People s Republic of Bangladesh: Strengthening Results-Based Monitoring and Evaluation Project

Size: px
Start display at page:

Download "People s Republic of Bangladesh: Strengthening Results-Based Monitoring and Evaluation Project"

Transcription

1 Technical Assistance Report Project Number: December 2006 People s Republic of Bangladesh: Strengthening Results-Based Monitoring and Evaluation Project (Financed by the Japan Special Fund) The views expressed herein are those of the consultant and do not necessarily represent those of ADB s members, Board of Directors, Management, or staff, and may be preliminary in nature.

2 CURRENCY EQUIVALENTS (as of 15 November 2006) Currency Unit taka (Tk) Tk1.00 = $ $1.00 = Tk ABBREVIATIONS ADB Asian Development Bank CAG Comptroller and Auditor General of Bangladesh CPTU Central Procurement Technical Unit DP development partner ERD Economics Relation Division EA executing agency FAPAD Foreign Aided Projects Audit Directorate GED General Economic Division IMED Implementation, Monitoring and Evaluation Division ICT information and communications technology MDG Millennium Development Goal M&E monitoring and evaluation MIS management information system PRS poverty reduction strategy PD project director RMB results-based management SPPP Strengthening Project Portfolio Performance TA technical assistance UNDP United Nations Development Programme WB World Bank TECHNICAL ASSISTANCE CLASSIFICATION Targeting Classification Targeted intervention Sector Law, economic management, and public policy Subsector National government administration, public finance and expenditure management Themes Governance, and capacity development Subtheme Public governance, institutional and organizational development NOTE In this report, "$" refers to US dollars. Vice President L. Jin, Operations 1 Director General K. Senga, South Asia Department (SARD) Director H. Du, Bangladesh Resident Mission (BRM), SARD Team leader Team members S. Ekelund, Project Implementation Specialist, SARD P. Kamayana, Senior Country Programs Specialist, BRM, SARD F. Ahmed, Governance Officer, BRM, SARD

3 I. INTRODUCTION 1. The Government of Bangladesh has requested the Asian Development Bank (ADB) to provide technical assistance (TA) for the Strengthening Results-Based Monitoring and Evaluation Project for possible ADB financing. From 20 to 30 August 2006 the Fact-Finding Mission from the Bangladesh Resident Mission (BRM) of ADB held discussions with senior officials of the agencies concerned, including the Economics Relation Division (ERD), the Implementation, Monitoring and Evaluation Division (IMED), the Comptroller and Auditor General of Bangladesh (CAG), and the Foreign-Aided Projects Audit Directorate (FAPAD). This TA is based on the understanding reached during the Mission. The design and monitoring framework is in Appendix 1. 1 II. ISSUES 2. The Government attaches high importance to effective project implementation and effective monitoring and evaluation (M&E) of projects and sectors. In support, ADB financed the TA for Strengthening Project Portfolio Performance (SPPP), 2 which was implemented from 12 December 1999 to 31 August The SPPP addressed the implementation weaknesses in IMED and FAPAD, specifically of ADB s portfolio of projects in Bangladesh. Executed by IMED of the Ministry of Planning, the SPPP focused on three critical areas streamlining managerial and technical capacities in IMED, establishing an operational portfolio performance monitoring system through a management information system (MIS), and strengthening the project accounts management system and audit capacity of FAPAD. 3. IMED and FAPAD have requested a follow-on to the SPPP to review the M&E practices under all Government-implemented development projects, regardless of their funding sources, and strengthen the capacity of IMED and line agencies to implement results-based M&E; and strengthen FAPAD s audit management, audit systems, and implement personal computer-based audit formats. IMED is particularly seeking assistance to address the new challenges arising from its important role in monitoring attainment of the sectoral targets of Bangladesh s poverty reduction strategy (PRS) 3 to assess progress made toward achieving the Millennium Development Goals (MDGs) by the year M&E under current IMED operations is largely focused on indicator calculation and information collection from executing agencies (EAs). However, the PRS requires that IMED s role be elevated to assess the impact of the Government s Annual Development Program on achieving program and sectoral results and targets. Therefore, line ministries must take on responsibility for M&E at the project level, for which IMED, following project completion, will provide network capacity development support. Furthermore, IMED s enhanced responsibilities under the PRS at the sector level will be carried out in close coordination with the General Economic Division (GED) of the Planning Commission, whose role is to monitor achievement of the broader PRS outcomes and objectives at a macrolevel, and assess their impact on progress toward MDGs The TA first appeared in ADB Business Opportunities on 6 September ADB Technical Assistance to the People s Republic of Bangladesh for Strengthening Project Portfolio Performance. Manila (TA 3336-BAN, approved on 12 December for $1 million). Economic Relations Division, Ministry of Finance, Government of the People s Republic of Bangladesh A National Strategy for Economic Growth, Poverty Reduction and Social Development. Dhaka. The PRS focuses on generating employment; improving nutritional status; improving primary, secondary and vocational education; establishing good governance; improving maternal health, sanitation and drinking water; combating terrorism; and monitoring.

4 2 5. Consequently, IMED s mandate, role, and functions within the Government s development planning and M&E system require a systematic review in light of the expanding demands being placed upon the organization. The review must involve participatory consultations with all key stakeholders, through which the institutional structure, reporting relationships, and human resource requirements would be proposed and a strategic plan prepared so as to achieve an effective and sustainable M&E capacity needed to achieve the desired outcomes of the PRS. The TA will develop and implement a reform agenda that builds effective and sustainable capacity, and support IMED in applying results-based management (RBM) concepts, in conformance with the understanding between development partners (DPs) and developing countries, including Bangladesh, at the Paris High-Level Forum on Harmonization and Aid Effectiveness (2005). 6. FAPAD was established in the early 1980s as an office of the CAG to audit all foreignaided projects in the public sector. The constitutional provisions of Bangladesh provide for audit of all funds under the Consolidated Fund, including aid funds, by the office of the CAG. Each year FAPAD conducts audits of about 400 loan and TA projects financed by DPs and submits reports to the respective DPs as well as to the Government and EAs. ADB, like other DPs, has been relying mainly on FAPAD audit reports for assurance on the proper use of development funds and to determine if any actions are needed on reported misuse or impropriety in financial transactions under projects. Due to the enormous volume of work, and inherent capacity and personnel constraints, FAPAD is not always able to ensure quality in its audit reports, and that loan and TA agreements are followed by the EAs. 7. An interdepartmental workshop 4 organized by IMED in January 2006 to assess the SPPP recommendations highlighted that a number of reform and capacity development initiatives were preconditions to the effectiveness of IMED, as well as for RBM to be fully grounded in the Government s monitoring mechanisms. The workshop specifically emphasized the need for enhancing M&E knowledge, techniques, and skills development; operationalizing and expanding the IMED MIS; and a comprehensive study on capacity development with linkages to the absorptive capacity of IMED. III. THE TECHNICAL ASSISTANCE A. Impact and Outcome 8. The outcome of the TA is to strengthen the organizational capacity of IMED and FAPAD through qualitative changes in their structure, functions, reporting relationships, M&E and audit capacity based on the principles of RBM. This outcome will enable the organizations to support monitoring of the implementation of the PRS and achievement of the MDGs at the sectoral level, in partnership with line ministries and GED. The impact of the TA will be improved accountability and enhanced performance in delivering development programs. B. Methodology and Key Activities 9. The five outputs below will provide IMED with a strategic plan, support its implementation through capacity development and training, and enhance its MIS to support results-based M&E; and provide FAPAD with enhanced audit management tools. 4 IMED, Planning Ministry, Government of the People s Republic of Bangladesh. 31 January Workshop on Dissemination of Findings and Recommendations of Five Study Reports. Dhaka.

