1 The Anderson School at UCLA POL Numbers 101: Taxes, Investment, and Depreciation Copyright 2002 by Richard P. Rumelt. In the Note on Cost and Value over Time (POL ), we introduced the basic mechanics of discounting, taking present values, and showed how to compare simple situations with differing durations. Unfortunately, the real world also contains corporate income taxes and taxes complicate matters. The complication arises because all cash inflows and outflows are not treated alike by the tax code. Put differently, taxes are levied on income, not on cash flow. Consequently, just adding up the present values of pre-tax numbers can lead you far astray in comparing alternatives. Before-Tax and After-Tax Numbers The average U.S. corporation pays federal and state income taxes at about a 40% marginal rate. 1 Make sure you understand this simple equation (T is the tax rate): {After-Tax Income} = (1 T) {Pre-Tax Income}. Anything that increase pre-tax income by $1 will increase after-tax income by (1-T). Any expense that reduces pre-tax income by $1 will reduce after-tax income by (1-T). Independent business-people often think about pre-tax dollars as less expensive than after-tax dollars. If they can lease a car as a business expense, a $1000 lease payment reduces after-tax income by only $600. If the alternative was a personal lease, the business lease is cheaper. It isn t that the lease is cheaper, it s that the government has helped out, chipping in $400 each month towards the lease in the form of a reduced tax bill. The two main culprits in the tax story are capital expenditures and depreciation. Capital expenditures are expenditures for long-lived assets. Such money outflows are NOT expenses. They are not deducted from revenue to arrive at income. Therefore they do not reduce income or taxes on income. They are not tax deductible. Cash Flow and Discount Rates In business decision-making, what should be discount and at what rate? This is a very complex question and we only hope to introduce it here. We will put forward several rules that are guidelines for solving many business problems. They are not the most sophisticated rules, but they are the basic rules that most MBA s are expected to know and use. More sophisticated rules require specialized training in finance. 1 U.S. federal marginal corporate income tax rates start at 15%, rise to 39% for corporate incomes between $100K and $335K, then fall to 35%, which is the marginal rate for most large companies. State corporate tax rates vary by state. In California, for example, the marginal corporate income tax rate is 8.8%. State income taxes are a deductible expense in computing federal income tax liability.

2 Taxes, Investment, and Depreciation 2 POL Rule 1: Work with after-tax numbers. If the situation involves capital expenditures, or other items that are not revenues or expenses, it is very difficult to perform a correct analysis working only with before-tax numbers. Rule 2: Work with cash flows, not profits. The value of the firm is governed by cash flow, not by accounting profit. The first adjustment we make is to add depreciation and amortization back to Net Income to get cash flow. Depreciation and amortization are fictitious expenses Net Income understates cash flow by the amount of these fake expenses. Secondly, cash flow is reduced by any increases in working capital. 2 Thirdly, cash flow is reduced by investment (capital expenditures less capital sales). Cash Flow = Net Income + Depreciation + Amortization - Increases in Working Capital - Investments Oftentimes (as in the next section) we look at a project by itself, not having a clue as to the company s total Net Income. We then work with the incremental cash flows generated by the project. Any incremental benefits b have an after-tax impact on cash flow of (1 T)b. Any incremental expenses have an after-tax impact on cash flow of (1 T)e. Incremental investment I has an impact I. The only tricky part is depreciation. It has an impact on both Net Income and then we add it back in. So, incremental depreciation in the amount d has a total impact on cash flow of (1-T)d + d = Td. That amount, Td, is called the depreciation tax shield (DTS). It is the reduction in the tax bill caused by depreciation it is the impact on cash flow of depreciation. Rule 3: Don t include financing in your cash flows. Leave out interest charges and dividends. This is, perhaps, the trickiest rule to understand. The basic idea is that we work with the cash flows as if the firm had no debt. We include the effects of debt in the discount rate (Rule 4). If the cost of debt is already included in the discount rate, then putting debt charges into the cash flows is double counting. It is possible to do analyses looking at after-interest after-tax cash flows, but it is quite hard to get the discount rate right in these cases. Rule 4: Discount at the weighted average cost of capital. If the firm has total capital C and debt D, it is said to have a leverage ratio of L = D/C (the proportion of debt). Suppose the rate of interest on debt is k d, and the cost of equity (non-debt capital) is k e. Then the weighted average cost of capital is k = (1 T) Lk + (1 L) k. (1) Notice that we use the after-tax cost of debt in the weighted average. What is the cost of equity? It depends on risk. For the average firm it is the risk free rate (T-Bills) plus the equity risk premium perhaps 6%. So, if the risk-free rate is 6.5%, the cost of equity would be 12.5%. The cost of debt might be 8% (debt is not riskless). Taking these numbers, and assuming that a firm s leverage ratio is ¼, we compute the weighted average cost of capital to be k = 0.25(1 0.4) (.125) = 10.6%. There are complex economic arguments behind each of these numbers and relationships. For example, the cost of equity is also a function of the amount of leverage. So you can t just set L=1 d e 2 Working capital is Current Assets less Current Liabilities. It is the amount of Current Assets that has been, or has to be, financed by long-term sources. It requires investment, but not capital investment.

