1 TERMS OF REFERENCE CONSULTANCY TO DEVELOP A MODEL NATIONAL RECOVERY FRAMEWORK 1.0 INTRODUCTION The Caribbean is one of the most disaster prone regions in the world 1. Economic, social and environmental advances, achieved by the countries of the Region in the post independence period of their development, are threatened by the far reaching consequences of disasters. Recognising the threat which disasters pose to sustainable development, CARICOM countries have embraced a Comprehensive Disaster Management (CDM) approach, emphasising risk reduction and resilience building at all levels in addition to developing and maintaining sound response and recovery mechanisms. The Caribbean Disaster Emergency Management Agency (CDEMA) is an associate institution of the Caribbean Community (CARICOM), established and supported by Caribbean Governments to function as a specialized regional disaster management agency. The CDEMA Coordinating Unit (CU), is located in Barbados, and is responsible for day to day activities of the Agency. In 2001 CARICOM, through broad based stakeholder consultation, adopted a Strategy and Results Framework for CDM in the Region. The goal was to link CDM to development decisionmaking and planning. In June 2007, the then CDERA CU revised the 2001 Strategy and adopted an Enhanced Framework Comprehensive Disaster Management (CDM) Strategy and Programming Framework ( ). The revised strategic framework stressed disaster loss reduction, through risk management, and following a more Program Based Approach (PBA) with an emphasis on Results Based Management (RBM). The revised Strategy was expected to result in better coordinated programming among regional CDM actors and to stimulate national and regional championing of risk management. Outcome 4 of the Enhanced CDM Strategy speaks to enhancing community resilience in CDEMA states/territories to mitigate and respond to the adverse effect of climate change and disasters. Key to achieving this result is ensuring that there is a suitable policy and planning environment for recovery and reconstruction. The Recovery phases of the CDM cycle are recognised as key entry points for integrating risk reduction measures. The 1999 impact of Hurricane Lenny caused significant infrastructural and environmental damage to a number of CDEMA Participating States (PS) and precipitated increased focus on 1 Living with Risk (to be confirmed) 1
2 the issue of national recovery planning. Following Hurricane Lenny, the CDEMA (then CDERA) CU prepared a Model Recovery Plan (2000), through the support of the United Nations Development Programme (UNDP). A set of Operational Guidelines accompanied the 2000 Model. These tools were intended as resources to support CDEMA PS in strengthening national recovery planning. Since the development of the 2000 Model, new issues have emerged that are relevant to recovery planning, including the critical nexus between climate change adaptation and disaster risk reduction. The development of a new Model National Recovery Framework is therefore set against the backdrop of heightened awareness of the necessity of integrating recovery planning into disaster management processes and of the wide ranging and far reaching project impacts of climate change on the Region. This heightened awareness is also reflective of the philosophical and paradigm shift in the region towards a more proactive, risk management oriented approach to disaster management. Against this background, the CDEMA Coordinating Unit is desirous of engaging a Consultant/Firm to develop a Model National Recovery Framework and Adaptation Guide. 2.0 OBJECTIVES The overall objective of this consultancy is to strengthen CDM programme implementation at the national level through the development of a Model National Recovery Framework. 2.1 Specific Objectives The specific objectives are: A Model National Recovery Framework A user friendly, easily understood Adaptation Guide to assist PS in adapting the Model National Recovery Framework. 3.0 SCOPE OF WORK The Consultant will: 3.1 Participate in an inception meeting with the CDEMA CU to agree on the roll out of the consultancy. 2
3 3.2 Review relevant literature aimed at providing an understanding of the context for the consultancy and the review, revision and adaptation processes to date. Documents to be reviewed will include inter alia: a. The Enhanced CDM Strategy , b. The Blue Print for Advancing CDM at the National Level, c. The Refined Model CDM Legislation and Regulations (2013), d. The Model National CDM Policy, e. The Model National Disaster Office Organisational Structure(s) 2, f. The CDERA Recovery Planning Framework and Model Recovery Plan, g. The CDERA Recovery Planning Framework Detailed Operational Guidelines, h. Existing Recovery and/or Reconstruction frameworks/policies/plans of CDEMA PS, including Jamaica, St. Lucia and the Turks and Caicos Islands. i. UNDP/World Bank and UNISDR approach to Post Disaster Needs Assessment (PDNA) and Probabilistic Risk Assessments 3.3 Prepare an inception report, post inception meeting, which details the methodology/approaches and timelines associated with this consultancy. This report should demonstrate consideration of gender and climate change issues. 