1 Tunnelling and Underground Space Technology 22 (2007) Tunnelling and Underground Space Technology incorporating Trenchless Technology Research A methodology for evaluation and classification of rock mass quality on tunnel engineering Chao-Shi Chen, Ya-Ching Liu * Department of Resources Engineering, National Cheng Kung University, Tainan, Taiwan Received 4 May 2006; received in revised form 18 October 2006; accepted 18 October 2006 Available online 30 November 2006 Abstract In this paper a new methodology for evaluation and classification of rock mass quality that can be applied to rock tunneling is presented. An evaluation model based on combing the analytic hierarchy process (AHP) and the fuzzy Delphi method (FDM) for assessing the rock mass rating is the main procedure. This research treats rock mass classification as a group decision problem, and applies the fuzzy logic theory as the criterion to calculate the weighting of factors. The main advantage of this procedure is that it can effectively change the weighting of each rating parameter with the variation of geological conditions. The proposed method was evaluated and applied to the actual cases that are the two tunnels along the Second Northern Highway around Taipei area in Taiwan, namely Mu- Zha and Hsin-Tien tunnels. It was found that the determined results were in a good agreement with the original data assessed by the RMR. Results of the analyses show that it can be provided a more quantitative measure of rock mass and hence minimize judgmental bias. The proposed method should be more feasible for future tunnel construction and for suggestions of tunnel support design in the geological area of Taiwan. Ó 2006 Elsevier Ltd. All rights reserved. Keywords: Rock mass classification; Fuzzy Delphi method; Analytic hierarchy process method 1. Introduction Due to the high percentage of mountainous area in Taiwan, up to 75%, tunneling projects have been very frequently included in the construction of many roads and railways. The mechanism of tunnel engineering is quite complicated. Applying mechanical analytical method in design of tunnel supports is, to a certain degree, also difficult. To this day, empirical design methods are still commonly used in the engineering practices. In the 1970s, several rock mass classification systems were proposed for tunneling and underground excavation, which belonged to the empirical design methods with rudiment of the expert system. In the last decades, the rock mass classification concept has been applied * Corresponding author. addresses: chencs@mail.ncku.edu.tw (C.-S. Chen), n @ mail.ncku.edu.tw (Y.-C. Liu). extensively on engineering design and construction such as tunnels, slopes and, foundations for a long time. The main objective of rock mass classification is used to provide quantitative data and guidelines for engineering purpose that can improve originally abstract descriptions of geological formation. Until now for rock engineering, the most commonly used rock mass classification systems are RSR (Wickham et al., 1972), RMR (Bieniawski, 1973, 1975, 1979, 1989), and Q-system (Barton et al., 1974). However, these traditional classification systems, which ignored the regional and local geological features and rock properties, were constructed with the fixed weight for each rating factor. They often result a certain degree of rating deviation in the same case by different investigators. In addition, the main island of Taiwan is relatively young in geological era and situates at plate borders, thus rock property, rock strength, overburden, excavation span and groundwater are greatly different from those in the area where the well-known rock mass /$ - see front matter Ó 2006 Elsevier Ltd. All rights reserved. doi: /j.tust
2 378 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) classifications originated. Therefore, it is necessary to establish a new rock mass classification system for engineering practices in Taiwan. The main objective of this paper is to present a systemic procedure combined the analytic hierarchy process (Saaty, 1980) and the fuzzy Delphi method (Kaufmann and Gupta, 1988) for assessing the rock mass rating. The proposed method is based on the concept of the hierarchy structure for rock mass quality evaluation which can display the relationship of each criterion (or parameter) and define easily the feasible model for different project, purpose and geology. This research treats the rock classification as a group decision problem because that is analogous to multi-feature pattern recognition problem involving the past history accumulated and the professional opinions of engineer. How can we lower down uncertainties in expert opinion and the decision process? The fuzzy logic theory on the criterion of weighting calculations is applied. The fuzzy Delphi method not only saves the survey time and cost but also denotes the group opinions clearly. The main advantage of this procedure is that it can also effectively change the weighting of each rating parameter with the variation of geological conditions based on two rounds of investigations and comprehensive discussions by a group of experts. In this paper, the proposed method can be successfully applied to determine the ratings of rock mass for the cases of tunneling. 135 cross-sections of two tunnels in the Second Northern Highway were selected to assess the rating of rock mass. It was found that the results determined by the proposed method were in a good agreement with the original data assessed by the RMR. Table 1 Fundamental scale of the AHP (Saaty, 1980) Intensity of Definition importance Explanation 1 Equal importance Two activities contribute equally to the objective 2 Weak 3 Moderate importance Experience and judgment slightly favor one activity over another 4 Moderate plus 5 Strong importance Experience and judgment strongly favor one activity over another 6 Strong plus 7 Very strong or demonstrated importance An activity is favored very strongly over another; its dominance demonstrated in practice 8 Very, very strong 9 Extreme importance The evidence favoring one activity over another is of the highest possible order of affirmation Reciprocals of above Rationals If activity i has one of the above nonzero numbers assigned to it when compared with activity j, then j has the reciprocal value when compared with i Ratios arising from the scale A reasonable assumption If consistency were to be forced by obtaining n numerical values to span the matrix State Problems Decision of Assessment Factors and Hierarchy for RMR Pairwise Comparison Calculation of Priority Vector and Maximum Eigenvalue Consistence Check Weights of Factors Fig. 1. A flow chart of the proposed method.
3 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) Fig. 2. The hierarchy of the rock mass quality evaluation on tunneling project. Dear Sirs: The academic questionnaire is to investigate for evaluation and classification of rock mass quality. It is sincerely invited that you spend a few minutes to complete the questionnaire and return to us at your earliest convenience. No personal or corporate information will be made public. Please be assured that your answers will be kept in strict confidence and take the time to fill out this questionnaire as accurately as possible. Your help is crucial to this research. We deeply appreciate your cooperation. Thank you Yours faithfully Questionnaire design For example: Based on the hierarchy for rock mass evaluation, please fill your opinion inside the below table to judge the degree of importance by Saaty s scale. If the expert think Rock material essentiality is weak important than Groundwater, he/she may write down 3 in the corresponding blank. The rest may be deduced by analogy. Please start writing down the scale of contribution at the following matrix based on your expertise. Reading order: from left to right Table 1 Pairwise comparison of the 1 st layer Rock material essentiality Rock material essentiality Groundwater Features of discontinuities Groundwater 1/3 1 1/2 Features of discontinuities 1/5 2 1 Fig. 3. An example of the questionnaire for rock mass evaluation.
