Property Management. Guidelines For Office Space. Property Management. Issued by The Minister of State Services. CENTRE of E X P E RT I S E

Size: px
Start display at page:

Download "Property Management. Guidelines For Office Space. Property Management. Issued by The Minister of State Services. CENTRE of E X P E RT I S E"

Transcription

1 Property Management Guidelines For Office Space Issued by The Minister of State Services Prepared by G O V E R N M E N T Property Management CENTRE of E X P E RT I S E

2

3 Property Management Guidelines For Office Space Issued by The Minister of State Services Prepared by G O V E R N M E N T Property Management CENTRE of E X P E RT I S E These Guidelines are updated from time to time. To ensure you have the most recent version please check the website at:

4 August 2012 ISBN (Print) ISBN (Online) Crown copyright 2011 This work is licensed under the Creative Commons Attribution 3.0 New Zealand licence. In essence, you are free to copy, distribute and adapt the work, as long as you attribute the work to the Crown and abide by the other licence terms. To view a copy of this licence, visit Please note that no departmental or governmental emblem, logo or Coat of Arms may be used in any way that infringes any provision of the Flags, Emblems, and Names Protection Act ( Attribution to the Crown should be in written form and not by the reproduction of any such emblem, logo or Coat of Arms.

5 Contents 1. Introduction Government goals Government expectations of Crown Agencies Purpose of the Property Management Guidelines Role of the Property Management Centre of Expertise Role of agencies Reporting Property Management Guidelines content and structure Expectation relationship matrix Planning Introduction and purpose Key considerations Acquisition Introduction and purpose Key considerations Design and fit out Introduction and purpose Key considerations Design Key considerations Fit out Lease management Introduction and purpose Key considerations Facilities management Introduction and purpose Key considerations Disposal Introduction and purpose Key considerations...38 Appendices Appendix 1: Key consideration/government expectation cross-references...40 Appendix 2: Expected crown lease covenants...49 Appendix 3: Other references...50 Appendix 4: Agency roles and policies on energy and emissions Glossary Page 1

6 Property Management Guidelines For Office Space 1. Introduction 1.1 Government goals In establishing the Property Management Centre of Expertise (PMCoE) 1, the Government has confirmed its desire to achieve specific goals for Crown property management. These goals are to: realise efficiency and effectiveness gains in Crown property management build property management capability within departments and Crown agencies maximise the use of the Crown property portfolio build collaboration and co-operation between Crown entities in property and property related activities. 1.2 Government expectations of Crown Agencies To support the achievement of its goals, the Government has provided seven clear expectations for departments and Crown agents (agencies 2 ) with regards to how they manage their property portfolios and how they contribute to the Government s property management goals. 3 These expectations are that agencies will: have national property plans provide productive, flexible, cost-effective workspaces adopt cost-effective options to manage energy consumption and emissions reduce the total, life-cycle cost of occupancy; including working towards an office space occupancy density 4 goal of between 12m 2 and 16m 2 per FTE (full-time equivalent staff member) behave and negotiate with due regard to the impact on other Crown agencies operating in the same market take a whole-of-government perspective when considering lease options, including as a priority considering surplus space available from other government agencies and co-location opportunities only enter rental contracts that limit performance and price risks. 1 CAB Min 11 14/14 (see the PMCoE s shared workspace) 2 For the purpose of these guidelines the common descriptor agencies will refer to both government departments and Crown agents. 3 CAB Min 11 14/14 (see the PMCoE s shared workspace) 4 Occupancy density has been defined for the purpose of these guidelines. Calculation details can be found under Occupancy Density Ratio in the Glossary. Page 2

7 1.3 Purpose of the Property Management Guidelines To support agencies in meeting its property management expectations, the Government directed the PMCoE to develop and document Property Management Guidelines 5 for issue by the Minister of State Services. These guidelines have been drafted at a high rather than at a detailed level. We suggest agencies consider the overall intent of the guidelines when they apply them within their organisations. An agency s size and the complexity of its property portfolio will influence how it applies them. The guidelines are not: prescriptive intended to supersede existing property management practices or approaches agencies have in place where they support the Government s expectations applicable to buildings for highly specialised functions such as schools, hospitals, prisons, etc. The guidelines do: outline the key considerations agencies should regard as expected practice when operating towards the achievement of the Government s property management expectations specifically focus on areas that are important for agencies in delivering the Government s property management goals apply to all office space 6 occupied by departments and Crown agents, whether owned or leased require agencies to match their response to their organisation s scale and operating environment. 5 CAB Min 11 14/14 (See PMCoE shared workspace) 6 Office space is office accommodation, whether leased or owned, including those properties which are office in nature, even if they are not used for desk based activities (e.g. some justice sector facilities, service delivery or public interface facilities etc). We expect that, as these guidelines are used, we will find opportunities to enhance or improve them. Therefore, this document is living, in the sense we expect it to evolve as the Crown property management capability and community grows. 1.4 Role of the Property Management Centre of Expertise The PMCoE provides tools, information and guidance on property management best practice. It is the central repository for the cross-government property database. It identifies and facilitates cross-government approaches to accommodation, co-location and collective procurement opportunities. Its mandated 7 roles and responsibilities are to: provide leadership through working with agencies to identify and promote opportunities to drive efficiency and effectiveness gains in property management, and to recommend property management expectations for approval by Cabinet provide guidance and support by documenting and publishing best practice, working with agencies to move towards best practice, and identifying agencies with strong property management expertise willing to advise and support their peers monitor performance by collecting and collating office property measurements and information, and publishing an annual report on property provide a brokerage service to match Crown agencies seeking space with those who have surplus space, to investigate the shared contracting of property related supplies and facilities management, and to support the co-location of agencies (including identifying common barriers to co-location and developing solutions). 7 CAB Min 11 14/14 (see PMCoE shared workspace) Page 3

8 Property Management Guidelines For Office Space The PMCoE is also responsible for maintaining the Property Management Guidelines. To support the use of these guidelines, the PMCoE has developed a shared workspace as the repository for practical guidance, templates, examples and case studies. The shared space is also an online facility for discussion and the exchange of information between agencies. We encourage agencies to arrange for their property management personnel to register for access to the shared workspace by contacting the PMCoE. The guidelines, supplementary guidance material, and other activities of the PMCoE can be seen as a tiered model below. 1.5 Role of agencies Agencies are accountable for delivering the Government s property management goals and outcomes. Agencies are responsible for: establishing office accommodation requirements according to service delivery needs complying with applicable legislation managing their property portfolios efficiently and effectively meeting Government expectations and ensuring they are incorporated into their operating principles and practices, with consideration of the Property Management Guidelines. Agencies can draw on the services of the PMCoE and the expertise of other agencies at any time. They are also encouraged to support the building of the Crown Property Management community by actively participating in and using the PMCoE s shared workspace. Cabinet Government policy Seven expectations of agencies in regard to property management Four roles of the PMCoE PMCoE Expected practices Property management guidelines Reporting of agency property information PMCoE shared workspace Recommended practices Supplementary guidance & advice Templates, examples & case studies Community of practice Page 4