5 3 1. Output 1: An Agreed-upon Strategic Plan for IMED 10. Activities for development of a strategic plan for IMED include: A series of participatory workshops involving stakeholders at the policy and operational levels, i.e., IMED, line ministries, EAs, Planning Commission (particularly GED), and concerned development partners to formulate a strategic plan for IMED. Suggested areas for the workshops include (a) IMED s current linkages with line ministries/eas and means to strengthen this linkage; and (b) IMED s current mandates, structure, locus, and reporting relationship with a view to strengthening its M&E capacity and role to support monitoring of PRS and MDG implementation applying the principles of RBM; Through a participatory consultative process, which will also contribute to the capacity development of IMED, design M&E frameworks (a minimum of two) for social sector and infrastructure projects in line with the indicators of the PRS; and Based on the participatory workshops outcomes, prepare a draft strategic plan and M&E manual for IMED, for the approval of the Government. 2. Output 2: Capacity Needs Assessment and Implementation of Capacity Development and Training Plans 11. Activities for development of capacity building and training plans for IMED include: (vii) Support institution, organization, and network capacity development as approved and agreed upon in the strategic plan; Review training needs assessment reports, as well as capacity development reports prepared under the SPPP; Assess the absorptive capacity of IMED staff and their current skills that may be relevant to their capacity development in order to implement the strategic plan; Assess the appropriateness of establishing in IMED a unit for result-based M&E knowledge management, training, and research. This will include exploring utilization of existing Government training institutions, academic institutions, the private sector, and twinning arrangements with foreign institutions in the region; Develop capacity development and training plans supporting IMED s strategic plan; Implement the capacity development and training plans to enhance IMED and EA staff capacity in a range of areas required to support the reform process; and Review a similar country s efforts in improving M&E and implementing RBM reforms. 3. Output 3: Enhancement of MIS into a Web-Based Online M&E System Operationally Linked to Line Ministries and Key Agencies 12. Activities for enhancing the IMED MIS include: Review information needs for improved result-based project monitoring at different levels of the Government, including IMED; Review all relevant reports including recommendations of the SPPP project and projects supported by other development partners; Prepare a conceptual and functional design for upgrading the existing MIS by establishing web-based interfaces with other government MISs (including the IMED Central Procurement Technical Unit [CPTU]) MIS); Conduct a participatory workshop involving IMED and key line ministries, relevant EAs, development partners, and the national information and

6 4 (vii) (viii) communications technology (ICT) task force to strengthen the MIS to support implementation of the IMED strategic plan; Prepare recommendations to strengthen the IMED MIS and establish web-based linkages with the key line ministries/eas/planning Commission; Upgrade in collaboration with the United Nations Development Programme (UNDP) and World Bank-supported e-governance initiatives, the local area network of the Planning Commission campus, including ERD, GED, IMED, and CPTU, to support implementation of the IMED MIS; Develop training materials, and IMED trainers, for the upgraded MIS; and Conduct training for IMED, line ministry, and EA staff to fully implement the enhanced IMED MIS. 4. Output 4: Enhancement of FAPAD s Audit Management 13. Activities for enhancing FAPAD s audit management include: Review the impact of all project support to FAPAD, including the SPPP, and the FAPAD component of the World Bank-supported Computerization of Project Accounts Manual, Development of Asset Management, and Reforming Project Audit Methodology Project; Conduct trial pilot audits with the FAPAD audit team to strengthen capacity and validate and, if necessary, propose revisions to audit manuals; Based on an appraisal of the foregoing review, develop capacity development and training plans for the revised audit manual, and computerized audit monitoring system 5 ; Review hardware and network setup for the proposed computerized audit monitoring system, and upgrade if required; and Implement the capacity development and training plans to enhance FAPAD staff capacity in a range of areas required to support the audit process. 5. Output 5: Recommendations for Follow-Up Support 14. Activities for preparing subsequent support to FAPAD and IMED include: C. Cost and Financing Prepare recommendations for subsequent support to IMED and FAPAD based on an assessment of the achievement and impact of outputs The total cost of the TA is estimated to be $1,000,000 equivalent, of which $800,000 will be financed on a grant basis by the Japan Special Fund, funded by the Government of Japan. The Government of Bangladesh will finance the remaining $200,000 equivalent by providing counterpart staff, office accommodation, meeting venues, and related facilities on IMED and FAPAD premises, local transport for counterpart staff, and telephone connections for the TA team. The detailed cost estimates are in Appendix 2. D. Implementation Arrangements 16. IMED will be the EA for the TA, and the support to FAPAD is provided as a separate module under the TA, with FAPAD as Implementing Agency. The secretary of IMED will appoint 5 Developed under the FAPAD component of the World-Bank supported Computerization of Project Accounts Manual, Development of Asset Management, and Reforming Project Audit Methodology Project, implemented under the Ministry of Finance. Project completion is scheduled for December 2006.

7 5 a senior project director (PD), at no less than director general rank, to act as full- time PD for the TA. The FAPAD component will be implemented in close coordination with CAG. A core group of qualified technical staff (minimum one per consultant) within IMED and FAPAD will serve as counterparts to the TA consultants. The counterparts must have background in capacity development and training, institutional development and change management, and policies and strategic planning and MIS/ICT systems development, corresponding to the skill areas of the international and national consultants. A high-level TA steering committee, chaired by the IMED secretary, with the office of the PD serving as the secretariat, will be constituted, involving FAPAD, key ministries and agencies, and development partners presently supporting or planning support to IMED and FAPAD, to provide policy guidance and supervise the TA activities. The steering committee will meet at a minimum every second month to review consultants reports, and evaluate project activities and project implementation arrangements. 17. The TA will be implemented in close coordination with initiatives proposed by other DPs to ensure complementarities and avoid duplication of effort. UNDP is supporting e-governance initiatives. 6 Under a World Bank-supported Public Procurement Reform Project, IMED has implemented procurement reforms, including new procurement procedures and legislation, established a CPTU in IMED, and developed an MIS for monitoring all public procurement. Through the Economic Management TA project, the World Bank is also supporting development of a national e-governance strategy, preparation of a road map for ICT development, preparation of a prioritized plan and deployment of ICT facilities within the Government structure (ministries and departments), and training of civil servants on ICT applications. The World Bank is further supporting FAPAD to prepare a revised audit manual, and develop a computerized audit monitoring system The TA will be implemented over a period of 24 months, from February 2007 to January International (18 person-months) and national (40 person-months) consultants will be engaged through an internationally recognized consulting firm under quality- and cost-based selection in accordance with ADB s Guidelines on the Use of Consultants (April 2006, as amended from time to time), and shortlisted firms will be asked to submit biodata and technical proposal. The expertise to be provided include RBM, strategic planning, institutional and capacity development, change management, MIS, and audit management. The equipment for the TA will be procured in accordance with ADB s Procurement Guidelines (April 2006, as amended from time to time), and will be handed over to the Government on completion of the TA. Outline terms of reference for the consultants are in Appendix 3. IV. THE PRESIDENT'S DECISION 19. The President, acting under the authority delegated by the Board, has approved the provision of technical assistance not exceeding the equivalent of $800,000 on a grant basis to the Government of Bangladesh for Strengthening Results-Based Monitoring and Evaluation Project, and hereby reports this action to the Board. 6 Assistance to SICT by Strengthening Planning Division, Economic Relations Division (ERD), Ministry of Finance, and IMED through ICT executed by the Planning Ministry project and financed by UNDP and the Canadian International Development Agency (CIDA) for $2.3 million. 7 A component of the Computerization of Project Accounts Manual, Development of Asset Management, and Reforming Project Audit Methodology Project, implemented under the Ministry of Finance. Project completion is scheduled for December 2006.

