1 System components and Design Lecture Note: Part 1 Solomon Seyoum

2 Chapter 7. System components and Design This chapter gives an overview of the elements that make up urban drainage and sewer system components. The main stages in the design process, design consideration and data requirements are described. Initial system layouts of urban drainage systems are also discussed. Methods and procedures are given for the hydraulic design of urban drainage systems. Finally design exercise is presented. Part of this note is mainly taken from (Butler and JW, 2011; Geiger et al., 1987; Mays, 2001) 7.1 System components Sewers Sewer pipes are available in a variety of materials, They can be made of cast and ductile iron, PVC (polyvinyl chloride), concrete, asbestos cement, HDPE (high density polyethylene), brick, and vitrified clay. Most new sewer pipe has a circular cross section; however, many older sewers, especially those made from brick, have different cross-sectional shapes. Vertical alignment Figure 7-1 illustrates how the vertical position of a sewer is defined by its invert level (IL). The invert of a pipe refers to the lowest point on the inside of the pipe. The invert level is the vertical distance of the invert above some fixed level or datum. Soffit level is the highest point on the inside of the pipe and the crown level is the highest point on the outside of the pipe. a = invert level (IL b = Soffit level c = Crown level d = Ground level D = internal diameter of pipe t = pipe wall thickness b = a+d c= b+t Figure 7-1: Level definitions associated with sewers (Buttler and Davies, 2011) Manholes Manholes are structures designed to provide access to a sewer. Access is required for testing, visual inspection of sewers, and placement and maintenance of flow or water quality monitoring instruments.

3 Manholes are usually provided at heads of runs, at locations where there is changes in direction, changes in gradient; changes in size, at major junctions with other sewers and at every 90 to 200 meter intervals depending on the size of the sewer pipes. The diameter of the manhole will depend on the size of sewer and the orientation and number of inlets Gully Inlets Gully inlets are inlets where surface water from roads and paved areas are entering the sewer system. Gullies consist of a grating and usually an underlying sump to collect heavy material in the flow. A water seal is incorporated to act as an odour trap for those gullies connected to combined sewers. Gullies are connected to the sewer by lateral pipes. Figure 7-2: Trapped road gully (Buttler and Davies, 2011) Ventilation It is important to have adequate air ventilation in all urban drainage systems, but particularly in foul and combined sewers. It is needed to ensure that aerobic conditions are maintained within the pipe, and to avoid the possibility of build-up of toxic or explosive gases. 7.2 Design Design stages A number of fundamental stages need to be followed to design a rational and cost-effective urban drainage system. The first stage is to define the contributing area (catchment area and population) and mark it on a topographical map. The map should already include contours, but other pertinent natural (e.g. rivers) and man-made (e.g. buildings, roads, services) features should also be marked up. Possible outfall or overflow points should be identified and investigations made as to the capacity of the receiving water body.

4 The next stage is to produce a preliminary horizontal alignment aiming to achieve a balance between the requirement to drain the whole contributing area and the need to minimise pipe run lengths. Least-cost designs tend to result when the pipe network broadly follows the natural drainage patterns and is branched, converging to a single major outfall. Having located the pipes horizontally, the pipe sizes and gradients can now be calculated based on estimated flows from the contributing area. Generally, sewers should follow the slope of the ground as far as possible to minimise excavation. However, gradients flatter than 1:500 should be avoided as they are difficult to construct accurately. A preliminary vertical alignment can then be produced, again bearing in mind the balance between coverage of the area and depths of pipes. The alignment can be plotted on longitudinal profiles. Pumping should be avoided, particularly on storm sewer systems, but will be needed if excavations exceed about 10m. The final stage involves revising both the horizontal and vertical alignment to minimise cost by reducing pipe lengths, sizes and depths whilst meeting the hydraulic design criteria. Longer sewer runs may be cost-effective if shorter runs would require costlier excavation and/or pumping. Various stages of urban drainage design procedure Stage 1. Data collection and analysis Identify the area(s) to be served. Collect regulatory codes and design guidelines and set system design criteria. Collect topographic map, geologic and geographic data. Add location and level of existing or proposed details such as: o Contours o physical features (e.g. rivers) o road layout o buildings o sewers and other services o outfall point (e.g. near lowest point, next to receiving water body). o Railroads, o Industry and other utilities Undertake field investigations, including feature surveys and ground truthing at sites that potentially conflict with other services. Identify the natural drainages, streets, and existing or planned wastewater inflow points at the boundaries of the area to be sewered. Locate all proposed sources of wastewater. Identify likely elevations of customer laterals. Stage 2. Preliminary horizontal layout Design the horizontal layout of the sewer, including manholes and possible pumping station locations. If necessary, prepare alternate layouts. Stage 3. Preliminary sewer sizing Divide the total area into logical subareas, as needed, and develop design flow rates for each section in the system.

