1 April/May Volume 9, Issue 3 BOFDAC news Bureau of Facility Design & Construction, Harrisburg, PA Phone: Fax: Director s Notes: FACILITY DESIGN & CONSTRUCTION Inside This Issue Spring, as they say, has sprung and infrastructure construction activities in DCNR are already in full force as I write. From the construction of the Ohiopyle visitor center in western Alfred Uzokwe, P.E. Pennsylvania to the rehabilitation of flood damaged areas and structures at the Delaware Canal in eastern Pennsylvania, work continues to progress. Bureau of Facility Design and construction staff have completed the design of the Lackawanna pool Director s Notes: 1 Nockamixon Dam Rehabilitation 1 Nolde Forest Education Center Water Line 3 Public-Private Partnerships at Presque Isle State Park 4 Annual Spring Beach Walk at Presque Isle State Park 5 Works In Progress 6 Employee Profile 8 Bureau Activities and News 8 ding Summary Jan. and Feb. 9 project, and the project has been issued for bidding preparatory to award and construction. The project entails rehabilitation of the pool complex to include replacement of the main pool and filtration systems and Nockamixon Dam Rehabilitation installation of spray ground and filtration systems. The bath houses will also be renovated and an open air changing stockade will be incorporated into the shower house building. There also will be space for life guard and first aid station, while the existing life guard first aid station will become a storage space. Many more projects are in the works, at various stages of design as well as construction, especially under the Enhance Penn s Wood initiative. Bureau of Facility Design and Construction staff will continue to diligently shepherd these projects from cradle to grave. Pictures of works in progress (WIP) will always be brought to readers in this newsletter to keep you apprised of the great infrastructure upgrades going on in our various parks and forests Andrew Orlovsky, P.E., Senior Civil Engineer A contract was recently completed for the rehabilitation of Nockamixon Dam in Nockamixon State Park, Bucks County. The contractor was Clearwater Construction of Mercer, Pa. Several mechanical components of the 45-year-old dam were repaired or replaced. The contract consisted of the cleaning and painting of the 10-inch low-flow pipe hanging from the ceiling of the left outlet conduit and the replacement of several components of the pipe. Those components consisted of a cone valve at the downstream end of the pipe. The cone valve s operating mechanism was also replaced. Continued on page -2-

2 Nockamixon Dam Rehabilitation Continued Top view of new 10 cone valve (open) and repaired 60 Bunger valve (open) Side view of new 10 cone valve (open) and repaired 60 Bunger valve (closed) In addition, a 10-inch gate valve near the upstream end of the low-flow pipe, a compression coupler fitting near the downstream end of the pipe, and a damaged steel beam that supported the pipe were also replaced. The project also consisted of the rehabilitation of a 60-inch Howell Bunger Valve, which is used to release large amounts of water from the dam for biannual whitewater rafting events. The hex bolts and nuts, stem, and gear box assembly of the valve were replaced. The valve was also cleaned and painted. New 10 knife gate valve at upstream end of low flow pipe This much needed rehab project not only allows for more efficiency in controlled water releases, but enhances the safety and service longevity of this dam structure. Project Capsule Project Number: FDC Project Coordinator: Edward Raptosh, P.E. Project Designer: Andrew Orlovsky, P.E. Construction Inspection: Anthony Giacobbe, P.E. General Contractor: Clearwater Construction Construction Cost: $196,500 Fund: Key 93 New steel beam for the support of the 10 low flow pipe - 2 -

