Clean Development Mechanism and Development of a Methodology for the Recycling of Municipal Solid Waste

Size: px
Start display at page:

Download "Clean Development Mechanism and Development of a Methodology for the Recycling of Municipal Solid Waste"

Transcription

1 Clean Development Mechansm and Development of a Methodolog for the Recclng of Muncpal Sold Waste CONTACT Charles Peterson, World Bank Jule Godn, World Bank Contact name: Charles Peterson Jule Godn Organzaton: World Bank World Bank Postal address: 1818 H Street, NW (MC 3-309) 1818 H Street, NW (MC 3-309) Washngton, DC USA Washngton, DC USA Telephone: (202) (202) Emal: cpeterson@worldbank.org jgodn@worldbank.org EXECUTIVE SUMMARY The World Bank (Bank, s nvolved wth more than 100 projects (actve or under development) wth muncpal sold waste 1 management components n developng countres. Loan and grant commtments have been made for captal nvestments n a broad scope of waste management functons ncludng recclng, collecton, transfer statons, and landfll desgn/constructon. Loans and grants are an mportant, tradtonal, Bank actvt. A more recent Bank program s carbon fnance, whch s the purchase of greenhouse gas (GHG) emsson reductons from developng countres under the Clean Development Mechansm (CDM), a sustanable fnancng nstrument created b n the Koto Protocol. The Bank purchases CDM emsson reductons for a group of 11 carbon funds or facltes for varous European countres and Japan, utltes, and manufacturng companes to assst n offsettng ther emsson reducton targets under the Koto Protocol. Emsson reductons are determned under methodologes approved b the CDM Executve Board of the Unted Natons Framework Conventon on Clmate Change (UNFCCC). These methodologes establsh elgblt crtera for projects Baselne scenaro and emssons. Exstng, or busness as usual, level of emssons. Addtonalt scenaro and emssons. The proposed CDM project actvt that needs to be addtonal (beond the baselne scenaro). Montorng procedures to allow project performance to be tracked durng the credtng perod. 1 Muncpal sold waste s composed of dscards prmarl from resdences and commercal operatons, such as retal stores and offce as well as nsttutons and non-hazardous ndustral wastes.

2 CDM approved muncpal sold waste methodologes nclude the capture of landfll gas (ACM0001) and methane avodance projects such as aerobc compostng and ncneraton (AM0025). Recclng s one mportant waste management area for whch a CDM methodolog has et to be approved. The Bank s seekng to remed ths through the development of a methodolog for recclng. In conjuncton wth a draft CDM methodolog, an assessment (project desgn document, or PDD) was prepared on a plot project that wll nvolve nstallaton of eght sortng plants n the area of Buenos Ares, Argentna. The draft CDM methodolog focuses on recclng of plastcs - hgh denst polethlene (HDPE) and low denst polethlene (LDPE). When the methodolog s approved b the CDM Executve Board and made avalable to an project developers, addtonal methodologes wll be submtted for other recclables ncludng metals, paper, and glass. It s antcpated b the World Bank that a methodolog for HDPE and LDPE ma be approved b md Development of a recclng methodolog s a complex process. The methodolog follows the prncples of lfe-ccle assessment and compares the greenhouse gas emssons from all steps nvolved under the project actvt. The methodolog wll promote hgher recover rates for recclables and hgher market for recclables through upgradng of the materals offered for sale. In addton, t wll mprove the workng condtons for those that recover materals from the waste stream. The nformal recclng sector s a global phenomenon that nvolves 1 to 2% of the urban populaton n developng countres. The people n ths sector often are at the ver low ncomes and lvng standards n urban areas. The expected emsson reductons from the methodolog under development are expected to be relatvel small because of the small quantt of plastcs (HDPE and LDPE) forecast to be reccled and the focus on onl one recclable categor. The rate wll ncrease as addtonal methodologes for recclable materals are developed and approved. The Bank also s workng towards an urban methodolog that wll enable smaller ndvdual actvtes to gan the fnancal benefts of ncremental reductons n GHG emssons. Ths new program s targetng three sectors envronmental management, (prmarl sold waste), energ effcenc (areas such as buldng effcenc and street lghtng), and transt. INTRODUCTION Muncpal sold waste s a sgnfcant contrbutor to GHG emssons. One effort to date to remed the effect of muncpal waste on clmate change has been the capture and destructon of the methane generated n landflls from the decomposton of the organc bomass fracton of sold waste such as food, paper, and wood. Another effort s the avodance of methane generaton b the treatment of muncpal waste through varous non-landfll processes ncludng aerobc compostng and ncneraton. Even though recclng of the materals n muncpal sold waste has been shown to reduce the level of GHG emssons relatve to the use of vrgn feedstock, a methodolog that wll measure and montor the emsson reductons from a recclng program has et to be

3 approved b the CDM Executve Board. The Bank s workng to remed ths stuaton wth the development of a methodolog for the recclng of materals from muncpal waste. Except for paper, recclables, such as plastcs, alumnum, ferrous metal, and glass, do not degrade n a landfll to form methane. The greenhouse gas beneft of recclng s a reducton n emssons from the use of fossl-fuel energ n the extracton and manufacture of products from vrgn materals versus secondar materals. The Bank s methodolog ntatve to measure and montor GHG emssons s focused on the recclng of products manufactured from hgh denst polethlene (HDPE), such as plastc bottles, and low denst polethlene (LDPE), such as plastc bags. Methodologes wll be developed for other materals after the methodolog for HDPE and LDPE s approved. The process for development of a methodolog requres a specfc project to demonstrate the applcaton. A recclng project n the area of Buenos Ares, Argentna s the sample project beng used for ths purpose. BACKGROUND World Bank The World Bank s role s to reduce povert n developng countres through loans, grants, and techncal assstance n a range of areas ncludng nfrastructure such as waste management. Currentl, the Bank has more than 100 projects (actve or under development) wth waste management components wth total nvestment commtments of US$2.3 bllon. The waste management projects cover the spectrum of the sold waste feld recclng, collecton equpment, transfer statons, and landfll desgn/constructon. Carbon fnance or the purchase of GHG emsson reductons from projects s a servce the Bank ( has offered to developng countres snce the ear Carbon fnance was developed to meet the opportuntes provded b the Clean Development Mechansm (CDM, a provson n the Koto Protocol ( whch enables buers from developed countres to purchase GHG emsson reductons from projects n developng countres. Such emsson reductons are credted towards the emsson reducton targets for developed countres under the Koto Protocol. The Bank s as a trustee for a group of 11 funds and facltes. In the waste management area, exstng CDM methodologes n whch the Bank s nvolved nclude landfll gas collecton wth energ recover / flarng and compostng projects. The Bank s developng a methodolog for methane avodance through recclng. In the carbon fnance area, the Bank has 32 muncpal waste management projects, ncludng 25 n landfll gas capture and 7 n compostng; plus addtonal projects for agrcultural wastes. Sold Waste and Greenhouse Gas Emssons Methane, a b-product of the decomposton of the organc bomass porton of sold waste dsposed of n a landfll, s a greenhouse gas, whch has 21 tmes the global warmng potental of carbon doxde (CO 2 ). 2 2 Methane has an atmospherc lfe n the range of 9 to 15 ears wth a GWP over 20 ears of 56, declnng to 21 over 100 ears, ncludng ndrect effects of tropospherc ozone producton and stratospherc water vapor producton. (Source: Values of the Revsed 1996 IPCC Gudelnes

