1 Kalamunda Builds Asset Management Strategy to 2023 A Plan to ensure Sustainable Community Infrastructure

2

3 Contents Page 1. Introduction Purpose & Objective Of The Strategy Key Strategices Key Benefits Of The Strategy Implementation Corporate Asset Management System 4 2. Strategies 5 3. Asset Management Process Key Performance Indicators Strategy Review References 17 Attachment 1: Background Community Profile Strategic Asset Management Within the Integrated Planning Framework Alignment With The National Asset Management Framework Roles And Responsibilities Legislative Control Of Asset Management 22 Attachment 2: Current Position & Status Of The Shire s Asset Planning Shire s Asset Stock Asset Stock & Replacement Costs Levels Of Service Snapshot Of Health Of Asset Stock Asset Management Maturity Measuring The Shire s Asset Management Maturity Snapshot Of Asset Management Issues Facing The Shire 31 Attachment 3: Long-Term Projections 32 Attachment 4: Asset Management Maturity Matrix 36 3

4 4 The objective of this Asset Management Strategy is to develop a structured set of key actions.

5 1.0 Introduction 1.1 Purpose & Objective of the Strategy The purpose of this Asset Management Strategy (AMS) is to provide a framework for the Shire of Kalamunda (the Shire) to meet its statutory obligations with respect to the Integrated Planning and Reporting Framework and Guidelines being introduced in Western Australia as part of the State Government s Local Government Reform Program. These reporting requirements and guidelines will be reflected in strategic asset management documents. The objective of this Asset Management Strategy is to develop a structured set of key actions to enable the Shire to improve its asset management practices in line with the Shire s Strategic Community Plan to 2023 and Asset Management Policy. The AMS together with a subsequent Asset Management Plan (AMP) for each asset class will provide the Shire with the comprehensive information and knowledge necessary for its short-term and long-term service delivery and asset management planning. Figure 1 Elements of WA Asset Management Framework Department of Local Government Asset Management Framework and Guidelines May

6 1.2 Key Strategies This Asset Management Strategy proposes the following nine Strategies Strategy 1: Asset Management Steering Group Strategy 2: Roles, Responsibilities and Skills Strategy 3: Asset Information Strategy 4: Hierarchy Strategy 5: Risk Management Strategy 6: Quality / Standards Strategy 7: Systems and Integration Strategy 8: Renewal vs New Assets / Funding Strategy 9: Continuous Improvement To be successful, it is impor tant that the community infrastructure is provided and maintained at a reasonable level. 2

7 1.3 Key Benefits of the Strategy Implementation In its Strategic Community Plan to 2023, the Shire has established six strategic priorities. For Strategic Priority 4 Kalamunda Develops: Using our land and assets diversely and effectively, a set of objectives for asset management including indicators have been developed, and will be measured and reported annually. To be successful, it is important that community infrastructure is provided and maintained at a reasonable level, commensurate with community expectations, technical requirements and affordability. Additionally, it will be necessary to implement strategies to enable the Shire to determine options for maintaining, refurbishing, upgrading, timely disposal and, when required, acquisition of infrastructure assets. Thus, the Shire has a critical need to adopt good asset management practices. By implementing this Strategy, the Shire is aiming to improve its asset management practices to provide a more sustainable service delivery process. The key benefits are: The ability to provide better outputs with fewer resources by better aligning the Shire s resources and needs. The ability to understand what condition the Shire s assets are in and to monitor the effect the Shire s actions are having on them. Having a key set of actions that will allow the Shire to manage the provision of these assets into the future at optimal long-term cost. Being able to determine appropriate levels of funding for operational actions on each asset class in line with service level targets. Being able to clearly define what service levels the Shire can deliver to the Shire s customers, the ratepayers and users. 3

8 1.4 Corporate Asset Management System To assist the Shire to successfully move forward with its asset management practices, the implementation of an Asset Management System called Assetic s MyData commenced in The solution chosen by the Shire is an advanced system, as it provides both operational and strategic solutions in one system. Developed specifically to meet the needs of Local Government Authorities in Australia, it is considered best of breed by its users. In order to undertake long term financial modelling and in line with contemporary good practice, the Shire is using a Condition Rating Scheme where assets are scored between 1 (Very Good) and 5 (Unserviceable). Currently the average conditions of the Shire s major infrastructure assets are: Roads 1.9 (very good) Footpaths 2.3 (good) Buildings 3.2 (average) The long-term projections drawn from the Corporate Asset Management System are covered in more detail in Attachment 3: Long-Term Projections. In order to under take long term financial modelling and in line with contemporary good practice, the Shire is using a Condition Rating Scheme where assets are scored 4

9 2. Strategies As noted in Attachment 2, the Shire has made significant improvements in asset management practices over the past two years as evidenced by the improvement in the Asset Management Maturity scores. It is vital that the Shire capitalises on its efforts to date with a relevant continuous improvement strategy. By adopting the following strategies, the Shire will move closer to the ideal Asset Management Maturity Score. The following strategies are a series of linked steps that will enable the Shire to produce advanced Asset Management Plans which will guide the long-term financial planning for its assets. Asset Management is an organisational imperative and needs to be reflected in a cross functional partnership arrangement. An Asset Management Steering Group (AMSG) needs to be driven by senior management and be focussed on delivering outcomes. Deliverable 1.1: A draft charter for the AMSG will be provided in the Asset Management Strategy (2013). Deliverable 1.2: AMSG to report to Development & Infrastructure Services Committee and Ordinary Council Meeting on a regular basis. Note that the Development & Infrastructure Services Committee and the Council will have the opportunity to review, comment and endorse the implementation of any new or revised direction in Asset Management. Strategy 1: Asset Management Steering Group (AMSG) Strategy 1: Asset Management Steering Group 5

10 Strategy 2: Roles, Responsibilities and Skills Asset Management needs to become second nature to the organisation. Many business units have a key role in ensuring successful asset management including: Operations and Engineering Finance Planning and Economic Development Community Development Asset Management responsibility needs to be adequately recognised in position descriptions to enable a culture change. Deliverable 2.1: Human Resources to ensure Asset Management responsibility is considered in every new and updated position description (ongoing). Deliverable 2.2: Relevant training in asset management to be provided for positions with Asset Management responsibilities (ongoing). Information needs to be continuously collected, validated and input into the system to allow planning, repor ting and investigation. 6

11 Strategy 3: Asset Information Information needs to be continuously collected, validated and input into the system to allow planning, reporting and investigation. This includes inventory, condition and valuation information. The Shire needs to consider regular data collection projects across the major asset categories: Roads Footpaths Car Parks Drainage Parks and Reserves Buildings Plant and Fleet Strategy 4: Hierarchy Preliminary work on the asset hierarchy has commenced and needs to be recognised in strategic documents, business plans, service agreements and work plans. Deliverable 4.1: AMSG to formalise asset hierarchy (2013/14). Deliverable 4.2: Asset Management staff to incorporate hierarchy and componentisation into final draft plans, maintenance and CAPEX programs (2013/14). Deliverable 4.3: Operations staff to update Service Agreements to reflect hierarchy (2013/14, 2014/15). Deliverable 3.1: Top three priorities for funding of data collection projects are: Roads inventory and condition (2013/14) Street tree and parks inventory (2014/15, 2015/16) Drain inventory and condition (2013/14 onwards) 7

12 Strategy 5: Risk Management Risk management is a key driver for asset treatments. The main element to robust risk management is Criticality (i.e. importance to the network, community or Shire operations). Deliverable 5.1: AMSG to undertake an assessment of criticality (2013). Deliverable 5.2: Asset Management staff to undertake risk assessment of critical assets and develop risk controls (2013/14). Deliverable 5.3: Staff to implement risk controls (2013/14). Strategy 6: Quality / Standards In order to improve quality, efficiency and effectiveness, standards are required across: Design and specifications Colours and styles Construction methods Supervision and Auditing (Subdivisions and Council works) Expenditure on new assets should be additional, recognising this increases the required renewal/ maintenance budget. Deliverable 6.1: AMSG to commence development of standards (2013/14). Deliverable 6.2: Asset Management and design staff to implement standards (2013/14). Deliverable 6.3: Project delivery staff to implement construction standards (2013/14). Deliverable 6.4: All staff to implement standards (2014/15). 8

