1 Greater Orlando Aviation Authority Buildings Orlando International Airport Orlando, Florida, USA

2 800 flights per day on 40+ commercial airlines 13 th busiest airport in the U.S. / 29 th busiest in the world Boarded 35 million passengers in 2011 Previously a U.S. Air Force base built during World War II

3 Orlando Int l. Airport Orlando Airport covers 58,311 square meters

4 Projects Completed by JENSEN HUGHES: Fire Alarm Program Evaluation & Upgrade for Greater Orlando Aviation Authority (GOAA) Fire Safety Consulting for South Terminal Complex Fire Code Consulting and Design for Airside 1 and 3

5 Challenge: The (GOAA) required an evaluation and upgrade of fire alarm systems in buildings owned on the Orlando Airport campus. Solution: JENSEN HUGHES served as the Owner s Representative, managing the survey, evaluation, recommendations, code analysis, engineering design, system specification, and cost estimating services. The project included two phases: The Fire Alarm Program Evaluation The Fire Alarm Upgrade

6 Fire Alarm Program Evaluation included the following buildings: Main Terminal Building Main Parking Garage Terminal Buildings 1, 3, & 4 This phase of the project benchmarked the existing fire alarm system protection against adopted codes and standards, with specific recommendations to allow the Airport Authority to make appropriate short and long range implementation plans.

7 Fire Alarm Upgrades included the following buildings: Main Terminal Building Airside 4 North Terminal Complex This phase of the project included the removal and replacement of existing conventional fire alarm system components with point-addressable devices and ADA-compliant appliances, and other related system alterations and additions.

8 The upgraded Fire Alarm System: Interfaces with the smoke control and HVAC control systems Provides immediate notification to a manned onsite security post Expands the public address system to become the primary means for Emergency Voice/Alarm Communications needed for evacuation

9 Challenge: To accommodate future passenger growth, the GOAA is planning a 2.2 million square foot South Terminal Complex (STC) addition. Airport fire safety consultation was needed for Phase I. Solution: JENSEN HUGHES performed fire safety consulting services for the 30% of the STC Phase I design, identifying code requirements and performing a Fire Safety Analysis.

10 Orlando Airport Orlando Airport Terminal Expansions

11 The Phase I STC Addition: Will accommodate 10 million domestic and international passengers a year Estimated construction cost $385 M Designed, but not built The Fire Safety Analysis addressed: Occupancy type, building construction, fire resistance ratings, building separations, elevator and conveyance systems criteria, egress provisions, interior finish, fire department access, and identification of areas with fire suppression and fire alarm systems.

12 Challenge: In 2009, Airside 1 and Airside 3 were part of a $187 million dollar rehabilitation/hurricane restoration project at Orlando Airport. Fire engineering was needed to complete the project. Solution: JENSEN HUGHES provided fire protection system design, building and fire code consulting, and the preparation of life safety drawings for various projects.

13 Orlando Airport Orlando Airport Airside 1 and 3

14 The rehabilitation effort included: Modifications to the central energy plant Mechanical and electrical infrastructure upgrades Expansion of hubs New shell space for retail areas A roof skylight The airport maintained its 24 hour airline and passenger service operations during the effort. Work was scheduled so that there was no interference with airport operations.

15 For More Information Contact Us: Michael Ferreira, PE Director Transportation Sector JENSEN HUGHES

ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA 01002-5000

ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA 01002-5000 AMHERST COLLEGE ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA 01002-5000 Michael Zlogar April 11, 2001 Assistant Fire Chief Amherst Fire Department 68 North Pleasant St. Amherst, MA 01004 FIRE ALARM

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 05/23 (3,001 feet long by 75 feet wide), Runway

More information

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) 697-0904 Fax: (508) 697-0940 E-mail: inspection@bridgewaterma.