5 Select pipe sizes, slopes, and inverts. Perform the hydraulic design of the system. Revise selections until the design criteria are met. Draw preliminary longitudinal profiles (vertical alignment): o ensure pipes are deep enough so all users can connect into the system o try to locate pipes parallel to the ground surface o ensure pipes arrive above outfall level o avoid pumping if possible Stage 4. Cost estimate Complete cost estimate(s) for the design and alternate designs. Carefully review all designs, along with assumptions, alternates, and costs. Stage 5. Revise design Modify the design or develop alternate designs, or even alternate layouts. This cycles the designer back to the appropriate earlier step. Complete the plan and profile construction drawings and prepare the specifications and other bid documents Initial Planning Before a new drainage sewer system is designed, an initial planning study should be carried out to address the issues of whether to provide drainage service, the type of conveyance wanted (gravity and/or pressure), and the pros and cons of different types of systems (separate, combined, vacuum, simplified systems). Some of the factors that must be analyzed when considering the construction of a wastewater collection system for example are: Population growth and housing density Suitability to on-site disposal systems Environmental impact Pollution problems in the area Accessibility to and cost of collection systems and sewage treatment Regulatory requirements Ease of construction, including the extent of rock excavation required. An onsite wastewater treatment system that is properly designed, constructed, operated, and maintained and that has a suitable effluent-receiving body may be an appropriate means of wastewater disposal, especially when a development is far from a regional system. However, wastewater collection and centralized treatment systems usually prove to be the most cost-effective solution to providing sewage services. Public health authorities generally favour collection and centralized treatment systems over on-site systems because they are much easier to inspect, monitor, and regulate. A preliminary investigation is generally conducted to determine the potential area to be served, the consequences of not serving the area, how the area will be served, and the economic feasibility of such a project. There is usually some break-even population above which a centralized sewage collection and

6 treatment system is desirable, although the exact break-even point varies widely, according to site-specific considerations Types of Conveyance Sewer systems use gravity, pressure, vacuum, or some combination of these methods to convey wastewater. In most cases, lower total life-cycle costs (construction, operation, and maintenance) favor gravity sewers over pressure or vacuum systems. In gravity systems, pumping may be required to move flows in areas of flat or uneven topography. In these systems, sewage flows by gravity into a wet well and is pumped through a force main. Low-pressure sewers differ from force mains in that the pumps are located on the property of each customer. These systems are used either where direct gravity flow is not possible or where excavation depths, extensive shallow rock, obstacles, and alignments make the smaller and shallower pressure lines more economical. The pressurized lines may discharge into a wet well or into a gravity sewer. Vacuum systems operate on the basis of differential air pressure created by a central vacuum station. Wastewater from each connection is discharged to a sump that is isolated from the main line by a valve. When the level in the sump reaches a designated limit, an actuator opens the valve and the vacuum propels the wastewater to the central vacuum station. In a good vacuum system, the maximum water-level differential in each vacuum zone is about 7.6 m. This means that vacuum systems are relegated to rather flat areas. Multiple vacuum zones may be placed in series, but operating complexity and costs increase rapidly Separate versus Combined Systems In the past, conveyance of sanitary flows and storm drainage in the same conduits (combined sewers) made economic sense. Today, with expensive mandatory treatment requirements in place, the cost of control and treatment for new systems is almost always lower if the two types of flow are conveyed and treated in completely separate sewer systems. Currently, most pollution control agencies specifically prohibit combining storm drainage and wastewaters in their regulations governing new sanitary sewer design, construction, and operation. However, it is conceivable that future treatment requirements for storm waters in urban and industrial settings may become so stringent that combined system conveyance and treatment may again be the more economical solution. The practice of integrated catchment management, which considers the combined effect on receiving waters of stormwater and treated wastewater, may result in some portion (such as the first flush) of stormwater being directed into the sanitary system.

7 7.2.5 Preliminary Design Considerations Design codes and criteria are promulgated by various public environmental and pollutioncontrol agencies. Codes give information on location and clearances relative to other utilities, flow-generation rates, peaking factors, and hydraulic guidelines. Codes may reflect the effects of local conditions, such as soil and weather, on the design of sewers. Current codes tend to make more use of such terms as recommended or guidelines, rather than required or mandatory. Some regulatory agencies have adopted a more performancebased approach to establish system regulations. Design engineers need to be well-versed in these codes. Depending on the regulatory agency evaluating the design, either the sewers must be able to carry the design flow while flowing full or at some given fraction of the full depth, or the design flow must be some percentage of the full-pipe capacity (e.g., 75 percent of capacity at design flow). The engineer must determine which is the better approach for a given case, as the two requirements can produce different pipe sizes. Minimum slopes to prevent sedimentation and minimum cover to prevent traffic impacts must also be considered. Where local codes do not exist or do not address a specific issue, widely adopted standards, should be consulted. In addition to technical design criteria and the hydraulic loads, other pertinent considerations include the following: Costs The planning, design, construction, operation, and maintenance costs should all be considered in assessing the long-term sustainability of the project. Schedule The time between the initial planning and the operation of a sewer may be as long as a decade, and the project may need to be constructed in phases. Operation and maintenance Gravity sewers are not maintenance free. They require periodic inspections and cleaning, and some components may require repair or replacement. An organization to operate the system must be in place. Environment Construction of the sewer results in both temporary disruption of and long-term effects on the environment. Short-term effects include temporary lowering of the groundwater table and release of sediments. Over its design life, the sewer system will affect the performance of the wastewater treatment facility and the water quality of the receiving water body. Regulatory compliance The sewer project must comply with all applicable laws and regulations. The design criteria should be developed in consultation with the sewer utility and the financing and regulatory agencies. Consensus on the design criteria before the start of the design is essential Data Requirements Additional physical data, beyond that necessary for hydraulic analysis, is required for the design of new sewers. The following list of data requirements has been adapted from American Society of Civil Engineers (1982):