4 380 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) Results show that it can be used to determine the rock mass ratings of tunneling as a simple design assessment method for tunnel supports system and suite for tunnel engineering in Taiwan. 2. Methodology Although currently used rock mass rating systems as RMR and NGI-Q system still can be applied for the consolidated rock before Miocene. But, some of the factors weighting should be reviewed and adjusted to fit with Taiwan s special geological background. For that soft rock younger than Miocene and other composite strata, appropriate rock mass classification for tunnel should be established in the near future. The objective of this study is to introduce a different viewpoint to establish the rock mass quality evaluation model. This research treats the rock classification as a group decision problem. In developing the analytical framework, two issues are addressed. We expressed briefly as follows: many decisions involve criteria and goals, many of which are conflicting with some quantitative and some qualitative. We called this type of decision-making as multiple criteria decision-making (MCDM). One of the methods employed to support MCDM is the AHP. It is a powerful approach to adjust the factors weighting to fit with Taiwan s special geological background. In addition to MCDM, another key point is that groups must make decisions. It is known that group decision-making is a very important and powerful tool to accelerate the consensus of various opinions from experts, which are experienced in practices. In this section, the FDM was taken to synthesize their responses for the questionnaires. The FDM is a methodology in which subjective data of experts are transformed into quasi-objective data using the statistical analysis and fuzzy operations. The main advantages of FDM are that it can reduce the numbers of surveys to save time and cost and it also includes the individual attributes of all experts. From the above-mentioned point, the same way can be applied on the problem of rock mass quality evaluation. The newly developed systemic procedure presented in this paper is based on combining the AHP and the FDM in tunnel engineering. Fig. 1 illustrates the flow chart of this paper. 3. Structure the hierarchy from the top (the objectives from a decision-maker s viewpoint) through the intermediate levels (criteria on which subsequent levels depend) to the lowest level, which usually contains the list of alternatives. 4. Design the format of questionnaire items as to process according to the hierarchy in step 2. And then to collect input by a pairwise comparison of decision elements. 5. On the basis of the data obtained from the respondents through the questionnaires, construct a set of pair-wise comparison matrices (size n n) for each of the lower levels with one matrix for each element in the level immediately above by using the relative scale 2.1. Rock mass quality evaluation analysis In this paper the major steps for evaluating rock mass quality rating proposed in an orderly manner are shown in the following: 1. Define the problem (group decision making) and determine its goal (rock mass rating). 2. Selection and determination of evaluating rock mass parameters for different types of engineering projects (such as tunnels or slopes). Fig. 4. The location of two case tunnels along the Second Northern Highway.
5 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) measurement which is the same as Saaty s scale (1980) shown in Table 1. The pair-wise comparisons are done in terms of which element dominates the other. 6. Use the eigenvalue method to estimate the consistence index. 7. Determine whether the input data satisfies a consistence check. If it does not, go back to step 1and redo the pairwise comparisons. In this step, the inconsistency of judgments through the matrix can be captured using the largest eigenvalue, k max. Given an n n square matrix, a number, (k max n), measures the deviation of the judgments from the consistent approximation. The closer k max is to n, the more consistent is the result. The deviation of consistency is represented by the consistency index (CI), which is defined as, CI ¼ðk max nþ=ðn 1Þ: ð1þ 8. Calculate the relative fuzzy weights of the decision elements using the following three steps based on the FDM and aggregate the relative fuzzy weights to obtain scores for the decision alternation. (1) Compute the triangular fuzzy numbers (TFNs) fa ij as defined in Eq. (2). In this work, TFNs that represent the pessimistic, moderate and optimistic estimate are used to represent the opinions of experts for each activity time. ~a ij ¼ða ij ; d ij ; c ij Þ; ð2þ a ij ¼ Minðb ijk Þ; k ¼ 1;...; n; ð3þ d ij ¼ Yn k¼1 b ijk! 1=n; k ¼ 1;...; n; ð4þ c ij ¼ Maxðb ijk Þ; k ¼ 1;...; n; ð5þ Table 2 General information of two tunnel sites Name Hsin-Tien tunnel Mu-Zha tunnel Tunnel features Lithology Thick sandstone Sandstone Average sandstone and shale Average sandstone Shale Tuff Site position along the highway k k k k Numbers of cross-section selected Excavation method NATM NATM Drilling and blasting Road-header machine Usage Highway Highway NATM: the new Austrian tunneling method, so named by Rabcewicz (1964) and now generally known as NATM. Fig. 5. The standard cross-section of the two tunnels (three-lanes with sidewalk).
6 382 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) Fig. 6. Geological profile map of the Mu-Zha tunnel. where aij 6 dij 6 cij, aij, dij, cij 2 [1/9, 1] [ [1, 9] and aij, dij, cij are obtained from Eqs. (3) (5). aij indicates the lower bound and cij indicates the upper bound. bijk indicates the relative intensity of importance of expert k between activities i and j. n is the number of experts in consisting of a group. (2) Following outlined above, we obtained a fuzzy posie tive reciprocal matrix A e ¼ ½~ A aij ; ~ aij ~ aji 1; 8i; j ¼ 1; 2;... ; n; or 2 ð1; 1; 1Þ ða12 ; d12 ; c12 Þ e ¼6 A 4 ð1=c12 ; 1=d12 ; 1=a12 Þ ð1; 1; 1Þ ða13 ; d13 ; c13 Þ 3 7 ða23 ; d23 ; c23 Þ 5 ð1=c13 ; 1=d13 ; 1=a13 Þ ð1=c23 ; 1=d23 ; 1=a23 Þ ð1; 1; 1Þ ð6þ (3) Calculate the relative fuzzy weights of the evaluation factors. e i ¼ ~aij ~ain 1=n ; Z 1 ei¼ Z ei Z ei Z en W ð7þ where, ae1 ae2 ffi ða1 a2 ; d1 d2 ; c1 c2 Þ: Fig. 7. The field condition for shaft excavation method of the Hsin-Tien tunnel. Fig. 8. The field condition for shaft excavation method of the Mu-Zha tunnel.
