPROVEMENT MATERIAL INVENTORY TRACKING FOR MAINTENANCE AND PROJECT THROUGH LEAN SIGMA METHODOLOGY

IMPROVEMENT MATERIAL INVENTORY TRACKING FOR MAINTENANCE AND PROJECT THROUGH LEAN SIGMA METHODOLOGY IMPROVEMENT MATERIAL INVENTORY TRACKING FOR MAINTENANCE AND PROJECT THROUGH LEAN SIGMA METHODOLOGY Sotarduga Manurung, School of Business & Management, Bandung Institute of Technology (ITB), J1. Ganesha

More information

REPOSITÓRIUM - IMPLEMENTING DSPACE IN PORTUGUESE: LESSONS FOR THE FUTURE AND RESEARCH PATHWAYS

REPOSITÓRIUM - IMPLEMENTING DSPACE IN PORTUGUESE: LESSONS FOR THE FUTURE AND RESEARCH PATHWAYS REPOSITÓRIUM - IMPLEMENTING DSPACE IN PORTUGUESE: LESSONS FOR THE FUTURE AND RESEARCH PATHWAYS ELOY RODRIGUES 1 ; ANA ALICE BAPTISTA 2 ; ISABEL RAMOS 2 ; MARIA FERNANDA SARMENTO E SOUZA 3 1 Serviços de

More information

The President s Critical Infrastructure Protection Board. Office of Energy Assurance U.S. Department of Energy 202/ 287-1808

The President s Critical Infrastructure Protection Board. Office of Energy Assurance U.S. Department of Energy 202/ 287-1808 cover_comp_01 9/9/02 5:01 PM Page 1 For further information, please contact: The President s Critical Infrastructure Protection Board Office of Energy Assurance U.S. Department of Energy 202/ 287-1808

More information

Preliminary Planning and Integrated Data Collection Handbook U.S. Fish and Wildlife Service

Preliminary Planning and Integrated Data Collection Handbook U.S. Fish and Wildlife Service Preliminary Planning and Integrated Data Collection Handbook Diiviisiion off Polliicy and Diirecttiives Managementt Preliminary Planning and Integrated Data Collection Handbook U.S. Fish and Wildlife

More information

Wireless Equipment Monitoring System

Wireless Equipment Monitoring System Wireless Equipment Monitoring System TM TM Komtrax gathers critical machine information to make fleet management easier and more effective. This data provides key information about your operators, machines,

More information

You've just been assigned to a team with

You've just been assigned to a team with PMI Virtual Library 2007 Project Management Institute How's Your Distributed Team Doing? 10 Suggestions From The Field By Mario Bourgault, Ph.D., PMP, and Nathalie Drouin, MBA, Ph.D. You've just been assigned

More information

A Step-Up Transformer Online Monitoring Experience at Euzébio Rocha UTE [Thermal Power Plant]

A Step-Up Transformer Online Monitoring Experience at Euzébio Rocha UTE [Thermal Power Plant] A Step-Up Transformer Online Monitoring Experience at Euzébio Rocha UTE [Thermal Power Plant] Ivan da Costa Vieira (2) 2 Lucas Pavan Fritoli (3) 3 Fábio Marcelino de Paula Santos (1) 1 ABSTRACT The step-up

More information

FORMAÇÃO CONTINUADA DE PROFESSORES A DISTÂNCIA DISTANCE CONTINUING EDUCATION OF TEACHERS

FORMAÇÃO CONTINUADA DE PROFESSORES A DISTÂNCIA DISTANCE CONTINUING EDUCATION OF TEACHERS 1 FORMAÇÃO CONTINUADA DE PROFESSORES A DISTÂNCIA DISTANCE CONTINUING EDUCATION OF TEACHERS 05/05/2008 Thiago Rozineli Fundação Hermínio Ometto UNIARARAS, thiagorozineli@uniararas.br Marilena Souza Rosalen

More information

025-0638 PROJECT PORTFOLIO MANAGEMENT: AN ANALYSIS OF MANAGEMENT PRACTICES

025-0638 PROJECT PORTFOLIO MANAGEMENT: AN ANALYSIS OF MANAGEMENT PRACTICES 025-0638 PROJECT PORTFOLIO MANAGEMENT: AN ANALYSIS OF MANAGEMENT PRACTICES Marly Monteiro de Carvalho, Escola Politécnica da Universidade de São Paulo, Av. Prof. Almeida Prado, Travessa 2, Nº 128 Cidade

