BETTER CONTRACTING IN OIL AND GAS MAJOR PROJECTS

Size: px
Start display at page:

Download "BETTER CONTRACTING IN OIL AND GAS MAJOR PROJECTS"

Transcription

1 BETTER CONTRACTING IN OIL AND GAS MAJOR PROJECTS December 2008 Management consulting at Charles River Associates

2 With the recent headline-grabbing rise in oil prices and the consequent increase in major project activities, oil companies and their suppliers need to design and implement contracts to build new production capacity quickly. Operators, be they international oil companies (IOCs) or national oil companies (NOCs), must deliver complex and technically challenging projects on time, while guaranteeing quality and controlling costs. Meanwhile, suppliers and contractors are seeking to maximise the value of the goods and services they sell while keeping their risks as low as possible. Although their interests sometimes diverge, operators and suppliers share the need to improve the effectiveness and clarity of their contracting approaches. This paper presents the different perspectives of IOCs, NOCs and suppliers, and recommends eight levers that will enable all of them to significantly improve project contracting IOC perspective After many years of over-capacity in their project supply chains, IOCs now face restricted supplies of goods, services and people. This has led to high levels of inflation in everything from engineering services through to raw materials. More seriously, there is a shortage of capacity to get major projects built at all. Securing supply in a tight supplier market IOCs became used to an over-supplied market in the latter half of the 1990s, but the resulting low margins for major suppliers and contractors led to reduced investment in building their businesses. This left them under-sized to meet demand when market conditions improved. Supply has become even tighter as high oil prices have led to a wave of mega oil and gas projects, coupled with a boom in civil infrastructure projects in oil producing countries. At the same time, China and India are executing huge industrialization programmes. These projects are tying up the resources of the larger multinational service firms especially those that have local joint venture partners leaving less traditional capacity available to IOCs. Avoiding detrimental local content stipulations As oil prices have climbed, NOCs and major resource holders (MRHs) have increased their market power over the IOCs. They have used this power to demand that IOCs both deliver their projects on time and on budget, and invest in local economic development. To promote economic development, MRHs typically demand the use of local suppliers for the supply of goods, services and materials. All too often, this can turn into a requirement to only use local suppliers, or to develop sub-standard local suppliers. Local content requirements can prevent IOCs from using global suppliers who offer lower costs better quality through contracts for multiple projects. This puts the IOCs into an impossible position, as they can meet the most demanding local content requirements or deliver on time and budget, but they cannot do both. Need for stable investment conditions Another consequence of this increased market power is that the IOCs are left with a riskier set of major projects. MRHs are executing the simplest projects without IOC support. IOCs are being left with the technically more challenging and riskier projects, such as ultra-deep water, viscous oil, tight or sour gas, and arctic projects. To deliver such projects profitably, IOCs argue that they need predictable fiscal terms and long-term access to the best suppliers. IOCs believe that such stable investment conditions and long-term relationships will help them train and develop a better cadre of international and local contractors and suppliers that will improve project execution and lower project risks across multiple, sequential projects. This approach also allows IOCs to develop their own expertise and become more effective over time. 2

3 IOC needs Faced with these market conditions, we have seen that IOCs are looking for: Access to high quality capabilities, goods and materials Significant investments by major suppliers and contractors to increase their own capabilities and improve their supply chains Sequential projects that create learning curve opportunities They see the main enablers of this to be: Predictable, stable investment conditions Long-term contracts to develop multiple projects in a basin, province or consistent operating environment And the main threats to be from: Competition for suppliers from larger-scale, more attractive contracts, typically with the larger NOCs Detrimental local content stipulations that drive up costs and reduce quality of inputs Over-reliance on too few core suppliers Government and NOC perspective All NOCs share a common goal: to maximise the value from their national resources. However, each has a different approach, depending on its relationship with the government, its maturity and the portfolio of resources that it manages. When it comes to contracting major projects, some NOCs are operators, while others have a checks and balances role as a non-operator. Whatever their role, NOCs need to ensure that capital investment is managed as prudently as possible and in line with government economic policy. We have found that NOCs typically focus on three major aspects of contracting strategy: maximizing local content, managing costs and minimising risk exposure. Maximising local content Governments desire to promote local content is understandable each hydrocarbon rich country wants to develop its secondary economy as much as possible. To implement this, many NOCs have developed a sophisticated approach to applying local content conditions in their contracting strategies for major projects. The traditional argument that local companies lack necessary skills and technology is no longer valid in most regions. It is widely accepted today that every major project can improve on the local content achieved previously. NOC managers tell us that they believe this incremental approach, used widely in projects in Asia, West Africa and the Middle East, has been very successful. The greatest challenge to achieving increased local content is gaps in local supply chains. An NOC needs to ensure that local supply chains provide both the long-term investment in sustainable skills, capabilities and infrastructure, while meeting the near-term requirements of specific projects, but they find this a difficult balance to achieve. Managing costs In our work with NOCs, we have seen that many NOC managers believe that cost inflation is not entirely due to inflation in commodities and raw inputs. They believe that much of the increase comes from higher supplier margins and inadequate contracting terms. Therefore, they want to create better capabilities to manage these cost increases. This means improving the skills of their procurement functions and gaining experience with strategic sourcing, supplier management and contract management. They also believe that badly designed oil and gas fiscal terms can fail to prevent excessive spending being passed on to the government. NOCs and governments are very keen to improve their ability to prevent this. 3