8 6 Appendix 1 DESIGN AND MONITORING FRAMEWORK Design Summary Impact Improved accountability and enhanced performance in delivering development programs toward poverty reduction Outcome Improve organizational capacity of IMED and FAPAD through qualitative changes in their structure, functions, reporting relationships, and monitoring, evaluation, and audit capacity based on the principles of RBM Outputs Performance Indicators/Targets Increase in transparency and accountability in development project management RBM for outcome measurement widely practiced Changes in IMED locus, functions and structure; IMED MIS expanded and FAPAD MIS established; IMED WAN implemented and capacity developed among IMED, FAPAD, and selected line ministry/ea staff; M&E capacity in IMED, and audit capacity of FAPAD enhanced Data Sources/Monitoring Mechanisms Project audits, reports, and reviews Capacity assessment reports Assumptions and Risks Assumption Government continues to pursue RBM approach and recognizes the linkages between RBM and improved poverty reduction outcome of development projects Risk Project not implemented on schedule Assumptions Prevalence of political will to undertake change, continuous dialogue with stakeholders throughout the process, staff motivation in IMED and FAPAD maintained, and consultants performance satisfactory Risks Absence of timely Government decisions 1. An agreed-upon strategic plan for IMED containing a welldefined institutional development action package in relation to its functions, staffing, structure, appropriate locus, and reporting relationships IMED strategic plan and M&E manual prepared; strategy for wider whole of government engagement with IMED delineated; best practice examples understood by the stakeholders; and M&E frameworks established Reports and TA review missions Government decisions are made on time Line ministries/eas continue to engage with IMED Sustained interest from development partners Ministries and EAs continue to support changes

9 7 Outputs 2. A capacity needs assessment and implementation of a capacity development and training plan that will support the implementation of the IMED strategic plan 3. Enhancement of the IMED MIS into a webbased on-line M&E system linked to line ministries and EAs for data entry and utilization of information, within the framework of the Government s comprehensive e- governance strategy 4. Implement a plan for enhancing FAPAD s audit management Performance Indicators/Targets Capacity development and training plans developed and implemented on time Line ministries, EAs and other stakeholders becoming more involved in M&E and RBM; IMED acting as mentor and partner Consensus reached on MIS expansion to support implementation of IMED strategic plan and to establish linkages with other stakeholders Information needed for monitoring at IMED and line ministries/eas available. A conceptual and functional design for upgrading existing MIS through web interfaces with other automated systems in the government (such as CPTU) prepared on time A network with key line ministries and key EAs established Based on review and appraisal of earlier support to FAPAD, capacity development and training plans developed and implemented; and PCbased audit tools developed, and PC network initiated in FAPAD and CAG for better audit management Data Sources/Monitoring Mechanisms Reports and TA review mission TA review missions Implementation of MIS expansion documented Personnel trained and capacity enhanced Key line ministries and EAs linked to IMED s M&E system Reports and TA review mission Stakeholders involvement in audits and overall performance of the audit process demonstrated Assumptions Ministries and EAs continue to support changes Staff is available for training Staff is eager to learn new techniques in M&E and understand RBM Government decisions on MIS expansion and line ministry connections are made on time Personnel are available to handle mentoring functions DPs collaborate in the process of change management in MIS. Availability of funds for equipment procurement and operations and maintenance from the Government of Bangladesh and DPs Availability of maintenance support Government involvement in implementation Government decisions are made on time Personnel are available to handle mentoring Staff members are available for training Staff members are eager to learn new techniques

10 8 Appendix 1 Outputs 5. Recommendations prepared for subsequent support (investment and/or TA as required) to IMED and FAPAD Performance Indicators/Targets Recommendations for subsequent support, in phases as appropriate, prepared based on an assessment of the achievement and impact of outputs 1 4 Data Sources/Monitoring Mechanisms Project final report Activities and Milestones Activities with Milestones 1. Improve the organizational capacity of IMED 1.1. Strategic plan for IMED prepared (within 3 months from mobilization), and approved by the Government (within 6 months from mobilization); 1.2. Capacity development and training plans supporting the strategic plan for IMED prepared (within 3 months from mobilization), and approved by the Government (within 6 months from mobilization); 1.3. Capacity development and training plans for IMED implemented (within 22 months from mobilization); 1.4. Consensus reached on MIS expansion to support IMED strategic plan and establish linkages with other stakeholders (within 6 months from mobilization); and 1.5. MIS expansion to support IMED strategic plan and linkages with other stakeholders established and functioning (within 18 months from mobilization). 2. Improve the organizational capacity of FAPAD 2.1. Capacity development and training plans for FAPAD prepared (within 2 months from mobilization), and approved by the Government (within 4 months from mobilization); 2.2. Capacity development and training plans for FAPAD implemented (within 22 months from mobilization); and 2.3. PC-based audit tools developed and used, and PC network established and used by key managers of FAPAD and CAG (within 12 months from mobilization). 3. Future Support 3.1. A plan with recommendation for subsequent support (investment and/or TA as required) to IMED and FAPAD (within 22 months from mobilization). Assumptions Political will on role of IMED in M&E of PRS, and FAPAD for financial and performance audits, continues Input ADB: About 18 personmonths of international consultants, and 40 person-months of national consultants, costing not more than $800,000. Government: In-kind contribution in the form of local counterpart facilities, including office accommodation, meeting venues, and related facilities on IMED and FAPAD premises, but also local transport for counterpart staff, and telephone connections for the TA team. All relevant reports, documents, and information will be made available as needed. ADB = Asian Development Bank, CAG = comptroller and auditor general of Bangladesh, CPTU = Central Procurement Technical Unit, DP = development partner, EA = executing agency for a project, FAPAD = Foreign Aided Projects Audit Directorate, IMED = Implementation Monitoring Evaluation Division, M&E = monitoring and evaluation, MIS = management information system, PC = personal computer, PRS = poverty reduction strategy, RMB = results-based management, TA = technical assistance. HUA DU Country Director, BRM KUNIO SENGA Director General, SARD

11 Appendix 2 9 COST ESTIMATES AND FINANCING PLAN ($'000) Total Item Cost A. Asian Development Bank Financing a 1. Consultants a. Remuneration and Per Diem i. International Consultants ii. National Consultants b. International and Local Travel 57.0 c. Reports and Communications Equipment b Training, Seminars, and Conferences a. Facilitators c 10.0 b. Training Program d Miscellaneous Administration and 20.0 Support Costs 5. Representative for Contract Negotiations Contingencies 70.0 Subtotal (A) B. Government Financing 1. Office Accommodation and Transport Remuneration and Per Diem of Counterpart Staff 3. Others 35.0 Subtotal (B) Total 1,000.0 a Financed by the Japan Special Fund, funded by the Government of Japan. b Office equipment, management information system and network hardware and software. All equipment to be provided under the technical assistance (TA) will be procured in accordance with ADB s Procurement Guidelines, and will be handed over to the Government on completion of the TA. c Provided for the series of participatory workshops, and participatory consultative process. Estimate based on a total of 2 months input including preparation and support. d Training for estimated 300 Implementation, Monitoring and Evaluation Division and Foreign Aided Projects Audit Directorate staff during 1 5 days training courses. Exact number and training program will be determined following completion of capacity development and training plans. Source: Asian Development Bank estimates.

12 Appendix 3 10 OUTLINE TERMS OF REFERENCE FOR CONSULTANTS A. International Team Leader/Strategic Planning, Institutional Strengthening/Resultbased Management Expert (7 person-months) 1. The team leader will have three inputs 3 person-months at the beginning to prepare the inception report, set up the project and work plan, and complete the draft strategic plan of the Implementation, Monitoring and Evaluation Division (IMED); 3 months during the middle of the project life to prepare the midterm report and work with the capacity development team as well as follow up any pending reform agenda; and 1 month at the end to oversee the completion of the project and prepare the final report. This is a tentative proposal subject to work plan finalization. The expert will have the following responsibilities: (vii) (viii) (ix) (x) (xi) (xii) (xiii) (xiv) (xv) Lead the consultant team; Conduct, in conjunction with the team, a series of participatory strategic planning workshops involving IMED staff and other stakeholders; Review all relevant reports including recommendations of the Strengthening Project Portfolio Performance (SPPP) Workshop of January 2006 and IMED Road Map prepared in 2004; Lead the review and appraisal of past support to the Foreign Aided Projects Audit Directorate (FAPAD), and support the development of modern audit management tools for FAPAD; In line with the outcome of the participatory workshops, prepare, involving IMED counterparts and project team, a strategic plan document delineating short-, medium- and long-term actions for IMED, which will form the basis of a specific divisional plan for IMED; Collect and disseminate best practices on monitoring and evaluation (M&E) and results-based management (RBM) from the region and globally (such as India and Malaysia) through participatory workshops that will serve as inputs to the development of the IMED reform recommendations; Mentor IMED staff in the preparation of strategic plans as a capacity development activity; Following the series of workshops and in conjunction with the national institutional strengthening, strategic planning and result-based management specialist, recommend an appropriate reform package delineating IMED s structure, functions, mandate, locus, reporting relationship, and potential linkages with line ministries and EAs; Consult various development partners and other stakeholders regularly on the project activities and seek suggestions for inclusion in the recommendations for IMED reforms; Maintain regular communication with the Asian Development Bank s Bangladesh Resident Mission; In conjunction with the national institutional strengthening and result-based management specialist, prepare a plan for implementing reforms; Conduct high-level workshops with regard to IMED reforms and strategic plan; Design, through a participatory capacity development exercise, two sets of resultbased M&E framework relevant to social sector and infrastructure projects that can measure outcomes and impacts, as well as support the monitoring of the Millennium Development Goals and poverty reduction strategy; Advise and provide mentoring to IMED on change and result management with regard to IMED s reforms as and when required; and Prepare reports in conjunction with the consultant team.