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) 697-0904 Fax: (508) 697-0940 E-mail: inspection@bridgewaterma. BUILDING PERMIT FEE SCHEDULE - RESIDENTIAL New Dwelling Structure... $0.50/Sq. Ft., Minimum $500.00 Expanded Living Space (In-Law Unit)... $0.50/Sq. Ft., Minimum $300.00 Mechanical HVAC duct work 2% value

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT M.I.T APPARELS LTD PATHANTULY, GODNAIL, SHIDDIRGONJ, NARAYANGONJ OTHER FACTORIES: NONE June 4, 2014 Page 2 SUMMARY was surveyed for fire safety on 6/4/2014 by Hughes Associates,

More information

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report? RHODE ISLAND DIVISION OF STATE FIRE MARSHAL 1951 Smith Street, North Providence, RI 02911 Telephone: (401) 383-7717 Fax: (401) 383-8879 John E. Chartier, EFO, CFI State Fire Marshal Rhode Island State

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

Fire Alarm Systems Requirements by Occupancy Type

Fire Alarm Systems Requirements by Occupancy Type WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Fire Alarm Systems Requirements by Occupancy Type 2013 California Building

More information

Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT

Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT Nate Smith Executive Vice President DFW International Airport DALLAS/FORT WORTH INTERNATIONAL AIRPORT DFW Airport: Connecting the World In four decades of existence, DFW has grown into a global super

More information

Miami Beach Building Department

Miami Beach Building Department Miami Beach Building Department Documents Required To Be Signed and Sealed By A Design Professional (FLORIDA BUILDING CODE) GENERAL CONTRACTOR: If the plans are prepared by a design professional that is

More information

KATHIE CANNING EXECUTIVE DIRECTOR

KATHIE CANNING EXECUTIVE DIRECTOR OVEMBER 20, 2013 DISTRICT NOVEMBER ADVISORY BOARD MEETING KATHIE CANNING EXECUTIVE DIRECTOR AGENDA INTRODUCTION/OVERVIEW 2014 PROJECTIONS COMPETITIVE OVERVIEW 2013 CLIENT ADVISORY BOARD CAPITAL IMPROVEMENT

More information

UK HOSPITAL. Projects NOT Involving the General Fund, Road Fund, or Agency Bonds* Project Title / Description Total Budget Source(s) 2008-2010

UK HOSPITAL. Projects NOT Involving the General Fund, Road Fund, or Agency Bonds* Project Title / Description Total Budget Source(s) 2008-2010 UK HOSPITAL Projects NOT Involving the General Fund, Road Fund, or Agency Bonds* Project Title / Description Total Budget Source(s) 2008-2010 Construct/Purchase Good Sam Medical Office Building... $15,730,000...RF

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities JIA is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual Service Volume (ASV) of the runway

More information

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL January, 2003 Environmental Health and Safety Florida Atlantic University 777 Glades Rd. Boca Raton, FL 33431 Phone: 561-297-3129 Fax:

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

property introduction

property introduction THE PINNACLE IN DOWNTOWN SARASOTA OFFICE SPACE property introduction Built in 1970 as part of the Ellis Group of banks, downtown Sarasota s Ellis Building has always had a healthy and stable mix of business

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011, Updated March 2012 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or

More information

Amendments to the 2012 INTERNATIONAL FIRE CODE

Amendments to the 2012 INTERNATIONAL FIRE CODE Amendments to the 2012 INTERNATIONAL FIRE CODE 2012 Edition, International Fire Code. Section 101.1 Amend to read as follows. 101.1 Title. These regulations shall be known as the Fire Code of the City

More information

THE UNIVERSITY OF WYOMING BOARD OF TRUSTEES REPORT. Conference Call Meeting Wednesday, October 14, 2015

THE UNIVERSITY OF WYOMING BOARD OF TRUSTEES REPORT. Conference Call Meeting Wednesday, October 14, 2015 THE UNIVERSITY OF WYOMING BOARD OF TRUSTEES REPORT Conference Call Meeting Wednesday, October 14, 2015 The final report can be found on the University of Wyoming Board of Trustees website at http://www.uwyo.edu/trustees/

More information

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 GUIDELINES FOR THE PREPARATION OF FIRE PROTECTION SYSTEM NARRATIVE REPORTS 780 CMR 903.1.1 State

More information

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008 SOCIETY OF FIRE PROTECTION ENGINEERS (SFPE) NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS (NSPE) NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET) POSITION STATEMENT THE ENGINEER AND

More information

Planned Procurement Opportunities Report. August 2014

Planned Procurement Opportunities Report. August 2014 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report August 2014 Prepared by the Procurement Department Planned Procurement Opportunities Report - August 2014 Overview The Planned

More information

Global Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems.