13 Strategy 7: Systems and Integration Deliverable 7.1: Asset Management staff to work with vendor to seek further practical improvements to the software (2013/14). Deliverable 7.2: AM staff to look at the development of a range of field devices for the capture and recording of information relating to inventory, condition, works and defects (2014/15). Deliverable 7.3: AM staff to look at further integration with GIS, Finance, Records and other IT systems (2015/16). Strategy 8: Renewal vs New Assets / Funding The required annual renewal spend is over $16.7M. In addition the current backlog is estimated at above $16.7M (2012/13). To close the gap over 10 years would require an additional $1.7M per annum over the required renewal/maintenance spend ($16.7M + $1.7M = $18.4M pa). Expenditure on new assets should be additional to this, recognising this increases the required renewal/maintenance budget. Deliverable 8.1: Council and Senior Management to determine where current service levels can be reduced (2013). Deliverable 8.2: Shire staff to ensure maximum funding income is achieved through Developer contributions and available Grants Asset Required Renewal ($M) Current Gap ($M) Buildings $3.6 $7.1 Car Parks $0.2 $0 Footpath $0.2 $0.3 Roads $3.2 $2.1 Drainage $2.2 $6.1 Parks and Reserves $7.3 $1.1 Other Assets Unknown Unknown Total $16.7 $16.7 9

14 10 Strategy 9: Continuous Improvement Asset Management is an ongoing requirement. Technology and methods improve over time. Deliverable 9.1: AMSG to remain abreast of AM improvements and, where practicable seek to implement these (ongoing). Deliverable 9.2: AM staff to develop and maintain an improvement program that reflects the decisions of the AMSG (ongoing). The Shire is currently implementing a modern Asset Management process as a par t of the Asset Management System.

15 3. Asset Management Process The Shire is currently implementing a modern Asset Management process. The principal objectives of the new process are to: Provide accurate records of the Shire s assets. Facilitate efficient day-to-day management of the Shire s assets. Enable objective long-term asset planning based on a sound knowledge of the current state of the Shire s assets i.e. long-term impacts of funding decisions. Allow the adoption of Consumption Based Depreciation. Figure 2 is a systematic representation of the system showing the links to the Shire s computer-based systems. Linked systems provide tangible benefits to the Shire through the removal of data doublehandling which is both inefficient and a potential source of errors. Continuing inventory and condition based data collections are undertaken by a range of specialist contractors and consultants. The data collection task is ongoing. As new data becomes available, it is being quality-checked and then imported into the Asset Management System by the Asset Management team. On a continuing basis, the data in the asset register and the existing GIS system will be integrated. 11

16 12 MyPredictor Module Life Cycle Analysis Budget Optimisation Prediction Modelling Finance System Financial Projections Works Programming Strategic AM External CRM Mobile and PDA GIS System INTERFACES WITH MyData Module Premium (Tactical) Works management Maintenance Management Risk Management Service Levels MyData Module Premium (Tactical) Tactical AM The Shire of Kalamunda will assess the quality and effectiveness of its Asset Management practices. Single Corporate Register Condition Management Document management Figure 2 Systematic Representation of the Asset Management Process

17 4. Key Performance Indicators Asset Sustainability Ratio 2013/ / / / / / / / / /23 Capital Expenditure - Renewal & Replacements 7,423,329 5,842,525 6,108,067 7,170,697 5,576,437 7,177,850 8,677,539 9,921,752 13,343,985 12,598,095 Depreciation 9,877,138 10,441,105 11,183,925 11,808,425 12,400,931 12,881,259 13,331,209 13,767,952 14,323,757 14,657,173 Target > 90% 75.2% 56.0% 54.6% 60.7% 45.0% 55.7% 65.1% 72.1% 93.2% 86.0% The Asset Sustainability Ratio is an approximation of the extent to which the infrastructure assets managed by the local government are being replaced as these reach the end of their useful lives. Depreciation expense represents an estimate of the extent to which the infrastructure assets have been consumed in a period. Capital expenditure on renewals (replacing assets that the local government already has) is an indicator of the extent to which the infrastructure assets are being replaced. This ratio indicates whether a local government is renewing or replacing existing non-financial assets at the same rate that its overall stock of assets is wearing out. The Shire s Long term Financial Plan shows it will have difficulty in achieving the benchmark for the Asset Sustainability Ratio because the ratio does not take into account any funds spent on maintenance of assets or monies spent for the creation of new assets. On the counter side, the depreciation amount applied in this ratio is based on the aggregated depreciation amount of both new and renewal assets. This ratio will force Local Government to think very closely about building new assets before closely examining its renewal program. The Shire will not be in a strong position to spend the equivalent amount of funds on renewal projects to match depreciation levels until the outer years of the Plan. The Shire has planned for a number of major new asset projects in the next forthcoming year such as the Woodlupine Hub which impacts on the levels of spend on renewal of assets. Whilst renewal funding levels are impacted negatively when new assets are created there is a corresponding decrease in the asset maintenance and renewal for that new facility for a medium length of time. By 2015 the Shire will be required to introduce fair value accounting on infrastructure assets and this will also impact on the asset consumption ratio. It is inevitable under fair value that the Shire s assets will be revalued to a much higher amount than what is currently recorded under historical cost. Once a revised fair value is applied to the assets infrastructure there will be a subsequent review required of the amount of depreciation being applied. 13

18 14 Key Performance Indicators for Quality Assessment of Asset Management Practices KPI Asset Management Maturity Levels of Service Asset Management Performance Ratios Measurement Method Measured in terms of the maturity index in this Strategy. Target as per Maturity Charts in Attachment 4. Measuring actual vs targets. The Shire is yet to define desired Levels of Service. To be detailed in future revisions of the Asset Management Plans. As per the Shire s Strategic Community Plan to 2023 Strategic Priority 4. Ratios to be measured and reported annually. The Asset Renewal Funding Ratio indicates whether the local government has the financial capacity to fund asset renewal at existing revenue and service levels.

19 Asset Renewal Funding Ratio Planned Capital Expenditure Required Capital Expenditure 2013/ / / / / / / / / /23 14,079,067 15,970,517 14,405,488 12,061,252 9,577,428 12,825,335 12,264,219 13,901,010 17,478,203 15,378,085 14,079,067 15,970,517 14,405,488 12,061,252 9,577,428 12,825,335 12,264,219 13,901,010 17,478,203 15,378,085 Target > 95% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% The Asset Renewal Funding Ratio indicates whether the local government has the financial capacity to fund asset renewal at existing revenue and service levels. This represents the extent to which the required capital expenditure on renewals per the asset management plans have been incorporated into the 10 year financial model of the local government. The Shire has yet to finalise its asset management plans and hence the ratio is currently being estimated based on the capital expenditure that has been included in the Long Term Financial Plan. Asset Consumption Ratio The calculation for this ratio is based on Depreciated Replacement Cost of Assets (written down value) divided by the Current Replacement Cost of Depreciable Assets. The Shire is unable to calculate this ratio until the Fair Value of the Shire s assets has been assessed and determined. The Shire will have all it assets valued at Fair Value by June

20 5. Strategy Review Any strategy is recommended to be a dynamic document, reflecting and responding to changes over time. Reviews of this Asset Management Strategy should take place at the following intervals: Annual review of actions, KPIs, update financials. Full review every four years. Any strategy is recommended to be a dynamic document, reflecting and responding to changes over time. 16