3 Taxes, Investment, and Depreciation 3 POL and get a nice low discount rate. Making L high makes the equity stream very risky and pushes k e through the roof! A Simple Capital Project NOT! Capital projects involve making capital expenditures in the expectation of future gains. For example, consider a situation in which management will invest $1 million for a plant expansion that will produce $450K annually in benefits (income less expenses). Now consider a different problem: there are two machines being compared, and one costs $1 million more than the other, but has maintenance expenses Table 1 The Capital Project Capital Expenditure ($K) Useful Life (years) that are $450K less per year. If the two ma- Pre-Tax Benefits ($K/Year) 450 chines have the same life, the problem is just like that of the factory. In both cases we are comparing spending Tax Rate (%) 40 $1 million (or $1 million more) in order to get benefits of $450K per year. Discount Rate (%) 10 Assume that the useful life of the equipment is 7 years, that the marginal corporate tax rate is 40%, and that the appropriate discount rate is 10%. The data about our project are summed up in Table 1. Let s first do an incorrect pre-tax analysis. The present value of $450 received each year for 7 years at 10% is PV(0.1,7,-450) = $1,191K. The net present value of the project, then, is = $191K. So it looks OK. The problem with the above analysis is that the benefits are taxed each year as they occur, but that the tax effects of the capital expenditure are spread-out over time, through the mechanism of depreciation accounting. Working correctly with taxes is often confusing. The problem is made worse because many people prefer to ignore taxes and just work with the before tax numbers. This bad habit is reinforced by divisional accounting (a business inside a corporation) that stops at Operating Income taxes are handled by corporate. But correct decisions require that the tax implications of the decision be taken into account. Another place you will see improper tax treatment is in consulting reports aimed at senior management. Often, to keep things simple, the consultants just deal with before tax numbers. But the results of such analyses can be misleading. Although capital expenditures are not deductible, U.S. tax law lets you depreciate an asset over its useful life and deduct the depreciation. As discussed above in Rule 2, depreciation is a fictitious expense but it is tax deductible. Because it is fictitious, depreciation only affects aftertax profits through its impact on tax payments. That is, if you have profits, depreciation of amount d reduces your tax bill by dt, where T is your marginal tax rate. That is like having Uncle Sam make an after-tax payment into net income of dt. Let s look at the after-tax cash flows. The before-tax present value of the benefit stream is $1191. Therefore, the after-tax value of the benefit stream is simply (1 T)(1191) = (.6)(1191) = $714K. The before-tax cost of the equipment is $1,000K, spent immediately. But the after-tax cost is not (1 T)(1000). The $1 million capital expenditure is not an expense and it isn t tax deductible. What is tax deductible is depreciation expense, which is the accounting convention of spreading the $1 million over the useful life of the equipment. If we use straight-line depreciation, we divide the $1 million into 7 equal chunks of $142.9K. Each year we declare this (fictitious) expense until the equipment is fully depreciated after 7 years. Each year the $142.9K in depreciation reduces taxable income by that amount, reducing taxes by T(142.9) = (.4)(142.9) = $57.1. After 7 years of doing this we have obtained 7(57.1) = $400K in tax savings. That is ex-

4 Taxes, Investment, and Depreciation 4 POL actly (1 T)($1000K) in absolute dollars. But the tax savings are spread over time. Take the present value of these depreciation tax savings (DTS) and find PV(0.1,7,-57.1) = $278.2K, much less than $400K. By forcing us to depreciate the equipment, rather than expense it, the tax law has reduced the value of the tax shield. So the after-tax cost of the equipment is = Table 2 After-Tax Analysis Straight-Line Depreciation a Annual Benefit ($K) b Annual Benefit After-Tax ($K) [(1 T)(a)] c Annual Depreciation Expense ($K) [1000/7] d Depreciation Tax Savings ($K) [Tc] 57.1 e Present Value of After-Tax Benefits ($K) [PV(0.1,7,-270)] f Present Value of Depreciation Tax Savings ($K) [PV(0.1,7,-54.17)] g Net Present Value of Project ($K) [ e + f] -7.3 $721.8K much more than (1 T)(1000). This series of calculations is displayed in Table 2. Whereas the erroneous pre-tax calculations showed a positive NPV, the after-tax calculations show a negative NPV of -$7.3K. The difference is NOT taxes per se, but the tax-code s asymmetric treatment of CAPEX and benefits. Whereas the tax on benefits is immediate, depreciation rules defer the tax shield on CAPEX. Working with Real Depreciation Real depreciation (for tax purposes) is usually calculated on an accelerated basis. Doubledeclining balance works like this: if the un-depreciated balance is B, and the total useful life was L years, then you can deduct 2B/L in depreciation, or the remaining straight-line amount, whichever is larger. (150% depreciation works the same way but the factor is 1.5B/L). 3 Look at Table 3. The DDB depreciation charges $1 million over 7 years are shown. 4 The first-year s depreciation is (1000)(2/7) and the second year it is 2/7 s of the remaining balance. In year 5 the depreciation switches over to straight-line because DDB is actually slower than straight-line from then on. Table 3 DDB Depreciation Year Depreciation ($K) The life over which you can depreciate an asset is also controlled by law. Accelerated depreciation is allowed for 6 classes of assets with lives of 3, 5, 7, 10, 15, and 20 years. You can, for example, depreciate a race horse over 12 years old in 3 years. You can depreciate an automobile over 5 years. Most industrial machinery depreciates over 7 years. A tugboat depreciates over 10 years, and so on. 4 Double-declining balance method switching to straight-line in year 3. Check your accounting course and Excel function VDB for details.

5 Taxes, Investment, and Depreciation 5 POL Excel provides two functions to help with these calculations. DDB() function gives the double-declining balance depreciation charges for an asset in any period. However, it never switches to straight-line. The VDB() function takes the DDB or the straight-line, whichever is larger in each year. See Excel documentation for the details about how these functions work. Use Excel s NPV() function to take the present value of the stream of numbers in Table 3 and you get $ Multiplying by 0.4 yields the present value of the depreciation tax savings (DTS) = $ Using straight-line depreciation (Table 2) we found the present value of DTS to be $278.2K. Using DDB depreciation increases it to $302.6, an increase of $24.4K. This is more than enough to swing the NPV of the project from -$7.3 to +$17K. To summarize, the pure pre-tax view of the project was much too rosy. The real NPV of the project is $17K, not $191K. If we had used only the simple straight-line depreciation analysis, the after-tax NPV would have been -$7K. Making an Excel Macro One problem with these Excel functions is that you must produce a table, like Table 3, before you can calculate a present value. Wouldn t it be nice if there was a function that just spat out the present value of the depreciation stream in one swoop? The function is called PV_DDB() and is easily added as a macro VBA function. It takes 5 parameters, the last one being optional. The parameters are: Cost = the initial investment cost of the capital equipment Salvage = the salvage value of the equipment at the end of its useful life Life = the useful life in years Rate = the discount rate expressed as a fraction (not a percentage) Ddbf = the depreciation rate. The default value is 2 (double declining). To specify another rate, specify it as a number such as 1.5 for 150% depreciation rules. Example: The present value of the stream shown in Table 3 can be obtained as =PV_DDB(1000,0, 7, 0.1). The result is Multiply by 0.4 to get the DTS. To add this function to your system, type Alt-F11, add a module to your workbook and paste this function into it. If you don t understand any of this, get some help from someone who does. Public Function PV_DDB(Cost, Salvage, Life, Rate, _ Optional ddbf As Variant) As Double Dim f As Double, beta As Double, gamma As Double Dim i As Integer f = 2 If Not IsMissing(ddbf) Then f = ddbf End If PV_DDB = 0# beta = 1# / (1# + Rate) gamma = beta For i = 0 To Life - 1 PV_DDB = PV_DDB + gamma * _ Application.WorksheetFunction.Vdb_ (Cost, Salvage, Life, i, i + 1, f) gamma = gamma * beta Next i End Function