3.4 Participate in regular progress meetings with the CDEMA CU, the frequency of which will be agreed at the inception stage of the consultancy. 3.5 Consult with key stakeholders, including PS and the CU, to inform the development of the Model. Consultations should also be familiar with, inter alia: a. The Work Programme Development and Review Sub Committee (WPDRSC) of the CDEMA Technical Advisory Committee (TAC). b. The Plan Development and Review Sub Committee (PDRSC) of the CDEMA Technical Advisory Committee (TAC). c. The National Disaster Offices/Coordinators of Jamaica, St. Lucia, and the Turks and Caicos Islands (TCI). 3.6 Prepare a report of the consultation. 3.7 Develop a first draft of the Model National Recovery Framework (inclusive of the UNDP/World Bank and UNISDR PDNA and PRA approach) which should be informed by the feedback received during the consultations noted at 3.5 above. Gender and climate change issues must be considered and clearly integrated into the Model. 2 Subject to its availability. 3
4 3.8 Present the first draft of the Model National Recovery Framework to the CDEMA CU and WPDR SC. The first draft will also be circulated to CDEMA PS and partners for comments. 3.9 Develop a second draft of the Model National Recovery Framework based on the comments received at Develop a draft Adaptation Guide for the Model National Recovery Framework. The Adaptation Guide should be detailed, offering guidance on adapting each section of the Model National Recovery Framework, and executing each step of a model adaptation process Facilitate a Regional Consultation of CDEMA PS and other key stakeholders to review, discuss and comment on the second draft of the Model National Recovery Framework and the draft Adaptation Guide. Including: a. Preparation of agenda b. Preparation of meeting documents c. Rapporteuring of the discussions 3.12 Submit a report of the Regional Consultation noted at 3.11 above Finalise the Model National Recovery Framework and Adaptation Guide, based on the comments and guidance received at the Regional Consultation noted at 3.10 above Prepare a draft final report of the Consultancy for review. The draft final report should include, inter alia: a. The Model National Recovery Framework, b. The Adaptation Guide, c. Report of the Regional consultation d. Activities undertaken and results achieved (planned and unplanned), e. Challenges, lessons learned and recommendations Submit the Final Report of the Consultancy, amended as per comments received, for final review and approval. 4
5 4.0 RESULTS AND DELIVERABLES The Consultant(s) will submit to the CU for approval: 4.1 An Inception Report which details the methodology/approaches and timelines associated with this consultancy. This report should demonstrate consideration of gender and climate change issues. To be submitted within one (1) week of signature of contract. The acceptance of the inception report by the CDEMA CU is to be considered as a critical path activity of the consultancy. 4.2 Report of the Consultations. To be submitted within three (3) weeks of signature of contract. 4.3 First draft of the Model National Recovery Framework. To be submitted within two (2) months of signature of contract. 4.4 Second Draft of the Regional Consultation To be submitted within three (3) months of signature of contract. 4.5 Draft Adaptation Guide. To be submitted within three (3) months of signature of contract. 4.6 Report of the Regional Consultation. To be submitted within one (1) week of conclusion of the Regional Consultation. 4.7 Final Model National Recovery Framework. To be submitted within two (2) weeks of conclusion of the Regional Consultation. 4.8 Final Adaptation Guide. To be submitted within two (2) weeks of conclusion of the Regional Consultation. 4.9 The Draft Final Report on the consultancy, inclusive of the final deliverables. To be submitted within two (2) weeks of conclusion of the Regional Consultation The Final Report on the consultancy, inclusive of the final deliverables. To be submitted within six (6) weeks of conclusion of the Regional Consultation. 5.0 INPUTS OF THE CDEMA COORDINATING UNIT The CDEMA CU will: i. Provide technical comments and feedback on the outputs of the Consultancy; ii. Organize the inception meeting; iii. Support the organization of relevant meetings and teleconferences between the Consultant, and relevant stakeholders through the provision of contact information, and participate, if required; 5
6 iv. Provide oversight in the roll out of the consultancy. 6.0 CONSULTANT REQUIREMENTS The Consultant/Consulting firm should demonstrate the following qualifications and competencies: 6.1 QUALIFICATIONS A Masters degree in Disaster Management or a related field. 6.2 PROFESSIONAL EXPERIENCE a) Minimum ten (10) years demonstrated working experience in Disaster Management. b) Demonstrated experience in post disaster Recovery planning and implementation. Practical experience is preferred. c) Proven experience in working in a participatory and consultative environment. d) Analytical skills, particularly the ability to conduct research and prepare appropriate findings and conclusions e) Exceptional written and report writing skills f) Knowledge of disaster management, gender and climate change issues would be a distinct asset. g) Experience as a facilitator with good presentation and listening skills. 7.0 DURATION Work is expected to start by February 15 th 2014 and conclude by July 15 th The Consultant may be an individual or team and should be able to assume duties by February 15 th The Consultancy is scheduled to last for approximately five (5) months. A technical and financial proposal based on the Terms of Reference outlined above must be provided by no later than close of business on February 01 st The proposal must include full Curriculum Vitae for each member of the proposed team. Further information may be obtained from Ms. Joanne Persad (joanne.persad@cdema.org); or Mr. Robert 6