8 Topography, surface and subsurface conditions, underground utilities and structures, subsoil conditions, water table elevations, traffic control needs, and elevations of structure basements or connection points Locations of streets, alleys, or unusual structures; required rights of way; and similar data necessary to define the physical features of a proposed sanitary sewer project, including preliminary horizontal and vertical alignment Details of existing sewers to which a proposed sewer may connect Information pertinent to possible future expansion of the proposed project Locations of historical and archeological sites, significant plant or animal communities, or other environmentally sensitive areas. The data may be obtained from a variety of sources. Maps, aerial photographs, construction drawings, and ground surveys may be queried. Typically, no single data source is complete, so one must identify inconsistencies and fill in gaps. Instrument surveys are the most accurate method of obtaining high quality spatial data. Many vertical-elevation reference and control points should be established systematically along the route Alternatives Alternate system configurations, alignments, and pipe sizes must be explored during the design of new sewers. Each alternate design should be considered until it is apparent that it is infeasible or inferior to another design. The point at which an alternative is dropped from consideration will vary. In some cases, a simple calculation will show that an alternative does not meet one or more design criteria. In other cases, an alternative design must be completed, with a detailed cost estimate, before its economic ranking is known. It may be necessary to document alternate designs dropped from consideration and the reasons for those decisions. Such decisions are made at various levels. The design engineer will typically make decisions regarding pipe sizes, invert elevations, and manhole details. However, decisions regarding alignments, stream crossings, and locations of pump stations often require input from sewer utility management and permitting authorities. Hydraulic sewer models are invaluable for managing design alternatives. Most modelling packages have capabilities that facilitate the analysis of multiple alternatives without building separate models. A final design report usually should include results of alternate designs that were considered and the justifications for rejecting them Initial System Layout Sewers are almost always laid out in a dendritic (treelike) pattern. Unlike water distribution systems, which have pressurized flow in all directions, gravity sewers normally allow flow in only one direction and are rarely looped. Some of the significant factors that affect the layout of the final wastewater collection network are political jurisdictions and boundaries, alignment of existing sewers, land topography, and geology. When new sewers are proposed for an existing development, the locations of all underground utilities should be determined before beginning the layout of the sewage collection system.

9 Generally speaking, it is most economical to plan the network and design pipes for the service and flows expected at full buildout of the drainage areas. However, the cost of such piping in areas that remain sparsely populated can be significant, and much of the loading may not be realized for many years. This results in tradeoffs between budget limitations and the desire to provide ultimate capacity. The layout of a gravity sewer system begins with a topographic map of the service area. The drainage divide lines and natural drainage paths for a new service area should be drawn on the map. Then, the locations of the sewer outlet(s) and elevations of the highest services should be identified. The highest manhole is located where it can provide a connection to a lateral from the highest service. The highest possible invert is determined either from the elevation of the basement (or lowest plumbing fixture) minus an adequate drop along the lateral, or the minimum depth that would give a lower elevation. The sewer should continue along streets or other public rights-of-way at the flattest acceptable slope, as determined by capacity needs, self-cleansing requirements, minimum depth, or service lateral depths. When localized high points in the sewer alignment are encountered, a downhill slope may be maintained by either deeper excavation or an alternate path. Crossing depressions of streams may require an inverted siphon. Ultimately, the line ends at a connection to a trunk sewer, a wastewater treatment facility, or a pumping station. Sometimes service areas include drainage divides, such that only part of the development can flow by gravity into downstream sewers. Other parts drain by gravity to a pump station that either lifts the flow to the minimum elevation necessary to continue by gravity or pushes the flow through a force main (pressure pipe) to the desired location. Manhole Location and Spacing Manholes are generally placed at every change in slope, pipe size, or alignment; where two or more incoming lines are joined; at the upstream end of lines; and at distances not greater than about 90 m for diameters less than 150 mm, about 120 m for diameters of mm, and about 150 m for diameters of 450 mm or greater. These distances are dictated by regulations and by the reach of cleaning and maintenance equipment. The following are some additional considerations related to manhole location: Street intersections are common locations for manholes A terminal manhole should be located at the upper end of a sanitary sewer to provide access for maintenance. Manholes should not be placed in a location that allows surface water to enter. Location of Pumping Facilities Pumping facilities are logically placed at low points to collect gravity flow from an area and pump it to a desired point. Pumping facilities are best placed on public land, where they are readily accessible but also as isolated as possible to minimize odour and noise complaints.

10 Aesthetic or other local considerations may require putting a pumping station some distance from the ideal location as determined from an initial hydraulic and cost-efficiency point of view. Horizontal and Vertical Alignment Once sewer system layouts and design flows have been determined, the engineer can proceed with designing the vertical sewer alignment and sizing the pipes. Pipe Slopes A minimum velocity must be maintained to prevent solids build-up during low flows and is determined by the tractive force method. Alternatively, the minimum slopes may be used. These minimum slopes vary according to pipe diameter. Usually it is recommended that flow velocities be less than 3m/s at peak flow. Higher velocities may be tolerated if proper consideration is given to the pipe material, abrasive characteristics of the wastewater, turbulence, and thrust at changes in direction. Minimum slopes for house connections are often specified in local codes. In addition to the real need for somewhat steeper slopes for self-cleansing given the small flow rates in most laterals, the steeper minimum slopes cover a multitude of shortcomings commonly encountered with laterals, such as poor slope control, alignment, bedding, placement, and backfill, leading to pipe differential settlement and joint separation. Curved Sewer Alignment Typically, sewer piping is installed in straight segments, with changes in the vertical or horizontal alignment occurring at manholes. However, in some cases, a good solution may be to use a curved sewer alignment to change direction. For example, a vertically curved alignment might be used to maintain a reasonable depth without the need for additional manholes where the ground surface makes a fairly large change in slope a short distance. A horizontal or vertical curve may be used to avoid obstructions or give future access for lateral connections or repair. Hydraulically, there is little to prohibit curved alignment as long as the minimum slope meets capacity and self-cleansing needs. The main objections to curved alignment are the extra effort and cost for field survey staking and construction, as well as the extra location information needed to avoid damage during future digging, connect laterals, or provide maintenance. When the cost savings resulting from fewer manholes and shallower construction outweighs these problems, curved sewers should be considered. Minimum Depth of Cover Sewer pipe should be placed as shallow as possible while still being located Deep enough to provide gravity service whenever feasible Below the frost line (in permafrost areas, the sewer must be insulated, perhaps even heated)