4 Total anthropogenc (human nduced) methane emssons represent about 15% of greenhouse gases (EPA, June p. I-2). Worldwde, waste dsposal accounts more than 20% of anthropogenc methane (EPA. June P. III-1), whch makes waste dsposal the fourth largest source of non-carbon doxde greenhouse gas. Carbon doxde from bomass organcs n muncpal waste are consdered clmate neutral. Ths ncludes CO 2 from compostng (aerobc) as well as burnng of methane n a flare or a generator to produce electrct. Clean Development Mechansm Projects n developng countres that have ratfed the Koto Protocol must compl wth the condtons of an approved methodolog to develop an elgble project and sell ther emsson reducton credts. These methodologes are overseen b the CDM Executve Board under the UNFCCC ( ). A common element of all methodologes s the need to set a baselne scenaro, whch s the level of greenhouse gas that would be emtted n the absence of the CDM project actvt (also known as the busness as usual or base case scenaro). For recclng projects, the baselne s rate of recover for the targeted materal under exstng condtons. Addtonalt, or the addtonal level of GHG emsson reductons that would be acheved beond the baselne because of CDM ncentves, s a second basc element. Addtonalt can be demonstrated usng the barrer approach, the obstacles that prevent a project from happenng n the absence of CDM ncentves. Examples of barrers that prevent a CDM project nclude access to fnancng sources, sgnfcant technologcal rsks, barrers due to prevalng practce n the host countr where the project s takng place. In addton, on current practces barrer, the frst-of-ts-knd barrer could be used to demonstrate the addtonalt of the CDM project usng documented evdences on the sector and common practces n the host countr. Addtonalt can be also be demonstrated usng an nvestment analss such as a smple cost analss, nternal rate of return (IRR) or net present value (NPV) of the project. The project must show that t s not the most fnancall attractve nvestment scenaro. Alternatvel benchmark approach could also be used to demonstrate the addtonalt f a project usng nvestment analss. In ths case, t s necessar to demonstrated that the CDM project actvt has a less favorable ndcator (e.g. lower IRR) than the benchmark. Approved CDM Methodologes Snce a CDM approved methodolog for recclng does not exst, the Bank s pursung development of such methodolog. The methodolog s beng developed under the CDM small-scale modaltes and rules that wll eld a maxmum 60,000 tons 3 of carbon doxde equvalent (tco 2 e) per ear per project. An advantage wth small-scale projects s that the can be developed usng smplfed rules, ncludng smplfed montorng once operatons begn. Offsettng these advantages s the relatvel hgh development cost for the emsson reductons that can be earned wth smallscale projects. for Natonal Greenhouse Gas Inventores (1996) are to be used for the frst credtng perod of CDM project (.e, 21 for methane). 3 Ton = metrc ton.

5 Methodolog Applcatons Preparaton of a Project Desgn Document (PDD), a formal requrement of the CDM Procedures and Modaltes to regster a CDM project and start generatng credts, defnes the nature of a proposed project, the expected emsson reductons, the factors used to estmate expected reductons, and descrbes a montorng plan to track future performance, s a crtcal step n the development of a project. The completon of a PDD s also requred to demonstrate a tpcal applcaton when developng a new CDM methodolog. A PDD has been prepared as part of the development ntatve for a recclng methodolog. A project n the metropoltan area of Buenos Ares, Argentna s the sample project addressed n the PDD. PROJECT DESCRIPTION The CEAMSE Plastc Recclng Project wll be developed b CEAMSE 4, the entt n charge of the collecton and fnal dsposal of muncpal sold waste n Buenos Ares ct and ts surroundngs. The project conssts of the nstallaton of eght recclng plants where HDPE and LDPE dscards wll be recovered from post-consumer waste, classfed, packaged and sold as raw materals for the producton of HDPE and LDPE products such as bottles and bags. These recclng plants, also called socal plants, wll be operated b cvl assocatons. CEAMSE wll collect the waste and provde the land, the nfrastructure and some of the equpment needed for operaton of the recclng facltes. The workers wll keep the net revenue from the sale of recovered HDPE and LDPE. The project s forecast to reduce GHG emssons b 914 tco 2 e per ear wth the use of reccled HDPE and LDPE rather than the manufacture of products from vrgn raw materals. The amount of emsson reductons and credts wll ncrease sgnfcantl once the methodolog wll cover other recclables such metals and paper. About 500 tons of HDPE and LDPE wll be recovered annuall because of ths project actvt. In absence of the project, the HDPE and LDPE resdues would have been dsposed n CEAMSE s landfll. Ths project onl takes nto account the emsson reductons assocated wth the energ saved durng the producton of plastc products because of the complext of trackng overall materal lfe-ccle emssons. The project n Buenos Ares wll contrbute to sustanable development n the followng manner: Decrease n overall energ use, greenhouse gas emssons, and the envronmental effect from raw materal extracton through manufacture wth secondar materal nstead of usng vrgn materal. 4 Coordnacón Ecológca Área Metropoltana Socedad del Estado (CEAMSE) s a governmental organzaton n charge of the collecton, treatment and fnal dsposal of sold waste generated n Buenos Ares and ts surroundngs. CEAMSE collects more than 435,000 tons of resdues per month, whch s the equvalent of the resdues generated b 13.0 mllon habtants. CEAMSE has nter-jursdctonal character, snce ts captal stock s shared n equal parts b the Government of the Provnce of Buenos Ares and the Government of the Independent Ct of Buenos Ares.

6 Reduced demand for capact at CEAMSE s landfll. Provde emploment n the recclng plants that wll be operated b local people lvng n the extremel poor neghborhoods. Currentl these people are earnng ncome as waste pckers, an unsantar workng envronment. The eght socal plants wll hre about 40 people per plant. The revenue generated from the sale of recclables wll be pad to the emploees. Promoton of organzed recclng actvt n Argentna and technolog transfer for the producton of plastc usng reccled materal. The followng actvtes wll be undertaken at the recclng facltes: At the eght recclng plants, the dscards collected b CEAMSE wll be delvered to a recclng plant, placed on a conveor that wll move the waste to be sorted through a faclt. Workers wll manuall separate recclables and place them n baskets accordng to ther tpes: cardboard, plastcs, paper, and alumnum. The resdues that are not recclable wll fall nto another contaner at the end of the lne and wll be dsposed at the CEAMSE s landfll. Separated plastcs n the ntal step wll be manuall sorted further accordng to dfferent plastc tpes ncludng HDPE, LDPE, PET, PC, PP, PVC or PS and colors. The classfed materal, ncludng LDPE and HDPE, wll then be packaged to be sold. The total ex-ante emsson reductons for the 10-ear credtng perod of the project are estmated to be 9,140 tco 2 e. The actual amount of emsson reductons wll be based on the quantt of waste reccled and, therefore, wll be evaluated ex-post. Estmatng Emsson Reductons The emsson reductons acheved b the project actvt wll be the dfference between baselne emssons and project emssons as well as leakage 5, see equaton 1. ER BE PE LE (1) Where: ER BE PE LE = Emsson reductons n ear (tco 2 e). = Baselne emssons n ear (tco 2 e). = Project emssons n ear (tco 2 e). = Leakage emssons n ear (tco 2 e). Baselne emssons are calculated usng equaton 2. BE L * BE * r (2) B,, PM, Where: BE I = Baselne emssons n ear (tco 2 e/). = Materal (HDPE and LDPE) 5 Leakage s emssons assocated wth a project actvt that occur outsde the project boundar.