7 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) Table 3a Partial results of the rock mass rating and classification on the Hsin-Tien tunnel Case Nos Site position k k k k k k Strength RQD Spacing Condition Groundwater Orientation Rating in this study RMR Classification in this study V V V V III III Classification Of RMR IV IV IV IV III III Table 3b Partial results of the rock mass rating and classification on the Mu-Zha tunnel Case Nos Site position k k k k k k Strength RQD Spacing Condition Groundwater Orientation Rating in this study RMR Classification in this study V V VI VI IV IV Classification Of RMR IV IV IV IV III III The symbol here denotes the multiplication of fuzzy numbers and the symbol, and here denotes the addition of fuzzy numbers. fw i is a row vector in consist of a fuzzy weight of the ith factor. ew i ¼ ðw 1 ; w 2 ; w 3 Þ, and W i is a fuzzy weight of the ith factor. W i ¼ ð Q 3 j¼1 w jþ 1=3. Table 4 The interval ratings to account for evaluating parameters in tunneling (Bieniawski, 1989) Total rating (goal) Main aspects (subject) Rock quality indexes (criteria) Range of values Score Rock essential Intact rock strength > <1 material Uniaxial compressive strength (MPa) RQD% (rock quality <25 None designation) Groundwater Groundwater condition Completely dry Damp Wet Dripping Flowing None General condition Feature of Spacing of >2 m m mm mm <60 mm None discontinuities discontinuities Conditions of A B C D E None discontinuities a a Conditions of discontinuities Criteria A B C D E Conditions of discontinuities Very rough surfaces; Not continuous; No Separation; Unweathered wall rock Slightly rough surfaces; Separation < 1 mm; Slightly weathered walls Slightly rough surfaces; Separation < 1 mm; Highly weathered walls Slickenside surfaces; Continuous gouge < 5 mm thick or separation 1 5 mm Continuous soft gouge > 5 mm thick or separation > 5 mm
8 384 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) Table 5 The descriptive statistics of rock mass ratings by RMR and the proposed method Valid N Mean Min Max Range Variance Standard deviation Standard error This study RMR on the findings of the field investigation, literature review and collected assistant data, five parameters were found relevant to rock mass quality. In the present study, there are three main aspects for rock mass quality evaluation on the tunnels, i.e., rock material essentiality (including intact rock strength and RQD), groundwater, and features of discontinuities (including spacing and condition). The proposed evaluating system for tunnels contains three layers of hierarchy as shown in Fig Determining the weights of factors The total weights were determined by the proposed method and should be conformed to the consistence check as described in the previous section. We can see the example of the questionnaire shown such as Fig. 3. For the geomathematical analysis, matrix coding was done and rating values were designated for subcategories of each parameter to construct pull down menus. Through one round of investigation papers, replied by 13 experts and through a series of comprehensive discussions, the assessment factors and fuzzy weights can be decided as Fig. 2. Our original evaluating system contains three layers of hierarchy as shown in the following. The number listed in the brackets is the total weight of each element. Fig. 9. Distributions of the rock mass rating which are calculated by the RMR and the proposed method Rock mass quality evaluation on tunnel engineering Decision of factors for rock mass quality evaluation Among all stages in Fig. 1, the stage for factors decision and hierarchy is technically the most important one. Based Table 6 Rock mass rating classified for the tunnels along the Second Northern Highway in Taiwan (modified) Class number Q-value RMR FDAHP (This paper proposed) I >40 >77 >76 II III IV V VI F1 rock material essentiality (0.357) F 11 intact rock strength (0.528) F 12 RQD (0.472) F2 groundwater (0.162) F3 features of discontinuities (0.481) F 31 discontinuous spacing (0.417) F 32 discontinuous condition (0.583) Then, we can define that the rock mass total rating (TR) is equal to the summation of total weights of the three main aspects, TR ¼ðF 1 þ F 2 þ F 3Þ10; ð8þ F 1 ¼ 0:357 ð0:528 F 11 þ 0:472 F 12 Þ; ð9þ F 2 ¼ 0:162 F 21 ; ð10þ F 3 ¼ 0:481 ð0:417 F 31 þ 0:583 F 32 Þ; ð11þ where F1, F2, and F3 are the total rating with respect to the three main aspects. F 11 is the interval rating of intact rock strength, F 12 is interval rating of RQD, F 21 is the interval rating of ground water condition, F 31 is the interval rating of discontinuous spacing and F 32 is the interval rating of discontinuous condition (see Table 4). Finally, rock mass rating was calculated for each tunnel cross-section, higher values of the rating indicate higher
9 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) degrees of rock mass quality and could be classified to less support need. 3. Case study 3.1. Site description In this paper, two tunnel sites, namely Hsin-Tien and Mu-Zha tunnels along the Northern Second Highway around Taipei area in Taiwan were selected to make a rock mass quality evaluation by the proposed model. The location of two tunnels along the highway is shown in Fig. 4. This area mainly consists of sedimentary rocks of sandstone, shale, close-banded alternate layers of sandstone shale. The deepest overburden is only around 170 m that belongs to the shallow rock formation and strongly weathered. The uniaxial compressive strength distributes from 100 to 500 kg/cm 2. Geological information and tunnel features are summarized in Table 2. The standard main cross-section of the two tunnels is presented in Fig. 5. The geological profile map of Mu- Zha tunnel is shown as Fig. 6. The field condition for Table 7 Supporting system guideline for the tunnels in this paper Class number I II III Excavated procedure Cycle length <4.0 m <3.0 m <2.5 m Rock bolts 29U prestressed grout rock bolts 29U prestressed grout rock bolts L = m 29U prestressed grout rock bolts L = m L = 4.0 m locally 19-two segments m 17-two segments L = 6.0 m 10-two segments m Shotcrete 5 cm cover T: 10cm T: 15cm B: 5cm B: 15cm Wire mesh T: 1 5 mm U ( ) T, B: 1 5 mm U ( ) Light steel sets T: if required to install H-shape steel Class number IV V VI Excavated procedure Cycle length 1.5 m 2.0 m 1.0 m 1.5 m 0.8 m 1.2 m Rock bolts 29U prestressed grout rock bolts L = m 29U prestressed grout rock bolts L = m 29U prestressed grout rock bolts L = m 29-two segments m 17-two segments L = 9.0 m 12-two segments m 21-two segments L = 9.0 m 16-two segments m Shotcrete T: 15cm T: 20cm T: 25cm B: 15cm B: 20cm B: 20cm I: 20cm Wire mesh T, B: l 5 mmu ( ) T, B: 2 5 mmu ( ) T, B: 2 5 mmu ( ) I: l 5 mm ( ) Light steel sets T: H-shape 1.5 m 2.0 m T: H-shape 1.0 m 1.5 m T: H-shape 0.8 m 1.2 m Cutting face support T: locally shotcrete T: fully 5 cm shotcrete or fully 10 cm wire net added B: if required to install Locally 5 cm shotcrete Invert Decided to set after measurement Yes Yes Pipe support Local Local Local 11/ U pipe 11/ U pipe 11/ U pipe L = 3.0 m L = 3.0 m L = 2.0 m Deadline for support setting Immediately after arch excavation bench before second round Immediately after excavation close invert during 20 days Immediately after excavation close invert during 20 days Note: (1) T: crown, B: bench, I: invert. (2) The invert of Class V to added shotcrete (thickness 20 cm) depends on rock material and measurement results.
