1 Training Workshop on Business Process Analysis in International Trade Module 1: Preliminary stage. Preparation for the BPA Organization and Management of the BPA Somnuk Keretho, PhD Director, Institute of IT Innovation Kasetsart University, Bangkok Joint Workshop on Trade Facilitation and the Single Window September 2015, Moscow

2 Objectives of this session To understand the basic concept about what is a project? and how to manage a project? e.g. basic project management To understand the overall 3 main phases on how to conduct a BPA project. To understand basic roles & responsibilities of those who should involve in the BPA project. 2

3 What is a Project? Definition of a Project (* ISO/DIS 21500:2011 Standard) A project is a unique set of processes consisting of coordinated and controlled activities with start and finish dates, undertaken to achieve an objective. Achievement of the project objective requires deliverables conforming to specific requirements, including multiple constrains such as time, cost and resources. 3

4 What do we need to manage in a project? [Basic Project Management] Time Cost Tasks Resources Requirements Start Date Team & Stakeholders Collaboration Finish Date Deliverables Managing Risks & Issues 4

5 Project Management in general: 4 phases 1. Preliminary (Initiation) 2. Planning (Detailed Design) 3. Implementation 4. Closing 5

6 Project Management Example: Electronic Single Window for Swiss Border Control* BPA is conducted here. BPA is needed here. BPA is needed here. BPA is needed here. BPA is needed here. * EA PM Course in Cybernetic Approach to Project Management Bangkok Prof. Dr. Bogdan Lent (2015) 6

7 What is a BPA Project? A Business Process Analysis (BPA) is a project to understand, then capture and analyze business processes and their attributes such that improvement recommendations can be provided. Procedures and Documents required Who involved Some quantitative indicators Related Rules and Regulations BPA is an important and necessary analysis normally conducted before and during Single Window initiation, planning/design & implementation. 7

8 Why conducting a BPA Project? (Benefits of BPA) 8

9 Three (3) main phases to conduct a BPA Project 1. Defining Scope of and Planning a BPA Project 2. Capturing and Modelling the As-Is Process 3. Analyzing Findings of the BPA and Proposing Recommendations for Improvement (Proposing the To-Be Process) Ref: Business Process Analysis Guide to Simplify Trade Procedures, Updated 2012, UNESCAP/UNECE. 9

10 3 Phases (6 steps) & Deliverables of a BPA Project Phase I Phase II Phase III Step Step 1: Define project scope Step 2: Develop a detailed plan and secure resources Step 3: Acquire background information Step4: Conduct interview and document captured data Step 5: Analyze the as-is processes and identify bottlenecks Step 6: Develop and propose recommendations Deliverable Use case diagram illustrating business domain, process areas, process participants, and key business processes Detailed project plan including an estimation of human resources required, schedules, and software supported tools A list of potential interviewees and their contact information A folder of background information about the business processes under the investigation A list of guiding questions for the interview A set of activity diagrams illustrating activities that come in a specific order and decision points, actors who perform those activities, defined inputs and outputs of each activity, criteria for entering and exiting the business process, relationships among actors, and information flow A set of business process descriptions that describes activity diagram and lists all related rules and regulations Activity diagram illustrating integrated processes in the business domain Time-Procedure chart displaying time required to complete each business process A set of observations of the as-is business processes that have the potential for improvement Final report with recommendations which may include diagrams of to-be business processes 10

11 Several roles & responsibilities are needed for conducting a BPA project plan. BPA core team Stakeholders Project Sponsor (PS): an authorized person(s)/organizations (who has the authority) who can grant the necessary resources and takes the ownership of the deliverables of the BPA project, e.g. by escalating it for actual implementation. Project Manager (PM): A person who is assigned to manage the BPA project, e.g. planning, staffing and controlling this BPA project. Process Analysts (PA): A person(s) who collects data related to the processes, documents/models those processes, identify bottlenecks, and propose improvement recommendations. Domain Experts (DE) - Stakeholder Organizations: Those who are knowledgeable about some specific processes, documentation requirements, practices and laws/regulations related to the scope of the BPA project providing information, verify and validate the findings as captured and proposed by PA. 11

