1 Cuyahoga County Data Center Relocation to Medical Examiners Building Cuyahoga County Medical Examiner Building Cedar Avenue Cleveland, OH 4410 October 19, 2012 Irie Kynyk Goss Architects Inc. in association with R Engineering Team LLC Regency Construction Services, Inc. Cuyahoga County Data Center Relocation to Medical Examiners Building

2 Index Summary Option 1 Option 2 Program Option Matrix Mechanical and Electrical Systems Schedule Appendex Cost Estimate Option 1 and 2 Narratives Plans for Cost Estimate Feasibility Matrix - Mechanical and Electrical Data Center One Line Diagram Site Plan Projected 10 Year Data Center Floor Space Requirements Additional Building and Facility Requirements Current State of Data Center Estimated Data Center Requirement for 10 years Option 1A plan Cuyahoga County Data Center Relocation to Medical Examiners Building

3 Summary UHHS currently leases the second floor and part of the third floor in the Medical Examiners Building The UHHS Data Center and support office space occupies the north half of the second floor. The south half of the second floor is occupied by laboratory and office space. UHHS occupies a portion of the third floor with Data Center and IT support offices. Each half of the building is approximately 10,000 sf. The current Cuyahoga County ISC Data Center located in the Sterling Building includes approximately 10,650 sf of area and contains 35 server cabinets, IBM mainframe, mainframe printers and tape backup robotics. The data center has growth for approximately 19 additional server cabinets. This information was provided by ISC along with Projected 10 Year Data Center Floor Space Requirements which was used as program requirements. Program information provided by ISC has a 10 year Data Center Floor Space Requirement projected for a total of 7,500 sf which includes 5,000 sf for Computer Room, 1,000 sf for Tape and Printers and 1,500 sf for Operators/Support Personal Space (7 occupants). Additional space of 1,000 sf is to be provided for 17 Optional Staff Offices Outside the Computer Room (Security & Com/WAN/VoIP; Network Engineers; Call/Support Center). Two Options for re-location of the Data Center were developed as part of the feasability study: Option 1: Expand the existing UHHS Data center raised computer room floor on the north half of the second floor to provide space for Cuyahoga County Data Center. Renovate the south half of the second floor for the Data Center support spaces, and for relocation of displaced UHHS support office space. This provides approximately 3,000 sf for computer room use versus 5,000 sf proposed in the program. Option 1 includes providing new CRAC units and electrical upgrades for the Data Center, and (2) 350 KW stand-by generators (N+1) to serve the Cuyahoga County Data Center exclusively. Preliminary budget project costs: $6,450,000 ($3,700,000 hard construction cost) Option 2: Renovate the south half of the second floor for Cuyahoga County Data Center and support spaces. Option 2 includes providing new CRAC units and electrical upgrades for the Data Center, and (2) 350 KW stand-by generators (N+1) to serve the Cuyahoga County Data Center exclusively. Preliminary budget project costs: $5,900,000 ($3,300,000 hard construction cost) The preliminary cost estimate was developed for the two options above with project costs that include $500,000 for moving, $500,000 for fiber relocation and 30% for soft costs. Estimate is included in the appendix. Cuyahoga County Data Center Relocation to Medical Examiners Building

4 The relocation of the Data center to the second floor of the Medical Examiners Building is considered to be feasible. The cost estimate reflects the estimated costs to construct facilities and move the Data Center based on the existing building and the program requirements desired for the Data Center. The following Program Option Matrix provides a line item review of program requirements and inclusion in estimated costs. Option 1 and Option 2 are illustrated on the following pages. These two options were developed as preliminary plans to test how a County Data Facility could fit into the existing building, and to develop a cost estimate. Assumption for the two options are included in the appendix as Option 1 and 2 Narratives. The Mechanical and Electrical narrative reviews the existing Data Center in the Sterling Building, provides an analysis of the Medical Examiners Building and provides recommendations for mechanical/electrical system improvements to relocate the facility to this building. The appendix includes a site plan to show possible location of mechanical/ electrical improvements required for the Data Center. Included in the appendix is an Option 1A which illustrates adding server cabinets to the existing raised computer room floor area in the UHHS Data Center. Infrastructure for mechanical/electrical system would need to be added to support this area, similar to Options 1 and 2. Upgrades to the UHHS Data Center are not included in the cost estimate. A possible upgrade includes adding UHHS to the dedicated standby generator system provided for the Cuyahoga County Data Center. This upgrade would involve a larger generator size and separating the UHHS Data Center at the main electrical service panels from the other electrical services. This may require new main service panels for the building. Cuyahoga County Data Center Relocation to Medical Examiners Building