4 Minimising risk exposure NOCs need to minimise the risk of project failures.to do this, they have developed rigid control processes. However, they are now facing pressure to approve and execute more projects to take advantage of high oil and gas prices. This has led to contradictions between their approach to procurement and their strategic goals, and has also increased strains with their project partners. Government and NOC needs We have seen that host governments and NOCs are looking for: Maximum economic contribution by a major project to the local economy Minimum costs and risks for the host government and NOC They see the main enablers of this to be: High local content targets Greater influence on procurement decisions, supplier management and contract management Greater capabilities to design and apply fiscal terms appropriately And the main threats to be from: Overly short-term focused investment in local content Non-adherence to procurement procedures by IOCs Improper use of fiscal terms by IOCs, to pass on costs to governments Major supplier perspective After many years of low margins and slow growth, major suppliers are enjoying full order books and higher profitability. However, suppliers are finding it difficult to take full advantage of this increased demand. First, they are struggling to recruit new staff, as the market is short supplied, and training, especially for new engineers and technicians, is a relatively long process. They are also losing staff, as competitors, faced with the same staff shortages, push up wages. This is causing their knowledge base and experience to become diluted, making it harder to work on multiple large contracts. Second, they are facing new competitors: subcontractors moving upstream along the value chain and suppliers from developing economies taking advantage of growing knowledge and skills, lower cost bases and increasing globalisation. Third, they are facing high inflation in their own supply chains, because of raw material price inflation and shortages of manufacturing capacity. To overcome these challenges, suppliers need contracts that provide both financial returns and the opportunities to sustain and grow their businesses. Need for longer term contracts to enable investment and develop staff Suppliers always struggle to make investments that are longer term than their order books. Senior managers from major suppliers tell us that they find it difficult to make major investment decisions, and are concerned that the cycle may turn down again. Hence, they are keen to enter into longer term contracts that reduce their uncertainties and allow them to invest in people and capacity building. Doing so would also keep their sales costs down, by reducing bidding and marketing costs, which can be very high. Achieving fair returns for demanding projects In a high-demand environment, suppliers are less willing to take on the risks of large and complex projects, and demand better contracting terms. They wish to ensure that each project delivers a target return level, and so seek to mitigate risks that could lower returns. Suppliers also want NOCs to agree to the same contracting terms that they expect from IOCs, with prompt payments and proper dispute resolution processes. Some suppliers are also keen to enter into contracts that give them the potential of highe returns, through performance-related incentives, 4

5 but are unwilling to put their base profit margins at risk through reciprocal penalty arrangements. But Need for opportunities to grow in new sectors and markets Stakeholders and shareholders in major suppliers demand growth. To grow, they need business in new markets and sectors. They therefore seek opportunities to diversify into new geographic markets, while limiting their investments and exposure until they have contracts in place. Suppliers are looking for customers to help them grow by offering contracts for new, non-traditional services. This could benefit operators by creating more choice and competition, although it could also change contracting models, as new suppliers bring their own practices. An alternative growth model for suppliers is to acquire existing firms. This can benefit IOCs and NOCs by offering more integrated service providers, but it can also reduce competition and choice. Major supplier needs We have seen that major suppliers are looking for: Higher margins Growth opportunities Greater predictability around future business They see the main enablers of this to be: Longer term contracts to reduce sales costs and enable (re)investment Fair contract terms, with upside potential Opportunities to get into new markets and sectors And the main threats to be from: Reluctance for IOCs and NOCs to make commitments Over dependency on NOCs Better performers find ways to resolve differences As our discussions have shown, IOCs, NOCs and suppliers have very different interests and perspectives. Despite these obstacles, they sometimes find ways to work together effectively. This happens when the players create the right contracting environment for their major projects to succeed. We believe there are eight main levers at the parties disposal, and that these levers will work for any set of IOCs, NOCs and suppliers. Using these levers will ensure the right contracting strategy is implemented in the best way possible. Schedule aligned with marketplace Right people Local content strategy aligned with government Structured Supply chains Eight levers for better contracting in major oil and gas projects Contractor continuity Share simple incentives Cost visibility Fair risk allocation model 1. Structure the supply chains properly Projects work best when the players design supply chains to allow direct and consistent communication. To do this, designers must take account of both the criticality of individual suppliers and the relationships among project partners. A common pitfall is for an IOC or NOC to push for a single top-tier supplier structure (e.g. a single EPC contract) in order to reduce project management interfaces, making it impossible to deal directly with the long-lead component suppliers that are most critical to achieving a successful project schedule. Another common 5

6 mistake is for NOCs to set up alternative and multiple communications channels with various suppliers, rather than creating a common structure and governance model with all the equity partners. Tier 1 suppliers Long lead item supplies Technology suppliers Operator + Partners Long lead item supplies Critical equipment suppliers 3. Select a risk allocation model that genuinely reflects risk capacity The best way to ensure that risks do not lead to lengthy project delays or cost over-runs is to select the right risk allocation model. Risks eventually fall back onto those best placed to manage them, but it can be a painful and protracted process if risk is incorrectly assigned in the first place. A common pitfall is for NOCs to insist on suppliers taking all the cost and schedule risk (including those risks outside of their control) because the NOC fears giving suppliers too much licence to inappropriately increase costs and or delay project schedules. To correctly assign risk, all the main parties must be involved in the upfront risk analysis. This may cause friction and force some differences of opinions into the open, but it is far preferable to do this early on rather than when things begin to go wrong. Project cost Tier 2 suppliers 2. Build incentives that drive each party to a common goal It is difficult to structure and apply incentives in a rapidly changing economic environment, as there are lots of conflicting interests. For an IOC operator, the biggest risk to value is production start-up delays, especially if the concession timeframe is short. For an NOC, the biggest risk is higher than expected project costs, which reduce early oil available for sales. For a major contractor, it is overruns that impair earnings and tie up critical resources needed for other projects. It is therefore important to align all parties around one overall meaningful goal, such as on-schedule delivery or a target cost. To do this, all parties need to review and compare their project objectives at the beginning of the project. Once a shared goal is established, the parties can then develop specific incentives based on the influence of each party on achieving that shared single goal. Lowest Project cost 0% 100% Contractual transfer of risks to suppliers 4. Strive for cost visibility at each level in the supply chain In a high inflation environment, all parties should strive to make their costs as visible as possible. This builds trust between them and creates a shared ownership of total project costs, which in turn promotes the collective management of unexpected cost changes. It is more challenging to award contracts where costs are broken down and visible than it is to award contracts on a sealed-bid fixed price basis. However, this extra complexity in the award process should not be used as a reason for advocating a black-box. 6

