Financial and Economic Study of Alternatives for the proposed N2 Wild Coast Toll Highway for the section of the road from Mthatha to Port Shepstone

Size: px
Start display at page:

Download "Financial and Economic Study of Alternatives for the proposed N2 Wild Coast Toll Highway for the section of the road from Mthatha to Port Shepstone"

Transcription

1 Financial and Economic Study of Alternatives for the proposed N2 Wild Coast Toll Highway for the section of the road from Mthatha to Port Shepstone Addendum to Screening Report Prepared for CCA Environmental Prepared by: Barry Standish Antony Boting 20 November 2006

2 N2 Wild Coast Toll Road: Evaluation of Alternatives i Executive Summary This report is an addendum to the earlier report on the financial and economic study of alternatives for the proposed N2 Wild Coast Toll Highway for the section of road from Mthatha to Port Shepstone dated 11 February The report was submitted as part of the scoping phase of the environmental impact assessment (EIA) of the project. It analysed the financial and economic costs of a number of alternative alignments. Since that time three new greenfield routes have been proposed. These are: 1. The Coastal Mzamba route, which is a variation on SANRAL s preferred route, 2. A proposal made by Dr Keith Cooper of WESSA, 3. A proposal made by Mr Mark Gallagher. This report analyses the financial and economic implications of these three routes and compares them to SANRAL s preferred route as presented in the earlier report. The Coastal Mzamba route and the WESSA route are analysed as greenfield routes from Lusikisiki to Port Edward and compared to SANRAL s preferred greenfield alignment as presented in the earlier report. The Mark Gallagher route is analysed from Mthatha to Port Shepstone and is compared to SANRAL s preferred alignment as well as to the alternative of upgrading the existing N2 between these two cities. When looking at the new greenfield alignments between Lusikisiki and Port Edward (the Mthamvuna River) the Coastal Mzamba route is marginally more expensive (0.3%) than SANRAL s preferred route, while the WESSA alignment is twice as expensive both financially and economically when compared to the other two. SANRAL s preferred route, the Coastal Mzamba route and the WESSA routes have costs with a financial present value (PV) of R3.09bn, R3.10bn and R6.20bn respectively. The respective economic PV of the costs are R2.67bn, R2.67bn and R5.27bn respectively.

3 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives ii For the route from Mthatha to Port Shepstone, the Mark Gallagher alignment is more expensive than either the proposed N2 toll highway along SANRAL s preferred alignment or upgrading the existing N2. The main reason is the need for large bridges and tunnels that would be required for this alignment to conform to national road design specifications and their high costs mean that the Mark Gallagher alignment is financially and economically less viable than the do nothing alternative. SANRAL s preferred route, upgrading the N2 and the Mark Gallagher alignment have financial Net Present Values (NPVs) of R4.22bn, R364m and negative R5.47bn respectively. Their respective economic NPVs are R3.79bn, R354m and negative R4.40bn.

4 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives iii Table of Contents Executive Summary...i Table of Contents... iii List of Tables... iv List of Figures... iv 1 Introduction Evaluating the Coastal Mzamba and the WESSA Alignments Evaluating the Mark Gallagher Alignment Conclusion Appendix A: Methodology Quantifying Road Construction and Upgrade Costs Initial Construction and Upgrade Costs Future Rehabilitation and Periodic Maintenance Costs Appendix B: Map of Alternative Routes... 12

5 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives iv List of Tables Table 1: Key data used in the analysis of alternative greenfield alignments...2 Table 2: Financial and Economic Evaluation of Greenfield Alternatives...3 Table 3: Key data used in the analysis of upgrading the existing N2, constructing the N2 Wild Coast road and the Mark Gallagher alignment..6 Table 4: Financial and Economic Analysis of alternatives in relation to the do nothing alternative...7 List of Figures Figure 1: WESSA Alignment Mtentshwana River Crossing...4 Figure 2: Mark Gallagher alignment proposed crossing point of the Mzimvubu River...8

6 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 1 1 Introduction This report serves as an addendum to the earlier report on the financial and economic study of alternatives for the proposed N2 Wild Coast Toll Highway for the section of road from Mthatha to Port Shepstone. This was dated 11 February 2006 and was submitted as part of the scoping phase of the environmental impact assessment (EIA) of the project. Three additional greenfield routes have now been proposed since the first report was submitted. The first route is a variation of SANRAL s proposed greenfield alignment between Lusikisiki and Port Edward while the remaining two routes are proposed by outside parties in an attempt to minimise the environmental impact of the new road The new routes are labelled: 1. The Coastal Mzamba route, which is the variation on SANRAL s preferred route, 2. A proposal made by Dr Keith Cooper of WESSA, 3. A proposal made by Mr Mark Gallagher. These routes were examined first hand in a field trip organised by SANRAL between the 15 th and 19 th of October This report analyses the financial and economic implications of these three routes and compares them to SANRAL s preferred route as presented in the earlier report. The Coastal Mzamba route and the WESSA route are analysed as greenfield routes from Lusikisiki to Port Edward and compared to SANRAL s preferred greenfield alignment as presented in the earlier report. The Mark Gallagher route is analysed from Mthatha to Port Shepstone and is compared to SANRAL s preferred alignment as well as the alternative of upgrading the existing N2 between these two cities.