5

6

7 Program Option Matrix LEGEND Included in budget costs NC Not compliant with requirement Not included in budget costs NA Not applicable? Requirement status unknown CC Provided by Cuyahoga County MINIMUM REQUIREMENTS Option 1 Option 2 Requirement N+1 redundancy for critical units related to cooling N+1 redundancy for critical units related to fire suppression CC CC 24/7/365 staff on-site for monitoring and "remote hands" 24/7/365 access for authorized staff Limited space Flexible office space off of the data center floor for OBOL staff use during extended periods of work at the facility CC CC Cameras, 24/7/365 security guards and alarm systems "Man-trap" entry and exit with multi-factor authentication Individual code locks for cabinets and cages with auditing and reporting capability N+1 UPS with battery power sufficient for generator start-up (minimum) N+1 Generators with sufficient fuel for 48 hours and contracts for guaranteed scheduled fuel delivery Minimum of 150 Watts per square foot power density Diverse entry for physical lines (opposite sides of building) Dual Ethernet hand-off backed by a network design with (ideally) % availability SAS70 type II equivalent (now SSAE16) Appropriate ISO series certifications PCI certification Cuyahoga County Data Center Relocation to Medical Examiners Building

8 LEGEND Included in budget costs NC Not compliant with requirement Not included in budget costs NA Not applicable? Requirement status unknown CC Provided by Cuyahoga County Metered power -Typically, power is sold by circuit, but metered power may reduce the entry cost for a client and it also incents them to use less power. Option 1 Option 2 Requirement ADDITIONAL REQUIREMENTS The new data center facility location shall be within 30 miles of the Cleveland metropolitan area?? All efforts should be made to develop a Green Data Center {definition TBD}?? The primary data center shall have a minimum of 50 miles of physical separation from the disaster recovery facility?? Outside the 500 year flood zone Electrical and Telecommunications service should come into the building underground Access to multiple telecommunications Local Exchange Carriers, including: One Community and AT&T NC NC 5 mile separation from commercial or industrial railways NC NC 100 foot separation from other buildings and/or parking structures 1 1 NC NC Existing building should be constructed within the last 20 years Existing building should be well maintained 2 2 NC NC Structural (clear) height of 13'?? Floor load capacity of 150 PSI 1 2 Building constructed in Clear height approx. 11'-3". Cuyahoga County Data Center Relocation to Medical Examiners Building

9 LEGEND Included in budget costs NC Not compliant with requirement Not included in budget costs NA Not applicable? Requirement status unknown CC Provided by Cuyahoga County?? Hanging live load of 100 PSI plus?? Roof load of 50 PSI Proper roof drainage with no signs of leaking or pooling of water Transformers located outside should be protected by bollards Dual ended main switchgear to support the building Space on property to install redundant 2000kW generators to support IT equipment load 3 3 Dedicated freight elevator (8'hx6'wx4'd <-This seems small for some of the larger equipment) to accommodate large equipment deliveries -Cuyahoga County Requires Larger Loading dock with an apron to accommodate deliveries from trucks with 65' trailers and 13.5' high?? Hydraulic lift Multi-membrane roof, concrete ballasted roof deck, no penetrations, energy efficient. Building lightning protection Main building grounding system Redundant (100' separation) pathways coming into the building from the street Well lit parking area Energy efficient building lighting system including the datacenter Base building automation system with monitoring capabilities Hand-held fire extinguisher installed per local code Code and ADA compliant for fire alarm enunciator quantity, types and location 3 Elevator exists, but it is not dedicated for freight. Cuyahoga County Data Center Relocation to Medical Examiners Building