7 Cost visibility Operator s ability to manage variances in costs 5. Build in the opportunity for contractor continuity through follow-on projects When IOCs and NOCs structure contracts in a way that offers the prospect of subsequent contracts, such as sequential projects, this creates a powerful incentive for improving performance, committing high quality people and making local investments. It also allows for all parties, not just suppliers, to apply the lessons learnt from the previous contracts and to invest in staff training and knowledge. This approach results in progressively lower costs, relative to a brand new project. In the current environment, the benefits of having experienced teams outweigh the risks of an incumbent supplier giving poorer performance and above market prices, as long as those risks are mitigated through a proper supplier management process. Single large project Project 1 Discrete follow-on projects Project 1a Project 1b Project 1c Single lump sum price Open-book Costs by Tier `` Suppliers Open-book Costs by Tier 1 and 2 Suppliers` Duration Duration 6. Ensure that project has a local content strategy aligned with host government objectives Local content goals for a project should be aligned with the economic development priorities of the host government. If these are not clear, then the IOC or NOC should ensure that work is done to clarify these up front. This makes it possible to agree an acceptable balance of short- and longterm local content goals. A common pitfall is for all parties to agree local content goals but not a feasible governance structure to monitor the delivery of local content during project execution. To mitigate this risk, all parties should jointly manage the implementation of the local content strategy to ensure that as the project is executed, the best decisions are made in-line with government goals. This approach prevents an excessive focus on crude measures, such as the percentage of purchasing from local suppliers at any given moment, and the use of such measures to force major renegotiations or project changes. Government economic priorities Country local content strategy 7. Match the contracting and procurement schedule to the supplier marketplace Specific local content goals for contracts In the current environment, contracting processes, approval processes and award processes should be designed to fit with the response times of the marketplace. A common pitfall is for an NOC to expect suppliers to take all the cost and schedule risk while waiting for decisions, either because the NOC adheres to overly long internal processes, or is not aware of the risks from delays. However, today s best suppliers will not tolerate overly long or complex processes that make sense only when the market is suffering from spare capacity. All project partners should work together to understand and explicitly address these response times before setting down contracting processes and timeline. 7

8 Continues activities Award Start project execution Operator Market/ Suppliers Prepare 1 Assess Decide Bid Create team Finalise contract Early work Project Schedule 8. Use and keep the right people In a tight market with rising demand for projects, IOCs, NOCs and suppliers are experiencing growing staff turnover. This has diluted their base of skills and experience (especially among IOCs and suppliers). But it is crucial for project delivery to allocate the best people, committing them for the duration of the project. Contract terms often fail to require this, but we believe that such conditions are crucial. After all, it is experienced people who make the difference between project success or failure. Conclusion Today s environment is creating severe pressures on IOCs, NOCs and suppliers. Although each party has different interests and perspectives, we believe that they can work together effectively making project success more likely. The eight recommendations that we present in this paper are the best place to start.. Note: 1. Includes alignment with government objectives, ordering long lead items and developing contracting strategy 8

9 Written by: David Roxby Key contacts in our Oil & Gas practice: Randy DeGeer North America +1 (312) About Marakon Marakon is a strategy and organizational advisory firm with the experience and track record of helping CEOs and their leadership teams deliver sustainable profitable growth. We get hired when our client s ambitions are high, the path to get there is not clear (or taking too long) and lasting capabilities are as important as immediate impact. We help clients achieve their ambitions for sustainable profitable growth through: Neal Kissel Europe nkissel@marakon.com +44 (20) Stronger strategies and advantaged execution based on: A better understanding of what drives client economics and value Insight into changing industry dynamics and the context in which clients need to succeed A stronger management framework to generate better ideas and link decisions and actions to value A stronger organization with a more focused top management agenda and well-aligned resources A more confident and effective leadership team that s focused, decisive, and strategic We have a joint team delivery approach where client ownership and engagement is paramount. Partners are highly engaged in the work product and supported by strong analytical and industry relevant capability. We work as advisors and catalysts in close, trust-based relationships with top management teams. 9

Navigating the Crude Cycle The Upside of Capex Postponement. Five actions to help achieve success with major projects in energy

Navigating the Crude Cycle The Upside of Capex Postponement. Five actions to help achieve success with major projects in energy Navigating the Crude Cycle The Upside of Capex Postponement Five actions to help achieve success with major projects in energy Executive summary Sustained low prices have prompted energy companies to retrench

More information

How to successfully manage your mega-project

How to successfully manage your mega-project How to successfully manage your mega-project Part I Early planning and organizing for success kpmg.com 2 Building, Construction & Real Estate How to successfully manage your mega-project A three-part series

More information

Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified.

Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified. Asset management Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified. Data is about more than numbers. It tells

More information

Community Futures Management Consultant in a Box

Community Futures Management Consultant in a Box Community Futures Management Consultant in a Box Strategic Business Planning Purpose of this Document The purpose of this document is to provide you with the process that a management consultant would

More information

Energy OIL S WILD RIDE DRIVING VALUE FROM THE SUPPLY CHAIN AUTHORS. Keric Morris, Partner Curt Underwood, Partner Bob Peterson, Partner

Energy OIL S WILD RIDE DRIVING VALUE FROM THE SUPPLY CHAIN AUTHORS. Keric Morris, Partner Curt Underwood, Partner Bob Peterson, Partner Energy OIL S WILD RIDE DRIVING VALUE FROM THE SUPPLY CHAIN AUTHORS Keric Morris, Partner Curt Underwood, Partner Bob Peterson, Partner TAMING THE SUPPLY CHAIN The recent decline in oil prices has begun

More information

95% of asset management CEOs say they re very or somewhat confident about growth over the coming three years

95% of asset management CEOs say they re very or somewhat confident about growth over the coming three years 18th Annual Global CEO Survey Redefining competition in a world without boundaries 95% of asset management CEOs say they re very or somewhat confident about growth over the coming three years 82% of asset

More information

REVIEW ONE. Name: Class: Date: Matching

REVIEW ONE. Name: Class: Date: Matching Name: Class: Date: ID: A REVIEW ONE Matching Complete the following using these terms. a. outsourcing b. diversity c. entrepreneur d. competitive differentiation e. strategic alliance f. capital g. vision

More information

Strategies to successfully manage your major project

Strategies to successfully manage your major project PROJECT ADVISORY Strategies to successfully manage your major project Whitepaper 1 Thought Leadership Series 10 kpmg.com/nz About this whitepaper KPMG s Project Advisory thought leadership series is aimed

More information

Commodity Price Risk Management (CPRM) - Trends and Challenges for Corporates

Commodity Price Risk Management (CPRM) - Trends and Challenges for Corporates Advisory Commodity Price Risk Management (CPRM) - Trends and Challenges for Corporates May 2014 Agenda Industry Challenges CPRM A Business Case CPRM Maturity Model CPRM Trends What Should Companies Do?