Global Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems. Company Overview Finding simple solutions to complex problems. ON M9B 6H7 AB T2H 1Z9 339941 From our offices in,, and, we serve our national and international clients by providing cost-effective solutions

More information

FIRE MARSHAL BULLETIN

FIRE MARSHAL BULLETIN NASSAU COUNTY FIRE COMMISSION OFFICE OF THE FIRE MARSHAL Nassau County Public Safety Center 1194 Prospect Avenue Westbury, New York 11590 (516) 573-9900 / nassaucountyny.gov Chief Fire Marshal Scott D.

More information

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 7L/25R (10,500 feet long by 150 feet wide),

More information

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013 Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems April 2013 The National Multi Housing Council and the National Apartment Association (NMHC/NAA) have

More information

ELECTRICAL ENGINEERING INTRODUCTION ENGINEERING YOUR FUTURE

ELECTRICAL ENGINEERING INTRODUCTION ENGINEERING YOUR FUTURE ELECTRICAL ENGINEERING INTRODUCTION ENGINEERING YOUR FUTURE Agenda What is Engineering? Different disciplines What is Electrical Engineering? Different Subdisciplines. Background and overview Main Electrical

More information

Policy on Repair and Renovation Funding

Policy on Repair and Renovation Funding Policy on Repair and Renovation Funding I. POLICY STATEMENT Auburn University s (the University s) Policy on Repair and Renovation Funding provides guidance and direction regarding the use of Repair and

More information

LOGAN TERMINAL B SUBSTATION UPGRADE

LOGAN TERMINAL B SUBSTATION UPGRADE AIRPORTS LOGAN TERMINAL E AND HEATING PLANT 5 KV AND 15 KV UPGRADES D 2015 Design replacement of two double-ended substations, HVAC upgrades for six substations, upgrades to 400 hertz gate power central

More information

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009 2009 Seattle Energy Code Impacts: Building Envelope Impacts: Below is a Summary of Changes that impact building envelope construction planned for 624 Yale. There are several modifications are required

More information

Data Center Due Diligence List

Data Center Due Diligence List Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West

More information

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS CHAPTER 93 MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS Note: Chapter 93 is entirely Seattle amendments to the International Fire Code and is not underlined. Point of Information The requirements of this

More information

DRAWING DESIGN GUIDELINES

DRAWING DESIGN GUIDELINES City of Powell River DRAWING DESIGN GUIDELINES RESIDENTIALCONSTRUCTION The purpose of these guidelines is to provide assistance to the homeowner in order to prepare acceptable design drawings for the building

More information

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS 5200, 5250, 5300 AUTO CLUB DRIVE DEARBORN, MICHIGAN Ideal location minutes from Detroit Metro Airport, four expressways and hours from entire Midwest and

More information

Lease Security Standards: Instructions for Lease Acquisitions

Lease Security Standards: Instructions for Lease Acquisitions Addendum 1 Lease Security Standards: Instructions for Lease Acquisitions 1. Summary. a. The Interagency Security Committee (ISC) Standards will provide a consistent level of security to federal tenants

More information

James R. Quiter, P.E., Senior Vice President Rolf Jensen & Associates, Inc.