13 Appendix 3 11 B. International Capacity Development Expert (5 person-months) 2. The international capacity development expert and the national capacity development specialist will work together with mainly output 2 (capacity needs assessment and implementation of the capacity development and training plans), and output 4 (enhancing FAPAD s audit management), the latter with support from the international audit management expert. The inputs for this position will be organized as follows first mission for uninterrupted 2 months, 2 months during mid-project, and 1 month during the end of the Project. This is a tentative proposal subject to work plan finalization. The expert will have the following responsibilities: (vii) Design and conduct a series of capacity development and training activities in M&E, RBM, change management, audit management, and other relevant areas; Review reports on training needs and capacity development prepared under the SPPP, and training reports prepared in the supplementary phase of the SPPP; Assess the absorptive capacity of IMED and FAPAD staff and their current skills, including requirements for English report writing, and other aspects not covered under the SPPP that may be relevant to their capacity development; Assess the appropriateness of twinning arrangements with external agencies overseas and establishment of a special training and research unit within IMED; Identify areas of training and conduct special workshops on result-based M&E that draw upon current global best practices; Based on review and appraisal, prepare capacity development and training plans for IMED, FAPAD, and line ministry staff; and Develop appropriate mentoring tools for IMED, FAPAD, and line ministry staff. C. International MIS Planning Expert (3 person-months) 3. The expert will have initially 2 months uninterrupted input in the review and preparation activities for output 3 (enhancement of MIS) and output 4 (enhancing FAPAD s audit management); and a second input of 1 month during the implementation of MIS and networks. This is a tentative proposal subject to work plan finalization. The expert will have the following responsibilities: (vii) Conduct participatory workshops involving IMED and other stakeholders, such as the line ministries, relevant EAs, aid agencies, and information and communications technology (ICT) task force; Review all relevant reports including recommendations of the SPPP and Support to ICT Task Force Program Project (SICT) so as to avoid duplication of efforts and repetition of earlier activities; Prepare an MIS operationalization and expansion plan in close conjunction with the government counterparts, development partners, and ICT task force; Review information needs for effective result-based project monitoring at different levels of the government, including IMED, and suggest measures to establish adequate information flow; Prepare a conceptual and functional design for upgrading the existing MISs and making them part of the integrated MIS by establishing interfaces with other automated systems of the government; Review the required hardware and network setup for FAPAD s proposed computerized audit monitoring system, and propose upgrading, if required; Work with the long-term national MIS/Training Specialist in advising and, where appropriate, undertaking work to upgrade and expand the campus network of the

14 Appendix 3 12 (viii) (ix) (x) Planning Commission campus (to include General Economic Division Economics Relation Division and Central Procurement Technical Unit); Advise on the establishment of a wide area network with all ministries of the government and key executing agencies, utilizing already existing such networks where possible; Develop training materials for the upgraded MIS; and Help procure necessary hardware and software to upgrade the MIS, and networks (Note: Most of the funding for MIS hardware and software will be provided by development partners and the Government of Bangladesh; procurement under ADB funding will be identified by the MIS planning expert). D. International Audit Management Expert (3 person-months) 4. The expert will have initially an uninterrupted input of 2 months in the review and preparation activities for output 4 (enhancing FAPAD s audit management), and then an input of 1 month during the implementation of the capacity development and training plans. This is a tentative proposal subject to work plan finalization. The expert will have the following responsibilities: Review the impact of all project support to FAPAD, including the SPPP, and the FAPAD component of the World Bank-supported Computerization of Project Accounts Manual, Development of Asset Management, and Reforming Project Audit Methodology Project; Conduct trial pilot audits with the FAPAD audit team to strengthen capacity, validate and, if necessary, propose revisions to the audit manual; Prepare guidelines in applying the revised audit manual, and computerized audit monitoring system; Prepare recommendations regarding FAPAD s audit focus for foreign-aided projects, develop a model audit report and a model audit plan; Support the development of the capacity development and training plans; and Implement the capacity development and training plans to enhance FAPAD staff capacity in a range of areas required to support the audit process. E. National Deputy Team Leader and Strategic Planning, Institutional Strengthening and Result-based Management Specialist (8 person-months) 5. It is proposed that this specialist, in line with the team leader s inputs, will have three inputs 4 person-months at the beginning to assist in preparing the inception report, project setup and work plan, and work on output 1 (IMED strategic plan); 2 months during the middle of the project to prepare the midterm report and work with the capacity development team as well as follow up any pending reform agenda; and 2 months at the end to see the completion of the project and assist in preparing the final report. This is a tentative proposal subject to work plan finalization. The specialist will have the following responsibilities: Assist the team leader in conducting a series of participatory strategic planning workshops involving IMED staff and other stakeholders; Review reports relevant to reforms in IMED including recommendations from the SPPP workshop of January 2006 and IMED road map prepared in 2004; In line with the outcome of the participatory workshops, assist in preparing a strategic plan document delineating short-, medium- and long-term actions for IMED, which will form the basis of a specific divisional plan for IMED in the future;

15 Appendix 3 13 (vii) (viii) (ix) (x) (xi) Assist the team leader in collecting best practices on M&E and RBM from the region and globally and disseminate them through workshops to serve as inputs in developing the IMED reform recommendations; Mentor IMED staff in preparing strategic plans as a capacity development activity; Following the series of workshops, assist in preparing recommendations appropriate to IMED s structure, functions, mandate, locus, reporting relationship and IMED s potential linkages with line ministries and EAs; In conjunction with the team leader, consult various development partners and other stakeholders regularly on the project activities and seek suggestions for inclusion in the recommendations for IMED reforms; Assist the team leader in preparing an implementation plan for phased implementation of reforms; Assist in conducting workshops related to IMED reforms and strategic plan; Assist the team leader in designing, through a participatory capacity development exercise, two sets of result-based M&E framework relevant to the social sector and infrastructure projects that can measure outcomes and impacts, as well as support the monitoring of the Millennium Development Goals and the poverty reduction strategy; Assist in preparing reports. F. National Capacity Development and Training Specialist (8 person-months) 6. The specialist will work in tandem with the international expert in two areas, output 2 (capacity needs assessment and implementation of the capacity development and training plans), and output 4 (enhancing FAPAD s audit management). The inputs for this position will be organized as follows first mission for uninterrupted 4 months, and three inputs of 1 to 2 months each during months This is a tentative proposal subject to work plan finalization. The specialist will have the following responsibilities: Design and conduct a series of capacity development and training activities in M&E, RBM, change management, and other relevant areas; Review relevant reports on training needs and capacity development prepared under the SPPP; Assess the absorptive capacity of IMED and FAPAD staff and their current skills and other aspects not covered under the SPPP, including requirements for English report writing, or earlier support, relevant to their capacity development; Assess the appropriateness of twinning arrangements with external agencies overseas and establishment of a special training and research unit within IMED; Prepare the capacity development and training plans for IMED, FAPAD, and line ministry staff; and Develop appropriate mentoring tools for IMED, FAPAD, and line ministry staff. G. National MIS/Training Specialist (14 person-months) 7. The specialist will work with the international expert for a total of 14 person-months input involving planning, training, and implementing the MIS components. The 14 person-months may be divided into several inputs. This is a tentative proposal subject to work plan finalization. The specialist will have the following responsibilities: Conduct participatory workshops involving IMED and other stakeholders, such as the line ministries, relevant EAs, development partners, and ICT task force; Review all relevant reports including recommendations of the SPPP and SICT to avoid duplication of efforts and repetition of earlier activities;