11 A reasonable distance below other utilities, especially potable water lines, unless special features are used to protect against contamination Deep enough to adequately distribute traffic and other moving surface loads without causing loading stress breaks in pipes or connections The cover depth is the distance from the soil surface to the top of the outside surface of the pipe. Minimum cover in nontrafficked areas is generally m and in trafficked areas is m, depending on the pipe type. In areas with basements needing gravity sewer service, minimum depths have traditionally been m. Modern basements are often used as living areas and may be several feet deeper than they were in the past. Sewers serving these deeper basements may need to be m deep or more. Utilities may have a specification such as top of sewer must be at least 1 m below basement floor, although requiring a service line slope of 1 to 2 percent may be a more appropriate way of specifying minimum depth. If very few buildings have significantly deeper basements, individual or local-area pumps that discharge to the street sewer might be a more economical lifecycle solution. A significant cost issue relative to minimum depth sometimes occurs in relatively flat service areas, where the required pipe slope is greater than the slope of the ground surface. As the gravity sewer proceeds downstream, it is forced deeper. An alternative approach, especially where the water table is high or shallow rock is encountered, is to raise the upstream end of the sewer and service buildings with pumps. In such cases, the cost of pumped lateral services on the upstream end should be weighed against the increased construction cost of the deeper system. A rough approximation of the costs of raising the upstream end of a sewer can be made by multiplying the difference in depth by the incremental estimated excavation and pipe placement cost, adding the incremental cost of manholes in the deeper alternative, and comparing this value with the construction and operation costs of the pressurized service line. Maximum Depth Maximum sewer depths are often set at 6 8 m. Common factors that have historically limited depth are as follows: Groundwater makes construction more expensive and hazardous, and makes highquality pipe bedding and pipe placement more difficult. Soil layers, rock layers, or other subsurface conditions make excavation very difficult, the cave-in hazard high, or pipe structural loadings too high. Trench stability is more difficult to manage with greater depth. Often extreme (costly) measures are needed for deep sewers, such as special cutoff walls and piling support walls. Maximum depth capability of excavation and other maintenance equipment available to the owner may be exceeded. A limitation on maximum depth can be viewed primarily as a cost issue, to be weighed against the cost of increased pumping or alternative horizontal alignment. Since the cost of pumping, including construction and O&M, is very high, even deep sewer placement may cost less than additional pumping stations.

12 In areas where few or no service laterals are needed, trenchless sewer construction using horizontal directional drilling or boring and jacking may prove cost effective. Trenchless construction can also be used (and is often required) for service laterals where they cross railroads, streams, or major highways. Special Installations Sewers must sometimes be installed in steep terrain or along or across streams or other obstructions. The subsections that follow describe some special installation types. Sewers in Steep Terrain If steep terrain results in velocities in excess of 4.6 m/s, the engineer should consider using more durable pipe materials such as ductile iron and an energy-dissipation manhole at the end of the steep slope. Alternatively, flatter slopes can be maintained through the use of drop manholes. With a drop manhole configuration, pipes are commonly sloped to prevent velocities in excess of approximately 3 m/s. The water drop in the manhole dissipates energy without causing extremely high velocities, which are both a hazard to workers in the manhole and abrasive to the pipes. However, drop manholes do cause turbulence, which can release hydrogen sulfide from the wastewater, resulting in odor and corrosion problems. Sewers along Streams When sewers must be routed along waterways, extra care is needed to protect the sewer from erosion and breakage. Sewers placed parallel to streams or drainage channels are typically constructed of lined ductile iron or plastic pipe. The sewer is normally still designed as an open-channel flow conduit, but an inverted siphon may be required when crossing under a waterway. If the probability of breakage and spills is deemed significant, the streambank may need to be stabilized to prevent washout of the pipe. Stabilization is preferably achieved using a method based on the stream s natural geomorphology. Elevated Crossings Sometimes the best solution to crossing an obstruction such as a canal, stream, or gully is to use an elevated, above-grade structure. In some cases, open-channel flow can be maintained. If the flow must be pressurized at the crossing (i.e., there is a sag in the pipe), then it is an inverted siphon. A true elevated sewer will have the same slope as the upstream and downstream pipes. The designer should examine the ground profile to identify the segment of pipe that is above grade. Special pipe materials and construction techniques may be required for the exposed pipe. For example, some plastic pipes may be damaged by ultraviolet light, while metal pipe may need a wrap or coating. Inverted Siphons (Depressed Sewers) An inverted siphon is a sag in a sewer used to avoid an obstruction such as a gulley, stream, canal, depressed railway, or roadway. However, this type of structure is not really a siphon, and the term depressed sewer has been suggested as more appropriate. Because the pipe(s) comprising the inverted siphon are below the hydraulic grade line, it always contains sewage, and its hydraulic behaviour is that of a pressure-flow conduit. Minimum diameters for depressed sewers are the same as for gravity sewers: 150 or 200 mm. Depressed sewers require a larger sediment carrying capacity for self-cleansing than do normal, open-channel sewers, because it is desirable to scour larger particles out of the