Chapter 9. Year Revenue COGS Depreciation S&A Taxable Income After-tax Operating Income 1 $20.60 $12.36 $1.00 $2.06 $5.18 $3.11

Chapter 9. Year Revenue COGS Depreciation S&A Taxable Income After-tax Operating Income 1 $20.60 $12.36 $1.00 $2.06 $5.18 $3.11 Chapter 9 9-1 We assume that revenues and selling & administrative expenses will increase at the rate of inflation. Year Revenue COGS Depreciation S&A Taxable Income After-tax Operating Income 1 $20.60

More information

] (3.3) ] (1 + r)t (3.4)

] (3.3) ] (1 + r)t (3.4) Present value = future value after t periods (3.1) (1 + r) t PV of perpetuity = C = cash payment (3.2) r interest rate Present value of t-year annuity = C [ 1 1 ] (3.3) r r(1 + r) t Future value of annuity

More information

Net Present Value and Capital Budgeting. What to Discount

Net Present Value and Capital Budgeting. What to Discount Net Present Value and Capital Budgeting (Text reference: Chapter 7) Topics what to discount the CCA system total project cash flow vs. tax shield approach detailed CCA calculations and examples project

More information

CHAPTER 14 COST OF CAPITAL

CHAPTER 14 COST OF CAPITAL CHAPTER 14 COST OF CAPITAL Answers to Concepts Review and Critical Thinking Questions 1. It is the minimum rate of return the firm must earn overall on its existing assets. If it earns more than this,

More information

Chapter 09 - Using Discounted Cash-Flow Analysis to Make Investment Decisions

Chapter 09 - Using Discounted Cash-Flow Analysis to Make Investment Decisions Solutions to Chapter 9 Using Discounted Cash-Flow Analysis to Make Investment Decisions 1. Net income = ($74 $42 $10) [0.35 ($74 $42 $10)] = $22 $7.7 = $14.3 million Revenues cash expenses taxes paid =

More information

CHAPTER 7: NPV AND CAPITAL BUDGETING

CHAPTER 7: NPV AND CAPITAL BUDGETING CHAPTER 7: NPV AND CAPITAL BUDGETING I. Introduction Assigned problems are 3, 7, 34, 36, and 41. Read Appendix A. The key to analyzing a new project is to think incrementally. We calculate the incremental

More information

Vol. 2, Chapter 4 Capital Budgeting

Vol. 2, Chapter 4 Capital Budgeting Vol. 2, Chapter 4 Capital Budgeting Problem 1: Solution Answers found using Excel formulas: 1. Amount invested = $10,000 $21,589.25 Compounding period = annually Number of years = 10 Annual interest rate

More information

Numbers 101: Cost and Value Over Time

Numbers 101: Cost and Value Over Time The Anderson School at UCLA POL 2000-09 Numbers 101: Cost and Value Over Time Copyright 2000 by Richard P. Rumelt. We use the tool called discounting to compare money amounts received or paid at different

More information

(Relevant to AAT Examination Paper 4 Business Economics and Financial Mathematics)

(Relevant to AAT Examination Paper 4 Business Economics and Financial Mathematics) Capital Budgeting: Net Present Value vs Internal Rate of Return (Relevant to AAT Examination Paper 4 Business Economics and Financial Mathematics) Y O Lam Capital budgeting assists decision makers in a

More information

( ) ( )( ) ( ) 2 ( ) 3. n n = 100 000 1+ 0.10 = 100 000 1.331 = 133100

( ) ( )( ) ( ) 2 ( ) 3. n n = 100 000 1+ 0.10 = 100 000 1.331 = 133100 Mariusz Próchniak Chair of Economics II Warsaw School of Economics CAPITAL BUDGETING Managerial Economics 1 2 1 Future value (FV) r annual interest rate B the amount of money held today Interest is compounded

More information

CHAPTER 7 MAKING CAPITAL INVESTMENT DECISIONS

CHAPTER 7 MAKING CAPITAL INVESTMENT DECISIONS CHAPTER 7 MAKING CAPITAL INVESTMENT DECISIONS Answers to Concepts Review and Critical Thinking Questions 1. In this context, an opportunity cost refers to the value of an asset or other input that will

More information

Chapter 7: Net Present Value and Capital Budgeting

Chapter 7: Net Present Value and Capital Budgeting Chapter 7: Net Present Value and Capital Budgeting 7.1 a. Yes, the reduction in the sales of the company s other products, referred to as erosion, should be treated as an incremental cash flow. These lost

More information

CHAPTER 12 RISK, COST OF CAPITAL, AND CAPITAL BUDGETING

CHAPTER 12 RISK, COST OF CAPITAL, AND CAPITAL BUDGETING CHAPTER 12 RISK, COST OF CAPITAL, AND CAPITAL BUDGETING Answers to Concepts Review and Critical Thinking Questions 1. No. The cost of capital depends on the risk of the project, not the source of the money.