7 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 2 2 Evaluating the Coastal Mzamba and the WESSA Alignments This section of the report compares the Coastal Mzamba route and the WESSA route to SANRAL s preferred greenfield alignment between Lusikisiki and Port Edward (the Mthamvuna River). The information that has been used in this part of the analysis is given in Table 1. More detailed information relating to the bridge construction costs is given in Appendix A. Table 1: Key data used in the analysis of alternative greenfield alignments Preferred Alignment Coastal Mzamba WESSA Route Source Distance (Lusikisiki to Mthamvuna River) (km) Map Cost of Upgrading in 2023, 2031 & 2038 (Rm) SANRAL Database Number of Large Bridges SANRAL Database Total Cost of Bridges (R millions) ,870.5 SANRAL Database Length of Tunnel (km) SANRAL Database Total Cost of Tunnel (R million) - - 2,460 SANRAL Database Average PSI Assumption Average LV speed (km/h) Tolplan Average HV speed (km/h) Tolplan All three alignments would involve the construction of completely new roads. The WESSA route would join the existing R61 between Bizana and Port Edward some 16km inland after which it follows the R61 alignment to the existing crossing (Mitchell Bridge) over the Mthamvuna River. In this case 16km of the existing R61 would have to be upgraded to national road standards. Table 2 gives the financial and economic present value (PV) of the costs of these greenfield alternatives. This part of the analysis uses only costs and does not take into account benefits that accrue when considering the implications of the do nothing alternative. Hence the present value of costs is measured (as opposed to the net present value of costs and benefits). In consequence there is no benefit:cost (B:C) ratio or internal rate of return

8 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 3 (IRR). The values are reported in 2005 prices to keep them comparable to the estimates made in the original report Table 2: Financial and Economic Evaluation of Greenfield Alternatives Comparison of Alternatives PV (R Millions, 2005 Prices) Preferred Financial CBA Coastal Mzamba WESSA Capex & Opex (excl Bridges) Large Bridge & Tunnel Costs ,966.8 Road User Costs -1, , ,521.8 Total Costs -3, , ,200.5 Comparison of Alternatives PV (R Millions, 2005 Prices) Preferred Economic CBA Coastal Mzamba WESSA Capex & Opex (excl Bridges) Large Bridge & Tunnel Costs ,470.4 Road User Costs -1, , ,210.0 Total Costs -2, , ,274.9 The overall present value of the financial costs, which include the construction, upgrade and maintenance costs of the road, bridge construction costs and the road user costs for the greenfield alternatives are: The preferred alignment: The Coastal Mzamba: The WESSA alignment: -R3.09bn -R3.10bn -R6.20bn The Coastal Mzamba route is only slightly more expensive (0.3%) than SANRAL s preferred alignment. The former route is about 300m longer, so this increases construction costs, maintenance and upgrade costs and overall road user costs marginally. The Coastal Mzamba route crosses the main river gorges at the same places as SANRAL s preferred option, so the large bridge construction costs are the same. The WESSA alignment is twice as expensive as the other two routes. The WESSA alignment is not only longer, resulting in higher construction, maintenance & upgrade and road user costs, but it also traverses more rugged terrain necessitating more bridges and requiring a tunnel of 4.1km in length. In addition to these costs, land would need to be acquired alongside the R61 and the community resettled elsewhere. These resettlement costs

9 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 4 have not been included in the analysis but would work to reinforce the conclusion drawn above. The WESSA alignment crosses the Mtentu River upstream of SANRAL s proposed alignment and before the Mtentshwana River, a tributary of the Mtentu River, joins up with the main gorge. This necessitates an additional large bridge crossing the terrain shown in Figure 1. Figure 1: WESSA Alignment Mtentshwana River Crossing The conclusion from this section is therefore that there is only a marginal difference in costs (0.3%) between SANRAL s preferred alignment and the Coastal Mzamba route, but that the WESSA alignment is twice as costly both financially and economically.

10 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 5 3 Evaluating the Mark Gallagher Alignment This section compares the Mark Gallagher proposed alignment to two other alignments. These are the proposed N2 Wild Coast Toll Highway (which incorporates SANRAL s preferred alignment for the greenfield route between Lusikisiki and the Mthamvuna River) and the upgrading of the existing N2 from Mthatha to Port Shepstone. All three proposed alignments are analysed in relation to the do nothing alternative. All the costs on all the roads (the greenfield route where relevant, the existing R61 and the existing N2) are taken into account for each alternative. In addition all road user costs on all the roads are also taken into account. In each case the road user costs are compared to the road user costs that would be incurred in the do nothing alternative. This difference in road user costs is the road user benefit. By doing this, the alternatives are directly comparable with each other. The information that has been used in this part of the analysis is given in Table 3. It must be noted that the average travelling speed of light and heavy vehicles is the same for all three alternatives. In practise the Mark Gallagher alignment would result in a lower travelling speed and higher road user costs because of greater vertical slopes. For the purposes of this exercise, however, the average speeds for all three alternatives have been kept the same.