7 L B,, = Quantt of materal reccled n ear (ton of materal /) ths parameter wll be measured ex-post. For ex-antes estmaton, L B,HDPE, = 116 tons, L B,LDPE, = 388 tons. BE PM,I = Emssons generated durng the processng/manufacturng of materal produced from vrgn nputs per ton of materal (tco 2 e/ton of materal ). r = Rato to account for materal loss (%), specfc to materal (0.77). Equaton 3 provdes the calculaton for emssons durng processng / manufacturng. BE EG * EF PM, PM, grd (3) Where: EG PM,I EF grd = Electrct consumed at the processng/manufacturng level per ton of materal made of vrgn nput, usng data from publshed references (MWh/ton of materal ). As no countr specfc values are avalable, values for HDPE and LDPE are from the lterature (McDougall, 2007), EG PM,HDPE = 9.31 MWh/ton HDPE, EG PM,LDPE = MWh/ton LDPE. = msson factor for the electrcal grd sstem (tco 2 e/mwh). Emsson factor, made avalable b the Desgnated Natonal Authort (DNA), the CDM representatve n Argentna 6. EF grd = tco 2 e/ MWh. Project emssons are calculated usng the formula provded n equaton 4. PE L ( PE PE ) (4) Where: PE L B,, PE R,I, B,, * R,, PM,, = Project emssons n ear (tco 2 e/). = Reccled materal n ear (HDPE, LDPE). = Quantt of materal reccled n ear (tons of materal /). Ths parameter wll be measured ex-post. For ex-antes estmaton, L B,HDPE, = 116 tons, L B,LDPE, = 388 tons. = Emssons generated at recclng faclt for the reccled materal n ear (tco 2 e/). PE PM,I, = Emssons generated durng the processng/manufacturng of the reccled materal n ear (tco 2 e/ ton of materal ). Emssons assocated wth transportaton of recclables under the project actvt are neglgble when compared wth baselne and consequentl are neglected under ths methodolog (EPA, September 2006). Emssons at a recclng faclt wll be calculated usng equaton 5. PE R,, ( EGR, * EFgrd ) j FC SP, j * NCV SP, j * EF CO2, j *44 /12 (5) M 6 Lnk URL, access November 2008:

8 Where: EG R, EF grd FC SP, J NCV j EF CO2,j = Electrct consumed at recclng faclt at ear (MWh) - ths wll be measured ex-post separatel for HDPE and LDPE. For ex-ante estmaton, an estmate of 350 MWh s used (total for the eght plants). = Emsson factor for the electrcal grd sstem (tco 2 e/mwh). Emsson factor for the electrcal grd sstem (tco 2 e/mwh). Emsson factor, made avalable b natonal DNA 7. EF grd = tco 2 e/mwh. = Quantt of fossl fuel tpe j combusted at the recclng faclt at ear (ton). Ths wll be measured ex-post, for ex-antes estmaton, ths s estmated at 20,000 tons for the eght plants per ear for gasol. = All fuel tpe combusted at manufacturng level onl gasol. = Net calorfc value of fuel j (GJ/ton). NCV of gasol = TJ/ton. (IPCC, 2006) = Weghted average CO 2 emsson factor of fuel tpe j = 20.2 tco 2 e/tj. 44/12 = Mass converson factor. M SPT, = Quantt of sold waste enterng the recclng faclt at ear (ton/) Ths parameter wll be measured ex-post, 60,000 tons/ s used for ex-ante estmaton (based on capact of the eght plants). Emssons at reccled faclt are allocated to materal usng mass fracton of materal on total mass enterng the recclng faclt at ear. Processng/manufacturng emssons are expressed b equaton 6. PE * PM, EGPMR, EFpm (6) Where: EG PMR, = Electrct consumed at the processng/manufacturng stage per ton of materal made of reccled nputs, usng data from publshed references (MWh/ton of materal ). As no countr specfc values s avalable, values for HDPE and LDPE are from the lterature, (McDougall, 2007) EG PMR,HDPE = 2.13 MWh/ton HDPE, EG PMR,LDPE = 7.11 MWh/ton LDPE. EF grd = Emsson factor for the electrcal grd (EF pm = EF grd ) or emsson factor correspondng to the hghest fossl fuel used for generaton of heat or electrct fuel. Value used for Argentna s 1.3 tco 2 e/mwh. Derved from, fuel ol; 41,816 Kg/KJ (low calorfc value; emsson factor tco 2 e/tj; oxdaton 100%. (IPCC, P 1.24). Montorng The montorng protocol s mportant to trackng the performance of a CDM project. Pament for emsson reducton s based on the verfed results of the montorng data, so projects must be judcous n the collecton and storage of montorng data. A montorng plan wll be mplemented b CEAMSE n collaboraton wth the assocatons n charge of the each recclng plant. The plan s made to verf that the 7 Lnk URL, access November 2008:

9 emsson reductons are real and measurable. The montorng protocol wll nvolve the collecton of the followng: Mass of each reccled materal enterng the recclng faclt (L B,, ), measured b drect weghng. Total mass of sold waste enterng the recclng faclt (M SPT, ) measured b drect weghng. Amount of electrct consumed at the recclng faclt for power equpment (EG R, ). Emsson factor for the electrcal grd sstem (EF grd ). Amount of fossl fuel tpe j combusted at the recclng faclt (FC SP, ). Net calorfc value of each fuel used at recclng faclt (NCV j ). The weghted average CO 2 emsson factor of fuel tpe j (EF CO2,j ). Sale prce of reccled materal s montored and reported annuall, sale recepts are collected for annual verfcaton. At processng/manufacturng faclt, producton factors that comprse PE PM,j Methodolog Development - Tmelne The proposed methodolog and assocated PDD were orgnall submtted to the Small-Scale Workng Group (SSC WG) n December of As of earl Jul 2009, the Bank has responded to two rounds of questons, and at ths tme the methodolog s stll under revew. Two topcs stll pendng wth the SSC WG are: Materal loss. The SSC WG has commented that there should be a dscount on the quantt of materal recovered to account for materal losses durng the recclng process as well as the loss n product qualt that requres a hgher level of materal use n producton of a manufactured tem. As an example, the Workng Group has stated that plastc bags made from secondar LDPE use 50% more materal than such bags manufactured wth vrgn stock. Prmar energ and electrct use. The Bank suggested the use of a unversal default value, whch the SSC WG determned to not be applcable n all locatons. As an alternatve, emssons data for a range of developng countres s beng revewed to formulate default values on a regonal bass. Fnal responses on these topcs are to be submtted to the Workng Group for ther next formal meetng, whch s scheduled for late September It s antcpated that f ths effort t successful that a methodolog on the recclng of HDPE and LDPE wll be approved b md Wth approval the Bank wll pursue smlar methodologes for other recoverable materals ncludng ferrous metal, paper, and glass. Addtonall, the Bank s separatel workng on the development of a new urban-wde approach to carbon fnance (Ranade). The approach wll combne emsson reducton actvtes from several urban areas, ncludng waste management, transport, and energ effcenc, to ncrease the scope of carbon fnance programs to nclude smaller actvtes that mght not justf a separate CDM project. CONCLUSION