10 LEGEND Included in budget costs NC Not compliant with requirement Not included in budget costs NA Not applicable? Requirement status unknown CC Provided by Cuyahoga County Building egress meets local building code?? Cameras installed within the parking area Cameras installed to monitor facility entrances and common areas within the building including all datacenter entrances Bollards to protect main entrance from parking area Split mechanical system with a dedicated glycol based system for the data center (2) 350 (2) 350 Installation of a 2000 kw (2MW) generator Installation of a dual interlock, pre-action suppression system will be installed within the data center environment?? VESA system will be installed within the data center and critical support rooms Option 1 Option 2 Requirement DETAILED STORAGE REQUIREMENTS Telecommunications Cabinets/Racks -Combined with Network Network Cabinets/Racks 5 4 Storage Cabinets/Racks -Cuyahoga County ISC -30 / Cuyahoga County Agency -8 4 Tape Library 15 (5 initially, another 5 in five years, another 5 in ten years) New Data Center Spatial Requirements (SF) 60 (40 initially, another 10 in five years, another 10 in ten years) 4 Option 2 contains 790 sf storage cabinets/racks (vs 1000 sf program) and 750 sf tape library (vs 1000 sf program). Cuyahoga County Data Center Relocation to Medical Examiners Building

11 County of Cuyahoga Data Center Relocation Feasibility Study MECHANICAL AND ELECTRICAL SYSTEMS INTRODUCTION The Data Center is currently located in the Sterling Building. The County would like to determine the feasibility of relocating the Data Center into existing space in the Medical Examiners Building. This feasibility study will address the mechanical and electrical systems necessary to facilitate the relocation of the Data Center. The scope of the engineering services pursuant to this feasibility study includes the following: 1. Evaluation of existing electrical and mechanical systems at the Sterling and Medical Examiners Buildings. 2. Analysis addressing the following items in the Minimum Requirements and Additional Requirements document provided in the County Program. See Appendix. To wit: a. Cooling and Fire Protection b. Stand-by Generator Requirements c. Metered Power d. Main Switchgear e. Redundant Generator f. Building Grounding g. Lightning Protection h. Fire Suppression This feasibility study focused on critical factors identified in the Cuyahoga County Program document presented by Cuyahoga County personnel. See Appendix. These critical factors were utilized to determine feasibility to relocate the Data Center. The critical factors which affect the mechanical and electrical systems are: 1. N+1 redundancy for critical units related to cooling and fire suppression systems. 2. Cameras, 24/7/365 security guards and alarm systems. 3. N+1 UPS with battery power sufficient for generator start-up (minimum). 4. N+1 Generators with sufficient fuel for 48 hours. 5. Minimum of 150 Watts per square foot power density. 6. Metered power Typically, power is sold by circuit, but metered power may reduce the entry cost for a client and it also incents them to use less power. 7. Electrical and Telecommunications service should come into the building underground.

12 County of Cuyahoga Data Center Relocation Feasibility Study 8. Proper roof drainage with no signs of leaking or pooling or water. 9. Transformers located outside should be protected by bollards. 10. Dual ended main switchgear to support the building. 11. Space on property to install redundant 2000kw generators to support IT equipment load. 12. Building lightning protection system. 13. Main building grounding system. 14. Well lit parking area. 15. Energy efficient building lighting system including the data center. 16. Base building automation system with monitoring capabilities. 17. Code and ADA compliant for fire alarm annuciator quantity, types and location. 18. Building egress meets local building code. 19. Cameras installed to monitor facility entrances and common areas within the building including all data center entrances. 20. Split mechanical system with a dedicated glycol based system for the data center. 21. Installation of a 2000 kw (2MW) generator. 22. Installation of a dual interlock, pre-action suppression system will be installed within the data center environment. PURPOSE The purpose of this feasibility study is to identify and present viable options to relocate the Data Center from the Sterling Building to the Medical Examiners Building pertaining to the mechanical and electrical systems. Feasibility is defined as capable of being done, executed, affected or accomplish reasonable assurance of success. Page 2 of 10

13 County of Cuyahoga Data Center Relocation Feasibility Study METHODOLOGY The methodology utilized in the formulation of this feasibility study was to conduct research subject to the guidelines and constraints stated herein, perform data synthesis and evaluation, and provide analysis to develop the Feasibility Chart and Recommendations stated herein as follows: 1. Field investigation of existing conditions. 2. Preliminary data gathering. 3. Data synthesis and analysis of information gathered. 4. Review of all applicable building codes. 5. Interview pertinent facility personnel. 6. Review and evaluation of Option drawings prepared by the Architect. GUIDELINES AND CONSTRAINTS This feasibility study was prepared pursuant to the following criteria: 1. The critical factors stated in the Introduction section. Also see Appendix. 2. The definition of feasibility as defined in the Purpose section. Design solutions are not provided. 3. The methodology stated in the Methodology section. 4. As-built drawings and documentation were not available for review and evaluation. 5. All recommendations employ to minimize construction changes to the Medical Examiners building. 6. All recommendations shall be in accordance with applicable building codes. LEED items and criteria are not included. 7. All recommendations are made utilizing the best available technology. 8. Installation of computer system equipment, racks, cabinets, and cabling are not included. 9. The following items are not included: a. ISO certification b. VESA system Page 3 of 10