11 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 6 Table 3: Key data used in the analysis of upgrading the existing N2, constructing the N2 Wild Coast road and the Mark Gallagher alignment Existing N2 Nonupgraded Upgraded Road Source Distance in km (Mthatha to Port Shepstone) Road Map Cost of Upgrading (R/km) - 3,566,508 SANRAL Database Periodic Maintenance & Rehab (R/km p.a.) 180, ,476 SANRAL Database Routine Maintenance (R/km p.a.) 25,000 25,000 SANRAL Database Average PSI Assumption Average Light Vehicle speed (km/h) Tolplan Report Average Heavy Vehicle speed (km/h) Tolplan Report Nonupgraded Upgraded N2 Wild Coast Toll Highway Road Source Distance in km (Mthatha to Port Shepstone) Aerial Map New Road Construction (NPV - R millions) - 1,211 SANRAL Database Upgrade / Rehabilitation Costs (NPV - R m) SANRAL Database Periodic Maintenance(R/km p.a.) - Included in Upgrade / Rehab Costs above Routine Maintenance (R/km p.a.) - 25,000 SANRAL Database Average PSI Assumption Average Light Vehicle speed (km/h) Tolplan Report Average Heavy Vehicle speed (km/h) Tolplan Report Mark Gallagher Alignment Nonupgraded Upgraded Road Source Distance in km (Mthatha to Port Shepstone) Aerial Map New Road Construction (NPV - R millions) - 1,176 SANRAL Database Upgrade / Rehabilitation Costs (NPV - R m) SANRAL Database Periodic Maintenance(R/km p.a.) - Included in Upgrade / Rehab Costs above Routine Maintenance (R/km p.a.) - 25,000 SANRAL Database Average PSI Assumption Average Light Vehicle speed (km/h) Tolplan Report Average Heavy Vehicle speed (km/h) Tolplan Report In Table 4 the options of constructing SANRAL s preferred route, upgrading the existing N2 between Mthatha and Port Shepstone and constructing the Mark Gallagher alignment are considered in relation to the do nothing alternative. In so doing, benefits for each option can be calculated as the reduction in costs between the respective alternative and the do nothing alternative.

12 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 7 Table 4: Financial and Economic Analysis of alternatives in relation to the do nothing alternative Comparison of Alternatives Financial CBA Economic CBA NPV (R Millions, 2005 Prices) Pref Align Exist. N2 Upgr. Mark Gallagher Pref Align Exist. N2 Upgr. Mark Gallagher Capex & Opex (excl Bridges) -1, , , ,032.0 Bridge & Interchange Costs , ,080.7 Road User Cost Savings 5, , , , ,714.7 Total Benefits 4, , , ,398.0 B:C Ratio IRR 26% 15% N/A 27% 15% N/A The Mark Gallagher alignment has a total financial NPV of negative R5.47bn. This means that the do nothing scenario is more attractive than this alignment. The main reason for the large negative NPV is the large bridge, tunnel and interchange costs. When looking only at the road construction costs (i.e. ignoring the bridge and tunnel construction costs) Table 4 indicates that the costs associated with the Mark Gallagher alignment are less than those for SANRAL s preferred alignment, but more than upgrading the existing N2. The reason for this is that the Mark Gallagher alignment makes greater use of the existing R61 than SANRAL s preferred alignment, and is shorter in distance than the existing N2. When looking at the Road User Cost Savings, it can also be seen that the Mark Gallagher alignment has greater savings than upgrading the N2, but not as much as the SANRAL preferred alignment. However, it is the bridge and interchange costs for the Mark Gallagher alignment that makes it so costly. The Mark Gallagher crossing of the Mzimvubu River will necessitate a large bridge and some tunnelling. The proposed crossing point is indicated in Figure 2. The bridge required to cross the river would be built on the spur indicated in the figure, where the difference in height between the two banks of the river can be clearly seen.

13 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 8 Figure 2: Mark Gallagher alignment proposed crossing point of the Mzimvubu River For comparison purposes, SANRAL s preferred alignment has a positive NPV of R4.2bn while upgrading the existing N2 has a positive NPV of R365m. Because of their positive NPVs both alternatives are more attractive than the do nothing option whereas this is not the case for the Mark Gallagher alignment. The financial benefit cost ratio for the proposed N2 Wild Coast Toll Highway is 3.4, compared to 1.5 for upgrading the existing N2 and 0.4 for the Mark Gallagher alignment. The proposed project has an IRR of 26% while upgrading the existing N2 has an IRR of 15%. Because the financial NPV of the Mark Gallagher alignment is negative it does not have an IRR.

14 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 9 The economic benefit cost ratio for the proposed project is 3.6, compared to 1.6 for upgrading the existing N2 and 0.4 for the Mark Gallagher alignment. The proposed project has an economic IRR of 27% while upgrading the existing N2 has an IRR of 15%. Because the economic NPV of the Mark Gallagher alignment is negative it is not possible to determine an economic IRR for that alternative. These results all indicate that it would not be financially or economically beneficial to society to construct the Mark Gallagher alignment. 4 Conclusion The following conclusions are drawn: For the new greenfield alignments between Lusikisiki and Port Edward (the Mthamvuna River) the Coastal Mzamba route is only marginally more expensive (0.3%) than SANRAL s preferred route, while the WESSA alignment is twice as expensive when compared to the other two. For the route from Mthatha to Port Shepstone, the Mark Gallagher alignment is considerably more expensive than either the proposed N2 toll highway along SANRAL s preferred alignment or upgrading the existing N2.