More information

A Knowledge Management Framework Using Business Intelligence Solutions

A Knowledge Management Framework Using Business Intelligence Solutions www.ijcsi.org 102 A Knowledge Management Framework Using Business Intelligence Solutions Marwa Gadu 1 and Prof. Dr. Nashaat El-Khameesy 2 1 Computer and Information Systems Department, Sadat Academy For

More information

Chapter 3 Using a Risk Based Assessment for Establishing a Medical Equipment Maintenance Program

Chapter 3 Using a Risk Based Assessment for Establishing a Medical Equipment Maintenance Program Chapter 3 Using a Risk Based Assessment for Establishing a Medical Equipment Maintenance Program Goals of the maintenance program The goal of any medical equipment maintenance program is to ensure that

More information

Volume 10 Number 1 April 2015

Volume 10 Number 1 April 2015 Volume 10 Number 1 April 2015 ISSN 1807-1953 Oxygen Plasma Surface Treatment onto ITO Surface for OLEDs Based on Europium Complex G. Santos, M. R. Cavallari, F. J. Fonseca, and L. Pereira MWCNT Devices

More information

Automatic Inventory Control: A Neural Network Approach. Nicholas Hall

Automatic Inventory Control: A Neural Network Approach. Nicholas Hall Automatic Inventory Control: A Neural Network Approach Nicholas Hall ECE 539 12/18/2003 TABLE OF CONTENTS INTRODUCTION...3 CHALLENGES...4 APPROACH...6 EXAMPLES...11 EXPERIMENTS... 13 RESULTS... 15 CONCLUSION...

More information

Development of an Electrical Power Quality Monitor Based on a PC

Development of an Electrical Power Quality Monitor Based on a PC Renato Alves, D. Gonçalves, J. G. Pinto, José Batista, João L. Afonso, Development of an Electrical Power Quality Monitor Based on a PC, IECON 2009 - The 35th Annual Conference of the IEEE Industrial Electronics

More information

How To Write A Management Information System

How To Write A Management Information System A Seminar report On MANAGEMENT INFORMATION SYSTEM (MIS) Submitted in partial fulfillment of the requirement for the award of degree Of MBA SUBMITTED TO: SUBMITTED BY: www.studymafia.org www.studymafia.org

More information

Medical Equipment Management. Medical Equipment Management Activities (EC.02.04.01 and EC.02.04.03)

Medical Equipment Management. Medical Equipment Management Activities (EC.02.04.01 and EC.02.04.03) Medical Equipment Management Plan 2016 I. Introduction, Mission Statement, and Scope The Medical Equipment Management Plan defines the mechanisms for interaction and oversight of the medical equipment

More information

A Requirement Elicitation Process for BI Projects

A Requirement Elicitation Process for BI Projects A Requirement Elicitation Process for BI Projects Danielle A. Menéndez and Paulo Caetano da Silva Abstract To elicit requirements is one of the most important activities in the Software Engineering process.

More information

WELL-MANAGED LIFT TRUCK FLEETS INCREASE PRODUCTIVITY, REDUCE COSTS

WELL-MANAGED LIFT TRUCK FLEETS INCREASE PRODUCTIVITY, REDUCE COSTS WELL-MANAGED LIFT TRUCK FLEETS INCREASE PRODUCTIVITY, REDUCE COSTS By Edgar Warriner Director National & Major Accounts Services The Raymond Corporation Table of Contents PREVENT EXPENSIVE BREAKDOWNS...2

More information

ARTIFICIAL NEURAL NETWORKS FOR ADAPTIVE MANAGEMENT TRAFFIC LIGHT OBJECTS AT THE INTERSECTION

ARTIFICIAL NEURAL NETWORKS FOR ADAPTIVE MANAGEMENT TRAFFIC LIGHT OBJECTS AT THE INTERSECTION The 10 th International Conference RELIABILITY and STATISTICS in TRANSPORTATION and COMMUNICATION - 2010 Proceedings of the 10th International Conference Reliability and Statistics in Transportation and