14 County of Cuyahoga Data Center Relocation Feasibility Study NARRATIVE EXISTING SYSTEMS STERLING BUILDING Electrical System The building is currently served via dual 15KV primary CEI services fed from separate feeders and routed underground to the facility. Each primary service is redundant to each other and feeds one input of a primary source selector switch that is manually operated solely by the utility company. The primary source selector switch feeds a utility company, step-down transformer that supplies 480/277V - 3 phase - 4 wire, power to the base building Main Service Switchgear. Main Distribution System The main distribution for the Data Center is supplied from BlueBridge Co. via two (2) 400A feeders at 480V 3 phase 3 wire. See Appendix for one line diagram of the Data Center. The left side feeder load is 258A. The right side feeder load is 274A. The entire electrical distribution system inclusive of the UPS system is owned by others. Standby Generator System Each feeder stated above is backed up by a standby power generator at 480V-3 phase 3 wire. The standby power generator has sufficient capacity to provide backup standby power for the Data Center. There is no redundancy of backup standby power. The entire standby power generation system is owned by others. Mechanical System The Data Center is served by five (5) 20-ton Liebert air conditioning systems. The evaporators for the units are located on the roof. There are twelve (12) evaporators. The units provide cooling air discharged under the raised floor. There is no make-up or ventilation serving the Data Center. The entire Data Center air conditioning system is owned by others. Page 4 of 10

15 County of Cuyahoga Data Center Relocation Feasibility Study NARRATIVE EXISTING SYSTEMS MEDICAL EXAMINERS BUILDING Electrical Systems Main Utility Service The building is currently served via dual 15KV primary CEI services fed from separate feeders and routed underground to the facility. Each primary service is redundant to each other and feeds one input of a primary source selector switch that is manually operated solely by the utility company. The primary source selector switch feeds a utility company, step-down transformer that supplies 480/277V - 3 phase - 4 wire, power to the base building Main Service Switchgear. Main Electrical Distribution The existing base building Main Service Switchgear is original facility equipment, is approximately 42- years old, is rated 3000A, 480/277V - 3 phase - 4 wire and does not contain any spares or available spaces to serve future loads. There is no transient voltage surge suppression (TVSS) protection installed on this unit. This switchgear contains a 1600A circuit breaker that feeds normal power to ATS-1 and a 3000A circuit breaker that feeds normal power to ATS-2. The facility total load, as observed during the site assessment, was 1150 Amps. The facility personnel indicated the total facility load to be 1560A when the chiller unit is operating. The two (2) Automatic Transfer Switches, ATS-1 and ATS-2, are 4-pole bypass-isolation type, rated 1600A and 3000A respectively. ATS-1 feeds a base building Main Switchboard rated 1600A, 480/277V - 3 phase - 4 wire, and serves the majority of other Tenant and base building loads. ATS-2 feeds separate base building Main Switchboard rated 3000A, 480/277V, 3 phase, 4 wire, and services the UH Data Center critical support equipment and some base building mechanical equipment loads. There is no dedicated metering for the feeders serving the UH Data Center critical support equipment. Both main switchboards are original facility equipment, are approximately 42-years old, and have extremely limited spares or available spaces to serve future loads. Standby Generator System A single 2000kW, 480/277V - 3 phase - 4 wire, diesel standby, engine-generator set currently supports the entire building. This gen-set is approximately 12-years old and was partially overhauled in The unit is currently de-rated to a total output capacity of 1600kW at maximum operating temperatures. The gen-set is installed in a walk-in type weatherproof enclosure and located within a separate, dedicated exterior equipment area designed specifically for this function. The gen-set is equipped with a 6000-gallon belly type fuel storage tank capable of providing approximately 45 hours of run time at full rated load. The unit is adequately protected from unauthorized access and potential vehicular damage. Building management personnel stated that the gen-set is loaded to 99% of de-rated capacity during the hottest summer months. Page 5 of 10