12 Activities for Planning a BPA Project Project Manager/ Project Leader Use Case Diagram Identify tasks and their sequence Process Analysts Project Sponsor Project Manager/ Project Leader 1.2) Develop a detailed plan and secure resources Project Sponsor Estimate efforts Develop project schedule Process Analysts Objective To develop a detailed work plan that helps guide and manage the implementation of a BPA project (WBS Work Breakdown Structure Approach for planning by breaking the works down into several tasks, and several work products (deliverables). Assign process analysts Derive the detailed plan Project Detailed Plan Unacceptable Review and provide feedback Acceptable Unacceptable Review and provide feedback Approve Acceptable 12

13 Project Project An example: a BPA Project Plan Start Date End Date Month 1 Month 2 Month 3 Month 4 WBS 1 Refine the scope of the project - Develop the detailed plan Several iterations of verification & validation (refinement) WBS 2 Collect information - Capture & Document the process WBS 3 Analyze and identify bottlenecks - Provide recommendation for improvement WBS 4 Wrap-up & submit the final report WBS 5 Administrative/Project Tracking Work-Monthly progress report 13

14 Identifying BPA Project Tasks Develop a work breakdown structure for a BPA project A work breakdown structure is an output-oriented description of project tasks. It typically starts with outputs. The work components of outputs are then broken down into tasks necessary to achieve them. Ref: Business Process Analysis Guide to Simplify Trade Procedures, Updated 2012, UNESCAP/UNECE. 14

15 Identifying BPA Project Tasks Use the Business Process Analysis Guide to Capture and Simplify Trade Procedures, as an input for identifying BPA tasks for each output Activity and Activity for the modeling of activity diagrams describing core business processes represented by use cases in the use case diagram Activity for the development of process description for all activity diagrams Activity for the development of an integrated activity diagram Activity for the development of timeprocedure chart Activity for the consolidation and submission of output no. 1 4 to project sponsor for perusal Activity for the identification of bottlenecks Activity for the development of recommendations and/or new business processes 15

16 Small activities may be grouped into one prior to the estimation of efforts for a BPA project. The number of key business processes and stakeholders involved in each business process must be taken into account when estimate time required for elaborating them into activity diagrams. 16

17 Use Case Diagram as an Input for Estimating Time Required to Complete Tasks to Product Output 1 and 2 Source: Case Study Thailand s Export of Frozen Shrimp 17

18 Estimating Efforts for a BPA Project Task Estimate = (PERT*) Optimistic Time + (4 * Most Likely Time) + Pessimistic Time 6 Task/Activity (Shrimp Case) Predecessor Optimistic Time (day) Most-Likely Time (day) Pessimistic Time (day) Estimated Time (day) A None A A A 4.3 A A 4.4 A , A A 4.5 A A 4.6 A A 4.7 A A 4.8 A A 4.9 A A 4.10 A A 4.11 A A 4.12 A A 4.13 A 4.11, A A 4.14 A 4.11, A A 4.15 A 4.7, A 4.10, A A 4.16 A * Project Evaluation and Review Technique 18

19 Developing Project Schedule Task/Activity (Shrimp Case) Predecessor Estimated Time (day) Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F A None 7.83 A A A 4.3 A A 4.4 A , A A 4.5 A A 4.6 A A 4.7 A A 4.8 A A 4.9 A A 4.10 A A 4.11 A A 4.12 A A 4.13 A 4.11, A A 4.14 A 4.11, A A 4.15 A 4.7, A 4.10, A A 4.16 A

20 Managing risks Identifying risks that could make some delay or some damages to the project (anything affecting badly on quality, time, and cost of the project). Analyzing the possible likelihood of occurrence (1-5) and its negative impact (1-10) for each risk (if that risk occurs). Mitigating those risks with the high value of likelihood multiplying with its impacts (say, more than 20) --> mitigation actions and plans for those risks should be developed. 20

21 Skills needed for Process Analysts Technology skills: The basic knowledge of UML notations, especially in use case diagrams and activity diagrams is desirable. Related work experience is complementary. Business/ organization skills: It is important that the selected process analysts know or have an access to the individuals of the business domain under investigation. It is also very useful if they have knowledge of a particular organization or industry associated with the targeted business domain. Interpersonal/ communication skills: Process analysts ability to effectively communicate and interact with other project members is mostly crucial to project success. They should have the ability to create and sustain reasonably good relationships with project stakeholders and especially Process Participants/Business Domain Experts. Analytical skills: Process analysts should be able to capture relevant information from verbal expression and written documents, and then formalize them in various types of BPA output. 21