21 6. References 1. Local Government Act 1995, Western Australia 2. Strategic Plan , Shire of Kalamunda 3. Kalamunda Advancing: Strategic Community Plan to 2023, Shire of Kalamunda 4. Integrated Planning and Reporting-Framework and Guidelines 2010, Department of Local Government, Government of WA. 5. Asset Management Framework & Guidelines 2011, Department of Local Government, Government of WA. 6. Asset Management Policy, Shire of Kalamunda 7. International Infrastructure Maintenance Manual Annual Report 2012, Shire of Kalamunda 9. Annual Business Plan Period 12-13, Asset Management Business Unit, Shire of Kalamunda 17

22 Attachment 1: Background 1. Community Profile The Shire of Kalamunda is located approximately 24 kilometres east of Perth, along the Darling Scarp. Geographically, the Shire of Kalamunda has three distinct areas: The Foothills/Plains: Forrestfield, High Wycombe, Maida Vale and Wattle Grove. The Escarpment: Lesmurdie, Kalamunda and Gooseberry Hill. The Eastern Rural Districts: Walliston, Bickley, Carmel, Pickering Brook, Piesse Brook, Paulls Valley, Hacketts Gully and Canning Mills. The Shire comprises an area of 324 square kilometres, the majority of which is made up of State Forest, National Parks, Regional Open Space and water catchment area. The balance is available for rural and urban purposes. Local industries include orchards, vineyards, intensive horticulture activities, grazing, minor sawmills, poultry, Government Works Depot and the CBH state grain terminal. The Shire encompasses rapidly growing urban areas in the Foothills, such as Forrestfield, High Wycombe, Maida Vale, Wattle Grove and an expanding industrial and transpor t hub. The Shire also encompasses rapidly growing urban areas in the Foothills, such as Forrestfield, High Wycombe, Maida Vale, Wattle Grove and an expanding industrial and transport hub adjacent to Perth airport. The Shire of Kalamunda also has a growing tourism sector and a number of significant attractions. These include Lesmurdie Falls, the Northern Terminus of the Bibbulmun Track, Munda Biddi Trail, the Perth Observatory, the Kalamunda History Village, Kanyana Wildlife and Rehabilitation Centre, Bickley Reservoir, the Zig Zag, Mundaring Weir and Federation Gardens. The Shire has an estimated population of 56,462 (2011 Census), rate revenue of $24,000,000 in 2012 and employs a workforce comprising of 253 fulltime equivalents. 18

23 2. Strategic Asset Management within the Integrated Planning Framework Asset Management is a key strategic link in long term planning. In simplest terms, asset management is about the way in which the Shire looks after its assets, both on a day-to-day basis (i.e. maintenance and operations) and in both the medium and long term (i.e. strategic and forward planning). It is a process of logic used to guide the planning, acquisition, operation and maintenance, renewal and disposal of assets. Its objective is to maximise asset service delivery potential and manage related risks and costs over their entire lives. Figure 3 illustrates the typical lifecycle of an asset and associated asset management functions - from planning for the need to increase an asset through to its ultimate disposal including audit and review of performance of that asset. The anecdotal evidence is that within local government the approach to funding infrastructure renewal has been last year s budget plus X%. That is to say, decisions are more budget driven than service delivery considerations. The Asset Management Team has recognised that this approach leads to a mismatch between service delivery and financial planning, reflected in the gradual reduction of condition in the asset portfolio. With a clear focus on Strategic Asset Management, there can be a focus on ensuring that the assets are capable of providing service, of an agreed quality, in a sustainable manner, for present and future communities. This involves strategically targeted expenditure rather than merely ad-hoc annual expenditure increases. The decision to adopt a Strategic Asset Management System which can deliver long-term prediction of service levels is fundamentally a step in the right direction for the Shire and this Strategy encapsulates the results of this service-centric analysis. Figure 3 Asset Lifecycle Diagram 19

24 Figure 4 below illustrates the framework for Strategic Asset Management and the Shire s corporate Strategic Asset Management System. The three noteworthy impacts here are: Budget and Service Level form a feedback loop as each is dependent on the other. Strategic Asset Management allows the optimal Service Level to be adopted for the available Budget with an understanding of the predicted outcomes. The adopted Service Level drives the required Funding Programs and thus remains connected to the Budget. Figure 4 - Service Driven Framework Strategic Asset Management allows the optimal Service Level to be adopted for the available Budget with an understanding of the predicted outcomes. 20

25 3. Alignment with the National Asset Management Framework In line with the recent Asset Management Framework and Guidelines 2011 for WA Local Governments, the Shire is committed to the following six key outcomes: Asset Management Plans. Defining Levels of Service. Linking to the Long Term Financial Plan. The key Strategies as documented in Section 2 demonstrate the Shire s direction in achieving the above outcomes. The KPIs described in Section 4 demonstrate how the Shire intends to measure the Shire s success. Attachment 4 provides an Asset Management Maturity diagnostic for the Shire. Governance and Management Arrangements. Data and System Requirements. Improvement of Skills and Processes. 4. Roles and Responsibilities The roles and responsibilities will be defined on a per asset basis as defined in the Asset Management guidelines. 21

26 5. Legislative Control of Asset Management In addition to using asset management as a tool to manage the community s assets and provide better services to the community, there are also legislative requirements that the Shire must comply with in relation to the management of its assets and these are as follows: 5.1 WA Local Government Act 1995 and Associated Regulations In very general terms the Local Government Act 1995 requires the Shire to provide for the good government of persons in its district and to plan for the future of the district. The Local Government (Financial Management) Regulations 1996 associated with this Act provide more specific controls in relation to asset management. Significantly, since June 2008 Regulation 5A requires the annual budget, annual financial report and other financial reports of a local government must comply with the AAS (Australian Accounting Standards). There are legislative requirements that the Shire must comply with in relation to the management of its assets 22

27 5.2 Australian Accounting Standards The following Australian Accounting Standards apply to Local Government: AASB 116 Property, Plant & Equipment prescribes requirements for recognition and depreciation of property, plant and equipment assets. AASB 136 Impairment of Assets aims to ensure that assets are carried at amounts that are not in excess of their recoverable amounts. AASB 1021 Depreciation of Non-Current Assets specifies how depreciation is to be calculated. 5.3 Other Acts and Regulations There is an array of other legislative requirements that need to be considered in managing infrastructure assets such as the Commonwealth Disability Discrimination Act 1992, Western Australian Building Act 2011, Building Regulations 2012, Occupational Safety and Health Act These legislative requirements are taken into consideration at a more detailed level in each of the specific Asset Management Plans. AAS 1011 Accounting Policies specifies the policies that the Shire is to have for recognition of assets and depreciation. AASB 1041 Accounting for the reduction of Non- Current Assets specifies the frequency and basis of calculating depreciation and revaluation basis used for assets. AAS 1015 Accounting for acquisition of assets method of allocating the value to new assets on acquisition. AAS 27 Financial reporting by Local Government. AAS 1010 Recoverable Amounts of Non-Current Assets specifies requirement to test the reasonableness of valuations. 23

28 24 Attachment 2: Current Position & Status Of The Shire s Asset Planning 1. Shire s Asset Stock This Asset Management Strategy is designed to take into consideration all of the Shire s assets. Assets can be described as the physical objects owned and/or maintained by the Shire to support the community s social and economic activities. Assets provide the foundation on which the community carries out its everyday activities whilst also contributing to the overall quality of life. The Shire manages a broad range of assets that have been grouped into nine key categories as set out below. The challenge for asset management is to understand the manner in which the Shire s assets perform over time and whether they can be maintained in a fit for purpose condition, given that many cannot be seen and/or were built many years ago. Asset Categories Assets can be described as the physical objects owned and/or maintained by the Shire to suppor t the community s social and economic activities. Asset Category Roads Footpaths Parks and Reserves Car parks Buildings IT Infrastructure and Furniture Plant and Equipment Land Drainage Includes assets such as: Sealed roads, Unsealed roads, Kerbing, Bridges and Culverts, Traffic management, Road related infrastructure Pathways and cycleways Parks, Irrigation, Parks Infrastructure On street parking, Off street parking, Parking infrastructure Civic buildings, Community buildings, Buildings infrastructure Computer hardware, Computer software, Furniture Major plant, Minor plant light fleet, Minor Plant non fleet, Community fleet, Equipment Land Assets Underground drainage, Above ground drainage