More information

CHAPTER 8: ESTIMATING CASH FLOWS

CHAPTER 8: ESTIMATING CASH FLOWS CHAPTER 8: ESTIMATING CASH FLOWS 8-1 a. Straight line depreciation = ($15 - $3)/10 = $1.20 Annual Tax Savings from Depreciation = $ 1.2 (0.4) = $0.48 Present Value of Tax Savings from Depreciation = $

More information

Financial Statement Analysis!

Financial Statement Analysis! Financial Statement Analysis! The raw data for investing Aswath Damodaran! 1! Questions we would like answered! Assets Liabilities What are the assets in place? How valuable are these assets? How risky

More information

EVALUATING CAPITAL INVESTMENTS IN AGRIBUSINESS

EVALUATING CAPITAL INVESTMENTS IN AGRIBUSINESS EVALUATING CAPITAL INVESTMENTS IN AGRIBUSINESS Technological advancements impact the agribusiness industry in a very irregular fashion. Given the difficulties associated with predicting the arrival and/or

More information

1 (a) Calculation of net present value (NPV) Year 1 2 3 4 5 6 $000 $000 $000 $000 $000 $000 Sales revenue 1,600 1,600 1,600 1,600 1,600

1 (a) Calculation of net present value (NPV) Year 1 2 3 4 5 6 $000 $000 $000 $000 $000 $000 Sales revenue 1,600 1,600 1,600 1,600 1,600 Answers Fundamentals Level Skills Module, Paper F9 Financial Management December 2011 Answers 1 (a) Calculation of net present value (NPV) Year 1 2 3 4 5 6 $000 $000 $000 $000 $000 $000 Sales revenue 1,600

More information

Chapter 9 Cash Flow and Capital Budgeting

Chapter 9 Cash Flow and Capital Budgeting Chapter 9 Cash Flow and Capital Budgeting MULTIPLE CHOICE 1. Gamma Electronics is considering the purchase of testing equipment that will cost $500,000. The equipment has a 5-year lifetime with no salvage

More information

BA 351 CORPORATE FINANCE. John R. Graham Adapted from S. Viswanathan LECTURE 5 LEASING FUQUA SCHOOL OF BUSINESS DUKE UNIVERSITY

BA 351 CORPORATE FINANCE. John R. Graham Adapted from S. Viswanathan LECTURE 5 LEASING FUQUA SCHOOL OF BUSINESS DUKE UNIVERSITY BA 351 CORPORATE FINANCE John R. Graham Adapted from S. Viswanathan LECTURE 5 LEASING FUQUA SCHOOL OF BUSINESS DUKE UNIVERSITY 1 Leasing has long been an important alternative to buying an asset. In this

More information

Paper F9. Financial Management. Fundamentals Pilot Paper Skills module. The Association of Chartered Certified Accountants

Paper F9. Financial Management. Fundamentals Pilot Paper Skills module. The Association of Chartered Certified Accountants Fundamentals Pilot Paper Skills module Financial Management Time allowed Reading and planning: Writing: 15 minutes 3 hours ALL FOUR questions are compulsory and MUST be attempted. Do NOT open this paper

More information

FIN 413 Corporate Finance. Capital Structure, Taxes, and Bankruptcy

FIN 413 Corporate Finance. Capital Structure, Taxes, and Bankruptcy FIN 413 Corporate Finance Capital Structure, Taxes, and Bankruptcy Evgeny Lyandres Fall 2003 1 Relaxing the M-M Assumptions E D T Interest payments to bondholders are deductible for tax purposes while

More information

Overview of Lecture 9

Overview of Lecture 9 Overview of Lecture 9 Taxes The Tax Code Calculating after-tax cash flows What Discount Rate to Use? Materials covered: Reader, Lecture 7 BM Chapter 6, pp. 121-134. M. Spiegel and R. Stanton, 2000 1 Review:

More information

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA Basic 1. To calculate the payback period, we need to find the time that the project has recovered its initial investment. After two years, the

More information

EMBA in Management & Finance. Corporate Finance. Eric Jondeau

EMBA in Management & Finance. Corporate Finance. Eric Jondeau EMBA in Management & Finance Corporate Finance EMBA in Management & Finance Lecture 5: Capital Budgeting For the Levered Firm Prospectus Recall that there are three questions in corporate finance. The

More information

Chapter 20 Lease Financing ANSWERS TO END-OF-CHAPTER QUESTIONS

Chapter 20 Lease Financing ANSWERS TO END-OF-CHAPTER QUESTIONS Chapter 20 Lease Financing ANSWERS TO END-OF-CHAPTER QUESTIONS 20-1 a. The lessee is the party leasing the property. The party receiving the payments from the lease (that is, the owner of the property)

More information

TOPIC LEARNING OBJECTIVE

TOPIC LEARNING OBJECTIVE Topic Mapping 1 Transaction Analysis Understand the effect of various types of transactions on the accounting equation, accounting journal and accounting ledger. Concepts and Skills Accounting Equation

More information

Chapter 18. Web Extension: Percentage Cost Analysis, Leasing Feedback, and Leveraged Leases

Chapter 18. Web Extension: Percentage Cost Analysis, Leasing Feedback, and Leveraged Leases Chapter 18 Web Extension: Percentage Cost Analysis, Leasing Feedback, and Leveraged Leases Percentage Cost Analysis Anderson s lease-versus-purchase decision from Chapter 18 could also be analyzed using

More information

Chapter 14 Notes Page 1

Chapter 14 Notes Page 1 Chapter 14 Notes Page 1 Capital Budgeting This chapter examines various tools used to evaluate potential projects or investments. Accountants advocate the use of the Simple Rate of Return, which is based

More information

Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods TABLE OF CONTENTS

Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods TABLE OF CONTENTS Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods 1.0 FINANCIAL FORECASTING METHODS 1.01 Introduction