22 Practical Exercise 1 Preparation for the BPA Project Breaking out into small groups by countries, and in each group please perform the following tasks: [Suppose that each group is an initial core team to initiate and will actively involve in conducting a BPA project, as part of the Single Window initiative for international trade improvement in the country) 1. Discuss and propose the stakeholders/institutions who should be the authorized sponsor to officially create/endorse the BPA project, and take the ownership of the deliverables/outputs of the BPA project to escalate/push them further for actual implementation/realization. 2. Discuss and propose names/candidates of the BPA core team: Project Sponsor (SM): Project Manager (PM): Process Analysis (PA): 3. Identify organizations both governments and business entities which should involve as the stakeholders (and provide/identify domain experts) 4. Identify main stages (phases/steps) for implementing the BPA project. 5. Discuss role of each participant on each stage of the project. 6. (if time permitted) Identify one significant risk in this project and how to mitigate its impact and/or its likelihood of occurrence. 22

2.1. Introduction to UML: Use-Case Diagram

2.1. Introduction to UML: Use-Case Diagram Training Workshop on Business Process Analysis in International Trade Module 2: Analysis and description of existing business processes related to foreign trade activities 2.1. Introduction to UML: Use-Case

More information

Business Process Analysis for Business Process Simplification and Automation

Business Process Analysis for Business Process Simplification and Automation The United Nations Network of Experts for Paperless Trade Business Process Analysis for Business Process Simplification and Automation Workshop on Launch of the Implementation Master Plan for Mongolia

More information

Single Window. Somnuk Keretho, PhD Director, Institute for IT Innovation. Kasetsart University, Bangkok sk@ku-inova.org

Single Window. Somnuk Keretho, PhD Director, Institute for IT Innovation. Kasetsart University, Bangkok sk@ku-inova.org Single Window Collaborative Project Management Somnuk Keretho, PhD Director, Institute for IT Innovation. Kasetsart University, Bangkok sk@ku-inova.org Planning aspects of Single Window development in

More information

Project Time Management

Project Time Management Project Time Management Plan Schedule Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

National Trade and Transport Facilitation Monitoring Mechanism (TTFMM)

National Trade and Transport Facilitation Monitoring Mechanism (TTFMM) National Trade and Transport Facilitation Monitoring Mechanism (TTFMM) Dr. Somnuk Keretho Director Institute for IT Innovation Kasetsart University, Thailand Supported by Dr Tengfei Wang Economic Affairs

More information

The 10 Knowledge Areas & ITTOs

The 10 Knowledge Areas & ITTOs This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading

More information

The Plan s Journey From Scope to WBS to Schedule

The Plan s Journey From Scope to WBS to Schedule The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)

More information

The Project Planning Process Group

The Project Planning Process Group 3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity

More information

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>. Guide to Preparing the SOFTWARE PROJECT MANAGEMENT PLAN R. Buckley CSc 190 Senior Project Department of Computer Science - College of Engineering and Computer Science California State University, Sacramento

More information

TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain *

TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain * TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT Hazar Hamad Hussain * 1. Introduction The definition of Project as a temporary endeavor... refers that project has to be done within a limited

More information

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type

More information

Systems Analysis and Design

Systems Analysis and Design Systems Analysis and Design Slides adapted from Jeffrey A. Hoffer, University of Dayton Joey F. George, Florida State University Joseph S. Valacich, Washington State University Modern Systems Analysis

More information

Introduction to the ITS Project Management Methodology

Introduction to the ITS Project Management Methodology Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer

More information

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise

More information

Project Planning and Scheduling

Project Planning and Scheduling Project Planning and Scheduling MFS606 Project Planning Preliminary Coordination Detailed Task Description Objectives Budgeting Scheduling Project Status Monitoring When, What, Who Project Termination

More information

Network Calculations

Network Calculations Network Calculations The concepts and graphical techniques described in this week s readings form the basis of the tools widely used today to manage large projects. There is no way of simplifying the tasks

More information

Chapter 6. (PMBOK Guide)

Chapter 6. (PMBOK Guide) Chapter 6 Project Time Management (PMBOK Guide) Mohammad A. Rajabi Dept. of Geomatics Eng., University it of Th Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823 Email: marajabi@ut.ac.irac ir Homepage:

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

1.20 Appendix A Generic Risk Management Process and Tasks

1.20 Appendix A Generic Risk Management Process and Tasks 1.20 Appendix A Generic Risk Management Process and Tasks The Project Manager shall undertake the following generic tasks during each stage of Project Development: A. Define the project context B. Identify