10 386 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) percentage (%) Class number Fig. 10. The distribution of rock mass class for the Mu-Zha tunnel. percentage (%) Class number Fig. 11. The distribution of rock mass class for the Hsin-Tien I IV tunnel. shaft excavation method of these two tunnels is separately in Figs. 7 and Results and discussion Based on the above discussion, we can compute the rock mass ratings combining case records and algorithm introduced in this paper. RMR and our approach data including ratings for each parameter were carefully selected from the site investigation reports for two different tunnel projects conducted in Taiwan. Information was recorded regarding the rating parameters for each tunnel site, from which ratings numbers were assigned and total ratings calculated. For the rock mass quality evaluation of two tunnel sites, parts of the results comparison carried from RMR and our approach are shown in Tables 3a and 3b and the interval ratings to account for evaluating parameters in this study are shown in Table 4. Because of the limitation of publication space, the entire comparison results cannot be shown in the paper. So that parts of these values are not integrals. The descriptive statistics result is presented in Table 5. Distributions of the rock mass rating which are calculated by RMR and this study from two sites are shown partly in Fig. 9. These results indicate that there is a small amount of distinction between them. The tunnels in this study were excavated by NATM (Rabcewicz, 1964). Support design for the drill and blast section is through use of empirical calculation. The rock mass is divided into six types referred to Table 6, following the geotechnical parameters taken into consideration by RMR and Q-System and this study proposed. Consequently, six types of corresponding tunnel supports are selected, as shown in Table 7 (Ministry of Transportation and Communications Taiwan Area National Expressway Engineering Bureau, 1999). The rock mass class distributions of Hsin-Tien and Mu-Zha tunnels were presented in Figs. 10 and 11. These indicate that the Mu-Zha tunnel gives a strongly peaked distribution with the values clustered tightly at a peak of 42.1% class IV and a small standard deviation. The classes range across four class including class III, IV, V and VI of the six possible classes. In contrast, the Hsin-Tien tunnel shows a greater variation, with a higher average distribution between class III, IV, V and VI. In this case, the classes vary across five of the six
11 C.-S. Chen, Y.-C. Liu / Tunnelling and Underground Space Technology 22 (2007) categories. The geological condition is generally weak. Preliminary we performed evaluations of rock mass rating for tunnel sites by our approach and obtain agreed approximately with those expected. 4. Conclusions From the procedure described above, we conclude that the proposed method can be successfully applied to determine the ratings of rock mass quality for the cases of tunnel engineering. It was found that the determined results were in good agreement with the original data assessed by the RMR. Results of the analyses show that it can be provided a more quantitative measure of rock mass and hence minimize judgmental bias. The rock mass quality evaluation model in this paper can be applied to adjust the best feasible factors weighting for the field condition and project purpose. The proposed method should be more feasible for future tunnel construction and suggestions of tunnel support design in Taiwan. Acknowledgement This study is supported by a grant from Taiwan National Science Council through contract number NSC E References Barton, N., Lien, R., Lunde, J., Engineering classification of rock masses for the design of tunnel support. Rock Mechanics 6 (4), Bieniawski, Z.T., Engineering classification of jointed rock masses. Transactions of South African Institution of Civil Engineers 15 (12), Bieniawski, Z.T., Case studies: Prediction of rock mass behavior by the geomechanics classification. In: Proceedings of 2nd Australia New Zealand Conference Geomechanics, Brisbane. pp Bieniawski, Z.T., The geomechanics classification. In: Rock Engineering Application. In: Proceedings Fourth Congress of the International Society For Rock Mechanics, vol. 2. pp Bieniawski, Z.T., Engineering Rock Mass Classifications. Wiley, New York, pp Kaufmann, A., Gupta, M.M., Fuzzy Mathematical Models in Engineering and Management Science. North-Holland, Amsterdam. Ministry of Transportation and Communications Taiwan Area National Expressway Engineering Bureau, 1999 Introduction of the tunnel engineering along the Second Northern Highway, Taiwan (in Chinese). Rabcewicz, L.V., The New Austrian Tunneling Method, Water Power, vol.16, No , vol.17, No. 1, London. Saaty, T.L., The Analytic Hierarchy Process. McGraw-Hill International Book Company, New York. Wickham, G.E., Tiedemann, H.R., Skinner, E.H., Support Determination Based On Geologic Predictions. In: Proceedings of Conference Rapid Excavation and Tunneling. pp
An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy Logic: Case Studies of Life and Annuity Insurances
Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 126 An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy
More informationMULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process
MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process Business Intelligence and Decision Making Professor Jason Chen The analytical hierarchy process (AHP) is a systematic procedure
More informationANALYTIC HIERARCHY PROCESS (AHP) TUTORIAL
Kardi Teknomo ANALYTIC HIERARCHY PROCESS (AHP) TUTORIAL Revoledu.com Table of Contents Analytic Hierarchy Process (AHP) Tutorial... 1 Multi Criteria Decision Making... 1 Cross Tabulation... 2 Evaluation
More informationAnalytic Hierarchy Process for Design Selection of Laminated Bamboo Chair
Analytic Hierarchy Process for Design Selection of Laminated Bamboo Chair V. Laemlaksakul, S. Bangsarantrip Abstract This paper demonstrates the laminated bamboo chair design selection, the applicability
More informationSupplier Performance Evaluation and Selection in the Herbal Industry
Supplier Performance Evaluation and Selection in the Herbal Industry Rashmi Kulshrestha Research Scholar Ranbaxy Research Laboratories Ltd. Gurgaon (Haryana), India E-mail : rashmi.kulshreshtha@ranbaxy.com