16 Appendix 3 14 (vii) (viii) (ix) (x) Prepare an MIS expansion plan in close conjunction with the government counterparts and development partners and the ICT task force; Review the information needs for effective result-based project monitoring at different levels of the government, including IMED, and suggest measures to establish adequate information flow; Review required hardware and network setup for CAG and FAPAD s proposed computerized audit monitoring system, and propose upgrading, if required; Prepare a conceptual and functional design for upgrading the existing IMED MISs and make them part of the integrated MIS by establishing web interfaces with other automated systems of the government; Upgrade and expand the campus network of the Planning Commission campus; Establish a wide area network with key ministries of the government and key executing agencies utilizing already existing such networks where possible; Develop training materials for the upgraded MIS; and Assist in procuring necessary hardware and software required to upgrade the MIS and networks. (Note: Most of the funding for MIS hardware and software will be provided by other development partner projects and the Government of Bangladesh while some funds will be procured through this TA.) H. National Audit Specialist (10 person-months) 8. This position will provide initially 2 person-months for the review and preparation activities for output 4 (enhancing FAPAD s audit management), and an input of 8 personmonths during the implementation of the capacity development and training plans. This is a tentative proposal subject to work plan finalization. The specialist will have the following responsibilities: Assist in reviewing the impact of all project support to FAPAD, including the SPPP, and the FAPAD component of the World Bank-supported Computerization of Project Accounts Manual, Development of Asset Management, and Reforming Project Audit Methodology Project; Assist in trial pilot audits with the FAPAD audit team so as to strengthen capacity, validate, and, if necessary, propose revisions to the audit manual; Assist in preparing guidelines in applying the revised audit manual, and computerized audit monitoring system; Assist in preparing recommendations regarding FAPAD s audit focus for foreignaided projects, and develop a model audit report and a model audit plan; Support the development of the capacity development and training plans; and Support the implementation of the capacity development and training plans to enhance FAPAD staff capacity in a range of areas required to support the audit process. I. Reporting Requirements 9. The consultants will submit hard copies of the following reports to ADB (3 copies) and to the EA (20 copies): inception report, within 4 weeks of mobilization; monthly reports; draft strategic plan for IMED, within 3 months of mobilization; draft capacity development and training plans for FAPAD, within 2 months of mobilization; draft capacity development and training plans for IMED, within 3 months of mobilization; draft final report, 3 weeks before end of contract; and (vii) final report incorporating comments from the EA and ADB, prior to the closing of the TA. All reports will, in addition, be submitted in editable format on CD-ROM to ADB and the EA.

How To Help The Republic Of The Maldives

How To Help The Republic Of The Maldives Technical Assistance Report Project Number: 47150 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Maldives: Enhancing Tax Administration Capacity (Financed by the Japan Fund

More information

Republic of the Union of Myanmar: Support for Strengthening Public Debt Management

Republic of the Union of Myanmar: Support for Strengthening Public Debt Management Technical Assistance Report Project Number: 47225 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Union of Myanmar: Support for Strengthening Public Debt Management The views

More information

The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency

The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency Technical Assistance Report Project Number: 40137 December 2006 The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency The views expressed herein

More information

Papua New Guinea: Supporting Public Financial Management, Phase 2

Papua New Guinea: Supporting Public Financial Management, Phase 2 Technical Assistance Report Project Number: 44379 012 Capacity Development Technical Assistance (CDTA) November 2012 Papua New Guinea: Supporting Public Financial Management, Phase 2 The views expressed

More information

Technical Assistance Report. Project Number: 38281 December 2005. Technical Assistance Republic of the Philippines: Debt and Risk Management Project

Technical Assistance Report. Project Number: 38281 December 2005. Technical Assistance Republic of the Philippines: Debt and Risk Management Project Technical Assistance Report Project Number: 38281 December 2005 Technical Assistance Republic of the Philippines: Debt and Risk Management Project CURRENCY EQUIVALENTS (as of 24 November 2005) Currency

More information

Mongolia: Strengthening the Health Insurance System

Mongolia: Strengthening the Health Insurance System Technical Assistance Report Project Number: 47007 Capacity Development Technical Assistance (CDTA) September 2013 Mongolia: Strengthening the System (Financed by the Japan Fund for Poverty Reduction) The

More information

Asia Pacific Public Electronic Procurement Network

Asia Pacific Public Electronic Procurement Network Technical Assistance Report Project Number: 47192-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2013 Asia Pacific Public Electronic Procurement Network (Cofinanced by the Republic

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Strengthening Economic Management Program II (RRP BHU 46371-002) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The Ministry of Finance (MOF) of the Government of Bhutan requested capacity development

More information

Technical Assistance Report. Project Number: 42532 December 2008. Public Debt and Risk Management Forum

Technical Assistance Report. Project Number: 42532 December 2008. Public Debt and Risk Management Forum Technical Assistance Report Project Number: 42532 December 2008 Public Debt and Risk Management Forum ABBREVIATIONS ADB ADF Asian Development Bank Asian Development Fund DMC PDRM SDR developing member

More information

Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation

Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation Technical Assistance Report Project Number: 46231 Policy and Advisory Technical Assistance (PATA) December 2012 Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation (Financed

More information

ASIAN DEVELOPMENT BANK TAR:PRC 34096-02

ASIAN DEVELOPMENT BANK TAR:PRC 34096-02 ASIAN DEVELOPMENT BANK TAR:PRC 34096-02 TECHNICAL ASSISTANCE TO THE PEOPLE'S REPUBLIC OF CHINA FOR POLICY AND INSTITUTIONAL SUPPORT FOR SOCIAL INSURANCE ADMINISTRATION October 2003 CURRENCY EQUIVALENTS

More information

People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas

People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas Technical Assistance Report Project Number: 48022 Policy and Advisory Technical Assistance (PATA) August 2014 People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: TAJ 37040 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF TAJIKISTAN FOR IMPROVING THE ACCOUNTING AND FINANCIAL MANAGEMENT SYSTEM OF THE SUBSIDIARIES

More information

Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm)

Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) a. Background: 1. The GoB in accordance with its Public Financial Management (PFM) Strategy & Vision and Medium

More information

Greater Mekong Subregion Phnom Penh Plan for Development Management V

Greater Mekong Subregion Phnom Penh Plan for Development Management V Technical Assistance Report Project Number: 46232-001 Regional Capacity Development Technical Assistance (R-CDTA) November 2012 Greater Mekong Subregion Phnom Penh Plan for Development Management V (Cofinanced

More information

People s Republic of China: Design of the National Sulfur Dioxide Emission Trading System

People s Republic of China: Design of the National Sulfur Dioxide Emission Trading System Technical Assistance Report Project Number: 42056 Capacity Development Technical Assistance (CDTA) December 2008 People s Republic of China: Design of the National Sulfur Dioxide Emission Trading System

More information

Technical Assistance for Socioeconomic Impact of Road Crashes (Financed by the Poverty Reduction Cooperation Fund)

Technical Assistance for Socioeconomic Impact of Road Crashes (Financed by the Poverty Reduction Cooperation Fund) Technical Assistance TAR: STU 38081 Technical Assistance for Socioeconomic Impact of Road Crashes (Financed by the Poverty Reduction Cooperation Fund) October 2005 ABBREVIATIONS ADB Asian Development Bank

More information

Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy

Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy Technical Assistance Report Project Number: 46347 Policy and Advisory Technical Assistance (PATA) February 2013 Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy (Financed

More information

TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project)

TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project) TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project) A. Methodology and Key Activities 1. The Asian Development Bank (ADB) will engage a qualified team of consultants in

More information

Draft Resolution on Science, technology and innovation for development

Draft Resolution on Science, technology and innovation for development 1 Draft Resolution on Science, technology and innovation for development The Economic and Social Council, Recognizing the role of the Commission on Science and Technology for Development as the United

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 39572 January 2006 Technical Assistance Democratic Socialist Republic of Sri Lanka: Microinsurance Sector Development (Financed by the Poverty Reduction Cooperation

More information

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE

More information

Kyrgyz Republic: Implementing the e-procurement System

Kyrgyz Republic: Implementing the e-procurement System Technical Assistance Report Project Number: 46397-001 Capacity Development Technical Assistance (CDTA) December 2012 Kyrgyz Republic: Implementing the e-procurement System The views expressed herein are