7 Harewood at the CDEMA Coordinating Unit (CU). Please send proposals to the address below: Attention: Ms. Joanne Persad, Programme Manager Response and Recovery, CDEMA Building #1 Manor Lodge Lodge Hill St. Michael, Barbados Tel: (246) Fax: (246) E mail: joanne.persad@cdema.org;cdema@cdema.org 7
REQUEST FOR PROPOSALS PERFORMANCE MANAGEMENT SYSTEM CDEMA-CU
TERMS OF REFERENCE CONSULTANCY SERVICES FOR REVIEW AND DEVELOPMENT OF A PERFORMANCE MANAGEMENT SYSTEM AT THE CDEMA COORDINATING UNIT 1.0 BACKGROUND The Caribbean Disaster Emergency Management Agency is
More informationREQUEST FOR PROPOSALS FOR CONSULTING SERVICES FOR MARKET RESEARCH
REQUEST FOR PROPOSALS FOR CONSULTING SERVICES FOR MARKET RESEARCH 1. CONTEXT The Caribbean Disaster Emergency Management Agency (CDEMA) is a Regional Organization currently comprising eighteen (18) member
More informationCARIBBEAN DISASTER EMERGENCY MANAGEMENT AGENCY (CDEMA)
CARIBBEAN DISASTER EMERGENCY MANAGEMENT AGENCY (CDEMA) The Caribbean Disaster Emergency Management Agency (CDEMA) is a regional inter-governmental agency for disaster management in the Caribbean Community
More informationTERMS OF REFERENCE. Establishment of Technical Competency Standards for Emergency Response Professionals Providing Care in a Mass Casualty Event
TERMS OF REFERENCE Establishment of Technical Competency Standards for Emergency Response Professionals Providing Care in a Mass Casualty Event 1.0 INTRODUCTION Effective disaster management relies more
More informationEnhancing knowledge and application of comprehensive disaster management (ekacdm) initiative. Date: January 12, 2016. 1.
Enhancing knowledge and application of comprehensive disaster management (ekacdm) initiative Title: Production of Policy Guidelines and Frameworks for Inclusion of Comprehensive Disaster Management (CDM)
More informationCOMPREHENSIVE DISASTER MANAGEMENT COORDINATION
COMPREHENSIVE DISASTER MANAGEMENT COORDINATION AND HARMONISATION COUNCIL (CDM CHC) Terms of Reference for the Development and Installation of a Website for the Civil Society Sub-sector Committee (CSSSC)
More informationIslamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual
Islamic Republic of Afghanistan, Ministry of Rural Rehabilitation and Development (MRRD) Ministry of Rural Rehabilitation & Development Post Disaster Need Assessment (PDNA) Training Manual Social Protection
More informationREQUEST FOR PROPOSALS RFP #: EKACDM 1.2.1/YR3 DISASTER RISK REDUCTION CENTRE INSTITUTE FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF THE WEST INDIES
REQUEST FOR PROPOSALS RFP #: EKACDM 1.2.1/YR3 DISASTER RISK REDUCTION CENTRE INSTITUTE FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF THE WEST INDIES ENHANCING KNOWLEDGE AND APPLICATION OF COMPREHENSIVE
More informationTERMS OF REFERENCE. Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities
TERMS OF REFERENCE Reference: Post Title: DMU/NXCWG0927 Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities Project Location: Nassau, The Bahamas
More informationDEADLINE: 01 April 2015, 4:30PM (AST) CARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE
DEADLINE: 01 April 2015, 4:30PM (AST) CARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE TITLE: Lead generation, pre-qualification and short-listing of foreign companies identified as potential
More informationHurricane Sandy Recovery cross-sectoral recovery strategy and plan (Consultancy)
OFFICE OF DISASTER PREPAREDNESS & EMERGENCY MANAGEMENT 2-4 Haining Road, Kingston 5, Jamaica, W.I. Tel: (876) 906-9674-5, (876) 754-9077-8 Tel. /Fax: (876) 754-3229, E-mail: odpem@cwjamaica.com, Website:
More informationORGANISATION OF EASTERN CARIBBEAN STATES INVITATION FOR EXPRESSIONS OF INTEREST
ORGANISATION OF EASTERN CARIBBEAN STATES INVITATION FOR EXPRESSIONS OF INTEREST Consultancy to Provide Technical Assistance to the OECS Secretariat (OECSSEC) in the Integration of the OECSSEC Staff Competency
More informationCARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE CONSULTANT
CARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE TITLE: INVESTOR PERCEPTION SURVEY AND ANALYSIS FOR CARIFORUM CONSULTANT 1. Caribbean Export Development Agency (Caribbean Export), in collaboration
More information1. BACKGROUND. Terms of Reference. Background
GOVERNMENT OF SAINT VINCENT AND THE GRENADINES Caribbean Regional Communications Infrastructure Project TERMS OF REFERENCE FOR CONSULTING SERVICES For the Design of a National Broadband Network SVG CARCIP
More informationB. PURPOSE AND SCOPE C. DURATION