James R. Quiter, P.E., Senior Vice President Rolf Jensen & Associates, Inc. AT THE STRATOSPHERE TOWER, LAS VEGAS NEVADA By: James R. Quiter, P.E., Senior Vice President Rolf Jensen & Associates, Inc. INTRODUCTION This paper discusses the performance based approach to fire protection

More information

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009 FIRE ALARM PLAN REVIEW Office of the State Fire Marshal Massachusetts December 2009 SURPRISE QUIZ 1. A fire alarm system is required to be installed by the MSBC, what edition of NFPA 72 do you use? 2.

More information

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS 1) GENERAL GUIDELINES a) The following rules, regulations,

More information

2014 Oregon Structural Specialty Code New Oregon Amendments

2014 Oregon Structural Specialty Code New Oregon Amendments 204 OSSC Oregon Amendments Effective July, 204 204 Oregon Structural Specialty Code New Oregon Amendments This document outlines all new Oregon Amendments adopted during the code promulgation process for

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or comments regarding the

More information

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Grapevine Mills is located at the interchange of SR 121 and Grapevine Mills Parkway. It is centrally located just 20 miles northwest of Dallas and

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT SURAVEE GARMENTS LIMITED 2/C DARUS SALAM ROAD, MIRPUR OTHER FACTORIES: BABYLON CASUALWEAR LTD & ABONI FASHION March 29, 2014 Page 2 SUMMARY was surveyed for fire safety on

More information

Code Requirements for Existing Buildings

Code Requirements for Existing Buildings Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

Safety Management System

Safety Management System Safety Management System 2 Contents 1. What is SMS? 3 2. Why was SMS developed? 3 3. What are the components of SMS? 4 4. How is SMS organized at Fraport? 5 5. How Does SMS Define Itself In Relation to

More information

AGENDA. Item 2 Fire Alarm & Fire Protection Annual Maintenance $ 200,000 Month to Month SimplexGrinnell Harahan, Louisiana

AGENDA. Item 2 Fire Alarm & Fire Protection Annual Maintenance $ 200,000 Month to Month SimplexGrinnell Harahan, Louisiana Thursday, January 13, 2011 9:00 A.M. Item 1 Report of DBE Grievance Philistine Ferrand, DBE Liaison Officer Item 2 Fire Alarm & Fire Protection Annual Maintenance $ 200,000 Month to Month SimplexGrinnell

More information

Projects Index. Roger D. Fields & Associates Current Projects (614) 451-2248 rogerfields@rdfa.com

Projects Index. Roger D. Fields & Associates Current Projects (614) 451-2248 rogerfields@rdfa.com Projects Index Facility Study and Five Year Capital Improvements Plan 2012-2016... 2 Energy Conservation Program, House Bill 264... 3 New Rosemore Middle School... 4 Medical/Dental Addition, Lorain Correctional

More information

Executive Flight Office & Hangar

Executive Flight Office & Hangar ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 Exceptional value for world class 64,305 sq. ft. hangar facility in Eastern Washington ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 THE

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information

CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR PUBLIC SCHOOLS, CHARTER SCHOOLS AND JUNIOR COLLEGES

CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR PUBLIC SCHOOLS, CHARTER SCHOOLS AND JUNIOR COLLEGES DEPARTMENT OF PUBLIC SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR PUBLIC SCHOOLS, CHARTER SCHOOLS AND JUNIOR COLLEGES 8 CCR 1507-30 [Editor s Notes follow the text of the rules at the end

More information

STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT The University at Buffalo Medical School was established in downtown Buffalo, New York in 1846. Later additional schools were added

More information

Aurora Mall. Aurora (Denver), Colorado

Aurora Mall. Aurora (Denver), Colorado is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion

More information

Planned Procurement Opportunities Report. June 2015

Planned Procurement Opportunities Report. June 2015 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report June 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted

More information

2007 ICC FINAL ACTION AGENDA

2007 ICC FINAL ACTION AGENDA 907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more. Activation of the fire alarm in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal

More information

the Most Out of Your Facilities Christopher P. Hodges, P.E., CFM, LEED-AP, IFMA Fellow

the Most Out of Your Facilities Christopher P. Hodges, P.E., CFM, LEED-AP, IFMA Fellow Maximizing Building Life Cycle to Get the Most Out of Your Facilities Christopher P. Hodges, P.E., CFM, LEED-AP, IFMA Fellow Facility Engineering i Associates The Financial i Case for Facilities Corporate

More information

build safe live safe

build safe live safe NYC Buildings Department 280 Broadway, New York, NY 10007 Robert D. LiMandri, Commissioner BUILDINGS BULLETIN 2012-009 Technical Supersedes: Issuer: None Thomas Fariello, R.A. First Deputy Commissioner

More information

Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc

Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc By: Katie Tucker, Sales Representative, Rolyn Companies, Inc Are you and your facility disaster ready? As reported by the Red Cross, as many as 40 percent of small businesses do not reopen after a major

More information

PROSPECTUS - ALTERATION Prospectus for Design

PROSPECTUS - ALTERATION Prospectus for Design Description fhe General Services Administration (GSA) is seeking authorization for design projects during liscal year 2011 that we will schedule for construction in future years. Project descriptions are

More information

SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM

SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM ENGINEERING SPECIFICATION INTELLIGENT REPORTING FIRE DETECTION SYSTEM PART 1 GENERAL 1.1 DESCRIPTION A. This specification includes the furnishing,

More information

BOMA OFFICE INCOME & EXPENSE SURVEY FORM

BOMA OFFICE INCOME & EXPENSE SURVEY FORM BOMA OFFICE INCOME & EXPENSE SURVEY FORM ( * = Required Field ) Step 1: Contact Information Create an Account or Login Data for Calendar or Fiscal Year 2015 Name Company Name Address Suite City State/Province

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

Business Information Technology. Airport Roundtable. San Jose McEnery Convention Center San Jose, CA September 21, 2013

Business Information Technology. Airport Roundtable. San Jose McEnery Convention Center San Jose, CA September 21, 2013 Business Information Technology Airport Roundtable San Jose McEnery Convention Center San Jose, CA September 2, 203 Asheville Regional Airport ) Upgrading from Cisco Unified Communications Manager from

More information

Fire Alarm Systems Permit Packet. City of Greer Fire Department

Fire Alarm Systems Permit Packet. City of Greer Fire Department Fire Alarm Systems Permit Packet City of Greer Fire Department Updated July 2004 If you have any questions or comments regarding the information contained within; or of you need assistance interpreting

More information

NFPA 91 1999 Edition. 2.1.9 Fire dampers shall be permitted to be installed in exhaust systems in the following situations:

NFPA 91 1999 Edition. 2.1.9 Fire dampers shall be permitted to be installed in exhaust systems in the following situations: NFPA 91 1999 Edition 2.1.9 Fire dampers shall be permitted to be installed in exhaust systems in the following situations: 1) Where ducts pass through fire barriers (2) Where a collection system installed

More information

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms U.S. Department of the Interior Bureau of Indian Affairs Division of Safety and Risk Management Introduction

More information

Protecting your property s safety and performance with comprehensive, strategic solutions.

Protecting your property s safety and performance with comprehensive, strategic solutions. Protecting your property s safety and performance with comprehensive, strategic solutions. Program Management Raba Kistner Facilities, Inc. provides a specialized offering of services that ultimately creates

More information

www.maurerarchitecture.com

www.maurerarchitecture.com Design Guidelines, Historic Districts and Codes as Downtown Development Tools The NC Rehab Code and Its Benefits for Older Buildings North Carolina Main Street Conference January 25-27, 2012 History of

More information

Fees When A Permit Is Required:

Fees When A Permit Is Required: Fees When A Permit Is Required: GENERAL CONSTRUCTION Building Permit fees are divided into two categories - flat fee or area-calculated fee; find the work description in either the FLAT FEE SCHEDULE below

More information

Great Plains Annual Conference of the United Methodist Church Property/Casualty Insurance Application

Great Plains Annual Conference of the United Methodist Church Property/Casualty Insurance Application Requested Effective Date Incorporation Date Name of Church Federal ID Street Address City State Zip Church Phone Fax Church District Church Conference Current Insurance Company Name of Person Completing

More information

Experts in Life Safety and Security Systems since 1977

Experts in Life Safety and Security Systems since 1977 Experts in Life Safety and Security Systems since 1977 Bass-United. Your Go-To Team For Life Safety and Security Solutions. Bass-United began in 1977 with one man and his passion for life safety and technology.