9 1.6 Reporting Cabinet requires the PMCoE to publish an annual report detailing the state of the Government s property portfolio, and the progress made towards achieving the Government s property management goals. In addition, the PMCoE will provide reporting and data on an ad-hoc basis to support agencies strategy development and decision making. The PMCoE will use its centralised property database for all such reporting and agencies will be asked to periodically update their agency information. We also encourage agencies to build reporting against their progress in meeting the seven Government expectations into their existing internal reporting templates. 1.7 Property Management Guidelines content and structure These guidelines recognise agencies are at varying levels of capacity and capability in their property management activities. It is acknowledged that some agencies have access to a wide range of experience and expertise that informs good property management practices, and others do not. As stated in 1.3, the guidelines are drafted at a high level. They: outline the key considerations agencies should regard as expected practice when operating towards the achievement of the Government s property management expectations act as a prompt for agencies to examine their current property management approach and tools to ensure they will support the delivery of the Government s property management expectations. The guidelines have been drafted to reflect the property management cycle as depicted in the model below. The content for each of the six elements draws on the best practice and experiences of New Zealand and overseas public and private sector organisations, supplemented by professional input from the New Zealand property industry. Each of the six elements has a separate section in the guidelines. For consistency we have used the following generic format: Introduction and purpose a brief outline of the key focus of the section and background into what the particular section was designed to achieve or support. Key considerations concise statements of expected property management practice, plus commentary and suggestions for further supporting materials as appropriate. Planning Acquisition Design & fit out Lease management Facilities management Disposal Page 5

10 Property Management Guidelines For Office Space 1.8 Expectation relationship matrix For clarity the table below outlines the relationship (significant, moderate or low) between the sections of these guidelines and the seven expectations of Government. In addition, the key considerations in each section of the guidelines are cross-referenced to the expectation(s) they support (see Appendix 1). Cabinet expects Agencies to: Planning Acquisition Design & Fit Out Lease Management Facilities Management Disposal Have national property plans Provide productive, flexible, cost-effective, workspaces Adopt cost-effective options to manage energy consumption and emissions Reduce the total, life-cycle cost of occupancy Behave and negotiate with due regard to the impact on other Crown agencies operating in the same market Take a whole-of-government perspective when considering lease options Only enter rental contracts that limit performance and price risks Key Significant Moderate Low Page 6

11 2. Planning 2.1 Introduction and purpose Good plans shape good decisions. That s why good planning helps to make elusive dreams come true. Lester R. Bittel, The Nine Master Keys of Management Organisational outcomes How does property impact the delivery of outcomes The Government expects agencies to adopt a strategic approach to how they manage property. This approach is expected to be: How should our property portfolio perform? How does our property portfolio perform? clearly built on and integrated with organisational service delivery strategies and accountability document planning processes 8 in accordance with the Treasury s Capital Asset Management (CAM) practices and expectations (see the PMCoE s shared workspace for further information). Without well-conceived, documented property management plans, agencies risk providing accommodation solutions that are not fit for purpose or do not pursue opportunities that would benefit the agency or wider groups of agencies. Property plans help organisations to work through the link between organisational outcomes and the assets required to most cost-effectively support these outcomes. This can be illustrated at a high level as shown in the following diagram. For the purpose of these guidelines, we refer to property plans as incorporating the strategic and operational aspects of property. Larger organisations may well have separate documents covering property strategy, operational plans, policies and procedures. What is our plan to manage performance gaps? Property Plan Similarly, for the purpose of these guidelines, we distinguish between property plans (for managing the assets) and resource plans (for managing the property management functions). The Property Management Guidelines do not cover the latter. The PMCoE s shared workspace has: guidance on the development of a property plan, including a suggested structure and approach to developing the plan s content links and further information on the Treasury s Capital Asset Management expectations. Agencies are encouraged to use this information to test their existing planning approach and their documentation, adapting the guidance material to suit the size and nature of their property portfolios. 8 Accountability documents are the formal reports produced by agencies for external reporting purposes (e.g. the Annual Report and Statement of Intent presented to the House of Representatives). Page 7

12 Property Management Guidelines For Office Space The purpose of the Planning section is to: provide best practice property management planning advice to ensure property decisions support organisational service delivery highlight the key considerations needed to ensure the organisation s property portfolio meets current and future needs provide a suggested framework/structure for property management planning. 2.2 Key considerations Property plans should be based on an understanding of how property can have an impact on the successful achievement of organisational and wider government outcomes The process of building a property plan is as important as the plan itself. Agencies need to ensure they develop and maintain a clear understanding of organisational goals and desired outcomes. This can only be developed through a structured engagement with business groups and participation in strategic conversations. The agency will then be in a position to determine what gap, if any, exists between current provision and future organisational needs Property plans should cover a strategic timeframe and be interpreted into an operational timeframe Property decisions are generally long term in nature, so the context these decisions are taken in should be commensurate. This longer term understanding of needs enables agencies to identify key opportunities for planning and implementing portfolio changes to meet future requirements. As a guide, a strategic timeframe would be 5 10 years and an operational timeframe 1 3 years. Longer term views may be desirable for complex or large property portfolios Property plans should remain dynamic and current, being reviewed for any significant changes to operating conditions The internal and external environment is rarely static. Property plans inform day to day property management decisions and need to remain current. Agencies need to proactively identify significant changes in operating conditions and reflect them in their property plans. Best practice suggests a minimum review period of a year is likely for most organisations Property plans should be unambiguously stated and clearly measurable To be useful, property plans need to be structured, achievable and clearly aligned to the organisation s wider strategic direction. They must be measurable in terms of progress towards outcomes. Agencies should ensure regular reporting against the property plans is integrated into standard internal business reporting The property planning process should be integrated into the organisational planning processes for accountability documents 9, capital planning and the Estimates of Appropriations Property planning does not exist in isolation. Agencies should fully integrate their property planning processes with other organisational and Government planning activities. This will ensure the principles of other planning regimes are not over looked (e.g. better 9 Accountability documents are the formal reports produced by agencies for external reporting purposes (e.g. the Annual Report and Statement of Intent presented to the House of Representatives). Page 8

13 business cases guidance, capital intentions reporting, and Cabinet Office circulars) Effective plans are based on measuring the performance of property assets, as this performance has an impact on organisational objectives In addition to measuring progress towards the delivery of the property plan, agencies should incorporate goals and measurements relating to the performance of their property assets. Measurements should be timely, relevant, comparable, and measurable, covering not only cost efficiency but also effectiveness (contribution to organisational outcomes). Ideally, agencies should undertake performance benchmarking within their portfolios. The PMCoE will be facilitating benchmarking of performance across government, and will be asking agencies to participate A whole-of-government and sectorial perspective should be maintained when developing plans This perspective is relevant at all levels of planning from the strategic to the site-specific levels. In particular, agencies should recognise the significant role property plays as an enabler of change strategies at the wider government level. The PMCoE has a role to co-ordinate cross-government activity, and we encourage agencies to share opportunities and plans via the PMCoE s shared workspace. Agencies should also ensure the PMCoE is aware of individual property plans so it can maintain a cohesive view of changes to the Government s property portfolio Property plans will take account of government policy and (where practical) pending policy Agencies should give due regard to: any government policy that affects property decisions government s seven property management expectations any government policy affecting property or procurement strategic property management principles developed by the PMCoE. Agencies should be aware of any initiatives (e.g. sharing of services or delivery) that could have a significant impact on property portfolios, and where practical allow for these as contingencies. The PMCoE encourages agencies to use the shared workspace to discuss the implications of wider government policy on property decisions Property strategies should challenge the past and be future focussed Property decisions are long term in nature, and the built environment can have a significant impact on internal and external occupants. Once built, property can be inflexible to change and polarise processes and cultures. A good property strategy is based on understanding the current accommodation performance and suitability coupled with a clear view of future state possibilities. Property strategies developed from a sound understanding of the future needs of the organisation and of how property contributes to organisational outcomes provide opportunities to define and test new environments. A check sheet for whole-of-government analysis is available as well as advice and discussion forums on the PMCoE s shared workspace. Page 9