More information

Online Failure Prediction in Cloud Datacenters

Online Failure Prediction in Cloud Datacenters Online Failure Prediction in Cloud Datacenters Yukihiro Watanabe Yasuhide Matsumoto Once failures occur in a cloud datacenter accommodating a large number of virtual resources, they tend to spread rapidly

More information

A Model for Managing Civil Construction Company Systems

A Model for Managing Civil Construction Company Systems 20 ijamt A Model for Managing Civil Construction Company Systems Carlos Alberto Pereira Soares, Universidade Federal Fluminense, Brazil Christine Kowal Chinelli, Plinio Leite University, Brazil Abstract

More information

WEB-BASED ORIGIN-DESTINATION SURVEYS: AN ANALYSIS OF RESPONDENT BEHAVIOUR

WEB-BASED ORIGIN-DESTINATION SURVEYS: AN ANALYSIS OF RESPONDENT BEHAVIOUR WEB-BASED ORIGIN-DESTINATION SURVEYS: AN ANALYSIS OF RESPONDENT BEHAVIOUR Pierre-Léo Bourbonnais, Ph.D. Candidate, Department of Civil, Geological and Mining Engineering, École Polytechnique de Montréal,

More information

Dong-Joo Kang* Dong-Kyun Kang** Balho H. Kim***

Dong-Joo Kang* Dong-Kyun Kang** Balho H. Kim*** Visualization Issues of Mass Data for Efficient HMI Design on Control System in Electric Power Industry Visualization in Computerized Operation & Simulation Tools Dong-Joo Kang* Dong-Kyun Kang** Balho

More information

HUMAN AND SOCIAL SCIENCES MULTI-USER EQUIPMENT ADVANCED TECHNOLOGY TO REACH OF RESEARCHERS. Human and Social Sciences SÃO PAULO RESEARCH FOUNDATION

HUMAN AND SOCIAL SCIENCES MULTI-USER EQUIPMENT ADVANCED TECHNOLOGY TO REACH OF RESEARCHERS. Human and Social Sciences SÃO PAULO RESEARCH FOUNDATION HUMAN AND SOCIAL SCIENCES MULTI-USER EQUIPMENT ADVANCED TECHNOLOGY TO REACH OF RESEARCHERS Human and Social Sciences SÃO PAULO RESEARCH FOUNDATION 1 Multi-user Equipment Humanities ACQUISITION OF EDITING

More information

PROCEDURE TO IMPROVE SERVICE DELIVERY DHL COURIER EXPRESS COMPANY BELONGING TO THE CIENFUEGOS POST OFFICE

PROCEDURE TO IMPROVE SERVICE DELIVERY DHL COURIER EXPRESS COMPANY BELONGING TO THE CIENFUEGOS POST OFFICE PROCEDURE TO IMPROVE SERVICE DELIVERY DHL COURIER EXPRESS COMPANY BELONGING TO THE CIENFUEGOS POST OFFICE Delgado Alvares, Noemí Universidad de Cienfuegos Cienfuegos- Cienfuegos Cuba ndelgado@ucf.edu.cu

More information

RAID Made Easy By Jon L. Jacobi, PCWorld

RAID Made Easy By Jon L. Jacobi, PCWorld 9916 Brooklet Drive Houston, Texas 77099 Phone 832-327-0316 www.safinatechnolgies.com RAID Made Easy By Jon L. Jacobi, PCWorld What is RAID, why do you need it, and what are all those mode numbers that

More information

INCIDENT INVESTIGATION BASED ON CAUSALITY NETWORKS

INCIDENT INVESTIGATION BASED ON CAUSALITY NETWORKS IChemE SYMPOSIUM SERIES NO. 153 INCIDENT INVESTIGATION BASED ON CAUSALITY NETWORKS Yukiyasu Shimada 1, Rafael Batres 2, Tetsuo Fuchino 3 and Toshinori Kawabata 1 1 Chemical Safety Research Group, National

More information

Planning, Monitoring, Evaluation and Learning Program

Planning, Monitoring, Evaluation and Learning Program Planning, Monitoring, Evaluation and Learning Program Program Description Engineers Without Borders USA EWB-USA Planning, Monitoring, Evaluation 02/2014 and Learning Program Description This document describes