1 DRAFT MEMORANDUM OF UNDERSTANDING BETWEEN THE HUMAN RESOURCE MANAGEMENT ASSOCIATION OF BARBADOS (HRMAB) AND THE UNIVERSITY OF THE WEST INDIES, (DEPARTMENT OF MANAGEMENT STUDIES) CAVE HILL CAMPUS A. BACKGROUND
More informationADVERTISEMENT. Markets for Change / M4C Communications and Monitoring & Evaluation Officer (SC SB-4)
ADVERTISEMENT Vacancy Announcement No. 2016/11 The UN Women Fiji Multi Country Office (MCO) seek to recruit a suitably qualified Solomon Islands national for the following position to be based in Honiara,
More informationTerms of reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE
Terms of reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Position: Senior Specialist for the Survey of Public Satisfaction on Court Service in Judiciary Support to the Justice Sector Reform in Indonesia
More informationDECLARATION OF THE 7 th WORLD SCIENCE FORUM ON The Enabling Power of Science. 7 th World Science Forum, Budapest, 7 th November 2015 PREAMBLE
DECLARATION OF THE 7 th WORLD SCIENCE FORUM ON The Enabling Power of Science 7 th World Science Forum, Budapest, 7 th November 2015 PREAMBLE With the encouragement and support of the founding organisations
More informationJob Opportunity: EDUCATION & TRAINING SPECIALIST. CDEMA Coordinating Unit
Job Opportunity: EDUCATION & TRAINING SPECIALIST CDEMA Coordinating Unit Competition Reference No. CDEMA-CU/Intra-ACP/03 Application Deadline Date October 31, 2014 Location Organization Contract Period
More informationCONSULTING REQUIREMENTS
CONSULTING REQUIREMENTS Initiative: Directorate of Technical Management / Strategic Dialogue and Capacity Initiative to Combat Climate Change Project: CDKN Role: Technical Advisor for the project Climate
More informationNHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20
More informationNational Principles for Disaster Recovery
National Principles for Disaster Recovery Introduction Recovery is a significant component within Australia s comprehensive approach to emergency management (Prevention, Preparedness, Response, and Recovery).
More informationResolution adopted by the General Assembly. [without reference to a Main Committee (A/64/L.43 and Add.1)]
United Nations A/RES/64/251 General Assembly Distr.: General 30 April 2010 Sixty-fourth session Agenda item 70 (a) Resolution adopted by the General Assembly [without reference to a Main Committee (A/64/L.43
More informationExternal Audit BV Performance Report: Delivering Change Management and Financial Sustainability
CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 05 ON THE AGENDA Report to: Resources and Audit Committee Date of Meeting: 24 September 2015 Subject: External Audit BV Performance Report: Delivering
More informationGuidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
More informationCentre International de Droit Comparé de l Environnement CIDCE. Comments on the Zero draft of the Post 2015 framework for disaster risk reduction
Centre International de Droit Comparé de l Environnement CIDCE Comments on the Zero draft of the Post 2015 framework for disaster risk reduction Paragraph n (1,2,3,...), page Comments A. Preambule 5. page
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE ADVERTISEMENT Date: August 26, 2014 Country: CAPE VERDE Description of the assignment: International Consultant - Integrating climate change risks and opportunities
More informationCELP PROFILE Barbados CARIBBEAN EMERGENCY LEGISLATION PROJECT (CELP)
CELP PROFILE Barbados CARIBBEAN EMERGENCY LEGISLATION PROJECT (CELP) Legal Framework Constitution of Barbados, 1966 Section 25 of Barbados Constitution provides for the declaration of a state of emergency
More informationTerms of Reference PUBLIC PERCEPTION SURVEY. Office of Disaster Preparedness and Emergency Management
Terms of Reference PUBLIC PERCEPTION SURVEY Office of Disaster Preparedness and Emergency Management Background The ODPEM is the National Disaster Office responsible for disaster management in Jamaica
More informationBrand Development and Packaging Workshop/Webinar
Appendix 1: TERMS OF REFERENCE Brand Development and Packaging Workshop/Webinar 1. BACKGROUND INFORMATION 1.1. Beneficiary/Eligible countries CARIFORUM Region: Antigua and Barbuda, The Bahamas, Barbados,
More informationCARIBBEAN DEVELOPMENT BANK STATUS REPORT ON THE IMPLEMENTATION OF THE GENDER POLICY AND OPERATIONAL STRATEGY
SDF 8/2-NM-4 CARIBBEAN DEVELOPMENT BANK SPECIAL DEVELOPMENT FUND (UNIFIED) STATUS REPORT ON THE IMPLEMENTATION OF THE GENDER POLICY AND OPERATIONAL STRATEGY Revised APRIL 2012 ABBREVIATIONS AMT - Advisory
More informationGUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu ewa@gencat.cat
GUIDELINES FOR PILOT INTERVENTIONS www.ewaproject.eu ewa@gencat.cat Project Lead: GENCAT CONTENTS A Introduction 2 1 Purpose of the Document 2 2 Background and Context 2 3 Overview of the Pilot Interventions
More informationESKISP6056.01 Direct security testing
Direct security testing Overview This standard covers the competencies concerning with directing security testing activities. It includes setting the strategy and policies for security testing, and being
More informationJob Opportunity: ICT Manager CDEMA Coordinating Unit CDEMA-CU/CDM-HIP/07. Bridgetown, Barbados