16 County of Cuyahoga Data Center Relocation Feasibility Study The gen-set output feeds an Standby Switchboard rated 3000A, 480/277V - 3 phase - 4 wire, that contains one 1600A circuit breaker and one 3000A circuit breaker. These circuit breakers supply the standby source power inputs to ATS-1 and ATS-2 respectively. Fire Detection and Alarm System Building system smoke detectors were noted within common spaces and the elevator lobby. All building fire alarm systems are monitored and controlled by a central fire control panel. All alarms reports are monitored by security located within the lobby. Mechanical Systems HVAC System The south side of the building is served by a rooftop air handling unit (AHU-1), with hot water and chilled water coils. The second floor distribution is VAV without reheat. During the cooling season, the perimeter hot water heating system is off, and in order to maintain space temperatures at other floors, AHU-1 leaving air temperature is set to 55 degrees F, with no reheat available, space temperature is difficult to be maintained. AHU-1 has significantly exceeded its useful life, is in poor operating condition, and requires constant maintenance and repair, with parts difficult to obtain. Fire Protection System The building is served by a wet-pipe fire suppression system, with stand pipes in the stairwells. All floors are sprinklered with the exception of the second and third floors. Plumbing System The existing plumbing (Men and Women toilet rooms) are located in the core of the building, and are fully functional and operational. FEASIBILITY CHART The Feasibility Chart is a summary of systems and critical factors analyzed to determine the feasibility of relocating the Data Center. See enclosed chart. See the Recommendations section for detailed information regarding each item in the chart. The relocation of the Data Center to the Medical Examiners Building is deemed feasible pursuant to the mechanical and electrical systems given that all items in the feasibility chart are designated yes. Page 6 of 10

17 County of Cuyahoga Data Center Relocation Feasibility Study RECOMMENDATIONS All recommendations are made in accordance with the Feasibility Chart and the stated guidelines and constraints. The recommendations are as follows: Electrical Systems Service and Feeders 1. Existing service shall remain intact. Existing service comprises two (2) 15KV CEI feeders which enter the building underground. These feeders are equipped with a manual throwover switch for primary/backup mode of operation. 2. Modify existing main distribution switchgear to provide a feeder rated 800A, 480V 3 phase 3 wire. This feeder will serve a new 500 KVA transformer located in the main electrical room. This feeder will serve the Data Center. A meter will be located on this dedicated feeder. A TVSS unit shall be provided for this feeder. Standby Power System 1. Provide a standby power system that will consist of two (2) 350KW gensets rated at 480/277V 3 phase 4 wire and paralleling switchgear. These gensets will provide N + 1 redundancy for standby power. These gensets will interface with paralleling switchgear to facilitate the dedicated normal power feeder, the gensets, and standby power feeders for the Data Center. The standby power system will be located in an outdoor security environmental enclosure on the south side of the building adjacent to the main electrical room. The on-grade enclosure will be equipped with an integral diesel fuel storage tank sized for forty-eight (48) hours of operation for a single genset. All necessary alarming and annunciation provisions shall be provided. Data Center Power Distribution 1. The Data Center power distribution system shall consist of: a. Distribution Panels b. UPS c. Computer Power Centers The required distribution panels shall be located in the electrical room adjacent to the Data Center. The distribution panels shall be 208V 3 phase. The quantity and capacity of these distribution panels shall be as required to serve the needs of the UPS, power centers, and cooling equipment. UPS equipment shall be provided rated 208V 3 phase. Two UPS (2) units shall be provided for N + 1 redundancy. Switchgear shall be provided to facilitate redundant operation. The UPS system shall serve the computer power centers. The rating of the UPS system shall be as required to serve the data center electrical requirements. The UPS system shall have sufficient battery capacity to meet County requirements. All alarm and annunciation requirements shall be provided. Page 7 of 10