More information

The 9 Things in the PMBOK

The 9 Things in the PMBOK The 9 Things in the PMBOK 9/15/2011 The PMBOK Project Body of Knowledge sum of knowledge within the profession of project management used dto document and standardize di generally accepted project management

More information

Practical Project Management For Administrative Professionals

Practical Project Management For Administrative Professionals Practical Project Management For Administrative Professionals Presented By: Rhonda Scharf, CSP Certified Speaking Professional ON THE RIGHT TRACK 1 PROJECT MANAGEMENT FOR ADMINISTRATIVE PROFESSIONALS What

More information

Systems Analysis and Design in a Changing World, Fifth Edition

Systems Analysis and Design in a Changing World, Fifth Edition Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and

More information

Chapter 3 Managing the Information Systems (IS) Project

Chapter 3 Managing the Information Systems (IS) Project Content Chapter 3 Managing the Information Systems (IS) Project Process of managing IS projects Skills required to be an effective project manager Skills and activities of a project manager during project

More information

PMP Examination Tasks Puzzle game

PMP Examination Tasks Puzzle game PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in

More information

APPLYING PROJECT MANAGEMENT TECHNIQUES TO QEHS

APPLYING PROJECT MANAGEMENT TECHNIQUES TO QEHS APPLYING PROJECT MANAGEMENT TECHNIQUES TO QEHS Mary F. McDonald, CQA President/Principal Consultant Individual Solution Options/Quality Services (ISO/QS), Inc. Austin, TX 78739 Tel: (512) 282-0181 E-mail:

More information

CDC UNIFIED PROCESS PRACTICES GUIDE

CDC UNIFIED PROCESS PRACTICES GUIDE Purpose The purpose of this document is to provide guidance on the practice called Project Close-Out and to describe the practice overview, requirements, best practices, activities, and key terms related

More information

Project Management Planning

Project Management Planning Develop Project Tasks One of the most important parts of a project planning process is the definition of activities that will be undertaken as part of the project. Activity sequencing involves dividing

More information

Certification Preparation Course LATVIKON (R.E.P.)Centre

Certification Preparation Course LATVIKON (R.E.P.)Centre PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional

More information

Software Project Management

Software Project Management Software Project Management Project: unique process, consisting of a set of coordinated and controlled activities with start and finish dates, undertaken to achieve an objective conforming to specific

More information

Chapter01. Introduction to Software Project Management

Chapter01. Introduction to Software Project Management Chapter01. Introduction to Software Project Management A project = collaborative set of actions that is carefully planned to meet certain objectives, mission or a goal. Every state of a project is indicated

More information

SCOPE MANAGEMENT PLAN <PROJECT NAME>

SCOPE MANAGEMENT PLAN <PROJECT NAME> SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information

ICT Project Management

ICT Project Management THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE MANAGEMENT ICT Project Management A Step-by-step Guidebook for Managing ICT Projects and Risks Version 1.0 Date Release 04 Jan 2010 Contact

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Lecture 8. Systems engineering L E C T U R E. SIMILAR process. Zuzana Bělinová. Faculty of Transportation Sciences, CTU in Prague

Lecture 8. Systems engineering L E C T U R E. SIMILAR process. Zuzana Bělinová. Faculty of Transportation Sciences, CTU in Prague L E C T U R E 8 SIMILAR process LECTURE 8 - OVERVIEW Theoretical foundations of many methodologies - Typical SE process SYSTEMS ENGINEERING BASIC FACTS Systems Engineering is responsible for creating a

More information

Partnering for Project Success: Project Manager and Business Analyst Collaboration

Partnering for Project Success: Project Manager and Business Analyst Collaboration Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,

More information

MIS 460 Project Management

MIS 460 Project Management Ursuline College Accelerated Program CRITICAL INFORMATION! DO NOT SKIP THIS LINK BELOW... BEFORE PROCEEDING TO READ THE UCAP MODULE, YOU ARE EXPECTED TO READ AND ADHERE TO ALL UCAP POLICY INFORMATION CONTAINED

More information

Biometrics Enterprise Architecture Project Management Plan (BMEA PMP)

Biometrics Enterprise Architecture Project Management Plan (BMEA PMP) Biometrics Enterprise Architecture Project Management Plan (BMEA PMP) Version 1.0 Prepared by: Date: November 24, 2008 Revision History Purpose Revision Date Level 11/17/2009 First Draft 1.0 Responsible

More information

MNLARS Project Audit Checklist

MNLARS Project Audit Checklist Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?