More information

Capital Investment Analysis and Project Assessment

Capital Investment Analysis and Project Assessment PURDUE EXTENSION EC-731 Capital Investment Analysis and Project Assessment Michael Boehlje and Cole Ehmke Department of Agricultural Economics Capital investment decisions that involve the purchase of

More information

Chapter 13 Capital Budgeting: Estimating Cash Flow and Analyzing Risk ANSWERS TO END-OF-CHAPTER QUESTIONS

Chapter 13 Capital Budgeting: Estimating Cash Flow and Analyzing Risk ANSWERS TO END-OF-CHAPTER QUESTIONS Chapter 13 Capital Budgeting: Estimating Cash Flow and Analyzing Risk ANSWERS TO END-OF-CHAPTER QUESTIONS 13-3 Since the cost of capital includes a premium for expected inflation, failure to adjust cash

More information

Capital Budgeting Further Considerations

Capital Budgeting Further Considerations Capital Budgeting Further Considerations For 9.220, Term 1, 2002/03 02_Lecture10.ppt Lecture Outline Introduction The input for evaluating projects relevant cash flows Inflation: real vs. nominal analysis

More information

Investment, Time, and Present Value

Investment, Time, and Present Value Investment, Time, and Present Value Contents: Introduction Future Value (FV) Present Value (PV) Net Present Value (NPV) Optional: The Capital Asset Pricing Model (CAPM) Introduction Decisions made by a

More information

Capital Budgeting OVERVIEW

Capital Budgeting OVERVIEW WSG12 7/7/03 4:25 PM Page 191 12 Capital Budgeting OVERVIEW This chapter concentrates on the long-term, strategic considerations and focuses primarily on the firm s investment opportunities. The discussions

More information

CHAPTER 21 CAPITAL BUDGETING AND COST ANALYSIS. 21-20 Capital budgeting with uneven cash flows, no income taxes.

CHAPTER 21 CAPITAL BUDGETING AND COST ANALYSIS. 21-20 Capital budgeting with uneven cash flows, no income taxes. CHAPTER 21 CAPITAL BUDGETING AND COST ANALYSIS 21-20 Capital budgeting with uneven cash flows, no income taxes. 1. Present value of savings in cash operating costs: $10,000 0.862 $ 8,620 8,000 0.743 5,944

More information

Capital Budgeting Cash Flows

Capital Budgeting Cash Flows Learning Objectives 1-1 Capital Budgeting Cash Flows 1 Corporate Financial Management 3e Emery Finnerty Stowe 1-2 Calculate incremental after-tax cash flows for a capital budgeting project. Explain the

More information

Practice Exam (Solutions)

Practice Exam (Solutions) Practice Exam (Solutions) June 6, 2008 Course: Finance for AEO Length: 2 hours Lecturer: Paul Sengmüller Students are expected to conduct themselves properly during examinations and to obey any instructions

More information

CHAPTER 10 MAKING CAPITAL INVESTMENT DECISIONS

CHAPTER 10 MAKING CAPITAL INVESTMENT DECISIONS CHAPTER 10 MAKING CAPITAL INVESTMENT DECISIONS Answers to Concepts Review and Critical Thinking Questions 1. In this context, an opportunity cost refers to the value of an asset or other input that will

More information

Cash Flow, Taxes, and Project Evaluation. Remember Income versus Cashflow

Cash Flow, Taxes, and Project Evaluation. Remember Income versus Cashflow Cash Flow, Taxes, and Project Evaluation Of the four steps in calculating NPV, the most difficult is the first: Forecasting cash flows. We now focus on this problem, with special attention to What is cash

More information

CALCULATOR TUTORIAL. Because most students that use Understanding Healthcare Financial Management will be conducting time

CALCULATOR TUTORIAL. Because most students that use Understanding Healthcare Financial Management will be conducting time CALCULATOR TUTORIAL INTRODUCTION Because most students that use Understanding Healthcare Financial Management will be conducting time value analyses on spreadsheets, most of the text discussion focuses

More information

Chapter 7 Fundamentals of Capital Budgeting

Chapter 7 Fundamentals of Capital Budgeting Chapter 7 Fundamentals of Capital Budgeting Copyright 2011 Pearson Prentice Hall. All rights reserved. Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Choosing Among

More information

1. CFI Holdings is a conglomerate listed on the Zimbabwe Stock Exchange (ZSE) and has three operating divisions as follows:

1. CFI Holdings is a conglomerate listed on the Zimbabwe Stock Exchange (ZSE) and has three operating divisions as follows: NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY FACULTY OF COMMERCE DEPARTMENT OF FINANCE BACHELOR OF COMMERCE HONOURS DEGREE IN FINANCE PART II 2 ND SEMESTER FINAL EXAMINATION MAY 2005 CORPORATE FINANCE

More information

Management Accounting Financial Strategy

Management Accounting Financial Strategy PAPER P9 Management Accounting Financial Strategy The Examiner provides a short study guide, for all candidates revising for this paper, to some first principles of finance and financial management Based

More information

Fundamentals Level Skills Module, Paper F9

Fundamentals Level Skills Module, Paper F9 Answers Fundamentals Level Skills Module, Paper F9 Financial Management December 2008 Answers 1 (a) Rights issue price = 2 5 x 0 8 = $2 00 per share Theoretical ex rights price = ((2 50 x 4) + (1 x 2 00)/5=$2

More information

MODULE 2. Capital Budgeting

MODULE 2. Capital Budgeting MODULE 2 Capital Budgeting Capital Budgeting is a project selection exercise performed by the business enterprise. Capital budgeting uses the concept of present value to select the projects. Capital budgeting

More information

Valuation Free Cash Flows. Katharina Lewellen Finance Theory II April 2, 2003

Valuation Free Cash Flows. Katharina Lewellen Finance Theory II April 2, 2003 Valuation Free Cash Flows Katharina Lewellen Finance Theory II April 2, 2003 Valuation Tools A key task of managers is to undertake valuation exercises in order to allocate capital between mutually exclusive