29 2. Asset Stock & Replacement Costs The Asset Stock Replacement Values Table sets out the current values of the categories of infrastructure assets that the Shire is responsible for. Figure 5 below shows the distribution of values. The 2012 Annual Report records a total capital expenditure from all sources on infrastructure as $13,518,844 which is 2% of the Total Replacement Value. It is estimated that the value will increase as Fair Value principles are implemented in Asset Stock Replacement Values Asset Category Current Replacement Cost Written Down Value 1 Average Condition 2 Roads $329,551,000 $267,440, Footpath $33,700,000 $24,140, Parks and Reserves $39,144,000 $22,368, Car parks $5,982,000 $3,880, Buildings $168,708,000 $52,330, Drainage $112,500,000 $46,875, Total Asset Value $689,585,000 $417,033,000 1 Determined from Average Condition on a straight-line basis. 2 Refer to the condition Scoring Scale on page 27 for explanation of Condition scoring method. Figure 5 Distribution of Asset Replacement Values based on Asset Categories 25

30 3. Levels of Service The Shire does not yet have a series of strategic Levels of Service (LoS) to guide the management of its assets. For each major asset category, the Levels of Service define a number of Performance Outcomes and Measures, KPIs and Targets for achievement. The Shire has yet to define Levels of Service and this will be detailed in future revision of the Asset Management Plans. 4. Snapshot of Health of Asset Stock By understanding the condition of the Shire s assets and the various types of distresses that affect them, the Shire can utilise this data to assist in maintaining the level of service the community desires; in the context of affordability, provide long term benefits and minimise the risk of asset failure. Figure 6 provides a snapshot of the overall condition of the Shire s road pavements. By understanding the condition of the Shire s assets the Shire can utilise this data to assist in maintaining the level of service the community desires Figure 6 Road Pavement Overall Condition 6% of pavements need major renewal based on the condition score descriptions and current service level. 26

31 Condition Scoring Scale Condition Score Condition Description 1 Very Good 2 Good 3 Average 4 Poor 5 Unserviceable Asset is in near perfect condition. Maintenance is minor and basic to maintain the asset in very good condition. Asset has deteriorated slightly and regular maintenance is required to maintain the asset in good condition. Moderate rehabilitation is required to improve the rank of this asset. Asset is in satisfactory condition but showing signs of wear and tear. Moderate levels of maintenance are required to maintain the asset in this condition. Significant rehabilitation is required to improve the asset to either rank 1 or 2. Asset is in below average condition with significant signs of wear and tear. Moderate maintenance is required to maintain the rank of this asset. Regular safety inspections are required as part of a risk management strategy. Improvement of the rank of this asset is likely to require full replacement rather than rehabilitation. Asset is redundant and awaiting disposal, minimum funds are allocated to maintenance, however safety inspections must be undertaken and minor works may be required on a reactive basis. The descriptions in the table are a general guide to assist in understanding the meaning of each condition score. In practice the condition score for an asset is determined by a range of measures and indicators that vary for each asset category. The detailed scoring schemes will be documented in the separate Asset Management Plans prepared for each of the significant asset categories.. 27

32 Figure 7 is a snapshot of the overall condition of the Shire s footpaths. The general state of the footpaths is 8% requiring significant attention and another 24% requiring minor works. Figure 7 Footpaths Overall Condition Figure 8 shows the overall condition of the Shire s buildings. The building assets will need to be a priority for the Shire with 48% requiring major capital works or renewal in the short term and the remainder requiring some level of minor works. The general state of the footpaths is 8% requiring significant attention and another 24% requiring minor works. Figure 8 Buildings Overall Condition The financial implications of the work required for roads, footpaths and buildings are discussed in Attachment 3. 28

33 5. Asset Management Maturity Asset Management Maturity is the level or ability of the Shire to achieve contemporary best practice asset management. In general terms contemporary best practice asset management for the Shire of Kalamunda means the following: The Shire knows what it owns or has responsibility or legal liability for. The Shire has recorded these assets in a register down to an identifiable level and the Shire valuations are reported at a component level. The Shire monitors the condition, functionality, capacity, performance, utilization and costs of assets down to the managed component level and aggregates this data up to give outputs of cost and performance at the portfolio levels. The Shire understands and has recorded the current levels of service in terms of reliability, repeatability and quality of service as well as the Shire responsiveness to any asset failures. The Shire understands the likely future levels of service required based on population growth, demographic changes and community expectations. The Shire understands the long-term (10 years plus) funding needs of the Shire municipality to meet customer expectations in both capital and maintenance expenditure. The Shire monitors and reports on the condition, performance and functionality of the Shire assets against prescribed service levels and regulatory requirements. The Shire has uniform processes across the whole organisation for the evaluation of any investment in: Capital Works Maintenance Operations The Shire has a consistent method of developing annual needs based budgets. The Shire regularly reports and compares actual performance against planned performance costs, service levels and responsiveness. 29

34 6. Measuring the Shire s Asset Management Maturity An Asset Management Maturity diagnostic of the Shire of Kalamunda based on the Step Watch Model (please refer is attached as Attachment 4: Asset Management Maturity Matrix. Separate tables of results are provided for the asset categories of Road, Footpaths, Parks & Reserves and Buildings. Each table provides a baseline of the Shire s asset management maturity levels four years ago (yellow), maturity level two years ago (Green), Shire s current maturity level (brown). The results clearly show that the Shire has made significant improvements in its asset management practices and systems over the past two years. Each table also shows the ideal maturity level of a Local Government Authority (blue). Specific actions to allow the Shire to continue to improve towards the ideal target are documented in Attachment 4: Asset Management Maturity Matrix. The Shire is facing a series of asset management challenges that are very common for Local Government throughout Australia. 30

35 7. Snapshot of Asset Management Issues Facing the Shire The Shire is facing a series of asset management challenges that are very common for Local Government throughout Australia. The majority of the Shire s infrastructure assets were first constructed at the same time the original suburbs were built. These assets are approaching the latter half of their expected life and, as such, the physical condition will rapidly deteriorate in the coming years without proper management. At the same time, population growth and changing demographics are challenging the capacity of existing assets to meet the increasing demands and changes in the Shire environment. Community expectations are also changing, which affect the ability of existing assets to meet the functional needs of the community. For the Shire, these challenges have manifested as the following specific issues: Adopting good-practice asset management strategies to ensure the long term sustainability of the community assets that it is responsible for. Ensuring that the required funding is available to upgrade the existing assets of the Shire to meet changing expectations of the community. Moving towards consumption-based funding analysis and optimised budgeting methods. Being able to reliably predict the condition of assets after 10 years time at the current rate of expenditure. Ensuring sound risk management and mitigation associated with the Shire s assets. 31

36 Attachment 3: Long-Term Projections The Shire of Kalamunda utilises a modern local government asset modelling and prediction tool: mypredictor, a component of the Asset Management System. The Shire has applied asset performance and life-cycle models, which simulate the behaviour of the asset in real-life. The life-cycle models are capable of infrastructure modelling to take account of: Different Level of Service objectives for the Shire s assets. Different asset management practices. Different financial strategies for funding asset maintenance, renewal and upgrade. 1. Long-term Asset Condition Projections 1.1 Road Assets Figure 9 is an example of the outputs available from mypredictor. It shows a 10-year projection for the change in road pavement condition if capital expenditure levels are maintained at current budget levels for that period. The bars on the graph depict the road pavement segments that are good (red) and near new (blue) condition and thus require little attention. The Shire of Kalamunda utilises a modern local government asset modelling and prediction tool. It is predicted that after the 10 years, the quantity of asset stock in fair condition (green) will increase. This indicates that the budget is not sufficient and an increased rate of asset decay will be the result. 32