14 Property Management Guidelines For Office Space Operational plans should be expressed in terms of gap analysis Property plans should be specific about actions or initiatives to be undertaken. They should be based on a clear articulation of a preferred future state (which demonstrably optimises organisational outcomes), and reflect a clear understanding of the performance and risk of the existing assets Measurement of cost effectiveness should be expressed in terms of whole of life Agencies should be adopting good practice principles on cost benefit analysis and whole of life considerations. Guidance and advice is available from the Treasury at govt.nz/publications/guidance/planning/ costbenefitanalysis/h Property strategy should be considered at a strategic level, and integrated into HR and ICT strategies Property can be an enabler of change, and a catalyst for cultural reform. Agencies should develop and maintain a coherent view of how property can have an impact on their organisation. Generally, property assets do not operate in isolation of the occupants or technology platforms. It is important to ensure property plans are cohesively linked with ICT and HR strategies and plans. Agencies should ensure good governance is in place to enable such links to be realised. Policy options During the asset planning process agencies are likely to identify areas where their ability to improve value-for-money is constrained by current policy settings. Identify changes to existing policy settings which could improve value-for-money. Page 10

15 3. Acquisition 3.1 Introduction and purpose Overseas experience, particularly in the United Kingdom, has shown that significant reductions in property holdings can be made through a whole-of-government approach to property acquisition and use. The Government, through the seven property management expectations, has expressed a clear intention to: reduce the Crown s property portfolio move agencies towards more collaborative and co-operative working relationships with regard to property. The Government is seeking compelling business cases for all property investment decisions. The Better Business Case guidelines 10 provide specific guidance on the business case process and expectations. In particular, an Indicative Business Case (IBC) focuses on the strategic drivers for the investment and the benefits in return. As a result, each agency needs to undertake a robust analysis to understand and articulate the key drivers for the proposed investment. The diagram below is a recommended way of starting this process and addressing the requirements of the IBC. It will help agencies to explore the underlying organisational drivers for the project and to build a robust set of requirements. Note: It is important for agencies to defer the planning phase until the investigation, linking and briefing is completed. The purpose of the acquisition section is to: provide good practice advice on the acquisition of workspace highlight the key factors agencies should consider in meeting changing needs provide guidance on the integration of whole-of-government thinking into property acquisition processes. The recommended planning process Best practice start point for projects Typical start point for projects Investigation Linking Briefing Planning Premises brief Search and evaluation process Engagement with organisation High level drivers Building upgrade brief Fit out brief Building upgrade design Preliminary design Implementation Change brief Communications plan 10 betterbusinesscases Page 11

16 Property Management Guidelines For Office Space 3.2 Key considerations Agencies are usually prompted to consider acquiring new space or reconfiguring existing space by either an impending lease expiry or some form of organisational or structural change. While agencies are still responsible for providing accommodation solutions that best suit their business needs, the Government expects wider whole-of-government thinking to be built into the decision making process. This applies to both an agency s approach to seeking space and its behaviour in the property market. Overall, agencies are expected to look for opportunities to reduce the Government s property portfolio over time. This may well mean some agencies increase and some decrease their accommodation, as integrated solutions are developed. The following acquisition guidance is broken down into two areas: planning and implementation. Planning The need to acquire new premises should be founded in strategic analysis The acquisition of new premises should be the outcome of good property management planning at an agency and a wider government level. In developing a property management plan an agency needs to: engage with business groups within their organisation and sector to understand their strategic goals, direction and future property needs clearly identify and validate the business changes that drive a need for additional or alternate space. Having identified a high level business need through planning, agencies need to develop a more detailed picture of requirements with which to test planning assumptions. This requires further engagement with sector and organisational groups to develop a detailed accommodation brief. Examples of questionnaires and accommodation briefs can be found in the PMCoE s shared workspace. It is important for agencies to fully test and in some cases challenge the accommodation requirements being sought. At this stage of the process, new design/layout ideas and the Government space use expectations can be factored into the final accommodation brief Re-test strategic assumptions before acquisition Agencies should test their initial thinking on the most appropriate option to meet their accommodation needs, as the property market and circumstances may have changed since the initial plan was developed. Property strategies are dynamic and the operating environment is subject to change. Before making any changes to an agency s portfolio, strategic assumptions should be tested, including any whole-of-government considerations Specifications should be based on a measurable contribution to organisational outcomes The specification for a new acquisition should be driven by strategy and organisational needs that have been interpreted into property terms. The specification should allow an assessment of the relative success of options to meet organisational outcomes. Page 12

17 3.2.4 Acquisition of space should reflect cost effective options A key issue is to ensure property is cost effective. It is important to develop an awareness that planning is multi-dimensional and to recognise there is a cause and effect relationship between several variables. An example of how a small change in each variable can make a significant impact on the outcome is illustrated below. The purpose of this example is to show there is an opportunity to challenge requirements (and therefore cost) at all key decision points in the process. A relatively small change in multiple variables can provide cumulative improvement Robustly consider the marginal benefit of change To ensure the cost effectiveness of new premises, agencies should robustly assess the marginal benefit of new premises compared to the status quo and the practical minimum solution. Guidance on these principles can be found on the PMCoE s shared workspace Robustly consider the cost benefit of lease vs. own A whole of life approach should be taken in all new projects. The decision to own or lease an asset is affected by various factors including timeframe, specialisation, quality, cost, risk, and control considerations. Frameworks for the analysis of the cost-versus-own decision have been developed within government. Guidance is available on the PMCoE s shared workspace. Option Number of Staff Space Per Person (m 2 ) Rental Cost ($/m 2 ) Fit out Cost ($/m 2 ) Total Cost Per Person Option ,000 $25,500 Option $20,250 Change 11.7% 10% 10% 20.6% Page 13

18 Property Management Guidelines For Office Space Robustly question the need for additional space The Government wants to reduce its overall accommodation portfolio. An agency considering additional accommodation should first look in its own and the wider government property portfolio for cost effective solutions that do not involve acquiring additional space. Agencies should consider: Whether the new activity to be housed can be done via outsourcing or collaboration with another government agency. Whether other activities within the organisation could be consolidated or moved to create space to meet the new need. Whether the current property portfolio can be reconfigured to release space to meet the new need. There is a wealth of information and material available on options for the better use of existing space, including activity based layout, hot desk/hoteling, maximising shared workspace/minimising dedicated space. Examples and case studies can be found on the PMCoE s shared workspace. Whether new ways of working could be introduced to create spare shared workspace capacity for the new need. Research shows that, on any given day, 20 30% of workstations are vacant due to leave, sickness, training, meetings etc. Examples of organisations tapping into this as a space resource can be found on the PMCoE s shared workspace Robustly challenge location requirements Location decisions can have a significant impact on rental rates, as well as wider economic, social and environmental implications (e.g. increased commuting time and costs for staff). Challenging the required location(s) should be a specific step in developing property management plans, to ensure each option has been properly evaluated. When considering accommodation options, early planning should challenge locations and demonstrate all options have been considered and robustly evaluated. A location assessment framework, example questionnaires and accommodation briefs can be found on the PMCoE s shared workspace. Key components of analysing a location decision are to establish: Which groups need to be located in the traditional government locations (e.g. proximity to Parliament in Wellington or a city s CBD, or adjacent to other agencies or groups). This is based on an assumption that non-cbd based office accommodation solutions often cost less than CBD-based ones, particularly in metropolitan centres and in Wellington s Parliamentary precinct. For CBD properties, what potential is there for non-centre facing staff to be employed away from the region altogether. What are the adjacency issues for each business group. It is important to engage early with the PMCoE, to ensure business cases for new space take account of the whole-of-government and the agency s fiscal position, and the business needs and options are as inclusive as possible. Page 14