15 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 10 5 Appendix A: Methodology 5.1 Quantifying Road Construction and Upgrade Costs Construction costs for the proposed N2 Wild Coast toll road were supplied by SANRAL. The costs for the various sections of the road are as follows: Initial Construction and Upgrade Costs The proposed greenfields section between Lusikisiki and the Mthamvuna River was estimated from the SANRAL cost database records and equate to R11.436m per kilometre, spread over three years. This rate includes culverts, intersections and minor to medium size bridges. It excludes the price of constructing major bridges such as those over the Msikaba and Mtentu River gorges and the cost of tunnels. Bridge costs on the three new routes are as follows: Route River Length Width Unit Cost Total Cost (Rm) Coastal Mzamba Route Msikaba R25,000/m² Mthentu 1, R25,000/m² WESSA Route Msikaba 1, R25,000/m² Mtentu 1, R25,000/m² Mtentshwana 1, R25,000/m² Mzamba R10,000/m² Ntlakwe R10,000/m² Tunnel 4,100 R600,000/m 2,460.0 Mark Gallagher Route Mzimvubu 3, R25,000/m² 1,376.0 Mtamvuna 1, R10,000/m² A N Other R10,000/m² 51.6 Tunnel 1 14,320 R600,000/m 8,592.0 Tunnel R600,000/m No major bridge costs are required in upgrading either the existing N2 or R61. Any construction work that would be required to be done on the existing bridges would be covered in the rate per kilometre of road upgrade.

16 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 11 Initial upgrade costs where the proposed road is aligned on top of an existing road are estimated from the SANRAL cost database. They equate to R3.57 million per kilometre, spread over three years Future Rehabilitation and Periodic Maintenance Costs Future rehabilitation costs for the proposed N2 Wild Coast toll road are taken as those given in the cost schedule supplied by SANRAL. These costs occur at discreet intervals in time on the various sections of the road. Future rehabilitation costs for the existing N2 and R61, if they are to be upgraded and not kept at a minimum level of serviceability, are obtained by taking the future rehabilitation cost schedule for the proposed project (as in the point above) and calculating an average rate per kilometre per annum. This average rate per annum equates to R328,359 per kilometre per annum. On the do-minimum roads where the riding surface is kept at a minimum acceptable level of quality, periodic maintenance costs of R40,000 per kilometre per annum and rehabilitation costs of R140,000 per kilometre per annum are used. For all roads an annual routine maintenance cost of R25,000 per kilometre is used.

17 Proposed N2 Wild Coast Toll Highway: Screening of Alternatives 12 6 Appendix B: Map of Alternative Routes

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.

More information

Sample Micro Hydro Initial Report

Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.

More information

Status of Asset Management in the Roads Sector. L Kannemeyer

Status of Asset Management in the Roads Sector. L Kannemeyer Status of Asset Management in the Roads Sector L Kannemeyer Why Asset Management? Road Condition 100 80 60 40 20 Good Fair Poor B A Very Poor (Typically Designed for Traffic Expected over 20-30 Years)

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model

Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model Prepared For West Virginia Department of Transportation Transportation Planning Division Building 5, Room 824 1900 Kanawha Blvd.

More information

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning 2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3

More information

Module 10: Assessing the Business Case

Module 10: Assessing the Business Case Module 10: Assessing the Business Case Learning Objectives After completing this section, you will be able to: Do preliminary assessment of proposed energy management investments. The measures recommended

More information

INTRODUCTION TO MATHEMATICAL MODELLING

INTRODUCTION TO MATHEMATICAL MODELLING 306 MATHEMATICS APPENDIX 2 INTRODUCTION TO MATHEMATICAL MODELLING A2.1 Introduction Right from your earlier classes, you have been solving problems related to the real-world around you. For example, you

More information

Louw Kannemeyer. Asset Management

Louw Kannemeyer. Asset Management Louw Kannemeyer Asset Management South African Road Network Authority Paved Gravel Total SANRAL 18,247 0 18,247 Provinces - 9 46,099 136,640 182,739 Metros - 8 51,682 14,461 66,143 Municipalities 37,691

More information

SITE PHOTOGRAPHS (GOOGLE EARTH): ROAD REHABILITATION Refer to Appendix B for a map of the viewpoint locations.

SITE PHOTOGRAPHS (GOOGLE EARTH): ROAD REHABILITATION Refer to Appendix B for a map of the viewpoint locations. 469335: N7 Rehab BA Report_Appendix B5 Page i SITE PHOTOGRAPHS (GOOGLE EARTH): ROAD REHABILITATION Refer to Appendix B for a map of the viewpoint locations. R1 R1 R2 R2 Looking north with Okiep east of

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

APPENDIXB ONTARIO ENERGY BOARD GUIDELINES FOR ASSESSING AND REPORTING ON NATURAL GAS SYSTEM EXPANSION IN ONTARIO

APPENDIXB ONTARIO ENERGY BOARD GUIDELINES FOR ASSESSING AND REPORTING ON NATURAL GAS SYSTEM EXPANSION IN ONTARIO Was Appendix, preliminary page 2 247 APPENDIXB ONTARIO ENERGY BOARD GUIDELINES FOR ASSESSING AND REPORTING ON NATURAL GAS SYSTEM EXPANSION IN ONTARIO 1998 248 CONTENTS Was Appendix, preliminary page 3

More information

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL -- South Africa COTO Committee of Transport Officials Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL M a r c h 2013 C ommittee of Transport Officials Contents Background Process Contents of Manual Quo Vadis

More information

The Role of the Lender Common Infrastructure Design and Scoping Issues ESIA: The Management Planning Process Case Study Cross Cutting Themes:

The Role of the Lender Common Infrastructure Design and Scoping Issues ESIA: The Management Planning Process Case Study Cross Cutting Themes: Infrastructure Development, Ecosystem Services and the need for Adaptive Management: An EPFI s Perspective Chris Pullen Export Development Canada IAIA Biodiversity Symposium February 7, 2013 Presentation

More information

Investment Decision Analysis

Investment Decision Analysis Lecture: IV 1 Investment Decision Analysis The investment decision process: Generate cash flow forecasts for the projects, Determine the appropriate opportunity cost of capital, Use the cash flows and

More information

Amendments to Two Proposals

Amendments to Two Proposals Introduction 1 Addendum to the Slips, Trips and Falls final decision RIS Amendments to Two Proposals In April 2011 the Board considered the Slips, Trips and Falls final decision RIS and decided to list

More information

Financial and Cash Flow Analysis Methods. www.project-finance.com

Financial and Cash Flow Analysis Methods. www.project-finance.com Financial and Cash Flow Analysis Methods Financial analysis Historic analysis (BS, ratios, CF analysis, management strategy) Current position (environment, industry, products, management) Future (competitiveness,

More information

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

The Mathematics of Highway Design

The Mathematics of Highway Design The Mathematics of Highway Design Scenario As a new graduate you have gained employment as a graduate engineer working for a major contractor that employs 2000 staff and has an annual turnover of 600m.

More information

Economic Criteria for Justification of Capex for Growth of APA Gas Networks

Economic Criteria for Justification of Capex for Growth of APA Gas Networks APA GAS DISTRIBUTION TECHNICAL POLICY Economic Criteria for Justification of Capex for Growth of APA Gas Networks Policy Owner: Manager Commercial Gas Networks Policy review period- annually JULY 2010

More information

PRAGUE AIRPORT KLADNO RAILWAY LINK

PRAGUE AIRPORT KLADNO RAILWAY LINK PRAGUE AIRPORT KLADNO RAILWAY LINK Investor: SŽDC s.o. (Railway Infrastructure Administration) Project manager: METROPROJEKT Praha a.s. (some parts in consortium with SUDOP Praha a.s.) PRAGUE AIRPORT KLADNO

More information

Appendix E FAA ALP Sheet Checklist

Appendix E FAA ALP Sheet Checklist Appendix E FAA ALP Sheet Checklist AC 150/5070-6B (incl. Chg. 1, 5/1/07) Airport Layout Plan Drawing Set The following list provides general guidelines in preparing the Airport Layout Plan set. The individual

More information

Impact Assessment (IA)

Impact Assessment (IA) Impact Assessment Review of current funding restrictions for community radio IA No: 1814 Lead department or agency: Department for Culture, Media and Sport Other departments or agencies: Summary: Intervention

More information

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation 2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels

More information

MODULE 2. Capital Budgeting

MODULE 2. Capital Budgeting MODULE 2 Capital Budgeting Capital Budgeting is a project selection exercise performed by the business enterprise. Capital budgeting uses the concept of present value to select the projects. Capital budgeting

More information

CAPITAL PLANNING GUIDELINES

CAPITAL PLANNING GUIDELINES CAPITAL PLANNING GUIDELINES 1. INTRODUCTION... 2 2. EXTENSION OF EXISTING INFRASTRUCTURE PROJECTS... 2 3. NEW CAPITAL PROJECTS... 2 4. MINIMUM INFORMATION REQUIRED... 3 5. PREPARATORY WORK... 3 5.1 NEEDS

More information

CHAPTER 2 LCCA APPROACHES

CHAPTER 2 LCCA APPROACHES 2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting

More information

8. As a cart travels around a horizontal circular track, the cart must undergo a change in (1) velocity (3) speed (2) inertia (4) weight

8. As a cart travels around a horizontal circular track, the cart must undergo a change in (1) velocity (3) speed (2) inertia (4) weight 1. What is the average speed of an object that travels 6.00 meters north in 2.00 seconds and then travels 3.00 meters east in 1.00 second? 9.00 m/s 3.00 m/s 0.333 m/s 4.24 m/s 2. What is the distance traveled

More information

CARNEGIE MELLON UNIVERSITY CIO INSTITUTE

CARNEGIE MELLON UNIVERSITY CIO INSTITUTE CARNEGIE MELLON UNIVERSITY CIO INSTITUTE CAPITAL BUDGETING BASICS Contact Information: Lynne Pastor Email: lp23@andrew.cmu.edu RELATED LEARNGING OBJECTIVES 7.2 LO 3: Compare and contrast the implications

More information

Model Virginia Map Accuracy Standards Guideline

Model Virginia Map Accuracy Standards Guideline Commonwealth of Virginia Model Virginia Map Accuracy Standards Guideline Virginia Information Technologies Agency (VITA) Publication Version Control Publication Version Control: It is the user's responsibility

More information

The Basics of Navigation

The Basics of Navigation The Basics of Navigation Knowledge of map reading and the use of the compass is an indispensable skill of bushcraft. Without this skill, a walker is a passenger and mere follower on a trip. To become a

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS

Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS 11-1 a. Cash flow, which is the relevant financial variable, represents the actual flow of cash. Accounting

More information

LCCA Defined (FHWA) LCCA Policy Statement (9/96) LCCA Policy Statement (9/96) Policy Statement Con t... Use of LCCA. CE 4401 Pavement Design