37 While the obvious solution is a budget increase, this is not the only possibility. Other possibilities include: Community acceptance of a lower Level of Service from its assets, if funding were not increased (consultation). Changed asset construction standards to obtain longer life assets that may have a higher acquisition cost but lower whole-of-life cost. Changed asset maintenance practices to extend the life of assets. A budget increase at an earlier point in time to allow earlier renewal of decaying assets to reduce the magnitude of the overall renewal task. The investigation of these possibilities, which is the essence of contemporary good practice asset management, will continue using the Corporate Asset Management System. The results will be incorporated in a Road Asset Management Plan that will set the directions for providing sustainable roads for the community. Figure 9 10 Year Projection of Road Pavement Condition at Current Capital Budget Levels 33

38 1.2 Footpath Assets Figure 10 shows a 10-year projection for the change in footpath condition if capital expenditure levels are maintained at current budget levels for that period. While, like the road pavement, the footpaths start the period in generally good or near new condition, the number of segments in fair or poor condition is increasing from the outset. This indicates that the current budget is not adequate and suggests an immediate increase is required. However, like roads, this is not the only possible solution and the same broad range of opportunities also applies. These will be fully explored in the footpath section of the Road Asset Management Plan. The life-cycle costing of assets for their entire life span will be referenced into asset management plans for each individual asset category. Figure Year Projection of Footpath Condition at Current Capital Budget Levels 34

39 1.3 Building Assets Figure 11 below shows a 10-year projection for the change in building condition if capital expenditure levels are maintained at current budget levels for that period. This projection is markedly different to those for roads and footpaths in which it shows high levels of fair (green) and poor (purple) condition assets at the outset - this difference points to a historically insufficient budget provision. While the number of buildings in good condition grows progressively over the 10-year study period, this is at the expense of the remainder of the building assets. By the end of the ten-year period, more than half of the buildings are in fair (green), poor (purple), very poor (light blue) or end of life (brown) condition. This is a clear indication that funding to the current budget level will continue to be insufficient, if the same number of building assets are to be maintained into the future. The Corporate Asset Management System will be used during the preparation of the Building Asset Management Plan to determine the optimum budget forecast to deliver a Level of Service from the Shire s building assets that is both sustainable and affordable. Figure Year Projection of Building Condition at Current Capital Budget Levels 35

40 Attachment 4: Asset Management Maturity Matrix The Scoring Indicators are used to assign the current assessment to each of 15 measures of Asset Management Maturity for the major Asset Categories. The results for the Shire are set out on the following pages. The blue Ideal target in each matrix represents an achievable good practice target for Local Governments in Australia. Scoring Indicators are used to assign the current assessment to each of 15 measures of Asset Management Maturity for the major Asset Categories. 36

41 Scoring Indicators for Asset Management Maturity Assessments Rating Frequency Emphasis Formality Systems Results 0-9 Unawareness Never do this Not emphasised No formal process No system exists No results seen Awareness Occasionally do this Receives minimal emphasis; some efforts underway Done informally only; ad hoc procedures; minimal documentation Manual system exists; plans for automated systems are in place Minimal results; long way to go Systematic Approach Competence Excellence Sometimes done on an as needed basis for critical programs and activities Often do this on many programs Usually do this; omitted only in exceptional circumstances Moderately emphasised; try to adhere to this Generally emphasised; something that is done and checked Strongly emphasised; used to measure and reward Semi-formal process; some routine procedures exist Formal process exists; modestly documented; good but still evolving Formal, documented process; well tested and well followed Good system in place; widely available; meets all key user needs Good system in place; widely available; meets all key user needs Strong system in place; meets nearly all user needs Good results; getting there Good results; getting there Excellent results; still some room to improve Best Possible Always do this; standard operating procedure Heavily emphasised; one of the principles by which business is done Strict, formal process exists; well documented; not deviated from State of the art system in place Unparalleled results a total success 37

42 38 Asset Management Maturity Assessment for Roads Maturity Level - Roads Unaware Aware Syst. Approach Score Processes & Plans Corporate Registry Management Knowledge of Assets Service Level Specs & Measurement Demand Analysis & Management Strategic Planning & Lifecycle Analysis Asset Costing & Budgeting Works Management Performance Measurement Systems & Tools Asset Register System Strategic Planning Systems Works Management Systems Asset Costing Systems Customer Management Systems Plans & Records Management Spatial Mapping Systems Competence Excellence Legend 2008 Maturity level 2010 Maturity level Ideal Target Current condition

43 Asset Management Maturity Assessment for Footpaths Maturity Level - Footpaths Unaware Aware Syst. Approach Competence Excellence Score Processes & Plans Corporate Registry Management Knowledge of Assets Service Level Specs & Measurement Demand Analysis & Management Strategic Planning & Lifecycle Analysis Asset Costing & Budgeting Works Management Performance Measurement Systems & Tools Asset Register System Strategic Planning Systems Works Management Systems Asset Costing Systems Customer Management Systems Plans & Records Management Spatial Mapping Systems Legend 2008 Maturity level 2010 Maturity level Ideal Target 2011 Maturity level 39

44 40 Asset Management Maturity Assessment for Parks & Reserves Maturity Level Parks & Reserves Unaware Aware Score Processes & Plans Corporate Registry Management Knowledge of Assets Service Level Specs & Measurement Demand Analysis & Management Strategic Planning & Lifecycle Analysis Asset Costing & Budgeting Works Management Performance Measurement Systems & Tools Asset Register System Strategic Planning Systems Works Management Systems Asset Costing Systems Customer Management Systems Plans & Records Management Spatial Mapping Systems Syst. Approach Competence Excellence Legend 2008 Maturity 2010 Maturity Ideal Target 2011 Maturity

45 Asset Management Maturity Assessment for Buildings Maturity Level: - Buildings Score Processes & Plans Corporate Registry Management Knowledge of Assets Service Level Specs & Measurement Demand Analysis & Management Strategic Planning & Lifecycle Analysis Asset Costing & Budgeting Works Management Performance Measurement Systems & Tools Asset Register System Strategic Planning Systems Works Management Systems Asset Costing Systems Customer Management Systems Plans & Records Management Spatial Mapping Systems Unaware Aware Syst. Approach Competence Excellence Legend 2011 Maturity 2010 Maturity Ideal Target 2008 Maturity 41

46 2 Railway Road Kalamunda WA PO Box 42 Kalamunda 6926 Telephone: (08) Facsimile: (08)

ASSET MANAGEMENT STRATEGY. Adopted by Council at its meeting on Tuesday 21 June 2011 Minute No: 371

ASSET MANAGEMENT STRATEGY. Adopted by Council at its meeting on Tuesday 21 June 2011 Minute No: 371 ASSET MANAGEMENT STRATEGY Adopted by Council at its meeting on Tuesday 21 June 2011 Minute No: 371 1. EXECUTIVE SUMMARY... 2 2. INTRODUCTION... 3 2.1 PURPOSE OF THE STRATEGY... 3 2.2 KEY BENEFITS OF THE

More information

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

CGAM022.1/12/10. Asset Management Improvement Strategy 2010 Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT

More information

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Glenorchy City Council Asset Management Strategy for Infrastructure Assets Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control

More information

4 Adoption of Asset Management Policy and Strategy

4 Adoption of Asset Management Policy and Strategy 4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are

More information

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1.

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Asset Management Framework and Guidelines Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Contents Foreword 4 Part 1 Asset Management Framework 5 1. Introduction 7 2.