More information

Outsourcing. Knowledge Summary

Outsourcing. Knowledge Summary Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best

More information

Competitor or Partner?

Competitor or Partner? Manfred Schmitz, Patrick Hung Fai Ma Competitor or Partner? Equipment vendors are getting more and more involved into the telecom operators business via Managed Services Vendors are expanding their service

More information

Advanced Financial Management

Advanced Financial Management Progress Test 2 Advanced Financial Management P4AFM-PT2-Z14-A Answers & Marking Scheme 2014 DeVry/Becker Educational Development Corp. Tutorial note: the answers below are more comprehensive than would

More information

and Risk Tolerance in an Effective ERM Program

and Risk Tolerance in an Effective ERM Program The Roles of Risk Appetite and Risk Tolerance in an Effective ERM Program Eric Gerner, Risk Advisory Services Director Tuesday, July 10, 2012 General Information Share the webinar Ask a question Votes

More information

GOING GLOBAL: HOW TO DEVELOP YOUR CONTINUING ENGINEERING EDUCATION STRATEGY FOR A WORLD WITHOUT BORDERS

GOING GLOBAL: HOW TO DEVELOP YOUR CONTINUING ENGINEERING EDUCATION STRATEGY FOR A WORLD WITHOUT BORDERS GOING GLOBAL: HOW TO DEVELOP YOUR CONTINUING ENGINEERING EDUCATION STRATEGY FOR A WORLD WITHOUT BORDERS Andy DiPaolo Senior Associate Dean, Stanford University School of Engineering Stanford, California

More information

Rating Methodology for Domestic Life Insurance Companies

Rating Methodology for Domestic Life Insurance Companies Rating Methodology for Domestic Life Insurance Companies Introduction ICRA Lanka s Claim Paying Ability Ratings (CPRs) are opinions on the ability of life insurance companies to pay claims and policyholder

More information

Interview with Fred Sotabank, the Canadian Economy Expert

Interview with Fred Sotabank, the Canadian Economy Expert Transcript and Model Answers Small Businesses and the Canadian Economy Scotiabank is a leading bank in Canada. You will hear a group of senior executives discussing the impact of the Canadian economy on

More information

Strategies to Help Vendors Optimize Their Long-term Global Contracts

Strategies to Help Vendors Optimize Their Long-term Global Contracts THE INDUSTRIAL PERSPECTIVE Strategies to Help Vendors Optimize Their Long-term Global Contracts May 2010 KPMG INTERNATIONAL HAVE YOU CONSIDERED ALL THE ISSUES? The following questions may help vendors

More information

Member Brief No 114 Selling a Recruitment Business

Member Brief No 114 Selling a Recruitment Business Camberley House 1 Portesbery Road Camberley, Surrey GU15 3SZ Tel: 01276 509306 Fax: 01276 761076 Email: info@labourproviders.org.uk Website: www.labourproviders.org.uk March 2013 1. Introduction Member

More information

Retail Industry Outlook Survey:

Retail Industry Outlook Survey: Retail Industry Outlook Survey: Modest Gains Keep Cautious Optimism in Style kpmg.com KPMG s Industry Outlook Survey KPMG LLP, the audit, tax and advisory firm, surveyed C-suite and other top-level executives

More information

Stop Reacting to Buyers Price Expectations; Manage Them

Stop Reacting to Buyers Price Expectations; Manage Them Stop Reacting to Buyers Price Expectations; Manage Them BY THOMAS T. NAGLE AND JOSEPH ZALE Executive Takeways Pricing policies empower companies to manage customers price expectations, and avoid the cycle

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

SEPTEMBER 2014 6 Reasons Why You May Be Spending Too Much on IT Support

SEPTEMBER 2014 6 Reasons Why You May Be Spending Too Much on IT Support SEPTEMBER 2014 6 Reasons Why You May Be Spending Too Much on IT Support Decision Maker s Guide to Information Technology Investment Research shows that today s business goals are centred on reducing costs,

More information

More information on CEP can be found at http://www.cdainc.com.

More information on CEP can be found at http://www.cdainc.com. CORPORATE ENGAGEMENT PROJECT Issue Paper Contracting Policies This paper is one of a series of Issue Papers based on preliminary findings from the site visits and consultations carried out by the Corporate

More information

Offshore Megaprojects - Why we fail and how to fix it

Offshore Megaprojects - Why we fail and how to fix it ------ ---- Track Two: Deepwater Developments: Increasing Demand While Maintaining Quality & Reliability Offshore Megaprojects - Why we fail and how to fix it Roy Robinson Global Contracts Manager for

More information

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3 /01 PROJECT ADVISORY Stakeholder management and communication Leadership Series 3 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes,

More information

Managing Cash Flow: Practical ways to Improving Cash Flow & Optimise Funding

Managing Cash Flow: Practical ways to Improving Cash Flow & Optimise Funding Managing Cash Flow: Practical ways to Improving Cash Flow & Optimise Funding A Practical Guide to understanding Effective Financial Management Module 6 Brendan Binchy CEO ROCG Europe W: www.europe.rocg.com

More information

Meet challenges head on

Meet challenges head on Meet challenges head on Deal Advisory / Global We can help you master Financial Restructuring. Enhancing value through financial restructuring. / 1 Your vision. Our proven capabilities. Despite its challenges,

More information

UNLOCKING MAJOR COST SAVINGS ON OIL & GAS PROJECTS

UNLOCKING MAJOR COST SAVINGS ON OIL & GAS PROJECTS UNLOCKING MAJOR COST SAVINGS ON OIL & GAS S $ RESPONDING TO A LOW-PRICE OIL ENVIRONMENT THE BENEFITS OF EARLY INVOLVEMENT: In our experience early involvement on a project is key when it comes to securing