10 As a stand-alone project, the proposed project for the recclng of HDPE and LDPE s ver small as a CDM actvt. Even wth the antcpated, eventual of other recclable materal the project wll generate onl small level of greenhouse gas emssons. Nonetheless, the development of the proposed methodolog for the recover of secondar materal from postconsumer dscards s deemed a worthwhle undertakng as regstered projects wll generate addtonal revenue for waste pckers who as a group survve on ver low ncomes. ACKNOWLEDGEMENTS Rama Chandra Redd. Manager, Methodolog Team. Carbon Fnance Unt, World Bank. Roberto Aello. Latn Amercan and Carbbean (LAC) Regonal Offce, World Bank (formerl wth the Carbon Fnance Unt, World Bank) and Horaco Terraza (formerl wth the LAC Regonal Offce, World Bank). Jontl ntated the recclng methodolog. Sandra Contreau. Sold Waste Advsor, World Bank. REFERENCES Eggleston, S., Buenda, L., Mwa, K., Ngara, T., Tanabe, K IPCC Gudelnes for Natonal Greenhouse Gas Inventores. Intergovernmental Panel on Clmate Change Global Mtgaton of Non-CO 2 Greenhouse Gases U.S. Envronmental Protecton Agenc. Washngton, DC. June McDougal, F., Whte, P., Franke, M., Hndle, P. (ed) Integrated Sold Waste Management: A Lfe ccle Inventor. 2 nd Edton. Blackwell Publshng Compan (Chapter 22). Smplfed modaltes and procedures for small- scale CDM project actvtes. UN Framework Conventon on Clmate Change, Clean Development Mechansm. Ranade, M., Peterson, C., Pnno, N. Access to carbon fnance for clmate change mtgaton n urban areas. In: Proceedngs of the 5 th Urban Research Smposum, Marselle, France. June 28-30, Sold waste management and greenhouse gases a lfeccle assessment of emssons and snks. U.S. Envronmental Protecton Agenc. Washngton, DC. September 2006.

JCM_VN_AM003_ver01.0 Sectoral scope: 03

JCM_VN_AM003_ver01.0 Sectoral scope: 03 Sectoral scoe: 03 Jont Credtng Mechansm Aroved Methodology VN_AM003 Imrovng the energy effcency of commercal buldngs by utlzaton of hgh effcency equment A. Ttle of the methodology Imrovng the energy effcency

More information

Waste to Energy System in Shanghai City

Waste to Energy System in Shanghai City Waste to Energy System n Shangha Cty Group of Envronmental Systems, Department of Envronmental Studes M2 46876 Ya-Y Zhang 1. Introducton In the past ffteen years, the economcs of Chna has mantaned contnuously

More information

Hollinger Canadian Publishing Holdings Co. ( HCPH ) proceeding under the Companies Creditors Arrangement Act ( CCAA )

Hollinger Canadian Publishing Holdings Co. ( HCPH ) proceeding under the Companies Creditors Arrangement Act ( CCAA ) February 17, 2011 Andrew J. Hatnay ahatnay@kmlaw.ca Dear Sr/Madam: Re: Re: Hollnger Canadan Publshng Holdngs Co. ( HCPH ) proceedng under the Companes Credtors Arrangement Act ( CCAA ) Update on CCAA Proceedngs

More information

To manage leave, meeting institutional requirements and treating individual staff members fairly and consistently.

To manage leave, meeting institutional requirements and treating individual staff members fairly and consistently. Corporate Polces & Procedures Human Resources - Document CPP216 Leave Management Frst Produced: Current Verson: Past Revsons: Revew Cycle: Apples From: 09/09/09 26/10/12 09/09/09 3 years Immedately Authorsaton:

More information

An Alternative Way to Measure Private Equity Performance

An Alternative Way to Measure Private Equity Performance An Alternatve Way to Measure Prvate Equty Performance Peter Todd Parlux Investment Technology LLC Summary Internal Rate of Return (IRR) s probably the most common way to measure the performance of prvate

More information

Data Mining from the Information Systems: Performance Indicators at Masaryk University in Brno

Data Mining from the Information Systems: Performance Indicators at Masaryk University in Brno Data Mnng from the Informaton Systems: Performance Indcators at Masaryk Unversty n Brno Mkuláš Bek EUA Workshop Strasbourg, 1-2 December 2006 1 Locaton of Brno Brno EUA Workshop Strasbourg, 1-2 December

More information

Rob Guthrie, Business Initiatives Specialist Office of Renewable Energy & Environmental Exports

Rob Guthrie, Business Initiatives Specialist Office of Renewable Energy & Environmental Exports Fnancng Solar Energy Exports Rob Guthre, Busness Intatves Specalst Offce of Renewable Energy & Envronmental Exports Export-Import Bank of the U.S. Independent, self-fundng fundng agency of the U.S. government

More information

DEFINING %COMPLETE IN MICROSOFT PROJECT

DEFINING %COMPLETE IN MICROSOFT PROJECT CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,

More information

Reporting Forms ARF 113.0A, ARF 113.0B, ARF 113.0C and ARF 113.0D FIRB Corporate (including SME Corporate), Sovereign and Bank Instruction Guide

Reporting Forms ARF 113.0A, ARF 113.0B, ARF 113.0C and ARF 113.0D FIRB Corporate (including SME Corporate), Sovereign and Bank Instruction Guide Reportng Forms ARF 113.0A, ARF 113.0B, ARF 113.0C and ARF 113.0D FIRB Corporate (ncludng SME Corporate), Soveregn and Bank Instructon Gude Ths nstructon gude s desgned to assst n the completon of the FIRB

More information

How To Get A Tax Refund On A Retirement Account

How To Get A Tax Refund On A Retirement Account CED0105200808 Amerprse Fnancal Servces, Inc. 70400 Amerprse Fnancal Center Mnneapols, MN 55474 Incomng Account Transfer/Exchange/ Drect Rollover (Qualfed Plans Only) for Amerprse certfcates, Columba mutual

More information

A system for real-time calculation and monitoring of energy performance and carbon emissions of RET systems and buildings

A system for real-time calculation and monitoring of energy performance and carbon emissions of RET systems and buildings A system for real-tme calculaton and montorng of energy performance and carbon emssons of RET systems and buldngs Dr PAAIOTIS PHILIMIS Dr ALESSADRO GIUSTI Dr STEPHE GARVI CE Technology Center Democratas

More information

Capacity-building and training

Capacity-building and training 92 Toolkt to Combat Traffckng n Persons Tool 2.14 Capacty-buldng and tranng Overvew Ths tool provdes references to tranng programmes and materals. For more tranng materals, refer also to Tool 9.18. Capacty-buldng

More information

Calculation of Sampling Weights

Calculation of Sampling Weights Perre Foy Statstcs Canada 4 Calculaton of Samplng Weghts 4.1 OVERVIEW The basc sample desgn used n TIMSS Populatons 1 and 2 was a two-stage stratfed cluster desgn. 1 The frst stage conssted of a sample

More information

Traffic-light a stress test for life insurance provisions

Traffic-light a stress test for life insurance provisions MEMORANDUM Date 006-09-7 Authors Bengt von Bahr, Göran Ronge Traffc-lght a stress test for lfe nsurance provsons Fnansnspetonen P.O. Box 6750 SE-113 85 Stocholm [Sveavägen 167] Tel +46 8 787 80 00 Fax

More information

Small pots lump sum payment instruction

Small pots lump sum payment instruction For customers Small pots lump sum payment nstructon Please read these notes before completng ths nstructon About ths nstructon Use ths nstructon f you re an ndvdual wth Aegon Retrement Choces Self Invested

More information

Time Value of Money. Types of Interest. Compounding and Discounting Single Sums. Page 1. Ch. 6 - The Time Value of Money. The Time Value of Money

Time Value of Money. Types of Interest. Compounding and Discounting Single Sums. Page 1. Ch. 6 - The Time Value of Money. The Time Value of Money Ch. 6 - The Tme Value of Money Tme Value of Money The Interest Rate Smple Interest Compound Interest Amortzng a Loan FIN21- Ahmed Y, Dasht TIME VALUE OF MONEY OR DISCOUNTED CASH FLOW ANALYSIS Very Important