More informationHow to do AHP analysis in Excel
How to do AHP analysis in Excel Khwanruthai BUNRUAMKAEW (D) Division of Spatial Information Science Graduate School of Life and Environmental Sciences University of Tsukuba ( March 1 st, 01) The Analytical
More informationTHE ANALYTIC HIERARCHY PROCESS (AHP)
THE ANALYTIC HIERARCHY PROCESS (AHP) INTRODUCTION The Analytic Hierarchy Process (AHP) is due to Saaty (1980) and is often referred to, eponymously, as the Saaty method. It is popular and widely used,
More informationA Fuzzy AHP based Multi-criteria Decision-making Model to Select a Cloud Service
Vol.8, No.3 (2014), pp.175-180 http://dx.doi.org/10.14257/ijsh.2014.8.3.16 A Fuzzy AHP based Multi-criteria Decision-making Model to Select a Cloud Service Hong-Kyu Kwon 1 and Kwang-Kyu Seo 2* 1 Department
More informationAnalytical Hierarchy Process for Higher Effectiveness of Buyer Decision Process
P a g e 2 Vol. 10 Issue 2 (Ver 1.0), April 2010 Global Journal of Management and Business Research Analytical Hierarchy Process for Higher Effectiveness of Buyer Decision Process Razia Sultana Sumi 1 Golam
More informationDevelopment of Virtual Lab System through Application of Fuzzy Analytic Hierarchy Process
Development of Virtual Lab System through Application of Fuzzy Analytic Hierarchy Process Chun Yong Chong, Sai Peck Lee, Teck Chaw Ling Faculty of Computer Science and Information Technology, University
More informationDIMENSIONING TUNNEL SUPPORT BY DESIGN METHODOLOGY
DIMENSIONING TUNNEL SUPPORT BY DESIGN METHODOLOGY "INTERACTIVE STRUCTURAL DESIGN" Diseno Estructural Activo, DEA) Benjamín Celada Tamames, Director General, Geocontrol, Madrid Translated from: Taller sobre
More informationResearch on supply chain risk evaluation based on the core enterprise-take the pharmaceutical industry for example
Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(6):593-598 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Research on supply chain risk evaluation based on
More informationVendor Evaluation and Rating Using Analytical Hierarchy Process
Vendor Evaluation and Rating Using Analytical Hierarchy Process Kurian John, Vinod Yeldho Baby, Georgekutty S.Mangalathu Abstract -Vendor evaluation is a system for recording and ranking the performance
More informationComparative Analysis of FAHP and FTOPSIS Method for Evaluation of Different Domains
International Journal of Research Studies in Computer Science and Engineering (IJRSCSE) August 2015, PP 58-62 ISSN 2349-4840 (Print) & ISSN 2349-4859 (Online) www.arcjournals.org Comparative Analysis of
More informationENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS
ISAHP 2005, Honolulu, Hawaii, July 8-10, 2003 ENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS Jerzy Michnik a,b, 1, Mei-Chen Lo c a Kainan University, No.1, Kainan Rd.,
More informationUsing Analytic Hierarchy Process (AHP) Method to Prioritise Human Resources in Substitution Problem
Using Analytic Hierarchy Process (AHP) Method to Raymond Ho-Leung TSOI Software Quality Institute Griffith University *Email:hltsoi@hotmail.com Abstract In general, software project development is often
More informationInformation Security and Risk Management
Information Security and Risk Management by Lawrence D. Bodin Professor Emeritus of Decision and Information Technology Robert H. Smith School of Business University of Maryland College Park, MD 20742
More informationApplication of the Multi Criteria Decision Making Methods for Project Selection
Universal Journal of Management 3(1): 15-20, 2015 DOI: 10.13189/ujm.2015.030103 http://www.hrpub.org Application of the Multi Criteria Decision Making Methods for Project Selection Prapawan Pangsri Faculty
More informationMaintainability Estimation of Component Based Software Development Using Fuzzy AHP
International journal of Emerging Trends in Science and Technology Maintainability Estimation of Component Based Software Development Using Fuzzy AHP Author Sengar Dipti School of Computing Science, Galgotias
More informationSYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN
Robert Bertuzzi Pells Sullivan Meynink, Unit G3 56 Delhi Road, North Ryde NSW 2113, Australia 1 BACKGROUND Inherent in any set of rock mass parameters are various assumptions regarding, amongst other things
More informationEvaluating Simulation Software Alternatives through ANP
Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 24, 2011 Evaluating Simulation Software Alternatives through ANP
More informationCombining Fuzzy Analytic Hierarchy Process
International Journal of Engineering & Technology IJET-IJENS Vol: 11 No: 05 37 Combining Fuzzy Analytic Hierarchy Process and GIS to Select the Best Location for a Wastewater Lift Station in El-Mahalla
More informationPrize: an R package for prioritization estimation based on analytic hierarchy process
Prize: an R package for prioritization estimation based on analytic hierarchy process Daryanaz Dargahi October 14, 2015 daryanazdargahi@gmail.com Contents 1 Licensing 2 2 Overview 2 3 Relative AHP 3 3.1
More informationNuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso
Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso By Ernesto Villaescusa, PhD Chair in Rock Mechanics WA School of Mines, CRC Mining & Curtin
More informationJournal of Chemical and Pharmaceutical Research, 2014, 6(3):34-39. Research Article. Analysis of results of CET 4 & CET 6 Based on AHP
Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(3):34-39 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Analysis of results of CET 4 & CET 6 Based on AHP
More informationCONTRACTOR SELECTION WITH RISK ASSESSMENT BY
CONTRACTOR SELECTION WITH RISK ASSESSMENT BY USING AHP FUZZY METHOD Seyed Ali Tabatabaei Khodadadi 1, B. Dean Kumar 2 ¹Department of Civil Engineering, JNTUH CEH, Hyderabad -500085, India ²Associate Professor
More informationOptimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time
Tamsui Oxford Journal of Management Sciences, Vol. 0, No. (-6) Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time Chih-Hsun Hsieh (Received September 9, 00; Revised October,
More informationA new Environmental Performance Index using analytic hierarchy process: A case of ASEAN countries
Article A new Environmental Performance Index using analytic hierarchy process: A case of ASEAN countries Wan Khadijah Wan Ismail, Lazim Abdullah Department of Mathematics, Faculty of Science and Technology,