Job Opportunity: ICT Manager CDEMA Coordinating Unit Competition Reference No. CDEMA-CU/CDM-HIP/07 Application Deadline Date February 21, 2012 Location Organization Bridgetown, Barbados Caribbean Disaster
More informationMINISTERIAL MEETING OF THE BLUE WEEK 2015
5 JUNE 2015 MINISTERIAL MEETING OF THE BLUE WEEK 2015 We, Ministers responsible for Ocean/ Fisheries/ Maritime Affairs, having met in Lisbon on June the 5 th, 2015, at the invitation of the Minister of
More informationTerms of Reference for Assessment of the Environment & Natural Resources Sector in Kenya
Terms of Reference for Assessment of the Environment & Natural Resources Sector in Kenya REF.NO: ACT/ESS/08/2015 1. Background Act Change Transform (Act!) is a leading Kenyan Non-Governmental Organization
More informationCall for Expression of Interest Consultant
Assessing the way forward for Eco-Industrial Parks The United Nations Environment Programme (UNEP) is looking for a consultant to carry out an analytical baseline study of past and existing technical approaches
More informationTERMS OF REFERENCE Issued on: 5 March 2015
United Nations Human Settlements Programme Myanmar No. 6, Natmauk Road, Yangon, Myanmar Tel: (95-1) 542 910 ~ 919 Ext: 168~170 Fax: (95-1) 544 531, 545 634 Email: desk@unhabitat-mya.org Ref: UN-HABITAT/VA-I/2015/002
More information************************ REQUEST FOR EXPRESSIONS OF INTEREST FOR AN INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK
************************ REQUEST FOR EXPRESSIONS OF INTEREST FOR AN INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK 01 B.P. 1387 Abidjan 01 - Côte d Ivoire 8 th floor, office 8A/CCIA Building. IDEV Department
More informationSituation Report #2 Hurricane Irene impact on Turks and Caicos Islands and The Bahamas (as at 5:00 p.m.)
Situation Report #2 Hurricane Irene impact on Turks and Caicos Islands and The Bahamas (as at 5:00 p.m.) Hurricane Irene impacting the Turks and Caicos Islands and Bahamas Message: Hurricane Irene a Category
More informationCCRIF: Application of Risk Analysis and Modelling in the Insurance Sector
CCRIF: Application of Risk Analysis and Modelling in the Insurance Sector Technical Cooperation Workshop for Development of the Caribbean Regional Cooperation Programme in Multi-Hazard Early Warning System
More informationA. SUMMARY OF CORE DUTIES Human Resources Business Partner:
CARIBBEAN EXAMINATIONS COUNCIL EXECUTIVE SEARCH The Caribbean Examinations Council (CXC) is seeking four talented professionals to join its team in the capacity of: (A) Human Resources Business Partner;
More informationACE PROJECT M&E CONSULTANCY
ASSOCIATION OF AFRICAN UNIVERSITIES ASSOCIATION DES UNIVERSITÉS AFRICAINES ACE PROJECT M&E CONSULTANCY BACKGROUND The Association of African Universities has received financing from the World Bank toward
More informationGOVERNANCE AND CIVIL SOCIETY
PARTNERS FOR CHANGE GOVERNANCE AND CIVIL SOCIETY SUB-SAHARAN AFRICA PARTNERS FOR CHANGE GOVERNANCE AND CIVIL SOCIETY PARTNERS FOR CHANGE The British Council is committed to building engagement and trust
More informationBSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012
To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached
More informationGovernment of Antigua and Barbuda Public and Social Sector Transformation Project Project Preparation Advance (P4650-001)
Government of Antigua and Barbuda Public and Social Sector Transformation Project Project Preparation Advance (P4650-001) Terms of Reference Communications Specialist for Public and Social Sector Transformation
More informationIT Professional Standards. Information Security Discipline. Sub-discipline 605 Information Security Testing and Information Assurance Methodologies
IT Professional Standards Information Security Discipline Sub-discipline 605 Information Security Testing and Information Assurance Methodologies December 2012 Draft Version 0.6 DOCUMENT REVIEW Document
More informationCDEMAnews The Bulletin of the Caribbean Disaster Emergency Management Agency
CDEMAnews The Bulletin of the Caribbean Disaster Emergency Management Agency Issue 1 2012 1. 2. 3. 5. 6. 6. 7. 8. 8. 9. 10. 11. CONTENTS Disaster management planning - A critical investment for Caribbean
More informationEnsuring Accountability in Disaster Risk Management and Reconstruction
Ensuring Accountability in Disaster Risk Management and Reconstruction Date: 08 December 2015 Time: 8.30 am until 4.30 pm Venue: Jaic Hilton Hotel, Colombo, Sri Lanka Organised by SPARC, University of
More informationAPPENDIX 1 POSITION DESCRIPTION. Name Signature Date. Name Signature Date. Position: Intermediate/Senior Planner (Career Progression Level 3-4)
APPENDIX 1 POSITION DESCRIPTION Employee: Manager: Position: Intermediate/Senior Planner (Career Progression Level 3-4) Location: Reports to: Purpose: Gisborne, New Zealand Senior Projects Engineer (Water
More informationREQUIRED DOCUMENTS FROM HIRING UNIT 8 - CONFIRMATION OF CATEGORY OF LOCAL CONSULTANT, please select : Senior (1) Junior Consultant
Terms of reference GENERAL INFORMATION Title: Mid-Term Review Lead Consultant for Climate Change Adaptation - SPARC Project (International) Re Advertisement Project Name: Strategic Planning and Actions
More informationDuration: One year with the option of an additional year based on performance.