LCCA Defined (FHWA) LCCA Policy Statement (9/96) LCCA Policy Statement (9/96) Policy Statement Con t... Use of LCCA. CE 4401 Pavement Design LCCA Defined (FHWA) CE 4401 Pavement Design Introduction to Life Cycle Cost Analysis A process for evaluating the total economic worth of a useable project segment by analyzing initial costs and discounted

More information

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund Concept for Railway and Transportation in Southern Norway High Speed Line with High Speed Line Oslo Trondheim / Ålesund DB International GmbH Ottmar Grein Gjøvik, 28.10.2011 Concept for Railway and Transportation

More information

Project Design to Assist Local Businesses. State Infrastructure Banks PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT

Project Design to Assist Local Businesses. State Infrastructure Banks PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT CHAPTER 7 Economic Development PASSIVE Project Design to Assist Local Businesses State Infrastructure Banks Basic Employment Funding Programs PLANNING REQUIREMENTS CAPABILITIES Industrial Roads Process

More information

Phase Attribute Identification using GPS Technology

Phase Attribute Identification using GPS Technology Phase Attribute Identification using GPS Technology Date 11 June 2009 John Sinclair Power Quality Manager Slide 1 Topics of Discussion Remote Phase Identification How it works Principals of operation Benefits

More information

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented

More information

LONGITUDINAL PROFILE COMPLETION

LONGITUDINAL PROFILE COMPLETION LONGITUDINAL PROFILE COMPLETION Course of the trench bottom determine using drawn cross-sections plot (refer to fig. 0630) according to the stationing direction: right-sided... dotted line left-sided...

More information

Delineation. Section 4 Longitudinal markings

Delineation. Section 4 Longitudinal markings Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections

More information

Managing sewer flood risk

Managing sewer flood risk Managing sewer flood risk J. Ryu 1 *, D. Butler 2 1 Environmental and Water Resource Engineering, Department of Civil and Environmental Engineering, Imperial College, London, SW7 2AZ, UK 2 Centre for Water

More information

Maximizing Operator Value from VoIP Services

Maximizing Operator Value from VoIP Services WIRELESS 20/20 Maximizing Operator Value from VoIP Services Maximizing Operator Value from VoIP Services How cloud-based service delivery platforms are changing the game By Haig Sarkissian and Randall

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

BABERGH DISTRICT COUNCIL. To: Strategy Committee Date of meeting: 6 October 2011

BABERGH DISTRICT COUNCIL. To: Strategy Committee Date of meeting: 6 October 2011 BABERGH DISTRICT COUNCIL From: Strategic and Financial Planning Task Group Report Number: L77 To: Strategy Committee Date of meeting: 6 October 2011 STRATEGIC AND FINANCIAL PLANNING PROCESS 1. Purpose

More information

Life Cycle Cost Analysis (LCCA)

Life Cycle Cost Analysis (LCCA) v01-19-11 Life Cycle Cost Analysis (LCCA) Introduction The SHRP2 R-23 Guidelines provide a number of possible alternative designs using either rigid of flexible pavements. There is usually not a single

More information

Strategy and Analysis in Using NPV. How Positive NPV Arises

Strategy and Analysis in Using NPV. How Positive NPV Arises Strategy and Analysis in Using NPV (Text reference: Chapter 8) Topics how positive NPV arises decision trees sensitivity analysis scenario analysis break-even analysis investment options AFM 271 - Strategy

More information

Project Cost Management

Project Cost Management Project Cost Management Guide to Mathematical Questions PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Present

More information

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Appendix F Benefit-Cost Analysis of Flood Protection Measures Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual

More information

REPORT FEHMARNBELT FIXED LINK. Financial Analysis - February 2003. Main Results. March 2003. Prepared by Sund & Bælt / Femer Bælt

REPORT FEHMARNBELT FIXED LINK. Financial Analysis - February 2003. Main Results. March 2003. Prepared by Sund & Bælt / Femer Bælt REPORT FEHMARNBELT FIXED LINK Financial Analysis - February 23 Main Results Prepared by Sund & Bælt / Femer Bælt March 23 A division of Sund & Bælt Holding A/S Vester Søgade 1 DK-161 Copenhagen V Tel.

More information

CORPORATE POLICY, STANDARDS and PROCEDURE POLICY TITLE TRAVEL AND BUSINESS EXPENSES NUMBER TBA. CURRENT VERSION DATE February 2015

CORPORATE POLICY, STANDARDS and PROCEDURE POLICY TITLE TRAVEL AND BUSINESS EXPENSES NUMBER TBA. CURRENT VERSION DATE February 2015 Page 1 of 9 APPROVED (S) REVISED / REVIEWED SUMMARY Version Date Comments / Changes 1.0 Initial Policy Released 2.0 February 2003 Policy Revised 3.0 September 2003 Policy Revised 4.0 August 2004 Policy

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

How To Improve Road Quality

How To Improve Road Quality A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan

More information

ERGON ENERGY. Fleet. Capital Expenditure Forecast. Fleet Forecast Expenditure Summary 1

ERGON ENERGY. Fleet. Capital Expenditure Forecast. Fleet Forecast Expenditure Summary 1 ERGON ENERGY Fleet Capital Expenditure O i Fleet Expenditure Summary 1 Contents Contents... 2 1. Introduction... 3 1.1 Purpose... 3 1.2 Summary of expenditure... 3 1.3 Customer outcomes... 4 2. Current

More information

DATE APPROVED June 2002

DATE APPROVED June 2002 Page 1 of 9 APPROVED (S) REVISED / REVIEWED SUMMARY Version Date Comments / Changes 1.0 Initial Policy Released 2.0 February 2003 Revised 3.0 September 2003 Revised 4.0 August 2004 Revised 5.0 January