19 For Wellington-based head office decisions, the framework below sets out a definition and generic criteria outlining how each business unit could be classified, broken down into four groups. Group Definition Criteria Examples Group 1 Minister-facing Staff who are directly involved with the Minister or the Minister s office through face-to-face engagement Regular personal interface with Minister or Minister s office staff Hold 2 3 meetings a week with Minister s staff Advise on specialist/high level policy areas Chief Executive Deputy Chief Executives Executive Leadership Team Executive Steering Group Person-to-person interface to carry out position effectively Interact/engage with other government agencies frequently Group 2 CBD-based staff Staff who directly support the Ministerfacing group in the preparation of strategic policy, planning or execution; and other staff who need to be based in the CBD to operate effectively Regular personal interface with Group 1 members Hold 2 3 meetings a week with Group 1 members Subject matter experts required for Group 1 direct support Person-to-person interface with Group 1 to carry out position effectively Only occasional interface with corporate and administrative support staff Operational staff who need to be CBD-based Senior policy staff Strategy planning/ execution Senior functional staff (Level 2 managers) Operational level staff required to be in the CBD Group 3 Agency-specific corporate and administrative support staff; and non CBD-based operational staff Staff whose agencyrelated subject matter expertise allows daily functions to be carried out by the agency; and operational staff who do not need to be based in the CBD to operate effectively Does not require regular personal interface with Groups 1 and 2 personnel to carry out position effectively Has agency-related expertise that someone from a separate government agency (but same business unit) would be unable to fulfil without significant training and experience Operational staff who do not need to be CBD-based HR (agency-specific) Finance (agency-specific) IT (agency-specific) Corporate (agency-specific) Operational level staff (not required to be in CBD) Group 4 Agency non-specific corporate and administrative support staff Staff who provide non-agency-specific subject matter expertise that allows daily functions to be carried out by the Ministry Does not require regular personal interface with Groups 1 and 2 personnel to carry out position effectively Has non-agency-specific subject matter expertise similar in function to other government agencies like business units IT (business-as-usual) Payroll Property (office accommodation) HR (non-agency-specific) Corporate (non-agency-specific) The definition of each group requires a clear organisational understanding by an agency s senior management. This will ensure the agency s operational and functional effectiveness remains if personnel become physically separated. Technology and management solutions could be developed to mitigate this separation. Page 15

20 Property Management Guidelines For Office Space Robustly challenge single vs. multiple site requirements The location and size of the space required can have a significant impact on rental rates and contestability. The decision to split or aggregate the functions of agencies within site(s) or locations requires a complex analysis of, among other factors, adjacency links, proximity to stakeholders and business continuity requirements. This analysis is challenging but often significantly increases the range of options as well as the complexity of evaluation. The PMCoE s shared workspace contains guidance and case studies to help agencies to do this analysis Formally explore co-location options or the availability of surplus Crown accommodation Agencies are accountable for their own workspace decisions. However, the Government has set an explicit expectation for agencies to take a whole-of-government perspective when considering lease options, including priority consideration of other Crown surplus space or co-location options. Agencies should ensure their property decision-making processes and templates cater for this step. In addition, agencies should document the whole-of-government opportunities considered and the decisions made in their property management plans and/or business cases. Taking over spare space and physically defining the boundaries between agencies has been the traditional approach to using spare capacity in the Crown property portfolio. Increasingly, agencies are seeing co-location as a viable option. Agency responses to accommodation pressures after the Christchurch earthquake have validated this concept. Not all agency functions are suitable for co-location. However, when considering the co-location option, agencies should ensure any perceived barriers or legal constraints are robustly challenged to ensure their validity. Agencies should document the outcomes of solutions developed from such research for publication on the PMCoE s shared workspace, for reference by other agencies. When considering new premises, in particular CBD properties, a formal process should be undertaken to identify the organisational, sectoral and whole-of-government user requirements. This will help the agency to identify and evaluate any options for co-location. A suggested approach is outlined in the following diagram. Phase 1 Phase 2 Phase 3 Define organisational investment objectives, existing arrangement and business needs. Quantify the four functional groups and detail the group-specific business needs High level assessment of four generic options for the organisation Identification and engagement with Sectoral stakeholders Identification of AoG policy, strategy and property issues (property issues via PMCoE) Define high level Sectoral investment objectives, existing arrangment and business needs Identify all-of-government objectives, strategies, existing arrangement and opportunities High level assessment of two generic options for the sector/aog Identification and evaluation of long list Page 16

21 Phase One: Analysis should be done as per the Better Business Cases framework, with particular emphasis on stakeholder engagement (including the PMCoE) and formal definition of the objectives, needs and existing arrangements in other agencies (sectoral and whole-of-government). Phase Two: As outlined in key consideration 3.2.8, the functions of the agencies can be grouped to determine the restraints on location (such as the need to be CBD located) and the opportunity for co-location with or without integration. Phase Three: The organisational, sectoral and whole-of-government investment objectives, business needs and existing arrangements and opportunities can be assessed at a high level against six generic options before the detailed analysis of specific options (the first four are agency specific and the final two involve wider groups of agencies): 1. Current state/status quo (as a baseline) 2. Practical minimum cost solution for the agency 3. Optimised single site solution 4. Multiple sites single agency 5. Co-location (part or whole) of agencies without integration of functions 6. Co-location (part or whole) of agencies with integration of functions (shared services) All changes to portfolio should be taken with consideration of current government strategy and policies Government policy in non-property areas such as procurement, service delivery and sectoral strategies can affect property decisions. In addition, from time to time, the PMCoE will develop property related strategies, policies and principles that aim to provide a whole-of-government perspective for agencies considering lease options. Information on such wider policy considerations can be found on the PMCoE s shared workspace Ensure full compliance with any government policy on safe and effective working environments Agencies should ensure any new premises fully comply with government policies such as accessibility and the current published earthquake standards. Information about earthquake policy as it relates to government agency buildings can be found on the PMCoE s shared workspace. Each of these six options can be evaluated using the Better Business Cases guidance to establish evaluative measures based on investment objectives. Agencies should contact the PMCoE early if they: identify surplus space within their portfolio wish to explore co-location as an option. Page 17

22 Property Management Guidelines For Office Space Leverage property projects for wider organisational change Changes in the property portfolio (expanding, reducing or reconfiguring), are ideal opportunities for agencies to leverage wider organisational or cultural change. It is important for agencies to consider this at the earliest point in the property planning process to ensure the property solutions support the organisation s desired changes. Examples include: An organisation with a siloed operational culture may want to create a more open, flexible, collaborative work environment to promote more co-operation between business groups. An organisation spread across a number of buildings with a degree of autonomy ( my space ) in space management may use consolidation into a single site as an opportunity to introduce a more standardised, consistent, modular ( our space ) space management approach. An organisation undertaking reconfiguration of a traditional one desk per person site may want to explore activity based design and alternate work options for staff (working from home, hot desking etc.). The PMCoE s shared workspace has New Zealand and overseas case studies of organisations successfully using property projects as a catalyst for wider change initiatives. Implementation Proactively manage transparency and co-ordination within government when engaging with the market Agencies should: advise the PMCoE of upcoming market activity to ensure a co-ordinated approach be mindful of the wider government implications of the precedent effect of lease terms avoid the use of confidentiality provisions which restrict the transparency of transactions within government (e.g. agencies not being excluded from using relevant market evidence for rental reviews) Obtain independent advice Agencies should ensure: externally sourced advice is free of interests beyond the provision of quality advice to the agency for the purposes contracted anyone providing advice has no vested interest in any particular option or outcome under consideration the advisor has no conflict of interest or significant relationship with other parties within the transaction. Page 18