More information

Mongolia: Strengthening the Capacity of Judicial Training

Mongolia: Strengthening the Capacity of Judicial Training Technical Assistance Report Project Number: 49189-001 Capacity Development Technical Assistance (CDTA) November 2015 Mongolia: Strengthening the Capacity of Judicial Training This document is being disclosed

More information

OUTPUT: RURAL ROAD ASSET MANAGEMENT

OUTPUT: RURAL ROAD ASSET MANAGEMENT Rural Roads Improvement Project II (RRP CAM 42334) OUTPUT: RURAL ROAD ASSET MANAGEMENT A. Introduction 1. The Project. The Royal Government of Cambodia (the Government) has requested for a loan from Asian

More information

ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN

ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN Darkhan Wastewater Management Project (RRP MON 37697) ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN A. Introduction 1. The capacity development technical assistance

More information

Supporting the Asian EXIM Banks Forum

Supporting the Asian EXIM Banks Forum Technical Assistance Report Project Number: 48430-001 Regional Capacity Development Technical Assistance (R-CDTA) October 2015 Supporting the Asian EXIM Banks Forum (Financed by the People s Republic of

More information

Technical Assistance Consultant s Report

Technical Assistance Consultant s Report Technical Assistance Consultant s Report Project Number: 45280 June 2012 Socialist Republic of Viet Nam: Support to Improve Portfolio Performance and Aid Effectiveness (Financed by ADB s Technical Assistance

More information

Strengthening Project Preparation Capacity in Asia and the Pacific

Strengthening Project Preparation Capacity in Asia and the Pacific Technical Assistance Report Project Number: 49407-001 Cluster Capacity Development Technical Assistance (C-CDTA) January 2016 Strengthening Project Preparation Capacity in Asia and the Pacific Distribution

More information

New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department

New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department New JICA Guidelines for Project Evaluation First Edition Japan International Cooperation Agency (JICA) Evaluation Department June 2010 Contents 1 OVERVIEW OF AID EVALUATION AND JICA'S PROJECT EVALUATION...

More information

Consulting Opportunities in Jordan Sustaining and Extending Technical Vocational Education and Training Project (No. 774C)

Consulting Opportunities in Jordan Sustaining and Extending Technical Vocational Education and Training Project (No. 774C) Consulting Opportunities in Jordan Sustaining and Extending Technical Vocational Education and The Association of Canadian Community Colleges (ACCC) is currently implementing a CIDA funded project in Jordan.

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTING SERVICES

OUTLINE TERMS OF REFERENCE FOR CONSULTING SERVICES A. Introduction OUTLINE TERMS OF REFERENCE FOR CONSULTING SERVICES 1. Interdisciplinary international and national consultants with extensive experience in climate change planning, project planning and

More information

Section 7. Terms of Reference

Section 7. Terms of Reference APPENDIX-A TERMS OF REFERENCE UNION-LEVEL TECHNICAL ASSISTANCE TO PROVIDE INSTITUTIONAL SUPPORT TO THE MYANMAR NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT I. INTRODUCTION IDA GRANT H814MM FY 2013-16

More information

PROJECT FICHE 3.2.1.2

PROJECT FICHE 3.2.1.2 PROJECT FICHE 3.2.1.2 TO ACTION PROGRAMME 2005 FOR THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Title Combating money laundering (phase II) Total cost EC contribution: 1.5 million (approx) Aid Method Project

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI No. 2.02 Page 1 of 10 PREPARING FOR CONSULTANT RECRUITMENT 1. This project administration instruction (PAI) guides the recruiting party in preparing for consultant

More information

NAIROBI CITY COUNTY NAIROBI COUNTY PUBLIC SERVICE BOARD

NAIROBI CITY COUNTY NAIROBI COUNTY PUBLIC SERVICE BOARD NAIROBI CITY COUNTY Telephone: 020 2177325 web: www.nairobi.go.ke City Hall, P. O. Box 30075-00100, Nairobi, KENYA. NAIROBI COUNTY PUBLIC SERVICE BOARD VACANCIES IN NAIROBI CITY COUNTY GOVERNMENT The Nairobi

More information

Terms of Reference Independent Completion Report (ICR) for ADB Infrastructure Technical Assistance

Terms of Reference Independent Completion Report (ICR) for ADB Infrastructure Technical Assistance Terms of Reference Independent Completion Report (ICR) for ADB Infrastructure Technical Assistance Background Program overview Timor-Leste has critical infrastructure needs given the widespread destruction

More information

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013. Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for

More information

SECTOR ASSESMENT (SUMMARY): EDUCATION 1

SECTOR ASSESMENT (SUMMARY): EDUCATION 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESMENT (SUMMARY): EDUCATION 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Country context. In Viet Nam, education is

More information

Nepal: Mainstreaming Climate Change Risk Management in Development

Nepal: Mainstreaming Climate Change Risk Management in Development Technical Assistance Report Project Number: 44168 Capacity Development Technical Assistance (CDTA) November 2011 Nepal: Mainstreaming Climate Change Risk Management in Development (Financed by the Strategic

More information

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES)

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES) REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES) Consultancy services for Systems Integration and IT project management Client: Central Bank of Yemen Country: Republic of Yemen Project: Financial

More information

Part 1. MfDR Concepts, Tools and Principles

Part 1. MfDR Concepts, Tools and Principles Part 1. Concepts, Tools and Principles 3 Overview Part 1. MfDR Concepts, Tools and Principles M anaging for Development Results (MfDR) is multidimensional, relating back to concepts about how to make international

More information

Deposit Insurance Establishment (Financed by the People s Republic of China Regional Cooperation and Poverty Reduction Fund)

Deposit Insurance Establishment (Financed by the People s Republic of China Regional Cooperation and Poverty Reduction Fund) Technical Assistance Report Project Number: 43074 Regional Policy and Advisory Technical Assistance (R-PATA) August 2009 Deposit Insurance Establishment (Financed by the People s Republic of China Regional

More information

Performance Monitoring and Evaluation System (PMES) Framework Document

Performance Monitoring and Evaluation System (PMES) Framework Document Performance Monitoring and Evaluation System (PMES) Framework Document Performance Management and Evaluation Unit Cabinet Support and Policy Division Cabinet Office 8 th November 2010 Table of Contents

More information

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE DEVELOPMENT ASSISTANCE COMMITTEE PARIS, 1991 DAC Principles for Evaluation of Development Assistance Development Assistance Committee Abstract: The following

More information

TECHNICAL COOPERATION PROFILE (EC-T1198)

TECHNICAL COOPERATION PROFILE (EC-T1198) ECUADOR TECHNICAL COOPERATION PROFILE (EC-T1198) I. BASIC PROJECT DATA Country: Republic of Ecuador Program Name/Number: Team Leader/Members: Beneficiary: Executing Agency: Amount and source of funding:

More information

PROGRAM IMPLEMENTATION SCHEDULE

PROGRAM IMPLEMENTATION SCHEDULE Water Sector Improvement Program (RRP PAL 44031) A. Program Description PROGRAM IMPLEMENTATION SCHEDULE 1. The Program will support reform of the water and sanitation sector, focusing on improving policy

More information

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows JOB DESCRIPTION Position: Location of position: Reporting to: Special functional relationships: Term of Appointment: Programme Manager/Procurement Specialist Suva Capital Works Manager Capital Works Programme

More information

Technical Assistance TAR: TAJ 33042

Technical Assistance TAR: TAJ 33042 Technical Assistance TAR: TAJ 33042 Technical Assistance to the Republic of Tajikistan for Farm Analysis and Awareness-Raising for Debt Resolution (Financed by the Poverty Reduction Cooperation Fund) October

More information

SUMMARY TECHNICAL ASSISTANCE SUPPORTING THE URBAN PRIMARY HEALTH CARE SERVICES DELIVERY PROJECT

SUMMARY TECHNICAL ASSISTANCE SUPPORTING THE URBAN PRIMARY HEALTH CARE SERVICES DELIVERY PROJECT SUMMARY TECHNICAL ASSISTANCE Urban Primary Health Care Services Delivery Project (RRP BAN 42177) SUPPORTING THE URBAN PRIMARY HEALTH CARE SERVICES DELIVERY PROJECT A. Background 1. The attached technical