More information

Week- 1: Solutions to HW Problems

Week- 1: Solutions to HW Problems Week- 1: Solutions to HW Problems 10-1 a. Payback A (cash flows in thousands): Annual Period Cash Flows Cumulative 0 ($5,000) ($5,000) 1 5,000 (0,000) 10,000 (10,000) 3 15,000 5,000 4 0,000 5,000 Payback

More information

Global Financial Management

Global Financial Management 1 Global Financial Management Valuation of Cash Flows Investment Decisions and Capital Budgeting Copyright 1999 by Alon Brav, Campbell R. Harvey, Stephen Gray and Ernst Maug. All rights reserved. No part

More information

Discount Rates and Tax

Discount Rates and Tax Discount Rates and Tax Ian A Cooper and Kjell G Nyborg London Business School First version: March 1998 This version: August 2004 Abstract This note summarises the relationships between values, rates of

More information

Today s Agenda. DFR1 and Quiz 3 recap. Net Capital Expenditures. Working Capital. Dividends. Estimating Cash Flows

Today s Agenda. DFR1 and Quiz 3 recap. Net Capital Expenditures. Working Capital. Dividends. Estimating Cash Flows Today s Agenda DFR1 and Quiz 3 recap Net Capital Expenditures Working Capital Dividends Estimating Cash Flows Net Capital expenditures Net capital expenditures = capital expenditures - depreciation Depreciation

More information

Problems for CFA Level I

Problems for CFA Level I Problems for CFA Level I Analysis of Income Taxes 1. [Deferred tax classification] Explain in which of the following caregories deferred taxes can be found. Provide an example for each category in your

More information

DUKE UNIVERSITY Fuqua School of Business. FINANCE 351 - CORPORATE FINANCE Problem Set #1 Prof. Simon Gervais Fall 2011 Term 2.

DUKE UNIVERSITY Fuqua School of Business. FINANCE 351 - CORPORATE FINANCE Problem Set #1 Prof. Simon Gervais Fall 2011 Term 2. DUKE UNIVERSITY Fuqua School of Business FINANCE 351 - CORPORATE FINANCE Problem Set #1 Prof. Simon Gervais Fall 2011 Term 2 Questions 1. Two years ago, you put $20,000 dollars in a savings account earning

More information

Financial Condition Analysis Model

Financial Condition Analysis Model Financial Condition Analysis Model GOVERNMENTAL ACTIVITIES & ENTERPRISE FUNDS Economic resources and accrual basis of accounting Flow Financial Dimension Financial Indicator Interpretation Interperiod

More information

Net revenue 785 25 1,721 05 5,038 54 3,340 65 Tax payable (235 58) (516 32) (1,511 56) (1,002 20)

Net revenue 785 25 1,721 05 5,038 54 3,340 65 Tax payable (235 58) (516 32) (1,511 56) (1,002 20) Answers Fundamentals Level Skills Module, Paper F9 Financial Management December 2013 Answers 1 (a) Calculating the net present value of the investment project using a nominal terms approach requires the

More information

Corporate Finance: Final Exam

Corporate Finance: Final Exam Corporate Finance: Final Exam Answer all questions and show necessary work. Please be brief. This is an open books, open notes exam. For partial credit, when discounting, please show the discount rate

More information

t = 1 2 3 1. Calculate the implied interest rates and graph the term structure of interest rates. t = 1 2 3 X t = 100 100 100 t = 1 2 3

t = 1 2 3 1. Calculate the implied interest rates and graph the term structure of interest rates. t = 1 2 3 X t = 100 100 100 t = 1 2 3 MØA 155 PROBLEM SET: Summarizing Exercise 1. Present Value [3] You are given the following prices P t today for receiving risk free payments t periods from now. t = 1 2 3 P t = 0.95 0.9 0.85 1. Calculate

More information

Dealing with Operating Leases in Valuation. Aswath Damodaran. Stern School of Business. 44 West Fourth Street. New York, NY 10012

Dealing with Operating Leases in Valuation. Aswath Damodaran. Stern School of Business. 44 West Fourth Street. New York, NY 10012 Dealing with Operating Leases in Valuation Aswath Damodaran Stern School of Business 44 West Fourth Street New York, NY 10012 adamodar@stern.nyu.edu Abstract Most firm valuation models start with the after-tax

More information

Chapter 8: Using DCF Analysis to Make Investment Decisions

Chapter 8: Using DCF Analysis to Make Investment Decisions FIN 301 Class Notes Chapter 8: Using DCF Analysis to Make Investment Decisions Capital Budgeting: is the process of planning for capital expenditures (long term investment). Planning process involves 1-

More information

BA 351 CORPORATE FINANCE. John R. Graham Adapted from S. Viswanathan LECTURE 10 THE ADJUSTED NET PRESENT VALUE METHOD

BA 351 CORPORATE FINANCE. John R. Graham Adapted from S. Viswanathan LECTURE 10 THE ADJUSTED NET PRESENT VALUE METHOD BA 351 CORPORATE FINANCE John R. Graham Adapted from S. Viswanathan LECTURE 10 THE ADJUSTED NET PRESENT VALUE METHOD FUQUA SCHOOL OF BUSINESS DUKE UNIVERSITY 1 THE ADJUSTED NET PRESENT VALUE METHOD COPING

More information

Land Purchase Analysis

Land Purchase Analysis Land Purchase Analysis With this program, the user can evaluate the economic return on a farmland purchase and calculate a maximum bid price The maximum bid price is the purchase price that allows the

More information

Examiner s report F9 Financial Management June 2013

Examiner s report F9 Financial Management June 2013 Examiner s report F9 Financial Management June 2013 General Comments The examination consisted of four compulsory questions, each worth 25 marks. Most candidates attempted all four questions and there

More information

Fundamentals Level Skills Module, Paper F9

Fundamentals Level Skills Module, Paper F9 Answers Fundamentals Level Skills Module, Paper F9 Financial Management June 2008 Answers 1 (a) Calculation of weighted average cost of capital (WACC) Cost of equity Cost of equity using capital asset