More information

How effective information management helps fleet managers reduce operational risk and enhance commercial performance

How effective information management helps fleet managers reduce operational risk and enhance commercial performance How effective information management helps fleet managers reduce operational risk and enhance commercial performance October 2015 www.alcumusgroup.com Managing risk in the transport and logistics sector

More information

IT Cost Reduction. Doing More with Less. Anita Ballaney, Vishwanath Shenoy, Michael Gavigan. Strategic IT cost reduction - Doing More with Less

IT Cost Reduction. Doing More with Less. Anita Ballaney, Vishwanath Shenoy, Michael Gavigan. Strategic IT cost reduction - Doing More with Less IT Cost Reduction Doing More with Less Anita Ballaney, Vishwanath Shenoy, Michael Gavigan Strategic IT cost reduction - Doing More with Less The current economic climate will force all businesses to thoroughly

More information

Response to Ministry of Justice consultation: Transforming Rehabilitation: A revolution in the way we manage offenders

Response to Ministry of Justice consultation: Transforming Rehabilitation: A revolution in the way we manage offenders Response to Ministry of Justice consultation: Transforming Rehabilitation: A revolution in the way we manage offenders February 2013 For more information contact: Rhodri Davies Policy Manager Charities

More information

Project Management Issues in the Finance Transformation Arena

Project Management Issues in the Finance Transformation Arena Project Management Issues in the Finance Transformation Arena Projects, and the ability to deliver them on time and on budget, not only represent an ongoing challenge for any organization, but also require

More information

Support across the value chain. Expertise for Offshore Renewables Projects. rpsgroup.com/downstream

Support across the value chain. Expertise for Offshore Renewables Projects. rpsgroup.com/downstream Downstream Consultancy Support across the value chain Expertise for Offshore Renewables Projects rpsgroup.com/downstream 2 Downstream Consultancy RPS Energy a global energy consultancy n RPS Energy is

More information

Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process

Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should

More information

E X C E RPT I D C M a r k e tscape: Project Portfolio M a nagement Solutions in the Worldwide O i l a n d Gas Industry

E X C E RPT I D C M a r k e tscape: Project Portfolio M a nagement Solutions in the Worldwide O i l a n d Gas Industry E X C E RPT I D C M a r k e tscape: Project Portfolio M a nagement Solutions in the Worldwide O i l a n d Gas Industry I D C E n e r g y I n s i g h t s : W o r l d w i d e O i l a n d G a s I T S t r

More information

PROJECT ESTIMATION & CONTROL

PROJECT ESTIMATION & CONTROL PROJECT ESTIMATION & CONTROL Jean-François REITER VP Project Estimation & Control INVESTOR DAY, PARIS, FRANCE - October 22, 2004 E.P.C. LUMP SUM CONTRACTS Technip guarantees to its client: The price of

More information

If your company had an extra $41 million, what would you do with it? For every $1 billion in revenue,

If your company had an extra $41 million, what would you do with it? For every $1 billion in revenue, CASH ADVANTAGE Put Working Capital Back to Work There s never been a better time to reduce working capital requirements to speed financing and invest in future growth. By Lisa Higgins If your company had

More information

Causes, Effects and Minimization of Delays in Construction Projects

Causes, Effects and Minimization of Delays in Construction Projects Causes, Effects and Minimization of Delays in Construction Projects Divya.R 1, S.Ramya 2 Assistant Professor Department of Civil Engineering Bharathiyar Institute of Engineering for Women, Deviyakurichi

More information

Aggregation. Is bigger always better?

Aggregation. Is bigger always better? Aggregation Is bigger always better? Contents Purpose of this guidance 1 What is aggregation? 2 When should aggregation be considered? 4 Why use aggregation? 6 Some practical considerations 8 Further reading

More information

Understanding a Firm s Different Financing Options. A Closer Look at Equity vs. Debt

Understanding a Firm s Different Financing Options. A Closer Look at Equity vs. Debt Understanding a Firm s Different Financing Options A Closer Look at Equity vs. Debt Financing Options: A Closer Look at Equity vs. Debt Business owners who seek financing face a fundamental choice: should

More information

Integrated Business Planning. Steering Towards Profit

Integrated Business Planning. Steering Towards Profit Integrated Business Planning Steering Towards Profit Accurate financial forecasting starts with meaningful profitability analysis; this means obtaining a good understanding of which channels, customers

More information

Investing in infrastructure?

Investing in infrastructure? Investing in infrastructure? Independent guide for investors about infrastructure investments This guide is for you, whether you re an experienced investor or just starting out. Key tips from ASIC about

More information

EFFECTIVE VENDOR MANAGEMENT: REAPING LONG-TERM BENEFITS FROM YOUR VENDOR RELATIONSHIPS

EFFECTIVE VENDOR MANAGEMENT: REAPING LONG-TERM BENEFITS FROM YOUR VENDOR RELATIONSHIPS EFFECTIVE VENDOR MANAGEMENT: REAPING LONG-TERM BENEFITS FROM YOUR VENDOR RELATIONSHIPS TERRA FIRMA, AUGUST 2013 Leading organisations have understood for some time that active vendor management, as opposed

More information

Operations Excellence in Professional Services Firms

Operations Excellence in Professional Services Firms Operations Excellence in Professional Services Firms Published by KENNEDY KENNEDY Consulting Research Consulting Research & Advisory & Advisory Sponsored by Table of Contents Introduction... 3 Market Challenges

More information

Ellipse The Enterprise Asset Management (EAM) solution for asset intensive industries

Ellipse The Enterprise Asset Management (EAM) solution for asset intensive industries Ellipse The Enterprise Asset Management (EAM) solution for asset intensive industries Ellipse is a fully-integrated Enterprise Asset Management (EAM) application suite providing complete visibility and

More information

Ref: B15.01 Eumedion response draft revised OECD principles on corporate governance