18 County of Cuyahoga Data Center Relocation Feasibility Study Branch Circuitry 1. Branch circuitry for general purpose lighting and power shall be provided utilizing existing panelboards and circuit breakers. 2. Branch circuitry for Data Center equipment and cooling system shall be provided as required to serve the needs of the Data Center. Grounding 1. Maintain the existing building ground system. Interface with the existing ground system as required to install the dedicated Data Center feeder. 2. Provide a ground system for the standby power system in accordance with the National Electrical Code (NEC). 3. Provide a dedicated computer system ground for the Data Center in accordance with all applicable standards. Lightning Protection System 1. Provide a lightning protection system in accordance with all applicable UL and NFPA standards to achieve a UL Master Label. The grounding systems for the Data Center and standby generation system shall be bonded to the lightning protection system. Lighting System 1. Provide interior lighting for the Data Center and related spaces in accordance with IES standards. Existing branch circuit panelboards are equipped with sufficient capacity and provisions. 2. Emergency and egress lighting shall be in accordance with applicable codes and County requirements. 3. Exterior lighting appears adequate and requires no modifications. Fire Alarm System 1. The existing building fire alarm systems shall remain. Provide a fire alarm panel to install any required detection and alarm devices. Interface new fire alarm panel with existing fire alarm panel. Interface fire suppression system with new fire alarm panel. Data Center Alarm/Monitoring 1. Provide alarm and monitoring system as required to meet County needs for the following systems and equipment: Page 8 of 10

19 County of Cuyahoga Data Center Relocation Feasibility Study a. UPS b. Power centers c. Standby generation system d. Electric meter e. Fire/smoke f. Fire suppression g. Water detection in Data room Security System 1. Provide systems to achieve security and monitoring in accordance with County requirements. To wit: a. CCTV surveillance b. Intrusion detection c. Access control Mechanical Systems HVAC System 1. Refurbish existing boilers to original operating condition. 2. Remove existing rooftop air handling Unit AHU Install new rooftop Unit AHU-1, 30,000 CFM, with heating hot water and chilled water coils. Provide unit controls and variable frequency drives. 4. Remove existing VAV terminal units on second floor. 5. Install twelve (12) VAV terminal units with hot water reheat coils. Provide controls for VAV terminal units. 6. Remove existing ductwork distribution in the occupied areas. 7. Install round or oval ductwork distribution in the occupied areas. 8. Install seven (7) floor mounted computer room air conditioning units at 15 ton each. This includes the N + 1 requirement. 9. Install round or oval ductwork distribution in computer room area where there is no raised floor. 10. Provide temperature control system with humidity controls for HVAC system. 11. Install exhaust fan with manual controls for Data Room fire suppression system. Page 9 of 10

20 County of Cuyahoga Data Center Relocation Feasibility Study Fire Suppression System 1. Provide a duel interlock pre-action fire suppression system for the Data Center room. System shall include nozzles, tanks, piping and activation controls. Addressable smoke detectors dedicated to detect smoke in the protected zone shall be provided. Manual activation stations shall be located at all exits from the Data Room. Fire Protection System 1. No work is required per code for the Fire Protection System. Plumbing System 1. Install standpipes at first floor from condensate draining of Data Room air conditioning equipment. Page 10 of 10

21 Cuyahoga County Data Center Activity Name Duration (Work Days) Start Date Schedule Schematic /1/13 1/28/13 Review /29/13 2/18/13 Revision - Schematic /19/13 3/4/13 Review /5/13 3/18/13 Design Development /19/13 4/29/13 Review /30/13 5/13/13 Construction Documents /14/13 6/24/13 Review /25/13 7/22/13 Bidding/Award /23/13 12/23/13 Construction /24/13 9/15/14 Move in /16/14 10/23/ Finish Date ONDJFMAMJ JASONDJFMAMJ JASON ONDJFMAMJ JASONDJFMAMJ JASON Oct 8, 2012 Irie Kynyk Goss Architects Inc.

22 Appendix

23 Cuyahoga County Coroner's Building DATA CENTER RELOCATION REGENCY CONSTRUCTION SERVICES, INC. EXECUTIVE SUMMARY FEASIBILITY STUDY October 19, 2012 This statement of probable project cost (SPPC) was generated from the Feasibility Study Plans developed by Irie Kynyk Goss Architects. The documents were dated October 1, 2012 and titled "Cuyahoga County Coroner's Building Data Center Relocation". The documents were received by Regency Construction Services, Inc. on October 2, The project consists of interior renovations of the Second Floor space of the County Coroner's Building. The Option 1 project costs are estimated to be $ 6,451,641. The Option 2 project costs are estimated to be $ 5,915,850. 1

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to

More information

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following

More information

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G 100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the

More information

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA)

AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina

More information

Gymnasium. Building Data. Number of Stairs: 3

Gymnasium. Building Data. Number of Stairs: 3 Gymnasium Building Data Year Built: 1939 Total Floor Area: 14,611 SF Number of Stairs: 3 Elevator: IBC Classification none III-B, Non-Sprinklered General Description Building consists primarily of a main

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

A/E REVIEW CHECKLIST ARCHITECTURAL

A/E REVIEW CHECKLIST ARCHITECTURAL A/E REVIEW CHECKLIST ARCHITECTURAL Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Architectural, Boiler Safety Devices Operation Checklist,

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15

More information

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,

More information

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

OPERATOR - FACILITY ADDRESS - DATE

OPERATOR - FACILITY ADDRESS - DATE . Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.

More information

Think Of Us First! When It s Time to Distribute Your Plans

Think Of Us First! When It s Time to Distribute Your Plans Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

Iron Hill Corporate Center Newark, DE

Iron Hill Corporate Center Newark, DE Iron Hill Corporate Center Newark, DE Delaware s Premier Suburban Office Park Contact: John Kaczowka (302) 661-6709 or Brian Hopkins (302) 661-6712 Total Project Size 463,085 RSF Red Wing Built in 1988

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

N O W A V A I L A B L E

N O W A V A I L A B L E N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina S P E C I F I C A T I O N S Contact Doug Hollidge for more information

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP 11044 1 VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 31 32 Geotechnical Data 00 70 00 General Conditions 00 73 00 Supplementary Conditions

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL PARTITIONS REGULAR WALLS 9' HIGH 214 LF TENANT DEMISING WALL 150 LF INTERIOR FURRED WALLS 9' 86 LF OFFICE DEMISING WALL 98 LF DOUBLE FRAME RADIUS WALL 18 LF RADIUS SOFFITS 172 LF SOFFIT 76 LF FINISH NEW

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

City of Oviedo Commercial Shell Building Permit Application Guidelines

City of Oviedo Commercial Shell Building Permit Application Guidelines City of Oviedo Commercial Shell Building Permit Application Guidelines All permit application packages must be complete prior to acceptance. A complete application package shall include the following:

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

Department of Administration DATA CENTER Two Phase Approach Located at the State Defense Building

Department of Administration DATA CENTER Two Phase Approach Located at the State Defense Building DATA CENTER Two Phase Approach Located at the State Defense Building July 17, 2015 Compiled by: Office of Facilities and Property Management 800 SW Jackson, Suite 600 Topeka, Kansas 66612-1216 i I. Programming

More information

Aurora Mall. Aurora (Denver), Colorado

Aurora Mall. Aurora (Denver), Colorado is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion

More information

Data Center Due Diligence List

Data Center Due Diligence List Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015 Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

Estimated Cost of Repair

Estimated Cost of Repair 1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:

More information

AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx)

AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx) AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx) Site Biography Market Area: Dallas and Fort Worth Areas of Texas Location: Allen, Tx 75013 Address: 900 Ventura Drive CLLI, POP, NPA/NXX

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

MINIMUN SUBMISSION REQUIREMENTS FOR COMMERCIAL PLANS: NEW BUILDINGS AND ADDITIONS: SITE PLANS /OTHER

MINIMUN SUBMISSION REQUIREMENTS FOR COMMERCIAL PLANS: NEW BUILDINGS AND ADDITIONS: SITE PLANS /OTHER MINIMUN SUBMISSION REQUIREMENTS FOR COMMERCIAL PLANS: NEW BUILDINGS AND ADDITIONS: SITE PLANS /OTHER: Provide copies of the signed, approved site plans and building elevations if Planning Board approval

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

J&S Construction Company, Inc. completed

J&S Construction Company, Inc. completed Vehicle Maintenance Facility Fort Campbell, Kentucky General Contractor & Estimator completed construction in September 2013, on the $12.2 million Vehicle Maintenance Facility for the 101st Combat Aviation

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

LEVEL 3 DATA CENTER ASSESSMENT

LEVEL 3 DATA CENTER ASSESSMENT Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications

More information

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively

More information

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS January 7, 2014 0 BASIS OF ESTIMATE The estimate is based on the drawings and documents received

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

Element D Services Electrical

Element D Services Electrical Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as

More information

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 PERMIT AUTHORIZATION EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 El Lago ordinances require the issuance of building permits as a method of enforcing code minimums, ensuring

More information