More information

CHAPTER 10: UNCERTAINTY AND RISK IN CAPITAL BUDGETING: PART I

CHAPTER 10: UNCERTAINTY AND RISK IN CAPITAL BUDGETING: PART I CHAPTER 10: UNCERTAINTY AND RISK IN CAPITAL BUDGETING: PART I 10-1 Year ATCF 0-2,500,000 Initial Investment = $2,500,000 1 $1,280,000 Annual Operating Cash Flows 2 $1,280,000 Revenues $5,000,000 3 $1,280,000

More information

Presentation to Community Task Force July 9, 2007

Presentation to Community Task Force July 9, 2007 Alternative Evaluation Results Presentation to Community Task Force July 9, 2007 Outline of Presentation Overview of alternative evaluation Alternative evaluation methodology Process and assumptions General

More information

Safety performance of traffic management at major motorway road works

Safety performance of traffic management at major motorway road works Safety performance of traffic management at major motorway road works Prepared for Safety Standards and Research, Safety and Information Division, Highways Agency M Freeman, J Mitchell and G A Coe TRL

More information

Maximum and minimum problems. Information sheet. Think about

Maximum and minimum problems. Information sheet. Think about Maximum and minimum problems This activity is about using graphs to solve some maximum and minimum problems which occur in industry and in working life. The graphs can be drawn using a graphic calculator

More information

Economic Analysis Reports: Briefing. Transportation Finance Panel

Economic Analysis Reports: Briefing. Transportation Finance Panel Economic Analysis Reports: 1. I-84 Viaduct in Hartford 2. I-84/Rt8 Mixmaster in Waterbury 3. New Haven Rail Line Briefing for Transportation Finance Panel Nov 23, 2015 Economic analyses 1 & 2 1. I-84 Viaduct

More information

Appendix A Flood Damages Assessment

Appendix A Flood Damages Assessment Appendix A Flood Damages Assessment 106 GHD Report for Bundaberg Regional Council - Floodplain Action Plan, 41/26909 10. Flood Damages Assessment Methodology An important part of assessing flooding impact

More information

Tool 4.4: Individual house flood mitigation measures Costs and benefits

Tool 4.4: Individual house flood mitigation measures Costs and benefits Impacts of Climate Change on Urban Infrastructure & the Built Environment A Toolbox Tool 4.4: Individual house flood mitigation measures Costs and benefits Author Ian Page Affiliation BRANZ, Private Bag

More information

The Map Grid of Australia 1994 A Simplified Computational Manual

The Map Grid of Australia 1994 A Simplified Computational Manual The Map Grid of Australia 1994 A Simplified Computational Manual The Map Grid of Australia 1994 A Simplified Computational Manual 'What's the good of Mercator's North Poles and Equators, Tropics, Zones

More information

Exercise (4): Open Channel Flow - Gradually Varied Flow

Exercise (4): Open Channel Flow - Gradually Varied Flow Exercise 4: Open Channel Flow - Gradually Varied Flow 1 A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches

More information

Roadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035)

Roadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035) 7 Transportation Criteria 7.1 Introduction A goal of this project is to improve mobility in the corridor. To that end, all the major Project alternatives identified at this point in the study include significant

More information

Application of Modified Internal Rate of Return Method for Watershed Evaluation 1

Application of Modified Internal Rate of Return Method for Watershed Evaluation 1 Agricultural Economics Research Review Vol. 22 (Conference Number) 2009 pp 401-406 Application of Modified Internal Rate of Return Method for Watershed Evaluation 1 K.J.S. Satyasai * Department of Economic

More information

Potential Effects of Automatic Vehicle Location and Computer-Aided Dispatch Technology on Paratransit Performance

Potential Effects of Automatic Vehicle Location and Computer-Aided Dispatch Technology on Paratransit Performance Transportation Research Record 1760 107 Paper No. 01-2429 Potential Effects of Automatic Vehicle Location and Computer-Aided Dispatch Technology on Paratransit Performance A Simulation Study Liping Fu

More information

Instructions for Using the Casio FC range of Business/Financial Calculators

Instructions for Using the Casio FC range of Business/Financial Calculators Instructions for Using the Casio FC range of Business/Financial Calculators These instructions are based on the Casio FC-100 Financial Consultant calculator, and may vary slightly with different models.

More information

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation

More information

Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL

Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL Government of the People s Republic of Bangladesh Ministry of Communications PAVEMENT INVENTORY SURVEY MANUAL MAY 2005 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ROAD NUMBERING... 4 2.1 OBJECTIVE...4 2.2

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

Policy Research CENTER

Policy Research CENTER TRANSPORTATION Policy Research CENTER Truck Travel Cost Estimates on Tolled and Non-tolled Facilities A Central Texas Case Study Executive Summary Texas has actively pursued tolling as a means to provide

More information

Appendix 6145-T1 Forklift Use Practices

Appendix 6145-T1 Forklift Use Practices Appendix 6145-T1 Operators must perform a preoperational inspection of the forklifts and attachments in accordance with the equipment operating manual. They will immediately report any equipment deficiencies

More information

KOCKS ENGINEERS. Using GIS as a tool for asset planning and management: lessons from work in Georgia. Ulaanbaatar, 30.4.2015