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy Strategy Owner Manager Parks and Assets Engineering and Infrastructure Creation Date 27 March 2006 Revision Date 4 March 2015 Please check Council s Intranet to

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY City of Salisbury ASSET MANAGEMENT STRATEGY Version 6 June 2015 City of Salisbury Asset Management Strategy Document Control Document Control NAMS.PLUS Asset Management www.ipwea.org/namsplus Document

More information

Asset Management Plan Overview

Asset Management Plan Overview Council Strategy Asset Management Plan Overview City of Albany 2013 File Ref: CM.STD.6 Synergy Ref: NMP1331749 102 North Road, Yakamia WA 6330 Version: 25/06/2013 PO Box 484, ALBANY WA 6331 Tel: (08) 9841

More information

2. CORPORATE POLICIES 2.3 OTHER CORPORATE 2.3.11 Asset Management Policy

2. CORPORATE POLICIES 2.3 OTHER CORPORATE 2.3.11 Asset Management Policy 2. CORPORATE POLICIES Background & Issues Local Government across Australia is facing the challenge of building, operating and maintaining vital infrastructure necessary for the well-being of their communities.

More information

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers

More information

Asset Management Policy

Asset Management Policy Asset Policy DETAILS Council Admin Effective from: July 2015 Contact officer: Executive Coordinator Strategic Asset, Corporate Asset Next review date: June 2017 File reference: LG343/1045/03/01 ispot #

More information

Report of the Auditor-General No. 5 of 2013-14. Infrastructure Financial Accounting in Local Government. Strive Lead Excel To Make a Difference

Report of the Auditor-General No. 5 of 2013-14. Infrastructure Financial Accounting in Local Government. Strive Lead Excel To Make a Difference Report of the Auditor-General No. 5 of 2013-14 Infrastructure Financial Accounting in Local Government December 2013 Strive Lead Excel To Make a Difference The Role of the Auditor-General The Auditor-General

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 NAMS.PLUS Burnie City Council Asset Strategy Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID:

More information

Campbelltown City Council Asset Management Strategy 2012-2022

Campbelltown City Council Asset Management Strategy 2012-2022 Campbelltown City Council Asset Management Strategy 2012-2022 Disclaimer This document was first published on 1 July 2012. The information contained in this document is to be considered general in nature

More information

GLAMORGAN SPRING BAY COUNCIL. Asset Management Strategy

GLAMORGAN SPRING BAY COUNCIL. Asset Management Strategy GLAMORGAN SPRING BAY COUNCIL Asset Management Strategy Table of Contents Introduction... 3 Vision... 3 Objective of the Asset Management Strategy... 4 Aim of the Asset Management Strategy... 4 Links to

More information

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 ASSET MANAGEMENT STRATEGY 2010-2020 November 2009 1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 4. WESTERN AUSTRALIAN ASSET MANAGEMENT IMPROVEMENT PROGRAM

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

Asset Management Policy

Asset Management Policy Asset Management Policy July 2014 Purpose The purpose of this Asset Management Policy is to guide sustainable management of Council s assets to meet current and future community needs. Scope Council's

More information

A FIT FOR PURPOSE CORPORATE ASSET MANAGEMENT FRAMEWORK DESCRIPTION OF A JOURNEY

A FIT FOR PURPOSE CORPORATE ASSET MANAGEMENT FRAMEWORK DESCRIPTION OF A JOURNEY A FIT FOR PURPOSE CORPORATE ASSET MANAGEMENT FRAMEWORK DESCRIPTION OF A JOURNEY Phillip Burton Manager Assets and Contracts, District Council of Mount Barker Ashay Prabhu Managing Director, ACEAM Pty Ltd

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Adopted May 2011 Table of Contents Page 1. Introduction 3 2. Purpose 4 3. Asset Register System 4 4. Asset Management Working Group 4 5. Asset Management Plans 5 6. Condition

More information

City of Canning. Asset Management Strategy 2015 2018

City of Canning. Asset Management Strategy 2015 2018 City of Canning Asset Management Strategy 2015 2018 Document Control Version No Version Date Description TRIM Reference 1.0 11 December 2012 Asset Management Strategy D12/68776 2.0 23 September 2015 Updated

More information

Long-Term Asset Management Plan 2011-2021

Long-Term Asset Management Plan 2011-2021 Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5

More information

Willoughby City Council Asset Management Improvement Strategy

Willoughby City Council Asset Management Improvement Strategy Page 1 of 102 Willoughby City Council Asset Management Improvement Strategy Contents: 1 Executive summary...4 2 Introduction... 5 3 Purpose...5 4 Asset Management Framework...6 4.1 Purpose of Asset Management...6

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Page 1 of 15 TABLE OF CONTENTS 1. INTRODUCTION...3 2. THE ASSET LIFECYCLE...3 2.1 Asset Planning...5 2.2 Asset Creation / Acquisition...6 2.3 Asset Operations...7 2.4 Asset Maintenance...7

More information

Asset Management Plan

Asset Management Plan Wandering Shire Council Roads Asset Management Plan TABLE OF CONTENTS 1 Executive Summary... 2 Context... 2 Questions you may have... 4 2. INTRODUCTION... 5 2.1 Background... 5 2.2 Goals and objectives

More information

Asset Management Plan

Asset Management Plan BUILDING Asset Management Plan Version 1 May 2013 Document Control Document ID: Buildings AMP 2013 Rev No Date Revision Details Author Reviewer Approver 1 22 May 2013 JN RG WI Copyright 2012 All rights

More information

Building Infrastructure Asset Management Plan

Building Infrastructure Asset Management Plan Building Infrastructure Asset Management Plan Version 1.1 Building Infrastructure Asset Management Plan (Version 1.1) Page 1 of 19 Document Control Council policy documents change from time to time and

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY 2015-2019 The Darebin City Council acknowledges that the general format of this strategy and some content has been developed by the Cardinia Shire Council in their Asset Management

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY SHIRE OF BODDINGTON ASSET MANAGEMENT STRATEGY Version 1 January 2014 Asset Management Strategy Document Control Rev No Date Revision Details Author Reviewer Approver 1 January 2014 Draft Strategy T McCarthy

More information

ROADING ASSET MANAGEMENT PLAN

ROADING ASSET MANAGEMENT PLAN ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY Wattle Range Council ASSET MANAGEMENT STRATEGY Version February 2014 V1 Wattle Range Council Asset Management Strategy Document Control Document Control NAMS.PLUS Asset Management www.ipwea.org.au/namsplus

More information

Senior Asset Capability Engineer Electrical

Senior Asset Capability Engineer Electrical Senior Asset Capability Engineer Electrical PO6 Permanent - Ipswich Based About the position Reporting to the Principal Asset Capability, as the Senior Asset Capability Engineer you will be responsible

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

BUSINESS MANAGEMENT COMPLIANCE POLICY & MANUAL ADOPTED

BUSINESS MANAGEMENT COMPLIANCE POLICY & MANUAL ADOPTED F021 BUSINESS MANAGEMENT COMPLIANCE POLICY & MANUAL ADOPT... http://ln.burdekin.qld.gov.au/cis/policies.nsf/95f9bd5961a3b1aa4a2565a900141... Page 1 of 1 30/04/2013 Policy Register Category: Policy Number:

More information

The Asset Management Landscape

The Asset Management Landscape The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces

More information

Roads and Footpaths Infrastructure Asset Management Plan

Roads and Footpaths Infrastructure Asset Management Plan Roads and Footpaths Infrastructure Asset Management Plan Version 2a November 2012 This page is left blank intentionally Prepared By: Rob Damhuis Senior Transport Asset Management Consultant Opus International

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

Council Policy: Asset Management

Council Policy: Asset Management Classification: Council Policy: Asset Management Council Policy First Issued: 7 November 2006 Dates of Review: 4 March 2014 Version Number: 2 DW Doc set ID: 459426 Next Review Due: 4 March 2019 Applicable

More information

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 INTRODUCTION Long term financial planning is a key element of the Integrated Planning and Reporting Framework. It is the mechanism that enables local

More information

ASSET CAPITALISATION AND MATERIALITY THRESHOLDS Financial Management Policy

ASSET CAPITALISATION AND MATERIALITY THRESHOLDS Financial Management Policy ASSET CAPITALISATION AND MATERIALITY THRESHOLDS Financial Management Policy Policy classification Statutory Policy number: 7.29 Responsible Manager/ Department Manger, Finance & Customer Service Policy