More informationThe Application of ANP Models in the Web-Based Course Development Quality Evaluation of Landscape Design Course
, pp.291-298 http://dx.doi.org/10.14257/ijmue.2015.10.9.30 The Application of ANP Models in the Web-Based Course Development Quality Evaluation of Landscape Design Course Xiaoyu Chen 1 and Lifang Qiao
More informationTreatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole
An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water
More informationTunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
More informationEMPLOYEE PERFORMANCE APPRAISAL SYSTEM USING FUZZY LOGIC
EMPLOYEE PERFORMANCE APPRAISAL SYSTEM USING FUZZY LOGIC ABSTRACT Adnan Shaout* and Mohamed Khalid Yousif** *The Department of Electrical and Computer Engineering The University of Michigan Dearborn, MI,
More informationKlaus D. Goepel No 10 Changi Business Park Central 2 Hansapoint@CBP #06-01/08 Singapore 486030 E-mail: drklaus@bpmsg.com ABSTRACT
IMPLEMENTING THE ANALYTIC HIERARCHY PROCESS AS A STANDARD METHOD FOR MULTI-CRITERIA DECISION MAKING IN CORPORATE ENTERPRISES A NEW AHP EXCEL TEMPLATE WITH MULTIPLE INPUTS Klaus D. Goepel No 0 Changi Business
More informationEstimation of Unknown Comparisons in Incomplete AHP and It s Compensation
Estimation of Unknown Comparisons in Incomplete AHP and It s Compensation ISSN 0386-1678 Report of the Research Institute of Industrial Technology, Nihon University Number 77, 2005 Estimation of Unknown
More informationNumerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes
Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes Introduction When designing a shallow tunnel in a poor quality rock mass, the designer has to face a number of problems
More informationToward Secure Distribution of Electronic Health Records: Quantitative feasibility study on secure E-mail systems for sharing patient records
J Med Dent Sci 2005; 52: 229 236 Original Article Toward Secure Distribution of Electronic Health Records: Quantitative feasibility study on secure E-mail systems for sharing patient records Yuichiro Gomi
More informationOn the Interaction and Competition among Internet Service Providers
On the Interaction and Competition among Internet Service Providers Sam C.M. Lee John C.S. Lui + Abstract The current Internet architecture comprises of different privately owned Internet service providers
More informationSelection of Database Management System with Fuzzy-AHP for Electronic Medical Record
I.J. Information Engineering and Electronic Business, 205, 5, -6 Published Online September 205 in MECS (http://www.mecs-press.org/) DOI: 0.585/ijieeb.205.05.0 Selection of Database Management System with
More informationAnalytical hierarchy process for evaluation of general purpose lifters in the date palm service industry
Journal of Agricultural Technology 2011 Vol. 7(4): 923-930 Available online http://www.ijat-aatsea.com ISSN 1686-9141 Analytical hierarchy process for evaluation of general purpose lifters in the date
More informationDesign of Analytic Hierarchy Process Algorithm and Its Application for Vertical Handover in Cellular Communication
Design of Analytic Hierarchy Process Algorithm and Its Application for Vertical Handover in Cellular Communication Under the Guidance of Asso. Prof. Mr. Saurav Dhar Deptt. of Electronics and Communication
More informationA Decision-Making Framework for IT Outsourcing using the Analytic Hierarchy Process
A Decision-Making Framework for IT Outsourcing using the Analytic Hierarchy Process Vivek Pandey and Veena Bansal October 14, 2003 Abstract Information Technology Outsourcing (ITO) has generated considerable
More informationTHE SELECTION OF BRIDGE MATERIALS UTILIZING THE ANALYTICAL HIERARCHY PROCESS
THE SELECTION OF BRIDGE MATERIALS UTILIZING THE ANALYTICAL HIERARCHY PROCESS Robert L. Smith Assistant Professor/Extension Specialist, Virginia Tech Robert J. Bush Associate Professor, Virginia Tech and
More informationApproaches to Qualitative Evaluation of the Software Quality Attributes: Overview
4th International Conference on Software Methodologies, Tools and Techniques Approaches to Qualitative Evaluation of the Software Quality Attributes: Overview Presented by: Denis Kozlov Department of Computer
More informationA fuzzy analytic hierarchy process tool to evaluate computer-aided manufacturing software alternatives
TJFS: Turkish Journal of Fuzzy Systems (eissn: 09 90) An Official Journal of Turkish Fuzzy Systems Association Vol. No.2 pp. 4-27 204. A fuzzy analytic hierarchy process tool to evaluate computer-aided
More informationProject Management Software Selection Using Analytic Hierarchy Process Method
Project Management Software Selection Using Analytic Hierarchy Process Method ISSN - 35-055 Sweety Sen (B.tech: Information Technology) Dronacharya College of Engineering Gurgaon, India Phone no. : 00343
More informationEstimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
More informationAnalytical hierarchy process to choose the best earthwork machine in northern forests of Iran
JOURNAL OF FOREST SCIENCE, 59, 2013 (12): 487 492 Analytical hierarchy process to choose the best earthwork machine in northern forests of Iran A. Parsakhoo 1, S.A. Hosseini 2 1 Department of Forestry,
More informationImpacts of Tunnelling on Ground and Groundwater and Control Measures Part 1: Estimation Methods
Impacts of Tunnelling on Ground and Groundwater and Control Measures Part 1: Estimation Methods Steve Macklin Principal Engineering Geologist GHD Melbourne 1. Introduction, scope of Part 1 2. Terminology
More informationMulti-Criteria Decision-Making Using the Analytic Hierarchy Process for Wicked Risk Problems
Multi-Criteria Decision-Making Using the Analytic Hierarchy Process for Wicked Risk Problems Introduction It has become more and more difficult to see the world around us in a uni-dimensional way and to
More informationPennsylvania State University Department of Mineral Engineering University Park, Pennsylvania 16802. Approved For Public Re;tas,,
: OTIC FILE COPY IECHNICAL REPORT GL-79-19 TUNNEL DESIGN BY ROCK MASS CLASSIFICATIONS D-A219 783 by Z. T. Bieniawski Pennsylvania State University Department of Mineral Engineering University Park, Pennsylvania
More informationTunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.
Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation
More informationApplying the Analytic Hierarchy Process to Health Decision Making: Deriving Priority Weights
Applying the to Health Decision Making: Deriving Priority Weights Tomás Aragón, MD, DrPH Principal Investigator, Cal PREPARE,. CIDER UC Berkeley School of Public Health Health Officer, City & County of
More informationProject Management Software Selection Using Analytic Hierarchy Process Method
International Journal of Applied Science and Technology Vol. 4, No. ; November 04 Project Management Software Selection Using Analytic Hierarchy Process Method Birgul Kutlu Professor Bogazici University
More informationThe Analytic Hierarchy Process. Danny Hahn
The Analytic Hierarchy Process Danny Hahn The Analytic Hierarchy Process (AHP) A Decision Support Tool developed in the 1970s by Thomas L. Saaty, an American mathematician, currently University Chair,
More informationHow To Calculate Tunnel Longitudinal Structure
Calculation and Analysis of Tunnel Longitudinal Structure under Effect of Uneven Settlement of Weak Layer 1,2 Li Zhong, 2Chen Si-yang, 3Yan Pei-wu, 1Zhu Yan-peng School of Civil Engineering, Lanzhou University
More informationApplying the ANP Model for Selecting the Optimal Full-service Advertising Agency
International Journal of Operations Research International Journal of Operations Research Vol.8, No. 4, 4858 (2011) Applying the ANP Model for Selecting the Optimal Full-service Advertising Agency Pi-Fang
More informationContractor selection using the analytic network process
Construction Management and Economics (December 2004) 22, 1021 1032 Contractor selection using the analytic network process EDDIE W. L. CHENG and HENG LI* Department of Building and Real Estate, The Hong
More informationSUPPLY CHAIN MANAGEMENT AND A STUDY ON SUPPLIER SELECTION in TURKEY
SUPPLY CHAIN MANAGEMENT AND A STUDY ON SUPPLIER SELECTION in TURKEY Pelin Alcan, Hüseyin Başlıgil, Melih Coşkun Yildiz Technical University, Besiktas, İstanbul, Turkey Abstract This study mainly focuses
More informationMine Wide Risk Assessment What is the State of your Arteries. L.Human, J Doolan and L Potts Xstrata Zinc
Mine Wide Risk Assessment What is the State of your Arteries L.Human, J Doolan and L Potts Xstrata Zinc Abstract A geotechnical mine wide risk management approach is presented for the systematic inspection,
More informationEarly FP Estimation and the Analytic Hierarchy Process
Early FP Estimation and the Analytic Hierarchy Process Luca Santillo (luca.santillo@gmail.com) Abstract Several methods exist in order to estimate the size of a software project, in a phase when detailed
More informationAdopting an Analytic Hierarchy Process to Select Internet Advertising Networks
Adopting an Analytic Hierarchy Process to Select Internet Advertising Networks Chin-Tasi Lin 1), Pi-Fang Hsu 2) 1) Yuanpei Institute of Science and Technology, Department of Information Management, Taiwan
More informationCredit Risk Comprehensive Evaluation Method for Online Trading
Credit Risk Comprehensive Evaluation Method for Online Trading Company 1 *1, Corresponding Author School of Economics and Management, Beijing Forestry University, fankun@bjfu.edu.cn Abstract A new comprehensive
More informationChapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY
Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY This chapter highlights on supply chain performance measurement using one of the renowned modelling technique
More informationUSING THE ANALYTIC HIERARCHY PROCESS FOR DECISION MAKING IN ENGINEERING APPLICATIONS: SOME CHALLENGES
Published in: Inter l Journal of Industrial Engineering: Applications and Practice, Vol. 2, No. 1, pp. 35-44, 1995. 1 USING THE ANALYTIC HIERARCHY PROCESS FOR DECISION MAKING IN ENGINEERING APPLICATIONS:
More informationCOMBINING THE RMR, Q, AND RMi CLASSIFICATION SYSTEMS
Paper published February 009 in www.rockmass.net Reference: Palmstrom, A., 009: Combining the RMR, Q, and RMi classification systems. www.rockmass.net, 5p. COMBINING THE RMR, Q, AND RMi CLASSIFICATION
More informationDecision Support System for Rapid Prototyping Process Selection
International Journal of Scientific and Research Publications, Volume 4, Issue 1, January 2014 1 Decision Support System for Rapid Prototyping Process Selection Vikram Shende*, Dr. Prafulla Kulkarni**
More informationProposing an approach for evaluating e-learning by integrating critical success factor and fuzzy AHP
2011 International Conference on Innovation, Management and Service IPEDR vol.14(2011) (2011) IACSIT Press, Singapore Proposing an approach for evaluating e-learning by integrating critical success factor
More informationAxiomatic design of software systems
Axiomatic design of software systems N.P. Suh (1), S.H. Do Abstract Software is playing an increasingly important role in manufacturing. Many manufacturing firms have problems with software development.
More informationDecision-making with the AHP: Why is the principal eigenvector necessary
European Journal of Operational Research 145 (2003) 85 91 Decision Aiding Decision-making with the AHP: Why is the principal eigenvector necessary Thomas L. Saaty * University of Pittsburgh, Pittsburgh,
More informationA REVIEW AND CRITIQUE OF HYBRID MADM METHODS APPLICATION IN REAL BUSINESS
Application in Real Business, 2014, Washington D.C., U.S.A. A REVIEW AND CRITIQUE OF HYBRID MADM METHODS APPLICATION IN REAL BUSINESS Jiri Franek Faculty of Economics VSB-Technical University of Ostrava
More informationLearning Management System Selection with Analytic Hierarchy Process
Learning Management System Selection with Analytic Hierarchy Process Aydın Çetin 1, Ali Hakan Işık 2, İnan Güler 1 1 Gazi University, Faculty Of Technology 2 Gazi University, Institute of Information Sciences
More informationCorresponding Author email: s.esfandi.7@gmail.com
International Research Journal of Applied and Basic Sciences 2015 Available online at www.irjabs.com ISSN 2251-838X / Vol, 9 (4): 542-546 Science Explorer Publications Review and Prioritization of the
More informationDETERMINING CONSUMER S CHOICE AMONG VARIOUS INSURANCE POLICIES: AN ANALYTICAL HIERARCHICAL PROCESS APPROACH
DETERMINING CONSUMER S CHOICE AMONG VARIOUS INSURANCE POLICIES: AN ANALYTICAL HIERARCHICAL PROCESS APPROACH Emmanuel Olateju Oyatoye* Department of Business Administration, University of Lagos, Nigeria.
More informationCOMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES
COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES JULIA IGOREVNA LARIONOVA 1 ANNA NIKOLAEVNA TIKHOMIROVA 2 1, 2 The National Nuclear Research
More informationReport on SELECTING THE BEST PROJECT DELIVERY METHOD USING THE ANALYTICAL HIERARCHY PROCESS (AHP)
Report on SELECTING THE BEST PROJECT DELIVERY METHOD USING THE ANALYTICAL HIERARCHY PROCESS (AHP) Prepared for Dr. Soliman Almohawis CEM 520 Construction Contracting & Administration By Abdullah S. Alzouri
More informationPerformance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process
Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process Y. H. Liang Department of Information Management, I-SHOU