23 Project and risk management disciplines should be applied commensurate to the scale and complexity of the project Agencies should: Understand the level of project management and risk management capability required to manage property projects with regard to the size, complexity and fiscal risks involved. Ensure personnel with the appropriate skills and experience are appointed to undertake this activity. This may not necessarily be a member of the property team, as the early stages of the acquisition process require a strong understanding of the public sector policy and processes for business cases and the appropriate approval levels Procurement, governance and probity principles should be applied commensurate to the scale and complexity of the project In undertaking new lease arrangements, agencies are committing the Government to long term arrangements and significant costs. Agencies should ensure: personnel selected to lead these activities have the appropriate skill set and knowledge appropriate levels of governance commensurate to the size and complexity of the project are in place Emphasise the value of the Crown covenant in negotiations Agencies should ensure the appropriate financial allowances are made for the relatively low risk associated with a Crown covenant in lease and construction contracts. This allowance should be transparent in calculations that use private sector comparative evidence Minimise performance and price risks in contract terms and documentation Specialist advice should be sought, commensurate with the scale and complexity of the contract. The expected lease covenants are included in Appendix 2, and guidance on performance and price risks in development agreements and agreements to lease is provided on the public sector intranet ( property/leaserisks). Case studies, sample documents and discussion forums are available on the PMCoE s shared workspace. Specialist advice on these matters can be obtained from the Ministry of Business, Innovation and Employment, the Office of the Auditor General and the State Services Commission. Page 19

24 Property Management Guidelines For Office Space 4. Design and fit out 4.1 Introduction and purpose The Better Administration and Support Services (BASS) report noted that the 33 agencies measured for the 2009/2010 year spent a combined total of $205 million on property costs. It also noted there was a potential to save 25 35% of this cost if agencies were to use new design trends in maximising space utilisation. The Government expects Crown agencies will, over time, move towards an occupancy density ratio 11 of between 12m 2 and 16m 2 per FTE. This target is realistic and is being achieved by some agencies who have moved into new accommodation. Significant space savings have been achieved with relatively modest changes from the traditional approach to the design of shared workspace and the way shared workspace is used. To achieve the Government s utilisation targets, agencies need to challenge the: one desk per FTE standard approach allocation of dedicated rather than shared spaces preference for agencies to replicate facilities that could readily be shared. More efficient space utilisation will require agencies to embrace the new ideas for creating a flexible and innovative work environment. 11 Details about the calculation of the Occupancy Density Ratio can be found in the Glossary. The purpose of the design and fit out section is to: provide best practice advice in the design and fit out of both existing and new workspace introduce a consistent approach to achieving an occupancy density of 12 16m 2 per FTE provide information on current government requirements for energy efficiency and sustainability provide best practice considerations to support the change management aspects of introducing a flexible shared workspace environment and leveraging property fit out to support wider organisational change. 4.2 Key considerations Design Most agencies make significant decisions about changing or reconfiguring their premises once every years. This presents agencies with an opportunity to examine the way they operate and to ask questions about the nature of the work environment and how this might better support the agencies long term strategies. It is also the most effective time to consider incorporating options to reduce the life-cycle cost of operating the premises. These options include design features that support a reduction in energy use and emissions. The goal of workplace design is to provide spaces that allow people to do their jobs effectively and in comfort. For government agencies there is also an expectation of maximising the use of the space available and, over time, working towards achieving a 12 16m 2 per FTE occupancy density ratio. To support design decisions, agencies should develop a comprehensive functional brief that outlines the functions to be accommodated and the inter-relationships between functions. Page 20

25 The brief should also clearly draw the link to the agencies business strategies and objectives. Agencies are responsible and accountable for delivering a workplace design that best suits their business needs. However, the following key principles will strongly support the Government s occupancy density expectations. The principles have been drawn from the concept of activity based design and apply equally to new buildings or reconfigured existing spaces Design for flexibility To reduce the life-cycle cost of occupation, as affected by churn 12, agencies should: develop generic planning, space standards, a modular approach to furniture profiles and workpoints and the design of utilities and other shared workspaces minimise built fit out (e.g. solid partitioning or fix floor to ceiling screens) minimise the use of fixed, built in furniture items develop processes that focus on moving people not workpoints use a modular approach to all fit out elements to facilitate easy reconfiguration Design to optimise space and provide choice in work style Agencies should understand the work styles of occupants and teams as well as get competent professional advice on the configuration of the property. Principles to consider include: use boundaries that separate but do not divide restrict built fit out to the building core and reserve building perimeter areas for open plan staff occupancy plan support functions (utilities space, storage, beverage stations etc.) and shared workspaces (meeting rooms, team rooms, informal meeting spaces) as centralised hubs positioned adjacent to the building core design meeting rooms for flexibility and to cover a range of seating capacity, and consider a centralised suite of meeting rooms with movable walls to create a multi-purpose meeting space design to accommodate alternate methods of working or different work activities Design to support the work of people and teams Agencies should ensure the design focus is the business activities rather than the organisational structure or hierarchy and: design with sharing in mind, to encourage the concept of our space rather than my space for occupants incorporate design elements that encourage interaction and collaboration ensure the design process supports the identification of opportunities to improve work flow and work group relationships. 12 Churn is defined in the Glossary. Page 21

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

Lease and Facilities Management Standards and Guidelines

Lease and Facilities Management Standards and Guidelines Lease and Facilities Management Standards and Guidelines GOVERNMENT Property Management CENTRE of EXPERTISE Government Property Management Centre of Expertise Charles Fergusson Building Level 8 Bowen Street

More information

Resource Management Guide No. 501. Property Management Planning Guidance

Resource Management Guide No. 501. Property Management Planning Guidance Resource Management Guide No. 501 Property Management Planning Guidance JULY 2014 Commonwealth of Australia 2014 ISBN: 978-1-922096-64-7 (Online) With the exception of the Commonwealth Coat of Arms and

More information

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project evaluation 5 3.0 Project feasibility 7 3.1 Defining the objectives

More information

All Ministers Speaker of the House All Chief Executives Controller and Auditor-General

All Ministers Speaker of the House All Chief Executives Controller and Auditor-General Cabinet Office CO (15) YY Circular Intended for All Ministers Speaker of the House All Chief Executives Controller and Auditor-General Copies to All Senior Private Secretaries All Private Secretaries This

More information

Resource Management Guide No. 500. Overview of the Commonwealth Property Management Framework

Resource Management Guide No. 500. Overview of the Commonwealth Property Management Framework Resource Management Guide No. 500 Management Framework SEPTEMBER 2015 Commonwealth of Australia 2015 ISBN: 978-1-922096-63-0 (Online) With the exception of the Commonwealth Coat of Arms and where otherwise

More information

Standards and Guidelines for the management of lessee assets

Standards and Guidelines for the management of lessee assets Standards and Guidelines for the management of lessee assets GOVERNMENT Property Management CENTRE of EXPERTISE Government Property Management Centre of Expertise Charles Fergusson Building Level 8, Bowen

More information

for the year ending 30 June 2016 Economic Development and Infrastructure Sector

for the year ending 30 June 2016 Economic Development and Infrastructure Sector B.5 Vol.1 for the Government of New Zealand for the year ending 30 June 2016 Economic Development and Infrastructure Sector 21 May 2015 ISBN: 978-0-478-43637-2 (print) 978-0-478-43638-9 (online) Guide

More information

Guide to Integrated Strategic Asset Management

Guide to Integrated Strategic Asset Management Guide to Integrated Strategic Asset Management Issue date: 14 November 2011 Acknowledgements This guide is based on the Australasian Procurement and Construction Council Inc. s (APCC) publication, Asset

More information

Mobile Voice and Data Services

Mobile Voice and Data Services Procurement driving better value Mobile Voice and Data Services All-of-Government Contract Buyers Guide A guide for government agencies November 2014 Acknowledgements and thanks development of this guide:

More information

Improving Accountability: Developing an Integrated Performance System

Improving Accountability: Developing an Integrated Performance System OCCASIONAL PAPER No. 11 Improving Accountability: Developing an Integrated Performance System This paper was prepared as part of the State Services Commission's "Improving Accountability" project, and

More information

BEST PRACTICE CONSULTATION

BEST PRACTICE CONSULTATION BEST PRACTICE CONSULTATION July 2014 Introduction Of the 10 principles for Australian Government policy makers in the Australian Government Guide to Regulation, two are related to consultation: 5. Policy

More information

NSW Government ICT Governance Framework for Whole of Government Investments

NSW Government ICT Governance Framework for Whole of Government Investments NSW Government ICT Governance Framework for Whole of Government Investments November 2014 CONTENTS 1. Introduction 1 2. Scope and application 2 3. Purpose 2 4. Outcomes 2 5. Governance framework 3 6. Governance

More information

Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07

Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07 Performance Detailed Report Date Last saved: 12/10/2007 13:18:00 Property asset management Audit 2006/07 - Audit Commission descriptor to be inserted by Publishing- Document Control Author Filename Bob

More information

The Asset Management Landscape

The Asset Management Landscape The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces

More information

Contents. Asset Management Strategy... 1. 1.0 Background... 1. 2.0 The aims of the Council s Asset Management Strategy... 2

Contents. Asset Management Strategy... 1. 1.0 Background... 1. 2.0 The aims of the Council s Asset Management Strategy... 2 Contents Asset Management Strategy... 1 1.0 Background... 1 2.0 The aims of the Council s Asset Management Strategy... 2 3.0 The aims of a Partnership Property Strategy... 4 4.0 The property portfolio

More information

Procurement Capability Standards

Procurement Capability Standards IPAA PROFESSIONAL CAPABILITIES PROJECT Procurement Capability Standards Definition Professional Role Procurement is the process of acquiring goods and/or services. It can include: identifying a procurement

More information

Management of Business Support Service Contracts

Management of Business Support Service Contracts The Auditor-General Audit Report No.37 2004 05 Business Support Process Audit Management of Business Support Service Contracts Australian National Audit Office Commonwealth of Australia 2005 ISSN 1036

More information

Published by the National Regulatory System for Community Housing Directorate. Document Identification: 003-04-13/NRSD. Publication date: January 2014

Published by the National Regulatory System for Community Housing Directorate. Document Identification: 003-04-13/NRSD. Publication date: January 2014 Evidence guidelines Published by the National Regulatory System for Community Housing Directorate. Document Identification: 003-04-13/NRSD Publication date: January 2014 Supported by the Commonwealth Government

More information

University of Brighton Sustainable Procurement Strategy 2011-2015

University of Brighton Sustainable Procurement Strategy 2011-2015 University of Brighton Sustainable Procurement Strategy 2011-2015 Sustainable procurement in a challenging environment Introduction There is widespread recognition that climate change and the use of dwindling

More information

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 ASSET MANAGEMENT STRATEGY 2010-2020 November 2009 1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 4. WESTERN AUSTRALIAN ASSET MANAGEMENT IMPROVEMENT PROGRAM

More information

Good practice Public Service Communications Unit Communications Function Review 2009

Good practice Public Service Communications Unit Communications Function Review 2009 Final text: 06/04/10 Good practice Public Service Unit Function Review 2009 Purpose The purpose of this paper is to outline recommendations on good practice communications unit models and guidelines for

More information

Strategic Asset Management Framework

Strategic Asset Management Framework STRATEGIC ASSET MANAGEMENT Strategic Asset Management Framework (Second Edition) Achieving better value for South Australians from our investment in State assets Government of South Australia First edition

More information

UNSOLICITED PROPOSALS

UNSOLICITED PROPOSALS UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY

More information

Project Assessment Framework Establish service capability

Project Assessment Framework Establish service capability Project Assessment Framework Establish service capability July 2015 Component of the Project Assessment Framework (PAF) This document forms part of the Project Assessment Framework, as outlined below.

More information

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper december 08 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper Preface The NSW Government is committed to the ongoing improvement of public services by ensuring

More information

New Cabinet Expectations: Investment and Asset Management, and Financial Authorities

New Cabinet Expectations: Investment and Asset Management, and Financial Authorities Cabinet CAB Min (15) 11/7A Copy No: Minute of Decision This document contains information for the New Zealand Cabinet. It must be treated in confidence and handled in accordance with any security classification,

More information

Procurement driving better value for money. Guide 7 to Sustainable Procurement. Manage the contract and disposal route

Procurement driving better value for money. Guide 7 to Sustainable Procurement. Manage the contract and disposal route Procurement driving better value for money Guide 7 to Sustainable Procurement Manage the contract and disposal route A guide for agencies July 2010 This guide is part of a series of documents focussed

More information

Quick Guide: Meeting ISO 55001 Requirements for Asset Management

Quick Guide: Meeting ISO 55001 Requirements for Asset Management Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get

More information

SPACE MANAGEMENT POLICY

SPACE MANAGEMENT POLICY SPACE MANAGEMENT POLICY Originated by Assistant Director, Management Services: October 2010 Impact Assessment: 11 November 2010 Recommended by Estates Committee: 1 November 2010 Approved by Council: 22

More information

Performance audit report. Ministry of Education: Management of the school property portfolio

Performance audit report. Ministry of Education: Management of the school property portfolio Performance audit report Ministry of Education: Management of the school property portfolio Office of the Auditor-General Private Box 3928, Wellington Telephone: (04) 917 1500 Facsimile: (04) 917 1549

More information

Efficiency and reform in government corporate functions through shared service centres

Efficiency and reform in government corporate functions through shared service centres REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1790 SESSION 2010 2012 7 MARCH 2012 Cross government Efficiency and reform in government corporate functions through shared service centres 4 Key facts

More information

IN CONFIDENCE. Regulatory Impact Analysis Requirements: New Guidance

IN CONFIDENCE. Regulatory Impact Analysis Requirements: New Guidance IN CONFIDENCE Cabinet Office CO (09) 8 Circular 10 November 2009 Intended for All Ministers All Chief Executives Chief Parliamentary Counsel Clerk of the House Senior Private Secretaries Private Secretaries

More information

KEY PERFORMANCE INFORMATION CONCEPTS

KEY PERFORMANCE INFORMATION CONCEPTS Chapter 3 KEY PERFORMANCE INFORMATION CONCEPTS Performance information needs to be structured to demonstrate clearly how government uses available resources to deliver on its mandate. 3.1 Inputs, activities,

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

Australian Government Cloud Computing Policy

Australian Government Cloud Computing Policy Australian Government Cloud Computing Policy Maximising the Value of Cloud VERSION 2.1 JULY 2013 AGIMO is part of the Department of Finance and Deregulation Contents Foreword 3 Introduction 4 Policy 5

More information

Single Stage Light Business Case Template

Single Stage Light Business Case Template Better Business Cases Single Stage Light Business Case Template Prepared by: Prepared for: Date: Version: Status: Better Business Cases Single Stage Light Business Case Template Document Control Document

More information

POSITION INFORMATION DOCUMENT

POSITION INFORMATION DOCUMENT POSITION INFORMATION DOCUMENT Position Title: Senior Manager, ICT Contracts Classification Code: ASO8 Division: ICT Services Directorate: ICT Contracts & Performance Management Type of Appointment: Branch:

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

EAST AYRSHIRE COUNCIL CABINET 23 JUNE 2010 REVISED COMPETENCY FRAMEWORK. Report by Executive Director of Finance and Corporate Support