Ref: B15.01 Eumedion response draft revised OECD principles on corporate governance Organisation for Economic Co-operation and Development (OECD) Corporate Governance Committee 2, rue André Pascal 75775 Paris Cedex 16 France The Hague, 2 January 2015 Ref: B15.01 Subject: Eumedion response

More information

A Collaborative Approach to Creating an Agile Workforce

A Collaborative Approach to Creating an Agile Workforce A Collaborative Approach to Creating an Agile Workforce In periods of economic uncertainty, every company strives to increase its agility. During past economic downturns, companies employed tighten your

More information

pg. pg. pg. pg. pg. pg. Rationalizing Supplier Increases What is Predictive Analytics? Reducing Business Risk

pg. pg. pg. pg. pg. pg. Rationalizing Supplier Increases What is Predictive Analytics? Reducing Business Risk What is Predictive Analytics? 3 Why is Predictive Analytics Important to Sourcing? 4 Rationalizing Supplier Increases 5 Better Control of Sourcing and Costs 6 Reducing Business Risk 7 How do you implement

More information

PPP Basics and Principles of a PPP Framework

PPP Basics and Principles of a PPP Framework Note 1 May 2012 PPP Basics and Principles of a PPP Framework This note is the first in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership

More information

Progressive Acquisition and the RUP Part III: Contracting Basics

Progressive Acquisition and the RUP Part III: Contracting Basics Copyright Rational Software 2003 http://www.therationaledge.com/content/feb_03/m_progressiveacqrup_mw.jsp Progressive Acquisition and the RUP Part III: Contracting Basics by R. Max Wideman Project Management

More information

Data Quality Assurance: Quality Gates Framework for Statistical Risk Management

Data Quality Assurance: Quality Gates Framework for Statistical Risk Management Data Quality Assurance: Quality Gates Framework for Statistical Risk Management Narrisa Gilbert Australian Bureau of Statistics, 45 Benjamin Way, Belconnen, ACT, Australia 2615 Abstract Statistical collections

More information

Cash flow is the life line of a business. Many start-up

Cash flow is the life line of a business. Many start-up PM.02 ABC of Cash Flow Projections Mark T. Chen, PE CCE Cash flow is the life line of a business. Many start-up companies fail because of insufficient cash flow. From the perspectives of both owner and

More information

ENTERPRISE RISK MANAGEMENT FRAMEWORK

ENTERPRISE RISK MANAGEMENT FRAMEWORK ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...

More information

PMI s Pulse of the Profession The High Cost of Low Performance

PMI s Pulse of the Profession The High Cost of Low Performance PMI s Pulse of the Profession The High Cost of Low Performance Pulse Perspective As I travel around the world advocating for the value of project, program and portfolio management with organization leaders

More information

6.0 Procurement procedure 1 Infrastructure

6.0 Procurement procedure 1 Infrastructure Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement

More information

by David Hebert, Managing Director, Oracle Applications, Answerthink and Dr. David Oppenheim, Director, Delivery Services, Answerthink

by David Hebert, Managing Director, Oracle Applications, Answerthink and Dr. David Oppenheim, Director, Delivery Services, Answerthink Conflicts Between ERP Systems and Shared Services Can Inhibit Return on Investment The proliferation of ERP systems may not be a problem for individual business units, but it can represent a significant

More information

How To Manage A Contract

How To Manage A Contract Contract Management Checklist Preparation This section deals with laying good foundations before a contract is let. The contract should be actively managed. You should have a plan for doing this, which

More information

An Enterprise Resource Planning Solution (ERP) for Mining Companies Driving Operational Excellence and Sustainable Growth

An Enterprise Resource Planning Solution (ERP) for Mining Companies Driving Operational Excellence and Sustainable Growth SAP for Mining Solutions An Enterprise Resource Planning Solution (ERP) for Mining Companies Driving Operational Excellence and Sustainable Growth 2013 SAP AG or an SAP affi iate company. All rights reserved.

More information

CHAIRMAN S STATEMENT. William Fung Group Chairman

CHAIRMAN S STATEMENT. William Fung Group Chairman CHAIRMAN S STATEMENT William Fung Group Chairman The year 213 is the final year of our Three-Year Plan that covered the period 211 to 213. This Three-Year Plan has also been one of the most challenging

More information

Global and US Trends in Management Consulting A Kennedy Information Perspective

Global and US Trends in Management Consulting A Kennedy Information Perspective Global and US Trends in Management Consulting A Kennedy Information Perspective Summary There is firm evidence of significant growth in the management consulting industry in 2005 and 2006. In some markets,

More information

Supply Chain Talent: A Broken Link in the Supply Chain

Supply Chain Talent: A Broken Link in the Supply Chain Supply Chain Talent: A Broken Link in the Supply Chain Five Proven Strategies to Close the Gaps 8/19/2014 By Lora Cecere Founder and CEO Supply Chain Insights LLC Contents Disclosure Research Research

More information

Delivering a Competitive Edge Across the Supply Chain

Delivering a Competitive Edge Across the Supply Chain Delivering a Competitive Edge Across the Supply Chain An Industry White Paper By Laura Rokohl, Supply Chain Manager, AspenTech Supply chain leaders face significant challenges today amidst market volatility

More information

TELLING STORY WITH DATA: GAINING SENIOR- LEVEL SUPPORT FOR ANALYTICS AND PLANNING

TELLING STORY WITH DATA: GAINING SENIOR- LEVEL SUPPORT FOR ANALYTICS AND PLANNING MERCER WEBCAST TELLING STORY WITH DATA: GAINING SENIOR- LEVEL SUPPORT FOR ANALYTICS AND PLANNING 24 September 2013 Astik Ranade, Principal Julia Howes, Principal Today s Presenters Julia Howes Principal,

More information

POLICY BRIEF SMAF AND THE EXTRACTIVE INDUSTRIES IN AFGHANISTAN A TREASURE OR A POISON? February 2016

POLICY BRIEF SMAF AND THE EXTRACTIVE INDUSTRIES IN AFGHANISTAN A TREASURE OR A POISON? February 2016 POLICY BRIEF SMAF AND THE EXTRACTIVE INDUSTRIES IN AFGHANISTAN February 2016 Natural resource exploitation has the potential to be a major source of economic development and government revenue for Afghanistan,