More information

Chapter 8: Fundamentals of Capital Budgeting

Chapter 8: Fundamentals of Capital Budgeting Chapter 8: Fundamentals of Capital Budgeting-1 Chapter 8: Fundamentals of Capital Budgeting Big Picture: To value a project, we must first estimate its cash flows. Note: most managers estimate a project

More information

CHAPTER 8. Problems and Questions

CHAPTER 8. Problems and Questions CHAPTER 8 Problems and Questions 1. Plastico, a manufacturer of consumer plastic products, is evaluating its capital structure. The balance sheet of the company is as follows (in millions): Assets Liabilities

More information

CHAPTER 7. Fundamentals of Capital Budgeting. Chapter Synopsis

CHAPTER 7. Fundamentals of Capital Budgeting. Chapter Synopsis CHAPTER 7 Fundamentals of Capital Budgeting Chapter Synopsis 7.1 Forecasting Earnings A firm s capital budget lists all of the projects that a firm plans to undertake during the next period. The selection

More information

MBA Financial Management and Markets Exam 1 Spring 2009

MBA Financial Management and Markets Exam 1 Spring 2009 MBA Financial Management and Markets Exam 1 Spring 2009 The following questions are designed to test your knowledge of the fundamental concepts of financial management structure [chapter 1], financial

More information

Part 9. The Basics of Corporate Finance

Part 9. The Basics of Corporate Finance Part 9. The Basics of Corporate Finance The essence of business is to raise money from investors to fund projects that will return more money to the investors. To do this, there are three financial questions

More information

Valuation. The Big Picture: Part II - Valuation

Valuation. The Big Picture: Part II - Valuation Valuation The Big Picture: Part II - Valuation A. Valuation: Free Cash Flow and Risk Apr 1 Apr 3 Lecture: Valuation of Free Cash Flows Case: Ameritrade B. Valuation: WACC and APV Apr 8 Apr 10 Apr 15 Lecture:

More information

Using the FRR to rate Project Business Success

Using the FRR to rate Project Business Success Using the FRR to rate Project Business Success The purpose of this note is to explain the calculation of the financial rate of return (FRR), with a view, firstly to clarify the FRR concept and its determination,

More information

Financial Reporting and Analysis Chapter 13 Solutions Income Tax Reporting Exercises

Financial Reporting and Analysis Chapter 13 Solutions Income Tax Reporting Exercises Financial Reporting and Analysis Chapter 13 Solutions Income Tax Reporting Exercises Exercises E13-1. Determining current taxes payable (AICPA adapted) The amount of current income tax liability that would

More information

CHAPTER 15 FIRM VALUATION: COST OF CAPITAL AND APV APPROACHES

CHAPTER 15 FIRM VALUATION: COST OF CAPITAL AND APV APPROACHES 0 CHAPTER 15 FIRM VALUATION: COST OF CAPITAL AND APV APPROACHES In the last two chapters, we examined two approaches to valuing the equity in the firm -- the dividend discount model and the FCFE valuation

More information

Chapter 7. . 1. component of the convertible can be estimated as 1100-796.15 = 303.85.

Chapter 7. . 1. component of the convertible can be estimated as 1100-796.15 = 303.85. Chapter 7 7-1 Income bonds do share some characteristics with preferred stock. The primary difference is that interest paid on income bonds is tax deductible while preferred dividends are not. Income bondholders

More information

Building a Business Case for Material Handling System Investment

Building a Business Case for Material Handling System Investment Building a Business Case for Material Handling System Investment Introduction Investments in new or updated material handling equipment and control systems offer an outstanding opportunity for Supply Chain

More information

Will the future benefits of this project be large enough to justify the investment given the risk involved?

Will the future benefits of this project be large enough to justify the investment given the risk involved? Chapter 1 The Overall Process Capital Expenditures Whenever we make an expenditure that generates a cash flow benefit for more than one year, this is a capital expenditure. Examples include the purchase

More information

Part 7. Capital Budgeting

Part 7. Capital Budgeting Part 7. Capital Budgeting What is Capital Budgeting? Nancy Garcia and Digital Solutions Digital Solutions, a software development house, is considering a number of new projects, including a joint venture

More information

Fundamentals Level Skills Module, Paper F9. Section A. Monetary value of return = $3 10 x 1 197 = $3 71 Current share price = $3 71 $0 21 = $3 50

Fundamentals Level Skills Module, Paper F9. Section A. Monetary value of return = $3 10 x 1 197 = $3 71 Current share price = $3 71 $0 21 = $3 50 Answers Fundamentals Level Skills Module, Paper F9 Financial Management December 2014 Answers Section A 1 A Monetary value of return = $3 10 x 1 197 = $3 71 Current share price = $3 71 $0 21 = $3 50 2

More information

Chapter 14 Demonstration Problem Solutions Page 1

Chapter 14 Demonstration Problem Solutions Page 1 Chapter 14 Demonstration Problem Solutions Page 1 Demo 14-1 ANSWER a. First, we need to calculate the tax bill: Year (A) (B) (CA-B) (D.4C) Cash Flow Depreciation Taxable Inc Tx Rate Taxes 1 $ 100,000 -

More information

Capital Budgeting Formula

Capital Budgeting Formula apital Budgeting Formula Not in the book. Wei s summary If salvage value S is less than U n : If salvage value S is greater than U n : Note: IF t : incremental cash flows (could be negative) )(NW): change

More information

Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS

Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS 11-1 a. Cash flow, which is the relevant financial variable, represents the actual flow of cash. Accounting

More information

Chapter 9. Plant Assets. Determining the Cost of Plant Assets

Chapter 9. Plant Assets. Determining the Cost of Plant Assets Chapter 9 Plant Assets Plant Assets are also called fixed assets; property, plant and equipment; plant and equipment; long-term assets; operational assets; and long-lived assets. They are characterized

More information

Chapter 7 Fundamentals of Capital Budgeting

Chapter 7 Fundamentals of Capital Budgeting Chapter 7 Fundamentals of Capital Budgeting 7-1. Pisa Pizza, a seller of frozen pizza, is considering introducing a healthier version of its pizza that will be low in cholesterol and contain no trans fats.