EAST AYRSHIRE COUNCIL CABINET 23 JUNE 2010 REVISED COMPETENCY FRAMEWORK. Report by Executive Director of Finance and Corporate Support EAST AYRSHIRE COUNCIL CABINET 23 JUNE 2010 REVISED COMPETENCY FRAMEWORK Report by Executive Director of Finance and Corporate Support 1. PURPOSE OF REPORT 1.1 The purpose of this report is to recommend

More information

2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT

2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT 2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT Published in August 2015 Education Payroll Limited 2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT CONTENTS Foreword 3 Who We Are 4 What We Do 5 How

More information

POSITION INFORMATION DOCUMENT

POSITION INFORMATION DOCUMENT POSITION INFORMATION DOCUMENT Position Title: Scheduling Officer, ICT Programs Classification Code: ASO6 Division: ICT Services Directorate: ICT Program Services Type of Appointment: Branch: ICT Program

More information

Department of Infrastructure and Planning: Governance Framework for Infrastructure Delivery Special Purpose Vehicles

Department of Infrastructure and Planning: Governance Framework for Infrastructure Delivery Special Purpose Vehicles Department of Infrastructure and Planning: Governance Framework for Infrastructure Delivery Special Purpose Vehicles Governance Framework for Special Purpose Vehicles Table of Contents Executive Summary...3

More information

Australian Government Cloud Computing Policy

Australian Government Cloud Computing Policy Australian Government Cloud Computing Policy Maximising the Value of Cloud VERSION 2.0 MAY 2013 AGIMO is part of the Department of Finance and Deregulation Contents Foreword 3 Introduction 4 Australian

More information

Accommodating Change Measuring Success Property Asset Management Delivery Plan. 30 July 2013

Accommodating Change Measuring Success Property Asset Management Delivery Plan. 30 July 2013 Accommodating Change Measuring Success Property Asset Management Delivery Plan 30 July 2013 1 Accommodating Change Measuring Success Property Asset Management Delivery Plan OVERVIEW 3 1. CURRENT POSITION

More information

The Transport Business Cases

The Transport Business Cases Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business

More information

Internal Audit Quality Assessment Framework

Internal Audit Quality Assessment Framework Internal Audit Quality Assessment Framework May 2013 Internal Audit Quality Assessment Framework May 2013 Crown copyright 2013 You may re-use this information (excluding logos) free of charge in any format

More information

Professional Standards Capability Program

Professional Standards Capability Program Procurement Title of document Professional - Avante Garde Capability 18pt, 80% Standard black Professional Standards Capability Program VERSION 1 5 th Feb 2014 IPAA PROCUREMENT PROFESSIONAL CAPABILITY

More information

I N C O N F I D E N C E

I N C O N F I D E N C E I N C O N F I D E N C E Cabinet Office CO (10) 2 Circular 1 August 2010 Intended for All Ministers All Chief Executives Speaker of the House General Manager, Parliamentary Service Controller and Auditor-General

More information

Corporate Plan. 2015 16 to 2018 19

Corporate Plan. 2015 16 to 2018 19 Corporate Plan 2015 16 2015 16 to 2018 19 Commonwealth of Australia 2015 ISBN 978-1-925205-28-2 (print) ISBN 978-1-925205-29-9 (online) This publication is available for your use under a Creative Commons

More information

Capital Works Management Framework

Capital Works Management Framework POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset

More information

Compliance Review Department of Education, Training and Employment

Compliance Review Department of Education, Training and Employment Compliance Review Department of Education, Training and Employment Review of Department of Education, Training and Employment compliance with the Right to Information Act 2009 (Qld) and the Information

More information

The Human Capital Management Systems Business Case A Checklist to assist agencies developing a business case

The Human Capital Management Systems Business Case A Checklist to assist agencies developing a business case The Human Capital Management Systems Business Case A Checklist to assist agencies developing a business case Final version for release Human Capital Management See more at psc.nsw.gov.au/hcm Index - Business

More information

ANALYSIS FOR OUTCOMES BETTER USE OF DATA TO IMPROVE OUTCOMES

ANALYSIS FOR OUTCOMES BETTER USE OF DATA TO IMPROVE OUTCOMES Chair Cabinet Committee on State Sector Reform and Expenditure Control ANALYSIS FOR OUTCOMES BETTER USE OF DATA TO IMPROVE OUTCOMES Purpose 1. This paper reports back on business case work to develop a

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

Business Change Mandate (Including Budget Mandates) Proposal Number: B18 Title: Strategic Property Review

Business Change Mandate (Including Budget Mandates) Proposal Number: B18 Title: Strategic Property Review Business Change Mandate (Including Budget Mandates) Proposal Number: B18 Title: Strategic Property Review All information requested must be completed on the proposed mandate to enable the Cabinet to decide

More information

HPF Tool. Template for the Performance and Accountability Statement Second round reviews. Amended December 2012

HPF Tool. Template for the Performance and Accountability Statement Second round reviews. Amended December 2012 HPF Tool Template for the Performance and Accountability Statement Second round reviews Amended December 2012 The High Performance Framework was developed by the Public Sector Performance Commission. This

More information

Financial Management Framework >> Overview Diagram

Financial Management Framework >> Overview Diagram June 2012 The State of Queensland (Queensland Treasury) June 2012 Except where otherwise noted you are free to copy, communicate and adapt this work, as long as you attribute the authors. This document

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

Framework for Managing Programme Performance Information

Framework for Managing Programme Performance Information Framework for Managing Programme Performance Information Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Managing

More information

Property Asset Management in Central Government

Property Asset Management in Central Government Property Asset Management in Central Government REPORT BY THE COMPTROLLER AND AUDITOR GENERAL 13 November 2012 Cover Photograph: Dundonald House, Belfast Report by the Comptroller and Auditor General for

More information

AER reference: 52454; D14/54321 ACCC_09/14_865

AER reference: 52454; D14/54321 ACCC_09/14_865 Commonwealth of Australia 2014 This work is copyright. In addition to any use permitted under the Copyright Act 1968, all material contained within this work is provided under a Creative Commons Attribution

More information

NSW SENIOR EXECUTIVE SERVICE

NSW SENIOR EXECUTIVE SERVICE NSW SENIOR EXECUTIVE SERVICE NSW DEPARTMENT OF EDUCATION AND TRAINING Position Description POSITION DETAILS Position Title: Reports to: Location: Directorate: Chief Financial Officer Deputy Director-General,

More information

AoG Contracts

AoG Contracts January 2016 For more information on anything covered in this guide, please contact the Advertising and Design Centre of Expertise (CoE) at the details below: Advertising and Design CoE New Zealand Government

More information

Government Enterprise Architecture

Government Enterprise Architecture Government Enterprise Architecture GEA-NZ v3.0 Context Document September 2014 Crown copyright. This copyright work is licensed under the Creative Commons Attribution 3.0 New Zealand licence. In essence,

More information

Better Practice Guide

Better Practice Guide Better Practice Guide June 2008 Risk Management COMCOVER Commonwealth of Australia 2008 ISBN 1 921182 78 4 print ISBN 1 921182 79 2 online Department of Finance and Deregulation This work is copyright.