KOCKS ENGINEERS. Using GIS as a tool for asset planning and management: lessons from work in Georgia. Ulaanbaatar, 30.4.2015 KOCKS ENGINEERS 14th TRANSPORT SECTOR COORDINATING COMMITTEE (TSCC) MEETING OF THE CENTRAL ASIA REGIONAL ECONOMIC COOPERATION PROGRAM Using GIS as a tool for asset planning and management: lessons from

More information

ROAD SURVEYING Section I. RECONNAISSANCE SURVEY PREPARATION AND SCOPE

ROAD SURVEYING Section I. RECONNAISSANCE SURVEY PREPARATION AND SCOPE CHAPTER 2 ROAD SURVEYING Section I. RECONNAISSANCE SURVEY PREPARATION AND SCOPE The reconnaissance survey is an extensive study of an entire area that might be used for a road or airfield. Its purpose

More information

Port Mann/Highway 1 Project Request For Proposals Volume 1 Instructions to Proponents

Port Mann/Highway 1 Project Request For Proposals Volume 1 Instructions to Proponents Port Mann/Highway 1 Project Request For Proposals Volume 1 Instructions to Proponents August 7, 2007 PAGE 1 OF 57 Table of Contents 1. Introduction... 5 1.1 Project Scope Overview... 5 1.2 Short-listed

More information

Howsham fish passage Consultation document

Howsham fish passage Consultation document Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing

More information

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA Answers to Concepts Review and Critical Thinking Questions 1. A payback period less than the project s life means that the NPV is positive for

More information

Capital allowances for business cars

Capital allowances for business cars Capital allowances for business cars Who is likely to be affected? Any business that buys or leases cars. General description of the measure The 100 per cent first-year allowance (FYA) for expenditure

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Background to the Norwegian Ministry of Transport and Communications support for the measures

Background to the Norwegian Ministry of Transport and Communications support for the measures TØI report 738/2004 Author(s): Nils Fearnley and Åse Nossum Oslo 2004, 45 pages, Norwegian language mary: Public transport packages of measures 1996-2000 Economic evaluations Background to the Norwegian

More information

IMPROVING CORD BLOOD BANK OPERATIONAL EFFICIENCY

IMPROVING CORD BLOOD BANK OPERATIONAL EFFICIENCY IMPROVING CORD BLOOD BANK OPERATIONAL EFFICIENCY Francesc de Haro Partner, Blood Bank Solutions, Barcelona (Spain) francescdeharo@bloodbanksolutions.es INTRODUCTION Cord Blood Banks (CBBs) activities started

More information

2) Summary of previous and current toll applications

2) Summary of previous and current toll applications WHITCHURCH BRIDGE COMPANY TOLL APPLICATION DATED 5 th November 2014 Financial Management and the Business Planning Model 1) Principles a) The Whitchurch Bridge Company is in principle a relatively simple

More information

Building a business case for a fully continuous biomanufacturing platform

Building a business case for a fully continuous biomanufacturing platform Building a business case for a fully continuous biomanufacturing platform Sol Pompe disease Argentina Integrated Continuous Biomanufacturing Jason Walther 23 October 2013 www.genzyme.com Fully continuous

More information

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division Keith et P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict

More information

Assessing Paved Trails for Compliance with Standards and Best Practices

Assessing Paved Trails for Compliance with Standards and Best Practices Assessing Paved Trails for Compliance with Standards and Best Practices Session Presenters: Kristin Maravilla, Planner/Designer Masters in Landscape Architecture (UC Berkeley) Masters in City and Regional

More information

State Super. Fee Booklet. Date of Issue 20 January 2015

State Super. Fee Booklet. Date of Issue 20 January 2015 State Super TAILORED SUPER PLAN FLEXIBLE INCOME PLAN Fee Booklet Date of Issue 20 January 2015 State Super Financial Services Australia Limited ABN 86 003 742 756 Australian Financial Services Licence

More information

Probability Assessment of Traffic Accident

Probability Assessment of Traffic Accident Appendix A5 Probability Assessment of Traffic Accident 1.0 Traffic Accident and Release Three credible accident scenarios were assessed in this study. They are: Scenario 1: Collision of two vehicles (Crash)

More information

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO Executive Summary The Miami-Dade County Metropolitan Planning Organization (MPO) has prepared a Truck Route System Plan for Miami-Dade County. The MPO and its consultants have worked closely with the MPO

More information

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales

Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales www.gov.uk/defra www.wales.gov.uk Consultation on integrating flood defence consents into the Environmental Permitting regime in England and Wales Annex 2; Proposed exclusions Emergencies and licensable

More information

CHAPTER 6 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 6 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA CHAPTER 6 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA Answers to Concepts Review and Critical Thinking Questions 1. Assuming conventional cash flows, a payback period less than the project s life means

More information

COST PROXY MODELS IN RURAL TELEPHONE COMPANIES

COST PROXY MODELS IN RURAL TELEPHONE COMPANIES COST PROXY MODELS IN RURAL TELEPHONE COMPANIES Prepared for the United States Telephone Association by Austin Communications Education Services, Inc. 2937 Landmark Way Palm Harbor, FL 34684-5019 USA Tel:

More information

Regional Cycling Strategy. May 2004

Regional Cycling Strategy. May 2004 Regional Cycling Strategy May 2004 they also have the largest number of cyclists. Fault rests approximately two thirds with drivers and one third with cyclists. Figure 1 illustrates

More information