3 New Water Line to Serve Nolde Forest Education Center Victor Li, P.E., Civil Engineer tool head, attach other equipment, and to collect and remove excess spoils. The pits are well off the stream channel limit. HDD eliminates the need to create cofferdam or other construction techniques that require working in the stream and inevitably generating large amount of debris and pollution of water. The beauty of HDD: cross the stream and leave no footprints (Photo 1). In design of the project, the Eastern Engineering Office received timely and effective support from the BOFDAC central office engineer Shawn Beeler and from biologist Marcus Snyder as well as guidance from Victoria Neboga of the Bureau of Topographic and Geologic Survey and Susan Werner from DEP. The project would not have been a success without the assistance and cooperation of Nolde Forest staff. The contractor, Lechmanik Inc. from West Chester, Pa. was able to deliver the project while enduring the severe winter weather. (Photo 2) Use of horizontal directional drilling (HDD) allows for crossing the stream, with little or no impact! After a long, hard winter, a water line project to serve the park residence and Sawmill Comfort Station in Nolde Forest Environmental Education Center in Berks County has been completed. The work under the contract included an extension of the existing water distribution system. The extension was comprised of 1,665 feet of 2- inch HDPE pipe and associated connections and devices. The project also included the abandonment of a well and revisions to the plumbing system inside the park residence. The existing well that served the residence and Sawmill facility had a history of low capacity and bacterial contamination, which created problems for the users of popular trails during peak usage season. Often, the facility needed to be closed due to lack of an adequate water supply. The project used directional drilling to cross the Punches Run, a cold water fishery that runs through the Center. Horizontal directional drilling (HDD) continues to gain popularity as the alternative to conventional trenching. Horizontal directional drilling (guided boring) is a method of trenchless construction using a surface launched steerable drilling tool controlled from a mobile drilling frame, and includes a field power unit, mud mixing system and mobile spoils extraction system. Pits are dug at the start point and endpoint of the proposed pipe installation and are used to align the Backfilling a pipe trench after a winter storm Project Capsule Project Number: FDC Project Coordinator: Anthony Giacobbe, P.E. Project Designer: Victor Li, P.E. Construction Inspection: Victor Li, P.E. General Contractor: Lechmanik, Inc. Construction Cost: $96, Fund: Key

4 Public-Private Partnerships in Joint Projects at Presque Isle State Park John P. Jaskolka, P.E., Regional Engineer View of the fireplace at the Erie Runners Club Pavilion Private groups have helped enhance state parks by making approved improvements for use by the public. Two such improvement projects occurred recently at Presque Isle State Park, one in association with the Erie Runners Club, and one in association with the Presque Isle Partnership. The Erie Runners Club recognized a need for a pavilion in Presque Isle State Park and approached the park with a proposal for a joint project. This project was to construct a large pavilion at Beach 1, adjacent to the existing comfort station/change house where their various events start and finish. The pavilion was constructed by the Runners Club and is to be turned over to the park for use by the public. This joint approach is a win for the state, the public and the runners. The park gets the new pavilion at no cost, the public gets a pavilion they can enjoy and the club has a facility to use for their events. This joint project was reviewed and approved by DCNR. The club paid for the planning, development, design and construction of the pavilion. There is no state money used for the structure. The cost for the pavilion was estimated to be between $100,000 to $150,000. The work began last summer and numerous local companies and volunteers have been involved in the construction. The general contractor was Joe Dobrich of Dobrich Construction, who is also a Runners Club member. The 40'x 50' pavilion has an enclosed space and will be able to hold a little over 100 people. The pavilion has electricity, hot and cold water in an indoor sink, cabinets, countertops, roll-up service windows and a fireplace that has both indoor and outdoor sides. The Bureau of Facility Design and Construction provided technical assistance and review for the park on this project. The joint project enables enhancements to be made within a park where they would not normally take place due to lack of funding and other infrastructure needs within the park. The Erie Runners Club pavilion at Beach 1 is a fine example of this type of project. This is not the only joint project in the park. The Presque Isle Partnership also completed a similar joint project at the Perry Monument. That project involved improvements at Perry Monument and a new pavilion. The new pavilion replaced an existing pavilion which was in disrepair. The new pavilion is 30' x 40', has electricity, and can hold between 80 to 100 people. This pavilion was designed and constructed by the Presque Isle Partnership. The funding ($50,000) came from the Partnership from the 2012 Crosby, Stills, and Nash concert. Many thanks to all of our partners who make these projects possible. Presque Isle State Park, which is in Erie County, is a 3,200-acre sandy peninsula that arches into Lake Erie. As Pennsylvania's only "seashore," Presque Isle offers its visitors a beautiful coastline and many recreational activities, including swimming, boating, fishing, hiking, bicycling and in-line skating. Project Capsule Runners Club Pavilion Project Number: FDC Project Coordinator: Erie Runners Club Project Designer Rectenwald Architects, Inc., Erie, Pa. General Contractor: Dobrich Construction The new pavilion at the Perry Monument