Position: Adviser to the Internal Audit Unit Objectives: A person to support the newly established Internal audit unit to transform it from its infancy stage to a unit that is a trusted adviser, and more
More information2008 review 2013 review Targeted measures Targeted deadline. ENQA Criterion / ESG. February 2016/ Measures already taken. Level of compliance
/ ESG Level of compliance 2008 review 2013 review Targeted measures Targeted deadline Recommendations and suggestions Level of compliance Recommendations February 2016/ Measures already taken ESG 2.1:
More informationGuiding principles on security of tenure for the urban poor
Guiding principles on security of tenure for the urban poor Security of tenure is understood as a set of relationships with respect to housing and land, established through statutory or customary law or
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 04.02.2015 Country: Description: Reference Code: Project Name: Turkey Framework based Consultancy Services on Field Analyses, Planning and Monitoring in Community
More informationNCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat. 2. BTC Change co-manager. Signature.
NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE Position Type Organization Partner organization Duration Type of contract Human Resources Expert Coach Consultancy contract National Capacity Building
More informationPOSITION DESCRIPTION
POSITION DESCRIPTION Position Title: Reports to: DEVICES CATEGORY MANAGER MANAGER, DEVICES FUNDING Date: September 2014 PHARMAC S MISSION Our legislative objective is: to secure for eligible people in
More informationTOR. Developing Database System for the NGOs Directorate. National Consultant. 180 days (over a period of 6 months)
TOR Developing Database System for the NGOs Directorate National Consultant Period of assignment/services: Duty Station: 180 days (over a period of 6 months) Baghdad Estimated Starting Date: 1 May Contract
More informationTERMINAL EVALUATION TERMS OF REFERENCE
TERMINAL EVALUATION TERMS OF REFERENCE BASIC INFORMATON Location: Uganda Application Deadline: July 30 th, 2015 Type of Contract: Individual Contract Post Level: International Consultant Languages Required:
More informationEfficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change
Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change For Decision Member Champion(s): Cllr A Alford, Corporate - Director:
More informationATTACHMENTS: 1. CUSTOMER EXPERIENCE PROGRAM CHART
INFORMATION REPORT REPORT TITLE: ITEM NUMBER: 1176 DATE OF MEETING: 14 JULY 2014 AUTHOR: JOB TITLE: RESPONSIBLE OFFICER: JOB TITLE: COMMUNITY GOAL: CUSTOMER EXPERIENCE PROGRAM ANNABEL SHINKFIELD MANAGER
More informationUNDP Recovery Activities: Examples from Indonesia and Haiti
UNDP Recovery Activities: Examples from Indonesia and Haiti Hossein Sarem Kalali, UNDP The Second Expert Group Meeting on the Great East Japan Earthquake Learning from the Mega Tsunami Disaster 16 18 December
More informationREQUEST FOR PROPOSAL (RFP) For Consultancy Services
National Environment & Planning Agency 10 & 11 Caledonia Avenue, Kingston 5, Jamaica W.I. Tel: (876) 754-7540 Fax: (876) 754-7595-6, toll free help-line: 1-888-991-5005 Website: http://www.nepa.gov.jm
More informationTERMS OF REFERENCE Disaster Recovery Coordinator
TERMS OF REFERENCE Disaster Recovery Coordinator I. DUTY STATION: OFFICE OF DISASTER PREPAREDNESS AND EMERGENCY MANAGEMENT II. REPORTING TO: DEPUTY DIRECTOR GENERAL 1. INTRODUCTION: The Office of Disaster
More informationCCRIF s Economics of Climate Adaptation (ECA) Initiative
preliminary results of the ECA Study CCRIF s Economics of Climate Adaptation (ECA) Initiative Enhancing the Climate Risk and Adaptation Fact Base for the Caribbean An informational brochure highlighting
More informationPM Governance. Executive Team ADCA ADCA