13 siphon to avoid build-up and clogging, and also because particles must be suspended in the turbulent flow to be successfully removed. To make them as maintenance free as possible, velocities of at least 0.9 m/s need to be achieved at a minimum of every few days. Higher velocities can be induced by placing a splitter box with different weir levels at the inlet and using two or more parallel pipes in the siphon section. All flow goes into the smaller pipe until it surcharges, then the overflow spills into the next pipe, and so on. Depressed sewers are usually constructed using lined ductile iron or plastic pressure pipe. The hydraulic design is best handled by applying the energy equation from the inflow section at the entrance to the depressed section, through the transitions (bends), to the outlet where flow enters the open-channel pipe. Head loss resulting from changes in velocity at the entrance must be accounted for Hydraulic Design Storm drainage networks physically connect stormwater inlet points such as road gullies and roof downpipes to a discharge point or outfall, by a series of continuous and unbroken pipes. Flow into the sewer results from the random input over time and space of rainfallrunoff. Generally, these flows are intermittent, of relatively long duration and are hydraulically unsteady. Separate storm sewers will stand empty for long periods of time. The extent to which the capacity is taken up during rainfall depends on the magnitude of the event and conditions in the catchment. During low rainfall, flows will be well below the available capacity, but during very high rainfall the flow may exceed the pipe capacity inducing pressure flow and even surface flooding. Design is accomplished by first choosing a suitable design storm. The physical properties of the storm contributing area must then be quantified. A number of methods of varying degrees of sophistication have been developed to estimate the runoff flows resulting from rainfall. The concepts of statistically analysed rainfall and the design storm give statistically representative rainfall that can be applied to the contributing area and converted into runoff flows. Once flows are known, suitable pipes can be designed. The choice of design storm return period therefore determines the degree of protection from stormwater flooding provided by the system. This protection should be related to the cost of any damage or disruption that might be caused by flooding. In practice, cost benefit studies are rarely conducted for ordinary urban drainage projects, a decision on design storm return period is made simply on the basis of judgement and precedent. Although we can assess and specify design rainfall return period, our greatest interest is really in the return period of flooding. It is normally assumed that the frequency of rainfall is equivalent to the frequency of runoff. However, this is not completely accurate. For example, antecedent soil moisture conditions, areal distribution of the rainfall over the catchment and movement of rain all influence the generation of stormwater runoff. These conditions are not the same for all rainfall events, so rainfall frequency cannot be identical to runoff frequency. However, comprehensive storm runoff data is less common than rainfall records, and so the assumption is usually the best reasonable approach available.

14 Urban drainage systems deal with both wastewater and stormwater. Most stormwater is the result of rainfall. Other forms of precipitation snow for example are contributors too, but rainfall is by far the most significant in most places. Methods of representing and predicting rainfall are therefore crucial in the design, analysis and operation of drainage systems. Rainfall Analysis Rain data measured at an individual rain gauge is most commonly expressed either as depth in mm or intensity in mm/h. This type of point rainfall data is therefore representative of one particular location on the catchment. Such data is of greater value if it can be related statistically to two other important rainfall variables: duration and frequency (or probability). The rainfall duration refers to the time period D minutes over which the rainfall falls. However, duration is not necessarily the time period for the whole storm, as any event can be subdivided and analysed for a range of durations. It is common to represent the frequency or probability of the rainfall as a return period. An annual maximum rainfall event has a return period of T years if it is equalled or exceeded in magnitude once, on average, every T years. Thus a rainfall event that occurs on average twenty times in 100 years has a probability of being equalled or exceeded of 0.2, and a return period of 5 years. Annual maximum storm events are normally used to determine return period because it is assumed that the largest event in one year is statistically independent of the largest event in any other year. IDF relationships Definition A convenient form of rainfall information is the intensity-duration-frequency (IDF) relationship. For an event with a particular return period, rainfall intensity and duration are inversely related. As the duration increases, the intensity reduces. This confirms the common-sense observation that heavy storms only last a short time, but drizzle can go on for long periods. Also, frequency and intensity are related, as rarer events (greater return periods) tend to have higher intensities (for a given duration). Derivation When local rainfall data are available, IDF curves can be developed using frequency analysis Steps for IDF analysis are: 1. The IDF analysis starts by gathering time series records of different duration. ( eg. 5, 10, 15, 20, 30, 60, 90, and 120 min). 2. After time series data is gathered, annual extremes are extracted from the record of each duration. 3. The annual extreme data is then fit to a probability distribution in order to estimate rainfall quantities. X K where T T

15 X T represents the magnitude of the T-year event, µ and σ are the mean and standard deviation of the annual maximum series and K T is frequency factor depending on the return period T. Note that the frequency factor is distribution-specific. For example K for Gumbel s extreme value distribution is T given by K T 6 T ln ln T 1 Calculate the average intensities Construct the IDF curves. Methods of plotting positions can also be used to determine the design storm depths. Most of these methods are empirical. Rainfall depths monitored during individual storms are abstracted from recording gauges and the annual maximum values ranked from 1 to n (the number of years of record) in decreasing order of magnitude. The exceedence probability (relevant return period in years) of the m th largest value, X m, for large n, is then estimated using, for example, Weibull s plotting position formula: T = P(X + 1 x m) = n m The exceedence probability for other distributions is given in the following table. Table 7-1: Plotting position formula

16 Exercise: Develop an IDF relationship for the rainfall data given in Table 2. Table 2 Rainfall amounts and durations Durations Rainfall Amounts (mm) Year 5min 10min 15min 30min 1hr 2hr 6hr 12hr 24hr Runoff computation The hydraulic sizing of drainage and conveyance structures in urban settings always requires estimation of peak flow rates. The peak discharge is a primary design variable for the design of stormwater runoff facilities such as pipe systems, storm inlets and culverts, and small open channels. It is also used for some hydrologic planning such as small detention facilities in urban areas. There have been many different approaches for determining the peak runoff from an area. As a result many different models (equations) for peak discharge estimation have been developed. Ideally, flood record for a long period of time (30 years or more) is required to estimate peak discharge needed for design work. If such data were always available, then a frequency analysis of the flood record could be used to characterize the flood potential at the site of the design work. More often than not, flood records are rarely available where peak discharge estimates are needed for design work. Therefore, it is necessary to use either a prediction method that was developed from flood frequency analyses of gaged data in the region or an uncalibrated prediction equation that was designed for use at ungaged sites. Rational method