5 Annual Spring Beach Walk at Presque Isle State Park Denise Kelly, P.G., Professional Geologist Presque Isle State Park is continually subjected to the weather effects triggered by Lake Erie. Throughout the year continuous wind and wave action contribute to beach sand migration from the neck of the spit up to Gull Point. Since Presque Isle State Park is the only state park in Pennsylvania that provides visitors with surf swimming, preserving the beaches is essential for the legions of park visitors. Since 1975, a 50/50 monetary cost share agreement has been in place between the U.S. Army Corps of Engineers, Buffalo District, and the Commonwealth to provide annual beach sand nourishment. The Corps and DCNR work closely together to develop each year s sand nourishment contract although the bidding and administration of the contract is the responsibility of the Corps. Twice each year, in the spring and the fall, a beach walk is conducted to ascertain the condition of the beaches related to the on-going beach nourishment project. In the spring, the beaches are inspected to determine the extent of erosion/accretion as a result of the winter storms. Pictures and extensive notes are taken, and the Corps uses this information to fine tune the annual beach nourishment contract. In the fall, the purpose is to see how successful that year s sand nourishment was and to refine where nourishment changes are needed. Beach 10 Presque Isle Extensive ice cover on both the lake and the beach forced the spring beach walk to be rescheduled to April 22. On that cool, misty, foggy day various intrepid representatives from the bureaus of State Parks and Facility Design and Construction, the Corps, the Presque Isle Advisory Committee and others began the walk at Beach 5 and continued to Sunset Point, a distance of approximately 3 miles. During this walk, the beaches were inspected for areas of accretion and erosion; tombolos (where the sand has connected to the offshore breakwater) and salients were also noted. In the afternoon, the 3.5-mile shoreline of Gull Point was inspected, also for erosion and accretion. Gull Point is the most biologically dynamic and fragile area of the park. There are several outstanding examples of ecological succession as well as many threatened or endangered plant species here. Gull Point has also become a resting, feeding, and possible nesting place for rare and migratory shore birds. In order to preserve the valuable resource of this area, it has been determined that Gull Point must continue to grow at a rate equal to or greater than 0.4 acres per year. This growth comes primarily from sand migration from the down drift beaches. The semi-annual beach walk, along with subsequent air photos, are used to determine if this target goal is being attained. Lake Erie s lower lake water level coupled with the extensive ice cover during the winter and spring helped to attenuate any significant impact from the winter storms although, as always, there are still areas in need of sand replenishment and sand redistribution. The Corps will use the information gathered during the recent beach walk to adjust the current nourishment contract, and it is anticipated that the contractor can begin in a few weeks so the beaches will be ready for Memorial Day weekend, the unofficial start of summer at the park. Gull Point Presque Isle State Park Additional photo, page -9

6 Works in Progress (The following photographs represent some of BOFDAC s active construction efforts throughout DCNR) FDC Blue Knob State Park Rehabilitation of Park Facilities Workers construct ADA pool ramp FDC Blue Knob State Park Rehabilitation of Park Facilities A worker fuse welding polyethylene pipe FDC Blue Knob State Park Rehabilitation of Park Facilities New water distribution system FDC Loyalsock State Forest Pleasant Stream Road Repair Storm Damage Soil nail installation at embankment FDC Moraine State Park Rehabilitate Sewage System Pleasant Valley Phase 1 Directional drilling for the sewage lines FDC Moraine State Park Rehabilitate Sewage System Pleasant Valley Phase 1 Installation of sanitary sewage lines