More information

1.1 The University may award Higher Doctorate degrees as specified from time-to-time in UPR AS11 1.

1.1 The University may award Higher Doctorate degrees as specified from time-to-time in UPR AS11 1. HIGHER DOCTORATE DEGREES SUMMARY OF PRINCIPAL CHANGES General changes None Secton 3.2 Refer to text (Amendments to verson 03.0, UPR AS02 are shown n talcs.) 1 INTRODUCTION 1.1 The Unversty may award Hgher

More information

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT Toshhko Oda (1), Kochro Iwaoka (2) (1), (2) Infrastructure Systems Busness Unt, Panasonc System Networks Co., Ltd. Saedo-cho

More information

Overview of monitoring and evaluation

Overview of monitoring and evaluation 540 Toolkt to Combat Traffckng n Persons Tool 10.1 Overvew of montorng and evaluaton Overvew Ths tool brefly descrbes both montorng and evaluaton, and the dstncton between the two. What s montorng? Montorng

More information

7.5. Present Value of an Annuity. Investigate

7.5. Present Value of an Annuity. Investigate 7.5 Present Value of an Annuty Owen and Anna are approachng retrement and are puttng ther fnances n order. They have worked hard and nvested ther earnngs so that they now have a large amount of money on

More information

The Current Employment Statistics (CES) survey,

The Current Employment Statistics (CES) survey, Busness Brths and Deaths Impact of busness brths and deaths n the payroll survey The CES probablty-based sample redesgn accounts for most busness brth employment through the mputaton of busness deaths,

More information

Tuition Fee Loan application notes

Tuition Fee Loan application notes Tuton Fee Loan applcaton notes for new part-tme EU students 2012/13 About these notes These notes should be read along wth your Tuton Fee Loan applcaton form. The notes are splt nto three parts: Part 1

More information

Lecture 3: Force of Interest, Real Interest Rate, Annuity

Lecture 3: Force of Interest, Real Interest Rate, Annuity Lecture 3: Force of Interest, Real Interest Rate, Annuty Goals: Study contnuous compoundng and force of nterest Dscuss real nterest rate Learn annuty-mmedate, and ts present value Study annuty-due, and

More information

Stress test for measuring insurance risks in non-life insurance

Stress test for measuring insurance risks in non-life insurance PROMEMORIA Datum June 01 Fnansnspektonen Författare Bengt von Bahr, Younes Elonq and Erk Elvers Stress test for measurng nsurance rsks n non-lfe nsurance Summary Ths memo descrbes stress testng of nsurance

More information

Using Series to Analyze Financial Situations: Present Value

Using Series to Analyze Financial Situations: Present Value 2.8 Usng Seres to Analyze Fnancal Stuatons: Present Value In the prevous secton, you learned how to calculate the amount, or future value, of an ordnary smple annuty. The amount s the sum of the accumulated

More information

One Click.. Ȯne Location.. Ȯne Portal...

One Click.. Ȯne Location.. Ȯne Portal... New Addton to your NJ-HITEC Membershp! Member Portal Detals & Features Insde! One Clck.. Ȯne Locaton.. Ȯne Portal... Connect...Share...Smplfy Health IT Member Portal Benefts Trusted Advsor - NJ-HITEC s

More information

iavenue iavenue i i i iavenue iavenue iavenue

iavenue iavenue i i i iavenue iavenue iavenue Saratoga Systems' enterprse-wde Avenue CRM system s a comprehensve web-enabled software soluton. Ths next generaton system enables you to effectvely manage and enhance your customer relatonshps n both

More information

Fragility Based Rehabilitation Decision Analysis

Fragility Based Rehabilitation Decision Analysis .171. Fraglty Based Rehabltaton Decson Analyss Cagdas Kafal Graduate Student, School of Cvl and Envronmental Engneerng, Cornell Unversty Research Supervsor: rcea Grgoru, Professor Summary A method s presented

More information

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)

More information

LIFETIME INCOME OPTIONS

LIFETIME INCOME OPTIONS LIFETIME INCOME OPTIONS May 2011 by: Marca S. Wagner, Esq. The Wagner Law Group A Professonal Corporaton 99 Summer Street, 13 th Floor Boston, MA 02110 Tel: (617) 357-5200 Fax: (617) 357-5250 www.ersa-lawyers.com

More information

CERTIFICATION PROGRAMS YOU ARE INVITED TO JOIN THE INDUSTRY ELITE

CERTIFICATION PROGRAMS YOU ARE INVITED TO JOIN THE INDUSTRY ELITE CERTIFICATION PROGRAMS YOU ARE INVITED TO JOIN THE INDUSTRY ELITE ASA delvers four prestgous certfcaton programs Certfed Staffng Professonal The CSP program features rgorous content focused on employment

More information

Can Auto Liability Insurance Purchases Signal Risk Attitude?

Can Auto Liability Insurance Purchases Signal Risk Attitude? Internatonal Journal of Busness and Economcs, 2011, Vol. 10, No. 2, 159-164 Can Auto Lablty Insurance Purchases Sgnal Rsk Atttude? Chu-Shu L Department of Internatonal Busness, Asa Unversty, Tawan Sheng-Chang

More information

Financial Mathemetics

Financial Mathemetics Fnancal Mathemetcs 15 Mathematcs Grade 12 Teacher Gude Fnancal Maths Seres Overvew In ths seres we am to show how Mathematcs can be used to support personal fnancal decsons. In ths seres we jon Tebogo,

More information

Activity Scheduling for Cost-Time Investment Optimization in Project Management

Activity Scheduling for Cost-Time Investment Optimization in Project Management PROJECT MANAGEMENT 4 th Internatonal Conference on Industral Engneerng and Industral Management XIV Congreso de Ingenería de Organzacón Donosta- San Sebastán, September 8 th -10 th 010 Actvty Schedulng

More information

STRATEGIC PLAN TORINO METROPOLI 2025

STRATEGIC PLAN TORINO METROPOLI 2025 Tor nopl an Sc ent f ccomm t t ee FI RSTMEETI NG Tur n, 910J anuar y2014 STRATEGIC PLAN TORINO METROPOLI 2025 In July 2012, Mayor Fassno launched Torno s thrd Strategc Plannng effort. After a perod of

More information

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ). REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or

More information

Earthquake Vulnerability Reduction Program in Colombia A Probabilistic Cost-benefit Analysis

Earthquake Vulnerability Reduction Program in Colombia A Probabilistic Cost-benefit Analysis Publc Dsclosure Authorzed Earthquake Vulnerablty Reducton Program n Colomba A Probablstc Cost-beneft Analyss WPS3939 Publc Dsclosure Authorzed Abstract Francs Ghesquere, World Bank Lus Jamn, Unversty of

More information

Long-Term Modeling of Solar Energy: Analysis of Concentrating Solar Power (CSP) and PV Technologies

Long-Term Modeling of Solar Energy: Analysis of Concentrating Solar Power (CSP) and PV Technologies PNNL-16727 Long-Term Modelng of Solar Energy: Analyss of Concentratng Solar Power (CSP) and PV Technologes Y Zhang SJ Smth August 2008 DISCLAIMER Ths report was prepared as an account of work sponsored

More information

The Safety Board recommends that the Penn Central Transportation. Company and the American Railway Engineering Association revise