More information

Electrical Contractors. and the. New Jersey. Rehabilitation Code

Electrical Contractors. and the. New Jersey. Rehabilitation Code Electrical Contractors and the New Jersey Rehabilitation Code Alan Chech Electrical Seminars 609-890-7072 www.alanchech.com Information is based on the presently adopted electrical subcode NEC 2005. Current

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER

More information

PROSPECTUS ALTERATION DENVER FEDERAL CENTER BUILDING 53 LAKEWOOD, CO

PROSPECTUS ALTERATION DENVER FEDERAL CENTER BUILDING 53 LAKEWOOD, CO FY2015 Project Summary The General Services Administration (GSA) proposes a repair and alteration project to undertake system and architectural repairs as well as alteration of existing space at the Denver

More information

Emergency Voice Communication in High-Rise Buildings. Presented by: Michael J. Klemenz, PE, SFPE

Emergency Voice Communication in High-Rise Buildings. Presented by: Michael J. Klemenz, PE, SFPE Emergency Voice Communication in High-Rise Buildings Presented by: Michael J. Klemenz, PE, SFPE Society of Fire Protection Engineers (SFPE) Established in 1950 and incorporated as an independent organization

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LTD UNIT-1 EAST ISDAIR, CHANDMARI, FATULLAH OTHER FACTORIES: FAKIR KNIT LTD. July 20, 2014 Page 2 SUMMARY was surveyed for fire safety on 7/20/2014 by

More information

Accessible Means of Egress

Accessible Means of Egress U. S. A CCESS B O A R D T E C H N I C A L G U I D E This guide explains requirements in the ADA Standards and referenced sections of the International Building Code (IBC) and was developed in cooperation

More information

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all

More information

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or 9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing

More information

Construction Management Association of America San Diego Chapter

Construction Management Association of America San Diego Chapter Construction Management Association of America San Diego Chapter An Overview of 2015-2019 Capital Improvement Program Presented by: Iraj Ghaemi, P.E., Director Facilities Development November 13, 2014

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

Flexible Office Space Up to 66,240 Ft 2

Flexible Office Space Up to 66,240 Ft 2 Flexible Office Space Up to 66,240 Ft 2 Building Description: Wide Open Large Office Complex Numerous Perimeter Offices, Conference & Break Rooms and Wide Open Office Space Throughout Can Be Modified to

More information

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt

More information

Comprehensive Solutions for Data Centers. Rely on Siemens for maximum uptime, reliability, and efficiency. www.usa.siemens.

Comprehensive Solutions for Data Centers. Rely on Siemens for maximum uptime, reliability, and efficiency. www.usa.siemens. Comprehensive Solutions for Data Centers Rely on Siemens for maximum uptime, reliability, and efficiency. www.usa.siemens.com/datacenters Siemens can meet the demands of your mission critical facility.

More information

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

IFE Level 4 Certificate in Fire Science and Fire Safety (HL) IFE Level 4 Certificate in Fire Science and Fire Safety (HL) Unit 2: Fire Safety Unit Reference Number: D/505/5932 Introduction This unit focuses on the prevention and detection of fire in premises and

More information

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards

More information

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

2.4 Protected Elevators For Egress And Access During Fires In Tall Buildings

2.4 Protected Elevators For Egress And Access During Fires In Tall Buildings 2.4 Protected Elevators For Egress And Access During Fires In Tall Buildings Richard W. Bukowski, P.E., FSFPE NIST Building and Fire Research Laboratory The events of September 11, 2001 have generated