7 Works in Progress (The following photographs represent some of BOFDAC s active construction efforts throughout DCNR) BOFDAC news FDC Ricketts Glen State Park Camping Cottage Colony Site clearing and survey for cottage construction FDC Delaware Canal State Park Lock No. 17 Repairs at the Delaware Canal Stone work repairs FDC Sinnemahoning State Park Visitors Center Entrance Road Construction Workers install drain pipe at road shoulder FDC Ohiopyle State Park Laurel Highlands Falls Area Visitor Center Construction of stamped concrete sidewalk FDC Ohiopyle State Park Laurel Highlands Falls Area Visitor Center Workers encase conduit in concrete FDC Ohiopyle State Park Laurel Highlands Falls Area Visitor Center Placement of landscaping and site elements

8 Employee Profile: Jamie Pritts Bureau Activities & News Jamie Pritts resides in Champion, where he grew up. He started working heavy highway construction when he was 19 years old. He started out as a laborer and worked his way up in a short period of time to superintendent. From there Jamie moved to PENNDOT District 12 in Uniontown, Pa. as a transportation construction inspector. Jamie s love of the outdoors led him to the DCNR where he now works as an environmental projects construction inspector. Jamie and his wife Michelle were married in 2000 and have a 12-year-old daughter named Cameron. Jamie loves spending time outdoors with his family. He also enjoys skiing, golfing, hunting and fishing as much as possible! Jamie is thankful to have the opportunity to travel throughout this area and work in all of the wonderful state parks and forests that Region 2 has to offer. He is looking forward to meeting everyone in our DCNR family. Birthdays: Teresa Allen April 29 Gene Gelfand May 16 Jim Sowerbrower June 10 Tony Giacobbe June 15 Jason Horst June 28 The Annual Bureau Meeting will be held June 4 at Little Buffalo State Park. Employees will gather for training and discussion, including an hour and a half presentation on Enhance Penn s Woods, a project database training and a sprains and strains safety training. An engineer in Region 4 is scheduled to go to the 2014 International Bridge Conference, sponsored by the Engineers Society of Western Pennsylvania, in Pittsburgh, June The conference includes technical information on designing bridges, case studies of bridge designs, best practices and inspection information. The four-day program gives an opportunity to learn about bridges through workshops, technical sessions, seminars and tours. This training is a valuable asset to the department in the management of bridges. A central office engineer and a Region 1 engineer will attend the Pennsylvania Association of Sewage Enforcement Officers Installation of Wastewater Treatment Systems training course in June in Williamsport. This two-day course will educate attendees in proper design and installation of septic systems in a manner so that the systems operate effectively upon start up and are accessible for regular service over the life of the system. Topics covered will include: Industry Integrity, Installation Safety, Soils and Site Evaluation, Materials and Techniques, Installation Planning, Distribution Pressure and Gravity Systems, Tanks, Installation Piping, and, Pumps & Controls

9 ding Summary January 2014 FDC Clear Creek State Forest Clarion Maintenance Building Roof Replacement $46, Low der: SSR Contracting FDC Presque Isle State Park TREC Wind Turbine Demolition $47, Low der: Konzel Construction Co. Inc. FDC Delaware Canal State Park Reline Canal North New Hope $81, Low der: Rutledge Excavating, Inc. A rock lined exposed sea wall is inspected at Presque Isle State Park during the spring beach walk ding Summary February 2014 FDC Elk State Forest Structure Replacement Bridge No ; Bridge No ; Bridge No INTERESTED IN DOING WORK FOR DCNR? For a list of current projects out for bid, visit the Bureau's current bid proposal page at: /index.htm Be sure to check back frequently for updates $441, Low der: FDC Penn Nursery Replace Spillway Footbridge $32, Low der: LTT Trucking LLC Kevin E. Raker Construction, LLC Questions Comments? We value our reader s feedback. Send your questions or comments to: Chief Editor: Jim Kalp, Assistant Editor: Rhonda Dolen, Contributing Editor: Denise Kelly, ding Summary: January Total s: 3 January Total Value: $175, February Total s: 2 February Total Value: $474, We re on the Web! Visit us at: Bureau Mission: To provide multi-disciplined technical support to the other bureaus in DCNR in the areas of project design, project inspections, construction management, contract administration, surveying and other technical advice and consultation

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

National Archives and Record Administration

National Archives and Record Administration National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