More information

Overall Asset Management Plan

Overall Asset Management Plan Overall Asset Management Plan Adopted by Council 17 August 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 1 INTRODUCTION... 4 1.1 Legislative Basis for the Plan... 4 1.2 Purpose of the Asset Management

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

10.0 ASSET MANAGEMENT PRACTICES. Table of Contents

10.0 ASSET MANAGEMENT PRACTICES. Table of Contents 10.0 ASSET MANAGEMENT PRACTICES Table of Contents 10.0 ASSET MANAGEMENT PRACTICES... 119 10.1 Current Asset Management Practices... 120 10.2 Asset Management Processes... 120 10.2.1 Attribute data collection

More information

STRATEGIC ASSET MANAGEMENT PLAN

STRATEGIC ASSET MANAGEMENT PLAN STRATEGIC ASSET MANAGEMENT PLAN (As at ) Strategic Asset Management Plan Version 7 Document Control Document ID: Rev No Date Revision Details Author Reviewer Approver 1 April 2010 Draft Asset and Infrastructure

More information

Wandering Council Draft Plant Asset Management Plan

Wandering Council Draft Plant Asset Management Plan Wandering Council Draft Plant Asset Management Plan TABLE OF CONTENTS EXECUTIVE SUMMARY... 2 Context... 2 1 INTRODUCTION... 2 1.1 Background... 2 1.2 Goals and Objectives of Asset Management... 3 1.3 Pla

More information

HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 SECTION INTRODUCTION

HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 SECTION INTRODUCTION HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 HORNSBY SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2014/15-2023/24 SECTION INTRODUCTION P1 P2 CONTENTS Executive Summary Financial Results Future

More information

CONTENTS 3 MESSAGE FROM THE CEO 4 INTEGRATED PLANNING & REPORTING FRAMEWORK 5 INTRODUCTION 7 ASSET MANAGEMENT PRACTICES 12 RENEWAL GAP ANALYSIS 15

CONTENTS 3 MESSAGE FROM THE CEO 4 INTEGRATED PLANNING & REPORTING FRAMEWORK 5 INTRODUCTION 7 ASSET MANAGEMENT PRACTICES 12 RENEWAL GAP ANALYSIS 15 WORKING TOGETHER City of South Perth_Asset Management Plan 2013 2023 CONTENTS 3 MESSAGE FROM THE CEO 4 INTEGRATED PLANNING & REPORTING FRAMEWORK 5 INTRODUCTION 7 Asset Management Policy 7 Asset Management

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

INTEGRATED PLANNING AND REPORTING

INTEGRATED PLANNING AND REPORTING Government of Western Australia Department of Local Government INTEGRATED PLANNING AND REPORTING Framework and Guidelines Integrated Planning and Reporting Framework and Guidelines p1. Contents Foreword

More information

Asset Management Strategy

Asset Management Strategy Asset Management Strategy City of Stonnington April 2011 Odysseus-imc Pty Ltd APPROVAL FUNCTION NAME DATE Checked by S. Muir 4 Mar 2011 Reviewed by T. Griffin 6 Mar 2011 Approved by S. Muir 4 April 2011

More information

Financial Management (Sustainability) Guideline 2013 Version 1.1

Financial Management (Sustainability) Guideline 2013 Version 1.1 Financial Management (Sustainability) Guideline 2013 Version 1.1 For the purposes of explaining the concept of sustainability and to provide guidance for calculating the relevant financial sustainability

More information

Long Term Financial Planning

Long Term Financial Planning Long Term Financial Planning Framework and Guidelines Long Term Financial Planning Framework and Guidelines for Western Australian Local Governments p1. Contents Foreword 4 1. Introduction 7 2. Purpose

More information

Asset Management Policy

Asset Management Policy Printed copies of this document are uncontrolled. Before using this printed copy, check Council's Intranet to verify that this is a current copy. Asset Management Policy Reference Number: 4.7 Classification:

More information

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

How To Write A Budget For The Council

How To Write A Budget For The Council FP5 SIGNIFICANT ACCOUNTING POLICIES - BUDGET Adopted: Audit Committee 20 June 2013 Committee Decision No. 10 Audit Committee Minutes endorsed by Council OMC 18 July 2013 Council Decision No. 2753 AASB

More information

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT Engineering Services POLICY DIRECTIVE This Asset Management policy will ensure that Asset Management is clearly recognised by Council and community in accordance

More information

5 Year Strategic Asset Management Plan

5 Year Strategic Asset Management Plan Westernport Region Water Corporation 30 July 2007 Prepared for Westernport Region Water Corporation Prepared by Maunsell Australia Pty Ltd Level 9, 8 Exhibition Street, Melbourne VIC 3000, Australia T

More information

www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT

www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT Peter Clewer: Asset Management Officer (Roads), Mornington Peninsula Shire Amy Wade, Manager Axim - A Downer EDI Works Business Abstract

More information

Long Term Financial Plan

Long Term Financial Plan Gladstone Regional Council Long Term Financial Plan Revision No. 6 02/2016 1 Our Charter We are Gladstone Regional Council. Our Vision Our vision is to be the best local government in Queensland. Our Purpose

More information

CORPORATE PERFORMANCE MANAGEMENT GUIDELINE

CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 TABLE OF CONTENTS 1 Introduction... 3 1.1 Scope... 3 1.2 Purpose... 3 2 Performance Management Framework Overview... 4 3 Performance Management Framework...

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

SHIRE OF CARNARVON POLICY

SHIRE OF CARNARVON POLICY SHIRE OF CARNARVON POLICY POLICY NO C010 POLICY SIGNIFICANT ACCOUNTING POLICIES RESPONSIBLE DIRECTORATE CORPORATE COUNCIL ADOPTION Date: 27.5.14 Resolution No. FC 5/5/14 REVIEWED/MODIFIED Date: Resolution

More information

Local Government Operational Guidelines. Number 18 June 2013. Financial Ratios

Local Government Operational Guidelines. Number 18 June 2013. Financial Ratios Local Government Operational Guidelines Number 18 June 2013 Page 2 of 20 1. Introduction This guideline is intended to provide a clear explanation of each ratio required to be included in the annual financial

More information

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed

More information

LONG TERM FINANCIAL PLAN 2011/2012 2020/2021

LONG TERM FINANCIAL PLAN 2011/2012 2020/2021 LONG TERM FINANCIAL PLAN 2011/2012 2020/2021 INDEX TO CONTENTS 1. Long Term Financial Planning Defined 1.1 Purpose 1.2 Principles 1.3 CEO Statement on Financial Sustainability 2. Impacts upon the Current

More information

Timaru District Council. Land Transport. Lifecycle Management Strategy

Timaru District Council. Land Transport. Lifecycle Management Strategy Timaru District Council Land Transport Lifecycle Management Strategy Quality Record Sheet Timaru District Council Land Transport Lifecycle Management Strategy Issue Information Issue Purpose Final Issue

More information

Asset Management Policy. Sutherland Shire Council. Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1

Asset Management Policy. Sutherland Shire Council. Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1 Asset Management Policy Sutherland Shire Council Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1 Document review and approval This document has been approved by Subject matter

More information

Long Term Financial Plan 2014 2023 Adopted December 2013

Long Term Financial Plan 2014 2023 Adopted December 2013 Long Term Financial Plan 2014 2023 Adopted December 2013 District Council of Mallala CONTENTS 1 Introduction 1 2 Planning Framework 2 3 Assumptions 7 4 Summary & Financial Statements 10 Estimated Comprehensive

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Shire of Woodanilling Version 1 Adopted 12 August 2013 Prepared By: Marie Sorrell Building Asset Management Consultant Opus International Consultants (PCA) Ltd Approved for Release

More information

CITY OF VINCENT. Audit Completion Report to the Audit Committee For the Year Ended 30 June 2015

CITY OF VINCENT. Audit Completion Report to the Audit Committee For the Year Ended 30 June 2015 CITY OF VINCENT Audit Completion Report to the Audit Committee For the Year Ended 30 June 2015 20 November 2015 Table of Contents 1. Executive Summary... 1 1.1 Status of Audit... 1 1.2 Deliverables...