More information15.062 Data Mining: Algorithms and Applications Matrix Math Review
.6 Data Mining: Algorithms and Applications Matrix Math Review The purpose of this document is to give a brief review of selected linear algebra concepts that will be useful for the course and to develop
More informationUSING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORITIZE PROJECTS IN A PORTFOLIO
USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORIZE PROJECTS IN A PORTFOLIO Ricardo Viana Vargas, MSc, IPMA-B, PMP Professor Fundação Getúlio Vargas (FGV) Brasil Professor Fundação Instituto
More informationSubcontractor Selection Using Analytic Hierarchy Process
Volume 3 Number 3 2012 pp. 121-143 ISSN: 1309-2448 www.berjournal.com Subcontractor Selection Using Analytic Hierarchy Process Vesile Sinem Arıkan Kargı a Ahmet Öztürk b Abstract: Turkish textile firms
More informationSELECTION OF THE BEST SCHOOL FOR THE CHILDREN- A DECISION MAKING MODEL USING EXTENT ANALYSIS METHOD ON FUZZY ANALYTIC HIERARCHY PROCESS
SELECTION OF THE BEST SCHOOL FOR THE CHILDREN- A DECISION MAKING MODEL USING EXTENT ANALYSIS METHOD ON FUZZY ANALYTIC HIERARCHY PROCESS Reshma Radhakrishnan 1, A. Kalaichelvi 2 Research Scholar, Department
More informationIntegration of a fin experiment into the undergraduate heat transfer laboratory
Integration of a fin experiment into the undergraduate heat transfer laboratory H. I. Abu-Mulaweh Mechanical Engineering Department, Purdue University at Fort Wayne, Fort Wayne, IN 46805, USA E-mail: mulaweh@engr.ipfw.edu
More informationDecision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process
Decision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process Nina Begičević University of Zagreb, Faculty of Organization and Informatics, Pavlinska 2, Varaždin nina.begicevic@foi.hr
More informationTUNNEL boring was originally attempted over 150 years
The advantages of tunnel boring : a qualitative/quantitative comparison of D&B and TBM excavation by Peter J Tarkoy, PhD, Geotechnical and Tunnel Construction Consultant and James E Byram, PhD, Senior
More informationMonitoring and Warning System for Information Technology (IT) Outsource Risk in Commercial Banks Based on Nested Theory of Excel Logical Function
Advance Journal of Food Science and Technology 9(4): 302-307, 2015 ISSN: 2042-4868; e-issn: 2042-4876 Maxwell Scientific Organization, 2015 Submitted: March 3, 2015 Accepted: March 14, 2015 Published:
More informationRisk oriented design and construction of tunnels
Risk oriented design and construction of tunnels Wulf Schubert Graz University of Technology 3G-Gruppe Geotechnik Graz ZT GmbH INTRODUCTION Risk in engineering commonly is understood as the product of
More informationMULTICRITERIA MAKING DECISION MODEL FOR OUTSOURCING CONTRACTOR SELECTION
2008/2 PAGES 8 16 RECEIVED 22 12 2007 ACCEPTED 4 3 2008 V SOMOROVÁ MULTICRITERIA MAKING DECISION MODEL FOR OUTSOURCING CONTRACTOR SELECTION ABSTRACT Ing Viera SOMOROVÁ, PhD Department of Economics and
More informationANALYTICAL HIERARCHY PROCESS AS A TOOL FOR SELECTING AND EVALUATING PROJECTS
ISSN 1726-4529 Int j simul model 8 (2009) 1, 16-26 Original scientific paper ANALYTICAL HIERARCHY PROCESS AS A TOOL FOR SELECTING AND EVALUATING PROJECTS Palcic, I. * & Lalic, B. ** * University of Maribor,
More informationOPERATIONAL RISK EFFECT ON INSURANCE MARKET S ACTIVITY Darja Stepchenko, Irina Voronova, Gaida Pettere Riga Technical University, Latvia
OPERATIONAL RISK EFFECT ON INSURANCE MARKET S ACTIVITY Darja Stepchenko, Irina Voronova, Gaida Pettere Riga Technical University, Latvia Abstract. The main aim of Solvency II framework is to establish
More informationANALYTIC HIERARCHY PROCESS AS A RANKING TOOL FOR DECISION MAKING UNITS
ISAHP Article: Jablonsy/Analytic Hierarchy as a Raning Tool for Decision Maing Units. 204, Washington D.C., U.S.A. ANALYTIC HIERARCHY PROCESS AS A RANKING TOOL FOR DECISION MAKING UNITS Josef Jablonsy
More informationStudy of Lightning Damage Risk Assessment Method for Power Grid
Energy and Power Engineering, 2013, 5, 1478-1483 doi:10.4236/epe.2013.54b280 Published Online July 2013 (http://www.scirp.org/journal/epe) Study of Lightning Damage Risk Assessment Method for Power Grid
More informationOBJECT ORIENTED SOFTWARE SYSTEM BASED ON AHP
OBJECT ORIENTED SOFTWARE SYSTEM BASED ON AHP Soumi Ghosh Department of Computer Science & Engineering Amity School of Engineering and Technology Amity University, Sec-125, NOIDA, (U.P.), INDIA noni.soumi@gmail.com
More informationINFORMATION SECURITY RISK ASSESSMENT: BAYESIAN PRIORITIZATION FOR AHP GROUP DECISION MAKING. Zeynep Filiz Eren-Dogu and Can Cengiz Celikoglu
International Journal of Innovative Computing, Information and Control ICIC International c 2012 ISSN 1349-4198 Volume 8, Number 11, November 2012 pp. 8019 8032 INFORMATION SECURITY RISK ASSESSMENT: BAYESIAN
More informationA Selection Model for ERP System by Applying Fuzzy AHP Approach
A Selection Model for ERP System by Applying Fuzzy AHP Approach Chi-Tai Lien* and Hsiao-Ling Chan Department of Information Management Ta Hwa Institute of Tachenology, Hsin-Chu, Taiwan, R.O.C. *E-mail:
More informationApplication of discriminant analysis to predict the class of degree for graduating students in a university system
International Journal of Physical Sciences Vol. 4 (), pp. 06-0, January, 009 Available online at http://www.academicjournals.org/ijps ISSN 99-950 009 Academic Journals Full Length Research Paper Application
More informationComparison between Vertical Handoff Decision Algorithms for Heterogeneous Wireless Networks
Comparison between Vertical Handoff Decision Algorithms for Heterogeneous Wireless Networks Enrique Stevens-Navarro and Vincent W.S. Wong Department of Electrical and Computer Engineering The University
More informationIMPROVING THE CRM SYSTEM IN HEALTHCARE ORGANIZATION
IMPROVING THE CRM SYSTEM IN HEALTHCARE ORGANIZATION ALIREZA KHOSHRAFTAR 1, MOHAMMAD FARID ALVANSAZ YAZDI 2, OTHMAN IBRAHIM 3, MAHYAR AMINI 4, MEHRBAKHSH NILASHI 5, AIDA KHOSHRAFTAR 6, AMIR TALEBI 7 1,3,4,5,6,7
More informationA Multi-Criteria Decision-making Model for an IaaS Provider Selection
A Multi-Criteria Decision-making Model for an IaaS Provider Selection Problem 1 Sangwon Lee, 2 Kwang-Kyu Seo 1, First Author Department of Industrial & Management Engineering, Hanyang University ERICA,
More informationA FUZZY LOGIC APPROACH FOR SALES FORECASTING
A FUZZY LOGIC APPROACH FOR SALES FORECASTING ABSTRACT Sales forecasting proved to be very important in marketing where managers need to learn from historical data. Many methods have become available for
More informationInternational Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research)
International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research) International Journal of Engineering, Business and Enterprise
More information6 Analytic Hierarchy Process (AHP)
6 Analytic Hierarchy Process (AHP) 6.1 Introduction to Analytic Hierarchy Process The AHP (Analytic Hierarchy Process) was developed by Thomas L. Saaty (1980) and is the well-known and useful method to
More information