BOFDAC news. Sustainable Sites Initiative. Director s Notes FACILITY DESIGN & CONSTRUCTION

BOFDAC news. Sustainable Sites Initiative. Director s Notes FACILITY DESIGN & CONSTRUCTION February 2010 Volume 5, Issue 2 Bureau of Facility Design & Construction, Harrisburg, PA 17101 www.dcnr.state.pa.us/facde Phone: 717-787-7398 Fax: 717-705-5549 FACILITY DESIGN & CONSTRUCTION Sustainable

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

EMERGENCY STORAGE PROJECT

EMERGENCY STORAGE PROJECT EMERGENCY STORAGE PROJECT San Vicente Pipeline San Vicente Pumping Facilities San Vicente Interconnect Pipeline San Vicente Dam Raise Carryover Storage Project Briefing Summary DATE: May 21, 2008 ORGANIZATION:

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014

Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014 Estabrook Dam A Discussion of Alternatives Public Scoping Meeting June 5, 2014 Presenters Kevin Haley, PLA, Milwaukee County Don Pirrung, P.E., PH, AECOM Mike Hahn, P.E., PH, Southeastern Wisconsin Regional

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

SEWAGE DISPOSAL SYSTEM APPLICATION

SEWAGE DISPOSAL SYSTEM APPLICATION To avoid any delays in the processing of the application and issuance of the Sewage Disposal Permit, please read all the following instructions and attached information carefully. Complete all applicable

More information

Joe DiVittorio IS Program Coordinator Policy and Administration Bureau of Reclamation Denver, CO.

Joe DiVittorio IS Program Coordinator Policy and Administration Bureau of Reclamation Denver, CO. Joe DiVittorio IS Program Coordinator Policy and Administration Bureau of Reclamation Denver, CO. Using the Bureau of Reclamation Equipment Inspection and Cleaning Manual WORKSHOP 17 th International Conference

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT RIGHT: the proposed conceptual profile of the new Joe Redington Sr. JR/SR High School January 2014 Project Management Division New Knik Area Middle/High

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

Forty-one miles of submerged coils that heat and cool a high school of 2,400 students.

Forty-one miles of submerged coils that heat and cool a high school of 2,400 students. ACKNOWLEDGEMENTS Architects: Bray Associates Architects, Inc., Sheboygan, Wisconsin Energy consultant: CDH Energy Corporation, Evansville, Wisconsin Energy management system: J&H Controls, Inc., Fond du

More information

Single Family Residential Erosion and Sediment Control Standards

Single Family Residential Erosion and Sediment Control Standards July 2011 Planning and Development Services Single Family Residential Erosion and Sediment Control Standards This booklet contains standard plans and procedures appropriate for typical residential building

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Sewer construction damages streams and stream valleys, both during initial installation and again when the sewers must be repaired or replaced.

Sewer construction damages streams and stream valleys, both during initial installation and again when the sewers must be repaired or replaced. Sewer pipes placed under streams or in stream banks are notorious for cracking and being exposed by erosion. Cracked pipes leak sewage into streams. Eroded pipes block fish passage. Sewer construction

More information

Director s Notes: Who We Are: Sustainability Professionals FACILITY DESIGN & CONSTRUCTION

Director s Notes: Who We Are: Sustainability Professionals FACILITY DESIGN & CONSTRUCTION Ap ril 2 01 5 BOFDAC news Bureau of Facility Design & Construction, Harrisburg, PA 17101 www.dcnr.state.pa.us/facdes Phone: 717-787-7398 Fax: 717-705-5549 Director s Notes: Who We Are: Sustainability Professionals

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural

More information

The City of Maplewood Public Works Department Guidelines to Obtaining a Building Permit

The City of Maplewood Public Works Department Guidelines to Obtaining a Building Permit The City of Maplewood Public Works Department Guidelines to Obtaining a Building Permit Topic Page WHAT IS A BUILDING PERMIT? 2 WHY DO I NEED A BUILDING PERMIT? WHEN DO I NEED A BUILDING PERMIT? EXAMPLES

More information

Recreational Enhancements on the Lehigh River Public Information Workshop February 2013