The Safety Board recommends that the Penn Central Transportation. Company and the American Railway Engineering Association revise V. RECOWNDATONS 4.! The Safety Board recommends that the Penn Central Transportaton Company and the Amercan Ralway Engneerng Assocaton revse ther track nspecton and mantenance standards or recommended

More information

The Second Generation Model: Data, Parameters, and Implementation

The Second Generation Model: Data, Parameters, and Implementation PNNL-15431 The Second Generaton Model: Data, Parameters, and Implementaton Ronald D. Sands 1 Allen A. Fawcett 2 October 2005 Prepared for the Unted States Envronmental Protecton Agency under Contracts

More information

PRIVATEENTERPRISESTIMUIATEDBY ECONOMICLOANS

PRIVATEENTERPRISESTIMUIATEDBY ECONOMICLOANS RELEASE: 86-66 PRIVATEENTERPRISESTIMUIATEDBY ECONOMICLOANS,./, '_, Sapan, Fmrana Islands, Trust Terrtory of the Pacfc Islands - - June S, - - _The Economc Development Loan Fund has been one of the most

More information

Construction Rules for Morningstar Canada Target Dividend Index SM

Construction Rules for Morningstar Canada Target Dividend Index SM Constructon Rules for Mornngstar Canada Target Dvdend Index SM Mornngstar Methodology Paper October 2014 Verson 1.2 2014 Mornngstar, Inc. All rghts reserved. The nformaton n ths document s the property

More information

Getting It Together Project & Implementation Management

Getting It Together Project & Implementation Management Gettng It Together Project & Implementaton Management CFE NETWORKING November 30, 2011 Fnancng NFA Fshng Best Practces Tranng & Mentorng Marketng & Brandng Governance Markets Fsh Legal Regulaton ? HR

More information

Assessment of the legal framework

Assessment of the legal framework 46 Toolkt to Combat Traffckng n Persons Tool 2.4 Assessment of the legal framework Overvew Ths tool offers gudelnes and resources for assessng a natonal legal framework. See also Tool 3.2 on crmnalzaton

More information

Traffic-light extended with stress test for insurance and expense risks in life insurance

Traffic-light extended with stress test for insurance and expense risks in life insurance PROMEMORIA Datum 0 July 007 FI Dnr 07-1171-30 Fnansnspetonen Författare Bengt von Bahr, Göran Ronge Traffc-lght extended wth stress test for nsurance and expense rss n lfe nsurance Summary Ths memorandum

More information

LAW ENFORCEMENT TRAINING TOOLS. Training tools for law enforcement officials and the judiciary

LAW ENFORCEMENT TRAINING TOOLS. Training tools for law enforcement officials and the judiciary chapter 5 Law enforcement and prosecuton 261 LAW ENFORCEMENT TRAINING TOOLS Tool 5.20 Tranng tools for law enforcement offcals and the judcary Overvew Ths tool recommends resources for tranng law enforcement

More information

Intra-year Cash Flow Patterns: A Simple Solution for an Unnecessary Appraisal Error

Intra-year Cash Flow Patterns: A Simple Solution for an Unnecessary Appraisal Error Intra-year Cash Flow Patterns: A Smple Soluton for an Unnecessary Apprasal Error By C. Donald Wggns (Professor of Accountng and Fnance, the Unversty of North Florda), B. Perry Woodsde (Assocate Professor

More information

Estimation of Perceived Flood Damage in Tokyo Metropolitan Area

Estimation of Perceived Flood Damage in Tokyo Metropolitan Area Estmaton of Perceved Flood Damage n Tokyo Metropoltan Area Azusa OKAGAWA* Akra HIBIKI* * Natonal Insttute for Envronmental Studes Overvew Comparng prces of lands wth/wthout flood rsk Land prce wthout flood

More information

Simple Interest Loans (Section 5.1) :

Simple Interest Loans (Section 5.1) : Chapter 5 Fnance The frst part of ths revew wll explan the dfferent nterest and nvestment equatons you learned n secton 5.1 through 5.4 of your textbook and go through several examples. The second part

More information

IT09 - Identity Management Policy

IT09 - Identity Management Policy IT09 - Identty Management Polcy Introducton 1 The Unersty needs to manage dentty accounts for all users of the Unersty s electronc systems and ensure that users hae an approprate leel of access to these

More information

Texas Instruments 30X IIS Calculator

Texas Instruments 30X IIS Calculator Texas Instruments 30X IIS Calculator Keystrokes for the TI-30X IIS are shown for a few topcs n whch keystrokes are unque. Start by readng the Quk Start secton. Then, before begnnng a specfc unt of the

More information

M-applications Development using High Performance Project Management Techniques

M-applications Development using High Performance Project Management Techniques M-applcatons Development usng Hgh Performance Project Management Technques PAUL POCATILU, MARIUS VETRICI Economc Informatcs Department Academy of Economc Studes 6 Pata Romana, Sector, Bucharest ROMANIA

More information

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo.

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo. ICSV4 Carns Australa 9- July, 007 RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL Yaoq FENG, Hanpng QIU Dynamc Test Laboratory, BISEE Chna Academy of Space Technology (CAST) yaoq.feng@yahoo.com Abstract

More information

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy 4.02 Quz Solutons Fall 2004 Multple-Choce Questons (30/00 ponts) Please, crcle the correct answer for each of the followng 0 multple-choce questons. For each queston, only one of the answers s correct.

More information

Mathematics of Finance

Mathematics of Finance 5 Mathematcs of Fnance 5.1 Smple and Compound Interest 5.2 Future Value of an Annuty 5.3 Present Value of an Annuty;Amortzaton Chapter 5 Revew Extended Applcaton:Tme, Money, and Polynomals Buyng a car

More information

How To Trade Water Quality

How To Trade Water Quality Movng Beyond Open Markets for Water Qualty Tradng: The Gans from Structured Blateral Trades Tanl Zhao Yukako Sado Rchard N. Bosvert Gregory L. Poe Cornell Unversty EAERE Preconference on Water Economcs

More information

Reporting Instructions for Schedules A through S

Reporting Instructions for Schedules A through S FFIEC 0 Reportng Instructons for Schedules A through S FFIEC 0 FFIEC 0 CONTENTS INSTRUCTIONS FOR PREPARATION OF FFIEC 0 Rsk-Based Captal Reportng for Insttutons Subject to the Advanced Captal Adequacy

More information

Depreciation of Business R&D Capital

Depreciation of Business R&D Capital Deprecaton of Busness R&D Captal U.S. Bureau of Economc Analyss Abstract R&D deprecaton rates are crtcal to calculatng the rates of return to R&D nvestments and captal servce costs, whch are mportant for

More information

SUPPLIER FINANCING AND STOCK MANAGEMENT. A JOINT VIEW.