More information

PROJECT TIME MANAGEMENT. 1 www.pmtutor.org Powered by POeT Solvers Limited

PROJECT TIME MANAGEMENT. 1 www.pmtutor.org Powered by POeT Solvers Limited PROJECT TIME MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited PROJECT TIME MANAGEMENT WHAT DOES THE TIME MANAGEMENT AREA ATTAIN? Manages the project schedule to ensure timely completion of

More information

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management

Goals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management Project Scheduling Goals of the Unit Making the WBS into a schedule Understanding dependencies between activities Learning the Critical Path technique Learning how to level resources!2 Initiate Plan Execute

More information

Project Time Management

Project Time Management Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please

More information

Project Management Concepts and Strategies

Project Management Concepts and Strategies Project Management Concepts and Strategies Contact Hours: 24 Course Description This series provides a detailed examination of project management concepts and strategies. It discusses the seven components

More information

Computing Services Network Project Methodology

Computing Services Network Project Methodology Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change

More information

Information Technology Project Oversight Framework

Information Technology Project Oversight Framework i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11

More information

Applied Software Project Management

Applied Software Project Management Applied Software Project Management Software Project Planning http://www.stellman-greene.com 1 Who needs software? Most software is built in organizations for people with specific needs. A stakeholder

More information

PROJECT TIME MANAGEMENT

PROJECT TIME MANAGEMENT 6 PROJECT TIME MANAGEMENT Project Time Management includes the processes required to ensure timely completion of the project. Figure 6 1 provides an overview of the following major processes: 6.1 Activity

More information

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved Description of Program Management Processes (Initiating, Planning) Topics Covered Program Management Process Groups salient features Description of all processes in Initiating Process Group: Initiate Program

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

Software Process Models. Xin Feng

Software Process Models. Xin Feng Software Process Models Xin Feng Questions to Answer in Software Engineering? Questions to answer in software engineering What is the problem to be solved? Definition What are the characteristics of the

More information

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita

Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita Metadata-Based Project Management System. A Case Study at M-Files Corporation Iulia Adomnita University of Tampere School of Information Sciences Computer Science M.Sc. Thesis Supervisors: Timo Poranen,

More information

Business Analyst Work Plan. Presented by: Billie Johnson, CBAP CSM

Business Analyst Work Plan. Presented by: Billie Johnson, CBAP CSM Business Analyst Work Plan Presented by: Billie Johnson, CBAP CSM Agenda Topic Introduction Overview of a Business Analysis Work Plan Initiating a Business Analysis Effort Components of the Business Analysis

More information

Chapter 4: Planning Projects, Part I (Integration, Scope, Time, and Cost Management) Slide 1

Chapter 4: Planning Projects, Part I (Integration, Scope, Time, and Cost Management) Slide 1 Chapter 4: Planning Projects, Part I (Integration, Scope, Time, and Cost Management) Slide 1 Introduction to Project Management Learning Objectives Describe the importance of creating plans to guide project

More information

Activity Plan Project management tools

Activity Plan Project management tools Activity Plan Project management tools Content WBS MIS Gantt Chart WBS Work Breakdown Structure The WBS is a hierarchical graphical representation of the work that needs to be done to complete a project

More information

Project Management Plan Outline ITSC

Project Management Plan Outline ITSC Project Management Plan Outline ITSC Date: 02/28/2012 Introduction At start of each project vendors must create a project management plan for ITSC approval, including, at a minimum, the sections described

More information

Scheduling Glossary Activity. A component of work performed during the course of a project.