More information

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

COMPREHENSIVE ASSET MANAGEMENT STRATEGY COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY

More information

A Proud Community Growing Together

A Proud Community Growing Together A Proud Community Growing Together Melton City Council Asset Management Plan 2014-2018 1.0 Executive Summary Asset Management Plan 13 1.1 Purpose (The Asset Management Plan) 13 1.2 Asset Types in the City

More information

FINANCE POLICY POLICY NO F.6 SIGNIFICANT ACCOUNTING POLICIES. FILE NUMBER FIN 2 ADOPTION DATE 13 June 2002

FINANCE POLICY POLICY NO F.6 SIGNIFICANT ACCOUNTING POLICIES. FILE NUMBER FIN 2 ADOPTION DATE 13 June 2002 POLICY NO F.6 POLICY SUBJECT FILE NUMBER FIN 2 ADOPTION DATE 13 June 2002 Shire of Toodyay Policy Manual FINANCE POLICY SIGNIFICANT ACCOUNTING POLICIES LAST REVIEW 22 July 2014 (Council Resolution No 201/07/14)

More information

Quick Guide: Meeting ISO 55001 Requirements for Asset Management

Quick Guide: Meeting ISO 55001 Requirements for Asset Management Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get

More information

Road & Transport Asset Management Plan. Executive Summary 4. Glossary of Terms 6

Road & Transport Asset Management Plan. Executive Summary 4. Glossary of Terms 6 Contents Executive Summary 4 Glossary of Terms 6 1. Introduction 9 1.1 Background 9 1.2 Key Stakeholders 11 1.3 Goals & Objectives 12 1.4 The Asset Management Plan 14 1.5 Basic / Intermediate and Advanced

More information

Plymouth Council & Asset Management

Plymouth Council & Asset Management Plymouth Council & Asset Management Plymouth City Council is committed to improving the condition of its carriageways and has demonstrated this graphically by pledging to spend 20m over and above any DfT/central

More information

Asset Management Strategy

Asset Management Strategy Asset Management Strategy File Ref: CM.STD.6 Synergy Ref: NMP1331737 Version: 25/06/2013 City of Albany 2013 102 North Road, Yakamia WA 6330 PO Box 484, ALBANY WA 6331 Tel: (08) 9841 9333 Fax: (08) 9841

More information

Asset Management Strategy. High-performing and sustainable assets

Asset Management Strategy. High-performing and sustainable assets Asset Management Strategy High-performing and sustainable assets DISTRIBUTION SCHEDULE Revision No. Date Distribution Reference R1.0 19 September 2012 R1.1 25 September 2012 Issued to KPMG for review R1.2

More information

Rate Setting, Asset Management and Financial Sustainability. A guide for local governments June 2013

Rate Setting, Asset Management and Financial Sustainability. A guide for local governments June 2013 Rate Setting, Asset Management and Financial Sustainability A guide for local governments June 2013 1 Rate Setting, Asset Management and Financial Sustainability A guide for local governments June 2013

More information

State of Queensland. Published by the Department of Infrastructure and Planning, September 2010, 100 George Street, Brisbane Qld 4000.

State of Queensland. Published by the Department of Infrastructure and Planning, September 2010, 100 George Street, Brisbane Qld 4000. Looking forward. Delivering now. The Department of Infrastructure and Planning leads a coordinated Queensland Government approach to planning, infrastructure and development across the state. State of

More information

Plant Equipment and Emergency Services Asset Management Plan

Plant Equipment and Emergency Services Asset Management Plan Kyogle Council Plant Equipment and Emergency Services Asset Management Plan Version 2.01 May 2012 Document Control Plant Equipment and Emergency Services Asset Management Plan Document ID: kyogle_plant_amp_v2

More information

Asset Management Plan

Asset Management Plan City of Mitcham Stormwater Asset Management Plan Scenario 1 Version 8 June 2015 FINAL City of Mitcham STORMWATER ASSET MANAGEMENT PLAN Document Control Document ID : Mitcham SW AMP Dec14.doc Rev No Date

More information

Financial Management Strategy & Long Term Financial Plan 2014/2015 2023/2024

Financial Management Strategy & Long Term Financial Plan 2014/2015 2023/2024 Financial Management Strategy & Long Term Financial Plan 2014/2015 2023/2024 February 2014 Table of Contents Page 1.0 EXCUTIVE SUMMARY 1.1 Introduction 1.2 Financial Management Strategy 1.3 Long Term

More information

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

Chapter 7. Asset Management. The Board Guidelines below were provided to the Council to assist it in preparation of its submission to the Review:

Chapter 7. Asset Management. The Board Guidelines below were provided to the Council to assist it in preparation of its submission to the Review: Chapter 7 Asset Management The Board Guidelines below were provided to the Council to assist it in preparation of its submission to the Review: Board Guidelines to the Council Councils are the custodians

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework

More information

Frequently Asked Questions

Frequently Asked Questions Integrated Planning & Reporting Framework Frequently Asked Questions and their answers August 2009 Question Why are the planning and reporting requirements for local councils being changed? Page 3 What

More information

City Planning - Council's Improvement Strategy

City Planning - Council's Improvement Strategy Warringah Council Policy Policy No. Number 1 Purpose of Policy The purpose of this policy is to establish the strategic financial planning and sustainability framework to guide Council when developing

More information

Service Asset Management Plan - A Guide to the Bule City Council

Service Asset Management Plan - A Guide to the Bule City Council 1 st Cut AMP Draft Version 1.00 June 2014 Services Asset Management Plan Part A General Information Incorporated with: Part B Road Network Part C Pathways Part D Bridges Part E Stormwater Drainage System

More information

Financial Sustainability Information Paper 8. Long-term Financial Plans

Financial Sustainability Information Paper 8. Long-term Financial Plans Financial Sustainability Information Paper 8 Long-term Financial Plans Revised January 2012 Introduction This Information Paper is one of a series of Information Papers about Financial Sustainability and

More information

16. ASSET MANAGEMENT POLICY

16. ASSET MANAGEMENT POLICY 16. ASSET MANAGEMENT POLICY Asset Management Policy Document No.: WT-HRM-16.00 Approved By: Council Issue No.: 1.00 Approved On: 10 June 2014 Responsibility: Infrastructure Services Department Review Date:

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Information Paper 9. Local Government Financial Indicators

Information Paper 9. Local Government Financial Indicators Information Paper 9 Local Government Financial Indicators November, 2006 Introduction Formal financial statements contain a wealth of information. Unfortunately their detail and format often mean it is

More information

Logan City Council. Strategic Planning and Performance Management Framework

Logan City Council. Strategic Planning and Performance Management Framework Logan City Council Strategic Planning and Performance Management Framework 1 Table of contents 1. Overview 3 a) Purpose 3 b) Key Features 3 2. Context 4 a) National Framework for Sustainability 4 b) Elements

More information

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 Florentina Mihai, BEng, GDipMgt, MIEAust Main Roads Western Australia Neville Binning,

More information

Financial and Asset Management. Glossary of Terms and Abbreviations

Financial and Asset Management. Glossary of Terms and Abbreviations Financial and Asset Management Glossary of Terms and Abbreviations ABP see Annual Business Plan Accrual accounting: An accounting approach by which expenses, revenue, assets and liabilities are recognised

More information

Confirm. Infrastructure asset management solutions for improved efficiency, lower costs, and simplified compliance.

Confirm. Infrastructure asset management solutions for improved efficiency, lower costs, and simplified compliance. Confirm Infrastructure asset management solutions for improved efficiency, lower costs, and simplified compliance. Confirm Confirm is the recognised leader in infrastructure asset management and maintenance

More information

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS Introduction Toby Bourke (MWHSoft), Graham McGonigal (MWH) There is currently widespread concern

More information