Item 6.5a Action Plan against the Recommendations Made in the Review of Risk Management Arrangements by PM Governance, November 2014 Key: PM Governance Paul Moore, Risk Consultant ADCA Associate Director
More informationCARIBBEAN TELECOMMUNICATIONS UNION CARIBBEAN REGIONAL COMMUNICATIONS INFRASTRUCTURE PROJECT (CARCIP)
1 CARIBBEAN TELECOMMUNICATIONS UNION CARIBBEAN REGIONAL COMMUNICATIONS INFRASTRUCTURE PROJECT (CARCIP) TERMS OF REFERENCE FOR REDESIGN OF THE CARIBBEAN TELECOMMUNICATIONS UNION WEBSITE 1. BACKGROUND 1.1
More informationHow to Exercise a Business Continuity Plan (BCP)
How to Exercise a Business Continuity Plan (BCP) This document provides a step by step guide to exercising a Business Continuity Plan (BCP). The exercise of a BCP should not be undertaken in isolation,
More informationTRUST POLICY FOR EMERGENCY PLANNING
TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author
More informationRequest for Proposal Title: Website Development and Maintenance for the Caribbean Leadership Project Country: International
Request for Proposal Title: Website Development and Maintenance for the Caribbean Leadership Project Country: International Information to Consultants 1. Introduction 1.1 Consultants are invited to submit
More informationLead Business Analyst
Senior Business Analyst Date produced: July 2014 Produced by: Rob Norman Date last reviewed: November 2014 Reviewed by: Adrian Morris Date evaluated: November 2014 Evaluated by: Jenny Buck / Louise Dibble
More informationCOUNCIL CONCLUSIONS APPROVED DURING THE SPANISH PRESIDENCY ON PSYCHOSOCIAL SUPPORT IN THE EVENT OF EMERGENCIES AND DISASTERS
PROGRAM OF THE SPANISH PRESIDENCY OF THE EU COUNCIL IN THE FIELD OF CIVIL PROTECTION/2010 COUNCIL CONCLUSIONS APPROVED DURING THE SPANISH PRESIDENCY ON PSYCHOSOCIAL SUPPORT IN THE EVENT OF EMERGENCIES
More informationRISK MANAGEMENT STRATEGY 2014-17
RISK MANAGEMENT STRATEGY 2014-17 DOCUMENT NO: Lead author/initiator(s): Contact email address: Developed by: Approved by: DN128 Head of Quality Performance Julia.sirett@ccs.nhs.uk Quality Performance Team
More informationPOSITION DESCRIPTION. Date Amended: 6 March 2015
POSITION DESCRIPTION Date Amended: 6 March 2015 POSITION: Engineer (Graduate) Technical Services POSITION NUMBER: 155 DEPARTMENT: Infrastructure Services UNIT: Technical & Civic Services SALARY: AI1 AN3:
More informationSTATUS OF DISASTER RISK MANAGEMENT
STATUS OF DISASTER RISK MANAGEMENT PLANS FOR FLOODS, HURRICANES AND DROUGHT IN THE AGRICULTURE SECTOR A CARIBBEAN PERSPECTIVE February 2013 STATUS OF DISASTER RISK MANAGEMENT PLANS FOR FLOODS, HURRICANES
More informationRisk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.
Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for
More informationNFSA Project Management Guidelines
NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and
More informationTERMS OF REFERENCE. ASSIGNMENT INFORMATION Position Title:
TERMS OF REFERENCE Pacific Integrated Water Resources Management (IWRM) National Planning Programme Development of a National Water Resources Allocation Policy for the Government of Samoa BACKGROUND The
More informationSaskatoon North Partnership for Growth (P4G) Draft Communications and Engagement Strategy
Saskatoon North Partnership for Growth (P4G) Draft Communications and Engagement Strategy Introduction This Communications and Engagement Strategy (Strategy) sets the communications and engagement framework
More informationThe Development of Work Place Experience Guidelines for Colleges
SC/16/05 Agenda item 8 4 February 2016 The Development of Work Place Experience Guidelines for Colleges To provide information on the development of work place experience guidance for the college sector
More informationFor a detailed background of the Project and a job description, please refer to page 2.