Recreational Enhancements on the Lehigh River Public Information Workshop February 2013 Recreational Enhancements on the Lehigh River Public Information Workshop February 2013 Cooperating Agencies US Army Corps of Engineers Philadelphia District Pennsylvania Fish & Boat Commission Pennsylvania

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

Protect your home from basement flooding

Protect your home from basement flooding Protect your home from basement flooding It's important to protect your home from basement flooding because your home could be at risk of basement flooding. Why? Heavy rainstorms that fall over short periods

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington

More information

Rainwater Harvesting Demonstration Zilker Botanical Garden

Rainwater Harvesting Demonstration Zilker Botanical Garden Rainwater Harvesting Demonstration Zilker Botanical Garden HISTORY For centuries, people have relied on rainwater harvesting to supply water for household, landscape, livestock, and agricultural uses.

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

Frequently Asked Transmission Pipeline Questions

Frequently Asked Transmission Pipeline Questions Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).

More information

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT ATTACHED ARE THE REQUIREMENTS FOR OBTAINING A BUILDING PERMIT INCOMPLETE SUBMISSIONS WILL BE RETURNED IN THEIR ENTIRETY -- NO EXCEPTIONS!!

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

MOBILE HOME LAW. Revised November 2001

MOBILE HOME LAW. Revised November 2001 MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS

More information

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17 th Avenue Greeley, CO 80631 Web: www.weldhealth.org Health Administration Vital Records Tele: 970.304.6410 Fax: 970.304.6412 Public Health & Clinical

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Planning and Installing an Onsite Wastewater Management System

Planning and Installing an Onsite Wastewater Management System Replaces pages 27 to 32 of "The Cottager's Handbook for Manitoba Provincial Parks", Third Edition, distributed by Manitoba Conservation Planning and Installing an Onsite Wastewater Management System All

More information

ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS

ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS Onsite Sewage Treatment & Disposal System Requirements ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS 1. City of Ventura onsite sewage treatment and disposal system (Septic system) permit application

More information

Protect your. home from. basement. have you done everything you can?

Protect your. home from. basement. have you done everything you can? Protect your home from basement flooding have you done everything you can? No matter where you live in Winnipeg, your home can be at risk of basement flooding. Heavy rainstorms that fall over short periods

More information

Ranch. Donna Corrigan, Ranch Broker (970) (970)

Ranch. Donna Corrigan, Ranch Broker (970) (970) Last Chance Ranch 307 Acres Adjacent to Flattops Wilderness Bordered on Three Sides by National Forest Income-Producing Hunting, Recreation, and Leases Historical Log Headquarters and Buildings Live Water

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Attachment 6: Monitoring, Assessment, and Performance Measures

Attachment 6: Monitoring, Assessment, and Performance Measures Attachment 6: Monitoring, Assessment, and Performance Measures Contents Monitoring, Assessment and Performance Measures... 1 Monitoring, Assessment and Performance Measures Attachment 6 presents the anticipated

More information

Fig. 3.1: Most of the plant s feeder roots are concentrated near the drip line, beneath the outer edge of the plant s foliage.

Fig. 3.1: Most of the plant s feeder roots are concentrated near the drip line, beneath the outer edge of the plant s foliage. Chapter 3: Harvesting rainwater for landscape use Topics to be covered in this chapter I. Why harvest rainwater? II. Creating a rainwater harvesting system III. Types of rainwater harvesting systems IV.

More information

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW Parcel Number: Owner s Name: Co-Owner s Name: Owner s Mailing Address: Owner Phone Number: FIRM Panel: Lowest Floor Elevation (excluding garage):

More information

MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers

MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers The Plastics Pipe Institute March 2009 1 DISCLAIMER This guideline has been prepared by the Plastics

More information

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems Homeowners and Home Buyers Guide to Wells and Private Sewage Systems What every homeowner should know about living with a well and a private sewage system. YOUR ENVIRONMENTAL SYSTEMS Out of sight out of

More information

Street Tree Planting Standards City of Buffalo. Department of Public Works, Parks and Streets Division of Parks and Recreation