More information

PROSPECTUS ALTERATION HART-DOLE-INOUYE FEDERAL CENTER BATTLE CREEK, MI

PROSPECTUS ALTERATION HART-DOLE-INOUYE FEDERAL CENTER BATTLE CREEK, MI Prospectus Number: PMI-0501-BA15 FY2015 Project Summary The General Services Administration (GSA) proposes a repair and alteration project to upgrade components of the fire and life safety systems at the

More information

Emirates Airline. Cargo Security The EK Experience

Emirates Airline. Cargo Security The EK Experience Emirates Airline Cargo Security The EK Experience The aim of Aviation Security The aim of aviation security is to safeguard passengers, crew, ground personnel and the general public from acts of unlawful

More information

Under Section: II Required Services: Under Section: III Leased Premises:

Under Section: II Required Services: Under Section: III Leased Premises: May 14, 2012 The following are submitted in response to questions and for clarification. Under Section: II Required Services: 4. Maintenance, repair, and servicing of aircraft: Please clarify that the

More information

Division 21. Fire Suppression

Division 21. Fire Suppression 21 00 00. Fire Suppression For campus projects that require a fire suppression system shut down in a campus facility, a Shut Down Procedure of Fire Safety System Sheet must be completed and filed seven

More information

Tier IV Enterprise - Class Data Center

Tier IV Enterprise - Class Data Center Tier IV Enterprise - Class Data Center Colocation Cloud Hosting Broward Data Center Datasheet Managed Hosting Dedicated Servers www.volico.com Site Specification Security Site Specification Floor Space

More information

M E M O R A N D U M. To: Partnership for Safer Buildings Date: 21 March 2003

M E M O R A N D U M. To: Partnership for Safer Buildings Date: 21 March 2003 M E M O R A N D U M To: Partnership for Safer Buildings Date: 21 March 2003 From: Codes Assessment Subcommittee Walter Smittle III, Chairman Re: Building Code Fire Safety Concerns: NFPA 5000, Building

More information

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline Cx for Enhanced Healthcare Project Delivery Rick Staley Sr. Construction Manager PH&S Joe Webb Construction Manager PH&S Richard Beam Director, Energy Management Services PH&S Todd McGuire, PE - Sr. Project

More information

2006 Report Card for Pennsylvania s Infrastructure

2006 Report Card for Pennsylvania s Infrastructure AVIATION C- 2006 Report Card for Pennsylvania s Infrastructure Philadelphia International Airport (PHL) is currently one of the fastest growing airports in the world. It is also one of the most delay-prone

More information

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 PERMIT AUTHORIZATION EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 El Lago ordinances require the issuance of building permits as a method of enforcing code minimums, ensuring

More information

Ms. Jarrette reported that operations at OEA, with inquiries/complaints. These approaches to runways 07 and

Ms. Jarrette reported that operations at OEA, with inquiries/complaints. These approaches to runways 07 and On Thursday, July 9, 2015 the Aviation Noise Abatement Committee (ANAC) of the Greater Orlando Aviation Authority met in regular session at University of Florida IFAS Extension, South Conway Road, Orlando,

More information

Metropolitan Washington Airports Authority Office of Public Safety Fire & Rescue Department. Fire Code Enforcement Division

Metropolitan Washington Airports Authority Office of Public Safety Fire & Rescue Department. Fire Code Enforcement Division Metropolitan Washington Airports Authority Office of Public Safety Fire & Rescue Department Fire Code Enforcement Division Fire Protection System Impairment Requirements For Contractors and Service Personnel

More information

REQUIRED RESIDENTIAL PERMITS AND INFORMATION TO SUBMIT FOR PERMIT

REQUIRED RESIDENTIAL PERMITS AND INFORMATION TO SUBMIT FOR PERMIT REQUIRED RESIDENTIAL PERMITS AND INFORMATION TO SUBMIT FOR PERMIT Any item listed that requires a permit also requires a permit application to be filled out completely at the time of the plan submittal.

More information