More information

Victorian Government Risk Management Framework. March 2015

Victorian Government Risk Management Framework. March 2015 Victorian Government Risk Management Framework March 2015 This document reproduces parts of the AS/NZS ISO 31000:2099 Risk Management Principles and Guidelines. Permission has been granted by SAI Global

More information

Construction Procurement Policy Project Implementation Process

Construction Procurement Policy Project Implementation Process Construction Procurement Policy Project Implementation Process Government of South Australia Copyright. January 2015 ISBN 978-0-7590-0217-3 The text in this document may be reproduced free-of-charge in

More information

Manager Service Transition

Manager Service Transition Revised Manager Service Transition Your position description Your: Location Group Business unit / team Wellington Organisation Capability & Services IT Solutions / Service Transition Pay Group MGR Band

More information

NSW Government ICT Benefits Realisation and Project Management Guidance

NSW Government ICT Benefits Realisation and Project Management Guidance NSW Government ICT Benefits Realisation and Project Management Guidance November 2014 CONTENTS 1. Introduction 1 2. Document purpose 1 3. Benefits realisation 1 4. Project management 4 5. Document control

More information

ICT Benchmarking: Better Practice Roadmap

ICT Benchmarking: Better Practice Roadmap ICT Benchmarking: Better Practice Roadmap PART 1 VERSION 1.0 ICT Benchmarking: Better Practice Roadmap 1 Licensing The Department of Finance and Deregulation is licensed to use, reproduce, adapt, modify,

More information

National Occupational Standards. Compliance

National Occupational Standards. Compliance National Occupational Standards Compliance NOTES ABOUT NATIONAL OCCUPATIONAL STANDARDS What are National Occupational Standards, and why should you use them? National Occupational Standards (NOS) are statements

More information

Guidelines for Best Practices in Data Management Roles and Responsibilities

Guidelines for Best Practices in Data Management Roles and Responsibilities Guidelines for Best Practices in Data Management Roles and Responsibilities September 2010 Data Architecture Advisory Committee A subcommittee of Information Architecture & Standards Branch Table of Contents

More information

Managing Assets and Contracts at Parliament House

Managing Assets and Contracts at Parliament House The Auditor-General Performance Audit Managing Assets and Contracts at Parliament House Department of Parliamentary Services Australian National Audit Office Commonwealth of Australia 2015 ISSN 1036 7632

More information

Learning & Development Framework for the Civil Service

Learning & Development Framework for the Civil Service Learning & Development Framework for the Civil Service 2011-2014 Table of Contents 1. Introduction & Background... 1 2. Key Objectives and Actions arising... 3 3. Framework Objectives... 4 3.1 Prioritise

More information

Report to Parliament No. 4 for 2011 Information systems governance and security. Financial and Assurance audit. Enhancing public sector accountability

Report to Parliament No. 4 for 2011 Information systems governance and security. Financial and Assurance audit. Enhancing public sector accountability Financial and Assurance audit Report to Parliament No. 4 for 2011 Information systems governance and security ISSN 1834-1128 Enhancing public sector accountability RTP No. 4 cover.indd 1 15/06/2011 3:19:31

More information

Risk Financing and Insurance Buyer s Guide. A guide for government agencies April 2015

Risk Financing and Insurance Buyer s Guide. A guide for government agencies April 2015 Risk Financing and Insurance Buyer s Guide A guide for government agencies April 2015 For more information on anything covered in this guide, please contact the Risk Financing and Insurance Centre of Expertise

More information

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide Standard 1 Governance for Safety and Quality in Health Service Organisations Safety and Quality Improvement Guide 1 1 1October 1 2012 ISBN: Print: 978-1-921983-27-6 Electronic: 978-1-921983-28-3 Suggested

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

Gateway review guidebook. for project owners and review teams

Gateway review guidebook. for project owners and review teams Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and

More information

Guide for the Development of Results-based Management and Accountability Frameworks

Guide for the Development of Results-based Management and Accountability Frameworks Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and

More information

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016 AGENDA ITEM 5 HIGH PEAK BOROUGH COUNCIL Report to the Corporate Select Committee 19th January 2016 TITLE: EXECUTIVE COUNCILLOR: CONTACT OFFICER: WARDS INVOLVED: Housing Revenue Account (HRA) Business Plan

More information

FMCF certification checklist 2014-15 (incorporating the detailed procedures) 2014-15 certification period. Updated May 2015

FMCF certification checklist 2014-15 (incorporating the detailed procedures) 2014-15 certification period. Updated May 2015 FMCF certification checklist 2014-15 (incorporating the detailed procedures) 2014-15 certification period Updated May 2015 The Secretary Department of Treasury and Finance 1 Treasury Place Melbourne Victoria

More information

Guide to Integrated Strategic Asset Management

Guide to Integrated Strategic Asset Management Guide to Integrated Strategic Asset Management AAMCOG Guide to Integrated Strategic Asset Management Version 2.0 28 March 2012 Acknowledgements This guide is based on the Australasian Procurement and Construction

More information

Information Paper 9. Local Government Financial Indicators

Information Paper 9. Local Government Financial Indicators Information Paper 9 Local Government Financial Indicators November, 2006 Introduction Formal financial statements contain a wealth of information. Unfortunately their detail and format often mean it is

More information

FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION

FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION OFFICE OF THE MINISTER OF COMMERCE The Chair CABINET ECONOMIC GROWTH AND INFRASTRUCTURE COMMITTEE FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION PROPOSAL 1 I propose that regulations be promulgated

More information

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant

More information

Assessment of Software for Government

Assessment of Software for Government Version 1.0, April 2012 Aim 1. This document presents an assessment model for selecting software, including open source software, for use across Government, and the wider UK public sector. 2. It is presented

More information

Governance Document Management Framework

Governance Document Management Framework Governance Document Management Framework Relevant Definitions: In the context of this document: AB means Academic Board Contact Officer means the position responsible for the day to day implementation

More information

Disability ACT. Policy Management Framework

Disability ACT. Policy Management Framework Disability ACT Policy Management Framework OCT 2012 Disability ACT Policy Management Framework Version October 2012 Page 1 of 19 1. Context... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Background... 3 1.4

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

Corporate Plan 2015-19

Corporate Plan 2015-19 Corporate Plan 2015-19 i ii Serving the Australian Parliament The DPS Corporate Plan 2015-2019 This corporate plan lays out the strategic direction for the Department of Parliamentary Services for the

More information

Managing ICT contracts in central government. An update

Managing ICT contracts in central government. An update Managing ICT contracts in central government An update Prepared by Audit Scotland June 2015 Auditor General for Scotland The Auditor General s role is to: appoint auditors to Scotland s central government

More information

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

The Framework for Strategic Plans and Annual Performance Plans is also available on www.treasury.gov.za

The Framework for Strategic Plans and Annual Performance Plans is also available on www.treasury.gov.za Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Strategic Plans and Annual Performance Plans is also available

More information

Qualification Outline

Qualification Outline Qualification Outline Certificate IV in Project Management Practice BSB41513 Get it done. Get it done well Web: www.kneedeep.com.au/certification.html Phone: +61 8 7127 4885 Email: admin@kneedeep.com.au

More information

The Gateway Review Process

The Gateway Review Process The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible

More information

Logan City Council. Strategic Planning and Performance Management Framework

Logan City Council. Strategic Planning and Performance Management Framework Logan City Council Strategic Planning and Performance Management Framework 1 Table of contents 1. Overview 3 a) Purpose 3 b) Key Features 3 2. Context 4 a) National Framework for Sustainability 4 b) Elements

More information

E.33 SOI (2009-2014) Statement of Intent. Crown Law For the Year Ended 30 June 2010

E.33 SOI (2009-2014) Statement of Intent. Crown Law For the Year Ended 30 June 2010 E.33 SOI (2009-2014) Statement of Intent Crown Law For the Year Ended 30 June 2010 Contents Foreword: Attorney-General 3 Introduction from the Solicitor-General 4 Nature and Scope of Functions 6 Strategic

More information

Reducing work-related fatalities and serious injury by 2020: Progress toward the target

Reducing work-related fatalities and serious injury by 2020: Progress toward the target Reducing work-related fatalities and serious injury by 2020: Progress toward the target I ISBN 978-0-478-41778-4 (online) March 2015 Disclaimer This work is based on/includes Statistics New Zealand s data

More information