Street Tree Planting Standards City of Buffalo. Department of Public Works, Parks and Streets Division of Parks and Recreation Street Tree Planting Standards City of Buffalo Department of Public Works, Parks and Streets Division of Parks and Recreation March 2011 Table of Contents Foreword..3 Standards and Spacing... 5 Planting

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

2010-2011 Contractor of the Year

2010-2011 Contractor of the Year U.S. Army Corps of Engineers: Little Calumet River Stage VII Steel Sheet Piling Installation Hammond, Indiana Thatcher worked two rigs concurrently one on the north side and one on the south. The United

More information

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township Pumphouse Museum at the Historic Ottawa Beach Parks Park Township Project Description: Wedged between Ottawa Beach Road and the Lake Macatawa Shoreline, the historic red brick industrial building commonly

More information

Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop

Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Welcome to the Mission Reach! The Mission Reach Ecosystem Restoration and Recreation Project is transforming

More information

Beach Profiling. Grade Level: 11-12. Teaching Methods: Analysis, Calculation, Data Collection. Discussion, Graphing/ Mapping, Observation, Small Group

Beach Profiling. Grade Level: 11-12. Teaching Methods: Analysis, Calculation, Data Collection. Discussion, Graphing/ Mapping, Observation, Small Group Beach Profiling Grade Level: 11-12 Teaching Methods: Analysis, Calculation, Data Collection. Discussion, Graphing/ Mapping, Observation, Small Group Time: Preparation Time: 45 minutes Activity Time: 3

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements 1.0 INTRODUCTION Colorado Springs Utilities (Utilities) is requesting proposals to provide final engineering, design, and construction management

More information

EMERGENCY ACTION PLAN UPDATE OF LAKE GENEVA DAM ID #617. Prepared for: LAKE GENEVA ASSOCIATION 1114 E. Geneva Drive City of DeWitt, MI

EMERGENCY ACTION PLAN UPDATE OF LAKE GENEVA DAM ID #617. Prepared for: LAKE GENEVA ASSOCIATION 1114 E. Geneva Drive City of DeWitt, MI EMERGENCY ACTION PLAN UPDATE OF LAKE GENEVA DAM ID #617 Prepared for: LAKE GENEVA ASSOCIATION 1114 E. Geneva Drive City of DeWitt, MI Modified by: WILCOX PROFESSIONAL SERVICES, LLC 111 W. Edgewood Blvd.,

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md. MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.us Martin O Malley Governor Robert M. Summers, Ph.D. Secretary Anthony G.

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

Working together to improve beach water quality. Fixing our. public and private. sewers

Working together to improve beach water quality. Fixing our. public and private. sewers Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve

More information

Earth Science Education Learning about Kentucky s Land and Water Resource Materials for Teachers

Earth Science Education Learning about Kentucky s Land and Water Resource Materials for Teachers Earth Science Education Learning about Kentucky s Land and Water Resource Materials for Teachers Overview The Kentucky Geological Survey (KGS) at the University of Kentucky (UK) seeks to expand its efforts

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Activity Yes No N/A Notes

Activity Yes No N/A Notes CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3

More information

TOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd.

TOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd. FLOOD FACTS AND SAFETY TIPS Floods are one of the most common hazards in the United States. Flood effects can be local, impacting a neighborhood or community, or very large, affecting entire river basins

More information

MEMORANDUM. General: Foundation:

MEMORANDUM. General: Foundation: MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010

More information

HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan

HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan Harbor Location: Port Austin Harbor is located at the tip of the thumb of Michigan, about 80 miles northeast of Saginaw, MI Authority: Rivers

More information

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**

More information

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012

NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012 NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory

More information

How to Protect Your Property Against Plumbing Disasters

How to Protect Your Property Against Plumbing Disasters How to Protect Your Property Against Plumbing Disasters Over 15 Years of Experience Servicing Toronto & GTA Available 24-Hours a Day CONTENT Why Your Home Plumbing Matters...2 Plumbing 101...3 Caring For

More information

Failing Coastal Wood Infrastructure on the Great Lakes

Failing Coastal Wood Infrastructure on the Great Lakes University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many