SUPPLIER FINANCING AND STOCK MANAGEMENT. A JOINT VIEW. SUPPLIER FINANCING AND STOCK MANAGEMENT. A JOINT VIEW. Lucía Isabel García Cebrán Departamento de Economía y Dreccón de Empresas Unversdad de Zaragoza Gran Vía, 2 50.005 Zaragoza (Span) Phone: 976-76-10-00

More information

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008 Rsk-based Fatgue Estmate of Deep Water Rsers -- Course Project for EM388F: Fracture Mechancs, Sprng 2008 Chen Sh Department of Cvl, Archtectural, and Envronmental Engneerng The Unversty of Texas at Austn

More information

SPONSOR BROCHURE. WINning combinations for precision cancer medicine. Symposium

SPONSOR BROCHURE. WINning combinations for precision cancer medicine. Symposium 2014 Symposum WINnng combnatons for precson cancer medcne Breakthrough bomarker nvestgatons and combned therapeutc approaches SPONSOR BROCHURE Pars, France, June 23-24, 2014 1. GENERAL SYMPOSIUM INFORMATION

More information

A global view of managing water resources in Tunisia

A global view of managing water resources in Tunisia OCP Polcy Center Conference seres A global vew of managng water resources n Tunsa Jamel Chahed & Mustapha Besbes & Abdelkader Hamdane 11-13 June 2014 Tunsan water resources Average ranfall Pluval water

More information

HP Mission-Critical Services

HP Mission-Critical Services HP Msson-Crtcal Servces Delverng busness value to IT Jelena Bratc Zarko Subotc TS Support tm Mart 2012, Podgorca 2010 Hewlett-Packard Development Company, L.P. The nformaton contaned heren s subject to

More information

IDENTIFICATION AND CORRECTION OF A COMMON ERROR IN GENERAL ANNUITY CALCULATIONS

IDENTIFICATION AND CORRECTION OF A COMMON ERROR IN GENERAL ANNUITY CALCULATIONS IDENTIFICATION AND CORRECTION OF A COMMON ERROR IN GENERAL ANNUITY CALCULATIONS Chrs Deeley* Last revsed: September 22, 200 * Chrs Deeley s a Senor Lecturer n the School of Accountng, Charles Sturt Unversty,

More information

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol

CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK Sample Stablty Protocol Background The Cholesterol Reference Method Laboratory Network (CRMLN) developed certfcaton protocols for total cholesterol, HDL

More information

Solution: Let i = 10% and d = 5%. By definition, the respective forces of interest on funds A and B are. i 1 + it. S A (t) = d (1 dt) 2 1. = d 1 dt.

Solution: Let i = 10% and d = 5%. By definition, the respective forces of interest on funds A and B are. i 1 + it. S A (t) = d (1 dt) 2 1. = d 1 dt. Chapter 9 Revew problems 9.1 Interest rate measurement Example 9.1. Fund A accumulates at a smple nterest rate of 10%. Fund B accumulates at a smple dscount rate of 5%. Fnd the pont n tme at whch the forces

More information

Demographic and Health Surveys Methodology

Demographic and Health Surveys Methodology samplng and household lstng manual Demographc and Health Surveys Methodology Ths document s part of the Demographc and Health Survey s DHS Toolkt of methodology for the MEASURE DHS Phase III project, mplemented

More information

Traffic State Estimation in the Traffic Management Center of Berlin

Traffic State Estimation in the Traffic Management Center of Berlin Traffc State Estmaton n the Traffc Management Center of Berln Authors: Peter Vortsch, PTV AG, Stumpfstrasse, D-763 Karlsruhe, Germany phone ++49/72/965/35, emal peter.vortsch@ptv.de Peter Möhl, PTV AG,

More information

Uncrystallised funds pension lump sum payment instruction

Uncrystallised funds pension lump sum payment instruction For customers Uncrystallsed funds penson lump sum payment nstructon Don t complete ths form f your wrapper s derved from a penson credt receved followng a dvorce where your ex spouse or cvl partner had

More information

Research of Network System Reconfigurable Model Based on the Finite State Automation

Research of Network System Reconfigurable Model Based on the Finite State Automation JOURNAL OF NETWORKS, VOL., NO. 5, MAY 24 237 Research of Network System Reconfgurable Model Based on the Fnte State Automaton Shenghan Zhou and Wenbng Chang School of Relablty and System Engneerng, Behang

More information

Time Value of Money Module

Time Value of Money Module Tme Value of Money Module O BJECTIVES After readng ths Module, you wll be able to: Understand smple nterest and compound nterest. 2 Compute and use the future value of a sngle sum. 3 Compute and use the

More information

How To Understand The Results Of The German Meris Cloud And Water Vapour Product

How To Understand The Results Of The German Meris Cloud And Water Vapour Product Ttel: Project: Doc. No.: MERIS level 3 cloud and water vapour products MAPP MAPP-ATBD-ClWVL3 Issue: 1 Revson: 0 Date: 9.12.1998 Functon Name Organsaton Sgnature Date Author: Bennartz FUB Preusker FUB Schüller

More information

Protection, assistance and human rights. Recommended Principles and Guidelines on Human Rights and Human Trafficking (E/2002/68/Add.

Protection, assistance and human rights. Recommended Principles and Guidelines on Human Rights and Human Trafficking (E/2002/68/Add. chapter 8 Vctm assstance 385 Tool 8.3 Protecton, assstance and human rghts Overvew Ths tool dscusses the human rghts consderatons whch must be borne n mnd n protectng and assstng vctms of traffckng. Recommended

More information

REQUIRED FOR YEAR END 31 MARCH 2015. Your business information

REQUIRED FOR YEAR END 31 MARCH 2015. Your business information REQUIRED FOR YEAR END 31 MARCH 2015 Your busness nformaton Your detals Busness detals Busness name Balance date IRD number Contact detals - to ensure our records are up to date, please complete the followng

More information

Determinants of compliance with healthcare waste management regulations by European private healthcare facilities

Determinants of compliance with healthcare waste management regulations by European private healthcare facilities Internatonal Journal of Chemcal and Envronmental Engneerng Systems (IJCEES) www.journal-jcees.com ISSN: 0976-3716 (prnt) IJCEES Vol 3(2):78-84, 2012 Determnants of complance wth healthcare waste management

More information

A Secure Password-Authenticated Key Agreement Using Smart Cards

A Secure Password-Authenticated Key Agreement Using Smart Cards A Secure Password-Authentcated Key Agreement Usng Smart Cards Ka Chan 1, Wen-Chung Kuo 2 and Jn-Chou Cheng 3 1 Department of Computer and Informaton Scence, R.O.C. Mltary Academy, Kaohsung 83059, Tawan,

More information

VRT012 User s guide V0.1. Address: Žirmūnų g. 27, Vilnius LT-09105, Phone: (370-5) 2127472, Fax: (370-5) 276 1380, Email: info@teltonika.

VRT012 User s guide V0.1. Address: Žirmūnų g. 27, Vilnius LT-09105, Phone: (370-5) 2127472, Fax: (370-5) 276 1380, Email: info@teltonika. VRT012 User s gude V0.1 Thank you for purchasng our product. We hope ths user-frendly devce wll be helpful n realsng your deas and brngng comfort to your lfe. Please take few mnutes to read ths manual

More information

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION

More information

express why choose Interlink Express? invest in your future

express why choose Interlink Express? invest in your future I nt er l nke x pr es spa r c el sl m t ed sas ubs da r yofdpdgr oupukl m t ed express nvest n your future why choose Interlnk Express? If you re consderng becomng a franchse holder wth one of the UK s

More information

Kiel Institute for World Economics Duesternbrooker Weg 120 24105 Kiel (Germany) Kiel Working Paper No. 1120

Kiel Institute for World Economics Duesternbrooker Weg 120 24105 Kiel (Germany) Kiel Working Paper No. 1120 Kel Insttute for World Economcs Duesternbrooker Weg 45 Kel (Germany) Kel Workng Paper No. Path Dependences n enture Captal Markets by Andrea Schertler July The responsblty for the contents of the workng

More information

Residential real estate price indices as financial soundness indicators: methodological issues

Residential real estate price indices as financial soundness indicators: methodological issues Resdental real estate prce ndces as fnancal soundness ndcators: methodologcal ssues Bradford Case and Susan Wachter 1 I. Introducton The purpose of ths conference on real estate ndcators and fnancal stablty