Scheduling Glossary Activity. A component of work performed during the course of a project. Scheduling Glossary Activity. A component of work performed during the course of a project. Activity Attributes. Multiple attributes associated with each schedule activity that can be included within the

More information

PMI Lexicon of Project Management Terms

PMI Lexicon of Project Management Terms Project Management Institute PMI Lexicon of Project Management Terms Version 3.0 Published by: Project Management Institute, Inc. 14 Campus Boulevard Newtown Square, Pennsylvania 19073-3299 USA Phone:

More information

Project Scheduling & Tracking

Project Scheduling & Tracking Project Scheduling & Tracking Traditional Techniques: Work Breakdown Structure (WBS) Gantt Charts Precedence Diagrams Earned Value Planning It is the mark of an instructed mind to rest satisfied with the

More information

Software Development & Education Center. Microsoft Office 2010. (Microsoft Project 2010)

Software Development & Education Center. Microsoft Office 2010. (Microsoft Project 2010) Software Development & Education Center Microsoft Office 2010 (Microsoft Project 2010) Mastering Microsoft Project 2010 About This Course This three-day instructor-led course provides students with the

More information

PMLead. Project Management Professional. edition. Based on PMBOK Guide 4 th. www.pmlead.net

PMLead. Project Management Professional. edition. Based on PMBOK Guide 4 th. www.pmlead.net PMLead Project Management Professional Based on PMBOK Guide 4 th edition www.pmlead.net SECTION II Chapter 3 Project Management Processes Chapter 3 Project Process Groups A process is a set of interrelated

More information

8. Project Time Management

8. Project Time Management 8. Project Time Management Project Time Management closely coordinated Two basic approaches -bottom-up (analytical) -top-down (expert judgement) Processes required to ensure timely completion of the project

More information

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History

More information

PROJECT SCOPE MANAGEMENT

PROJECT SCOPE MANAGEMENT 5 PROJECT SCOPE MANAGEMENT Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully

More information

Project Management Planning

Project Management Planning Overview of Project Scheduling Following the definition of project activities, the activities are associated with time to create a project schedule. The project schedule provides a graphical representation

More information

Information Technology Project Management

Information Technology Project Management Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John Wiley & Sons, Inc. all rights reserved. Reproduction

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

2. Analysis, Design and Implementation

2. Analysis, Design and Implementation 2. Subject/Topic/Focus: Software Production Process Summary: Software Crisis Software as a Product: From Individual Programs to Complete Application Systems Software Development: Goals, Tasks, Actors,

More information

IT Project Management Methodology. Project Risk Management Guide. Version 0.3

IT Project Management Methodology. Project Risk Management Guide. Version 0.3 NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Risk Management Guide Version 0.3 Project Risk Management Support Guide version 0.3 Page 1 Version Date Author

More information

INTERNAL SERVICES GROUP PMO

INTERNAL SERVICES GROUP PMO Ownership & Awareness Program 1 Program 3 Program 4 Program 5 Program 6 Program 7 Program 2 Cap ability Development Infra structure Program n INTERNAL SERVICES GROUP ESSENTIAL FUNCTIONS Act as an interface

More information

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012 Minnesota Health Insurance Exchange Project (MNHI) Deliverable Definition Document (DDD) For Project Plan Date: 07-31-2012 11/9/2012 1:18 PM Page 1 of 8 1. High Level Deliverable Description The Project

More information

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing

More information

<name of project> Software Project Management Plan

<name of project> Software Project Management Plan The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor

More information

The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.

The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. Knowledge Areas The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. These are: Project Integration Management Project Scope

More information

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500 Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: office@sts.ch Phone:

More information

Project Management Process

Project Management Process Project Management Process Description... 1 STAGE/STEP/TASK SUMMARY LIST... 2 Project Initiation 2 Project Control 4 Project Closure 5 Project Initiation... 7 Step 01: Project Kick Off 10 Step 02: Project

More information

Business Analyst Interview Questions And Answers

Business Analyst Interview Questions And Answers Business Analyst Interview Questions And Answers What Does A Business Analyst Do 2013 All Rights Reserved http://www.whatdoesabusinessanalystdo.com (1) Question: Tell me the importance of a flow chart?

More information

BAL2-1 Professional Skills for the Business Analyst

BAL2-1 Professional Skills for the Business Analyst 1 BAL2-1 Professional Skills for the Business Analyst OVERVIEW This course trains participants to help business clients articulate their needs and wants, and to document them clearly, concisely, and completely.