PROJECT MANAGER (P.4) PROJECT COORDINATION UNIT, IMO-EC PROJECT ON CAPACITY BUILDING FOR CLIMATE MITIGATION IN THE MARITIME INDUSTRY, MARINE ENVIRONMENT DIVISION Circular letter No: 3621 Vacancy announcement:
More informationMarketing, Recruitment and Admissions. Marketing Strategy 2013-2015
Marketing, Recruitment and Admissions Marketing Strategy 2013-2015 November 2013 The Marketing Strategy is created cooperatively by the Department s marketing managers and exists to advance the University
More informationJoint UN Statement 1 st Preparatory Committee Meeting (PREPCOM) for the Third UN World Conference on Disaster Risk Reduction, 14-15 July 2014, Geneva
FINAL VERSION Joint UN Statement 1 st Preparatory Committee Meeting (PREPCOM) for the Third UN World Conference on Disaster Risk Reduction, 14-15 July 2014, Geneva PLEASE CHECK AGAINST DELIVERY Excellencies,
More informationin the CARIBBEAN Margarita Astralaga UNEP ROLAC February 2015
in the CARIBBEAN Margarita Astralaga UNEP ROLAC February 2015 Content I. Background II. Activities and Achievements III. Options and opportunities What is a green economy? A Green Economy is one that results
More informationAccreditation of qualifications for registration as an oral health practitioner
Accreditation of qualifications for registration as an oral health practitioner Purpose Approved by the Dental Council: August 2005 Updated: May 2008 Governance Structure Update: 8 August 2011 Updated:
More informationDRAFT Revised Guide to the National CDEM Plan 2015 July 2015
19. Planning Summary Planning involves the proactive coordination of CDEM Group and agency activities in the medium to long term, with the intention of achieving a unified effort that works towards a common
More information18-22 January 2005, Kobe, Hyogo, Japan. Building the Resilience of Nations and Communities to Disasters. www.unisdr.org/wcdr
World Conference on Disaster Reduction 18-22 January 2005, Kobe, Hyogo, Japan Hyogo Framework for Action 2005-2015: Building the Resilience of Nations and Communities to Disasters * www.unisdr.org/wcdr
More informationOAS University of the West Indies 2014 SCHOLARSHIP OPPORTUNITIES. OAS Partnerships Program for Education and Training (PAEC)
OAS University of the West Indies SCHOLARSHIP OPPORTUNITIES OAS Partnerships Program for Education and Training (PAEC) The Organization of American States (OAS), through the Department of Human Development,
More informationFCCC/SBI/2012/L.44. United Nations
United Nations FCCC/SBI/2012/L.44 Distr.: Limited 1 December 2012 Original: English Subsidiary Body for Implementation Thirty-seventh session Doha, 26 November to 1 December 2012 Agenda item 10 Approaches
More informationThe Role of Information Communication Technology in Advancing Risk Resilience in Small Island Developing States
The Role of Information Communication Technology in Advancing Risk Resilience in Small Island Developing States Presented by: Ronald Jackson, Executive Director, CDEMA At the: 10 th UN Regional Cartographic
More informationPosition Description. Enterprise Agreement: Budget Responsibility: Nil
Position Description Position Details Position Scope Title: Division: Project Manager Finance & Corporate Services Enterprise Agreement: Budget Responsibility: Department: Payroll Authority Level: Ambulance
More informationJAMAICA JA-CC2046: IMPLEMENTATION OF BUSINESS CLIMATE REFORMS IN JAMAICA ACCESS TO CREDIT FOR PRODUCTIVE DEVELOPMENT
JAMAICA JA-CC2046: IMPLEMENTATION OF BUSINESS CLIMATE REFORMS IN JAMAICA ACCESS TO CREDIT FOR PRODUCTIVE DEVELOPMENT TERMS OF REFERENCE End of Project Evaluation and Preparation of Draft Project Completion
More informationMiddlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager
Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant
More informationREQUESTS FOR PROPOSAL RFP TGF-16-017. Title: Professional Services for the Implementation of the Board Governance Performance Assessment Framework
REQUESTS FOR PROPOSAL RFP TGF-16-017 Title: Professional Services for the Implementation of the Board Governance Performance Assessment Framework Issue Date: March, 9th 2016 RFP Submission Date: March,
More informationEN 31IC/11/R7 Original: English Adopted
EN 31IC/11/R7 Original: English Adopted 31st INTERNATIONAL CONFERENCE OF THE RED CROSS AND RED CRESCENT Geneva, Switzerland 28 November 1 December 2011 Strengthening normative frameworks and addressing
More informationConfident in our Future, Risk Management Policy Statement and Strategy
Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents
More informationReport of a Peer Learning Activity in Limassol, Cyprus 17 21 October 2010. School Leadership for learning
EUROPEAN COMMISSION Directorate-General for Education and Culture Life Long Learning: policy and programmes School Education; Comenius Education and Training 2020 programme Thematic Working Group 'Teacher
More informationFramework and Resources for Early Childhood Education Reviews
Framework and Resources for Early Childhood Education Reviews Education Reviews in Early Childhood Education Services Contents 1 Introduction 1 The purpose of this framework ERO s approach to early childhood
More informationESKISP6046.02 Direct security architecture development
Overview This standard covers the competencies concerned with directing security architecture activities. It includes setting the strategy and policies for security architecture, and being fully accountable
More informationTERMS OF REFERENCE: GRAPHIC DESIGNER
TERMS OF REFERENCE: GRAPHIC DESIGNER Background In order to meet the increased requirements for coordination support, humanitarian advocacy and information, the OCHA Office in the occupied Palestinian
More information