17 Historically, Rational method has been the tool of choice for most practicing engineers around the world. Although the method definitely has its place in hydrologic design, it is routinely misapplied and overextended. The concept is attractive and easy to understand. If rainfall occurs over a basin at a constant intensity for a period of time that is sufficient to produce steady state runoff at the outlet or design point, then the peak outflow rate will be proportional to the product of rainfall intensity and basin area. Mathematically, the rational method relates the peak discharge (q, m3/sec) to the drainage area (A, ha), the rainfall intensity (i, mm/hr), and the runoff coefficient (C). In SI units the rational formula is given as; q = CiA/360 where q = design peak runoff rate in m 3 /s C = the runoff coefficient i = rainfall intensity in mm/h for the design return period and for a duration equal to the time of concentration of the catchment. Assumption of the rational method The rate of runoff resulting from any constant rainfall intensity is maximum when the duration of rainfall equals the time of concentration. That is, if the rainfall intensity is constant, the entire drainage area contributes to the peak discharge when the time of concentration has elapsed. The frequency of peak discharge is the same as the frequency of the rainfall intensity for the given time of concentration. The rainfall intensity is uniformly distributed over the entire drainage area. The fraction (C) of rainfall that becomes runoff is independent of rainfall intensity or volume. Limitation of the rational method For large drainage areas, the time of concentration can be so large that the assumption of constant rainfall intensities for such long periods is not valid, and shorter more intense rainfalls can produce larger peak flows. Additionally, rainfall intensities usually vary during a storm. In semi-arid and arid regions, storm cells are relatively small with extreme intensity variations. Frequencies of peak discharges depend on rainfall frequencies, antecedent moisture conditions in the catchment and the response characteristics of the drainage system. For small, mostly impervious areas, rainfall frequency is the dominant factor. For larger drainage basins, the response characteristics are the primary influence on frequency. For drainage areas with few impervious surfaces (less urban development), antecedent moisture conditions usually govern, especially for rainfall events with a return period of 10 years or less.

18 In reality, rainfall intensity varies spatially and temporally during a storm. For small areas, the assumption of uniform distribution is reasonable. However, as the drainage area increases, it becomes more likely that the rainfall intensity will vary significantly both in space and time. The constant runoff coefficient assumption is reasonable for impervious areas, such as streets, rooftops, and parking lots. For pervious areas, the fraction of runoff varies with rainfall intensity, accumulated volume of rainfall, and antecedent moisture conditions. Thus, the art necessary for application of the Rational Method involves the selection of a coefficient that is appropriate for storm, soil, and land use. By limiting the application of the Rational Method to 80 hectares, these assumptions are more likely to be reasonable. Modern drainage practice often includes detention of urban storm runoff to reduce the peak rate of runoff downstream and to provide storm water quality improvement. The Rational Method severely limits the evaluation of design alternatives available in urban and, in some instances, rural drainage design because of its inability to accommodate the presence of storage in the drainage area. Application of the rational method Taking in to account the various assumptions and limitations in the application of the rational method, the method is applicable in estimating storm water runoff peak flows for the design of hydraulic designs on very small catchments, design of gutter flows, drainage inlets, storm drain pipes, culverts and small ditches. It is most applicable to small, highly impervious areas. It is worthy of nothing that the method is applied to small areas to guarantee homogeneity and should not be used for calculating peak flows downstream of major hydraulic structures like bridges, culverts and storm sewers that may act as a restrictions and impact the rate of discharge Description of the Rational Method input variables Runoff Coefficient C It is a dimensionless ratio intended to indicate the amount of runoff generated by a catchment given an average intensity of precipitation for a storm. This variable represents the ratio of runoff to rainfall. It is the most difficult input variable to estimate. It represents the interaction of many complex factors, including the storage of water in surface depressions, infiltration, antecedent moisture, ground cover, ground slopes, and soil types. In reality, the coefficient may vary with respect to prior wetting and seasonal conditions. The use of average values has been adopted to simplify the determination of this coefficient. Where a drainage area is composed of subareas with different runoff coefficients, a composite coefficient for the total drainage area is computed by dividing the summation of the products of the subareas and their coefficients by the total area. Table 3 Runoff Coefficients for Urban Areas (from Storm Water Systems design handbook) Type of drainage area Runoff coefficient Business: Downtown areas

19 Neighborhood areas Residential: Single-family areas Multi-units, detached Multi-units, attached Suburban Apartment dwelling areas Industrial: Light areas Heavy areas Parks, cemeteries Playgrounds Railroad yard areas Unimproved areas Lawns: Sandy soil, flat, 2% Sandy soil, average, 2 7% Sandy soil, steep, 7% Heavy soil, flat, 2% Heavy soil, average, 2 7% Heavy soil, steep, 7% Streets: Asphaltic Concrete Brick Drives and walks Roofs: Rainfall Intensity - i is a function of geographic location, design exceedence frequency (return interval), and storm duration. Rainfall intensity at a duration equal to the time of concentration (TC) is used to calculate the peak flow in the Rational Method. The rainfall intensity can be selected from the appropriate intensity-duration- frequency (IDF) curves. Area A is defined as the drainage surface area in hectares, measured in a horizontal plane. The area is usually measured from plans or maps using a planimeter. The area includes all land enclosed by the surrounding drainage divides. In highway drainage design, this area will frequently include upland properties beyond the highway right-of-way. Time of Concentration - T c - is defined as the time it takes for runoff to travel from the most hydraulically distant point in the catchment to the outlet. Most drainage paths consist of overland flow segments as well as channel flow segments. Urban drainage basins often will have one or more pipe flow segments. The travel time is computed for each flow segment and the time of concentration is equal to the sum of the individual travel times. Usually, T c is taken as the sum of the overland flow time, t o (or the "time to entry" or the "inlet time"), and the time of travel, t d, in sewers or the main channel. t d can be estimated using the flow formulae. For small fully-sewered areas, some drainage authorities specify t o