More information

P&SM: Supply Chain Management

P&SM: Supply Chain Management CIPS Position on Practice P&SM: Supply Chain Management The supply chain conceptually covers the entire physical process from ordering and obtaining the raw materials through all process steps until the

More information

GUIDEBOOK MAXIMIZING SUCCESS DELIVERING MICROSOFT DYNAMICS

GUIDEBOOK MAXIMIZING SUCCESS DELIVERING MICROSOFT DYNAMICS GUIDEBOOK MAXIMIZING SUCCESS DELIVERING MICROSOFT DYNAMICS Corporate Headquarters Nucleus Research Inc. 100 State Street Boston, MA 02109 Phone: +1 617.720.2000 Nucleus Research Inc. TOPICS Enterprise

More information

Fundamentals Level Skills Module, Paper F9

Fundamentals Level Skills Module, Paper F9 Answers Fundamentals Level Skills Module, Paper F9 Financial Management June 2008 Answers 1 (a) Calculation of weighted average cost of capital (WACC) Cost of equity Cost of equity using capital asset

More information

Schindler People Strategy. Support our business. by supporting our people. Fulfill our People Strategy. Deliver our HR ambitions. Support our business

Schindler People Strategy. Support our business. by supporting our people. Fulfill our People Strategy. Deliver our HR ambitions. Support our business Fulfill our People Strategy Deliver our HR ambitions Support our business Foster our values Support our business by supporting our people www.schindler.com/careers 2 Support our business by supporting

More information

Procurement Outsourcing Services¹

Procurement Outsourcing Services¹ Procurement Outsourcing Services¹ The following overview of the procurement outsourcing services in Australia is mainly based on the information provided by IBISWorld and consists of additional information

More information

EMPLOYEE SHARE OWNERSHIP PLANS IN OWNER MANAGED BUSINESSES

EMPLOYEE SHARE OWNERSHIP PLANS IN OWNER MANAGED BUSINESSES EMPLOYEE SHARE OWNERSHIP PLANS IN OWNER MANAGED BUSINESSES Phil Thompson Business Lawyer, Corporate Counsel www.thompsonlaw.ca An employee share ownership plan ( ESOP ) (also known in many cases as an

More information

PROJECT EXPERIENCE Development/Transaction Support United States MANAGING DIRECTOR

PROJECT EXPERIENCE Development/Transaction Support United States MANAGING DIRECTOR Peter Abt Mr. Abt is a Managing Director in Black & Veatch s Management Consulting Division. He leads the division s Oil & Gas Strategy practice and holds primary responsibility for client management and

More information

Attribute 1: COMMUNICATION

Attribute 1: COMMUNICATION The positive are intended for use as a guide only and are not exhaustive. Not ALL will be applicable to ALL roles within a grade and in some cases may be appropriate to a Attribute 1: COMMUNICATION Level

More information

APICS INSIGHTS AND INNOVATIONS SUPPLY CHAIN RISK CHALLENGES AND PRACTICES

APICS INSIGHTS AND INNOVATIONS SUPPLY CHAIN RISK CHALLENGES AND PRACTICES APICS INSIGHTS AND INNOVATIONS SUPPLY CHAIN RISK CHALLENGES AND PRACTICES APICS INSIGHTS AND INNOVATIONS ABOUT THIS REPORT This report examines the role that supply chain risk management plays in organizations

More information

Y H & C Investments Brochure: Cover Page Y H & C Investments 2230 S. Paradise Las Vegas, NV 89104 www.y-hc.com

Y H & C Investments Brochure: Cover Page Y H & C Investments 2230 S. Paradise Las Vegas, NV 89104 www.y-hc.com Y H& C Investments Form ADV Part 2 Y H & C Investments Brochure: Cover Page Y H & C Investments 2230 S. Paradise Las Vegas, NV 89104 www.y-hc.com Contact Information: President: Yale Bock Phone: 702-449-0360,

More information

Supply Chain Management Think Global, Go Global. Hau L. Lee Stanford University

Supply Chain Management Think Global, Go Global. Hau L. Lee Stanford University Supply Chain Management Think Global, Go Global Hau L. Lee Stanford University Global Supply Chain Management Diverse needs of customers Greater complexities & uncertainties Large geographical spread of

More information

How to protect, inform & grow your business with trade credit insurance

How to protect, inform & grow your business with trade credit insurance Aon Risk Solutions How to protect, inform & grow your business with trade credit insurance Risk. Reinsurance. Human Resources. 2 How to protect, inform & grow your business with trade credit insurance

More information

Commodity Trading COMMODITIES

Commodity Trading COMMODITIES Commodity Trading COMMODITIES About us Enix Commodities s.r.o is a Commodity Trading investment firm founded in 2008 with the aim to manage discretionary investments for select investors in the energy

More information

Full speed ahead An industrial strategy for the UK automotive sector

Full speed ahead An industrial strategy for the UK automotive sector Brief March 2013 Full speed ahead An industrial strategy for the UK automotive sector David Leach industrial strategy CBI email: david.leach@cbi.org.uk The automotive industry is the UK s largest sector

More information

Dr. Tatiana Mitrova Head of Oil and Gas Department Energy Research Institute of the Russian Academy of Sciences. RPGC 2013 Moscow, June 25 th

Dr. Tatiana Mitrova Head of Oil and Gas Department Energy Research Institute of the Russian Academy of Sciences. RPGC 2013 Moscow, June 25 th Investment and export opportunities for Russian companies in oil and gas projects abroad: asset swaps as a method of developing direct foreign investment Dr. Tatiana Mitrova Head of Oil and Gas Department

More information

Market Intelligence and Risk Management

Market Intelligence and Risk Management Executive Insurance Partners White Paper Increasing Profit and Reducing Risk in Florida Homeowners Insurance Opportunities and risks abound in the Florida homeowners insurance market. But many companies

More information

Overview of Future Purchasing s fundamental and advanced training workshops...