More information

TECHNICAL ASSISTANCE FOR IMPROVING RURAL AND WOMEN S SMALL BUSINESSES ACCESS TO FINANCE

TECHNICAL ASSISTANCE FOR IMPROVING RURAL AND WOMEN S SMALL BUSINESSES ACCESS TO FINANCE Small Business and Entrepreneurship Development Project (RRP UZB 42007-014) Supplementary Document TECHNICAL ASSISTANCE FOR IMPROVING RURAL AND WOMEN S SMALL BUSINESSES ACCESS TO FINANCE COST ESTIMATES

More information

SECTOR ASSESSMENT (SUMMARY): EDUCATION 1

SECTOR ASSESSMENT (SUMMARY): EDUCATION 1 Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): EDUCATION 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh has made considerable progress

More information

Municipal Accounting ULB Level Reform

Municipal Accounting ULB Level Reform ULB Level Reform 1. The Reform In terms of the recommendations of the National Municipal Accounts Manual (NMAM) released by the Ministry of Urban Development MoUD, Government of India decided to introduce

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 49342-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2015 Implementing Information and Communication Technology Tools to Improve Data

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The finance sector in Bangladesh is diverse,

More information

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK Annex C PROGRESS REPORT ON MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK PREPARED FOR THE SECOND INTERNATIONAL ROUNDTABLE ON MANAGING FOR DEVELOPMENT RESULTS FEBRUARY 2004 Annex C CONTENTS

More information

CHAPTER 1: INTRODUCTION 1.1 BACKGROUND TO VFM AND POLICY REVIEW INITIATIVE

CHAPTER 1: INTRODUCTION 1.1 BACKGROUND TO VFM AND POLICY REVIEW INITIATIVE CHAPTER 1: INTRODUCTION 1.1 BACKGROUND TO VFM AND POLICY REVIEW INITIATIVE In 1996, the Co-ordinating Group of Departmental Secretaries established under the Strategic Management Initiative (SMI) in their

More information

(Cofinanced by the Government of Sweden and Credit Suisse AG)

(Cofinanced by the Government of Sweden and Credit Suisse AG) Technical Assistance Report Project Number: 46240 Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Inclusive Business Support (Cofinanced by the Government of Sweden and Credit

More information

Nepal: Preparation of the Agricultural Development Strategy

Nepal: Preparation of the Agricultural Development Strategy Technical Assistance Report Project Number: 43447 Policy and Advisory Technical Assistance (PATA) December 2010 Nepal: Preparation of the Agricultural Development Strategy (Cofinanced by the International

More information

Ahmed Ataul Hakeem, FCMA Comptroller & Auditor General of Bangladesh

Ahmed Ataul Hakeem, FCMA Comptroller & Auditor General of Bangladesh Ahmed Ataul Hakeem, FCMA Comptroller & or General of Bangladesh Comptroller & or General: Introduction The Supreme Institution of Bangladesh Mandate & Authority derived from the Constitution Not under

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

Guidance on the Governance and Management of Evaluations of Horizontal Initiatives

Guidance on the Governance and Management of Evaluations of Horizontal Initiatives Guidance on the Governance and Management of Evaluations of Horizontal Initiatives Centre of Excellence for Evaluation Expenditure Management Sector Treasury Board of Canada Secretariat Her Majesty the

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC RESOURCE MANAGEMENT. 1. Public Resource Management Sector Issues and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC RESOURCE MANAGEMENT. 1. Public Resource Management Sector Issues and Opportunities Country Partnership Strategy: SRI, 2012 2016 SECTOR ASSESSMENT (SUMMARY): PUBLIC RESOURCE MANAGEMENT 1. Public Resource Management Sector Issues and Opportunities 1. The problems in Sri Lanka are multifaceted

More information

Revised Scheme of Service. for Accountants

Revised Scheme of Service. for Accountants REPUBLIC OF KENYA Revised Scheme of Service for Accountants April, 2009 ISSUED BY THE PERMANENT SECRETARY, MINISTRY OF STATE FOR PUBLIC SERVICE OFFICE OF THE PRIME MINISTER NAIROBI 2 3 REVISED SCHEME OF

More information

International environmental governance. Bali Strategic Plan for Technology Support and Capacity-building

International environmental governance. Bali Strategic Plan for Technology Support and Capacity-building UNITED NATIONS UNEP/GC.23/6/Add.1 EP Governing Council of the United Nations Environment Programme Distr.: General 23 December 2004 Original: English Twenty-third session of the Governing Council/ Global

More information

Republic of the Philippines: Strengthening Evaluation and Fiscal Cost Management of Public Private Partnerships

Republic of the Philippines: Strengthening Evaluation and Fiscal Cost Management of Public Private Partnerships Technical Assistance Report Project Number: 47230-001 Capacity Development Technical Assistance (CDTA) April 2014 Republic of the Philippines: Strengthening Evaluation and Fiscal Cost Management of Public

More information

Office of Internal Audit and Investigations (OIAI) Report 2012/27. Report on an Audit of the Budgeting Process in UNICEF.

Office of Internal Audit and Investigations (OIAI) Report 2012/27. Report on an Audit of the Budgeting Process in UNICEF. Office of Internal Audit and Investigations (OIAI) Report 2012/27 Report on an Audit of the Budgeting Process in UNICEF October 2012 Report on an Audit of the Budgeting Process in UNICEF (2012/27) 1 Executive

More information

TERMS OF REFERENCE TO DEVELOP THE MANAGEMENT INFORMATION SYSTEM AND PROVIDE TECHNICAL SUPPORT FOR THE CONDITIONAL CASH TRANSFER PROGRAM IN BANGLADESH

TERMS OF REFERENCE TO DEVELOP THE MANAGEMENT INFORMATION SYSTEM AND PROVIDE TECHNICAL SUPPORT FOR THE CONDITIONAL CASH TRANSFER PROGRAM IN BANGLADESH TERMS OF REFERENCE TO DEVELOP THE MANAGEMENT INFORMATION SYSTEM AND PROVIDE TECHNICAL SUPPORT FOR THE CONDITIONAL CASH TRANSFER PROGRAM IN BANGLADESH I. INTRODUCTION International Firm Bangladesh spent

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS OUTLINE TERMS OF REFERENCE FOR CONSULTANTS A. Introduction 1. A team of individual consultants will be engaged to support a range of activities under the Central Asia Regional Economic Cooperation (CAREC)

More information

ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS. Terms of Reference

ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS. Terms of Reference CAPACITY-BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT PROJECT ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS Terms of Reference Background: The

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and

More information

A NEW DEAL for engagement in fragile states

A NEW DEAL for engagement in fragile states A NEW DEAL for engagement in fragile states THE FACTS 1.5 billion people live in conflict-affected and fragile states. About 70% of fragile states have seen conflict since 1989. Basic governance transformations

More information

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business

More information

KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results

KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI 2: Corporate strategy and mandate KPI 3: Corporate focus on results KPI 4: Focus

More information

Sixth Meeting of Working Group III 29 April 2008 Human Resources Management Strategy and Policy

Sixth Meeting of Working Group III 29 April 2008 Human Resources Management Strategy and Policy Sixth Meeting of Working Group III 29 April 2008 Human Resources Management Strategy and Policy Background 1. In its report to the Conference, the Independent External Evaluation (IEE) team indicated that

More information

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Kyrgyz Republic, 2013 2017 SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and

More information

Work Plan for 2015 2016: Enhancing Audit Quality and Preparing for the Future. The IAASB s Work Plan for 2015 2016 December 2014

Work Plan for 2015 2016: Enhancing Audit Quality and Preparing for the Future. The IAASB s Work Plan for 2015 2016 December 2014 The IAASB s Work Plan for 2015 2016 December 2014 International Auditing and Assurance Standards Board Work Plan for 2015 2016: Enhancing Audit Quality and Preparing for the Future This document was developed

More information

UNICEF International Public Sector Accounting Standards (IPSAS) Project Implementation Plan July 2009

UNICEF International Public Sector Accounting Standards (IPSAS) Project Implementation Plan July 2009 UNICEF International Public Sector Accounting Standards (IPSAS) Project Implementation Plan July 2009 I. Introduction The adoption of IPSAS by UNICEF represents major organisational change. This implementation