20 as a constant typically ranging from 5 to 15 minutes. In more complex situations, it is recommended to use the kinematic wave formula in the following form (Geiger et al., 1987): t0 = 6.9L n i s where t o is in minutes, L is the travelled length (m), n is the Manning's roughness coefficient, i is the rain fall intensity (mm/hr), and S is the slope (m/m). As the calculations progress downstream, the times of concentration at any inlet point must be estimated along all the possible flow paths and the longest time is generally retained in the calculations. The longest time is not necessarily obtained for the longest flow path. For example, at inlet point number 7 in the figure below, the various flow times to that point are as follows: t + t + t + t t02 + td2,3 + td3,7 t + t + t + t t04 + td4,3 + td3,7 t06 + td 6,7 t 01 d1,2 d2,3 d3,7 05 d5,4 d4,3 d3,7 07 Figure 7-3: Simple Catchment with 7 sub-catchments with 6 inlets Modified Rational Method: In some cases the Rational Method is modified to account for reduction of infiltration and other loses during high intensity storms. q = C f* CiA/360

21 Less frequent, higher intensity storms require adjusted runoff coefficients because infiltration and other losses have a proportionally smaller effect on runoff. The runoff coefficient are usual applicable for 10 year or less recurrence intervals. Runoff coefficient adjustment factor C f for storms of different recurrence intervals are listed below. Table 4 Runoff Coefficient Adjustment Factors Recurrence interval (years) Runoff coefficient adjustment factor C f 10 or less Hydrograph methods One of the major weaknesses of the Rational Method is that it only produces worst-case design flow and not a hydrograph of flow against time. Hydrograph methods have been developed to overcome this limitation. When catchments are large, that is, when they are comprised of two or more smaller catchments whose streamflow at the confluence with common collector channel can be expected to be displaced in time, where storage influences the time distribution of flow in a stream, or where storage is a part of the design problem, peak flow methods are inappropriate for hydrologic design. In these instances, it is necessary to estimate the entire flow hydrograph. Time area Method Area is treated as a constant in the Rational Method. In reality, the contributing area is not constant. For example, during the beginning of rainfall the area builds up with time, closest surfaces contributing first, more distant ones later. The Time area Method uses the time area diagram to produce not only a peak design flow, but also a flow hydrograph. The method also allows straightforward use of time-varying rainfall the design storm. The Time area Method utilizes a common, basic approach in determining the hydrograph at the outlet. The cumulative time-area curve is formed by summing the incremental areas and the corresponding travel times. Thus, the total time can be thought of as the time of concentration of the catchment under consideration. The diagram is used for storm sewer design by assuming that the time area plot for each individual pipe sub-catchment is linear. However, the design of each pipe is not concerned just with the local sub-catchment but also with the concentrating flows from upstream pipes. The combined time area diagram for each pipe can be produced using the principle

22 of linear superposition. For example, at point 2 of the catchment shown in Figure 7.3, the time-area diagram is shown below. Figure 7-4: Time-area diagram is shown below at point 2 of the catchment shown in Figure 7.3 The time of concentration of sub-catchment 2 is t c2, and this is plotted directly onto the time area plot. Time of concentration of subcatchment 1 is the inlet time t o1 plus the travel time in pipe 1,2 t d1,2, relative to the inlet at point 2. The time-area diagram for subcatchment 1 however, is not directly overlaid on the previous one, but is lagged by the time of flow in pipe 1,2 t d1,2. The ordinates of the two separate diagrams are added to produce the complete diagram. The resulting time area diagram is made up of linear segments but, as more individual pipes are added, the shape tends to become non-linear. Unit Hydrographs The unit hydrograph is defined as the out-flow hydrograph resulting from a unit depth of effective rain falling uniformly over a catchment at a constant rate for a unit duration D: the D-h unit hydrograph is shown in Figure 7-5. The ordinates of the D-h unit hydrograph are given as u(d,t), at any time t. D is typically 1h for natural catchments but could, in principle, be any time period.

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006 The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

2011 HYDRAULICS MANUAL

2011 HYDRAULICS MANUAL STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following

More information

Stormwater Drainage Design for Parking Lots

Stormwater Drainage Design for Parking Lots PDHonline Course C201 (4 PDH) Stormwater Drainage Design for Parking Lots 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org www.pdhcenter.com

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water 1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used: Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section: . Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing.

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing. Chapter 6 Storm Drains 6-1 Introduction A storm drain (storm sewer) is a network of pipes that conveys surface drainage from a surface inlet or through a manhole, to an outfall. Storm drains are defined

More information

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented

More information

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by: Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage

More information

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal

1. Carry water under the canal 2. Carry water over the canal 3. Carry water into the canal Lecture 21 Culvert Design & Analysis Much of the following is based on the USBR publication: Design of Small Canal Structures (1978) I. Cross-Drainage Structures Cross-drainage is required when a canal

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

PART 5 : WASTEWATER DRAINAGE

PART 5 : WASTEWATER DRAINAGE Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction

More information

City of West Linn Public Works Design Standards 2010. Table of Contents

City of West Linn Public Works Design Standards 2010. Table of Contents City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

OAR52 A-1 (September, 1981)

OAR52 A-1 (September, 1981) APPENDIX A SEWER PIPELINES (1) MINIMUM REQUIREMENTS FOR SEWER - PIPELINES (a) Capacity: Sewers shall be of such diameter as to pass without overflow, bypass, or back flow onto damageable property of a