More information

Software Process Improvement in Brazil: Evolving the MPS Model and Consolidating the MPS.BR Program

Software Process Improvement in Brazil: Evolving the MPS Model and Consolidating the MPS.BR Program Software Process Improvement in Brazil: Evolving the MPS Model and Consolidating the MPS.BR Program Gleison Santos 1, Kival Chaves Weber 2, Ana Regina Cavalcanti da Rocha 1 1 COPPE/UFRJ Universidade Federal

More information

Improve business agility with WebSphere Message Broker

Improve business agility with WebSphere Message Broker Improve business agility with Message Broker Enhance flexibility and connectivity while controlling costs and increasing customer satisfaction Highlights Leverage business insight by dynamically enriching

More information

An easy-learning and easy-teaching tool for indoor thermal analysis - ArcTech

An easy-learning and easy-teaching tool for indoor thermal analysis - ArcTech An easy-learning and easy-teaching tool for indoor thermal analysis - ArcTech Léa Cristina Lucas de Souza 1, João Roberto Gomes de Faria 1 and Kátia Lívia Zambon 2 1 Department of Architecture, Urbanism

More information

Data Quality Assurance

Data Quality Assurance CHAPTER 4 Data Quality Assurance The previous chapters define accurate data. They talk about the importance of data and in particular the importance of accurate data. They describe how complex the topic

More information

Linguística Aplicada das Profissões

Linguística Aplicada das Profissões Linguística Aplicada das Profissões VOLUME 16 nº 1-2012 This present volume has been kindness titled by us, editors, Veredas Sarangi. It comes from our decision of setting a publication that could show

More information

Using SAS MDM deployment in Brazil

Using SAS MDM deployment in Brazil Paper 1699-2014 Using SAS MDM deployment in Brazil Ielton de Melo Gonçalves, Dataprev ABSTRACT Dataprev has become the principal owner of social data on the citizens in Brazil by collecting information

More information

Application of the Prado - Project Management Maturity Model at a R&D Institution of the Brazilian Federal Government

Application of the Prado - Project Management Maturity Model at a R&D Institution of the Brazilian Federal Government doi: 10.5028/jatm.v5i4.272 Application of the Prado - Project Management Maturity Model at a R&D Institution of the Brazilian Federal Government Luiz Aldo Leite das Neves 1,2, Luiz Eduardo Nicolini do

More information

Microcontroller-based experiments for a control systems course in electrical engineering technology

Microcontroller-based experiments for a control systems course in electrical engineering technology Microcontroller-based experiments for a control systems course in electrical engineering technology Albert Lozano-Nieto Penn State University, Wilkes-Barre Campus, Lehman, PA, USA E-mail: AXL17@psu.edu

More information

How To Run An Ultravm Cloud Server

How To Run An Ultravm Cloud Server It s like a dedicated server. But different. Turing House, Archway, Manchester, M15 5RL tel: 0161 232 0001 fax: 0161 232 9125 e: inbox@melbourne.co.uk www.melbourne.co.uk Meet UltraVM. It s quite different.

More information

EP 2 455 926 A1 (19) (11) EP 2 455 926 A1 (12) EUROPEAN PATENT APPLICATION. (43) Date of publication: 23.05.2012 Bulletin 2012/21

EP 2 455 926 A1 (19) (11) EP 2 455 926 A1 (12) EUROPEAN PATENT APPLICATION. (43) Date of publication: 23.05.2012 Bulletin 2012/21 (19) (12) EUROPEAN PATENT APPLICATION (11) EP 2 4 926 A1 (43) Date of publication: 23.0.2012 Bulletin 2012/21 (21) Application number: 11190024.7 (1) Int Cl.: G08B 2/14 (2006.01) G08B 2/00 (2006.01) G0B

More information

Defining Indicators for Risk Assessment in Software Development Projects

Defining Indicators for Risk Assessment in Software Development Projects Defining Indicators for Risk Assessment in Software Development Projects Júlio Menezes Jr. Centro de Informática, Universidade Federal de Pernambuco, Recife, Brazil, 50740-560 jvmj@cin.ufpe.br Cristine

More information