More information

QUAๆASSURANCE IN FINANCIAL AUDITING

QUAๆASSURANCE IN FINANCIAL AUDITING Table of contents Subject Page no. A: CHAPTERS Foreword 5 Section 1: Overview of the Handbook 6 Section 2: Quality Control and Quality Assurance 8 2. Quality, quality control and quality assurance 9 2.1

More information

4: Proposals for Best Practice Principles for GHP activities at country level

4: Proposals for Best Practice Principles for GHP activities at country level DOC 2.05-8.1 From: WORKING GROUP ON GLOBAL HEALTH PARTNERSHIPS: REPORT --- BEST PRACTICE PRINCIPLES FOR GLOBAL HEALTH PARTNERSHIP ACTIVITIES AT COUNTRY LEVEL (Oct. 2005) 4: Proposals for Best Practice

More information

STANDARD TWINNING LIGHT PROJECT FICHE

STANDARD TWINNING LIGHT PROJECT FICHE STANDARD TWINNING LIGHT PROJECT FICHE 1. Basic Information 1.1 Programme: IPA 2011 1.2 Twinning Number: HR/2011/IB/OT/01 TWL 1.3 Title: Capacity Building of the National School for Public Administration

More information

Malaysia: Integrated Results-Based Management the Malaysia Experience

Malaysia: Integrated Results-Based Management the Malaysia Experience Malaysia: Integrated Results-Based Management the Malaysia Experience Koshy Thomas, (Deputy Undersecretary, Tax Division, Ministry of Finance) The Malaysia Modified Budgeting System (MBS) provides greater

More information

World Bank s Broad Objectives of Public Financial Management (PFM)

World Bank s Broad Objectives of Public Financial Management (PFM) 1 World Bank s Broad Objectives of Public Financial Management (PFM) Achieve overall fiscal discipline Allocation of resources to priority needs Efficient and effective allocation of public services 2

More information

KINGDOM OF CAMBODIA NATION- RELIGION-KING MINISTRY OF ECONOMY AND FINANCE MANUAL STANDARD OPERATING PROCEDURES. For

KINGDOM OF CAMBODIA NATION- RELIGION-KING MINISTRY OF ECONOMY AND FINANCE MANUAL STANDARD OPERATING PROCEDURES. For KINGDOM OF CAMBODIA NATION- RELIGION-KING MINISTRY OF ECONOMY AND FINANCE MANUAL On STANDARD OPERATING PROCEDURES For EXTERNALLY FINANCED PROJECTS/PROGRAMS IN CAMBODIA TABLE OF CONTENTS ABBREVIATIONS

More information

CARIBBEAN DEVELOPMENT BANK STATUS REPORT ON THE IMPLEMENTATION OF THE GENDER POLICY AND OPERATIONAL STRATEGY

CARIBBEAN DEVELOPMENT BANK STATUS REPORT ON THE IMPLEMENTATION OF THE GENDER POLICY AND OPERATIONAL STRATEGY SDF 8/2-NM-4 CARIBBEAN DEVELOPMENT BANK SPECIAL DEVELOPMENT FUND (UNIFIED) STATUS REPORT ON THE IMPLEMENTATION OF THE GENDER POLICY AND OPERATIONAL STRATEGY Revised APRIL 2012 ABBREVIATIONS AMT - Advisory

More information

Guidance Note on Developing Terms of Reference (ToR) for Evaluations

Guidance Note on Developing Terms of Reference (ToR) for Evaluations Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim

More information

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,

More information

Scope of Work Microsoft Infrastructure Upgrade

Scope of Work Microsoft Infrastructure Upgrade Introduction Scope of Work Microsoft Infrastructure Upgrade The University of Texas M. D. Anderson Cancer Center (M. D. Anderson) in Houston, Texas, celebrating six decades of Making Cancer History, is

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES Headquarters, Copenhagen O.D. No. 33 16 April 2010 ORGANIZATIONAL DIRECTIVE No. 33 UNOPS Strategic Risk Management Planning Framework 1. Introduction 1.1.

More information

U.S. DEPARTMENT OF THE INTERIOR SENIOR LEVEL AND SCIENTIFIC AND PROFESSIONAL PERFORMANCE AGREEMENT AND APPRAISAL SYSTEM.

U.S. DEPARTMENT OF THE INTERIOR SENIOR LEVEL AND SCIENTIFIC AND PROFESSIONAL PERFORMANCE AGREEMENT AND APPRAISAL SYSTEM. ` U.S. DEPARTMENT OF THE INTERIOR SENIOR LEVEL AND SCIENTIFIC AND PROFESSIONAL PERFORMANCE AGREEMENT AND APPRAISAL SYSTEM Table of Contents Page Section I. Authority and Purpose 1 Section II. Coverage

More information

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Contents Page 7.0 MONITORING, REPORTING AND EVALUATION See the New M & E Framework. 7.1 Policy framework 7.1.1 General policy statements 7.1.2 Coverage

More information

Project Management Specialist (Health) Type of vacancy:

Project Management Specialist (Health) Type of vacancy: Solicitation is open to: Position Title: Type of vacancy: Afghan Nationals ONLY Project Management Specialist (Health) Single Opening date: June 18, 2014 Closing date: July 09, 2014 Vacancy announcement

More information

Scheme of Service. for. Counselling Personnel

Scheme of Service. for. Counselling Personnel REPUBLIC OF KENYA Scheme of Service for Counselling Personnel October, 2009 APPROVED BY THE PUBLIC SERVICE COMMISSION OF KENYA AND ISSUED BY THE PERMANENT SECRETARY MINISTRY OF STATE FOR PUBLIC SERVICE

More information

Rwanda Governance Board Ikigo cy Igihugu Gishinzwe Imiyoborere Office Rwandais de la Gouvernance JOB ANNOUNCEMENT

Rwanda Governance Board Ikigo cy Igihugu Gishinzwe Imiyoborere Office Rwandais de la Gouvernance JOB ANNOUNCEMENT Rwanda Governance Board Ikigo cy Igihugu Gishinzwe Imiyoborere Office Rwandais de la Gouvernance JOB ANNOUNCEMENT Reference made to the Cabinet resolution of 15th December 2014 which approved the new structure,

More information

Independent State of Samoa: Ports Development Master Plan

Independent State of Samoa: Ports Development Master Plan Technical Assistance Report Project Number: 47358-001 Policy and Advisory Technical Assistance (PATA) April 2015 Independent State of Samoa: Ports Development Master Plan The views expressed herein are

More information

FORMULATING HUMAN RESOURCE DEVELOPMENT POLICY FOR THE PUBLIC SERVICE (KENYAN CASE)

FORMULATING HUMAN RESOURCE DEVELOPMENT POLICY FOR THE PUBLIC SERVICE (KENYAN CASE) CAPACITY BUILDING FOR HUMAN RESOURCE DEVELOPMENT POLICY AND STRATEGY IN PUBLIC SERVICE IN AFRICA WORKSHOP FORMULATING HUMAN RESOURCE DEVELOPMENT POLICY FOR THE PUBLIC SERVICE (KENYAN CASE) PRESENTED BY:

More information

TERMS OF REFERENCE FOR CERTIFICATION BODIES (CBs)

TERMS OF REFERENCE FOR CERTIFICATION BODIES (CBs) TERMS OF REFERENCE FOR CERTIFICATION BODIES (CBs) AUGUST 2014 1. Introduction National Information Technology Authority (NITA-U) was established by the Act of Parliament (National Information Technology

More information

ii. Project Finance Specialist (national consultant; 9 person-months; intermittent).

ii. Project Finance Specialist (national consultant; 9 person-months; intermittent). 1 ADDITIONAL CONSULTANTS FOR THE PUBLIC PRIVATE PARTNERSHIP CENTER AND THE DEPARTMENT OF FINANCE 1. Expansion of the PPP Center s consultant pool is proposed to strengthen PPP Center s capacity in thematic

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section J1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction PROJECT

More information

Vietnam's Experiences in Strengthening. Procurement and Public Financial Management Systems. in Harmonization, Alignment and Capacity Development

Vietnam's Experiences in Strengthening. Procurement and Public Financial Management Systems. in Harmonization, Alignment and Capacity Development Vietnam's Experiences in Strengthening Procurement and Public Financial Management Systems in Harmonization, Alignment and Capacity Development Mr. Chairman, Ladies and gentlemen, Dr. Duong Duc Ung Director

More information