More information

4.3 Cisterns and Rain Barrels

4.3 Cisterns and Rain Barrels 4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Property Care White Papers. Site Drainage: Monitor and Maintain

Property Care White Papers. Site Drainage: Monitor and Maintain Monitor and Maintain Site Drainage Good site drainage is an important part of keeping water issues from affecting the building. The upkeep of existing systems should be an important part of any maintenance

More information

CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS

CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS TABLE OF CONTENTS CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS 6.00 Objective Page 1 6.01 Additional Referenced Standards Page 2 6.02 Special Design Problems Page 2 6.03

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Appendix 4-C. Open Channel Theory

Appendix 4-C. Open Channel Theory 4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

Storm Drainage Design and Technical Criteria Manual. City of Brookings, SD

Storm Drainage Design and Technical Criteria Manual. City of Brookings, SD Storm Drainage Design and Technical Criteria Manual City of Brookings, SD May, 2006 City of Brookings Storm Drainage Manual Ecological Resource Consultants, Inc. Storm Drainage Design and Technical Criteria

More information

Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow

Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

Storm Drainage Systems 11.9-1

Storm Drainage Systems 11.9-1 Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of

More information

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures. BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

SECTION 5 - STORM DRAINS

SECTION 5 - STORM DRAINS Drainage Criteria Manual SECTION 5 - STORM DRAINS 5.1.0 GENERAL This The purpose of this section discusses briefly is to consider the hydraulic aspects of storm drains and their appurtenances in a storm

More information

Architectural Processing and Inspections for Home Mortgage Insurance

Architectural Processing and Inspections for Home Mortgage Insurance Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect

More information

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS TDOT DESIGN DIVISION DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS August 1, 2012 CHAPTER 7 STORM DRAINAGE SYSTEMS SECTION 7.01 INTRODUCTION 7.01 INTRODUCTION...7-1 SECTION 7.02 DOCUMENTATION PROCEDURES

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References

Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References Introduction General This Technical Booklet has been prepared by the Department of the Environment for Northern Ireland and provides for certain methods and standards of building which, if followed, will

More information

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is ~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions

More information

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII)

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) ARTICLE II STORM DRAINAGE (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) SECTION 2.1 Standard Provisions Standard Provisions All construction for storm drainage in the development

More information

BASEMENT FLOODING. Prevention Guide for. Homeowners

BASEMENT FLOODING. Prevention Guide for. Homeowners BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result

More information

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT 2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 003 SANITARY SEWER COLLECTION SYSTEM SECTION 3.1 INTRODUCTION... 1 (a) Objectives...1 (b) Applicability...1 (c) Drafting

More information

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE This page is intentionally left blank Contents 1 Introduction 1 11 Background 1 12 Requirements for Managing Peak Runoff at Source 1 13 On-site

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

Chapter 13 - Storm Drainage Systems Publication 584 2010 Edition CHAPTER 13 STORM DRAINAGE SYSTEMS

Chapter 13 - Storm Drainage Systems Publication 584 2010 Edition CHAPTER 13 STORM DRAINAGE SYSTEMS CHAPTER 13 STORM DRAINAGE SYSTEMS 13.0 OVERVIEW A. Introduction. This chapter provides guidance on storm drain design and analysis. The quality of a final inplace system depends upon careful attention

More information

See Appendix A for additional information, or contact ASTM directly.

See Appendix A for additional information, or contact ASTM directly. DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

BMP #: Dry Wells / French Drains

BMP #: Dry Wells / French Drains Structural BMP Criteria BMP #: Dry Wells / French Drains A Dry Well, or French Drain, is a variation on an Infiltration Trench that is designed to temporarily stores and infiltrate rooftop runoff. Key

More information

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE 31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that

More information

CHAPTER 7 STORM WATER DESIGN

CHAPTER 7 STORM WATER DESIGN CITY OF BOULDER DESIGN AND CONSTRUCTION STANDARDS CHAPTER 7 STORM WATER DESIGN TABLE OF CONTENTS Section Page 7.01 GENERAL...4 (A) INTENT... 4 (B) STORM WATER AND GREENWAYS MASTER PLANS... 4 (C) REFERENCE

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Downspout to storm sewer. Leaky laterals

Downspout to storm sewer. Leaky laterals Flooded street Surface water through MH top Blocked street catch basin Cracked MH or sewer Property line Downspout to storm sewer BREATHERS Leaky laterals Weeping Tile to sanitary or storm sewer BASEMENT

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING SEWER BACKUPS AND FLOODING Sewer backups and flooding can damage District homes and businesses. Sewer blockages are most commonly found

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

Protect Your Home From Flooding. A guide for Lethbridge Residents

Protect Your Home From Flooding. A guide for Lethbridge Residents Protect Your Home From Flooding A guide for Lethbridge Residents Every year, millions of litres of water flow into the City of Lethbridge s stormwater and wastewater collection systems from residential

More information

Homeowner s Guide to Drainage

Homeowner s Guide to Drainage Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

SECTION 7 UNDERDRAIN SERVICE

SECTION 7 UNDERDRAIN SERVICE SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Appendix F Benefit-Cost Analysis of Flood Protection Measures Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

MARSHALL COUNTY STORM DRAINAGE AND SEDIMENT CONTROL ORDINANCE. ralphb [Pick the date]

MARSHALL COUNTY STORM DRAINAGE AND SEDIMENT CONTROL ORDINANCE. ralphb [Pick the date] MARSHALL COUNTY STORM DRAINAGE AND SEDIMENT CONTROL ORDINANCE ralphb [Pick the date] MARSHALL COUNTY, INDIANA STORM DRAINAGE AND SEDIMENT CONTROL ORDINANCE An Ordinance applicable to the County Commissioner

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information