More information

Multiple-Period Attribution: Residuals and Compounding

Multiple-Period Attribution: Residuals and Compounding Multple-Perod Attrbuton: Resduals and Compoundng Our revewer gave these authors full marks for dealng wth an ssue that performance measurers and vendors often regard as propretary nformaton. In 1994, Dens

More information

Help is a tou ch of a button away. Telecare - keeping you safe and independent in your own home. i Personal emergency equipment

Help is a tou ch of a button away. Telecare - keeping you safe and independent in your own home. i Personal emergency equipment Help s a tou ch of a button away Telecare - keepng you safe and ndependent n your own home Personal emergency equpment 24/7 moble response - ncludng a dgnty savng lftng servce Professonal support Welcome

More information

Design and Development of a Security Evaluation Platform Based on International Standards

Design and Development of a Security Evaluation Platform Based on International Standards Internatonal Journal of Informatcs Socety, VOL.5, NO.2 (203) 7-80 7 Desgn and Development of a Securty Evaluaton Platform Based on Internatonal Standards Yuj Takahash and Yoshm Teshgawara Graduate School

More information

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE Yu-L Huang Industral Engneerng Department New Mexco State Unversty Las Cruces, New Mexco 88003, U.S.A. Abstract Patent

More information

Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining

Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining Rsk Model of Long-Term Producton Schedulng n Open Pt Gold Mnng R Halatchev 1 and P Lever 2 ABSTRACT Open pt gold mnng s an mportant sector of the Australan mnng ndustry. It uses large amounts of nvestments,

More information

10.2 Future Value and Present Value of an Ordinary Simple Annuity

10.2 Future Value and Present Value of an Ordinary Simple Annuity 348 Chapter 10 Annutes 10.2 Future Value and Present Value of an Ordnary Smple Annuty In compound nterest, 'n' s the number of compoundng perods durng the term. In an ordnary smple annuty, payments are

More information

Electronic Document Management

Electronic Document Management tem no 14- THE CTY OF EDNBURGH COUNCL Electronc Document Management Executve of the Councl 7th October 2003 y. 1 1. 2 2.1 2.2 2.3 2.4 2.5 Purpose of report To approve a preferred suppler and proposed way

More information

The program for the Bachelor degrees shall extend over three years of full-time study or the parttime equivalent.

The program for the Bachelor degrees shall extend over three years of full-time study or the parttime equivalent. Bachel of Commerce Bachel of Commerce (Accountng) Bachel of Commerce (Cpate Fnance) Bachel of Commerce (Internatonal Busness) Bachel of Commerce (Management) Bachel of Commerce (Marketng) These Program

More information

www.gov.uk/studentfinance 2016/17

www.gov.uk/studentfinance 2016/17 www.gov.uk/studentfnance SECTION 1 WHAT SUPPORT CAN YOU GET? FEES, LOANS, GRANTS & MORE *Fgures shown n ths secton are based on the 2015/16 student fnance polcy and may change SECTION 1 TUITION FEES AND

More information

U.S. DEPARTMENT OF ENERGY OFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENT PRESENTATION TO THE NUCLEAR WASTE TECHNICAL REVIEW BOARD

U.S. DEPARTMENT OF ENERGY OFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENT PRESENTATION TO THE NUCLEAR WASTE TECHNICAL REVIEW BOARD dh, U.S. DEPARTMENT OF ENERGY OFFCE OF CVLAN RADOACTVE WASTE MANAGEMENT PRESENTATON TO THE NUCLEAR WASTE TECHNCAL REVEW BOARD SUBJECT: YUCCA MOUNTAN PROJECT TRANSPORTATON PROGRAM PRESENTER: PRESENTER'S

More information

Safety instructions VEGAVIB VB6*.GI*******

Safety instructions VEGAVIB VB6*.GI******* Safety nstructons VEGAVIB VB6*.GI******* Kosha 14-AV4BO-0107 Ex td A20, A20/21, A21 IP66 T** 0044 Document ID: 48578 Contents 1 Area of applcablty... 3 2 General nformaton... 3 3 Techncal data... 3 4 Applcaton

More information

MONITORING METHODOLOGY TO ASSESS THE PERFORMANCE OF GSM NETWORKS

MONITORING METHODOLOGY TO ASSESS THE PERFORMANCE OF GSM NETWORKS Electronc Communcatons Commttee (ECC) wthn the European Conference of Postal and Telecommuncatons Admnstratons (CEPT) MONITORING METHODOLOGY TO ASSESS THE PERFORMANCE OF GSM NETWORKS Athens, February 2008

More information

! # %& ( ) +,../ 0 1 2 3 4 0 4 # 5##&.6 7% 8 # 0 4 2 #...

! # %& ( ) +,../ 0 1 2 3 4 0 4 # 5##&.6 7% 8 # 0 4 2 #... ! # %& ( ) +,../ 0 1 2 3 4 0 4 # 5##&.6 7% 8 # 0 4 2 #... 9 Sheffeld Economc Research Paper Seres SERP Number: 2011010 ISSN 1749-8368 Sarah Brown, Aurora Ortz-Núñez and Karl Taylor Educatonal loans and

More information

Return decomposing of absolute-performance multi-asset class portfolios. Working Paper - Nummer: 16

Return decomposing of absolute-performance multi-asset class portfolios. Working Paper - Nummer: 16 Return decomposng of absolute-performance mult-asset class portfolos Workng Paper - Nummer: 16 2007 by Dr. Stefan J. Illmer und Wolfgang Marty; n: Fnancal Markets and Portfolo Management; March 2007; Volume

More information

DO LOSS FIRMS MANAGE EARNINGS AROUND SEASONED EQUITY OFFERINGS?

DO LOSS FIRMS MANAGE EARNINGS AROUND SEASONED EQUITY OFFERINGS? DO LOSS FIRMS MANAGE EARNINGS AROUND SEASONED EQUITY OFFERINGS? Fernando Comran, Unversty of San Francsco, School of Management, 2130 Fulton Street, CA 94117, Unted States, fcomran@usfca.edu Tatana Fedyk,

More information

energies ISSN 1996-1073 www.mdpi.com/journal/energies

energies ISSN 1996-1073 www.mdpi.com/journal/energies Energes 2013, 6, 3444-3465; do:10.3390/en6073444 Artcle OPEN ACCESS energes ISSN 1996-1073 www.mdp.com/journal/energes Comparson and Analyss of Macro Energy Scenaros n Chna and a Decomposton-Based Approach

More information

Sample Design in TIMSS and PIRLS

Sample Design in TIMSS and PIRLS Sample Desgn n TIMSS and PIRLS Introducton Marc Joncas Perre Foy TIMSS and PIRLS are desgned to provde vald and relable measurement of trends n student achevement n countres around the world, whle keepng

More information

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000

Number of Levels Cumulative Annual operating Income per year construction costs costs ($) ($) ($) 1 600,000 35,000 100,000 2 2,200,000 60,000 350,000 Problem Set 5 Solutons 1 MIT s consderng buldng a new car park near Kendall Square. o unversty funds are avalable (overhead rates are under pressure and the new faclty would have to pay for tself from

More information

Air Quality Monitoring Using Model: A Review

Air Quality Monitoring Using Model: A Review Internatonal Journal of Scence and Research (IJSR), Inda Onlne ISSN: 39-7064 Ar ualt Montorng Usng Model: A Revew Ukagwe, Sandra A., Osoka, Emmanuel C., Department of Chemcal Engneerng, Federal Unverst

More information