Overview of Future Purchasing s fundamental and advanced training workshops... Performance Learning Presented by: Anna Del Mar - Director, Performance Learning Future Purchasing Overview of Future Purchasing s fundamental and advanced training workshops... Tailored excellence.. Our

More information

Unleashing the power of innovation

Unleashing the power of innovation How the role of innovation within the business and the way companies innovate are being transformed. Unleashing the power of innovation www.pwc.com 2 Unleashing the power of innovation Gauging changing

More information

Welcome to today s training on how to Effectively Sell SAP ERP! In this training, you will learn how SAP ERP addresses market trends and

Welcome to today s training on how to Effectively Sell SAP ERP! In this training, you will learn how SAP ERP addresses market trends and Welcome to today s training on how to Effectively Sell SAP ERP! In this training, you will learn how SAP ERP addresses market trends and organizations business needs. 1 After completing this lesson, you

More information

Contract risk and assurance

Contract risk and assurance Contract risk and assurance Delivering value from your key contracts and suppliers Maximise performance, confirm costs and gain assurance over your third party relationships and suppliers Performance Risk

More information

Digital Strategy. Digital Strategy. 2015 CGI IT UK Ltd. Digital Innovation. Enablement Services

Digital Strategy. Digital Strategy. 2015 CGI IT UK Ltd. Digital Innovation. Enablement Services Digital Strategy Digital Strategy Digital Innovation Enablement Services 2015 CGI IT UK Ltd. Contents Digital strategy overview Business drivers Anatomy of a solution Digital strategy in practice Delivery

More information

Mezzanine Finance. by Corry Silbernagel Davis Vaitkunas Bond Capital. With a supplement by Ian Giddy

Mezzanine Finance. by Corry Silbernagel Davis Vaitkunas Bond Capital. With a supplement by Ian Giddy Mezzanine Finance by Corry Silbernagel Davis Vaitkunas Bond Capital With a supplement by Ian Giddy Mezzanine Debt--Another Level To Consider Mezzanine debt is used by companies that are cash flow positive

More information

Deutsche Bank UK Banks Conference 07 April 2011 Chris Lucas, Group Finance Director

Deutsche Bank UK Banks Conference 07 April 2011 Chris Lucas, Group Finance Director Deutsche Bank UK Banks Conference 07 April 2011 Chris Lucas, Group Finance Director Slide: Name Slide Thanks very much, it s a great pleasure to be here today and I d like to thank our hosts Deutsche Bank

More information

UNECE PPP Healthcare Standard

UNECE PPP Healthcare Standard INTERNATIONAL SPECIALIST CENTRE OF EXCELLENCE ON PPPs IN HEALTH MANILA, PHILIPPINES UNECE PPP Healthcare Standard Questions on lessons learned in the development of Public-Private Partnership ( PPP ) programmes

More information

Supply Chain Maturity and Business Performance: Assessment and Impact

Supply Chain Maturity and Business Performance: Assessment and Impact Supply Chain Maturity and Business Performance: Assessment and Impact Abstract When evaluating your supply chain, no gap should exist between where your suppliers capabilities end and your capabilities

More information

Sourcing critical oil field services for shale plays in a tightening supply market

Sourcing critical oil field services for shale plays in a tightening supply market Sourcing critical oil field services for shale plays in a tightening supply market Successful operators are responding to the market by adopting a more strategic view of the role of their supply management

More information

Early in 2008, Matthew Li was facing a dilemma. operations

Early in 2008, Matthew Li was facing a dilemma. operations SMPs Combined Accounting firms are teaming up with business service companies to broaden their offerings. George W. Russell looks at how some partnerships evolved and what they offer the Institute s small-

More information

Business Analysis Capability Assessment

Business Analysis Capability Assessment Overview The Business Analysis Capabilities Assessment is a framework for evaluating the current state of an organization s ability to execute a business automation effort from and end-to-end perspective..

More information

Afro Ant Conversation. Change Management Return on Investment 3 April 2014

Afro Ant Conversation. Change Management Return on Investment 3 April 2014 Afro Ant Conversation Change Management Return on Investment 3 April 2014 Overview This report documents the information gathered at the Afro Ant Conversation held on the 3 rd of April 2014 on the topic

More information

Outsourcing Risk - What should every client of outsourced software know about mitigating the risk of project failure? April 2014

Outsourcing Risk - What should every client of outsourced software know about mitigating the risk of project failure? April 2014 Outsourcing Risk - What should every client of outsourced software know about mitigating the risk of project failure? April 2014 Scope of this Report IT Governance is about defining what decisions need

More information

Wealth and Asset Management Services Point of View. Designing a Modern IT Ecosystem for Asset Management Firms

Wealth and Asset Management Services Point of View. Designing a Modern IT Ecosystem for Asset Management Firms Wealth and Asset Management Services Point of View Designing a Modern IT Ecosystem for Asset Management Firms The asset management business once an industry characterized by high margins and predictable

More information

Introduction: The State of Network Managed Services

Introduction: The State of Network Managed Services Introduction: The State of Network Managed Services The global marketplace dynamic of convergence is driving a wide array of challenges in the arena of network managed services both for communications

More information

Best practices for planning and budgeting. A white paper prepared by Prophix

Best practices for planning and budgeting. A white paper prepared by Prophix A white paper prepared by Prophix Executive summary The continual changes in the business climate constantly challenge companies to find more effective business practices. However, common budgeting limitations

More information

Capital Project Services Middle East. Establishing a basis for effective project control

Capital Project Services Middle East. Establishing a basis for effective project control Capital Project Services Middle East Establishing a basis for effective project control The ca 2 The challenges of the Board in delivering Capital Projects Maturing economies and population growth across

More information

Vodafone Global Supplier Management

Vodafone Global Supplier Management Vodafone Global Supplier Management Vodafone Global Enterprise One global communications supplier for streamlined processes, reduced costs and fully centralised management. Vodafone Power to you 78% of

More information

Making the right choice: Evaluating outsourced revenue cycle services vendors

Making the right choice: Evaluating outsourced revenue cycle services vendors Making the right choice: Evaluating outsourced revenue cycle services vendors Page 1 Managing resources at today s hospitals and health systems is an ongoing challenge, considering the numerous clinical

More information