More information

Project Integration Management

Project Integration Management Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform

More information

Independent Verification and Validation of SAPHIRE 8 Software Project Plan

Independent Verification and Validation of SAPHIRE 8 Software Project Plan INL/EXT-09-17022 Rev. 2 Independent Verification and Validation of SAPHIRE 8 Software Project Plan March 2010 The INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance

More information

CIS Project Management

CIS Project Management Topic # 4 CIS Project Management A Correspondence of Positions and Languages/Communications in CIS Analysis, Design, Development and Implementation (Engineering) Industry Correspondence of Positions and

More information

Project Management Guidebook

Project Management Guidebook METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur Module 11 Software Project Planning Lesson 29 Staffing Level Estimation and Scheduling Specific Instructional Objectives At the end of this lesson the student would be able to: Identify why careful planning

More information

ME 407 Mechanical Engineering Design Spring 2016

ME 407 Mechanical Engineering Design Spring 2016 ME 407 Mechanical Engineering Design Spring 2016 Project Planning & Management Asst. Prof. Dr. Ulaş Yaman Acknowledgements to Dieter, Engineering Design, 4 th edition Ullman, The Mechanical Design Process,

More information

Assignment 2: Microsoft Project Toolset. Eric Palmer & Mahindra Bheodari. Kennesaw State University. IS 8100 Spring 2015

Assignment 2: Microsoft Project Toolset. Eric Palmer & Mahindra Bheodari. Kennesaw State University. IS 8100 Spring 2015 Assignment 2: Microsoft Project Toolset 1 Assignment 2: Microsoft Project Toolset Eric Palmer & Mahindra Bheodari Kennesaw State University IS 8100 Spring 2015 Assignment 2: Microsoft Project Toolset 2

More information

IMEO International Mass Event Organization based on Recent Experience of Euro 2012

IMEO International Mass Event Organization based on Recent Experience of Euro 2012 IMEO International Mass Event Organization based on Recent Experience of Euro 2012 1. Name of the project: Project Management 2. Leader of the workshop (materials' author): Szymon Włochowicz 1 Objectives

More information

(Refer Slide Time: 01:52)

(Refer Slide Time: 01:52) Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This

More information

The purpose of this course is to provide practical assistance for defining and managing project scope.

The purpose of this course is to provide practical assistance for defining and managing project scope. Scope Definition and Scope Management Purpose - To provide practical assistance for defining and managing project scope. This course will focus on tips for creating a scope statement rather than a step-by-step

More information

Project Execution Guidelines for SESAR 2020 Exploratory Research

Project Execution Guidelines for SESAR 2020 Exploratory Research Project Execution Guidelines for SESAR 2020 Exploratory Research 04 June 2015 Edition 01.01.00 This document aims at providing guidance to consortia members on the way they are expected to fulfil the project

More information

Project Management Standards: A Review of Certifications/Certificates

Project Management Standards: A Review of Certifications/Certificates Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in

More information

joe.houghton@learningtalk.ie 086 384 3670

joe.houghton@learningtalk.ie 086 384 3670 joe.houghton@learningtalk.ie 086 384 3670 Session Outline Facilitator Introduction Why bother with Project Management (PM)? A PM Framework Stakeholders & Group exercise (45m) Coffee Break (15m) The Importance

More information

NFSA Project Management Guidelines

NFSA Project Management Guidelines NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and

More information

Introduction to Project Management. What is the Project Management Life Cycle? Common Life Cycle Characteristics

Introduction to Project Management. What is the Project Management Life Cycle? Common Life Cycle Characteristics Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George 2008 Prentice Hall 2-1 What

More information

Impact of PMBOK 5 th Edition

Impact of PMBOK 5 th Edition PMP Exam Changes Impact of PMBOK 5 th Edition When the PMI exam will change Major Updates X1.1 Scope of Update Comments and feedbacks for prior version Overall review for accuracy Appropriate alignment

More information

Planning of Project Work (IS PM 6. Lecture, 2011 Spring)

Planning of Project Work (IS PM 6. Lecture, 2011 Spring) Planning of Project Work In planning of project work are in the context of information system development project under attention information system development processes and needed resources. Pictorially

More information

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort Basic s Project Scheduling and Tracking The process of building a schedule for any case study helps really understand how it s done. The basic idea is to get across to break the software project into well-defined

More information

The Key to a Successful KM Project

The Key to a Successful KM Project Introduction An integrated PKM methodology enables organizations to maximize their investments by ensuring initiatives are on time and within budget, while sharing project challenges and successes that

More information

Quick Guide Business Process Modeling Notation (BPMN)

Quick Guide Business Process Modeling Notation (BPMN) Quick Guide Business Process Modeling Notation (BPMN) IDM Technical Team January 2007 Quick Guide: BPMN 2 of 14 The scope of this document is to provide a quick guide to the concepts and usage of the Business

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information