More information

Subsurface Sewage Treatment System (SSTS) Self-Install Guide

Subsurface Sewage Treatment System (SSTS) Self-Install Guide Subsurface Sewage Treatment System (SSTS) Self-Install Guide Hubbard County Environmental Services Updated: February 2010 Introduction The purpose of this guide is to familiarize the homeowner with some

More information

Notice to Property Owners

Notice to Property Owners Modification or Repair of your Flood Prone Property Notice to Property Owners Rebuilding or Remodeling Your Home If your home or business sustained damage, or if you are making improvements to the structure

More information

Retaining Wall Stability and Maintenance

Retaining Wall Stability and Maintenance Retaining Wall Stability and Maintenance Heavy rains have contributed to landslides and other unfortunate occurrences in various jurisdictions. Although the SCRD has been spared any serious mishap, it

More information

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m.

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. Needs Assessment and Recommendation - Wholesale Water Utility Billing and Information Management Software Application

More information

Jay R. Smith Mfg. Co.

Jay R. Smith Mfg. Co. Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve

More information

Sims Bayou Federal Flood Damage Reduction Project

Sims Bayou Federal Flood Damage Reduction Project Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD

More information

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate

More information

Water Quality and Water Usage Surveys

Water Quality and Water Usage Surveys Appendix 1 Water Quality and Water Usage Surveys This appendix contains copies of the Water Quality Survey and the Lake Usage Survey that we used to complete the watershedbased community assessments. We

More information

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center To: BOS From: Joseph Michelangelo, P.E. Director of Public Works Re: CDBG-DR Pine Creek Culvert Upgrade Date: April 20, 2015 On June 19, 2014, the Town of Fairfield was awarded the above referenced project

More information

Managing Our Water Retention Systems

Managing Our Water Retention Systems Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

Introduction to Minimal Excavation Foundations

Introduction to Minimal Excavation Foundations Introduction to Minimal Excavation Foundations What is a minimal excavation foundation? A construction technique that minimizes disturbance of the natural soil profile within the footprint of the structure

More information

Tampa Bay Seawater Desalination Plant

Tampa Bay Seawater Desalination Plant Tampa Bay Seawater Desalination Plant Project History How The Plant Works Desal Fun Facts 2575 Enterprise Road, Clearwater, FL 33763-1102 Phone: 727.796.2355 / Fax: 727.791.2388 www.tampabaywater.org Tampa

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

DRAFT Non-Surface Disturbance Leasing and Review Criteria DCNR State Park and Forest Lands

DRAFT Non-Surface Disturbance Leasing and Review Criteria DCNR State Park and Forest Lands DRAFT Non-Surface Disturbance Leasing and Review Criteria DCNR State Park and Forest Lands July 2014 The Department of Conservation and Natural Resources (DCNR) manages approximately 2.5 million acres

More information

Topographic Map Symbols

Topographic Map Symbols Topographic Map s 1 2 Topographic Map s - Roads and Trails Road - hard surface, all season-4 Lanes (two way road, divided) Road - hard surface, all season- 2 Lanes Less than 2 Lanes Road - loose or stabilized

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide

More information

Protect Your Home From Flooding. A guide for Lethbridge Residents

Protect Your Home From Flooding. A guide for Lethbridge Residents Protect Your Home From Flooding A guide for Lethbridge Residents Every year, millions of litres of water flow into the City of Lethbridge s stormwater and wastewater collection systems from residential

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

Photos by: Bobby Thompson, Jeff Napier Illustrations: Rudy Martinez Bobby Thompson. July 16, 2009. Presented by Jeff Napier

Photos by: Bobby Thompson, Jeff Napier Illustrations: Rudy Martinez Bobby Thompson. July 16, 2009. Presented by Jeff Napier Photos by: Bobby Thompson, Jeff Napier Illustrations: Rudy Martinez Bobby Thompson July 16, 2009 Presented by Jeff Napier A Backwater Valve is a one way valve that is installed on a building sewer to prevent

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

SHORELINE SANITATION

SHORELINE SANITATION Septic System Report On:

More information