More information

CHAPTER 25. P.25.16 The following data are furnished by the Hypothetical Leasing Ltd (HLL):

CHAPTER 25. P.25.16 The following data are furnished by the Hypothetical Leasing Ltd (HLL): CHAPTER 25 Solved Problems P.25.16 The following data are furnished by the Hypothetical Leasing Ltd (HLL): Investment cost Rs 500 lakh Primary lease term 5 years Estimated residual value after the primary

More information

9-17a Tutorial 9 Practice Review Assignment

9-17a Tutorial 9 Practice Review Assignment 9-17a Tutorial 9 Practice Review Assignment Data File needed for the Review Assignments: Restaurant.xlsx Sylvia has some new figures for the business plan for Jerel's. She has received slightly better

More information

The Tax Benefits and Revenue Costs of Tax Deferral

The Tax Benefits and Revenue Costs of Tax Deferral The Tax Benefits and Revenue Costs of Tax Deferral Copyright 2012 by the Investment Company Institute. All rights reserved. Suggested citation: Brady, Peter. 2012. The Tax Benefits and Revenue Costs of

More information

Tax-adjusted discount rates with investor taxes and risky debt

Tax-adjusted discount rates with investor taxes and risky debt Tax-adjusted discount rates with investor taxes and risky debt Ian A Cooper and Kjell G Nyborg October 2004 Abstract This paper derives tax-adjusted discount rate formulas with Miles-Ezzell leverage policy,

More information

11.3 BREAK-EVEN ANALYSIS. Fixed and Variable Costs

11.3 BREAK-EVEN ANALYSIS. Fixed and Variable Costs 385 356 PART FOUR Capital Budgeting a large number of NPV estimates that we summarize by calculating the average value and some measure of how spread out the different possibilities are. For example, it

More information

COMPUTER APPLICATIONS IN BANKING & FINANCE. Salih KATIRCIOGLU

COMPUTER APPLICATIONS IN BANKING & FINANCE. Salih KATIRCIOGLU COMPUTER APPLICATIONS IN BANKING & FINANCE Salih KATIRCIOGLU Eastern Mediterranean University Faculty of Business and Economics Department of Banking and Finance Famagusta, Turkish Republic of Northern

More information

Financing Your Dream: A Presentation at the Youth Business Linkage Forum (#EAWY2014) Akin Oyebode Head SME Banking, Stanbic IBTC Bank, Nigeria.

Financing Your Dream: A Presentation at the Youth Business Linkage Forum (#EAWY2014) Akin Oyebode Head SME Banking, Stanbic IBTC Bank, Nigeria. Financing Your Dream: A Presentation at the Youth Business Linkage Forum (#EAWY2014) Akin Oyebode Head SME Banking, Stanbic IBTC Bank, Nigeria. Content 1 Introduction 2 Profit and loss Account or Income

More information

MBA Teaching Note 08-02 Net Present Value Analysis of the Purchase of a Hybrid Automobile 1

MBA Teaching Note 08-02 Net Present Value Analysis of the Purchase of a Hybrid Automobile 1 MBA Teaching Note 08-02 Net Present Value Analysis of the Purchase of a Hybrid Automobile 1 In this day and age of high energy prices and a desire to be more environmentally friendly, the automobile industry

More information

CHAPTER 22. Accounting Changes and Error Analysis 4, 6, 7, 8, 9, 12, 13, 15

CHAPTER 22. Accounting Changes and Error Analysis 4, 6, 7, 8, 9, 12, 13, 15 CHAPTER 22 Accounting Changes and Error Analysis ASSIGNMENT CLASSIFICATION TABLE (BY TOPIC) Topics 1. Differences between change in principle, change in estimate, change in entity, errors. Questions 4,

More information

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA 1. To calculate the payback period, we need to find the time that the project has recovered its initial investment. After three years, the project

More information

Multiple Choice Questions (45%)

Multiple Choice Questions (45%) Multiple Choice Questions (45%) Choose the Correct Answer 1. The following information was taken from XYZ Company s accounting records for the year ended December 31, 2014: Increase in raw materials inventory

More information

II. Estimating Cash Flows

II. Estimating Cash Flows II. Estimating Cash Flows DCF Valuation Aswath Damodaran 61 Steps in Cash Flow Estimation Estimate the current earnings of the firm If looking at cash flows to equity, look at earnings after interest expenses

More information

College Accounting Chapter 10 Plant Assets, Natural Resources, and Intangibles

College Accounting Chapter 10 Plant Assets, Natural Resources, and Intangibles College Accounting Chapter 10 Plant Assets, Natural Resources, and Intangibles 1. HOW DOES A BUSINESS MEASURE THE COST OF A PLANT ASSET? Plant assets are long-lived, tangible assets used in the operation

More information

Measuring Investment Returns

Measuring Investment Returns Measuring Investment Returns Aswath Damodaran Stern School of Business Aswath Damodaran 156 First Principles Invest in projects that yield a return greater than the minimum acceptable hurdle rate. The

More information

NIKE Case Study Solutions

NIKE Case Study Solutions NIKE Case Study Solutions Professor Corwin This case study includes several problems related to the valuation of Nike. We will work through these problems throughout the course to demonstrate some of the

More information

MBA 8230 Corporation Finance (Part II) Practice Final Exam #2

MBA 8230 Corporation Finance (Part II) Practice Final Exam #2 MBA 8230 Corporation Finance (Part II) Practice Final Exam #2 1. Which of the following input factors, if increased, would result in a decrease in the value of a call option? a. the volatility of the company's

More information

Estimating Cash Flows

Estimating Cash Flows Estimating Cash Flows DCF Valuation 1 Steps in Cash Flow Estimation Estimate the current earnings of the firm If looking at cash flows to equity, look at earnings after interest expenses - i.e. net income

More information